Representations on the Draft South West Regional Spatial Strategy

Total Page:16

File Type:pdf, Size:1020Kb

Representations on the Draft South West Regional Spatial Strategy Appendix 1 to Report OSB/18/06 TORBAY COUNCIL Report No: 191/2006 Title: Representations on the Draft South West Regional Spatial Strategy To: Overview and Scrutiny Board on 17 July 2006 Cabinet on 18 July 2006 Council on 27 July 2006 1. Purpose 1.1 The purpose of this report is to assist the Council in making its representations to the Regional Assembly on the Draft South West Regional Spatial Strategy [RSS]. 2. Relationship to Corporate Priorities 2.1 The RSS has potentially far reaching effects for many aspects of the Council over a long time frame. 2.2 The RSS has a particularly close relationship with the following themes: • Improving Torbay’s economy • Valuing our environment • Improving access to good quality affordable homes • Creating sustainable communities 3. Recommendation(s) 3.1 That Overview and Scrutiny Board consider the draft recommendations set out in paragraphs 7.8, 7.9, 7.11 – 7.16, 7.18 – 7.31, 7.33, 7.34, 7.36 – 7.44 and 7.47 of the report, taking into account any views expressed by the Local Development Framework Working Party. 3.2 That the Cabinet considers the draft recommendations, as set out in the paragraphs listed in paragraph 3.1 above, taking full account of any views expressed by the Overview and Scrutiny Board. 3.3 That the Council be recommended to approve the recommendations listed in paragraph 3.1 above, as the Council’s formal representation on the Draft Regional Spatial Strategy to the Regional Assembly. 4. Reason for Recommendation(s) 4.1 The RSS will be a major influence on the future development of Torbay, and in particular its prospects for economic regeneration. 4.2 The development strategy adopted in the emerging Torbay LDF [which will be the spatial expression of the new Community Plan] will be hugely influenced by the RSS. The LDF is required by law to be in conformity with the RSS. 4.3 Torbay Council as a unitary authority has a strategic planning role, and needs to ensure that its strategic vision is taken on board in the RSS. 5. Key Risks associated with the Recommendation(s) 5.1 The risk of accepting the recommendation is that there could be a slight increase in the rate of development in Torbay, with the associated pressures on services and transport. 5.2 However, the overall impact of these pressures are not considered to be significant, and acceptance of the RSS provisions for Torbay are more likely to lever in Government funding for major infrastructure, e.g. the South Devon Link Road and funding for regeneration schemes, than if the provisions of the RSS were not accepted by the Council. 6 6 12 18 24 5 5 10 15 20 4 4 8 12 16 3 3 6 9 12 Likelihood Likelihood 2 2 X4 6 8 1 1 2 3 4 1 2 3 4 Impact Low risk Intermediate risk High risk The "x" in the above matrix denotes where the author has assessed the level of final risk to fall 6. Alternative Options (if any) 6.1 The alternative option is non - involvement with the RSS process. This would remove Torbay’s ability to influence major decisions about its future. If this leads to attempting to plan for lower growth, the Council’s needs, such as key infrastructure, housing and economic requirements, may well not be included in the final version of the RSS, and there would be a strong chance of appeal-led development. 6.2 Non-involvement of a strategic planning authority with the development of the RSS would send the wrong messages to the Government and Regional Assembly, who determine levels of major infrastructure provision through the Regional Funding Allocation. 7. Background 7.1 Members will be aware that the Development Plan for Torbay is in two parts – the Regional Spatial Strategy [RSS], covering the entire South West, and the Local Development Framework [LDF], which translates the regional planning framework into more detailed policies and proposals for Torbay. The RSS, which is legally binding, sets the overall level of growth for Torbay over a 20 year period, including housing numbers, employment land and strategic transport schemes, and is therefore a critical strategic document . In addition to land use and transport planning, the document is likely to impact on most of the Council’s corporate objectives. The Torbay LDF has to be in conformity with the RSS, and the RSS will play a major part in shaping future LTPs. 7.2 The South West Regional Assembly published its Draft Regional Spatial Strategy [RSS] for the South West, covering the period 2006 – 2026, on 6 June 2006. The consultation period extends to 30 August 2006, closing at 5pm. The document is available on the South West Regional Assembly website at: http://www.southwest- ra.gov/swra/ourwork/RSS/RSS final draft version.shtml . The Local Development Framework Working Party will be considering the recommendations set out below at its meeting on 7 July 2006 and the Overview and Scrutiny Board is recommended to take account of any views expressed by the Working Party. 7.3 Torbay and South Devon Joint Study: Torbay, together with other Principal Urban Areas, was invited to prepare a sub-regional study as input to the emerging RSS. This input was provided in the form of technical advice from the Torbay and South Devon Sub-Regional Study, which met several times in 2004 and 2005. The Study Area Working Group comprised Members and Officers from Torbay, South Hams, Teignbridge and Devon, with further input from the RDA, GOSW and the Regional Assembly. In June 2005, the Torbay and South Devon Joint Study submitted its technical advice, followed by Torbay Council’s specific First Detailed Proposals in September 2005. In addition to public consultation, there was a stakeholder panel which met to inform the Joint Study Group, and the Torbay Strategic Partnership also had an ‘away day’ to provide input to the Council’s response in September 2005. 7.4 Detailed RSS Documentation: The pack of RSS documents comprises: [1] The Draft Regional Spatial Strategy [2] The Draft Regional Spatial Strategy Executive Summary [3] The Draft Regional Spatial Strategy Implementation Plan [4] The Draft Regional Spatial Strategy Strategic Sustainability Assessment Main Report [5] The Draft Regional Spatial Strategy Strategic Sustainability Assessment Non- Technical Summary [6] The Draft Regional Spatial Strategy Pre-Submission Consultation Statement 7.5 Timescale and Final RSS Strategy: These documents set out the strategic planning framework for the South West over a 20 year period. At this stage the RSS is for consultation and is not necessarily the final strategy to guide the amount and distribution of future development in the South West. 7.6 Links between the RSS and the LDF: The main link between the RSS and the Local Development Framework [LDF] is through the LDF Core Strategy, which was published in its Issues and Options stage in April 2006. In effect the ‘Big Picture’ for Torbay, as expressed in the RSS, will be reflected in the ‘Detailed Picture’ in the LDF, with the strategic options for interpreting the RSS into LDF proposals and policies being broached in the Core Strategy. 7.7 RSS Policy Provisions: The RSS policy framework contains a number of policy provisions which are of direct or general relevance to Torbay. The next few paragraphs outline these provisions of most relevance to Torbay and recommend a set of appropriate responses. 7.8 Chapter 1 – A Sustainable Future for the South West: Policies SD1 - 4 set out general principles on stabilising and reducing ecological impact; reducing and managing climate change [including a target for each local authority to reduce its CO2 emissions by 60% by 2050]; protecting and enhancing the environment and natural resources; and promoting sustainable communities in accordance with the Government’s ‘Securing the Future’ Sustainable Communities Plan. The RSS sustainable development principles are comprehensive and sound, and are in line with the sustainability principles currently guiding the preparation of the Torbay LDF. Recommendation: That the Council supports these sustainability principles as a sound basis for the emerging RSS. 7.9 Chapter 2 – Context for the Spatial Strategy: This section sets out key environmental, economic and social aspects which the RSS needs to relate to if it is going to have a cutting edge. Key elements include: • The South West is the fastest growing Region in the UK in population, and the average age of its population is increasing at a faster rate than nationally. • Housing affordability is a key issue and the Barker Review of Housing Supply argues that providing housing that most households can afford will only be achieved through increasing the supply of new housing nationally. In the South West, new housing numbers alone will not solve the problem of affordability, and other measures to provide affordable homes to rent or buy should be supported. • The RSS states that around 25,000 new homes a year will be needed in the South West, i.e. at levels higher than the current plan [RPG 10] • In economic development, the RSS argues that “a differential approach … is needed, recognising the variation in economic prospects across the region, addressing disadvantage and intra regional disparity.” • The South West Region’s ‘The Way Ahead’ contribution to the national Sustainable Communities Plan will be a key driver for infrastructure resources. Torbay Council is in the process of engagement with the Way Ahead Group to try and draw down much needed resources for regeneration schemes. • The RSS emphasises the importance of the role and function of places, and the importance of cities and towns which are relatively self contained in terms of housing and jobs, in the interests of increasing community involvement and reducing the need to travel.
Recommended publications
  • DRAFT Site of the Riviera International Conference Centre Market Brief
    September 2018 DRAFT Site of the Riviera International Conference Centre Market Brief Torbay Council | Market Brief 1 Contents Introduction .............................................................................................................................................. 3 Torbay and the English Riviera ................................................................................................................. 5 Development Opportunity ......................................................................................................................... 7 Site Characteristics .................................................................................................................................. 8 Relevant Local and National Planning Policy .......................................................................................... 11 Design Principles .................................................................................................................................... 12 Development Constraints ....................................................................................................................... 15 The Selection Process ............................................................................................................................ 16 Procurement Timelines ........................................................................................................................... 17 Draft Heads of Terms (subject to contract) ............................................................................................
    [Show full text]
  • Torquay Waterfront a Short Heritage Walk
    Company Tourism Riviera English of courtesy Image Torquay waterfront A short heritage walk Start at Torquay Railway Station. When the railway line was constructed it originally terminated at Torre Station (then called Torquay) which opened in December 1848. The line to Paignton opened eleven years later on 1 August 1859. The original station was described in some quarters as “a third rate station not worthy of the resort” and was rebuilt in 1878. Head for the sea front and, with the bay on your right, amble towards the harbour. On your left you’ll have a view of Torre Abbey, founded in 1196 and later home to the Cary family. The Spanish Barn was built in the early thirteenth century, but picked up its name after it was used to house prisoners from the Spanish Armada. One of the prisoners was the fiancée of one of the crew, who disguised herself as a sailor. Incarcerated with the other 396 prisoners, she died in the squalid conditions, and the ghost of The Spanish Lady supposedly roams the grounds to this day. You can also look out to sea and visualise some of the important maritime events that the people of Torquay would have seen from here at various points in the town’s long history. From Napoleon’s arrival in the bay in 1815 as a prisoner aboard HMS Bellerophon, to the presence in July 1910 of the Atlantic, Mediterranean and Home Fleets, which were in Torbay to be reviewed by King George V after the location was changed from Penzance due to bad weather.
    [Show full text]
  • English Riviera • Torquay, Paignton and Brixham
    Discover Photographers from top: John Lacey, Julia Amies-Green and Bob Small The Seafood CoastPhotographer: © English Heritage Discover The Seafood Coast Torbay and the English Riviera • Torquay, Paignton and Brixham Fresh fish, a funicular railway and Stone Age caves at Babbacombe MORNING Start your day in Torquay. From here you can either Babbacombe drive or hop on the No.22 bus for the two-mile journey (3.2km) to one of Britain’s highest clifftop promenades at Babbacombe. Soak up staggering sea views on the fairly strenuous 2.2 mile (3.5km) Babbacombe and Oddicombe Walk. Swap the steep descent from Lady Mount Temple for a ride on the historic funicular railway, and, from Oddicombe beach, gaze up to the mighty compressed layers of sandstone and limestone. Scour Babbacombe Beach for curled shell fossils, then climb the coast path through woodland, pausing for local ales and line-caught seafood at the Cary Arms. AFTERNOON If you want to wallow in the epitome of coastal chic, Kents Cavern linger at the Cary Arms for a soothing spa treatment and a sundowner by the sea. Otherwise, dig deeper into the wonders of this UNESCO Global Geopark at the enthralling Kents Cavern, just a 20 minute stroll (one mile / 1.6km) or a few minutes on the No.22 bus, from the starting point of your walk. In this labyrinth of Stone Age caves, you can discover evidence of ancient humans and clap eyes on 400-million-year-old stalagmites and stalactites. Backtrack to Babbacombe and finish the day with a hearty portion of award-winning fish and chips from Hanbury’s.
    [Show full text]
  • Woodlands Woodlands Seaway Lane, Torquay, TQ2 6PW Totnes 10 Miles Exeter 23 Miles Dartmouth 11 Miles
    Woodlands Woodlands Seaway Lane, Torquay, TQ2 6PW Totnes 10 miles Exeter 23 miles Dartmouth 11 Miles • Attractive Victorian Home • 5 Bedroom House with 3 Bedroom Annexe • Over 6,800 sq ft of Space • Sought after location • Outdoor Swimming Pool • Large Level Gardens • Large Cellar • Driveway Parking Guide price £995,000 SITUATION As the name suggests Seaway Lane extends from the seafront of Torquay and divides the popular area of Chelston from the picturesque Cockington Valley. Situated near the top of the lane in a quiet area this property is within easy reach of the many amenities and facilities that Torquay has to offer. Local shops can found a short distance away in Chelston on Old Mill Road and Walnut Road. Torquay railway station is also close by. The medieval village of Cockington, noted in the Domesday Book, is a short An attractive and substantial Victorian home in mature grounds stroll away, and surrounded by nearly 500 acres of parkland, lakes and woodland walks. The seafront and beach are equally as close, half a mile or so along the seafront is Torquay marina. The area is famous for year round with annexe or income potential water sports and renowned for its naturally mild climate and award winning beaches. If travel and commuting are important to you, the Cathedral city of Exeter and the M5 motorway is now within 30 minutes drive thanks to the new South Devon Link Road. DESCRIPTION Set amongst similar period properties on the leafy Seaway Lane, Woodlands is a substantial Victorian home benefitting from many period features.
    [Show full text]
  • TRANSPORT WORKING PARTY Working for a Healthy, Prosperous
    Wednesday, 4 December 2013 TRANSPORT WORKING PARTY A meeting of Transport Working Party will be held on Thursday, 12 December 2013 commencing at 4.00 pm The meeting will be held in the Meadfoot Room, Town Hall, Castle Circus, Torquay, TQ1 3DR Members of the Committee Councillor Hill (Chairman) Councillor Addis Councillor Cowell Councillor Amil Councillor Doggett Councillor Brooksbank Councillor Pountney Working for a healthy, prosperous and happy Bay For information relating to this meeting or to request a copy in another format or language please contact: Patrick Carney, Town Hall, Castle Circus, Torquay, TQ1 3DR (01803) 207710 Email: [email protected] www.torbay.gov.uk (i) TRANSPORT WORKING PARTY AGENDA 1. Apologies for absence 2. Minutes from meeting held on 24th October 2013 (Pages 1 - 7) 3. Petition - Polsham Park 4. Petition - Traffic Calming Jacks Lane 5. Petition - Closure of Well Street 6. High Speed 2 (D Whiteway) (Pages 8 - 11) 7. Western Corridor Improvements - Update on Proposals (Pages 12 - 14) 8. Annual Parking Report (Pages 15 - 59) 9. Review of Existing Bus Lanes in Torbay (Pages 60 - 61) 10. Local Pinch Point Fund Application - Torquay Gateway and (Pages 62 - 63) Town Centre Regeneration Scheme 11. Higher Union Street - Removal of Build Out (Pages 64 - 65) 12. National Express Bus Stop Bolton Cross Layby (Pages 66 - 73) 13. LSTF Update (Verbal) 14. Date of Next Meeting 23 rd January 2014, 4pm. (ii) Agenda Item 2 Minutes of the Transport Working Party 24 October 2013 -: Present :- Councillor Pete Addis, Councillor Stephen Brooksbank, Councillor Darren Cowell, Councillor Bobbie Davies, Councillor Ian Doggett and Councillor Ray Hill (Chairman) (Also in attendance: MPC David Carne, Patrick Carney, Louise Costin, Sally Farley, Heidi McBride and William Prendergast) Councillor Hill asked if anyone had any conflict of interest in respect of the agenda items, none were declared.
    [Show full text]
  • Chelston Conservation Area Character Appraisal
    Chelston Conservation Area Character Appraisal NOVEMBER 2005 CHELSTON CONSERVATION AREA CHARACTER APPRAISAL Revised Hal Bishop BA MA Cert Ecol & Cons November 2005 TORBAY COUNCIL Initial research by John Fisher BA MA MRTPI IHBC June 2000 CONTENTS PAGE 1. Location and Essential Characteristics 2 2 Historic Environment, Origins and Development 2 3 Character Areas 5 3.4 (1) The Historic Village and Modern Urban Centre 3.5 (2) The 19th Century Churches and Villas 4 Architectural and Historic Qualities 6 4.1 Listed & Other Key Buildings 6 4.2 Building Form & Ornament 10 4.3 Use of Materials & Local Details 11 4.4 Condition of Buildings 11 5 Character and Relationship of Spaces 11 6 Green Landscape and Trees 12 7 The Setting and Features of Special Importance 13 8 Extent of Loss, Damage and Intrusion 14 9 Summary 14 10 Conservation Area Policies 15 Bibliography 17 PHOTOGRAPHS EARLY EDITION ORDNANCE SURVEY 1: 2500 MAPS (not to scale) - Ordnance Survey County Series First Edition surveyed 1862 - Ordnance Survey County Series Second Edition surveyed 1904 - Ordnance Survey County Series Third Edition surveyed 1933 APPRAISAL MAPS - Map One: Historic Buildings - Map Two: Age of Buildings - Map Three: Building Materials - Roofs - Map Four Building Materials - Walls - Map Five Important Features 1 Chelston Conservation Area Character Appraisal adopted 19 December 2005 1 LOCATION AND ESSENTIAL CHARACTERISTICS 1.1 Chelston conservation area lies about 1 mile southwest of Torquay town centre, almost entirely west of the Torre-Torquay railway line, laid out 1858-9, but also includes a strip on its east side – all the area west of Rathmore Road.
    [Show full text]
  • Tor Bay Harbour Authority Port Masterplan
    Tor Bay Harbour Authority Port Masterplan Fit for a Sustainable Future for the Bay and the three enclosed Harbours of Brixham, Paignton and Torquay July 2013 Tor Bay Harbour Authority Port Masterplan Client Project Manager Consultant Funder Tor Bay Harbour Authority Torbay Development Agency Royal HaskoningDHV This Port Masterplan is part- Torquay Harbour Office 3rd Floor Tor Hill House Rightwell House financed by the European Regional Beacon Quay Union Street Bretton Development Fund under the Torquay Torquay Peterborough Interreg IVA France (Channel) – TQ1 2BG TQ2 5QW PE3 8DW England 2007-2013 programme www.tor-bay-harbour.co.uk www.torbaydevelopmentagency.co.uk www.royalhaskoningdhv.com www.interreg4a-channel.eu © Copyright by Royal HaskoningDHV and TDA, July 2013 Contents Foreword 4 Consultation & Community Engagement 28 Socio-economic considerations 54 Gordon Oliver, Mayor of Torbay Tor Bay Harbour 32 Implementation and delivery 56 Executive summary 6 Significance of the harbour Fishing and commercial activities Appendices 60 Introduction 14 Transport and connectivity References Setting the scene Spatial SWOT analysis Policy background – Planning Purpose & approach of the port masterplan Planning - policy background Policy background – Transport Transport - policy background Environmental Designations Context of Tor Bay Harbour 18 Green environment Tor Bay Recreation, leisure and tourism Brixham Harbour Paignton Harbour Proposals for Tor Bay Harbour 45 Torquay Harbour Tor Bay Harbour Brixham Harbour Strategy for Tor Bay Harbour Authority 26 Paignton Harbour Torquay Harbour Tor Bay Harbour Authority Port Masterplan Tor Bay Harbour Authority 4 Port Masterplan foreword Gordon Oliver, Mayor of torbay Foreword Mayor Oliver 5 Gordon “Torbay’s coastal location has been the most influential More recently an investment of some £20m has seen a new Foreword by factor in our history and it is also an essential part of our fish landing quay, office complex, fish processing units, fish Oliver, Mayor of Torbay future.
    [Show full text]
  • Community Plan 2007 +
    Community Plan 2007 + Turning the tide for Torbay Contents Foreword by Nick Bye, Chair of Torbay Strategic Partnership . .3 Moving forward from the last community plan . .4 Vision for the Bay – what we want Torbay to become in 10-20 years . .5 Pride in the Bay . .6 Learning and skills for the future . .9 The new economy . .12 Stronger communities . .15 How we will monitor our progress . .18 Key statistics about the Bay . .18 Torbay in the broader South West context . .19 We welcome your comments . .19 Foreword by Nick Bye, Chair of Torbay Strategic Partnership Welcome to Torbay’s Community Plan This plan has been developed and prepared by the Torbay Strategic Partnership on behalf of all the residents of Torbay . It builds on the previous community plan ‘Teaming up for Torbay’s Future 2004- 2007’ . It outlines the Partnership’s vision for Torbay over the next 20 years bringing together the views of residents as well as representatives from the business, community and voluntary sectors . The plan aims to unlock Torbay’s potential and drive forward its economic prosperity to give us prosperous communities with a higher quality of life and improved access to jobs . The need for economic regeneration is supported by a host of statistics and national indicators that predict low paid work and little prospects for the future unless something is done about it . The vision is directed by four key themes: Pride in the Bay, Stronger Communities, Learning and Skills for the Future and, underpinning it all, the New Economy . Together this focus will give us community prosperity for the people of the Bay .
    [Show full text]
  • Local Transport Implementation Plan 2016-2021 Consultation Results
    Local Transport Implementation Plan 2016-2021 Consultation Results Consultation Period: November/December 2015 The table below indicates the results of the consultation. The scheme reference numbers (1st column) can be linked back to the main document. The 2nd column indicates the number of respondents who prioritised that scheme. Ref. Ref. Ref. Ref. Ref. Ref. Ref. Ref. 1 7 11 19 21 11 31 5 41 0 51 8 61 3 71 1 2 17 12 14 22 4 32 4 42 13 52 6 62 8 72 2 3 23 13 8 23 6 33 1 43 3 53 4 63 12 4 1 14 3 24 5 34 3 44 0 54 4 64 3 5 6 15 8 25 13 35 1 45 4 55 2 65 5 6 7 16 5 26 4 36 18 46 1 56 3 66 10 7 14 17 3 27 8 37 1 47 1 57 5 67 4 8 4 18 9 28 6 38 3 48 5 58 7 68 8 9 13 19 6 29 14 39 2 49 5 59 0 69 4 10 15 20 1 30 12 40 12 50 5 60 2 70 7 The list below shows the priorities of the respondents. The consultation asked respondents to rank their priority. 1. Walking and Cycling 2. Public Transport 3. Private Vehicles Respondents were also asked to list out any additional schemes that they would prioritise but that were not listed in the initial document. This list was as follows (in no particular order): Close Torbay Road from Shedden Hill/Belgrave Rd to Cary Parade to revitalise the seafront.
    [Show full text]
  • Parking Services Annual Report 2012-2013
    Parking Services Annual Report 2012-2013 www.torbay.gov.uk Contents Introduction . 3 Chapter 1 - About Torbay . 4 Chapter 2 - Parking Strategy . 6 Chapter 3 - Parking Provision . 8 Chapter 4 - Partnerships . .. 13 Chapter 5 - Parking Promotions and Review . 15 Chapter 6 - Events . 17 Chapter 7 - Enforcement . 20 Chapter 8 - Parking Appeals & Permit Team . 23 Chapter 9 - Abandoned Vehicles . 26 Chapter 10 - Traffic Regulation Orders . 28 Chapter 11 - Customer Service Plans . 30 Appendices Appendix 1 - Penalty Charge Notices . 34 Appendix 2 - Penalty Charge Notices Issued - Payment and Cancellation Report . 37 Appendix 3 - Penalty Charge Notices Issued - Top Five Cancellations . 38 Appendix 4 - On street parking enforcement breakdown . 39 Appendix 5 - Parking Accounts 2012/13 . 40 Appendix 6 - Parking Dispensation Notices . 42 Appendix 7 - Useful websites . 43 2 Torbay Council Parking Services Annual Report 2012 - 2013 Introduction Welcome to Torbay Council’s fifth annual parking report . It summarises all the parking and traffic enforcement activities conducted by the council in 2012/13 . This year continued with ongoing difficulties for Torbay, both for struggling town centres and the council which faced £11 million cuts from its budgets imposed by central Government . Councillors and our elected Mayor faced extremely tough decisions regarding the provision of services . With the collapse of HMV, Woolworths and Blockbuster some big names are missing from our high streets, and some smaller traders are operating at just break even and living off savings . I was insistent parking charges were not increased through this difficult budget process as a way to raise income, and I led a process to review them so they suit the needs of the towns and residents .
    [Show full text]
  • Torquay Gateway Masterplan
    Torquay Rethink CONSULTATION Gateways Masterplan DRAFT A Vision for the Heart of the English Riviera. October 2014 1 Important note to the reader This is a draft document for consultation. It has been produced to support the emerging Torbay Local Plan which the Council expects to adopt in 2015. The final version of this document will be amended prior to adoption to reflect some or all of the following: - Comments received on this draft document during consultation; - Any amendments to relevant policies in the newly adopted local plan; - Any government policy changes The final version of this document will be adopted by the Council as a Supplementary Planning Document shortly after the new local plan is adopted. 2 CONTENTS PART 1: Background PART 2: The Gateways 1.0 INTRODUCTION 4.0 EDGINSWELL VALLEY 1.1 Purpose of the Masterplan Document 1.1.1 Brief 5.0 EDGINSWELL BUSINESS PARK 1.1.2 Torquay Today 1.1.3 Two Plans 6.0 KERSWELL GARDENS 1.1.4 Key Challenges 7.0 NEXT STEPS 2.0 EXISTING POLICY CONTEXT 2.1 The NPPF 2.2 The Emerging Local Plan 2.3 The Emerging Neighbourhood Plan 2.4 Previous Considerations 3.0 CONSULTATION 3.1 Stakeholder Responses 3.2 Public Exhibition 3 PART 1 Background 4 Introduction 1.1 The Purpose of the Masterplan Document 1.0 1.1.1 The Brief 1.1.12 Torquay Today In January 2014 the Mott MacDonald team (Lavigne Torquay is the largest town in Torbay. The economy is centred Lonsdale, Stride Treglown, iCube, Urban Movement) on tourism as well as a strong retail sector although this were appointed to deliver masterplans for specific areas has suffered over the last 5 years.
    [Show full text]
  • Stags.Co.Uk 01803 200160 | [email protected]
    stags.co.uk 01803 200160 | [email protected] 10 Court Road Torquay, TQ2 6SE A surprising spacious detached home with far reaching views over the Cockington Valley and beyond. Dartmouth 11, miles, Exeter 22 miles, Totnes 8 miles • Chain Free • Far Reaching Rural Views • Close to local Amenities • Flexible Layout Annexe Potential • 4 Double Bedrooms • Sitting Room and Terrace • Kitchen/Dining Room • Garden • Guide price £450,000 Cornwall | Devon | Somerset | Dorset | London 10 Court Road, Torquay, TQ2 6SE SITUATION DESCRIPTION Court Road is a quiet cul-de-sac overlooking the This property has a wonderful south westerly aspect beautiful Cockington Valley. The village of Cockington overlooking the South Devon countryside and is noted in the Domesday Book, and, on the face of it Cockinton Valley, but is within easy reach of the wide at least, little appears to have changed since. The village range of local amenities of the popular Chelston area of of Cockington is nestled in a valley just one mile from Torquay. Thought to have been built in the 1960s the the seafront at Torquay and sits somewhat property is surprisingly large, with a flexible layout over incongruously, right in the heart of urban Torbay, but two levels that could easily provide an annexe on the stubbornly refuses to be tainted by modern lower level if required. Currently the ground floor has 4 developments. The thatched village and the bedrooms, bathroom, kitchen/dining room, sitting surrounding country park and woodland, Is one of the room and sun room. The Lower ground floor has a most photographed places in the country shower, WC, lounge, two large rooms currently used as a home office, and many store rooms.
    [Show full text]