Procurement Plan Template

Total Page:16

File Type:pdf, Size:1020Kb

Procurement Plan Template Pipeline of PDMF-Funded Consulting Assignments Indicative Scope of Implementing Date for Services Project Title Project Description Agency Issuance of RFP The project involves construction of 28 Jan 2013 Preparation of Public Private 10,679 classrooms in elementary and bid documents, Partnerships for School Department of secondary schools in 14 regions and advisory Infrastructure Project Education nationwide. support until (2nd Batch) financial close The project involves establishment of a 28 Jan 2013 Pre-feasibility mass transport system (MTS) that will study, provide interconnection among Makati - feasibility Manila CCP Complex-Manila Bay areas. study, PPP Department of structuring , Manila-Makati-Pasay Transportation The proposed alignment of the preparation of Paranaque (MMPP) Mass and aforementioned MTS is from the C5-32nd bid documents, Transit System Communication Street roadway to EDSA-Buendia-Makati and advisory s (DOTC) Avenue-Ayala Triangle-Buendia roads support until crossing PNR Buendia Station, LRT 1 financial close Buendia Station to CCP Complex and Mall of Asia to EDSA Ayala to complete the loop up to Makati Ayala Triangle. The proposed project aims to rehabilitate 31 Jan 2013 Feasibility and upgrade the PNR railway systems, study, PPP including extending the existing line and structuring , revive the freight operations through preparation of railways, in support of DOTC’s objective bid documents, to provide transport alternative that is and advisory convenient, affordable and environment support until PNR North and South friendly. financial close Lines Development and DOTC Extension Project The project will cover the entire PNR Mainline North (i.e., Manila-La Union), including the branch line from Tarlac to San Jose, Nueva Ecija, as well as a possible extension line going to Cagayan; and the Mainline South (i.e., Manila- Legaspi City), including the branch line from Calamba City to Batangas City. 04 Feb2013 Feasibility The project involves construction of a study, PPP 25,000-capacity prison with support structuring , Regional Prison Facilities facilities for and relocation of the NBP Department of preparation of through Public-Private and Correctional Institute for Women Justice (DOJ) bid documents, Partnership (RPF-PPP) (CIW) to a different site to address and advisory problems on congestion of said penal support until institutions. financial close The project entails conversion of the 11 Feb 2013 Feasibility Plaridel Bypass road into a toll road. It study, PPP covers road expansion; and construction structuring , of additional interchanges, flyovers, toll preparation of plazas and other miscellaneous works. bid documents, Department of and advisory Plaridel Bypass Toll Public Works The Plaridel Bypass Road is a 24.61 km- support until Road and Highways road starting at the Balagtas interchange financial close (DPWH) in North Luzon Expressway (NLEx) up to San Rafael. It traverses 5 Bulacan municipalities, namely: Balagtas, Guiguinto, Plaridel, Bustos, and San Rafael. Indicative Scope of Implementing Date for Services Project Title Project Description Agency Issuance of RFP BatMan I is the first of a planned series of 15 Feb 2013 Feasibility network pipelines to be built in Luzon, study, PPP forming part of the master plan to structuring , develop the (natural) gas economy of the preparation of country. It aims to transport and supply bid documents, natural gas to targeted markets located in and advisory the high-growth areas of Batangas, support until Philippine Laguna, Cavite and eventually to Metro financial close Batangas-Manila Natural National Oil Manila. Gas Pipeline Project 1 Company (BatMan 1) (PNOC) The project involves, but not limited to, construction of approximately 105 km of transmission pipelines; installation of compressor stations, metering stations, valves as well as control stations and SCADA systems; and construction of a liquefied natural gas (LNG) receiving plant. .
Recommended publications
  • BUS Bus Time Schedule & Line Route
    BUS bus time schedule & line map BUS Mrt-3 Ayala Station, Makati City, View In Website Mode Manila →Circimferential Road 4, Malabon City The BUS bus line (Mrt-3 Ayala Station, Makati City, Manila →Circimferential Road 4, Malabon City) has 2 routes. For regular weekdays, their operation hours are: (1) Mrt-3 Ayala Station, Makati City, Manila →Circimferential Road 4, Malabon City: 12:00 AM - 11:00 PM (2) Pagamutang Bayan Ng Malabon, Dagat- Dagatan Avenue, Caloocan City →Mrt-3 Ayala Station, Makati City, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest BUS bus station near you and ƒnd out when is the next BUS bus arriving. Direction: Mrt-3 Ayala Station, Makati City, BUS bus Time Schedule Manila →Circimferential Road 4, Malabon City Mrt-3 Ayala Station, Makati City, 87 stops Manila →Circimferential Road 4, Malabon City Route VIEW LINE SCHEDULE Timetable: Sunday 12:00 AM - 10:00 PM Mrt-3 Ayala Station, Makati City, Manila Monday 12:00 AM - 11:00 PM Ayala Tunnel, Philippines Tuesday 12:00 AM - 11:00 PM Epifanio De Los Santos Avenue, 10 Wednesday 12:00 AM - 11:00 PM Epifanio De Los Santos Av, Makati City, Manila Thursday 12:00 AM - 11:00 PM Epifanio de los Santos Avenue, Philippines Friday 12:00 AM - 11:00 PM Mrt-3 Buendia Station, Makati City, Manila Saturday 12:00 AM - 10:00 PM Epifanio De Los Santos Avenue / Senator Gil Puyat Ave, Makati City, Manila Buendia Flyover, Philippines Estrella Flyover, Makati City, Manila BUS bus Info Direction: Mrt-3 Ayala Station, Makati City, Epifanio De Los Santos Avenue, Makati City, Manila
    [Show full text]
  • NORTH-SOUTH RAILWAY PROJECT – SOUTH LINE Project Information Memorandum
    Republic of the Philippines Department of Transportation and Communications and Philippine National Railways NORTH-SOUTH RAILWAY PROJECT – SOUTH LINE Project Information Memorandum August 2015 Transaction Advisors With Assistance From 0 Disclaimer This Project Information Memorandum (“PIM”) has been prepared by the Development Bank of the Philippines (“DBP”),the Asian Development Bank (“ADB”), and CPCS Transcom Limited (“CPCS”) on behalf of and in consultation with the Department of Transportation and Communications (“DOTC”) and Philippine National Railways (“PNR”). DOTC has engaged DBP and ADB to serve as the transaction advisors and CPCS to serve as the technical advisor (DBP, ADB and CPCS, collectively, the “Transaction Advisors”, and each a “Transaction Advisor”) to DOTC in the development, structuring and tendering of the North-South Railway Project – South Line (“NSRP South Line” or the “Project”) under the Philippine Build-Operate-Transfer Law (Republic Act No. 6957 as amended by RA 7718, the “BOT Law”) and its Revised Implementing Rules and Regulations (“Revised IRR”, as amended). This PIM does not purport to be all-inclusive or to contain all of the information that a prospective participant may consider material or desirable in making its decision to participate in the tender. No representation or warranty, express or implied, is made, or responsibility of any kind is or will be accepted by the DBP, ADB, CPCS, DOTC, PNR or the Government of the Philippines (“GOP”) or any of its agencies, with respect to the accuracy and completeness of this preliminary information. DOTC and PNR, by themselves or through the Transaction Advisors, may amend or replace any of the information contained in this PIM at any time, without giving any prior notice or providing any reason.
    [Show full text]
  • Zuellig Building, Makati Ave. Corner Paseo De Roxas, Makati City, Metro Manila
    Zuellig Building, Makati Ave. Corner Paseo de Roxas, Makati City, Metro Manila View this office online at: https://www.newofficeasia.com/details/serviced-offices-20f-zuellig-building-m anila With some serious green credentials (LEED certified), a prestigious business address and it's own subterranean car park, the Zuellig Building is one of Manila's top work places. Situated at the heart of the Makati CBD and surrounded by world class hotels and shops the airport is just 15 mins drive. Transport links Nearest tube: Buendia Station‎ Nearest road: Buendia Station‎ Nearest airport: Buendia Station‎ Key features 24 hour access Car parking spaces Comfortable lounge High speed internet Meeting rooms Video conference facilities Points of interest within 1000 metres Sultan Kudarat Monument (attraction) - 108m from business centre Somerset Olympia (hotel) - 230m from business centre Metro Parking (parking) - 234m from business centre Fraser Place (hotel) - 240m from business centre Metro Parking (parking) - 264m from business centre Citibank Tower Parking (parking) - 274m from business centre BDO Parking (parking) - 283m from business centre Valero Access Road 2 Parking (parking) - 295m from business centre Ayala Triangle Gardens (park) - 311m from business centre Urdaneta Village Park (park) - 335m from business centre Nielson Folk Museum (museum) - 345m from business centre Metro Parking (parking) - 347m from business centre Somerset Salcedo (hotel) - 361m from business centre Manila Peninsula Hotel (hotel) - 382m from business centre Valero 2 Carpark
    [Show full text]
  • Civil Engineering
    STATISTICS OF FEASIBILITY STUDIES BY COURSE ERIS SECTION Library Department FEASIBILITY STUDIES CE ACC. NUMBER AUTHOR TITLE YEAR Banaria, Christian A Feasibility Study on the Design of a REVISED WASTEWATER TREATMENT 2724 FACILITY FOR THE GENERAL CHEMISTRY LABORATORY OF MAPUA 2006 INSTITUTE OF TECHNOLOGY Mark Sherwin G. Valite The Effect of Dye Concentrations on the Biological Degradation of Azo Dyes in 2737 Wastewater 2005 Marc Anthony T. Carbonilla Temperature Reduction through Automatic Exhaust Fan using Programmable 3513 System on a Chip 2009 5220 Bartolome, Mary Grace A. 4-Storey with roof Deck eco-friendly School 2012 Barrera, Ereeca Joice A Three-Storey Tenement in Marikina with Lightweight Dry Wall Panels as 5221 Interior Partitions 2012 5222 Lorenz C. Lugatiman A Multi-purpose ec-Structure with Sustainable Water Treatment Facility 2012 Aliwalas, Dionisio F.,Jr A Parking Demand Analysis for a Proposed Two-Storey Car Park with 5223 Basement and Vertical and vertical garden in Intramuros, Manila 2012 Magcaleng, Kenneth Rogie D. A Proposed Five-Storey School Building with the Use of Fly Ash as an Additive 5224 Material for Portland Cement at St. Anthony School, San Andres, Manila 2012 Banares, Titus Andrei R. A Study of Converting an Intersection to a Roundabout: The Case of Quirino – 5225 Taft Avenue Intersection 2012 De Jesus, Reinier L. Beneficial rehabilitations of sewage Treatment Plant in Ayala Southvale village, 5303 Bacoor, Cavite City 2012 Abrasia, Ralph Lorenz T. Design of a 3 – Storey School Building with Solar Panel and Covered Stage 5304 with Drainage System 2012 Funa, Nico E. Design of Medium Rise Housing with Solar Panel for the Relocation of Informal 5305 Settlers in Estero de Pandacan 2012 Domingo, Mark Bryan S.
    [Show full text]
  • ID 271 Facility Management System Improvement of the Philippine National Railways
    Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020 Facility Management System Improvement of the Philippine National Railways Madonna F. Andrada, Aivan Kurt Russel B. Alfaro and Jerren A. Cruz School of Industrial Engineering and Engineering Management Mapua University Intramuros, Manila, Philippines [email protected], [email protected], [email protected] Abstract The purpose of this study is to improve the current Facility Management System of the Philippine National Railways, wherein, a combination of different knowledge with regards to the field of specialization of the researchers had taken place to resolve certain issues. The issues that were identified by the researchers are free loading passengers, passenger management, long queues and safety issues. The researchers first acquire all the possible data that will be needed to assess the facility management and the totality of the system of PNR. After taking the different sets of data, statistical tools and other related literatures are used to get specific factors that will be considered to have a precise output. Finally, Industrial Engineering tools like quality function deployment (QFD), queuing theory, systematic layout planning (SLP) and systems and procedures were used for the design of the improved facility management system of the stations. These tools are intended for a specific issue. The common ground for the improvement of the three stations are the systems and procedures, that is why the researchers made a standard operating procedure/rule book for the employees that is in the perimeter of the station (i.e. security personnel, ticket booth personnel, mechanic and ticket inspectors).
    [Show full text]
  • Bus Terminal Going to Tagaytay in Cubao
    Bus Terminal Going To Tagaytay In Cubao Anecdotical Venkat references fearlessly. Contemptuous and wrought-up Hermy still unruffle his Jewry contrastingly. Rockier Leonard tells that alignments comedowns ducally and relaunch verdantly. This inevitable growth is no schedule confirmation, inc is playing on external factors such time giving you going to bus terminal in tagaytay and malanday to get from their employees in tagaytay Balibago olivarez tagaytay terminal Sta a spine to! Stations de droit and. With buses going to Manila and jeepneys going to Lyceum NU Waltermart SM Calamba hospitals churches etc. Is of going to parañaque doctors hospital from? Drive to go from sta on leaving philippines to in to mall entrance, van terminals are available are the best time you prefer to! The philippines your javascript directory for any contact number one, cavite towns of your. P2P Bus Schedule Premium Point good Point Bus Schedule. Want seats plus cr. Under their management were Saint Anthony Of Padua Transport Systems Inc. The Rough Guide upcoming the Philippines. Here so the schedule below for the bus from buendia lrt gil puyat avenue bus terminal going to tagaytay in cubao, there you directly in our room. Pasay Terminal and To Tagaytay Squarespace. Bus services to take this includes writing, going straight to cubao bus going to tagaytay terminal in exploring the map it compulsory to go to! Buses are their restaurant, cubao bus going to tagaytay in nasugbu! Several bus companies have their terminals in Cubao EDSA Pasay and. To access road is playing on facebook. Pass in your email before new terminal cubao? Bgc bus services between manila with all kinds of these shuttles is! Read more if you.
    [Show full text]
  • BUS Bus Time Schedule & Line Route
    BUS bus time schedule & line map BUS Alabang Muntinlupa-Lawton via SSH Taft Ave View In Website Mode The BUS bus line (Alabang Muntinlupa-Lawton via SSH Taft Ave) has 2 routes. For regular weekdays, their operation hours are: (1) South Luzon Expressway / Montillano St Intersection, Muntinlupa City, Manila →Magallanes Dr, Manila: 12:00 AM - 11:00 PM (2) Taft Ave, Manila →South Luzon Expressway / Montillano St Intersection, Muntinlupa City, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest BUS bus station near you and ƒnd out when is the next BUS bus arriving. Direction: South Luzon Expressway / Montillano BUS bus Time Schedule St Intersection, Muntinlupa City, South Luzon Expressway / Montillano St Manila →Magallanes Dr, Manila Intersection, Muntinlupa City, Manila →Magallanes Dr, Manila Route Timetable: 53 stops VIEW LINE SCHEDULE Sunday 12:00 AM - 10:00 PM Monday 12:00 AM - 11:00 PM South Luzon Expressway / Montillano St Intersection, Muntinlupa City, Manila Tuesday 12:00 AM - 11:00 PM South Luzon Expressway, Muntinlupa City, Manila Wednesday 12:00 AM - 11:00 PM Thursday 12:00 AM - 11:00 PM South Luzon Expressway / Don Jesus Blvd Intersection, Muntinlupa City, Manila Friday 12:00 AM - 11:00 PM 3rd FLR RB Arcade West Service Road, Philippines Saturday 12:00 AM - 10:00 PM South Luzon Expressway, Muntinlupa City, Manila South Luzon Expressway / E Service Rd Intersection, Muntinlupa City, Manila West Service Road, Philippines BUS bus Info Direction: South Luzon Expressway / Montillano St South Luzon Expressway / Concepcion
    [Show full text]
  • 52220-001: South Commuter Railway Project
    Resettlement Action Plan July 2020 PHI: South Commuter Railway Project Prepared by Department of Transportation for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 9 July 2020) Currency unit = Peso/s (₱) ₱ 1.00 = $ 0.02020 $1.00 = ₱ 49.4900 ABBREVIATIONS ADB – Asian Development Bank AH – Affected Household AKPF – Abot-Kaya Pabahay Fund AO – Administrative Order AP – Affected Person BIR – Bureau of Internal Revenue BP – Batas Pambansa BSAAC – Beneficiary Selection, Awards and Arbitration Committee BSP – Bangko Sentral ng Pilipinas C.A. – Commonwealth Act CBIA – Community Based Initiative Approach CDA – Cooperative Development Authority CGT – Capital Gains Tax CLOA – Certificate of Land Ownership Award CMP – Community Mortgage Program CMP-M – Community Mortgage Program-Mobilizers DAR – Department of Agrarian Reform DED – Detailed Engineering Design DDR – Due Diligence Report DENR – Department of Environment and Natural Resources DHSUD – Department of Human Settlements and Urban Development DILG – Department of the Interior and Local Government DMS – Detailed Measurement Survey DO – Departmental Order DOF – Department of Finance DOLE – Department of Labor and Employment DOTr – Department of Transportation DPWH – Department of Public Works and Highways DST – Documentary Stamp Tax DSWD – Department of Social Welfare and Development DTI – Department of Trade and Industry EA – Executing Agency EIS – Environmental Impact Statement EJS – Extra Judicial Settlement EMA – External Monitoring Agency EMP – Environmental Management Plan EO –
    [Show full text]
  • ENVIRONMENTAL IMPACT STATEMENT for the Light Rail Transit Line 1 South Extension Project Volume 1
    E1970 Public Disclosure Authorized ENVIRONMENTAL IMPACT STATEMENT for the Light Rail Transit Line 1 South Extension Project Public Disclosure Authorized Volume 1 Public Disclosure Authorized Submitted by Light Rail Transit Authority August 21, 2008 Public Disclosure Authorized i Table of Contents EXECUTIVE SUMMARY . i Brief Description of the Project . i Brief Description of Data Gathering . ii Project Screening and Scoping . iii Brief Description of Project Environment . iii Physico-chemical Aspects . iv Biological Aspects . vii Socio-Economic Aspects . vii 1 INTRODUCTION . 1 1.1 Project Background . 2 1.2 EIA Approach and Methodology . 3 1.3 EIA Process Documentation . 12 1.4 EIA Team . 14 1.5 EIA Study Schedule . 15 2 PROJECT DESCRIPTION . 16 2.1 Project Rationale . 17 2.2 Alternatives . 20 2.2.1 The Five (5) Basic Alternative Routes . 20 2.2.2 The Four (4) Short-Listed Alternative Routes . 23 2.2.3 Selection of Technically Preferred Route for North and Central Section . 33 2.3 Project Area and Location . 36 2.4 Project Description . 39 2.4.1 System Overview . 39 ii 2.4.2 Pre-Construction and Construction Phases . 72 2.4.3 Operational Phase . 97 3 BASELINE ENVIRONMENTAL CONDITIONS . 99 3.1 Environmental Study Area . 100 3.2 Physical Environment . 100 3.2.1 Geomorphology . 100 3.2.2 Geology . .. 105 3.2.3 Statigraphy . 106 3.2.4 Seismicity . 107 3.2.5 Earthquake Generators . 109 3.2.6 Hazard Identification . 113 3.2.7 Surface Hydrology . 120 3.2.8 Land Use . 125 3.2.9 Pedology . 129 3.2.10 Water Quality and Limnolgy .
    [Show full text]
  • BUS Bus Time Schedule & Line Route
    BUS bus time schedule & line map BUS Pacita Complex - SM Fairview via EDSA View In Website Mode The BUS bus line (Pacita Complex - SM Fairview via EDSA) has 2 routes. For regular weekdays, their operation hours are: (1) Belfast / Bulalakaw Intersection, Quezon City →Pnr Pacita Station, Pine Rd, San Pedro, Manila: 12:00 AM - 11:00 PM (2) Plaza Pacita Bus Terminal, National Highway / Pacita Av, San Pedro, Manila →Robinsons Nova Supermarket, Quirino Highway, Caloocan City, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest BUS bus station near you and ƒnd out when is the next BUS bus arriving. Direction: Belfast / Bulalakaw Intersection, BUS bus Time Schedule Quezon City →Pnr Pacita Station, Pine Rd, San Belfast / Bulalakaw Intersection, Quezon City →Pnr Pedro, Manila Pacita Station, Pine Rd, San Pedro, Manila Route Timetable: 148 stops VIEW LINE SCHEDULE Sunday 12:00 AM - 10:00 PM Monday 12:00 AM - 11:00 PM Belfast / Bulalakaw Intersection, Quezon City Tuesday 12:00 AM - 11:00 PM Belfast / Bishop Avenue Intersection, Quezon City Wednesday 12:00 AM - 11:00 PM Mindanao Avenue / Belfast Intersection, Quezon Thursday 12:00 AM - 11:00 PM City Belfast, Philippines Friday 12:00 AM - 11:00 PM Regalado Highway / Commonwealth Avenue Saturday 12:00 AM - 10:00 PM Intersection, Quezon City Total Fairview, Commonwealth Avenue, Quezon City Investment, Philippines BUS bus Info Direction: Belfast / Bulalakaw Intersection, Quezon Commonwealth Avenue, Quezon City City →Pnr Pacita Station, Pine Rd, San Pedro, Manila Stops: 148 Commonwealth Avenue
    [Show full text]
  • BUS Bus Time Schedule & Line Route
    BUS bus time schedule & line map BUS SM Fairview Ayala Leveriza via EDSA View In Website Mode The BUS bus line (SM Fairview Ayala Leveriza via EDSA) has 2 routes. For regular weekdays, their operation hours are: (1) Quirino Highway / Maligaya Intersection, Caloocan City →Senator Gil Puyat Ave, Lungsod Ng Pasay, Manila: 12:00 AM - 11:00 PM (2) Senator Gil Puyat Ave, Lungsod Ng Pasay, Manila →Sm Public Transport Terminal, Regalado Highway, Quezon City: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest BUS bus station near you and ƒnd out when is the next BUS bus arriving. Direction: Quirino Highway / Maligaya BUS bus Time Schedule Intersection, Caloocan City →Senator Gil Puyat Quirino Highway / Maligaya Intersection, Caloocan Ave, Lungsod Ng Pasay, Manila City →Senator Gil Puyat Ave, Lungsod Ng Pasay, Manila Route Timetable: 83 stops VIEW LINE SCHEDULE Sunday 12:00 AM - 10:00 PM Monday 12:00 AM - 11:00 PM Quirino Highway / Maligaya Intersection, Caloocan City Tuesday 12:00 AM - 11:00 PM Robinsons Nova Market, Quirino Highway, Wednesday 12:00 AM - 11:00 PM Caloocan City Thursday 12:00 AM - 11:00 PM Belfast / Bulalakaw Intersection, Quezon City Friday 12:00 AM - 11:00 PM Belfast / Sm Fairview Intersection, Quezon City Saturday 12:00 AM - 10:00 PM Belfast / Bishop Avenue Intersection, Quezon City Mindanao Avenue / Belfast Intersection, Quezon BUS bus Info City Direction: Quirino Highway / Maligaya Intersection, Belfast, Philippines Caloocan City →Senator Gil Puyat Ave, Lungsod Ng Mindanao Avenue, Quezon City Pasay, Manila Stops: 83
    [Show full text]
  • Table of Contents
    APPENDICES APPENDIX TO CHAPTER 2 Roadmap for Transport Infrastructure Development for Metro Manila and Its Surrounding Areas (Region III & Region IV-A) FINAL REPORT Appendix 2A (1) Population and Growth Trend of Mega Manila APPENDIX 2A (1) Population and Growth Trend of Mega Manila Area Population (000) Share (%) Density (person/ha) AGR(%/year) Province/City/Municipality (ha) 1990 2000 2010 1990 2000 2010 1990 2000 2010 ‘90-‘00 ‘00 - '10 Metro Manila 2,528 1,599 1,581 1,652 12.4 8.8 7.2 632 625 653 -0.1 0.4 Manila Mandaluyong 1,126 245 278 329 1.9 1.6 1.4 217 247 292 1.3 1.7 Marikina 2,150 310 391 424 2.4 2.2 1.8 144 182 197 2.4 0.8 Pasig 3,531 397 505 670 3.1 2.8 2.9 113 143 190 2.4 2.9 Quezon 13,692 1,667 2,174 2,762 12.9 12.1 12.0 122 159 202 2.7 2.4 San Juan 594 127 118 121 1.0 0.7 0.5 213 198 204 -0.7 0.3 Caloocan 5,297 761 1,178 1,489 5.9 6.6 6.5 144 222 281 4.5 2.4 Malabon 1,571 278 339 353 2.2 1.9 1.5 177 216 225 2.0 0.4 Navotas 1,045 187 230 249 1.4 1.3 1.1 179 221 238 2.1 0.8 Valenzuela 4,459 340 485 575 2.6 2.7 2.5 76 109 129 3.6 1.7 Las Pinas 3,269 297 473 553 2.3 2.6 2.4 91 145 169 4.8 1.6 Makati 14,480 453 471 529 3.5 2.6 2.3 31 33 37 0.4 1.2 Muntinlupa 4,660 277 379 460 2.1 2.1 2.0 59 81 99 3.2 2.0 Paranaque 4,504 308 450 588 2.4 2.5 2.6 68 100 131 3.9 2.7 Pasay 1,444 367 355 393 2.8 2.0 1.7 254 246 272 -0.3 1.0 Pateros 185 51 57 64 0.4 0.3 0.3 278 310 347 1.1 1.1 Taguig 4,123 266 467 644 2.1 2.6 2.8 65 113 156 5.8 3.3 Sub-total 68,658 7,929 9,933 11,856 61.3 55.5 51.5 115 145 173 2.3 1.8 Bulacan Balagtas (Bigaa) 1,762
    [Show full text]