Traffic & Parking Advisory: Boston Marathon

Total Page:16

File Type:pdf, Size:1020Kb

Traffic & Parking Advisory: Boston Marathon 4/8/2019 TRAFFIC & PARKING ADVISORY: BOSTON MARATHON View this email in your browser BOSTON MARATHON 2019 TRAFFIC ADVISORY Street closures and parking restrictions will be in effect in Boston The Boston Marathon and the Patriot’s Day Parade will be held on Monday, April 15, 2019. The BAA 5K and the Invitational Mile will be held on Saturday, April 13, 2019. Street closures and parking restrictions will be in effect in the Back Bay, Beacon Hill, Brighton, Fenway­Kenmore, North End and Government Center. People coming into the City for the events are urged not to drive their personal vehicles. Information on Bluebike rentals may be found here and information on the MBTA may be found here. For a faster return trip, the MBTA advises riders to purchase a round­trip rather than a one­way ticket. Walking is also a great way to move around Boston. Changes to the following traffic and parking plan may be made by the City of Boston’s Police and Transportation Departments for the purpose of advancing public safety and traffic management. It is important to read all posted signs and variable message boards carefully. MONDAY, APRIL 15, BOSTON MARATHON TRAFFIC RESTRICTIONS https://mailchi.mp/bostonbackbay/2019-boston-marathon?e=ba65af59fe 1/9 4/8/2019 TRAFFIC & PARKING ADVISORY: BOSTON MARATHON The following streets will be closed to vehicular traffic on Monday, April 15, 2019. 3:30 AM Berkeley Street, between St. James Avenue and Newbury Street, and Boylston Street, from Berkeley Street to Arlington Street will close 5 AM Charles Street and Boylston Street, adjacent to the Boston Common and Public Garden will close 6 AM Boylston Street, Hereford Street to Berkeley Street will close 8 AM Streets east of Massachusetts Avenue and Massachusetts Turnpike Exit 22 will close 8 AM Streets west of Massachusetts Avenue in the Kenmore Square Audubon Circle area will close 8:30 AM Streets in the Brighton area leading to the route will close *Boylston Street is expected to reopen at 8 PM; all other streets are expected to reopen at 7PM. 3:30 AM – Berkley Street and Boylston Street Berkeley Street, St James Avenue to Newbury Street Boylston Street, Berkeley Street to Arlington Street 5 AM –Boston Common Area Boylston Street, Tremont Street to Arlington Street Charles Street, Park Plaza to Beacon Street 6 AM – Back Bay https://mailchi.mp/bostonbackbay/2019-boston-marathon?e=ba65af59fe 2/9 4/8/2019 TRAFFIC & PARKING ADVISORY: BOSTON MARATHON Boylston Street, Hereford Street to Berkeley Street 8 AM – Back Bay Clarendon Street, St. James Avenue to Newbury Street Dartmouth Street, St. James Avenue to Newbury Street Exeter Street, Newbury Street to Huntington Avenue Ring Road, Huntington Avenue to Boylston Street Fairfield Street, Newbury Street to Boylston Street Gloucester Street, Newbury Street to Boylston Street Providence Street, Arlington Street to Berkeley Street Trinity Place, St. James Avenue to Massachusetts Turnpike on­ramp Boylston Street, Massachusetts Avenue to Arlington Street Newbury Street, Arlington Street to Charlesgate East St. James Avenue, Arlington Street to Dartmouth Street Huntington Avenue (outbound), Dartmouth Street to Belvidere Street Stuart Street, Arlington Street to Dartmouth Street Blagden Street, Huntington Avenue to Exeter Street Berkeley Street, Columbus Avenue to Newbury Street Clarendon Street, Commonwealth Avenue to Columbus Avenue Dartmouth Street, Commonwealth Avenue to Columbus Avenue Exeter Street, Commonwealth Avenue to Huntington Avenue Fairfield Street, Commonwealth Avenue to Boylston Street Gloucester Street, Commonwealth Avenue to Boylston Street Hereford Street, Commonwealth Avenue to Boylston Street Dalton Street, Belvidere Street to Boylston Street Belvidere Street, Huntington Avenue to Dalton Street 8 AM – Kenmore Square Beacon Street, Park Drive to Commonwealth Avenue Brookline Avenue, Lansdowne Street to Commonwealth Avenue Newbury Street Extension, Brookline Avenue to Charlesgate West Commonwealth Avenue (inbound), from BU Bridge to Gloucester Street Commonwealth Avenue (outbound), Hereford Street to Deerfield Street https://mailchi.mp/bostonbackbay/2019-boston-marathon?e=ba65af59fe 3/9 4/8/2019 TRAFFIC & PARKING ADVISORY: BOSTON MARATHON Kenmore Street, Newbury Street Extension to Commonwealth Avenue (outbound) Raleigh Street, Beacon Street Extension to Commonwealth Avenue (outbound) 8:30 AM – Brighton Commonwealth Avenue, Beacon Street to Gloucester Street, and from the Newton City Line (Lake Street) to Chestnut Hill Avenue Beacon Street, Chestnut Hill Avenue to the Brookline town line (Cleveland Circle) Chestnut Hill Avenue, Commonwealth Avenue to Brookline town line at Ayr Road MONDAY, APRIL 15, PATRIOTS DAY PARADE TRAFFIC RESTRICTIONS The parade will begin at 9:00 AM at City Hall Plaza. Participants will march from Court Street to Cambridge Street to Tremont Street, left to Bromfield Street, left to Washington Street, right to State Street, left to Congress Street, right to Hanover Street, ending at the Paul Revere Mall. Streets along the route will be closed to traffic as the parade proceeds. Hanover Street at the Paul Revere Mall will close at 7 AM. SATURDAY, APRIL 13, BAA 5K and INVITATIONAL MILE TRAFFIC RESTRICTIONS On Saturday, April 13, streets along the routes of the B.A.A. 5K and the Invitational Mile will be closed to traffic. At 6 AM, traffic will be prohibited from Charles Street, between Boylston Street and Beacon Street. The 5K will begin at 8:00 AM on Charles Street near the Center Gate of the Public Garden and is expected to last about one hour with roads opening up as the tail vehicle passes. An estimated 10,000 runners will https://mailchi.mp/bostonbackbay/2019-boston-marathon?e=ba65af59fe 4/9 4/8/2019 TRAFFIC & PARKING ADVISORY: BOSTON MARATHON turn right onto Boylston Street, right onto Arlington Street, left onto Commonwealth Avenue outbound via the underpass at Massachusetts Avenue, left onto Charlesgate West, left onto Commonwealth Avenue inbound via the underpass at Massachusetts Avenue, right onto Hereford Street, left onto Boylston Street, left onto Charles Street. The Invitational Mile will start following the 5K. Formation will be on Boylston Street prior to Dartmouth Street, and the route will be Boylston Street, left to Dartmouth Street, left to Newbury Street and left to Exeter Street. Boylston Street, from Hereford Street to Clarendon Street, will be closed; along with Newbury Street, from Clarendon Street to Fairfield Street; and Exeter Street, from Newbury Street to Boylston Street. All streets are expected to be open by 3 PM. PATRIOTS DAY WEEKEND PARKING RESTRICTIONS Parking will be restricted on several streets in Boston on Monday, April 15. Parking will also be restricted on some streets several days in advance of the weekend to allow for related event and Marathon preparations to take place. These temporary parking restrictions are as follows. No Stopping April 3 to April 18 Blagden Street (opposite side of Library), Huntington Avenue to Exeter Street Boylston Street (both sides), Exeter Street to Dartmouth Street Boylston Street, heading east by Copley Square Mall, from Dartmouth Street to Clarendon St Exeter Street (east side), Boylston Street to Blagden Street No Stopping April 8­18 Blagden Street (north side), Dartmouth Street to BPL Driveway No Stopping April 10­16 Exeter Street (west side), Alley 441 to Boylston Street https://mailchi.mp/bostonbackbay/2019-boston-marathon?e=ba65af59fe 5/9 4/8/2019 TRAFFIC & PARKING ADVISORY: BOSTON MARATHON No Stopping Friday, Saturday & Monday Beacon Street (Boston Common side), Charles Street to Joy Street Boylston Street (both sides), Dalton Street to Arlington Street, unless otherwise posted Dartmouth Street (both sides), Boylston Street to Newbury Street Exeter Street (both sides), Newbury Street to Huntington Avenue Trinity Place (both sides), St. James Avenue to Stuart Street No Stopping Saturday to Monday Cambridge Street (both sides), Court Street to Sudbury Saint James Avenue (both sides), Berkeley Street to Arlington Street Boylston Street (south side, even side), Arlington Street to Hadassah Way No Stopping Saturday & Monday Boylston Street (both sides), Arlington Street to Charles Street, unless otherwise posted Charles Street (both sides), Boylston Street to Beacon Street Saint James Avenue (both sides), Berkeley Street to Dartmouth Street Stuart Street (both sides), Huntington Avenue to Arlington Street No Stopping Sunday & Monday Clarendon Street (both sides), Newbury Street to Public Alley 436 Berkeley Street (both sides), Boylston Street to Newbury Street Newbury Street (both sides, Berkeley Street west to # 69 Newbury Street No Stopping Saturday 12:01AM through 3PM Newbury Street (both sides), Dartmouth Street to Exeter Street “No Stopping Monday” Arlington Street (both sides), Beacon Street to Stuart Street Arlington Street (odd side), Columbus Avenue to Isabella Street https://mailchi.mp/bostonbackbay/2019-boston-marathon?e=ba65af59fe 6/9 4/8/2019 TRAFFIC & PARKING ADVISORY: BOSTON MARATHON Beacon Street, Brighton (both sides), Chestnut Hill Avenue to Brookline Line Berkeley Street (both sides), Columbus Avenue to Commonwealth Avenue unless otherwise posted Charles Street (both sides), Boylston Street to Beacon Street Charles Street South (both sides), Park Plaza to Boylston Street Chestnut Hill Avenue (both sides), Commonwealth Avenue to Beacon Street Clarendon Street (both sides), Commonwealth Avenue to Columbus Avenue unless otherwise posted Cleveland Circle (both sides ­ Parking area adjacent
Recommended publications
  • Public Comments
    Arborway Parkways Improvement Project Public Comments Submitted via DCR Online Comment Portal deadline 11/6/2020 Time Comment First Last Address (City) State Zipcode 10/21/20 3:27 PM The 2 circles alternative is the one that I prefer (followed by the 1 circle, then no circle designs). Roundabouts are a safer intersection design compared to a signalized intersection and should be used to Domenic Privitera Boston MA 02120 improve the safety of the Arborway. 10/22/20 10:18 AM 1. The paths should not be shared use. With E‐bikes, micro mobility, cargo bikes, accessible conveyances, and pedestrians wearing ear buds and not able to hear an approaching bicyclist, there will be crashes if Anne Lusk Brookline MA 02445‐6756 it is shared use due to speed differentials and widths of cargo/Fun2Go/child carrier bikes. 2. Bicyclists should not be on a path beside the traffic while the pedestrians have paths with wide green spaces by the homes, trees, and lawns. Riding beside the sound, mobile source air pollution, and dust from fast moving vehicles is not pleasant or healthy, Also, on a two way path, bicyclists riding with approaching vehicular traffic on their right would not be comfortable. At night, the intense and direct‐beam LED bike lights would be confusing to drivers who would see a beam of light approaching on their right. 3. The bicyclists should be shaded by trees, especially with hot summers, and for 24 hour riding, have continuous lighting directly over the two way bike path. The lighting should not be from the tall cobra head for the road because tree limbs obstruct the light from reaching the bike path, creating light and dark sections on the pathway.
    [Show full text]
  • Report Metropolitan Boston Transportation Commission
    SENATE No. 686 Cfre Commontocalti) of egasgacbusettg % REPORT OF THE METROPOLITAN BOSTON TRANSPORTATION COMMISSION Created by Chapter 121 of the Resolves op 1957 January 1958 * BOSTON WRIGHT A POTTER PRINTING CO., LEGISLATIVE PRINTERS 32 DERNE STREET 1968 Cl')t CommoniuealtJ) ot spassacimsetts * RESOLVE OF AUTHORIZATION. [Chapter 121] Resolve providing for an investigati )N AND STUDY BY A SPECIAL COMMISSION RELATIVE TO THE CREATION OF A METE DPOLITAN RAPID TRANSIT COMMISSION TO STUDY THE EXTENSION OF RAPID TBANSI' ERVICE THROUGHOUT THE AREA SERVED BY THE METROPOLITAN TRANSIT AUTHO TY AND RELATIVE TO TRANSPORTATION FACILITIES IN THE BOSTON METROPOLI AN AREA Resolved, That an unpaid special comr ion to consist of two members of the senate to be designated by the president thereof, three members of the house of representatives to be designated by the ipeaker thereof, and two persons to be appointed by the governor, is hereby es stablished for the purpose of making an investigation and study of the subject mai tter of current house document numbered 862, relative to providing for the creationn of a metropolitan rapid transit commis- sion to study the extension of rapid transi?it service throughout the area now served by the metropolitan transit authority: and of the investigation proposed by em- rent house document numbered 1736. ulative to transportation facilities in the Boston metropolitan area. Said commission shallbe provided with quarters in the state house or elsewhere, and may expend for clerical and other services and expenses such sums as may be appropriated therefor. Said commission shall report to the general court the re- sults of its investigation and study, and its recommendations, if any, together with drafts of legislation necessary to carry said recommendations into effect, by filing the same with the clerk of the senate on or before the fourth Wednesday of January in the year nineteen hundred and fifty-eight.
    [Show full text]
  • Boston Community Resources & Information
    Boston Community Resources & Information Red Cross of Massachusetts 101 Station Landing Suite 510 Phone: (781) 410-3670 Phone: (800) 272-7337 (toll-free) Information Referral Services GET HELP WITH: Mental Health Assistance Financial Assistance Health Services Fuel & Utility Assistance: ABCD 178 Tremont Street Boston, MA 02111 Phone: (617) 348-6000 Services: Clothing and Essentials Housing Counseling Services Food Pantries LIST OF FOOD PANTRIES (Boston & Surrounding Areas) Dothouse Health – Food Pantry Every Wednesday morning for general public has a food pantry Requirement: Must live in Dorchester or surrounding towns Allston-Brighton NOC 640 Washington Street, Suite 203 Brighton, MA Call: 617.903.3640 Roxbury/N. Dorchester NOC 565 Warren Street Roxbury, MA 02121 Call: 617.442.5900 Jamaica Plain APAC 30 Bickford Street, Lower Level Jamaica Plain, MA 02130 Call: 617.522.4250 North End/West End NSC 1 Michelangelo Street Boston, MA 02113 Call: 617.523.8125 Parker Hill Fenway NSC 714 Parker Street Roxbury, MA 02120 Call: 617.445.6000 SNAP/South End NSC 554 Columbus Avenue Boston, MA 02118 Call: 617.267.7400 FREE MEALS AND SOUP KITCHENS: Bread and Jams 50 Quincy Street, Cambridge 617-441-3831 Call to make an appointment Boston Living Center 29 Stanhope Street, Boston 617-236-1012 Serves only individuals with HIV/AIDS Bring verification of HIV+ status and income verification Boston Rescue Mission / Pantry 39 Kingston Street, Boston 617-338-9000 Must be 18 years old A referral is needed, call to make an appointment CASPAR Emergency Service Center and Shelter 240 Albany Street, Cambridge 617-661-0600 Must be resident of Somerville or Cambridge, over age 18 Catholic Social Services (Fall River) 1600 Bay Street, Fall River 508-674-4681 Call for eligibility requirements Community Servings, Inc.
    [Show full text]
  • Retail/Restaurant Opportunity Dudley Square
    RETAIL/RESTAURANT OPPORTUNITY 2262 WASHINGTON STREET DUDLEY ROXBURY, MASSACHUSETTS SQUARE CRITICALDates NEIGHBORHOODOverview MONDAY • DECEMBER 9, 2013 Distribution of Request for Proposals (RFP) • Located at the junction of Washington and Warren Streets with convenient access to Interstates 93 and 90 (Massachusetts Bid Counter • 26 Court Street, 10th floor Turnpike) Boston, MA • Dudley Square has a population of approximately 80,000 people and 28,000 households within a one mile radius • Retail demand and spending by neighborhood residents is upwards of $610 million annually TUESDAY • JANUARY 14, 2014 • Approximately $300 million in public/private dollars have been invested in the neighborhood since 2000 Proposer Conference • 2:00 P.M. Central Boston Elder Services Buliding • Dudley Square is within a mile of Boston’s Financial District, blocks away from the South End and is within walking distance to 2315 Washington Street Northeastern University, Roxbury Community College, Boston Medical Center and BU Medical School and in proximity to Mission Hill and WARREN STREET Roxbury, MA Jamaica Plain • Dudley Square Station is located adjacent to the site and provides local bus service that connects Dudley to the MBTA’s Ruggles Station MONDAY • FEBRUARY 10, 2014 Orange Line stop and Silver Line service to Downtown Boston. Dudley Square Station is the region’s busiest bus station and Completed RFP’s due by 2:00 P.M. averages 30,000 passengers daily SEAPORT BOULEVARD BACK BAY SUMMER STREET Bid Counter • 26 Court Street, 10th floor COMMONWEALTH
    [Show full text]
  • Significant Renovation Underway , Delivering
    SIGNIFICANT RENOVATION UNDERWAY , DELIVERING END 2 0 1 6 AN UPDATED CLASSIC TAILORED . TIMELESS . CLASSIC . An extensive redesign of the lobby, exterior, terraces and exterior make 116 Huntington the premier 15-story, 270,000sf Class-A office building Back Bay office building. Inspired by timeless Italian architecture and furnishings, tailored lines merge Freestanding with sweeping views of the Back Bay and Charles River with modern amenities in a tasteful palate. Parking garage on-site 24/7 Security Cab Stand at front of building Lucca Back Bay restaurant in building Located in the Back Bay across from Copley Place shopping Accessible transit 2 3 Boylston St. Boston Public Gardens AT THE CENTER OF WORLD CLASS RESTAURANTS SHOPPING HOTELS Commonwealth Ave. , , Newbury St. Boston Public Library John Hancock Tower 13 AND A LIVELY NEIGHBORHOOD 2 6 6 2 18 8 9 5 2 1 Boylston St. Huntington Ave. Hynes Convention Center 1 4 5 15 16 I-90 3 7 5 I-90 Back Bay Station Prudential Center 10 3 8 Copley Place P 16. Legal Sea Foods P RESTAURANTS HEALTH WELLNESS 14 P 3 6 Dartmouth St. 17. Lucca Back Bay 11 1 1 1. Towne 18. Post 390 1. Equinox P 2. Au Bon Pain 19. Eatily at Pridential Center - 2. Healthworks Fitness Massachusetts Ave. 2 116 3. Capital Grille Coming Soon 3. Boston Sports Club 4 3 7 17 4. The Cheesecake Factory 7 5. Wagamama SHOPPING HOTELS P 12 6. Top of the Hub 1. Marriott Hotel 4 7. 5 Napkin Burger 1. Shops at Prudential Center 2.
    [Show full text]
  • Red Sox Foundation R.B.I. 2018 Rules & Scorebook
    RED SOX FOUNDATION R.B.I. 2018 RULES & SCOREBOOK Special thanks to Copy Makers Inc. RED SOX FOUNDATION RBI 2018 RULES RBI OVERVIEW The Red Sox Foundation’s Reviving Baseball in Inner Cities (RBI) is the recreational cornerstone program aimed at inner-city boys and girls. To the Foundation, RBI is more than simply increasing the participation in baseball and softball in the neighborhoods we serve. It’s about coming together as a team, encouraging school attendance and achievement, developing self-esteem and life skills, promoting positive attitudes, instilling values of teamwork, tolerance, and teaching safe and healthy choices to at-risk youth. RBI emphasizes the importance of good decision-making through development of good nutrition, leadership, respect for others, nonviolent conflict resolution, and an overall commitment to one’s potential and to the community. Organized and operated by the official team charity of the Boston Red Sox, the Foundation’s RBI program serves approximately 700 inner-city boys and girls, aged 9-18, in 13 neighborhoods including Allston, Brighton, Dorchester, Hyde Park, Jamaica Plain, Mattapan, Mission Hill, the North and South Ends, Roslindale, Roxbury, South Boston, and West Roxbury. With many neighborhoods plagued by high crime, gang activity, and youth violence, we encourage RBI players to stay in school and resist drugs, alcohol, violence, and other damaging influences in their lives while providing a safe and vital alternative. The Red Sox Foundation is proud to fund the RBI program in its entirety without support from MLB. Our youth are the future and we understand the importance of providing a program that delivers on their needs as well as provides a safe and fun extra-curricular activity.
    [Show full text]
  • Roxbury-Dorchester-Mattapan Transit Needs Study
    Roxbury-Dorchester-Mattapan Transit Needs Study SEPTEMBER 2012 The preparation of this report has been financed in part through grant[s] from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation, under the State Planning and Research Program, Section 505 [or Metropolitan Planning Program, Section 104(f)] of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation. This report was funded in part through grant[s] from the Federal Highway Administration [and Federal Transit Administration], U.S. Department of Transportation. The views and opinions of the authors [or agency] expressed herein do not necessarily state or reflect those of the U. S. Department of Transportation. i Table of Contents EXECUTIVE SUMMARY ........................................................................................................................................................................................... 1 I. BACKGROUND .................................................................................................................................................................................................... 7 A Lack of Trust .................................................................................................................................................................................................... 7 The Loss of Rapid Transit Service .......................................................................................................................................................................
    [Show full text]
  • Gradient One Beacon Street, 17Th Floor, Boston, MA
    Gradient One Beacon Street, 17th Floor, Boston, MA By Public Transportation • One Beacon is a short walk from the Park Street, Government Center or Downtown Crossing stops on the MBTA (known locally as “the T”). • From the Red or Green line, get off at the Park Street stop. Walk .2 miles North on Tremont St. One Beacon will be on your left. • From the Orange or Red line, get off at the Downtown Crossing Stop. Walk two blocks on Washington St.; turn left on Bromfield St. and walk two blocks. Turn right on Tremont St. One Beacon will be on your left. • From the Blue line, get off at the Government Center Stop. One Beacon is .1 miles to the South on Tremont St. From the East (Logan Airport): • If driving, take 1A South from the Airport. • Take the Interstate 93 N exit towards Government Center. • Following signs for Government Center, stay on New Chardon St. • Turn left onto Cambridge St., then stay straight on Tremont St. • One Beacon will be on your right. From the West: • Take the Mass Pike (Route 90) East. • Take exit 24A-B-24C, and stay on exit 24B to merge onto Interstate 93 N. • Keep left, following signs for Government Center. • Use the right lane to turn left on Congress St. Stay straight for .1 miles, then turn right. • Continue onto Tremont St. One Beacon will be on your right. Parking Options: One Beacon St. Garage From the North/South: 1 Beacon Street Boston, MA 02108 • From Interstate 93 North or South Pi Alley Parking Garage • Take the Exit 24A-24B towards Government Center.
    [Show full text]
  • Arborway Road Safety Audit
    ROAD SAFETY AUDIT Arborway - West of South Street to West of Eliot Street City of Boston September 9, 2019 Prepared For: DCR Prepared By: Howard Stein Hudson 11 Beacon Street, Boston, MA Road Safety Audit—Arborway – West of South Street to Eliot Street, Boston Prepared by Howard Stein Hudson FINAL Table of Contents Contents Background ................................................................................................................................. 1 Project Location and Description .............................................................................................. 3 Project Crash Data ................................................................................................................... 10 Audit Observations and Potential Safety Enhancements...................................................... 11 Overall Arborway Corridor ............................................................................................................... 11 Safety Issue #1: Speed ....................................................................................................................... 11 Potential Enhancements: ............................................................................................................. 11 Safety Issue #2: Pedestrian, Bicycle, and ADA Accommodations ................................................... 12 Potential Enhancements: ............................................................................................................. 12 Safety Issue #3: Lighting ..................................................................................................................
    [Show full text]
  • RE: Suffolk University IMPNFIPNF Submission
    10/25/2019 City of Boston Mail - RE: Suffolk University IMPNF/PNF Submission - TASK FORCE COMMENT Edward Carmody <edward.carmody~boston.gov> RE: Suffolk University IMPNFIPNF Submission - TASK FORCE COMMENT 1 message Ernani DeAraujo Fri, Oct 25, 2019 at 9:39 AM To: Edward Carmody <edward.carmody~boston.gov> Hi Eddie. I write this note in support of Suffolk University’s proposal for the former Ames Boston hotel. Creating managed living space for university students is a very good use for this building and will have multiple benefits for the city of Boston including: relieving pressure on nearby residential housing; providing students with a safe, up-to-code, living experience; and preserving an architecturally impressive facade that might otherwise fall into disrepair. The Suffolk team has been very thoughtful around managing impacts with respect to transportation and tenants. In particular, the adaptation for student use should relieve some traffic congestion from the area and the concentration of students in the building should liven up the nearby streetscape and promote further investment in that area. Finally, Suffolk University has been a good neighbor and partner for the neighborhood of East Boston and I believe will be a good neighbor to the surrounding area on Court Street. Thank you for your consideration. Ernani J. DeAraujo, Esq. Vice President of Regulatory Affairs and General Counsel East Boston Neighborhood Health Center 20 Maverick Square, 4th Floor East Boston, MA 02128 Office: Fax: From: Edward Carmody [mailto: [email protected]] Sent: Friday, September 27, 2019 11:11 AM To: Edward Carmody Subject: Re: Please Review - Suffolk University IMPNF/PNF Submission EXTERNAL Message From Edward Carmody with a return email address of edward.carmody~boston.gov https://mail.google.com/mail/u/0?ik=577d5ceafd&viewpt&searchall&permthidthread-f%3A1648372784904956368&simplmsg-f%3A1 64837278490..
    [Show full text]
  • Massachusetts's 7Th District Through 2011
    1 LIHTC Properties in Massachusetts's 7th District through 2011 Annual Low Rent or Tax- Zip Nonprofit Allocation Allocated Year Placed Total Income Income Exempt Project Name Address City State Code Sponsor Year Amount in Service Construction Type Units Units Ceiling Credit Percentage Bond 113 Spencer 113 Spencer Ave Chelsea MA 2150 Yes 2008$ 802,700 2009 New Construction 48 48 60% AMGI 70 % present value 128-130 Park Street 128 Park St Dorchester MA 2122 1988 1989 Acquisition And Rehab 16 16 Not Indicated No 1460 House 1460 Dorchester Ave Boston MA 2122 Yes 2007$ 638,550 2008 New Construction 43 43 60% AMGI 70 % present value 1734 Washington 1734 Washington St Boston MA 2118 1988 1990 Not Indicated 31 31 Not Indicated No 2055 Columbus Avenue Inc 2055 Columbus Ave Roxbury MA 2119 Yes 2003 2005 Acquisition And Rehab 44 60% AMGI 70 % present value No 25 Ruggles Assisted Living 25 Ruggles St Roxbury MA 2119 Yes 2000 2001 Acquisition And Rehab 43 43 70 % present value No 270 Huntington Avenue 270 Huntington Ave Boston MA 2115 1992 1994 Not Indicated 75 75 60% AMGI Not Indicated No 300 Shawmut Avenue 300 Shawmut Ave Boston MA 2118 1988 1988 Not Indicated 15 15 Not Indicated No 33 Bow Street 33 Bow St Somerville MA 2143 Not Indicated 18 16 60% AMGI Not Indicated 34 Linden Street Apartments, Lp 36 Linden St Somerville MA 2143 Yes 2001 2002 New Construction 42 42 60% AMGI 70 % present value No 438 Warren Street 438 Warren St Dorchester MA 2121 1989 1990 Not Indicated 20 20 Not Indicated No 523 Massachusetts Ave 523 Massachusetts Ave Boston MA
    [Show full text]
  • Directions and Parking
    Directions and Parking One Ashburton Place 21st Floor, Conference Room 2&3 Boston, MA 02108 One Ashburton Place, also known as the John W. McCormack Building, is located adjacent to the eastern side of the Massachusetts State House, between Bowdoin and Somerset Streets. Driving Directions: Customized driving directions are available via Google Maps: By car from the North Take Interstate 93 SOUTH to Exit 26, Storrow Drive and North Station. Stay in the LEFT lane and follow signs to Storrow Drive. Once out of the tunnel stay in LEFT lane and take the first exit on the LEFT towards Government Center and Kendall Square. At the end of the exit ramp, go straight across under the Red Line tracks following signs to Government Center which bears to the left onto Cambridge Street. At the seventh light (a little under a half a mile) turn right onto Somerset Street. Somerset Street turns onto Ashburton Place at the top of the hill. One Ashburton Place will be on the RIGHT. By car from the South Take Interstate 93 NORTH. Take Exit 23, Government Center. Stay in the LEFT lane of the exit ramp and turn left at the first light onto North Street. Go straight through one set of lights. At the second set of lights, turn LEFT onto Congress Street. At the first intersection turn RIGHT onto State Street. State Street turns into Court Street. Turn LEFT onto Tremont Street. At the first light turn RIGHT onto Beacon Street. Turn RIGHT onto Somerset Street. Turn LEFT onto Ashburton Place. One Ashburton Place will be on the RIGHT.
    [Show full text]