Project Documents

Total Page:16

File Type:pdf, Size:1020Kb

Project Documents Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 54267-EG PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF US$70 MILLION, Public Disclosure Authorized A CLEAN TECHNOLOGY FUND LOAN IN THE AMOUNT OF US$149.75 MILLION AND A CLEAN TECHNOLOGY FUND GRANT IN THE AMOUNT OF US$0.25 MILLION TO THE Public Disclosure Authorized ARAB REPUBLIC OF EGYPT FOR A WIND POWER DEVELOPMENT PROJECT May 19,2010 Sustainable Development Department Middle East and North Africa Region This document has a restricted distribution and may be used by recipients only in the Public Disclosure Authorized performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective April 31, 2010) Currency Unit = Egyptian Pound (LE) LE 5.56 = US$ 1 USD 0.179 = LE 1 FISCAL YEAR July 1 J June– 30 ABBREVIATIONS AND ACRONYMS AFD Agence Française de Développement IBRD International Bank for Reconstruction and Development AfDB African Development Bank ICB International Competitive Bidding BOO Build Own Operate IFI International Financial Institution BOOT Build Own Operate Transfer IPP Independent Power Producer BOT Build Operate Transfer KfW German Agency for Development Assistance CAS Country Assistance Strategy kWh Kilowatt hour CASPR Country Assistance Strategy Progress Report LNG Liquified Natural Gas CCGT Combined Cycle Gas Turbine LPG Liquified Petroleum Gas CDM Clean Development Mechanism MENA Middle East and North Africa Region CEPC Cairo Electricity Production Company MMBTU Million British Thermal Units CFL Compact Fluorescent Lamp MoEE Ministry of Energy and Electricity CGC Credit Guarantee Company MIC Middle Income Country CSP Concentrated Solar Power NPV Net Present Value CTF Clean Technology Fund NIB National Investment Bank EEA Egyptian Electricity Agency NREA New and Renewable Energy Authority EEHC Egyptian Electricity Holding Company Mt Million Tons EIRR Economic Internal Rate of Return M/S Meters per second EETC Egyptian Electricity Transmission Company OCC Opportunity Cost of Capital EEUCPRA Egyptian Electric Utilities and Consumer Protection O & M Operation and Maintenance Authority ERA Electricity Regulatory Agency OHTL Overhead Transmission Line EIB European Investment Bank PPA Purchase Power Agreement ELNG Egyptian Liquefied Natural Gas PPIAF Public Private Infrastructure Advisory Facility EMP Environmental Management Plan REA Rural Electrification Agency EPC Engineering, Procurement, and Construction RPF Resettlement Policy Framework ESIA Environmental and Social Impact Assessment SBD Standard Bidding Document ESMAP Energy Sector Management Assistance Program SC Steam Cycle FDI Foreign Direct Investment SOE State –Owned Enterprise FM Financial Management SWH Solar Water Heating FMU Financial Management Unit TA Technical Assistance FY Fiscal Year Tcf Trillion Cubic Feet GDP Gross Domestic Product T & D Transmission and Distribution GEF Global Environmental Facility TOR Terms of Reference GoE Government of Egypt US¢ US cents GWh Gigawatt hour USAID United States Agency for International Development HFO Heavy Fuel Oil W/M2 Watts per square meter JICA Japanese International Cooperation Agency Vice President: Ms. Shamshad Akhtar Country Director: Mr. A. David Craig Sector Director: Mr. Laszlo Lovei Sector Manager: Mr. Jonathan Walters Task Team Leader: Mr. Chandrasekar Govindarajalu FOR OFFICIAL USE ONLY EGYPT. ARAB REPUBLIC OF Wind Power Development Project CONTENTS Page I . STRATEGIC CONTEXT AND RATIONALE .................................................................. 1 A . Country and sector issues .................................................................................................... 1 B . Rationale for Bank involvement ......................................................................................... -9 C . Higher level objectives to which the project contributes .................................................. 11 I1 . PROJECT DESCRIPTION ................................................................................................ 12 A . Lending instrument. ........................................................................................................... 12 ' B . Project development objective and key indicators ............................................................ 12 C . Project components ............................................................................................................ 13 D . Lessons learned and reflected in the project design .......................................................... 15 E . Alternatives considered and reasons for rejection ............................................................. 15 I11 . IMPLEMENTATION ..................................................................................................... 16 A . Partnership arrangements .................................................................................................. 16 B . Institutional and implementation arrangements ............................................................... -16 C . Monitoring and evaluation of outcomeshesults ................................................................ 18 D . Sustainability and Replicability ......................................................................................... 18 E . Critical risks and possible controversial aspects .............................................................. -19 F . Loadcredit conditions and covenants .............................................................................. -20 IV . APPRAISAL SUMMARY .............................................................................................. 21 A . Economic and financial analyses ...................................................................................... -21 B . Technical ........................................................................................................................... 27 C . Fiduciary. .......................................................................................................................... -27 D . Social ................................................................................................................................. 28 E . Environment ...................................................................................................................... 29 F . Safeguard policies .............................................................................................................. 30 G . Policy Exceptions and Readiness ...................................................................................... 30 This document has a restricted distribution and may be used by recipients only in the performance of their official duties . Its contents may not be otherwise disclosed without World Bank authorization . Annex 1: Country and Sector or Program Background .......................................................... 31 Annex 2: Major Related Projects Financed by the Bank and/or other Agencies .................. 37 Annex 3: Results Framework and Monitoring ......................................................................... 38 Annex 4: Detailed Project Description ...................................................................................... 42 Annex 5: Project Costs ................................................................................................................ 48 Annex 6: Implementation Arrangements .................................................................................. 49 Annex 7: Financial Management and Disbursement Arrangements ..................................... 52 Annex 8: Procurement Arrangements ....................................................................................... 63 Annex 9: Economic and Financial Analysis .............................................................................. 73 Annex 10: Safeguard Policy Issues............................................................................................. 95 Annex 11: Project Preparation and Supervision .................................................................... 120 Annex 12: Documents in the Project File ................................................................................ 121 Annex 13: Clean Technology Fund (CTF) .............................................................................. 122 Annex 14: International Energy Agency Comments and Responses .................................... 133 Annex 15: Statement of Loans and Credits............................................................................. 138 Annex 16: Country at a Glance ................................................................................................ 141 Annex 17: Map IBRD No . 37829 .............................................................................................. 143 EGYPT, ARAB REPUBLIC OF WIND POWER DEVELOPMENT PROJECT PROJECT APPRAISAL DOCUMENT MIDDLE EAST AND NORTH AFRICA MNSSD Date; May 19,2010 Team Leader; Chandrasekar Govindarajalu Country Director: A. David Craig Sectors: Renewable energy (1 00%) Sector ManagerDirector: Jonathan Walters Themes: Climate change (1 00%) Project ID: P113416 Environmental category: B Lending Instrument: Specific Investment Loan Joint IFC: Joint Level: Project Financing Data [XI Loan [ ] Credit [ XI Grant [ ] Guarantee [ 3 Other: For Loans/Credits/Others: Total Bank financing (US$m.): IBRD 70.00, Clean Technology Fund 149.75, Clean Technology Grant
Recommended publications
  • ACWA Power Business-Driven Value Development
    ACWA Power Business-driven Value Development May 31, 2016 Introduction 2 Who We Are? ACWA Power is a developer, investor, co-owner and operator of plants 32 assets investment representing value in 22.8 GW of excess of USD power 32 billion 2.5 million providing m3/day of employment desalinated to more than water 2,850 people Introduction 3 ACWA Power Renewable Energy Projects 50 MW Concentrated Solar Power (CSP) plant at Bokpoort in South Africa under construction. 100 MW of CSP has just finalized its testing in January 2016 at Redstone in South Africa. Noor I project of 160 MW CSP parabolic trough at Ouarzazate in Morocco was connected to the grid in February 2016. Noor II, 200 MW parabolic through CSP plant under construction. Noor III, 150 MW central tower CSP plants have just begun construction. Khalladi Wind project in Morocco of 120 MW capacity has achieved Financial Close on November 27, 2015. Karadzhalovo 60 MW PV project in operation since in 2012 Bulgaria. Shua’a 200 MW PV project in UAE under construction. Sunrise Solar Energy 50 MW PV project in Jordan under advanced development. Introduction 4 Global Figures on Renewable Energy: Last year Renewable capacity increased by 152 GW (8.3%) Total RE capacity in 2015 was 1,985 GW $ 286 billion invested in RE projects in 2015 2015 is a record year in RE Wind grew 62 GW (17%) with decline in onshore turbine price of 45% since 2010 Solar increased 47 GW (37%) with price drop up to 80% for solar PV modules The fasting growth was in the developing countries Introduction 5 Socio-Economic Value Socio-economic benefits are a key drivers for renewable energy deployment.
    [Show full text]
  • Mints – MISR NATIONAL TRANSPORT STUDY
    No. TRANSPORT PLANNING AUTHORITY MINISTRY OF TRANSPORT THE ARAB REPUBLIC OF EGYPT MiNTS – MISR NATIONAL TRANSPORT STUDY THE COMPREHENSIVE STUDY ON THE MASTER PLAN FOR NATIONWIDE TRANSPORT SYSTEM IN THE ARAB REPUBLIC OF EGYPT FINAL REPORT TECHNICAL REPORT 11 TRANSPORT SURVEY FINDINGS March 2012 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS CO., LTD. ALMEC CORPORATION EID KATAHIRA & ENGINEERS INTERNATIONAL JR - 12 039 No. TRANSPORT PLANNING AUTHORITY MINISTRY OF TRANSPORT THE ARAB REPUBLIC OF EGYPT MiNTS – MISR NATIONAL TRANSPORT STUDY THE COMPREHENSIVE STUDY ON THE MASTER PLAN FOR NATIONWIDE TRANSPORT SYSTEM IN THE ARAB REPUBLIC OF EGYPT FINAL REPORT TECHNICAL REPORT 11 TRANSPORT SURVEY FINDINGS March 2012 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS CO., LTD. ALMEC CORPORATION EID KATAHIRA & ENGINEERS INTERNATIONAL JR - 12 039 USD1.00 = EGP5.96 USD1.00 = JPY77.91 (Exchange rate of January 2012) MiNTS: Misr National Transport Study Technical Report 11 TABLE OF CONTENTS Item Page CHAPTER 1: INTRODUCTION..........................................................................................................................1-1 1.1 BACKGROUND...................................................................................................................................1-1 1.2 THE MINTS FRAMEWORK ................................................................................................................1-1 1.2.1 Study Scope and Objectives .........................................................................................................1-1
    [Show full text]
  • ILO Cairo Office 9, Dr
    DECENT WORK IN EGYPT 2015 RESULTS Copyright © International Labour Organization 2016 First published 2016 Publications of the International Labour Office enjoy copyright under Protocol 2 of the Universal Copyright Convention. Nevertheless, short excerpts from them may be reproduced without authorization, on condition that the source is indicated. For rights of reproduction or translation, application should be made to ILO Publications (Rights and Permissions), International Labour Office, CH-1211 Geneva 22, Switzerland, or by email: [email protected]. The International Labour Office welcomes such applications. Libraries, institutions and other users registered with reproduction rights organizations may make copies in accordance with the licences issued to them for this purpose. Visit www.ifrro.org to find the reproduction rights organization in your country. Decent Work in Egypt - 2015 Results اﻟﻌﻤﻞ اﻟﻼﺋﻖ ﰲ ﻣﴫ- ﻧﺘﺎﺋﺞ ﻋﺎم 2015 ISBN:978-92-2-031076-2(print) ISBN:978-92-2-031077-9(web pdf) ILO Cataloguing in Publication Data The designations employed in ILO publications, which are in conformity with United Nations practice, and the presentation of material therein do not imply the expression of any opinion whatsoever on the part of the International Labour Office concerning the legal status of any country, area or territory or of its authorities, or concerning the delimitation of its frontiers. The responsibility for opinions expressed in signed articles, studies and other contributions rests solely with their authors, and publication does not constitute an endorsement by the International Labour Office of the opinions expressed in them. Reference to names of firms and commercial products and processes does not imply their endorsement by the International Labour Office, and any failure to mention a particular firm, commercial product or process is not a sign of disapproval.
    [Show full text]
  • Assessment of Groundwater Resources for Irrigation Purposes in Assiut Governorate, Upper Egypt
    [Morsi et. al., Vol.6 (Iss.4): April 2018] ISSN- 2350-0530(O), ISSN- 2394-3629(P) (Received: Mar 03, 2018 - Accepted: Apr 29, 2018) DOI: 10.29121/granthaalayah.v6.i4.2018.1649 Science ASSESSMENT OF GROUNDWATER RESOURCES FOR IRRIGATION PURPOSES IN ASSIUT GOVERNORATE, UPPER EGYPT Mamdouh, S. Morsi *1, Abdelhai A. Farrag 2, Esam E. A. El Sayed 3 *1 Department of Mines and quarry Minia Governorate, Egypt 2 Geology Department, Faculty of Science, Assiut University, Egypt 3 Geology Department, Faculty of Science, Minia University61519, Egypt Abstract A general increase of water demand in Egypt is prominently denoted. This situation is more noticeable in the Middle and Upper Egypt of arid Zone and limited water resources in which Assiut is one of the governorates of this Zone. The main objectives of this study are to assess the groundwater quality for irrigation, and to present solutions for managing and protecting these resources in Assiut area. To achieve that, one hundred and nine groundwater samples were collected from Quaternary aquifer during autumn of the year 2013. Chemical analysis was carried out and analyzed for major and trace elements according to the irrigation water guidelines of (FAO, 1985), and Rowe, et al. 1995, taking into account the spatial variations and the representation of the hydrochemical data. The results show that 47% none degree of restriction on use and 52% Slightly to moderate degree of restriction on use, According TDS hazarded. 55 % belongs to (C2- S1) good water for irrigation all crops in all soils and45 % belongs to (C3 -S1) good water for irrigation all crops in all soils under ordinary and specific condition like adequate drainage and leaching, According U.S.
    [Show full text]
  • The Giant Projects.Pdf
    State Information Service Information Sector Contents Preface: Chapter One: The New Suez Canal 6 Chapter Two: Suez Canal Corridor Development Project 22 Chapter Three: 1.5 million Feddans Project 38 Chapter Four: The National Project for Developing Sinai 48 Chapter Five: National Roads Project 82 Chapter Six: The National Project for Developing Upper Egypt Governorates 94 Chapter Seven: Establishing New Generation of Inhabited Cities 104 Chapter Eight: National Social Housing Project 110 Chapter Nine: Other National Projects 126 First: National Project for Electricity 126 Second: Al-Galala Plateau Project 129 Third: The Golden Triangle Project 130 Fourth: The Northwest Coast Development Project 131 Fih: Logistics Center for Storage and Handling of Grains 134 Sixth: Toshka project 135 Seventh: Sharq al-Owaynat Project 136 Eighth: The National Project for Fish Culture 137 Ninth: National Program for Technological Incubators (Intilac) 149 Introduction The mega national projects are generally distinguished for being comprehensive and widespread all over the country, thus contributing to realizing economic balance, establishing basis of social justice, reducing unemployment, and redistributing population to several new cities nationwide. The mega national projects are considered the locomotive of the sustainable development. In this respect, the New Suez Canal, which was totally setup in one year (August 2015-August 2016), with 100% national finance, had a direct and indirect impact concerning increasing the GDP on the one hand, and activating the movement of trade and aracting foreign investments on the other hand, As regards the national project of developing the Suez Canal Corridor, this project mainly aims at increasing the job opportunities and turning the Suez Canal into a global center for maritime navigation and logistic services, an industrial center and a gate for the trade exchange between the east and the west.
    [Show full text]
  • Inventory of Municipal Wastewater Treatment Plants of Coastal Mediterranean Cities with More Than 2,000 Inhabitants (2010)
    UNEP(DEPI)/MED WG.357/Inf.7 29 March 2011 ENGLISH MEDITERRANEAN ACTION PLAN Meeting of MED POL Focal Points Rhodes (Greece), 25-27 May 2011 INVENTORY OF MUNICIPAL WASTEWATER TREATMENT PLANTS OF COASTAL MEDITERRANEAN CITIES WITH MORE THAN 2,000 INHABITANTS (2010) In cooperation with WHO UNEP/MAP Athens, 2011 TABLE OF CONTENTS PREFACE .........................................................................................................................1 PART I .........................................................................................................................3 1. ABOUT THE STUDY ..............................................................................................3 1.1 Historical Background of the Study..................................................................3 1.2 Report on the Municipal Wastewater Treatment Plants in the Mediterranean Coastal Cities: Methodology and Procedures .........................4 2. MUNICIPAL WASTEWATER IN THE MEDITERRANEAN ....................................6 2.1 Characteristics of Municipal Wastewater in the Mediterranean.......................6 2.2 Impact of Wastewater Discharges to the Marine Environment........................6 2.3 Municipal Wasteater Treatment.......................................................................9 3. RESULTS ACHIEVED ............................................................................................12 3.1 Brief Summary of Data Collection – Constraints and Assumptions.................12 3.2 General Considerations on the Contents
    [Show full text]
  • Egypt: Toponymic Factfile
    TOPONYMIC FACT FILE Egypt Country name Egypt1 State title Arab Republic of Egypt Name of citizen Egyptian Official language Arabic (ara2) مصر (Country name in official language 3(Mişr جمهورية مصر العربية (State title in official language (Jumhūrīyat Mişr al ‘Arabīyah Script Arabic Romanization System BGN/PCGN Romanization System for Arabic 1956 ISO-3166 country code (alpha- EG/EGY 2/alpha-3) Capital Cairo4 القاهرة (Capital in official language (Al Qāhirah Geographical Names Policy Geographical names in Egypt are found written in Arabic, which is the country’s official language. Where possible names should be taken from official Arabic-language Egyptian sources and romanized using the BGN/PCGN Romanization System for Arabic5. Roman-script resources are often available for Egypt; however, it should also be noted that, even on official Egyptian products, Roman-script forms may be encountered which are likely to differ from those arising from the application of the BGN/PCGN Romanization System for Arabic.6 There are conventional Roman-script or English-language names for many places in Egypt (see ‘Other significant locations’, p12), which can be used where appropriate. For instance, in an English text it would be preferable to refer to the capital of Egypt as Cairo, and perhaps include a reference to its romanized form (Al Qāhirah). PCGN usually recommends showing these English conventional names in brackets after 1 The English language conventional name Egypt comes from the Ancient Greek Aígyptos (Αἴγυπτος) which is believed to derive from Ancient Egyptian hut-ka-ptah, meaning “castle of the soul of Ptah”. 2 ISO 639-3 language codes are used for languages throughout this document.
    [Show full text]
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 54267-EG PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF US$70 MILLION, Public Disclosure Authorized A CLEAN TECHNOLOGY FUND LOAN IN THE AMOUNT OF US$149.75 MILLION AND A CLEAN TECHNOLOGY FUND GRANT IN THE AMOUNT OF US$0.25 MILLION TO THE Public Disclosure Authorized ARAB REPUBLIC OF EGYPT FOR A WIND POWER DEVELOPMENT PROJECT May 19,2010 Sustainable Development Department Middle East and North Africa Region This document has a restricted distribution and may be used by recipients only in the Public Disclosure Authorized performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective April 31, 2010) Currency Unit = Egyptian Pound (LE) LE 5.56 = US$ 1 USD 0.179 = LE 1 FISCAL YEAR July 1 J June– 30 ABBREVIATIONS AND ACRONYMS AFD Agence Française de Développement IBRD International Bank for Reconstruction and Development AfDB African Development Bank ICB International Competitive Bidding BOO Build Own Operate IFI International Financial Institution BOOT Build Own Operate Transfer IPP Independent Power Producer BOT Build Operate Transfer KfW German Agency for Development Assistance CAS Country Assistance Strategy kWh Kilowatt hour CASPR Country Assistance Strategy Progress Report LNG Liquified Natural Gas CCGT Combined Cycle Gas Turbine LPG Liquified Petroleum Gas CDM Clean Development Mechanism MENA Middle East and North Africa Region CEPC
    [Show full text]
  • Sustainability News & Topics Edition 3
    SUSTAINABILITY NEWS & TOPICS Edition 3 1 HY 2020 Photo by: Ahmed Ehab Photo by: Egyptian calligrapher preaches message of optimism. 1 39 Disclaimer This edition of Sustainability News & Topics publication is an outline of ALEXBANK’s sustainable business and operations. While ALEXBANK has made every attempt to ensure that the information contained in this publication is accountable and accurate, all information and performance indicated in this publication is historical; past performance is not an assurance of future results. All Intellectual Property Rights associated with this publication are proprietary. For further information: Amina Khalil Please visit the ALEXBANK Website Head of Social Performance & Reporting Unit Call 19033 to reach our contact center [email protected] Send an email to [email protected] Laila Hosny Farah Sadek Head of CSR & Sustainable Development Office Junior Social Performance & Reporting Officer [email protected] [email protected] TABLE OF CONTENTS Introduction Ghalya Page 1. Introducing “Ghalya”: An Initiative by Women for Women 05 2. Celebrating International Women’s Day 07 3. Launching “Bagaweet” for Red Sea Crafts 09 Our Response to COVID-19 4. “Ebda3 men Masr” Goes Digital in Response to COVID-19 11 5. ALEXBANK Joins the Egyptian Food Bank’s “Doing Good” 16 Challenge 6. Alleviating Pressure on National Hospitals: Equipping the 18 “Umberto I” Italian Hospital Intensive Care Unit 7. Our Community – Support via Awareness Creation 19 8. A Guide to Financing for the Creative Industries: 20 Microloans & Beyond Gifts with Impact 9. The Line Between Corporate & Impact with “Khotoot” 21 10. Mending Broken Hearts One Cookie at a Time 22 11.
    [Show full text]
  • Sustainable Development Criteria Set for the Transportation Hubs of the National Association of Provinces Planning Elshimy
    AvailableAvailable online online at www.sciencedirect.com at www.sciencedirect.com Procedia Engineering ProcediaProcedia Engineering Engineering 00 (2011) 21 (2011) 000–000 1042 – 1055 www.elsevier.com/locate/procedia 2011 International Conference on Green Buildings and Sustainable Cities Sustainable development criteria set for the transportation hubs of the national association of provinces planning Elshimy. Hishama∗ a Architectural Department, Pharos University, Alexandria, Egypt Abstract Sustainable development of Egypt requires the cognitive elements and components of sustainability in order to achieve integration between aspects of the environment, social and economic development of the regions administrative planning seven Egypt and axes of Transportation National Association and piercing her up search access to the path of an exemplary sustainable economic, but is central to the development and reconstruction pass-through in the west of Egypt, giving sustainable development in the Western Sahara, including Egypt and given a geographical balance from east to west and along the longitudinal development of the North West coast beside River Nile and through the analytical study of planning regions in Egypt. In this analytical study of regions planning to Egypt, we find that it is not balanced resources and the possibilities and requirements for the sustainable development of schemes of national long-term and that the area between the proposed hub and the Nile Valley is a product of adhesion and the juxtaposition of the new axis and the axis of the Nile Valley. The most important conclusions that the integration between resources and quality of the projects proposed in the new cities in order to achieve integration between the regions and given the interdependence and integration of sustainable development themes and incidental association are essential to creating spaces proportionate and compatible with the stages of national sustainable development.
    [Show full text]
  • Early Hydraulic Civilization in Egypt Oi.Uchicago.Edu
    oi.uchicago.edu Early Hydraulic Civilization in Egypt oi.uchicago.edu PREHISTORIC ARCHEOLOGY AND ECOLOGY A Series Edited by Karl W. Butzer and Leslie G. Freeman oi.uchicago.edu Karl W.Butzer Early Hydraulic Civilization in Egypt A Study in Cultural Ecology Internet publication of this work was made possible with the generous support of Misty and Lewis Gruber The University of Chicago Press Chicago and London oi.uchicago.edu Karl Butzer is professor of anthropology and geography at the University of Chicago. He is a member of Chicago's Committee on African Studies and Committee on Evolutionary Biology. He also is editor of the Prehistoric Archeology and Ecology series and the author of numerous publications, including Environment and Archeology, Quaternary Stratigraphy and Climate in the Near East, Desert and River in Nubia, and Geomorphology from the Earth. The University of Chicago Press, Chicago 60637 The University of Chicago Press, Ltd., London ® 1976 by The University of Chicago All rights reserved. Published 1976 Printed in the United States of America 80 79 78 77 76 987654321 Library of Congress Cataloging in Publication Data Butzer, Karl W. Early hydraulic civilization in Egypt. (Prehistoric archeology and ecology) Bibliography: p. 1. Egypt--Civilization--To 332 B. C. 2. Human ecology--Egypt. 3. Irrigation=-Egypt--History. I. Title. II. Series. DT61.B97 333.9'13'0932 75-36398 ISBN 0-226-08634-8 ISBN 0-226-08635-6 pbk. iv oi.uchicago.edu For INA oi.uchicago.edu oi.uchicago.edu CONTENTS List of Illustrations Viii List of Tables ix Foreword xi Preface xiii 1.
    [Show full text]
  • Infrastructure Progress in Egypt
    Market Watch Report Infrastructure Progress in Egypt www.invest-gate.me October 2016 /invest-gate /invest.gate_magazine Information in this report is based on official an- nouncements by both developers and the Egyp- tian government. All figures and facts obtained through news mediums have been confirmed from at least two different sources. This text is intended solely for general market evaluation purposes. Any decisions based on conclusions from this document is the sole responsibility of the reader. Reproduction of any part of this doc- ument is prohibited without written consent. 2 LATEST INDUSTRY UPDATES NUCA to Launch Electricity Station in New New Water Treatment Plant to be Launched in Aswan in 2017 Mostakbal City in New Cairo The New Urban Communities Authority (NUCA) has El Mostkbal for Urban Development will launch a water launched a new main power electricity station in New Aswan treatment plant in New Cairo, the first phase of which will with two generators that will be completed next year, report- cost EGP 250 million, according to the company’s chairman ed Al Borsa. The total cost of the project is estimated at EGP Essam Nassif, reported Amwal Elghad. The company is set 60 million, according to Alaa Naseem, Executive Manager of to sign a contract with the New Urban Communities Authori- Electricity and Telecommunications in NUCA. The new en- ty (NUCA), wherein the latter will provide 300,000 cubic me- hancement will boost power from 10 MV to 50 MV, Naseem ters of drinking water to Mostakbal City per day at a cost of added, noting that the total value of completed electricity EGP 2 billion, Nassif continued.
    [Show full text]