Procurement Plan Template
Total Page:16
File Type:pdf, Size:1020Kb
Pipeline of PDMF-Funded Consulting Assignments Indicative Scope of Implementing Date for Services Project Title Project Description Agency Issuance of RFP The project involves construction of 28 Jan 2013 Preparation of Public Private 10,679 classrooms in elementary and bid documents, Partnerships for School Department of secondary schools in 14 regions and advisory Infrastructure Project Education nationwide. support until (2nd Batch) financial close The project involves establishment of a 28 Jan 2013 Pre-feasibility mass transport system (MTS) that will study, provide interconnection among Makati - feasibility Manila CCP Complex-Manila Bay areas. study, PPP Department of structuring , Manila-Makati-Pasay Transportation The proposed alignment of the preparation of Paranaque (MMPP) Mass and aforementioned MTS is from the C5-32nd bid documents, Transit System Communication Street roadway to EDSA-Buendia-Makati and advisory s (DOTC) Avenue-Ayala Triangle-Buendia roads support until crossing PNR Buendia Station, LRT 1 financial close Buendia Station to CCP Complex and Mall of Asia to EDSA Ayala to complete the loop up to Makati Ayala Triangle. The proposed project aims to rehabilitate 31 Jan 2013 Feasibility and upgrade the PNR railway systems, study, PPP including extending the existing line and structuring , revive the freight operations through preparation of railways, in support of DOTC’s objective bid documents, to provide transport alternative that is and advisory convenient, affordable and environment support until PNR North and South friendly. financial close Lines Development and DOTC Extension Project The project will cover the entire PNR Mainline North (i.e., Manila-La Union), including the branch line from Tarlac to San Jose, Nueva Ecija, as well as a possible extension line going to Cagayan; and the Mainline South (i.e., Manila- Legaspi City), including the branch line from Calamba City to Batangas City. 04 Feb2013 Feasibility The project involves construction of a study, PPP 25,000-capacity prison with support structuring , Regional Prison Facilities facilities for and relocation of the NBP Department of preparation of through Public-Private and Correctional Institute for Women Justice (DOJ) bid documents, Partnership (RPF-PPP) (CIW) to a different site to address and advisory problems on congestion of said penal support until institutions. financial close The project entails conversion of the 11 Feb 2013 Feasibility Plaridel Bypass road into a toll road. It study, PPP covers road expansion; and construction structuring , of additional interchanges, flyovers, toll preparation of plazas and other miscellaneous works. bid documents, Department of and advisory Plaridel Bypass Toll Public Works The Plaridel Bypass Road is a 24.61 km- support until Road and Highways road starting at the Balagtas interchange financial close (DPWH) in North Luzon Expressway (NLEx) up to San Rafael. It traverses 5 Bulacan municipalities, namely: Balagtas, Guiguinto, Plaridel, Bustos, and San Rafael. Indicative Scope of Implementing Date for Services Project Title Project Description Agency Issuance of RFP BatMan I is the first of a planned series of 15 Feb 2013 Feasibility network pipelines to be built in Luzon, study, PPP forming part of the master plan to structuring , develop the (natural) gas economy of the preparation of country. It aims to transport and supply bid documents, natural gas to targeted markets located in and advisory the high-growth areas of Batangas, support until Philippine Laguna, Cavite and eventually to Metro financial close Batangas-Manila Natural National Oil Manila. Gas Pipeline Project 1 Company (BatMan 1) (PNOC) The project involves, but not limited to, construction of approximately 105 km of transmission pipelines; installation of compressor stations, metering stations, valves as well as control stations and SCADA systems; and construction of a liquefied natural gas (LNG) receiving plant. .