FORM – 1

Residential Development

“JASDAN ALTEZZA”

At Land bearing C.S. No. 2020 of .

By

M/s. Jasdan Construction Pvt. Ltd. B – 101, Marathon Innova, Ganpatrao Kadam Marg,

Lower , Mumbai – 400 013.

APPENDIX - I (See paragraph - 6) FORM 1

(I) Basic Information

Sr. Item Details 1. Name of the project/s Residential Development “Jasdan Altezza” at Byculla, Mumbai. 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage Total Plot Area: 8,692.41 Sq. mt. to be handled/command area/lease Built-up Area as per FSI: 21104.75 Sq.mt. (Including Fungible area/number of wells to be drilled area) Total Construction Built -up Area: 72,840.67 Sq.mt.

Project Proposal: Configuration Details Sale: 1 Building with two Wings Flats: 165 Nos. Wing A: 3 Basements + 1st to 7th Podium + 8th amenity/refuge floor + 9th to 44th upper floors. Wing B: 3 Basements + 1st to 7th Podium + 8th amenity/refuge floor + 9th to 44th upper floors. st th

EWS: Stilt +1 to 7 floors Flats: 40 Nos. 4. New/Expansion/Modernization New 5. Existing Capacity/ Area etc. Not applicable 6. Category of project i.e.’ A’ or ‘B’ B2 7. Does it attract the general condition? If Not Applicable yes, please specify. 8. Does it attract the specific condition? Not Applicable If yes, please specify. 9. Location Byculla Plot/Survey/Khasra No. C.S. No. 2020 Village Byculla Tehsil Mumbai District Mumbai City State 10. Nearest railway station Chinchpokli Railway station: Within 1.00 Km (Road Distance) Nearest airport Byculla Railway station: Within 1.00 Km (Road Distance) Mumbai Chhatrapati Shivaji Airport: Within 21.00 Km (Road Distance) 11. Nearest Town, city, District Mumbai Metropolitan Region headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation of Greater Mumbai (M.C.G.M.) Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. Jasdan Construction Pvt. Ltd. 14. Registered Address B – 101, Marathon Innova, Ganpatrao Kadam Marg, Lower Parel, Mumbai – 400 013. 15. Address for correspondence B – 101, Marathon Innova, Ganpatrao Kadam Marg, Lower

1 Form 1 – Residential Development, Byculla, Mumbai Sr. Item Details Parel, Mumbai – 400 013. Name Mr. Bharat D Momaya Designation(Owner/Partner/ CEO) Authorized Representative Address B – 101, Marathon Innova, Ganpatrao Kadam Marg, Lower Parel, Mumbai – 400 013. Pin Code 400 013. E-mail [email protected] Mobile number 9819396759 Telephone No. 022 - 40397474 Fax No. -- 16. Details of Alternative Sites examined, Not applicable if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects Not applicable 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not Applicable approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? Not Applicable (b) The Wildlife (Protection) Act, 1972? Not Applicable (c) The C.R.Z Notification, 1991? Not Applicable 22. Whether there is any Government Not Applicable Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. Information/Checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or temporary change No There are existing godown structures on the project in land use, land cover or site which shall be demolished. topography including increase in intensity of land use (with Project site is in Residential Zone (R) as per respect to local land use plan) DP remarks. DP remarks attached as Enclosure 5.

2 Form 1 – Residential Development, Byculla, Mumbai Sr. Information/Checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.2 Clearance of existing land, Yes There are existing godown structures on the project vegetation and building? site which shall be demolished 1.3 Creation of new land uses? Yes Project site is in Residential Zone (R) as per DP remarks. 1.4 Pre-construction investigation Yes Geotechnical Investigation has been carried out. e.g. bore houses, soil testing? Copy attached as Enclosure 7. 1.5 Construction works? Yes Residential development. 1.6 Demolition works? No There are existing godown structures on the project site which shall be demolished. Demolition debris (7656 cum) shall be partially recycled and partly shall be disposed to authorized landfill site with permission of M.C.G.M. 1.7 Temporary sites used for No -- construction works or housing of construction workers? 1.8 Above ground building, Yes Demolition debris (7656 cum) shall be partially structures or earthworks recycled and partly shall be disposed to authorized including linear structures, cut landfill site with permission of M.C.G.M. and fill or excavations Construction waste shall be partly recycled and remaining shall be disposed to authorized landfill site with permission of M.C.G.M. 1.9 Underground works including No -- mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Temporary storage facilities to store construction materials? material. 1.15 Facilities for treatment or Yes • STP for treatment of sewage disposal of solid waste or liquid • Segregation of solid waste into non- effluents? biodegradable and biodegradable garbage • Treatment of biodegradable waste in Organic Waste Converter • Non-biodegradable waste shall be handed over to Authorized recyclers • Dried sludge from STP : As manure 1.16 Facilities for long term housing No -- of operational workers? 1.17 New road, rail, or sea traffic No -- during construction or operation? 1.18 New road, rail, air waterborne No -- or other transport infrastructure including new or altered routes and stations, ports, airports etc?

3 Form 1 – Residential Development, Byculla, Mumbai Sr. Information/Checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission No -- lines or pipelines? 1.21 Impoundment, damming, No -- culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water No -- from ground or surface waters? 1.24 Changes in water bodies or the Yes By considering the runoff prior to development and land surface affecting drainage runoff after development there is some increment in or run-off? runoff of storm water. Incremental Runoff = 0.04 m3/sec 1.25 Transport of personnel or Yes Transport of construction materials. materials for construction, Precautions shall be taken to reduce the impact of operation or decommissioning? the vehicular movement by trying to avoid the vehicular trips during peak hours 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes There will be influx of about ~ 1082 persons. either temporarily or permanently? 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? No --

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sr. Information/checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The land is in developed infrastructure area. agricultural land (ha) 2.2 Water (expected source & Yes During Construction Phase – competing users) unit : KLD For Workers : From M.C.G.M.: 12 KLD For Construction: From Water tankers: 10 - 20 KLD (Depending upon the activity)

4 Form 1 – Residential Development, Byculla, Mumbai Sr. Information/checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data During Operational Phase – Fresh water from M.C.G.M.: 97 KLD (Domestic) Tanker water of potable quantity: 3 KLD (Swimming pool makeup) 2.3 Minerals (MT) No -- 2.4 Construction material – stone, Yes Quantity : As per requirement aggregates, and / soil (expected Sources: The material required for construction source – MT) activities shall be procured from company’s authorized / approved vendors/ open market. 2.5 Forests and timber (source – Yes Timber required for doors sourced from local MT) suppliers. 2.6 Energy including electricity Yes During Constructional Phase- and fuels (source, competing BEST/ Reliance: 500 kVA users) Unit: fuel (MT), energy D.G. Set: As per requirement (MW) During Operational Phase - Source: BEST/Reliance Connected load 5078 KW Maximum demand 2155 KW D.G sets (For 1 DG set of 1250 kVA emergency backup capacity

during power failure) 2.7 Any other natural resources No -- (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are No -- hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect No -- disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No -- changing living conditions? 3.4 Vulnerable groups of people who could No -- be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No --

5 Form 1 – Residential Development, Byculla, Mumbai 4. Production of solid wastes during construction or operation or decommissioning (MT/month):

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities / rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No -- 4.2 Municipal waste (domestic and or Yes During Construction Phase: commercial wastes) Total quantity of solid waste generated: 15 Kg/day (Biodegradable and Non-biodegradable) During Operation Phase: Total quantity of solid waste generated: 487 Kg/day (Biodegradable and Non-biodegradable) 4.3 Hazardous wastes (as per Hazardous Yes Waste oil generated from D.G. shall be stored waste Management Rules) at separate location duly marked and will be sold to the authorized recyclers. 4.4 Other industrial process wastes No -- 4.5 Surplus product No -- 4.6 Sewage sludge or other sludge from Yes Dried sludge from STP will be used as effluent treatment. manure for plants within the premises. 4.7 Construction or demolition wastes Yes Demolition debris (7656 cum) shall be partially recycled and partly shall be disposed to authorized landfill site with permission of M.C.G.M.

Construction waste which shall be generated during construction activity shall be partly recycled and remaining shall be disposed to authorized landfill site with permission of M.C.G.M. 4.8 Redundant machinery or equipment No -- 4.9 Contaminated soils or other materials No -- 4.10 Agriculture wastes No -- 4.11 Other solid wastes No --

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr):

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/ rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes CPCB approved D.G. Sets will be used fuels from stationary or mobile sources during power failure. 5.2 Emissions from production processes No -- 5.3 Emissions from materials handling Yes Fugitive dust emission due to handling and including storage or transport loading-unloading activities is envisaged during construction. Frequent water sprinkling will be done to minimise the fugitive emissions. 5.4 Emissions from construction activities Yes/ The project may cause rise in dust levels including plant and equipment Mar during construction phase. Precautions would ginal be taken to reduce dust generation by water sprinkling at regular intervals. 6 Form 1 – Residential Development, Byculla, Mumbai Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/ rates, wherever possible) with source of information data 5.5 Dust or odours from handling of materials Yes Dust generation controlled as described above. including construction materials, sewage For odour control: Proper ventilation shall be and waste provided around STP and solid waste management facilities. 5.6 Emissions from incineration of waste No -- 5.7 Emissions from burning of waste in open No -- air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No --

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes For control of noise following measures shall engines, ventilation plant, crushers. but be adopted: negli • Properly maintained equipment with gible mufflers will be used • High noise generating construction activities would be carried out only during day time • Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs 6.2 From industrial or similar processes. No -- 6.3 From construction or demolition. Yes Noise levels may increase due to operation of machinery as well as transportation vehicles. This may cause nuisance to the nearby area. Following precautions shall be taken to control noise pollution: • High noise generating construction activities would be carried out only during day time • Installation, use and maintenance of mufflers on equipment • Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs • Provision of barricades along the periphery of the site • 63 nos. of new trees shall be planted on site. • Acoustic enclosure for DG sets 6.4 From blasting or piling. No -- 6.5 From construction or operational traffic. Yes During Construction phase: Transport of materials for construction work. Precautions shall be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours.

7 Form 1 – Residential Development, Byculla, Mumbai Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data Operation Phase : The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion Tree plantation will also help to reduce the noise level and also will enhance air quality. 6.6 From lighting or cooling systems. No -- 6.7 From any other sources. No --

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea :

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of No -- hazardous materials. 7.2 From discharge of sewage or other No During Construction Phase: effluents to water or the land (expected Disposal of sewage to municipal sewer line. mode and place of discharge). During Operation Phase: The treated sewage will be reused for flushing and gardening within the premises. Excess treated sewage will be disposed to the sewer line. 7.3 By deposition of pollutants emitted to air No Dust will be generated during construction into the land or into water. phase from earthworks and movement of vehicles. Appropriate fugitive dust control measures, including watering, water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts.

Stack height of DG set shall be as per CPCB guidelines. 7.4 From any other sources. No -- 7.5 Is there a risk of long term buildup of No -- pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment : Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc from No -- storage, handling, use or production of hazardous substances 8.2 From any other causes No -- 8.3 Could the project be affected by natural -- Landslides are not expected in the area. 8 Form 1 – Residential Development, Byculla, Mumbai disasters causing environmental damage Management plan for flood & earthquake is (e.g. floods, earthquakes, landslides, and as follows cloudburst)? Floods: • Minimizing the incremental runoff from the site with the help of rain water harvesting tank (3 RWH tanks of total capacity 99 KL) • Proper management of channelization of storm water from site by using proper internal SWD system and discharge points of adequate capacity • Use of screens and silt traps to SWD • Proper maintenance of storm water drainage to avoid choking of drains and flooding on site • Existing external drain of adequate capacity.

Earthquake: The structure of the building is designed as per IS code for earthquake resistant design of structure. Disaster Management Plan is attached as Enclosure 7.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality: Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: •Supporting infrastructure (roads, power supply, waste or waste water treatment, No Supporting Infrastructure is already in etc.) existence. • housing development • extractive industries Yes Residential development. • supply industries • other 9.2 Lead to after-use of the site, which could No -- have an impact on the environment

9.3 Set a precedent for later developments Yes Will create job opportunities in construction and operation phase with support staff like security, maintenance, household workers, shop keepers etc. 9.4 Have cumulative effects due to Yes Impacts on water availability, sewage proximity to other existing or planned disposal, storm water drainage, availability of projects with similar effects electricity, traffic congestion etc.

9 Form 1 – Residential Development, Byculla, Mumbai (III) Environmental Sensitivity

Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) from Proposed project location boundary 1 Areas protected under -- -- international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Mahul Creek Approx. 5.00 Km sensitive for ecological reasons - Bay Approx. 4.00 Km Wetlands, watercourses or other Mithi River Approx. 8.00 Km water bodies, coastal zone, Arabian sea Approx. 2.00 Km biospheres, mountains, forests 3 Areas used by protected, Maharashtra Nature Park Approx. 8.00 Km important or sensitive species of Veermata Jijabai Bhosale Approx. 1.00 Km flora or fauna for breeding, Udyan and zoo nesting, foraging, resting, over Malbar Hill Approx. 3.00 Km wintering, migration 4 Inland, coastal, marine or Mahul Creek Approx. 5.00 Km underground waters Mahim Bay Approx. 4.00 Km Mithi River Approx. 8.00 Km Arabian sea Approx. 2.00 Km Banganga Lake Approx. 6.00 Km 5 State, National boundaries No -- 6 Routes or facilities used by the N M Joshi Marg Abutting public for access to recreation or Dr. Ambedkar Road (NH 3) Approx. 0.50 Km other tourist, pilgrim areas 7 Defence installations No -- 8 Densely populated or built-up Mumbai Metropolitan Region -- area 9 Areas occupied by sensitive man- made land uses (hospitals, Mumbai Metropolitan Region -- schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (Ground water resources, surface No -- resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing No -- legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems No -- (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic 10 Form 1 – Residential Development, Byculla, Mumbai Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) from Proposed project location boundary conditions)

(IV) Proposed Terms of Reference for EIA studies: Not Applicable

11 Form 1 – Residential Development, Byculla, Mumbai