Pratapgarh (UTTAR PRADESH)
Total Page:16
File Type:pdf, Size:1020Kb
PURVANCHAL VIDYUT VITARAN NIGAM LTD. SCHEME FOR HOUSEHOLD ELECTRIFICATION DISTRICT : Pratapgarh (UTTAR PRADESH) DEEN DAYAL UPADHYAYA GRAM JYOTI YOJANA Table of Contents Sl.No. Format No. Name Page No. 1 A General Information 1 2 A(I) Brief Writeup 2 3 A(II) Minutes 2 4 A(III) Pert Chart 2 5 A(IV) Certificate 2 6 A(V) Basic Details of District 2 7 A(VI) Abstract : Scope of Work & Estimated Cost 4 8 A(VII) Financial Bankability 21 9 B Electrification of UE villages 23 10 B(I) Block-wise coverage of villages 24 11 B(II) Villagewise/Habitation wise coverage 25 12 B(III) Existing Habitation Wise Infrastructure 25 13 B(IV) Village Wise/Habitation Proposed Works 25 14 B(V) Existing REDB Infrastructure 25 15 B(VI) Block-Wise Substation 29 16 B(VII) Feederwise DTs 30 17 C Feeder Segregation 37 18 D Connecting unconnected RHHs 38 19 D(I) Block-wise coverage of villages 39 20 D(II) Villagewise/Habitation wise coverage 40 21 D(III) Existing Habitation Wise Infrastructure 50 22 D(IV) Village Wise/Habitation Proposed Works 60 23 D(V) Existing REDB Infrastructure 86 24 D(VI) Block-Wise Substation 90 25 D(VII) Eligibility for Augmentation of Existing 33/11 KV Substations 91 26 D(VIII) Feederwise DTs 116 27 E Metering 123 28 E(I) DTR Metering 124 29 E(II) Consumer Metering 193 30 E(III) Feeder Metering 198 31 F System Strengthening and Augmentation 200 32 F(I) Block-Wise Substation 201 33 F(II) New 33 (or 66) KV REDB Works Proposed 202 34 F(III) Proposed Augumentation of Existing Sub-station 203 35 F(IV) EHV Substation Feeding the District 205 36 F(V) Districtwise Details of Existing 66 KV or 33 KV Lines 207 37 F(VI) Districtwise Details of Existing 11 KV or 22 KV Lines 210 38 F(VII) Details of New 66 KV or 33 KV Lines 216 39 F(VIII) Details of New 11 KV or 22 KV Lines 218 40 G SAGY 221 41 G(I) Block-wise coverage of villages 222 42 G(II) Villagewise/Habitation wise coverage 223 43 G(III) Existing Habitation Wise Infrastructure 224 44 G(IV) Village Wise/Habitation Proposed Works 225 Section -A Basic Details of District State : UTTAR PRADESH District : Pratapgarh Page 1 of 226 20/07/2016 (AS PER ORIGINAL DPR) A(V) Basic Details of District State : UTTAR PRADESH District : Pratapgarh Name of Project Implementing Agency Purvanchal Vidyut Vitaran Nigam Ltd. Name of DISCOM Purvanchal Vidyut Vitaran Nigam Ltd. Name of State UTTAR PRADESH Name of District Pratapgarh Total Population of district 3209141 Total Geographical Area(SqKm) 3717 Percentage of Hilly area 0 Total Block in the district 16 Total Urban Town in the district 7 Total Urban Population in the district 175242 Population Of Urban Area 175242 Total Census Revenue Villages in the district 2219 Total Habitations in the district 0 Total Rural Population in the district 3033899 House Holds Details :- Description 2001 Census 2011 Census CAGR Total HHs by Total HHs by 31.03.2015 as derived 31.03.2019 as derived Total House Holds in the district 455491 534254 2.33 626637 734995 Rural HH in the district 432188 506922 1.17 594579 697394 Urban HH in the district 23303 27332 1.16 32058 37601 Total Energised HH in the district 119819 140538 1.15 164840 193344 Urban HH electrified in the district 17988 21098 1.16 24746 29024 Rural HH electrified in the district 101831 119440 1.16 140094 164320 Balance Un-electrified Rural HH 330357 387482 0.01 454485 533074 Page 2 of 226 20/07/2016 (AS PER ORIGINAL DPR) A(V) Basic Details of District State : UTTAR PRADESH District : Pratapgarh Balance Un-electrified Urban HH 5315 6234 0 7312 8577 Balance Total un-electrified HH in the 0 0 0 0 0 district Status of Already Sanctioned 10th / 11th / 12th Plan Projects :- Plan Un-Electrified Villages Intensive Electrified Villages Total Habitation RHH Incl. BPL BPL Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement 10th 424 423 0 0 0 0 3878 3878 3878 3878 11th 0 0 566 0 1025 476 65766 7461 20526 7461 12th 0 0 1961 0 5013 0 129878 0 45966 0 Page 3 of 226 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Pratapgarh S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) C.Sansad Adarsh Gram Yozna BPL Hhs 1 Sangipur Total BPL Hhs proposed to be electrified Nos. 108 0.03 3.24 Sub-Total (BPL Hhs) 108 3.24 New 11 KV Line DTR 2 Sangipur 25 KVA (3 Ph) Nos. 3 2.64 7.92 Sub-Total (New 11 KV Line DTR) 3 7.92 New 11 KV Spur Line 3 Sangipur 11 KV Weasel Conductor Kms. 0.92 6.19 5.6948 Sub-Total (New 11 KV Spur Line) 0.92 5.6948 New LT AB Cable 4 Sangipur 2X25+1X16 Kms. 9.64 3.72 35.8608 3X50+1X35+1X16 Kms. 0.25 5.14 1.285 Sub-Total (New LT AB Cable) 9.89 37.1458 Total (C.Sansad Adarsh Gram Yozna) 54.0006 D.Connecting / UnConnecting HHs BPL Hhs 1 Aspur Deosara Total BPL Hhs proposed to be electrified Nos. 21 0.03 0.63 2 Babaganj Total BPL Hhs proposed to be electrified Nos. 20 0.03 0.6 3 Gaura Total BPL Hhs proposed to be electrified Nos. 21 0.03 0.63 4 Kalakankar Total BPL Hhs proposed to be electrified Nos. 37 0.03 1.11 5 Kunda Total BPL Hhs proposed to be electrified Nos. 11 0.03 0.33 6 Lakshamanpur Total BPL Hhs proposed to be electrified Nos. 4 0.03 0.12 Page 4 of 226 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Pratapgarh S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 7 Lalganj Ajhara Total BPL Hhs proposed to be electrified Nos. 41 0.03 1.23 8 Magraura Total BPL Hhs proposed to be electrified Nos. 13 0.03 0.39 9 Mandhata Total BPL Hhs proposed to be electrified Nos. 41 0.03 1.23 10 Patti Total BPL Hhs proposed to be electrified Nos. 49 0.03 1.47 11 Pratapgarh (Sadar) Total BPL Hhs proposed to be electrified Nos. 33 0.03 0.99 12 Rampur Sangramgarh Total BPL Hhs proposed to be electrified Nos. 8 0.03 0.24 13 Sandwa Chandrika Total BPL Hhs proposed to be electrified Nos. 43 0.03 1.29 14 Sangipur Total BPL Hhs proposed to be electrified Nos. 6 0.03 0.18 15 Shivgarh Total BPL Hhs proposed to be electrified Nos. 49 0.03 1.47 16 Vihar Total BPL Hhs proposed to be electrified Nos. 11 0.03 0.33 Sub-Total (BPL Hhs) 408 12.24 New 11 KV Line DTR 17 Aspur Deosara 25 KVA (3 Ph) Nos. 16 2.64 42.24 18 Babaganj 25 KVA (3 Ph) Nos. 14 2.64 36.96 19 Gaura 25 KVA (3 Ph) Nos. 15 2.64 39.6 20 Kalakankar 25 KVA (3 Ph) Nos. 29 2.64 76.56 21 Kunda 25 KVA (3 Ph) Nos. 6 2.64 15.84 22 Lakshamanpur 25 KVA (3 Ph) Nos. 2 2.64 5.28 23 Lalganj Ajhara 25 KVA (3 Ph) Nos. 20 2.64 52.8 24 Magraura 25 KVA (3 Ph) Nos. 9 2.64 23.76 25 Mandhata 25 KVA (3 Ph) Nos. 23 2.64 60.72 26 Patti 25 KVA (3 Ph) Nos. 35 2.64 92.4 27 Pratapgarh (Sadar) 25 KVA (3 Ph) Nos. 22 2.64 58.08 Page 5 of 226 20/07/2016 (AS PER ORIGINAL DPR) A(VI) Abstract : Scope of Work & Estimated Cost State : UTTAR PRADESH District : Pratapgarh S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 28 Rampur Sangramgarh 25 KVA (3 Ph) Nos. 4 2.64 10.56 29 Sandwa Chandrika 25 KVA (3 Ph) Nos. 28 2.64 73.92 30 Sangipur 25 KVA (3 Ph) Nos. 3 2.64 7.92 31 Shivgarh 25 KVA (3 Ph) Nos. 30 2.64 79.2 32 Vihar 25 KVA (3 Ph) Nos. 8 2.64 21.12 Sub-Total (New 11 KV Line DTR) 264 696.96 New 11 KV Spur Line 33 Aspur Deosara 11 KV Weasel Conductor Kms. 3.55 6.19 21.9745 34 Babaganj 11 KV Weasel Conductor Kms. 3.13 6.19 19.3747 35 Gaura 11 KV Weasel Conductor Kms. 3.36 6.19 20.7984 36 Kalakankar 11 KV Weasel Conductor Kms. 6.44 6.19 39.8636 37 Kunda 11 KV Weasel Conductor Kms. 1.37 6.19 8.4803 38 Lakshamanpur 11 KV Weasel Conductor Kms. 0.46 6.19 2.8474 39 Lalganj Ajhara 11 KV Weasel Conductor Kms. 4.59 6.19 28.4121 40 Magraura 11 KV Weasel Conductor Kms. 2.01 6.19 12.4419 41 Mandhata 11 KV Weasel Conductor Kms. 5.21 6.19 32.2499 42 Patti 11 KV Weasel Conductor Kms. 7.81 6.19 48.3439 43 Pratapgarh (Sadar) 11 KV Weasel Conductor Kms. 4.94 6.19 30.5786 44 Rampur Sangramgarh 11 KV Weasel Conductor Kms. 0.92 6.19 5.6948 45 Sandwa Chandrika 11 KV Weasel Conductor Kms.