50399-003: Education for Employment Sector Development Program

Total Page:16

File Type:pdf, Size:1020Kb

50399-003: Education for Employment Sector Development Program Education for Employment Sector Development Program (RRP LAO 50399) Initial Environmental Examination (Draft) July 2019 Lao PDR: Education for Employment Sector Development Program Prepared by the Government of Lao People’s Democratic Republic’s Ministry of Education and Sports for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 4 June 2019) Currency unit – Kip (KN) KN1.00 = $0.00011 $1.00 = KN8,666.40 ABBREVIATIONS ADB - Asian Development Bank ADPC - Asian Disaster Preparedness Center DES - District education and sports office DESB - District education sector bureaus DGE - Department of General Education DONRE - District environment and natural resources office ECDM - Education Construction and Design Management of MOES EHS - Environment, Health and Safety EIA - Environmental Impact Assessment EMP - Environmental Management Plan GRM - Grievance Redress Mechanism IEE - Initial Environmental Examination IUCN - International Union on Conservation of Nature LSE - lower secondary education MOES - Ministry of Education and Sports MOH - Ministry of Health MONRE - Ministry of Natural Resources and Environment MPWT - Ministry of Public Works and Transport NDMO - National Disaster Management Office NES - National environment specialist (consultant) NIP - national implementation plan NTFP - non-timber forest products OCHA - UN Office for the Coordination of Humanitarian Affairs PBL - policy-based loan PCP - ADB Public Communications Policy (2011) PCR - project completion report PES - Provincial education and sports office PMU - Project Management Unit POPs - persistent organic pollutants PPE - post-primary education PUCDA - Provincial unit for construction and development assistance REA - rapid environmental assessment SDP - sector development program SPS - ADB Safeguard Policy Statement (2009) TVET - technical and vocational education and training UNDP - United Nations Development Program UNFCC - United Nations Framework Convention on Climate Change USE - upper secondary education UXO - unexploded ordnance VEDC - Village Education Development Committee VOC - volatile organic compound WASH - water, sanitation and hygiene WHO - World Health Organization WREA - Water Resources and Environment Administration WEIGHTS AND MEASURES ha - hectare m - meter km - kilometer dBA - decibels km - kilometer hr - hour mm - millimeter oC - Degree Centigrade NOTE In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.s TABLE OF CONTENTS Page I. INTRODUCTION 1 A. Project Concept and Rationale 1 B. Methodology for Environmental Assessment 1 II. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 2 A. ADB’s Environment Safeguards Policies 2 B. Legal and Institutional Framework on Environmental Management in Lao PDR 5 C. Environmental Standards 9 D. Water, Sanitation and Hygiene (WASH) 9 E. International Conventions 9 F. MOES Policies on School Construction 10 III. DESCRIPTION OF THE PROJECT 11 A. Design Features of Schools 14 IV. DESCRIPTION OF THE ENVIRONMENT 22 A. Existing Condition at School Sites 24 B. Topography and Natural Hazards 26 C. Climate 28 D. Air Quality 29 E. Noise 29 F. Biological Resources 30 G. UXO Contamination 30 H. Water Supply, Sanitation and Health 32 I. Historical and Cultural Resources 33 J. Presence of Asbestos and Other Hazardous Materials 33 V. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 34 A. Anticipated Benefits from the Project 34 B. Pre-Construction Impacts and Mitigation 34 C. Environmental Impacts and Mitigation Measures During Construction 35 D. Environmental Impacts and Mitigation During School Operation 37 VI. INFORMATION DISCLOSURE, CONSULTATION AND PARTICIPATION 37 A. Stakeholders 38 B. Results of Stakeholders Consultations 38 C. Follow-up Information Disclosure and Stakeholder Consultations 40 VII. GRIEVANCE REDRESS MECHANISM 40 VIII. ENVIRONMENTAL MANAGEMENT PLAN 42 A. Objectives 42 B. Mitigation Plan 42 C. Reporting 42 IX. CONCLUSION AND RECOMMENDATIONS 44 APPENDIXES 1. Environmental Management Plan 45 2. Findings on Existing 60 Schools 57 3. Documentation of Stakeholder Consultations 70 4. Template of Environment Safeguard Monitoring Report 99 LIST OF TABLES Table 1: Environmental Safeguard Policy Principles of Asian Development Bank Safeguard Policy Statement (2009) 3 Table 2: Noise standards in Lao PDR and WHO Guideline Values 9 Table 3: Identified school sites for civil works based on school network mapping 13 Table 4: Location of School Sites 22 Table 5: Stakeholder Consultations 37 Table 6: Summary of issues raised during stakeholder consultations 38 Table 7: EMP Reporting Plan 52 LIST OF FIGURES Figure 1: Location of schools 2 Figure 2: Floor plan of a classroom block 16 Figure 3: Elevation plan of classroom block 17 Figure 4: Floor plan of dormitory 18 Figure 5: Elevation plan of dormitory 19 Figure 6: Plan of typical sex-segregated toilet 20 Figure 7: Seismicity and other hazards in Lao PDR 28 Figure 8: Mean annual precipitation and temperature across Lao PDR 29 Figure 9: Location of Phan Xam Secondary School in relation ot Nam Xam NBCA 30 Figure 10: UXO-contaminated sites in Lao PDR 31 PHOTOGRAPHS Photo 1: A classroom block in Tung Heung Lower Secondary School in Sekong Province 21 Photo 2: A typical dormitory 21 Photo 3: Classroom blocks made of bamboo and wood 25 Photo 4: Huts inside school compound 26 Photo 5: Water supply and toilets in existing schools 33 EXECUTIVE SUMMARY Introduction The proposed Education for Employment Sector Development Program (SDP) aims to strengthen human capital in the Lao People’s Democratic Republic (Lao PDR) and support inclusive growth and economic diversification. As an SPD, it will include two complementary components: (i) a policy-based loan (PBL); and (ii) an investment project. The PBL will help better prepare Lao PDR youth for employment by helping the Ministry of Education and Sports (MOES) to advance foundational reforms to align post-primary education—secondary education, technical and vocational education and training (TVET), and higher education—with workforce skill needs. The project component will build MOES capacity to deliver these reforms, enhance the quality and relevance of secondary education in preparing youth for employment, and increase completion rates. The proposed program builds on the Secondary Education (SDP) and related support for TVET and higher education by the Asian Development Bank (ADB). It directly supports ADB Strategy 2030 through the operational priority of improving education and training, and is closely aligned with the country partnership strategy, 2017–2020. Project Rationale Weak human resources continue to constrain Lao PDR’s efforts towards poverty reduction, inclusive growth, and economic diversification. There is extremely low enrolment and completion rates at lower secondary (Grades 6 to 9) and upper secondary (Grades 10 to 12) levels. There is also a high proportion of drop outs in secondary schools and these youth resort to taking up low- skill, temporary jobs in the informal sector. The problem stems from a combination of factors such as shortage of good quality secondary schools, lack of access (particularly for youth living in rural and remote areas), poor quality of school facilities and dormitories, teachers lacking the required educational background, pedagogy skills and motivation, outdated teaching and delivery methods, absence of rigorous classroom-based assessment, and demand-side constraints including financial and opportunity costs which makes it difficult for poor families to support children until grade 12.1 The MOES’ Vision for 2030 and the Lao PDR’s Eighth National Socio-economic Development Plan 2016-2020 prioritizes education as a prerequisite for poverty reduction and inclusive growth. The SDP is designed to support the Government’s priorities and will focus on enhancing and equitizing the flow of skills into the labor force to support inclusive growth and increased opportunities for youth. This SDP will support three core outputs: (i) Output 1: Alignment of post-primary education (PPE2) with labor market demand strengthened. (ii) Output 2: Quality and relevance of secondary education to emerging skills demands strengthened. (iii) Output 3: Equitable secondary education access and completion increased. Output 3 of the project will (i) help address supply-side constraints in 12 of 47 districts (covering 8 provinces) by constructing additional classroom blocks, sex-segregated dormitories, and 1 Draft Report and Recommendation of the President of the proposed Education for Employment SDP. 2 Unless otherwise noted, PPE herein refers to formal general secondary education, TVET, higher education (including teacher education), and NFE at post-primary levels. ii sanitation facilities (including toilets) at 60 existing primary and secondary school sites;3 and (ii) reduce demand-side constraints to access and completion by providing stipends to youth based on a combination of need and merit. Additional classrooms will be built
Recommended publications
  • National Integrated Water Resources Management Support Project (Cofinanced by the Government of Australia and the Spanish Cooperation Fund for Technical Assistance)
    Technical Assistance Consultant’s Report Project Number: 43114 August 2014 Lao People’s Democratic Republic: National Integrated Water Resources Management Support Project (Cofinanced by the Government of Australia and the Spanish Cooperation Fund for Technical Assistance) Prepared by: IDOM Ingenieria Y Consultoria S.A. (Vizcaya, Spain) in association with Lao Consulting Group Ltd. (Vientiane, Lao PDR) For: Ministry of Natural Resources and Environment Department of Water Resources Nam Ngum River Basin Committee Secretariat This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. NATIONAL INTEGRATED WATER RESOURCES MANAGEMENT SUPPORT PROGRAM ADB TA-7780 (LAO) PACKAGE 2: RIVER BASIN MANAGEMENT NIWRMSP - PACKAGE 2 FINAL REPORT August 2014 NIWRMSP - PACKAGE 2 FINAL REPORT National Integrated Water Resources Management Support Program ADB TA-7780 (LAO) Package 2 - River Basin Management CONTENTS EXECUTIVE SUMMARY IN ENGLISH ................................................................................................... S1 EXECUTIVE SUMMARY IN LAO ........................................................................................................... S4 1. BACKGROUND ............................................................................................................................... 1 2. RESOURCES ASSIGNED TO THE TECHNICAL ASSISTANCE .................................................. 2 3. WORK DEVELOPED AND OBJECTIVES
    [Show full text]
  • Typhoon Haima in the Lao People's Democratic Republic
    TYPHOON HAIMA IN THE LAO PEOPLE’S DEMOCRATIC REPUBLIC Joint Damage, Losses and Needs Assessment – August, 2011 A Report prepared by the Government of the Lao PDR with support from the ADB , ADPC, FAO , GFDRR, Save the Children, UNDP, UNFPA, UNICEF, UN-HABITAT, WFP, WHO, World Bank, World Vision, and WSP Lao People's Democratic Republic Peace Independence Democracy Unity Prosperity TYPHOON HAIMA JOINT DAMAGE, LOSSES AND NEEDS ASSESSMENT (JDLNA) *** October 2011 A Report prepared by the Government of the Lao PDR With support from the ADB, ADPC, FAO, GFDRR , Save the Children, UNDP, UNFPA, UNICEF, UN- HABITAT, WFP ,WHO, World Bank, World Vision, AND WSP Vientiane, August 29, 2011 Page i Foreword On June 24-25, 2011, Typhoon Haima hit the Northern and Central parts of the Lao PDR causing heavy rain, widespread flooding and serious erosion in the provinces of Xiengkhouang, Xayaboury, Vientiane and Bolikhamxay. The typhoon caused severe damage and losses to the basic infrastructure, especially to productive areas, the irrigation system, roads and bridges, hospitals, and schools. Further, the typhoon disrupted the local people’s livelihoods, assets and properties. The poor and vulnerable groups of people are most affected by the typhoon. Without immediate recovery efforts, its consequences will gravely compromise the development efforts undertaken so far by the government, seriously set back economic dynamism, and further jeopardise the already very precarious situation in some of the provinces that were hard hit by the typhoon. A Joint Damage, Losses and Needs Assessment (JDLNA) was undertaken, with field visit to the four most affected provinces from 25th July to 5th August 2011.
    [Show full text]
  • Payments for Environmental Services Schemes
    Effective Implementation of Payments for Environmental Services in Lao PDR Research Reports ISSN 2202-7432 THE ENVIRONMENTAL, ECONOMIC AND SOCIAL CONDITION OF THE NAM MOUANE – NAM GNOUANG CATCHMENT Research Report No. 5 October 2014 Xiong Tsechalicha1, Yiakhang Pangxang2, Saysamone Phoyduangsy3 & Phouphet Kyophilavong4 The project ‘Effective Implementation of Payments for Environmental Services in Lao PDR’ is funded by the Australian Centre for International Agricultural Research (ACIAR). The reports produced within this project are published by the Crawford School of Public Policy, Australian National University, Canberra, 0200 Australia. The reports present work in progress being undertaken by the project team. The views and interpretations expressed in these reports are those of the author(s) and should not be attributed to any organization associated with the project. Because these reports present the results of work in progress, they should not be reproduced in part or in whole without the authorization of the Australian Project Leader, Professor Jeff Bennett ([email protected]). 1Centre for Environmental Economics & Policy, University of Western Australia 2,3,4Faculty of Economics and Business Management, National University of Laos Abstract The main objective of this Research Report is to overview the environmental, economic and social condition of the Nam Mouane – Nam Gnouang catchment. This Research Report identifies threats to forest wildlife and forest cover arising from current management practices and suggests possible management actions to achieve environmental improvements. These include reducing the expansion of shifting cultivation into undisturbed forests by improving agricultural productivity of slash-and- burned; reducing poaching/ hunting of forest wildlife through increased patrolling and the collection of snares.
    [Show full text]
  • Project Evaluation of WWF Sustainable Rattan Project in Lao PDR
    © WSPA Contents Summary ____________________________________________________________ 3 Background __________________________________________________________ 6 Objectives of this report _______________________________________________ 7 Assessment team _____________________________________________________ 7 Methodology ________________________________________________________ 8 Interview summary ________________________________________________________ 8 Results _____________________________________________________________ 10 Project impacts at the village level __________________________________________ 10 Forest management ______________________________________________________ 13 Rattan harvesting and preparation __________________________________________ 17 Handicraft manufacture ___________________________________________________ 19 Sales and export _________________________________________________________ 23 Impact on government agencies and regulations _______________________________ 24 Conclusion __________________________________________________________ 25 References _________________________________________________________ 27 Note on spelling There is no standardised romanisation of Lao words. This report attempts to be consistent and uses an English transliteration of Lao words. Project evaluation of WWF Sustainable Rattan Project in Lao PDR. Roderick Campbell (2011) 2 Summary WWF’s Sustainable Rattan Harvest and Production Project (the Project) has been operating since 2006 and will run until at least 2014. It operates in Lao PDR,
    [Show full text]
  • The Ho Chi Minh Trail SecOns: the Ho Chi Minh Trail Was the Route from North Vietnam to South
    JULY 2019 SUPPLEMENT VOL 82.5 Chapter 16 Newsleer Organizaon and Responsibilies: Editor: Glen Craig The Ho Chi Minh Trail Secons: The Ho Chi Minh Trail was the route from North Vietnam to South Message from the President: Stephen Durfee Vietnam thru Laos and Cambodia that North Vietnam used to Treasurers Report: Willi Lindner supply the Viet Cong and the North Vietnamese Army in South Vietnam with Weapons, Ammuni on and other supplies. Sec. Rpt (Staff Meeng Minutes): Mike Barkstrom Sick Call/Obituary: Chaplain Butch Hall Blast from the Past: Glen Craig Special Recognion: Mike Barkstrom Upcoming Events: Mike Barkstrom Calendar: Stephen Durfee Human Interest Story: Chapter at large SFA Naonal HQ Update: Stephen Durfee Aer Acon Report: Jim Lessler Membership Info: Roy Sayer Adversements: Glen Craig Suspense: Newsleer published (Web): 1st of each odd numbered month Input due to editor: 20th of each even numbered month Dra due to President: 27th of each even numbered month Final Dra due 29th of each even numbered month I thought this was interesng and wanted to share it with everyone. I hope you enjoy it. Legend of the Ho Chi Minh Trail Ho Chi Minh Trail Aug14, 2012 Please ask, about our Ho Chi Minh Trail tours! Page 1 Ho Chi Minh trail, painng by Veteran Larry Chambers The Legend of the Ho Chi Minh trail, there are few brand names to match that of the Ho Chi Minh Trail, the secret, shiing, network of deep jungle tracks that led to the Victory for Vietnam war. SA 2 Surface to Air missile, Ho Chi Minh trail Southern Laos, Ho Chi Minh trail Huey helicopter used in the Lamson bale at the Ban Dong war museum Well here I sit in Laos again, I have been pung around the place on and off for 10 years now.
    [Show full text]
  • Lao Pdr. Raising Community Awareness On
    OCCASION This publication has been made available to the public on the occasion of the 50th anniversary of the United Nations Industrial Development Organisation. DISCLAIMER This document has been produced without formal United Nations editing. The designations employed and the presentation of the material in this document do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations Industrial Development Organization (UNIDO) concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries, or its economic system or degree of development. Designations such as “developed”, “industrialized” and “developing” are intended for statistical convenience and do not necessarily express a judgment about the stage reached by a particular country or area in the development process. Mention of firm names or commercial products does not constitute an endorsement by UNIDO. FAIR USE POLICY Any part of this publication may be quoted and referenced for educational and research purposes without additional permission from UNIDO. However, those who make use of quoting and referencing this publication are requested to follow the Fair Use Policy of giving due credit to UNIDO. CONTACT Please contact [email protected] for further information concerning UNIDO publications. For more information about UNIDO, please visit us at www.unido.org UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Vienna International Centre, P.O. Box 300, 1400 Vienna, Austria Tel: (+43-1) 26026-0 · www.unido.org · [email protected] -'FINAL REPORT ( g C Raising ComN4nltit Awalensbll oil HazaIds, of Melc4Fg Expos4P Introduction of'Small4cale Gold Mining Ejiiijiinent and Aeeeeement of Small4cale Gold Mining Acthrities in Lao PGR for UNfDO GLOBAL MERCURY PROJECT (EG/GLO/01/G34) and the OEPARTNEHT'OF GEOLOGY AND, NINES, GOVERNINEHT OF LAO PDR APRlL 2007 .
    [Show full text]
  • Power, Progress and Impoverishment: Plantations, Hydropower, Ecological Change and Community Transformation in Hinboun District, Lao PDR a Field Report
    YCAR Papers No. I June 2007 Political Ecology series (Re)making Governance series Power, Progress and Impoverishment: Plantations, Hydropower, Ecological Change and Community Transformation in Hinboun District, Lao PDR A Field Report By Keith Barney Acknowledgements The fieldwork for this research was made possible through the institutional support and encouragement of the Faculty of Forestry, National University of Laos and the International Development Research Centre-CBNRM Capacity Building Program. The author would like to thank the NUoL - IDRC team, including: Vice-Dean Houngpeth Chanthavong, Vice-Dean Khamla Phanvilay, Sitthong Thongmanivong, Yayoi Fujita, Thoumthone Vongvisouk, Phansamai Phommisai, Emily Hunter, and Amalin Phanvilay for their kind assistance, advice, and camaraderie. Acknowledgements for ongoing support are extended to an excellent doctoral committee at York University in Toronto, comprised of: Philip Kelly, Peter Vandergeest, Shubhra Gururani and Linda Peake. In Laos, I extend personal thanks to: Glenn Hunt, Japan Volunteer Centre Vientiane; Michael Dwyer, University of California at Berkeley; Richard Hackman, Canada Fund Laos/Global Association for People and Environment, Pakse; and Aviva Imhof, International Rivers Network, Berkeley. In Toronto, Robin Roth from the York Centre for Asian Research provided timely editorial comments. Phornmanee Xayasouk and Phansamai Phommisai were invaluable and enthusiastic field research assistants in Hinboun district. Bobby Allen and Bounmaa Molaknasouk from the Theun-Hinboun Power Company, and Mark Linton from Oji-Lao Plantation Forestry Limited took time to meet with the author on several occasions. The author would also like to thank the Provincial Agriculture and Forestry Office (PAFO) of Khammouane province, Laos, for facilitating this fieldwork. Major funding for this research was provided through doctoral dissertation awards from the International Development Research Centre (IDRC) in Ottawa, and Canada’s Social Sciences and Humanities Research Council (SSHRC).
    [Show full text]
  • Movement Pathways and Market Chains of Large Ruminants in the Greater Mekong Sub-Region
    Movement pathways and market chains of large ruminants in the Greater Mekong Sub-region FUNDED BY THE GOVERNMENT OF PR CHINA AND AUSTRALIAN STANDZ INITIATIVE | downloaded: 4.11.2019 Polly Smith, Nancy Bourgeois Lüthi, Li Huachun, Kyaw Naing Oo, Aloun Phonvisay, Sith Premashthira, Ronello Abila, Phillip Widders, Karan Kukreja and Corissa Miller https://doi.org/10.24451/arbor.6560 source: 0 Table of Contents Executive Summary ................................................................................................................................. 1 Purpose ................................................................................................................................................... 2 Background ............................................................................................................................................. 2 Methodology ........................................................................................................................................... 3 Snowball sampling .............................................................................................................................. 4 Interview technique ............................................................................................................................ 5 Constraints .......................................................................................................................................... 6 Results ....................................................................................................................................................
    [Show full text]
  • Preliminary Gibbon Status Review for Lao PDR 2008
    Preliminary Gibbon Status Review for Lao PDR 2008 J.W. Duckworth December 2008 This work was carried out with funding from the Arcus Foundation. Preliminary gibbon status review for Lao PDR 2008 This review is a work in progress for the conservation of gibbons in Lao PDR. It is intended to be updated periodically. Any comment on this document, including further records, would be gratefully received by the author and by Fauna & Flora International, at the addresses below. Citation: J. W. Duckworth, 2008, Preliminary gibbon status review for Lao PDR 2008, Fauna & Flora International, Unpublished report. Author: J. W. Duckworth, PO Box 5773, Vientiane, Lao PDR Email: [email protected] Date: December 2008 For more information or to send further comments contact: Paul Insua-Cao Fauna & Flora Asia-Pacific Programme, 340 Nghi Tam, Hanoi, Vietnam Tel: +84-(0)43-719 4117 Fax: +84-(0)43-719 4119 Email: [email protected] Front cover photo of a captive young yellow-cheeked crested gibbon by Monty Sly. All views expressed within are the author’s alone unless attributed otherwise and do not necessarily reflect the opinion of Fauna & Flora International. While the authors and editors strive for rigour and accuracy in presenting this report, Fauna & Flora International make no representations as to completeness, suitability or validity of any information contained, and will not be liable for any errors or omissions. The editors and Fauna & Flora International take no responsibility for any misrepresentation of material resulting from translation of this report into any other language. Reproduction of any part of this report for educational, conservation and other non-profit purposes is authorised without prior permission from the copyright holder, provided that the source is fully acknowledged.
    [Show full text]
  • UXO/Mine Action in Lao PDR
    2014 ANNUAL REPORT This document acts as Annual Report of the National Regulatory Authority for UXO/Mine Action in Lao PDR. For further information, please contact the: National Regulatory Authority for UXO/Mine Action Sector in Lao PDR (NRA) Sisangvone Village, P.O. Box 7621, Unit 19, Saysettha District, Vientiane, Lao PDR Website: www.nra.gov.la Telephone: (856-21) 262386 Donation for UXO victims: your support can make a difference. Your contribution to the National Regulatory Authority for UXO/Mine Action in Lao PDR can support for families and children whose lives have been suffered by the UXO from the Indo-China War. For how to give, please contact Victim Assistance Unit of the National Regulatory Authority for UXO/Mine Action in Lao PDR, Mr. Bountao Chanthavongsa via email: [email protected] Compiled and designed by: Vilavong SYSAVATH and Olivier BAUDUIN Photos: Photos that appear in the Operator Reports, unless individually credited, were taken by and are the property of that Operator. All other photos in this report, unless individually creditied, have been taken by the following people - Vilavong SYSAVATH Acknowledgements: The NRA would like to thank all UXO/Mine Action Sector Operators who provided images and information on their projects and activities in 2014 for this report. The NRA Programme and Public Relations Unit would also like to acknowledge the support and effort put in by all Members of the NRA team in helping to compile the UXO Sector Annual Report 2014. This report may be subject to change after publication. To find out more about changes, errors, or omissions please visit the website: www.nra.gov.la.
    [Show full text]
  • Laos Chapter
    Pha That Luang Buddhist temple in Vientiane, Laos L aos 133 The Commission removed Laos from its Watch List in 2005. built in the former Saisomboun Special Zone and Bolikham- In taking this action, the Commission cited the positive sai Province. Vientiane Province authorities also permitted steps taken by the Lao government to address the religious the Lao Evangelical Church to rebuild a destroyed church in freedom concerns expressed by the Commission and the Phone Ngam Village. international community. Most of these steps were taken in The government remains wary, however, of religious advance of Laos being granted Permanent Normal Trade traditions other than Theravada Buddhism, particularly Relations (PNTR) with the United States in October 2005. of various forms of Protestantism popular among ethnic Religious freedom conditions are improved relative to the minority groups. Theravada Buddhism, which is closely past and some positive developments continue, particularly associated with Lao culture, is generally exempt from the in urban areas and among the majority Buddhist population. restrictions and oversight experienced by other religious However, Laos’ respect for religious freedom continues to groups. Increasingly, Buddhist rituals and ceremony are be marred by problems at the provincial level, especially for being incorporated into state functions and Buddhism is ethnic and religious minorities. The Commission remains sometimes promoted by government officials. The rapid concerned that the Lao government appears unable or growth of Protestantism in the last decade and contacts unwilling to curtail the actions of provincial authorities. In between its adherents and co-religionists abroad have view of the Lao government’s continued poor overall human made many Communist government officials suspicious.
    [Show full text]
  • Potential Economic Corridors Between Vietnam and Lao PDR: Roles Played by Vietnam
    Munich Personal RePEc Archive Potential economic corridors between Vietnam and Lao PDR: Roles played by Vietnam Nguyen, Binh Giang IDE-JETRO 2012 Online at https://mpra.ub.uni-muenchen.de/40502/ MPRA Paper No. 40502, posted 06 Aug 2012 12:14 UTC CHAPTER 3 Potential Economic Corridors between Vietnam and Lao PDR: Roles Played by Vietnam Nguyen Binh Giang This chapter should be cited as: NGUYEN, Bing Giang 2012. “Potential Economic Corridors between Vietnam and Lao PDR: Roles Played by Vietnam” in Emerging Economic Corridors in The Mekong Region, edited by Masami Ishida, BRC Research Report No.8, Bangkok Research Center, IDE-JETRO, Bangkok, Thailand. CHAPTER 3 POTENTIAL ECONOMIC CORRIDORS BETWEEN VIETNAM AND LAO PDR: ROLES PLAYED BY VIETNAM Nguyen Binh Giang INTRODUCTION The Third Thai-Lao Friendship Bridge over the Mekong River officially opened on November 11, 2011, facilitating cross-border trade along Asian Highway (AH) 15 (Route No. 8) and AH 131 (Route No. 12) between northeast Thailand, central Lao PDR and North Central Vietnam. Since the establishment of the East-West Economic Corridor (EWEC) which is based on AH 16 (Route No. 9), the cross-border trade among countries in the Greater Mekong Sub-region has been much facilitated. The success of EWEC encourages local governments in the region to establish other economic corridors. Currently, it seems that there are ambitions to establish parallel corridors with EWEC. The basic criteria for these corridors is the connectivity of the Thailand-Lao PDR or Lao PDR-Vietnam border gates, major cities in northeast Thailand, south and central Lao PDR, and North Central and Middle Central Vietnam, and ports in Vietnam by utilizing some existing Asian Highways (AHs) or national highways.
    [Show full text]