Water Supply Assessment and Verification Report
Total Page:16
File Type:pdf, Size:1020Kb
Water Supply Assessment and Verification Report Newland Sierra Specific Plan December 2015 (Revised - July 2016) Prepared for Vallecitos Water District This page is intentionally left blank. Water Supply Assessment and Verification Report Newland Sierra Specific Plan Contents 1 Purpose ............................................................................................................................................... 1 2 Findings ............................................................................................................................................... 3 3 Project Description .............................................................................................................................. 5 4 Vallecitos Water District .................................................................................................................... 11 5 Historical and Projected Water Demands ......................................................................................... 13 5.1 Demand Management ............................................................................................................. 14 5.1.1 BMP Categories ......................................................................................................... 14 5.1.2 Senate Bill X 7-7 ......................................................................................................... 16 6 Existing and Projected Supplies ........................................................................................................ 19 6.1 Metropolitan Water District ...................................................................................................... 19 6.2 San Diego County Water Authority ......................................................................................... 20 6.2.1 Preferential Rights ...................................................................................................... 22 6.3 Local Water Agreements ......................................................................................................... 22 6.4 Vallecitos Water District .......................................................................................................... 22 6.4.1 Demonstrating the Availability of Sufficient Supplies and Plans for Acquiring Additional Supplies ..................................................................................................... 22 7 Conclusions: Availability of Sufficient Supplies ................................................................................. 25 Tables Table 3-1. Proposed Components of Newland Sierra Development Project ................................................ 7 Table 3-2. Projected Water Demand for Newland Sierra Development Project ........................................... 7 Table 3-3. 1979 County General Plan Zoning and 2008 Projected Water Demands for Study Area .................................................................................................................................................. 8 Table 5-1. Past, Current, and Projected Annual Water Use (AF) ............................................................... 13 Table 5-2. BMP Category 1 Description ..................................................................................................... 15 Table 6-1. Historic Imported Water Deliveries for Vallecitos Water District ................................................ 23 Table 7-1. Vallecitos Water District Projected Water Supply and Demand During Normal Year (AF) ................................................................................................................................................ 25 Table 7-2. Vallecitos Water District Projected Water Supply and Demand During Single Dry Year (AF) ................................................................................................................................................ 26 Table 7-3. Vallecitos Water District Projected Water Supply and Demand During Multi Dry Year Period (AF) ..................................................................................................................................... 26 Figures Figure 3-1. Proposed Newland Sierra Development Project Site Plan ....................................................... 6 Figure 3-2. 1979 County General Plan Zoning for Study Area ..................................................................... 9 Figure 5-1. Vallecitos Water District Conservation Compliance Targets ................................................... 17 Figure 6-1. Water Authority Supply Mix, Actual 1991, Estimated 2013, and Planned 2020 and 2035 ............................................................................................................................................... 21 (Revised - July 2016) | i Water Supply Assessment and Verification Report Newland Sierra Specific Plan Appendices Appendix A Newland Sierra Water Demand Estimate Dated 3/23/2016 Appendix B SDCW0A 2014 Annual Water Supply Report ii | (Revised - July 2016) Water Supply Assessment and Verification Report Newland Sierra Specific Plan 1 Purpose This Water Supply Assessment and Verification (WSA&V) Report has been prepared by the Vallecitos Water District (District) in consultation with the San Diego County Water Authority (Water Authority) and the County of San Diego pursuant to Public Resources Code Section 21151.9, and California Water Code Sections 10631, 10657, 10910, 10911, 10912, and 10915, referred to as SB 610, and Business and Professions Code Section 11010 and Government Code Sections 65867.5, 66455.3, and 66473.7, referred to as SB 221. SB 610 and SB 221 amended state law, effective January 1, 2002, to improve the link between information on water supply availability and certain land use decisions made by cities and counties. SB 610 requires that the water purveyor of the public water system prepare a water supply assessment to be included in the environmental documentation of certain proposed projects. SB 221 requires affirmative written verification from the water purveyor of the public water system that sufficient water supplies are available for certain residential subdivisions of property prior to approval of a tentative map. The County has requested that the District prepare both the Water Supply Assessment and Water Verification for the proposed Newland Sierra Development (Project), which is located within the County of San Diego and within the Vallecitos Water District service area. This WSA&V Report is intended for use by the County in its evaluation of the Project under the California Environmental Quality Act (C EQA) process. This WSA&V Report evaluates water supplies that are or will be available during normal, single-dry, and multiple-dry water years during a 20-year projection to meet existing demands, expected demands of the Project, and reasonably foreseeable planned future water demands served by the District. In March of 2005, a WSA&V Report was prepared and approved by the District Board of Directors for the Merriam Mountains Specific Plan (SP 04 06) development project. The applicant for the development later submitted substantial revisions to the location and extent of proposed land uses, thereby necessitating an update that was prepared in 2006. The project has now been revised to become the Newland Sierra Development project and the County has requested a new water supply assessment. The Project Description is provided in Section 3 of this WSA&V Report. (Revised - July 2016) | 1 Water Supply Assessment and Verification Report Newland Sierra Specific Plan This page is intentionally left blank. 2 | (Revised - July 2016) Water Supply Assessment and Verification Report Newland Sierra Specific Plan 2 Findings The WSA&V Report identifies that the water demand projections for the proposed project are included in the water demand forecasts within the Urban Water Management Plans (UWMP) and other water resources planning documents of the District, the Water Authority, and the Metropolitan Water District of Southern California (Metropolitan). Water supplies necessary to serve the demands of the proposed project, along with existing and other projected future users, as well as the actions necessary to develop these supplies, have been identified in the water supply planning documents of the District, the Water Authority, and Metropolitan. This WSA&V Report demonstrates and verifies that with development of the resources identified that there will be sufficient water supplies over a 20-year planning horizon to meet the projected demand of the proposed Project and the existing and other planned development projects within the District's service area. Based on a normal water supply year as described in the District's 2010 UWMP update, the District- estimated five-year increments for a 20-year projection indicate projected potable water supply will meet the projected water demand of 26,499 acre feet (AF) in 2015 to 34,164 AF in 2030. Based on dry year forecasts, the estimated water supply will also meet the projected water demand, during single and multiple- dry year scenarios. Supply totals for a single dry year, approximated at 19,943 AF per year to 20,455 AF per year for 2015 to 2030, respectively, would be necessary to meet demands. Multiple three-year dry period supplies are also provided for and needed to meet supply demands. The availability of sufficient imported and regional water supplies to serve existing and planned uses within the District's service area