Downtown Aurora Master Plan Existing Conditions Overview

Total Page:16

File Type:pdf, Size:1020Kb

Downtown Aurora Master Plan Existing Conditions Overview DATE Downtown Aurora Master Plan Existing Conditions Overview DRAFT - APRIL 2016 Acknowledgements Thank you to the following residents, business owners, City staff, and elected officials who participated in the creation of this Plan: Project Steering Committee Kirk Albinson, The Community Builders Jimi Allen, Gravity Building Lulu Blacksmith, Waubonsee Community College Karen Christensen, Fox Valley Music Foundation & A-Town Poetics Rena Church, Aurora Public Art Eric Gallt, City of Aurora Kim Granholm, Aurora Downtown Joe Grisson, African American Heritage Advisory Board Michael Groh, Pace Bus Brian Hacker, Metra Dave Hulseberg, Invest Aurora Sherman Jenkins, Economic Development Consultant Alex Minnella, City of Aurora Gina Moga, City of Aurora Cynthia Penne, Fox Valley Park District Cadence Peterson, Invest Aurora Stephane Phifer, City of Aurora Heather Tabbert, RTA Bill Wiet, City of Aurora Unless otherwise specified, all photos are by CMAP staff. Table of Contents Executive Summary 4 Section 1: Introduction & Context 6 Section 2: Background 10 Section 3: Community Outreach 15 Section 4: Transportation and Circulation 30 Section 5: Built Environment 52 Section 6: Economy and jobs 66 Section 7: Health and safety 74 Section 8: Natural Environment 82 Section 9: Education, Arts, and Community Services 94 Section 10: Looking Forward 104 Appendices 108 3 Executive Summary This report contains an in-depth look at the following Sustainability topics: background and history of downtown Aurora, The Fox River is the heart of the downtown study area, and the City has transportation and circulation, built environment, proven its interest in improving the river’s visibility and quality with a economy and jobs, health and safety, natural number of green infrastructure projects and open space development. The river provides recreational opportunities, wildlife habitat, and drinking environment, arts and community services. There is water through the City’s nationally recognized water treatment and supply also an overview of community outreach conducted to system. Unfortunately, as wildlife habitat and a recreational asset, it date and the direction of potential recommendations to suffers from impaired water quality, attributed to man-made dams, urban runoff, combined sewer overflows, and point source discharges. Increasing be pursued in the development of the master plan. the recreational use of the river and enhancing overall enjoyment for residents and visitors is a high priority for many, as evidenced by the Walkability recently completed River Edge Park development. A review of the various transportation options available in downtown Livability Aurora highlights many recent improvements including new pedestrian Downtown has an older and smaller housing stock with many studio and and bicycling infrastructure, as well as two-way street conversions. one-bedroom apartments. Although building codes have been modified Existing opportunities to creating a more walkable downtown area and recently to help facilitate redevelopment, there is a perception that some improving safety for all modes include addressing jurisdictional hurdles, codes and requirements, such as having retail on the first floor, may still push-button wait signals, and infrastructure built around the personal be obstacles. The City has many buildings of architectural significance, and automobile. Gateways into downtown lack distinction and due to traffic passionate groups dedicated to protecting them. High-level arts, such as speed and narrow sidewalks, some thoroughfares do not feel safe to walk the Broadway Series at the Paramount Theatre, have been a great success along. in Aurora, attracting thousands of visitors to the area on a regular basis. Numerous museums and institutions offer culture, classes, and valuable programs that are often underutilized by the community. 4 Downtown Aurora Master Plan Existing Conditions Report Trends A growing arts and culture scene has brought new interest and appreciation for the downtown area in recent years, which should complement the many public and civic organizations that exist and enhance economic development opportunities and attractiveness. However, economic development progress has been slower than some expected downtown due to a number of factors, including weak private sector job growth, limited new housing development, a lagging recovery from the recession for Aurora and other markets, and significant competition in the retail market. High office vacancy rates may indicate that industry sectors such as finance and insurance, information, and other service-related sectors desire types of space not currently available in the downtown. ADD PHOTO Despite a significant increase in safety and a decrease in crime in Aurora, based on public input it is apparent that the perception of crime and danger downtown may still impact public willingness to visit, walk, and bike downtown. A multi-pronged approach to inviting people to enjoy the many cultural and recreational opportunities, while promoting growth in targeted industries, will help the downtown to build the future that so many see as its strong potential Executive Summary 5 Section 1 INTRODUCTION & CONTEXT In partnership with the Chicago Purpose of the Existing Conditions The Downtown Metropolitan Agency for Planning, Report Master Plan the City of Aurora is developing a This Existing Conditions Report—representing the downtown master plan amendment to result of approximately four months of research, will serve as a the 2006 Seize the Future Downtown analysis, and public outreach activities—provides an overview of the current conditions in Aurora and is guide for elected Master Plan. The updated plan will designed to provide a starting point for creating a officials, property define the vision of the Downtown’s shared vision of the future. owners, City future and the steps needed to achieve What is a Downtown Plan? that vision. Having an accurate staff, community The Downtown Master Plan will serve as a guide understanding of the existing conditions for elected officials, property owners, City staff, residents, in the City is a necessary step to community residents, business owners, and potential business owners, developing an appropriate and effective investors. The Plan will assist in making informed administrative and implementation decisions about and potential downtown plan that addresses the future efforts that affect land use, transportation, issues and concerns of the community. infrastructure, urban design and identity, historical investors. and architectural preservation, and capital improvements within Downtown. Section 1: Introduction and Context 7 FFigureig 1.1 City o 1.1f Au rDowntownora and Downtown AuroraStudy Area StudySUNSET AAreaVE ZENGELE AVE T O S R T LAWNDALE AVE R S C E H W V A I E R I R V D E N N A V V A E N Why Does Aurora Need a New Downtown L O C N I E L Plan? W ILLINOIS AVE V A N A R EDWARDS ST O In 2006, the City of Aurora approved the Seize the Future R Illinois U A E T McCullough Park V Avenue E M A S RURAL ST Downtown Master Plan, which provided a 10-year plan V Island Park D E A c N C C A A O L u W T and long term vision for the downtown, focusing on M E A l S O l V M I P o A T A u O H E A g I neighborhoods and economic development. Since the O V T h N E l A R S i A V P D N V R a A L a N r E K development of the plan, Seize the Future has become Y A r D T A T k S L R I S O r N G W e N Y r R a nonprofit public-private partnership responsible for A E v EISIN i G E P AV M T R S e N city-wide economic development, and is now called E x K Stevens Playground o v A WILLIAMS ST F View Street Park L i Invest Aurora. Developers are interested in seeing a N R Y A new plan in place and City leaders desire to incorporate W D x A T F O S W PA ox Ri R RK AVE ver Tr recommendations for the northern part of downtown and ail Co B K nnector o N FRO W N h T ST A F c RiverEdge close to the Aurora Transportation Center. The new plan H n K VI a Park C N r CEDAR S E A T North River B T S L T Wilder S a will complement and enhance the existing Downtown B Street Park GR T r OV T Park E ST S T o U S r T N u Master Plan by addressing walkability, sustainability T S R S U E A V E C I - H R O «¬31 L S C h UP N E RIO and livability. With a robust public engagement process, t R ST N N a P e the new plan provides opportunities for the City to i r S i P a L RU r I2 IBERTY C P E ST T E comprehensively address issues related to its role within E Aurora V S S s V T i A W A G N ALE Metra NA B o N LVD Y O W n L T S i Station E N t l O the regional and local marketplace, land use priorities, S L s l R T E I C W e L E T S Y N A I F S O T W 25 V R «¬ L F U K - U S N E and improvement of pedestrian and vehicular access and C l T J N T i S O a T r L S T W E S r circulation needs. Figure 1.1 shows the study area chosen E I H e v CL V C i AIM R ST S S x for this planning project.
Recommended publications
  • +/- 167.45 Acres for SALE Route 47 & Wheeler Sugar Grove, Illinois
    +/- 167.45 Acres FOR SALE Route 47 & Wheeler Sugar Grove, Illinois Ideal Business Park Location! • Approx. 2 Miles to new I-88 interchange scheduled for 2019 • Approx. 1 Mile to Rt 56/30 Bypass • Only 1 stoplight from Interstate access • Sewer and water adjacent • Planned Business Park/Corridor Commercial Dan Flanagan, ALC Managing Broker Phone: 630-388-8522 Fax: 630-443-1239 email: [email protected] http://www.flanaganland.com Flanagan Realty, LLC represents the seller in this transaction and will not be acting as a dual agent or representative of the buyer unless specifically stated in writing. The information contained herein is from sources considered reliable, but is not guaranteed and is subject to change without notice. Buyers are advised to independently verify all information and perform their own due diligence. This offering may be withdrawn or subject to a change in price or terms without advance notice. Seller reserves the right to reject any and all offers. +/- 167.45 Acres FOR SALE Route 47 & Wheeler Sugar Grove, Illinois 17 Reasons to Consider This Sugar Grove Property for Industrial Development: 1. Less than 1 mile to Rt 56/U.S. 30 bypass to I-88 eastbound. 2. Less than 1 mile to westbound Rt 56/U.S. 30 with no tolls. 3. Only one stoplight away from interstate access. 4. <2.25 miles to full I-88 interchange at Rt 47 planned for 2019. 5. < 1/4 mile from proposed 500,000 sq ft manufacturing facility. 6. Within 30 miles of I-39, I-80, I-55, I-90, I-294 and O’Hare.
    [Show full text]
  • Phifer, Stephane
    Phifer, Stephane <[email protected]> Downtown Aurora Master Plan From Arts to Industry: Rebuilding the Historic Downtown Introduction & Overview ....................................................................................................................3 Project Background ............................................................................................................................. 3 Organization of the Plan ...................................................................................................................... 3 Community engagement overview ...................................................................................................... 4 A Vision for Downtown Aurora ...........................................................................................................6 Focus Areas .......................................................................................................................................8 The Downtown Experience ........................................................................................................... 8 Key findings ..................................................................................................................................... 8 Recommendations ........................................................................................................................... 8 Revitalizing the Downtown Economy ................................................................................................. 18 Key findings ..................................................................................................................................
    [Show full text]
  • Acceptance Criteria of Airfield Concrete Pavement Using Seismic and Maturity Concepts
    An IPRF Research Report Innovative Pavement Research Foundation Airport Concrete Pavement Technology Program Report IPRF-01-G-002-02-2 Acceptance Criteria of Airfield Concrete Pavement Using Seismic and Maturity Concepts Programs Management Office 5420 Old Orchard Road Skokie, IL 60077 May, 2006 An IPRF Research Report Innovative Pavement Research Foundation Airport Concrete Pavement Technology Program Report IPRF-01-G-002-02-2 Acceptance Criteria of Airfield Concrete Pavement Using Seismic and Maturity Concepts Principal Investigator Soheil Nazarian, PhD, PE Contributing Authors Deren Yuan, PhD Kurt Smith, PE Farhad Ansari, PhD Carlos Gonzalez, PE Programs Management Office 5420 Old Orchard Road Skokie, IL 60077 May, 2006 This report has been prepared by the Innovative Pavement Research Foundation under the Airport Concrete Pavement Technology Program. Funding is provided by the Federal Aviation Administration under Cooperative Agreement Number 01-G-002. Dr. Satish Agrawal is the Manager of the FAA Airport Technology R&D Branch and the Technical Manager of the Cooperative Agreement. Mr. Jim Lafrenz, P.E. is the Program Director for the IPRF. The Innovative Pavement Research Foundation and the Federal Aviation Administration thanks the Technical Panel that willingly gave of their expertise and time for the development of this report. They were responsible for the oversight and the technical direction. The names of those individuals on the Technical Panel follow. Mr. Jeff Rapol Federal Aviation Administration Dr. Kevin MacDonald, P.E. Cemstone Products Mr. Robert Taylor American Concrete Pavement Association Dr. Wayne Seiler, P.E. All About Pavements, Inc. Ms. Susan Winslow, P.E. Delta Airport Consultants, Inc. The contents of this report reflect the views of the authors who are responsible for the facts and the accuracy of the data presented within.
    [Show full text]
  • Preliminary Report Aviation
    This space for binding Printed on : 11/22/2013 7:45:37 AM NTSB ID: CEN11FA383 Most Critical Injury: National Transportation Safety Board Minor PRELIMINARY REPORT Occurrence Date: 06/13/2011 Investigated By: NTSB AVIATION Occurrence Type: Accident Location/Time Nearest City/Place State Zip Code Local Time Time Zone Oswego IL 60543 0947 CDT Aircraft Information Registration Number Aircraft Manufacturer Model/Series Number N390TH BOEING B-17G Type of Aircraft: Airplane Amateur Built Aircraft? No Injury Summary: Fatal Serious Minor 1 None 6 Revenue Sightseeing Flight: No Air Medical Transport Flight: No Narrative Brief narrative statement of facts, conditions and circumstances pertinent to the accident/incident: *** Note: NTSB investigators either traveled in support of this investigation or conducted a significant amount of investigative work without any travel, and used data obtained from various sources to prepare this aircraft accident report. *** On June 13, 2011, about 0947 central daylight time, a Boeing B-17G "Flying Fortress" airplane, N390TH, experienced an in-flight fire and performed an emergency landing near Oswego, Illinois. One passenger sustained a minor injury. The 3 crew members and 3 other passengers were not injured. The airplane was substantially damaged as a result of a fire that ensued after it was on the ground. The aircraft was registered to and operated by The Liberty Foundation under the provisions of 14 Code of Federal Regulations Part 91 as a repositioning flight. Visual meteorological conditions prevailed for the flight, which was not operated on a flight plan. The flight originated from the Aurora Municipal Airport (ARR), Aurora, Illinois at 0938.
    [Show full text]
  • Foxwalk Overlay District Design Guidelines-Regulations and Procedures
    The FoxWalk Overlay District Design Guidelines-Regulations and Procedures Forward to the Revised Edition, 2008 Beginning in 1974, the City of Aurora, in collaboration with a succession of expert consultants, set out to draft a series of plans and regulations to guide the redevelopment of downtown Aurora. These documents laid the foundation for efforts that have been implemented over the past 30+ years, including: • the creation of the FoxWalk Overlay District, encompassing the Downtown Core and Downtown Fringe zoning districts; • design guidelines for the restoration of existing structures; • principles to inform the architecture of new buildings; and • specifications for the Riverwalk, a two-tiered walkway to be built around Stolp Island and along the east and west banks of the Fox River, named “the FoxWalk” in 1992 by local schoolchildren. The first volunteers were appointed to the Riverwalk Commission (1989) and the FoxWalk Overlay District Design Review Committee (1993) by Mayor David L. Pierce to oversee construction of the public walkway system along the Fox River and development within the DC/DF zoning districts. Looking backward from our current vantage point, it is clear that these plans and the people who helped formulate them served the redevelopment of downtown Aurora well. Over 1100 Certificates of Appropriateness have been issued since the creation of the original design guidelines and the Design Review Committee. Construction permits valued at over $103 million have been issued within the boundaries of the FoxWalk District
    [Show full text]
  • BOARD of COMMISSIONERS BUDGET & APPROPRIATION PUBLIC HEARING AGENDA 1.0 Call to Order President Anderson 2.0 Roll Call Pres
    BOARD OF COMMISSIONERS Serving the Fox Valley Park District Kane, DuPage, Kendall & Will Counties, Illinois BUDGET & APPROPRIATION PUBLIC HEARING December 11, 2017 6:00 p.m. Prisco Community Center 150 W. Illinois Avenue, Aurora AGENDA 1.0 Call to Order President Anderson 2.0 Roll Call President Anderson 3.0 Budget & Appropriation Public Hearing President Anderson 4.0 Adjourn Public Hearing President Anderson The Fox Valley Park District is subject to the requirements of the Americans with Disabilities Act of 1990. Individuals with disabilities who plan to attend this meeting and who require certain accommodations in order to allow them to observe and/or participate in this meeting, or who have questions regarding the accessibility of the meeting or the facilities, are required to contact ADA Coordinator, Mr. Michael Pieroni at (630-897-0516) promptly to allow the District to make reasonable accommodations. FOX VALLEY PARK DISTRICT BOARD OF COMMISSIONERS Serving the Fox Valley Park District Kane, DuPage, Kendall and Will Counties, Illinois OPEN SESSION MEETING AGENDA December 11, 2017 Prisco Community Center 150 W. Illinois Avenue, Aurora 6:00 p.m. 1.0 CALL MEETING TO ORDER President Anderson 2.0 PLEDGE OF ALLEGIANCE AND MOMENT OF SILENCE President Anderson 3.0 ROLL CALL President Anderson 4.0 ADDENDA TO THE AGENDA President Anderson 5.0 CONSENT AGENDA President Anderson The following items require a Roll Call vote. 5.1 Approve the Open Session meeting minutes of November 20, 2017. 5.2 Approve payables for the period ending November 30, 2017 in the amount of $1,420,229.35.
    [Show full text]
  • City of Aurora Annual Budget 2020
    et 2020 et g Bud l a Annu a r o r Au of City et 2020 et g Bud l a Annu a r o r Au of City ANNUAL BUDGET 2020 fANNUALor the fiscal year beginning BUDGET January 1, 2020 for the fiscal year beginning January 1, 2020 (This page is intentionally left blank.) TABLE OF CONTENTS SECTION I – INTRODUCTION Reader’s Guide .............................................................................................................................. 1 City Council Photo ........................................................................................................................ 3 Principal Officials ......................................................................................................................... 4 Mayor’s Budget Message ............................................................................................................. 5 Distinguished Budget Presentation Award ................................................................................. 19 Map ............................................................................................................................................. 20 Historical Summary .................................................................................................................... 21 Community Profile...................................................................................................................... 22 Organization Chart ...................................................................................................................... 27 The Budget
    [Show full text]
  • Aurora Municipal Airport
    TH NOR 88 AURORA 56 47 30 47 112.41 Acres Galena Boulevard Municipal Drive 30 Wheeler Road Colliers International 112.41 Acres (Divisible) Sugar Grove, Illinois Property Description OFFERING PRICE: $2.50 SF 1.) 112.41 acres divisible 2.) Subject property is part of a larger TIF approved by the Village of Sugar Grove 3.) Pro-business community 4.) Frontage and access on Rt. 30, Galena Blvd. and Municipal Drive 5.) Two fully signalized intersections to the property; 1.) Rt. 30 and Municipal Drive and 2.) Rt. 47 and Galena Blvd. 6.) Sewer and water to the property 7.) Annexed and currently zoned A-1. Industrial and commercial/retail potential 8.) Immediate access to the expressway system from Rt. 30 / Rt. 56 / Rt. 47 • I-88 (East) .............................................. 5 miles • I-88 (West) .......................................... 3.7 miles • SR 59 .....................................................14 miles • I-355 .....................................................22 miles • I-80 ....................................................... 27 miles • I-294 ......................................................31 miles • O’Hare International Airport ................40 miles 9.) Adjacent to the Aurora Municipal Airport 10.) Illinois Rt 56 Bridge Clearance Galena Blvd EB 16’-01” WB 14’-02” Prairie Path (Virgil Gilman) EB 22’-10” WB 22’-02” Hankes Rd EB 14’-02” WB 14’-04” Colliers International 112.41 Acres (Divisible) | Sugar Grove, Illinois 2 PLEASANT PRAIRIE WISCONSIN ILLINOIS HARVARD GURNEE WAUKEGAN NORTH MCHENRY 01 5 10 miles NORTH CHICAGO GRAYSLAKE CRYSTAL LAKE LIBERTYVILLE 12 WAUCONDA 45 LAKE FOREST 83 60 . VERNON HILLS Y CO LAKE ZURICH 94 CARY 83 McHENR 22 MARENGO LAKE IN THE HILLS 45 LINCOLNSHIRE HIGHLAND PARK DEERFIELD HUNTLEY BARRINGTON LAKE CO. BUFFALO GROVE COOK CO.
    [Show full text]
  • Aurora Municipal Airport Advisory Board Meeting – April 16, 2018
    Aurora Municipal Airport Advisory Board Meeting – April 16, 2018 I. Meeting was called to order at 6:00 p.m. by Chairman Armbruster. II. MEMBERS PRESENT: Mr. Armbruster, Mr. Koster, Mr. Wolf, Mr. Baker, Mr. Lieser, Mr. Dorf, Mr. Rudigier, Mr. Fank MEMBERS EXCUSED: Mr. Davis MEMBERS ABSENT: Mr. Bonifas REPS PRESENT: Mr. Langerveld OTHERS PRESENT: Kyle Peabody, Luke Grotto, Mike Warner, Amy Maveus III. A motion was made by Mr. Lieser, seconded by Mr. Wolf, to accept the minutes of the February 12, 2018 meeting of the Airport Advisory Board. The motion carried unanimously. IV. Committee Reports A. Finance – No report B. Planning and Ops – No report V. Old Business A. Sugar Grove Update – Mr. Wolf reported Anytime Fitness has started construction. B. Draft Airport Rate Study – No report C. Drone Business Opportunities – No report. To be removed from agenda. D. Airfield Signage Project – Mr. Peabody reported D-Construction plans to begin the project on May 7, 2018. The project is scheduled to take 48 days. There will be phased airfield closures during construction. CMT, D-Construction, control tower personnel and airport administration will meet to discuss planned closures. A notice detailing phasing of closures will be emailed to airport tenants. E. Airport Entrance Sign – No report F. Sugar Grove Park District (Ball Field Sale) – Mr. Armbruster reported the closing on the property is scheduled to take place soon. Mr. Koster questioned the sale of the Harner property. Mr. Armbruster and Mr. Peabody reminded the board of the additional parcels that were included in the land release to be sold.
    [Show full text]
  • Autumn 2008 Aurora Borealis Newsletter
    INSIDE: Phillips Park Fall Festival page 5 Canadian National Railway fight pages 6-7 City Services Expo page 10 Festival of Lights celebration is Sept. 20 See page 4 the city of aurora, illinois - www.aurora-il.org aurora Public safety up; borealis AUTUMN crime down in Aurora 2008 Crime continued to drop significantly in Aurora during the first six months of 2008, Aurora and the Aurora Police Department reports there have been no homicides this year. repeats as Violent crime – murder, criminal sexual assault, robbery and aggravated assault/ battery – decreased 15.58 percent in the first six months of 2008 compared to the ‘top 100’ city same period last year. Property crimes – burglary, theft, motor vehicle theft and The City of Lights has once again arson – dipped 3.53 percent. been named one of America’s best These latest numbers come on the heels of 2007 statistics that showed the lowest places to live by Money magazine. number of reported crimes in Aurora in 22 years. The August edition of the magazine ranks Aurora as Chief of Police Greg Thomas connected the drop one of the top 100 small cities in which to live. in crime to the diligence of Aurora Police Officers, partnerships with federal, state and county law To determine America’s best places to live, Money Diligence of officers, enforcement agencies and increased community considers such data as housing affordability, job partnerships with law awareness and involvement. growth, education “ quality, public safety enforcement agencies “These factors, I feel, are the most important and recreational tools we’ve used in improving the safety of our and citizen involvement opportunities.
    [Show full text]
  • Transition Report
    Yesterday’s plan. Today’s action. LAYING THE FOUNDATION FOR AURORA’S FUTURE. MAYOR RICHARD C. IRVIN TRANSITION REPORT Cover Photo RICKY CERVANTES 2 MAYOR RICHARD C. IRVIN TRANSITION REPORT TABLE OF Contents 01 Mayor’s Introduction 02 Transition Team Leadership Introduction 03 Transition Team Subcommittee Members 04 Transition Plan Summary and Highlights 08 Government Administration Subcommittee 14 Education and Workforce Development Subcommittee 17 Public Safety Subcommittee 20 Arts, Recreation and Culture Subcommittee 23 Housing and Community Development Subcommittee 27 Intergovernmental Affairs Subcommittee 29 Economic Development Subcommittee 34 Transportation, Infrastructure, Environment and Sustainability Subcommittee 41 Attachment - Tallahassee Penny Tax Program 3 MAYOR RICHARD C. IRVIN TRANSITION REPORT LETTER FROM the Mayor Dear Friends, The Irvin Transition Team exemplifies what can clearly be accomplished when citizens are given the opportunity to engage with local government and lend their expertise, experience, desires and ideas to our city’s growth. Over 200 city of Aurora stakeholders participated in the creation of this transition report with the idea that their recommendations would influence and be an integral component of future governmental decisions. These recommendations were so much in alignment with my vision for the city of Aurora and my goals to achieve that vision that this transition report has evolved into the City of Aurora’s Action Plan. For example, during my campaign and early in my administration, I spoke regularly of the need to improve the educational and career outcomes of Aurora’s youth. I believe our young people should be offered many academic and skills development opportunities that will ultimately lead to successful careers.
    [Show full text]
  • 1016 Airpark Drive Sugar Grove, Il 60554
    INDUSTRIAL SPACE FOR LEASE 1016 AIRPARK DRIVE SUGAR GROVE, IL 60554 Neil Johnson Managing Director/Broker 630.938.4950 [email protected] SVN | LANDMARK COMMERCIAL REAL ESTATE | 25 N THIRD STREET, SUITE 200, GENEVA, IL 60134 LEASE BROCHURE 1016 Airpark Dr, Sugar Grove IL OFFERING SUMMARY PROPERTY OVERVIEW Available SF: 5,000 SF Flex industrial space in quality, multi-tenant brick building with well-kept landscaping. 16’ ceiling in warehouses. 14x14 overhead door, warehouse walk-in door, 200 AMP, 3 phase electric power. Lease Rate: $6.00 SF/yr (NNN) Warehouse area has ceiling hung gas furnace. Front office space has separate HVAC. Shared outdoor 54' at-grade dock located at north end of building. Lot Size: 2.01 Acres Private paved parking with 43 total spaces. $2.07/sf est. avg. operating expenses, including taxes, landscaping & snow removal. Year Built: 1991 LOCATION OVERVIEW Industrial business park located at US Hwy 30 & Dugan Rd, just west of the Building Size: 20,000 SF Aurora Municipal Airport at the western edge of the Chicago metropolitan area This property is 48 miles due west of downtown Chicago. Distance to Rt. 47 (3 mi), Orchard Rd (6.5 mi) Rt. 23 (14 mi), downtown Aurora (9 mi). Easy access to Zoning: M1 I-88 east/west tollway and Rt. 47. 30 minute drive to DeKalb, Naperville or St. Charles. Market: Chicago - Far West Submarket: Kane County INDUSTRIAL SPACE FOR LEASE | 1016 AIRPARK DRIVE, SUGAR GROVE, IL 60554 SVN | Landmark Commercial Real Estate | Page 2 The information presented here is deemed to be accurate, but it has not been independently verified.
    [Show full text]