Management of the Inland Rail Project by the Australian Rail Track

Total Page:16

File Type:pdf, Size:1020Kb

Management of the Inland Rail Project by the Australian Rail Track Focus Inland Rail Senate 2019 Inquiry and NSW Manufacturing Strategy to support the National Rail Freight Strategy NSW Rail About 87% of all National freight goes through NSW. Rail freight needs not just Sydney but importantly, Regional NSW support. The Inland Rail and the opportunity to have NSW Regions and towns like Parkes, Moree, Freight in Tamworth, Murrumbidgee Irrigation Area, Narrandera, Griffith, Shepparton, Mildura, Albury be inter-modal ports with distribution centres, will also demand manufacturing, maintenance, repair, emergency response, and context of the sustainment services. National The NSW Manufacturing Sector has reflected the National decrease in manufacturing employment. However, with the exit of the automotive vehicle manufacturers, there are NSW firms being affected. It means another Freight sector needs identified and supported to fill the gap and mitigate a manufacturing 'Valley of Death' (Department of Defence - Navy Shipbuilding). Strategy - and The NSW 'Jobs First' and recently released NSW Government Defence Strategy Paper (2017) will have an Implementation Plan developed to support NSW manufacturing firms to participate in the maintenance and opportunity for sustainment opportunities this sector is planned to deliver, similar to the Victorian Defence Supplier Development $50m support. revitalising rail One sector is the rail sector which has much in the way of manufacturing, maintenance and repair demands across the freight network for such operators like Pacific National, Downer EDI, UGL, RPC Technologies. The NSW sector Transport Plan identified NSW has sufficient sea- side capacity in its three main Ports, but insufficient land-side capacity. manufacturing, The Western Sydney Airport / Mary-Bird Walton Airport and Inter-modal ports there and in Moorebank, Cooks River and Enfield have known road and rail constraints and least of all access to local and regional maintenance manufacturing support. There are opportunities to link Mary-Bird Walton Airport to the Inland Rail and relieve the land-side capacity constraints already identified in Port Kembla, Newcastle and Port Botany, least of all is and repair having a dual track - standard gauge - double stack NSW, Inland Rail and National Freight Rail Network. With the Victorian Government flagging a 50 year horizon for moving Webb Dock to Truganina / Geelong, it may transpire that the Inland Rail could go be the node to Gladstone QLD instead of Acacia Ridge, Queensland. This is opportune for NSW as the previous 2009 NSW Manufacturing Council research by the IMIA / Australian Graduate School of Leadership for NSW Industry and Investment Chaired by Dr Roy Green UTS / Port of Newcastle Chairman. identified 3 growth industries to generate growth and hence jobs - Rail, Clean Energy and Sustainable Buildings. Strategy Inland Rail and NSW Freight Rail Infrastructure Strategies Actions NSW Rail sector How to get there: The rail equipment manufacturing companies have delivered continued growth, healthy order 1. Consider Truganina to Gladstone Inland Route as the Acacia Ridge Brisbane QLD is yet to have the Business Case proven and books and profitability. Austrade the Melbourne node is in within the inner city suburb of current rail freight Dynon depot. "https://www.austrade.gov.au/ArticleDocuments/2814/Heavy-Haul-Intermodal-and-Freight- 2. Revise the 2040 Freight Rail Technology Roadmap Rail-2013-10.pdf.aspx". 3. Work with the Commonwealth Department of Industry, Science and Innovation Business Growth services and Inland Rail Skills The Australian and New Zealand Market as being subject to cyclical government tenders and Academy to help Australian rail sector suppliers: contracts, peak and troughs in mining sector rail demand, seasonal freight and commuter rail - achieve AS/NZS ISO 9001:2016 and higher-level IRIS ISO TS 22136:2917 Rail Quality System; and AS/NZS 55001:2014 fluctuations and the perennial lack of standardisation in rail gauge and associated train sets, Asset Management Accredited Certification wagons etc. - achieve ISO 44001:2017 Collaborative Business Relationship certification Australian niche rail manufacturers can struggle to compete in the global market place due to for more resilient Rail Supply Chains – consider ISO 28001:2007 Security management systems for the supply chain and ISO price (Australian is a major influencer) and delivery. The research identified in the rail sector 22316:2917 Security and resilience that the major reason was the absence of local volume to create level demand and economies of -expand local rail sectors to work with international rail suppliers and secure more local content as does defence sectors scale. “Australian Industry Capability” requirement It is within NSW’s capability indeed even with the companies showcased, that NSW could be the 4. Consider more renewable and infrastructure to be built along Inland Rail corridors Rail Transport Manufacturing centre of excellence for Australia .
Recommended publications
  • The Case for Inland Rail
    The Case for Inland Rail Summary of the 2015 Business Case 1 September 2015 It is also the safest solution. A typical train travelling on Inland Rail will have Dear readers the capacity of 108 B-Double trucks. Over the past 18 months, the Australian This will help avoid a huge burden on Rail Track Corporation has been our nation’s highways and avoid up to working with PricewaterhouseCoopers 15 serious crashes each year. Over to develop a detailed business case for the lifetime of this asset that’s 1500 Inland Rail – the long awaited freight rail serious crashes. connection between Brisbane Inland Rail is part of an integrated and Melbourne. solution. Until now, the natural As Inland Rail will require a major geographic constraints and slow transit funding commitment and will have times of the coastal rail line have meant far-reaching implications for the that rail could never be completely logistics, farming and resources sectors competitive with road on the east coast. as well as road and rail commuters, I Once Inland Rail is constructed, rail and thought it was important to share the road will do their part in sharing the findings of our work with you. freight load, with rail taking the heavy long haul freight, and road taking the Why do we need Inland Rail? Every day short haul freight. our freight task grows – freight volumes are forecast to more than double by the This road competitive service will year 2050. Put simply, our existing reduce transit times to less than transport network won’t cope with this 24 hours, with reliability, freight increase in freight without availability and pricing to meet further investment.
    [Show full text]
  • Melbourne–Brisbane Inland Rail Alignment Study Final Report July 2010 Melbourne–Brisbane Inland Rail Alignment Study Final Report July 2010
    Melbourne–Brisbane Inland Rail Alignment Study Final Report July 2010 Melbourne–Brisbane Inland Rail Alignment Study Final Report July 2010 Photos in this report are included only as illustrations. They do not imply that operating companies whose trains are depicted would use the inland railway. Contents 1. Introduction ................................................................................................. 1 1.1 Terms of reference ................................................................................................................ 3 1.2 The three stages of working papers ...................................................................................... 4 2. Approach to the study ................................................................................. 7 A. Market take up .......................................................................................... 8 3. Demand for Inland Rail ................................................................................ 9 3.1 Freight in the inland railway corridor (all modes) ...................................................................... 9 3.2 Modal analysis methodology ................................................................................................ 10 3.2.1 Price and service attributes assumed........................................................................ 11 3.3 Capacity constraints in the base case .................................................................................. 15 3.4 Demand results ...................................................................................................................
    [Show full text]
  • Tottenham to Albury Inland Rail and North East Rail Line Upgrade Projects
    TOTTENHAM TO ALBURY INLAND RAIL AND NORTH EAST RAIL LINE UPGRADE PROJECTS DECEMBER NEWSLETTER VIC At Australian Rail Track Corporation (ARTC) In Victoria we are delivering two we’re all for rail. Across Australia we manage projects between now and 2025 to improve freight and passenger services and maintain a vast rail network and are along the North East rail line. working hard to bring more of the benefits We’re on track with the North East Rail of rail to more people. Line Upgrade to improve the reliability and ride quality for passenger services between Melbourne and Albury-Wodonga. We’re also tackling the causes of major delays such as signal failures due to copper line wire theft. We’re also delivering the Victorian section of Inland Rail from Tottenham to Albury along the same existing track. Inland Rail is the missing link in our national supply chain, transforming how everyday goods are moved around our vast country, creating more opportunities for regions to connect to cities and businesses to markets. Throughout the year we’ve continued to hold community conversations and information sessions at train stations, shows, town centres and community meetings to share our plans and hear feedback about the freight and passenger projects ARTC is delivering. Most recently we were at the Seymour Show, in the main street at Euroa and Wangaratta and hosted a stall at the Wodonga and Tallarook Farmers Markets. We’ll be back out in the community in 2020. Look out for social media updates and in local papers to find out when we’ll be next in your town.
    [Show full text]
  • Attachment 4: the Case for Inland Rail the CASE for INLAND RAIL
    Attachment 4: The Case for Inland Rail THE CASE FOR INLAND RAIL 1 Dear readers Over the past 18 months, the Australian Rail Track Corporation has been working with PricewaterhouseCoopers to develop a detailed business case for Inland Rail – the long awaited freight rail connection between Brisbane and Melbourne. As Inland Rail will require a major funding commitment and will have far-reaching implications for the logistics, farming and resources sectors as well as road and rail commuters, I thought it was important to share the findings of our work with you. Why do we need Inland Rail? Every day our freight task grows – freight volumes are forecast to more than double by the year 2050. Put simply, our existing transport network won’t cope with this increase in freight without further investment. The existing coastal line is heavily constrained with passing through the congested Sydney network, long transit times, and cannot accommodate highly efficient, long double-stacked trains. A new, standard-gauge rail connection is essential to meet Australia’s growing freight challenge. Inland Rail is the safe, sustainable solution to the freight challenge and will transform the way we move freight around the country. This new 1700km freight rail line will bypass the congested Sydney network and the circuitous north coast line, connecting Melbourne to Brisbane via Australia’s four richest farming regions in Victoria, New South Wales and Queensland. It will enhance the national freight rail network – connecting our capital cities, farms, mines and ports, creating jobs, reducing supply chain costs and making Australian exports more competitive.
    [Show full text]
  • 11.19 Senate RRAT Cttee Inland Rail
    Submission to the Senate Standing Committees on Rural and Regional Affairs and Transport Management of the Inland Rail project by the Australian Rail Track Corporation and the Commonwealth Government Philip Laird, University of Wollongong, November 2019 This submission will address route planning and selection processes along with any other related matters of the Committee Terms of Reference. It will in part update a submission made in June 2014 to the Inland Rail Implementation Group and draws from participation by this writer at Inland Rail conferences held in 2012 and 2018 at Parkes. It will also draw on observations made by the writer in a recent visit (September 2019) to Canada observing both CP and CN rail freight operations. This submission is based on research conducted at the University of Wollongong. However, the views and research findings are the responsibility of the writer. 1. The inland railway is a concept now over one hundred years old, and has been the subject of many papers and studies. Appendix A has a time line about the inland railway. 2. The inland railway is a project that ranks with the Alice Springs - Darwin railway that was finally completed in 2003. The weight of rail for the Northern Territory project was just 50 kg/m (a poor decision in retrospect as 60 kg/m would have been better) and the ruling curvature for most of the 1420 km of track was 1200 metres. The first Adelaide - Darwin freight train ran 15-17 January 2004 and the first passenger train ran 1-3 February 2004. Freight tonnages have exceeded initial projections and 15 years later, the line continues to carry passengers.
    [Show full text]
  • The Case to Connect Inland Rail from Toowoomba to Gladstone Key National Infrastructure: Connecting Inland Rail to Gladstone Port
    T2G: MAKING THE RIGHT CONNECTION THE CASE TO CONNECT INLAND RAIL FROM TOOWOOMBA TO GLADSTONE KEY NATIONAL INFRASTRUCTURE: CONNECTING INLAND RAIL TO GLADSTONE PORT Quicker freight times to Asia Enable $15.6B resource investment in regional Queensland Bring forward Nathan Dam and pipeline project Lowering supply chain costs Deeper port enables larger container ships Up to 18,300 extra jobs in regional Queensland Develop a 4th major container port for eastern Australia Reduce the cost of Up to 3 years quicker delivery of the Potential to remove coal trains from Inland Rail by $4.8 B Inland Rail vision Brisbane suburban network 2 Toowoomba CONTENTS Gladstone Inland Rail ABOUT INLAND RAIL 4 THE CHALLENGE GETTING TO THE PORT OF BRISBANE 6 CONNECTING TO GLADSTONE PORT IS A BETTER OPTION 8 INLAND RAIL DEVELOPMENT OPTIONS FROM TOOWOOMBA 10 GLADSTONE PORT OVERVIEW 11 SEA FREIGHT PRODUCTIVITY 12 UNLOCKING NEW RESOURCE DEVELOPMENTS 14 BUILDING DEMAND FOR NEW WATER INFRASTRUCTURE 15 ECONOMIC IMPACT ASSESSMENT - CONSTRUCTION 16 ECONOMIC IMPACT ASSESSMENT - OPERATIONS 17 ASK OF THE STATE AND FEDERAL GOVERNMENT 18 3 ABOUT INLAND RAIL Australia’s freight task is growing, driven by a forecast increase in containerized trade. Demand Projections for Inland Rail (Mtpa) 2.5 2.0 1.5 1.0 0.5 TEU volumes (million TEUs) 0 2025 2030 2035 2040 2045 2050 2055 2060 2065 2070 2075 SEQ-Intercapital Import/Export Note: ARTC Demand projections highlight freight from Melbourne to Brisbane, Brisbane to Adelaide, and Brisbane to Perth. Source: ARTC (2015). ARTC 2015 Inland Rail Programme Business Case. 4 Toowoomba ABOUT INLAND RAIL Gladstone Inland Rail Gladstone Inland Rail is a visionary Gateway Mwy Port of project, aimed at future Brisbane 38 km from Acacia Ridge Brisbane proofing Australia’s economy Airport to Port of Brisbane as the freight task grows.
    [Show full text]
  • North East Rail Alliance and the ARTC Inland Rail Project Contents 1 Introduction to the North East Rail Alliance
    North East Rail Alliance and the ARTC Inland Rail Project Contents 1 Introduction to the North East Rail Alliance ....................................................................................... 1 Euroa Connect Issues and Reccomendations ..................................................................................... 3 Better Benalla Rail Issues and Recommendations ............................................................................ 10 Glenrowan Improvers considerations. ............................................................................................... 18 North East Rail Alliance media release February 2021 ..................................................................... 22 North East Rail Alliance media release March 2021 ......................................................................... 23 The purpose and aims of the NE Rail Alliance. The North East Rail Alliance (NERA) was formed in late 2020 and represents the local rail action groups, Euroa Connect, Better Benalla Rail, Glenrowan Improvers and the Wangaratta Rail Action Group. The Australian Rail Track Corporation (ARTC) plan to run 1.8 km long, double-stacked freight trains from Brisbane to Melbourne. The trains will utilize the XPT standard gauge line in North East Victoria. This will require major changes to several station precincts, including Euroa, Benalla and Glenrowan where these trains will not fit under the existing overpass bridges. The Alliance was formed in response to seemingly impenetrable difficulties with the ARTC that
    [Show full text]
  • Melbourne–Brisbane Inland Rail Alignment Study Working
    ARTC Melbourne–Brisbane Inland Rail Alignment Study Working Paper No. 6 Design Standards ARTC Contents Page Number 1. Introduction .................................................................................................................................... 1 1.1 Overview 1 1.2 Background to Melbourne–Brisbane Inland Rail 1 1.3 Study objectives, stages and working papers: 1 1.4 Roles of the Lead Technical Consultant (LTC) and the Financial and Economic Consultant (FEC) 3 1.5 Stage 1 analysis 3 1.6 Working Paper No.6 objectives 5 2. Methodology ................................................................................................................................... 6 2.1 Background 6 2.2 Existing standards 7 2.3 Project scope of works 7 2.3.1 Context 8 3. Operations ...................................................................................................................................... 9 3.1 Summary 9 3.2 Reference train 9 3.2.1 Maximum load 9 3.3 Gradient 10 3.3.1 Standards 10 3.3.2 Existing ruling gradients 10 3.3.3 Effect of gradients on trains 11 3.3.4 Optimising gradients 13 3.4 Maximum speed 13 3.5 Double stack trains 13 3.6 Axle loads 13 3.6.1 Locomotive axle loads 14 3.6.2 Wagon axle loads 14 4. Permanent way ............................................................................................................................. 16 4.1 Methodology 16 4.2 Specific criteria 17 5. Signalling and communications .................................................................................................
    [Show full text]
  • Inland Rail Economic Analysis Central Queensland Regional Organisation of Councils February 2021 Toowoomba to Gladstone (T2g) Inland Rail Economic Analysis
    TOOWOOMBA TO GLADSTONE (T2G) INLAND RAIL ECONOMIC ANALYSIS CENTRAL QUEENSLAND REGIONAL ORGANISATION OF COUNCILS FEBRUARY 2021 TOOWOOMBA TO GLADSTONE (T2G) INLAND RAIL ECONOMIC ANALYSIS DOCUMENT CONTROL Job ID: J001901 Job Name: Inland Rail to Gladstone Port Economic Analysis Client: Central Queensland Regional Organisation of Councils Client Contact: John Abbott Project Manager: Jonathan Pavetto Email: [email protected] Telephone: 07 4771 5550 Document Name: Toowoomba to Gladstone (T2G) Inland Rail FINAL Last Saved: 19/2/2021 1:24 PM Version Date Reviewed Approved DRAFT v1.0 01/12/20 JP ARP DRAFT v2.0 19/01/21 JP ARP DRAFT v3.0 10/02/21 JP JP DRAFT v4.0 17/02/21 JP JP FINAL 19/02/21 JP JP Disclaimer: Whilst all care and diligence have been exercised in the preparation of this report, AEC Group Pty Ltd does not warrant the accuracy of the information contained within and accepts no liability for any loss or damage that may be suffered as a result of reliance on this information, whether or not there has been any error, omission or negligence on the part of AEC Group Pty Ltd or their employees. Any forecasts or projections used in the analysis can be affected by a number of unforeseen variables, and as such no warranty is given that a particular set of results will in fact be achieved. i TOOWOOMBA TO GLADSTONE (T2G) INLAND RAIL ECONOMIC ANALYSIS FOREWORD Inland Rail is Australia’s largest freight infrastructure project, which when fully developed is proposed to provide a standard gauge rail link between Melbourne and Brisbane.
    [Show full text]
  • Australia's Inland Rail .
    V5 f AUSTRALIA’S INLAND RAIL . Transforming the national supply chain James Michel, Hon.Mbr. AREMA, Mbr. RTSA MARSH RAIL PRACTICE Railway Technical Society of Australasia ENGINEERS–AUSTRALIA / ENGINEERS-NEW ZEALAND RTSA + AREMA Cooperation Agreement • Australian and American railways utilize similar equipment and technology • Australia is a technology incubator- high axle loads • Associations can share knowledge and experiences • Publicizing Calls for Conference Papers • Offering member fee eligibility for events • Sponsoring Study Tours on Railway Engineering (STORE) AUSTRALIA RAIL NETWORK • 210,000 miles; 3 gauges • Capital cities linked – standard gauge • ARTC managed infrastructure • Multiple freight operators/open access • Single track rail corridors • Commodity railways; iron, coal • State-run passenger services • Greatest freight flows: • Melbourne-Sydney-Brisbane Corridor • Only 30% of tonne-kms moves by rail • Speed limited by curvature and grade • Constrained by Sydney passenger train congestion and lack of track capacity INLAND RAIL Transform freight movement by building 1100 miles of modern, new and upgraded rail lines that bypass the Sydney commuter network • 2006 Initial Corridor Studies Like building a new • 2010 Conceptual routing finalized freight line from New • 2015 ARTC and PwC publish the Business York to Mobile, AL Case and rail service proposal • 2017 Federal government commits a total of A$9.3 billion to implement • 2018 ARTC initiates final studies, community outreach, calls for tenders • 2018 Construction starts
    [Show full text]
  • The Inland Rail Project Learning the Lessons of the Past Building a Railway for the Future
    The Inland Rail Project Learning the Lessons of the Past Building a Railway for the Future Rail, Tram and Bus Union Submission to the Senate Standing Committee on Rural and Regional Affairs and Transport Inquiry into the Management of the Inland Rail project by the Australian Rail Track Corporation and the Commonwealth Government November 2019 For further information, please contact the RTBU National Office on (02) 8203 6099 or [email protected] 1 Table of Contents EXECUTIVE SUMMARY ..................................................................................................... 3 INTRODUCTION ............................................................................................................... 4 Incremental Approach.............................................................................................................. 4 STATE OF PLAY ................................................................................................................ 5 Flawed assumptions................................................................................................................. 5 Construction in Existing Corridors ..................................................................................................................5 Optimism Bias .................................................................................................................................................5 Equity Financing and Public Private Partnership (PPP) ..................................................................................6
    [Show full text]
  • Making the Right Connection
    MAKING THE RIGHT CONNECTION Connecting the Port of Gladstone to the Inland Rail (Toowoomba to Gladstone via Wandoan) T2G Rail Submission to the Senate Standing Committee on Rural and Regional Affairs and Transport on Management of the Inland Rail project by the ARTC and the Commonwealth Government 29 November 2020 Contact details:- Mr John Abbott AM B.Eng., LLB, RPEQ, CPEng, Int’l PE, APEC Eng (Aust), MAICD, FIEAust Deputy Chairman Regional Development Australia – Central and Western Queensland PO box 307 Rockhampton, QLD 4700 Mobile:- 0448 223 589 WHO IS MAKING THIS SUBMISSION? This submission is being made by Mr John Abbott as the Project Manager for an Inland Rail Advocacy Project for extension of Inland Rail to Gladstone. The Project is an initiative of the CQROC and RDA, that is actively sponsored and funded by the Banana Regional Council, Gladstone Ports Corporation and Gladstone Regional Council. • The Central Queensland Region Organisation of Councils (CQROC) Member Councils are Gladstone Regional Council, Banana Regional Council, Livingstone Regional Council, Central Highlands Regional Council, and Woorabinda Shire Council • Regional Development Australia – Central and Western Queensland (RDACWQ) The RDACWQ covers 453,000 km2, encompassing 12 local government areas, 7 State Electorates, and 3 Federal Electorates • Gladstone Ports Corporation The Port of Gladstone is a world class port, with a total throughput of over 122 million tonnes per annum, with over 1,900 ships using the port every year. It has the ability to handle the largest of ships and has the approved ability to expand to 300 Million tonnes per annum. At this capacity, it would be in the top 15 ports by tonnage in the world.
    [Show full text]