FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring program)

1. LAND ENVIRONMENT

1.1 Will the existing land use get The total plot area of 80753 m2 has been proposed, significantly altered from the project under commercial land & the land has been made that is not consistent with the available at 9 Mi, 2 Da at Village- Majha Tihura, surroundings? (Proposed land use must Pargana & Tehsil-Haveli Avadh, District- Faizabad, conform to the approved Master Plan / Uttar Pradesh. Development Plan of the area. Change of land use if any and the statutory approval from the competent authority are submitted). Attach Maps of (i) Location Map of the project site is enclosed in Conceptual plan (i) Site location, (ii) 0.5 Km radius map of the site including (ii) Surrounding features of the micro level features is enclosed in proposed site (within 500 meters) Conceptual Plan. (iii) Conceptual Plan and layout Plan is (iii) The site (indicating levels & enclosed. contours) to appropriate scales. If not available attach only conceptual plans.

1.2 List out all the major project requirements in terms of the Total Plot Area- 80735 m2 Land area, Built up area Total Built Up Area 34358 m2 Water consumption, 35 KLD Power requirement,  11 KV Connectivity,  The proposed project is well connected with Ashapur Village – 4.86 Kms, NW Community facilities,  Parking needs etc.  Commercial Project 4 Wheeler= 44 nos.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., 1 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

2 Wheeler = 40 nos. Theme Park: Bus Parking = 7 nos. 4 Wheeler = 60 nos. 2 Wheeler = 330 nos.

1.3 No impact, Now it will be a commercial with 14570 What are the likely impacts of the 2 proposed activity on the existing m green area in the proposed project site. The entire facilities adjacent to the proposed site? project area will be developed to cater to the demand (Such as open spaces, community of Commercial building; no induced development is facilities, details of the existing land foreseen due to the proposed project. Also the use and disturbance to the local proposed development shall be carried out as per the ecology). defined building by-laws; hence no impact is envisaged due to the proposed development.

More over proposed project will provide value addition to the existing infrastructure facilities. Further, during the construction as well as operation stage of the project, direct and indirect employment opportunities for a large section of society will generate. The employment will have positive impact thereby increasing the quality of life.

1.4 Will there be any significant land Soil Type: disturbance resulting in erosion, The land surface of the district is covered by shallow subsidence & instability? soils cover. These are well drained clayey soils on (Details of soil type, slope analysis, very gently sloping land with moderate erosion. In vulnerability to subsidence, seismicity water devide area the soils are very shallow etc. may be given). somewhat excessively drained loamy soils. The soil cover is thin at places along river beds where sands are predominated. Seismicity: According to the seismic hazard map of 2000, by the Bureau of Indian Standards (BIS). The Barabanki district is Located in the Seismic zone III with majority of the portion having provision of Earthquake resistance in construction 1.5 Will the proposal involve alteration of The proposed project will not cause any alternation natural drainage systems? (Give details of natural drainage system. on a contour map showing the natural drainage near the proposed project site)

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 2 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

1.6 What are the quantities of earthwork During construction phase, some excavation is involved in the construction activity- envisaged in order to provide foundation. This cutting, filling, reclamation etc. excavated soil will be properly stacked within the site under tarpaulin cover and will be reused for (Give details of the quantities of backfilling purpose. The top soil will be preserved earthwork involved, transport of fill separately and will be used for landscaping purpose materials from outside the site etc.) only. Hence, no immediate adverse impact on the land environment is envisaged. 1.7 Give details regarding water supply, Water Supply: waste handling etc during the During Construction stage, water will be sourced construction period. through Submersible & During operational phase it will be through bore well. Waste Generation / Handling: Soil excavated will be reused for backfilling and the fertile top soil will be reused for horticultural purpose. Spillage of oil from the machinery or cement residual from concrete mixer plants will be properly collected and reused in construction site. For construction laborers, proper sanitary facilities & wash areas will be constructed and good hygienic conditions will be maintained. 1.8 Will the low lying areas & wetlands No low lying and wetlands area are there in and get altered? (Provide details of how around the project site. low lying and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris & waste The construction debris generated from the during construction cause health construction project will be common place in nature hazard? (Give quantities of various and will not cause any health hazard to associate and types of wastes generated during nearby population. The construction debris will be construction including the construction used for land leveling/ backfilling and landscaping labours and the means of disposal) according to its composition. Metal will be recycled. Waste concrete will be reused as aggregate in construction process. Approx. 200 labours will be engaged during the construction period. Proper Sanitary Facilities like Temporary Toilets etc. will be provided & treatment will be done using septic/soak pits.

2. WATER ENVIRONMENT

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 3 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

2.1 Give the total quantity of water The total quantity of water requirement shall be 35 KLD. requirement for the proposed Source – 2 no of Borewell project with the breakup of The break up is as follows: requirements for various uses. Total Domestic Water Requirement 22 KLD How will the water requirement met? Total requirement for Gardening 14 KLD

Flushing 10KLD State the sources & quantities and D.G. Set 1 KLD furnish a water balance statement. Total 47KLD

The water requirement shall be met through Borewell. Total water demand of the recreational and green areas which includes landscaping and plantation excluding fire fighting water demand and losses is calculated to be 0.47 KLD. Total treated water from 35 KLD STP Plant located at project site, will be totally utilized for the plantation, landscape area proposed within the project premises, with Zero Discharge. 2.2 What is the capacity (dependable The water demand during operation phase will be met flow or yield) of the proposed through bore well. This supply of water will meet the source of water? requirement of 35 KLD water. 2.3 What is the quality of water Supply of water during operation phase will be through required, in case, the supply is not Jal Nigam. The required water quality at the project site from a municipal source? (Provide will be within prescribed limits of IS: 10500-1991 physical, chemical, biological Specification. Details enclosed in Conceptual Plan. characteristics with class of water quality) 2.4 How much of the water Total Black & Grey water generation 26 KLD, which requirement can be met from the will be treated in 35 KLD STP plant located at project recycling of treated wastewater? site. 24 KLD of Treated water will be used for gardening & landscaping, street washing and drain (Give the details of quantities, cleaning sources and usage) 1. Total requirement for 14 KLD Gardening 2. D.G. Set 1 KLD ** Justifying Zero Discharge equation. Details of 35 KLD STP Plant located at project site, is given in Conceptual Plan. 2.5 Will there be diversion of water There will not be any substantial effect on from other users? water demand of this region. (Please assess the impacts of the project on other existing uses and No diversion of water from other users is anticipated.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 4 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

quantities of consumption) 2.6 What is the incremental pollution 35 KLD STP Plant located at project site. The total grey load from wastewater generated and black water generated from domestic sources is from the proposed activity? (Give estimated to be 26KLD which will be treated in 35 KLD details of the quantities and STP Plant located at project site, so no excessive composition of wastewater pollution load from waste water will be generated and generated from the proposed the treated water shall be totally reused with zero activity) discharge. The composition of domestic waste water generated would be as follows: Characteristics Values BOD 250-300 mg/l COD 400-500 mg/l TSS 150 mg/l Oil & Greases <20 mg/l 2.7 Give details of the water The rain water from terraces and other open area will be requirements met from water collected through rainwater down take pipes and harvesting? Furnish details of the connected to the 3 nos. of Rain Water Harvesting Pit. facilities created. The rain water from open areas shall be considered for rain water recharge only after approval from CGWB. Rainwater Harvesting will recharge the Ground water. For collecting storm water, storm water drainage network has been provided during the design stage as per the guidelines defined by the municipal authorities. In the project design, it shall be ensured that no mixing of the storm water with waste effluent takes place. All the storm water will be diverted to rain water-harvesting network proposed in the complex. The oil grit and silt will be trapped before discharge into the harvesting pits. Rainwater at peak rainfall intensity of 25 mm in the region will be recharged to first aquifer. 2.8 What would be the impact of the No impact land use changes occurring due to It will not aggravate the problems of flooding or water the proposed project on the runoff logging as the existing drainage slopes will be retained. characteristics (quantitative as well It is proposed to maintain & utilize the existing course as qualitative) of the area in the of natural drainage system with only minor re- post construction phase on a long- alignments for the disposal of main storm water runoff term basis? from the commercial scheme as per site conditions. Would it aggravate the problems of flooding or water logging in any way? 2.9 What are the impacts of the As the proposed project will encourage the recharging of proposal on the ground water? ground water through rain water harvesting, therefore (Will there be tapping of ground ground water extraction shall be substantiated. water; give the details of ground water table, recharging capacity,

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 5 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

and approvals obtained from competent authority, if any) 2.10 What precautions/measures are During the construction phase, runoff from the taken to prevent the run-off from construction site shall not be allowed into the roadside. construction activities polluting Adequate measures shall be taken to channelize such land & aquifers? (Give details of run off and the same shall be disposed off through quantities and the measures taken existing storm water drainage network. All Strom water to avoid the adverse impacts) drainage has been channelized to Rainwater pit. 2.11 How is the storm water from The storm water is channelized to ground water through within the site managed? (State the 4 nos. of Rainwater recharge pit after oil & grease trap. provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) 2.12 Will the deployment of Proper sanitary facilities like temporary toilets etc. will construction labourers particularly be provided to labourers and treatment will be done in the peak period lead to using septic tank/ soak pits. unsanitary conditions around the project site (Justify with proper explanation) 2.13 What on-site facilities are provided 35 KLD STP Plant located at project site, will be used for the collection, treatment & safe for treatment of waste water disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal) 2.14 Give details of dual plumbing Dual Plumbing system is being provided the detail have system if treated waste used is used been in the project. for flushing of toilets or any other use.

3. VEGETATION

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 6 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

3.1 Is there any threat of the project to The whole study area is divided into two parts, one the biodiversity? (Give a description study within the project site & another study within 15 of the local ecosystem with its km. Project site / core zone is devoid of any shrub and unique features, if any) herb, patches of local grasses and trees are seen. In 15 Km radius trees found are Neem (Azadirachta indica), Aswath (Ficus benganesis), Ber (Zyziphus mauritiana), Amaltash (Cassia fistula), Peepal (Ficus religiosa), Gulmohar (Delonix regia), Siris (Albizia lebbek). The ecology of the study area is not very rich in diversity or high in endemism, which may be primarily accounted for the scattered distribution of poor quality and quantity of fodder. The major mammalian fauna of the project influenced area involve common languor, mongoose (Herpestris edwardii) etc. Avifauna is primarily represented by common crow (Corvus splendens), House Sparrow (Passer domesticus), blue rock pigeon (Columba livia) and finches. Common peacock (Pavo cristatus) is known to be present in the area. Small, reptiles, primarily squamates like lizards, chameleons, poisonous and non- poisonous snakes are also found in the study area. No migratory birds breed in the study area. Except Egrets Sps. Is locally found. However, No Tiger Reserve / turtle breeding place is located within the 15 Km radius of the study area. 3.2 Will the construction involve Project site is having trees. But, there is no need of extensive clearing or modification of extensive clearing or modification of vegetation. vegetation? (Provide a detailed Vegetation provides erosion control, storm water account of the trees & vegetation detention, biofilteration, and aesthetic values to a site affected by the project) during and after construction activities. 3.3 What are the measures proposed to There will not be any kind of impact of this project on site features. The green area will mitigate the adverse be taken to minimize the likely 2 impacts on important site features impact of pollution. The Landscape area of 14570 m , for the development of green belt: ornamental herbs/ (Give details of proposal for tree shrubs: lawns. It will be ensured that 100% of the trees plantation, landscaping, creation of are native species. Since the proposed area already water bodies etc along with a layout have tree, nothing shall be rooted. Landscape and sps. plan to an appropriate scale) Details are given in Conceptual Plan.

4. FAUNA

4.1 Is there likely to be any displacement The proposed site is an open land and this place is not of fauna- both terrestrial and aquatic the habitat for local fauna. So, there will not be any type or creation of barriers for their of displacement or any other effect on the local fauna

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 7 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

movement? Provide the details. due to proposed project activities. 4.2 Any direct or indirect impacts on the Within the proposed project site, proper landscaping has avifauna of the area? Provide details. been planned to provide a clean, healthy and beautiful green environment for the population. Common native variety of trees and ornamental flowering species will be planted in the green space. Landscaping can have direct positive impact on the local avifauna, as this will provide shelter to local birds. 4.3 Prescribe measures such as corridors, These measures are not applicable for this project. fish ladders etc to mitigate adverse impacts on fauna

5. AIR ENVIRONMENT

5.1 Will the project increase atmospheric The project activities are in large area with green spaces concentration of gases & result in therefore no increase in concentration of gases or heat heat islands? (Give details of island effect expected. background air quality levels with

predicted values based on dispersion 3 models taking into account the 24 hourly concentrations (µg/m ) increased traffic generation as a result PM 10 PM 2.5 Sox NOx 99.8 28.93 21.7 7.6 of the proposed constructions) 5.2 What are the impacts on generation Air Pollution Dispersion Relationship with of dust, smoke, odorous fumes or Meteorology other hazardous gases? Give details The measurement of wind speed and direction, in relation to all the meteorological temperature, humidity, rainfall and solar radiation are parameters. important parameters used in the study of air quality monitoring results and to further understand the chemical reactions that occur in the atmosphere. Dust storms may leads to the build-up of particulate matter in the atmosphere. 5.3 Will the proposal create shortage of Provided Parking: parking space for vehicles? Furnish Resort: details of the present level of 4 Wheeler= 44 nos. transport infrastructure and measures 2 Wheeler = 40 nos. proposed for improvement including Theme Park: the traffic management at the entry & Bus Parking = 7 nos. exit to the project site. 4 Wheeler = 60 nos. 2 Wheeler = 330 nos.  The parking plan for this construction project would follow all the standards and norms as per the commercial building plans. The proposed project site is well connected by Bus route, Auto route through

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 8 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

Nawab Yusuf Road- 2.03 Kms, W  5.4 Provide details of the movement In the proposed project proper arrangement is made for patterns with internal roads, bicycle smooth traffic movement. Adequate lightening tracks, pedestrian pathways, arrangement tapping will be provided covering all footpaths etc., with areas under each corners. category.

5.5 Will there be significant increase in It is envisaged that the only source of noise pollution is traffic noise & vibrations? Give vehicular movement; hence this will not generate details of the sources and the significant noise level. Plantation of trees both sides of measures proposed for mitigation of all roads as well as the green belt shall be developed for the above. noise attenuation.

5.6 What will be the impact of DG sets & There would not be any impact on the ambient air other equipment on noise levels & quality The noise emission from D.G. Sets (if proposed) vibration in & ambient air quality will meet the noise level as per CPCB guidelines and around the project site? Provide only HSD of calorific 0.25 will be used to run these DG details. Set . Vibrator pads and acoustic enclosure will be used in DG sets to minimize the vibration effects.

6. AESTHETICS

2 6.1 Will the proposed constructions in The total plot area 80735 m has been proposed, under any way result in the obstruction of a commercial land by Zila Panchayat. view, scenic amenity or landscapes? Are these considerations taken into account by the proponents?

6.2 Will there be any adverse impacts The development in the entire project influenced area is from new constructions on the as per the Development area of Ayodhya, by Govt. of existing structures? What are the U.P. hence no adverse impacts are anticipated from new considerations taken into account? constructions on the existing structures in this area.

6.3 Whether there are any local There are no local consideration of urban forms & urban considerations of urban form & urban design influencing the design criteria. design influencing the design The proposed Theme park will be developed within the criteria? designated site at 9 Mi, 2 Da at Village- Majha Tihura, Pargana & Tehsil-Haveli Avadh, District- Faizabad, They may be explicitly spelt out. Are Uttar Pradesh. as per the defined building by-laws. there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 9 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

have been considered.

7. SOCIO-ECONOMIC ASPECTS

7.1 Will the proposal result in any The operation of the project shall provide value addition changes to the demographic to the existing infrastructure with improved living structure of local population? standards. Provide the details. The proposed project will provide indirect job facilities in the form of sales, reception & maintenance staff. During construction phase about 200 Nos. of skilled and unskilled work force will be required per day. This workforce will be hired from different places, which generate employment to the people. 7.2 Give details of the existing social The project site lies just on NH-24 A. infrastructure around the proposed Around the proposed project area it mainly constitutes project. of commercial land. Banks, Police station, Hospital, Institutes and Schools etc. is there within the 15 km radius of the proposed site.

Roads:

 Nawab Yusuf Road- 2.03 Kms, W  Rasulabad Darshan Nagar Road- 3.60 Kms, W

Railway Station:

 Darshan Nagar Railway Station- 4.59 Kms, NW  Faizabad Railway Station- 12.02 Kms, NW

Rivers:

 Ghaghra River- 1.92 Kms, E  Sharda Canal- 5.96 Km, W

Airport:

 Faizabad Airport- 9.72 Kms, NW

Other Important Places Nearby:

 Ashapur Village – 4.86 Kms, NW  Samaha Kala- 2.81 Kms, SW  Sarairasi- 2.61 Kms, SE

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 10 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

7.3 Will the project cause adverse The project will be constructed within the designated effects on local communities, site as per the defined building by-laws of U.P. disturbance to sacred sites or other government. There is no sacred site or cultural heritage cultural values? What are the site within the vicinity of the proposed project; hence no safeguards proposed? adverse impacts are envisaged.

8. BUILDING MATERIALS

8.1 May involve the use of building The major materials required for construction of the materials with high-embodied proposed project will be steel, cement, bricks, flooring energy. Are the construction tiles / stones, sanitary and hardware items, electrical materials produced with energy fittings, water, etc. efficient processes? (Give details of Energy efficient process will be used in the proposed energy conservation measures in project. Energy Conservation measures with “U” & “R” the selection of building materials values material will be proposed. and their energy efficiency 8.2 Transport and handling of materials Mitigate Measures for Air Pollution During during construction may result in construction stage: pollution, noise & public nuisance. All the loose material either stacked or transported shall What measures are taken to be provided with suitable covering such as tarpaulin, minimize the impacts? etc. Water sprinkling shall be done at the location where dust generation is anticipated. To minimize the occupational health hazard, proper personal protective gears i.e. mask shall be provided to the workers who are engaged in dust generation activity. Mitigate Measures for Noise Pollution during Construction stage: Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver’s end. To prevent any occupational hazard, ear muff/ earplug shall be given to the workers working around of operating plant and machinery emitting high noise levels. Use of such plant of machinery shall not be allowed during night hours. Careful plating of machinery operation and scheduling of operations shall be done to minimize such impact. 8.3 Are recycled materials used in As there is no availability of recyclable building roads and structures? material in the vicinity of proposed project site so recyclable materials cannot be used in the construction State the extent of savings process of the proposed project. If it is made available at achieved? reasonable price, it will be definitely used. 8.4 Give details of the methods of The quantity of Solid Waste Generation during

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 11 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

collection, segregation & disposal operation phase will be 696.25 kg/day (including of the garbage generated during the floating population). operation phases of the project. As per the manual of municipal solid waste prescribed in Central Public Health and Environmental Organization (CPHEEO), the solid waste disposal method shall be adopted. The solid waste will comprise of biodegradable waste e.g. domestic waste, food waste, horticultural waste etc. and recyclable waste, like plastic, paper, tin, glass etc. This solid waste would be disposed off as per Municipal solid waste management and handling norms.

Municipal Solid Waste Management Plan: In the proposed project, adequate number of collection bins separately for biodegradable and non- biodegradable waste shall be provided as per Municipal Solid Waste (Management and Handling Rules, 2016). Waste from such bin shall be collected separately on daily basis. Separate colored bins will be provided for biodegradable and non-biodegradable wastes. The solid waste will be collected and taken to a separate centralized collection facility. Final segregation of solid waste into biodegradable, non-biodegradable and inert fraction into the centralized collection fraction would be made. Arrangements will be made with authorized agency, for providing the garbage station or transfer point, where all wastes collected from collection bins shall be disposed off for further disposal by the authorities. Horticulture waste (leaves, grass and vegetation parts) shall be collected at the secured location such that it shall not hinder daily activity schedule or washed away by the surface run off causing choking of drains, etc. and will be separately disposed off along with biodegradable waste.

9. ENERGY CONSERVATION

9.1 Give details of the power Power Requirement & Source of Power: requirements, source of supply,  UPPCL will provide expected power demand. backup source etc. Essential load during power failure will be supplied by Rooftop Solar System 160 kW of What is the energy consumption Capacity. assumed per square foot of built-up  Energy Conservation Measures:

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 12 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

area?  In the operational phase, appropriate energy conservation measures & management plan will How have you tried to minimize be adopted in order to minimize the energy consumption? consumptions of non-renewable fuel. The following measures are suggested to adopt:- Compact fluorescent lamps will be used in place of incandescent halogen lamps in all common areas and basement parking. Lighting and switching shall be designed by keeping in mind day light integration. After testing the viability, solar energy can also be used to meet electricity requirement as it would reduce dependency on non-renewable sources of energy and make environment cleaner. Using solar photovoltaic cells, which convert solar energy into DC electricity directly, can trap solar energy. 9.2 What type of, and capacity of, Not envisaged in the project power back-up to you plan to provide? 9.3 What are the characteristics of the Glass of 10 mm thickness shall be used. glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? 9.4 What passive solar architectural Building design and envelope has been optimized features are being used in the through selection of appropriate wall and roof building? Illustrate the applications construction and through adoption of solar passive made in the proposed project. measures after studying the sun path analysis. 9.5 Does the layout of streets & Yes, the layout of buildings has been designed to buildings maximize the potential maximize the potential for solar energy devices. After for solar energy devices? Have you testing the viability, solar energy will also be used for considered the use of street street lighting, emergency lighting & solar heating. lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. 9.6 Is shading effectively used to Passive solar architectural measures have been adopted reduce cooling/heating loads? to provide shading devices for windows and roof, which What principles have been used to would effectively reduce heating up of building maximize the shading of Walls on envelope. the East and the West and the Although the project area is not situated in a warm Roof? How much energy saving climate, but still the provision of absorbing less heat has has been effected? been maintained. Roofs will be painted with reflective aluminum based paints with solar reflectance ranging from 0.3-0.6. This will result in less absorption of

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 13 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

sunlight causing 40 % back reflection and less heating of building structure during summer season. This will effectively reduce the heat load of the building envelope. 9.7 Do the structures use energy- The space-heating load will be minimized using passive efficient space conditioning, solar structure and suitable buildings envelop material. lighting and mechanical systems? Uses of incandescent lamp and halogen lamps have Provide technical details. Provide been avoided and energy efficient compact fluorescent details of the transformers and and fluorescent lamps have been used for all motor efficiencies, lighting common area and in parking area also. intensity and air-conditioning load No CFC & HCFC free chillers are proposed to be assumptions? Are you using CFC installed at proposed project. and HCFC free chillers? Provide specifications 9.8 What are the likely effects of the The total plot area 80735 m2 has been proposed, under building activity in altering the commercial land by Zila Panchayat. So there will neither micro-climates? be any significant effects on the surrounding Provide a self-assessment on the environment nor will any heat island effect have been likely impacts of the proposed envisaged. construction on creation of heat island & inversion effects? 9.9 What are the thermal The thermal characteristics are: characteristics of the building envelope? (a) roof; (b) external U Value R Value walls; and (c) fenestration? Give Roof 0.12 8.33 details of the material used and the External wall 0.38 2.63 U-values or the R values of the Fenestration (Glass) 1.10 0.91 individual components. 9.10 What precautions & safety Fire Fighting arrangement will be installed as per the measures are proposed against fire provisions of the National Building Code (SP7: 1993 hazards? Furnish details of Part IV amendment No. 3 of January, 1977). emergency plans. Firefighting Plan enclosed in Conceptual Plan. 9.11 If you are using glass as wall Glass with a low emissive coating will be used. material provides details and Windows manufactured with low –E coating reduce specifications including emissive energy loss by as much as 30-50%. Different type of and thermal characteristics. low –E coatings has been designed to allow for higher solar gain, moderate solar gain, or low solar gain. Typical thermal conductivity (U-values) will range between 1.2-1.4 W-m2 –K as compare to 1.5-1.7W-m2- K range for normal glass. 9.12 What is the rate of air infiltration Proper arrangement for Indoor air quality monitoring into the building? Provide details shall be made. of how you are mitigating the effects of infiltration. 9.13 To what extent the non- After testing the viability, solar energy will be used as a

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 14 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh

conventional energy technologies source of non-conventional energy. This source can are utilized in the overall energy fulfill the electricity requirements. consumption? Provide details of the renewable energy technologies used.

10. ENVIRONMENT MANAGEMENT PLAN

10.1 The Environment Management The Environmental Management Plan consists of the set Plan would consist of all mitigation of mitigation measures, management practices, measures for each item wise monitoring and commercial measures etc. that are to be activity to be undertaken during the taken during implementation and operation phase to construction, operation and the eliminate adverse environmental impacts, to offset them entire life cycle to minimize or to reduce them to acceptable levels. adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will Detailed Environmental Management Plan enclosed in state the steps to be taken in case of Conceptual Plan. emergency such as accidents at the site including fire.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 15