Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) Near Ram Katha Sankul, Tehsil & District- Faizabad, Uttar Pradesh
Total Page:16
File Type:pdf, Size:1020Kb
Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring program) 1. LAND ENVIRONMENT 1.1 Will the existing land use get The total plot area of 80753 m2 has been proposed, significantly altered from the project under commercial land & the land has been made that is not consistent with the available at 9 Mi, 2 Da at Village- Majha Tihura, surroundings? (Proposed land use must Pargana & Tehsil-Haveli Avadh, District- Faizabad, conform to the approved Master Plan / Uttar Pradesh. Development Plan of the area. Change of land use if any and the statutory approval from the competent authority are submitted). Attach Maps of (i) Location Map of the project site is enclosed in Conceptual plan (i) Site location, (ii) 0.5 Km radius map of the site including (ii) Surrounding features of the micro level features is enclosed in proposed site (within 500 meters) Conceptual Plan. (iii) Conceptual Plan and layout Plan is (iii) The site (indicating levels & enclosed. contours) to appropriate scales. If not available attach only conceptual plans. 1.2 List out all the major project requirements in terms of the Total Plot Area- 80735 m2 Land area, Built up area Total Built Up Area 34358 m2 Water consumption, 35 KLD Power requirement, 11 KV Connectivity, The proposed project is well connected with Ashapur Village – 4.86 Kms, NW Community facilities, Parking needs etc. Commercial Project 4 Wheeler= 44 nos. Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 1 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh 2 Wheeler = 40 nos. Theme Park: Bus Parking = 7 nos. 4 Wheeler = 60 nos. 2 Wheeler = 330 nos. 1.3 No impact, Now it will be a commercial with 14570 What are the likely impacts of the 2 proposed activity on the existing m green area in the proposed project site. The entire facilities adjacent to the proposed site? project area will be developed to cater to the demand (Such as open spaces, community of Commercial building; no induced development is facilities, details of the existing land foreseen due to the proposed project. Also the use and disturbance to the local proposed development shall be carried out as per the ecology). defined building by-laws; hence no impact is envisaged due to the proposed development. More over proposed project will provide value addition to the existing infrastructure facilities. Further, during the construction as well as operation stage of the project, direct and indirect employment opportunities for a large section of society will generate. The employment will have positive impact thereby increasing the quality of life. 1.4 Will there be any significant land Soil Type: disturbance resulting in erosion, The land surface of the district is covered by shallow subsidence & instability? soils cover. These are well drained clayey soils on (Details of soil type, slope analysis, very gently sloping land with moderate erosion. In vulnerability to subsidence, seismicity water devide area the soils are very shallow etc. may be given). somewhat excessively drained loamy soils. The soil cover is thin at places along river beds where sands are predominated. Seismicity: According to the seismic hazard map of India 2000, by the Bureau of Indian Standards (BIS). The Barabanki district is Located in the Seismic zone III with majority of the portion having provision of Earthquake resistance in construction 1.5 Will the proposal involve alteration of The proposed project will not cause any alternation natural drainage systems? (Give details of natural drainage system. on a contour map showing the natural drainage near the proposed project site) Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 2 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh 1.6 What are the quantities of earthwork During construction phase, some excavation is involved in the construction activity- envisaged in order to provide foundation. This cutting, filling, reclamation etc. excavated soil will be properly stacked within the site under tarpaulin cover and will be reused for (Give details of the quantities of backfilling purpose. The top soil will be preserved earthwork involved, transport of fill separately and will be used for landscaping purpose materials from outside the site etc.) only. Hence, no immediate adverse impact on the land environment is envisaged. 1.7 Give details regarding water supply, Water Supply: waste handling etc during the During Construction stage, water will be sourced construction period. through Submersible & During operational phase it will be through bore well. Waste Generation / Handling: Soil excavated will be reused for backfilling and the fertile top soil will be reused for horticultural purpose. Spillage of oil from the machinery or cement residual from concrete mixer plants will be properly collected and reused in construction site. For construction laborers, proper sanitary facilities & wash areas will be constructed and good hygienic conditions will be maintained. 1.8 Will the low lying areas & wetlands No low lying and wetlands area are there in and get altered? (Provide details of how around the project site. low lying and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris & waste The construction debris generated from the during construction cause health construction project will be common place in nature hazard? (Give quantities of various and will not cause any health hazard to associate and types of wastes generated during nearby population. The construction debris will be construction including the construction used for land leveling/ backfilling and landscaping labours and the means of disposal) according to its composition. Metal will be recycled. Waste concrete will be reused as aggregate in construction process. Approx. 200 labours will be engaged during the construction period. Proper Sanitary Facilities like Temporary Toilets etc. will be provided & treatment will be done using septic/soak pits. 2. WATER ENVIRONMENT Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 3 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh 2.1 Give the total quantity of water The total quantity of water requirement shall be 35 KLD. requirement for the proposed Source – 2 no of Borewell project with the breakup of The break up is as follows: requirements for various uses. Total Domestic Water Requirement 22 KLD How will the water requirement met? Total requirement for Gardening 14 KLD Flushing 10KLD State the sources & quantities and D.G. Set 1 KLD furnish a water balance statement. Total 47KLD The water requirement shall be met through Borewell. Total water demand of the recreational and green areas which includes landscaping and plantation excluding fire fighting water demand and losses is calculated to be 0.47 KLD. Total treated water from 35 KLD STP Plant located at project site, will be totally utilized for the plantation, landscape area proposed within the project premises, with Zero Discharge. 2.2 What is the capacity (dependable The water demand during operation phase will be met flow or yield) of the proposed through bore well. This supply of water will meet the source of water? requirement of 35 KLD water. 2.3 What is the quality of water Supply of water during operation phase will be through required, in case, the supply is not Jal Nigam. The required water quality at the project site from a municipal source? (Provide will be within prescribed limits of IS: 10500-1991 physical, chemical, biological Specification. Details enclosed in Conceptual Plan. characteristics with class of water quality) 2.4 How much of the water Total Black & Grey water generation 26 KLD, which requirement can be met from the will be treated in 35 KLD STP plant located at project recycling of treated wastewater? site. 24 KLD of Treated water will be used for gardening & landscaping, street washing and drain (Give the details of quantities, cleaning sources and usage) 1. Total requirement for 14 KLD Gardening 2. D.G. Set 1 KLD ** Justifying Zero Discharge equation. Details of 35 KLD STP Plant located at project site, is given in Conceptual Plan. 2.5 Will there be diversion of water There will not be any substantial effect on from other users? water demand of this region. (Please assess the impacts of the project on other existing uses and No diversion of water from other users is anticipated. Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 4 Form 1 A- Ayodhya Eye Theme Park at NH-28, Shree Ram Puram, (Tihura) near Ram Katha Sankul, Tehsil & district- Faizabad, Uttar Pradesh quantities of consumption) 2.6 What is the incremental pollution 35 KLD STP Plant located at project site. The total grey load from wastewater generated and black water generated from domestic sources is from the proposed activity? (Give estimated to be 26KLD which will be treated in 35 KLD details of the quantities and STP Plant located at project site, so no excessive composition of wastewater pollution load from waste water will be generated and generated from the proposed the treated water shall be totally reused with zero activity) discharge. The composition of domestic waste water generated would be as follows: Characteristics Values BOD 250-300 mg/l COD 400-500 mg/l TSS 150 mg/l Oil & Greases <20 mg/l 2.7 Give details of the water The rain water from terraces and other open area will be requirements met from water collected through rainwater down take pipes and harvesting? Furnish details of the connected to the 3 nos.