Unclaimed Monies: Pretoria
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
PUTCO PROPERTIES LIMITED ANNUAL REPORT 2005 PUTCO PROPERTIES LIMITED Incorporated in the Republic of South Africa (Reg No 1988/001085/06)
PUTCO PROPERTIES LIMITED ANNUAL REPORT 2005 PUTCO PROPERTIES LIMITED Incorporated in the Republic of South Africa (Reg No 1988/001085/06) EIGHTEENTH ANNUAL REPORT For the year ended 30 June 2005 Contents Directorate and Secretary 1 Shareholders’ diary 1 Analysis of shareholding 2 Corporate governance report 3 Chairman’s statement 5 Group value added statement 6 Directors’ statement of responsibility 7 Secretary’s statement 7 Report of independent auditors 8 Directors’ report 9 Income statements 10 Balance sheets 11 Statements of changes in equity 12 Cash flow statements 13 Accounting policies 14 Notes to the annual financial statements 16 Interest in subsidiaries 21 Dividend announcement 21 Notice of annual general meeting 33 Proxy form for annual general meeting 35 CIRCULAR RE PROPOSED NAME CHANGE Circular re proposed name change 22 Form of surrender (Pink) 31 Putco Properties Limited Annual Report 2005 DIRECTORATE AND SECRETARY Directors Dr J H de Loor (Chairman and Independent non-executive) (Appointed 1 July 2003 and resigned 30 September 2004) A B Adrian (Chairman and Independent non-executive) (Appointed 30 September 2004) A Carleo (Chief Executive Officer) E M R L Oldham (Managing Director) B C Carleo (Non-executive) L A Carleo (Non-executive) (Resigned 30 September 2004) F G Pisapia (Non-executive) (Appointed 16 September 2003 and resigned 30 September 2004) A L Carleo-Novello (Non-executive) – alternate to L A Carleo (Resigned 30 September 2004) P Senatore (Non-executive) (Appointed 30 September 2004) P Nucci (Independent non-executive) -
Research Into the Groundwater Abstraction in Residential Areas
Research into the Groundwater Abstraction in Residential Areas G C Simpson WRC Report No. 211/1/90 FINAL PROJECT REPORT to the WATER RESEARCH COMMISSION RESEARCH INTO GROUNDWATER ABSTRACTION IN RESIDENTIAL AREAS VOLUME I G C Simpson Pr.Eng. C.Eng. CSIR Division of Building Technology P Q Box 395 PRETORIA 0001 July 1990 ISBN 0 947447 68 7 SET 0 947447 70 9 WRC No. 211/1/90 CONTENTS page LIST OF TABLES AND FIGURES (i) LIST OF APPENDICES (ii) ACKNOWLEDGEMENTS (iii) AIMS OF THE PROJECT (iv) EXECUTIVE SUMMARY (v) INTRODUCTION 1 OVERVIEW OF THE PROJECT 2 ACHIEVEMENT OF THE MAIN TASK 5 COLLECTION OF WATER CONSUMPTION AND WATER LEVEL DATA 6 INDIVIDUAL SITE DATA 14 DETERMINING THE NUMBER OF PROPERTIES WITH BOREHOLES 18 WATER CONSUMPTION FOR PROPERTIES WITHOUT BOREHOLES 20 DETERMINING THE VARIATION IN GROUNDWATER LEVELS 22 WATER TABLE VARIATION ACROSS THE CITY 37 RECHARGE OF GROUNDWATER 38 WATER QUALITY 42 POTENTIAL FOR INCREASES IN GROUNDWATER ABSTRACTION 47 CONCLUSION 49 RECOMMENDATIONS 52 REFERENCES AND BIBLIOGRAPHY 56 APPENDICES ADDENDUM - ESTIMATING THE ANNUAL QUANTITY OF GROUNDWATER ABSTRACTED IN THE PRETORIA MUNICIPAL AREA AND ITS EFFECT ON MUNICIPAL WATER CONSUMPTION LIST OF TABLES AND FIGURES page TABLE 1 - GROUNDCOVER AREAS (SQUARE METRES) 16 TABLE 2 - GROUNDCOVER SUMMARY FOR RESIDENTIAL HOUSES 17 TABLE 3 - GROUNDCOVER FOR GROUP HOUSING 17 TABLE 4 - 018 TEST RESULT FEBRUARY 1989 41 TABLE 5 - PAST 018 TEST RESULTS 41 TABLE 6 - LIMITS FOR WATER QUALITY DETERMINANTS 43 TABLE 7 - SAMPLES EXCEEDING RECOMMENDED LIMITS 43 TABLE 8 - AVERAGE WATER QUALITY COMPARISONS 44 TABLE 9 - AVERAGE BOREHOLE MICROBIOLOGICAL WATER QUALITY . -
Pretoria East 18515/16-4-21
Pretoria East 18515/16-4-21 QUALITY USED VEHICLES AWESOME DEALS APRIL 30, 2021 • www.rekord.co.za • 012-842-0300 012 329 0730 | www.autoplatinum.co.za Visit our website for breaking More arrests expected Covid-19 patient in Funding for emergency local, national and international news. for highway spike traps 2 ICU for seven weeks 3 and social services 4 rekordeast.co.za Sole survivor key to deaths ‘It is believed the group had gone out for drinks the Friday night when they later took the party back to Kleynhans’ entertainment house.’ Noxolo Sibiya under the impression that it was just another day in paradise and they had just passed The only survivor to a tragedy that saw three out,” he said. people die at an “extreme house of pleasure” “We are also looking at poisoning.” in Menlo Park can help investigators piece Bolhuis said the house was defi nitely used together the mysterious deaths that took for a trade of some sort in the fi eld of sex place there a week ago. and drugs, which has led to him labelling the Investigators are hoping that the woman property as “the house of extreme pleasure”. could help shed light on the circumstances He said the house was under surveillance that led to the death of a well-known and this was mostly done to record some of Pretoria property developer, Theo Kleynhans the sexual acts that were performed there. (60), and two of his colleagues at the house “Kleynhans fi lmed everyone there, on Hazelwood Street. especially the sexual behaviours. -
ENVIRONMENTAL IMPACT ASSESSMENT for the PROPOSED IKAROS SUBSTATION and ASSOCIATED 400 Kv TRANSMISSION LINE INFRASTRUCTURE, NORTH WEST PROVINCE
02 April 2002 Dear I&AP, ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED IKAROS SUBSTATION AND ASSOCIATED 400 kV TRANSMISSION LINE INFRASTRUCTURE, NORTH WEST PROVINCE As a registered Interested and Affected Party (I&AP) for the proposed Ikaros Substation and associated 400 kV Transmission line infrastructure project in the North West Province, this newsletter aims to further facilitate your understanding of the proposed project and the Environmental Impact Assessment (EIA) process being followed. The first phase of the EIA process (i.e. the Environmental Scoping Study) has been completed, and detailed studies are currently being undertaken within Phase 2 of the process (i.e. the EIA). The public participation process has been on-going throughout this process and will continue until the final EIA Report is submitted to the environmental authorities for decision-making. 1. REFRESHER: BRIEF OVERVIEW OF THE PROPOSED PROJECT Eskom Transmission propose the construction of a new 400/132 kV substation (to be known as Ikaros Substation) on the eastern side of Rustenburg. This new substation will receive power from a 400 kV Transmission line looped in from the existing Matimba-Midas 400 kV line between Ellisras and Fochville. The primary purpose of the proposed project is to improve the reliability of the electrical supply to the towns of Brits, Marikana, Kroondal, Mooinooi and Rustenburg, as well as surrounding communities, farms, businesses, and the increasing number of platinum and chrome mines and smelters in the Rustenburg area. Electricity loads required by platinum and chrome mining and smelting in the Rustenburg area is expected to reach the combined firm capacities of the existing substations in the area (i.e. -
001-185 4-7 Gaut Layout 1
T E U N THE PROVINCE OF A DIE PROVINSIE G THE PGROVINCEAUTENG OF G DIEGAUTENGPROVINSIE UNITY DIVERSITY GAUTENG P IN GAUTENG R T O N V E IN M C RN IAL GOVE Provincial Gazette Provinsiale Koerant JULY PRETORIA, 4 2012 Vol. 18 JULIE No. 185 We oil hawm he power to preftvent kllDc AIDS HEIRINE 0800 012 322 DEPARTMENT OF HEALTH Prevention is the cure N.B. The Government Printing Works will not be held responsible for the quality of “Hard Copies” or “Electronic Files” submitted for publication purposes J12-167452—A 185—1 2 No. 185 PROVINCIAL GAZETTE, 4 JULY 2012 IMPORTANT NOTICE The Government Printing Works will not be held responsible for faxed documents not received due to errors on the fax machine or faxes received which are unclear or incomplete. Please be advised that an “OK” slip, received from a fax machine, will not be accepted as proof that documents were received by the GPW for printing. If documents are faxed to the GPW it will be the sender’s respon- sibility to phone and confirm that the documents were received in good order. Furthermore the Government Printing Works will also not be held responsible for cancellations and amendments which have not been done on original documents received from clients. WHEN SUBMITTING NOTICES FOR PUBLICATION, PLEASE TAKE NOTE OF THE NEW FAX NUMBERS ON PAGE 5 CONTENTS Page Gazette No. No. No. GENERAL NOTICES 1553 Gauteng Removal of Restrictions Act (3/1996): Removal of conditions: Erf 865, Finsbury, Randfontein..................... 10 185 1554 do.: do.: Portion 33 of Erf 160, Kliprivier....................................................................................................................... -
Heritage Statement for the Replacement of a Pipe Bridge in Stoffel Park, Mamelodi East
HERITAGE STATEMENT FOR THE REPLACEMENT OF A PIPE BRIDGE IN STOFFEL PARK, MAMELODI EAST ILISO CONSULTING (PTY) LTD February 2014 _________________________________________________ Digby Wells & Associates (Pty) Ltd. Co. Reg. No. 1999/05985/07. Fern Isle, Section 10, 359 Pretoria Ave Randburg Private Bag X10046, Randburg, 2125, South Africa Tel: +27 11 789 9495, Fax: +27 11 789 9498, [email protected], www.digbywells.com _________________________________________________ Directors: A Sing, AR Wilke, LF Koeslag, PD Tanner (British)*, AJ Reynolds (Chairman) (British)*, J Leaver*, GE Trusler (C.E.O) *Non-Executive _________________________________________________ c:\users\angeline.swanepoel\desktop\ili2395_hsr_stoffel_park_final.docx Heritage Statement for the replacement of a pipe bridge in Stoffel Park, Mamelodi East ILI2395 This document has been prepared by Digby Wells Environmental. Report Title: Heritage Statement for the replacement of a pipe bridge in Stoffel Park, Mamelodi East Project Number: ILI2395 Name Responsibility Signature Date Natasha Higgitt Junior heritage consultant: archaeologist Specialists and 6 February 2014 Shahzaadee report writers Karodia Junior heritage consultant: palaeontologist Johan Nel st HRM Unit 1 Review 6 February 2014 Manager This report is provided solely for the purposes set out in it and may not, in whole or in part, be used for any other purpose without Digby Wells Environmental prior written consent. ii Heritage Statement for the replacement of a pipe bridge in Stoffel Park, Mamelodi East ILI2395 EXECUTIVE SUMMARY Digby Wells Environmental (hereafter Digby Wells) has been requested by ILISO Consulting Engineers (hereafter ILISO) to complete a Heritage Statement Report and submit a Notification of Intent to Develop to the responsible authority in order to comply with certain requirements in terms of the National Environmental Management Act, 1998 and the National Heritage Resources Act, 1999 for the replacement of an informal pipe bridge in Stoffel Park, Mamelodi East. -
Madibeng – North West
Working for integration Mookgopong Thabazimbi Modimolle Waterberg District Bela-Bela Municipality Moses Dr JS Kotane Moroka Moretele Local Municipality of Madibeng Thembisile North West Bojanala District City of Tshwane Municipality Metropolitan Municipality Rustenburg N4 City of Tshwane Kgetlengrivier Mogale City City of Ditsobotla Johannesburg Ekurhuleni Victor Ventersdorp Merafong Randfontein Khanye City Sources:Lesedi Esri, USGS, NOAA Madibeng – North West Housing Market Overview Human Settlements Mining Town Intervention 2008 – 2013 The Housing Development Agency (HDA) Block A, Riviera Office Park, 6 – 10 Riviera Road, Killarney, Johannesburg PO Box 3209, Houghton, South Africa 2041 Tel: +27 11 544 1000 Fax: +27 11 544 1006/7 Acknowledgements The Centre for Affordable Housing Finance (CAHF) in Africa, www.housingfinanceafrica.org Coordinated by Karishma Busgeeth & Johan Minnie for the HDA Disclaimer Reasonable care has been taken in the preparation of this report. The information contained herein has been derived from sources believed to be accurate and reliable. The Housing Development Agency does not assume responsibility for any error, omission or opinion contained herein, including but not limited to any decisions made based on the content of this report. © The Housing Development Agency 2015 Contents 1. Frequently Used Acronyms 1 2. Introduction 2 3. Context 5 4. Context: Mining Sector Overview 6 5. Context: Housing 7 6. Context: Market Reports 8 7. Key Findings: Housing Market Overview 9 8. Housing Performance Profile 10 9. -
Failure of Rand Water's H29 Pipeline
HEAD OFFICE 522 Impala Road Glenvista 2058 P O Box 1127 Johannesburg 2000 South Africa 5 August 2020 MEDIA STATEMENT FAILURE OF RAND WATER’S H29 PIPELINE Rand Water has experienced a failure on its H29 pipeline in the Andeon area, Pretoria this morning. The line is now currently being dewatered in order for the repair to be effected. We have identified the failure and the repair will take place as soon as the line is dewatered All meters have alternative supply connection on our H22 pipeline; however, those meters that are supplied from Hartebeeshoek Reservoir will be affected whilst the H29 is being isolated. The Hartebeeshoek Reservoir level is dropping, as its supply was not possible during the 40-hour shutdown cross connection of the H42 to H29 pipeline that was undertaken from 4 to 5 August 2020. The areas below will be affected: Akasia Reservoir • Amandasig, all extensions • Beetgesberg 279-JR • Chantelle, all extensions 1 • Doreg AH • Florauna Ext 2 • Hartebeeshoek 303-JR and 312-JR • Heatherdale AH • Heatherview Ext 12, 54 and 56 • Ninapark, all extensions • Plantland 567-JR Klip-Kruisfontein Reservoir • Klipfontein 268-JR • Klip-kruisfontein 708-JR • Soshanguve South Ext 12 and 13 Magalies/Rosslyn Reservoir • Amandasig, all extensions • Beetgesberg 279-JR • Eldorette 311-JR • Chantelle Ext 41 • Clarina Ext 38 • Farm areas (Akasia) • Hartebeeshoek 251-JR and 303-JR • Haakdoornboom 267-JR • Hermon 289-JR • Karenpark, all extensions 2 • Klerksoord AH • Klerksoord Ext 20 and 28 • Klipfontein 268-JR • Moloto • Rosslyn, all extensions -
CHAPTER 5 Historic and Contextual Analysis Mamelodi
CHAPTER 5_ Historic and contextual analysis_ Mamelodi 5.1_ MAMELODI HISTORIC TIMELINE Pretoria was founded in 1855. During that time various black populations were living In 1958 the majority of the people were removed from the Lady Selborne area within the boundaries of the current city close to their employers and in their kraals or to the then Vlakfontein farm, known as the native location. settlements. In 1953 Vlakfontein was formally proclaimed a township. Only people working in Pretoria based on the ”dompas” law were allowed to stay in this area, others Set against the Thaba-tsa-ga-Mogale mountain, also known as Magaliesberg. The were removed. Thus making the “township“ a labour reservoir for Pretoria. Moretele River runs along the foot of this mountain. The first people to live on this In 1954 Mamelodi was divided into areas named wards based on ethnic origin, land were native herdsman and farmers speaking either Ndebele or Tshwane. ie: Zulu, Sotho, Tshwane etc. for political safety reasons. By 1954, 6000 people were already living at Vlakfontien in inadequate living nd conditions and by 1987 an estimate of 350 000 people by census in Mamelodi. The 2 Anglo Boer war left its trace with reminisces of trenches found in and around the area. The first squatter camp was situated in the current day Mamelodi East. These Mamelodi developed on the farm Vlakfontein 329 JR. originally owned my Mr. were people waiting to receive houses, it was called Mandela Village. Jansen until 1874 which was then divided into three plots. The three plots were sold The first amenity administration committee was established in 1955, it served as off in parts from 1874 to 1949. -
Region 5: Regional Integrated Development Plan 2014-15
REGION 5: REGIONAL INTEGRATED DEVELOPMENT PLAN 2014-15 1 REGIONAL INTEGRATED DEVELOPMENT PLAN: REGION 5 CONTENTS 1 INTRODUCTION ................................................................................................ 7 2 SITUATIONAL OVERVIEW ............................................................................... 8 2.1 Socio-Economic Profile ...................................................................................... 9 2.1.1 Population Size and Composition ................................................................ 9 2.1.2 Levels of Education ................................................................................... 10 2.1.3 Employment ............................................................................................... 11 2.1.4 Accommodation ......................................................................................... 12 2.2 Spatial Characteristics ..................................................................................... 13 2.2.1 Main Components ..................................................................................... 13 2.2.2 Regional Characteristics ............................................................................ 14 2.3 SWOT Analysis ................................................................................................ 15 3 STRATEGIC DIRECTION ................................................................................ 16 3.1 City of Tshwane Vision and Mission ................................................................ -
Mamelodi East P.39 Eersterust P.43 Woodlane Village P.46 Street Homelessness P.56 Urban Studio Map P.66
Healing Urban Fractures INSIDE A PANDEMIC Vulnerability, imagination, innovation in the City of Tshwane Urban Studio Annual Reflective Report TABLE OF CONTENTS Inside a pandemic p.01 Stephan de Beer When or demons are unleashed p.14 Lance Thomas Urban Studio: Annual Report 2020 Jude Nnorom p.17 Burgers Park p.21 Salvokop p.27 West Capital Precinct p.32 Mamelodi East p.39 Eersterust p.43 Woodlane Village p.46 Street homelessness p.56 Urban Studio Map p.66 Epilogue p.68 STEPHAN DE BEER ovid-19 is not really the but, because this takes place in great equalizer, as some the global South, the world does would have it. Instead, not come to a standstill and hardly C ways more visible than be- anyone gives it a thought. fore, it illustrated the cruel ine- The cruelty of debilitating poverty qualities that face humanity. And and the criminality of inequality only some have the ability to are not called out for what it is. protect themselves from the virus, Instead, it is regarded as inevita- whilst others are placed at greater ble. We even resort to Jesus, in- risk. Whereas Covid-19 reveals our terpreting his response to Judas, common and interconnected humanity, saying, 'The poor will always be with us!’ it also puts on vivid display our suggesting that Jesus thereby con- cruel and calculated inhumanity. doned poverty and inequality. What Jesus really did was to turn on the THE PANDEMIC, AND OTHER DEATH-DEALERS farcical Judas, pretending to care for the poor, whilst he not only Many have commented that Covid-19 exploited the poor, but was also is not the only pandemic we face at about to betray Jesus for money2. -
Laudium, City of Tshwane Local Municipality, Gauteng Province
Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTUCTION OF A HINDU TEMPLE IN LAUDIUM, CITY OF TSHWANE LOCAL MUNICIPALITY, GAUTENG PROVINCE Prepared for: Envirolution (Ms A Govender) • Postal Address: P O Box 1898, Sunninghill, 2157; Tel: 0861 444 499, E-mail: [email protected] Prepared by: J A van Schalkwyk (D Litt et Phil), • Heritage Consultant: ASAPA Registration No.: 164 - Principal Investigator: Iron Age, Colonial Period, Industrial Heritage. • Postal Address: 62 Coetzer Avenue, Monument Park, 0181; Tel: 076 790 6777; E-mail: [email protected] Report No: 2017/JvS/047 • Status: Final • Date: October 2017 • Revision No: - • Date: - Cultural Heritage Assessment Hindu Temple, Laudium Copy Right: This report is confidential and intended solely for the use of the individual or entity to whom it is addressed or to whom it was meant to be addressed. It is provided solely for the purposes set out in it and may not, in whole or in part, be used for any other purpose or by a third party, without the author’s prior written consent. Declaration: I, J.A. van Schalkwyk, declare that: • I am suitably qualified and accredited to act as independent specialist in this application. • I do not have any financial or personal interest in the proposed development, nor its developers or any of their subsidiaries, apart from the provision of heritage assessment and management services, for which a fair numeration is charged. • The work was conducted in an objective manner and any circumstances that might have compromised this