line 1: Stakeholder In November 2002 the Crossrail Board We welcome your preliminary views on decided that the company should carry this option, your comments will assist Consultation Addendum out further evaluation work on options the project in appraising the route outside the core route. In order to options for Crossrail line 1. ensure the line 1 scheme is feasible Corridor 6: Richmond and Kingston from both operation and engineering Please provide your responses by points of view, environmentally 14 February 2003 to: acceptable and affordable the The Consultation Manager, Crossrail, January 2003 company is now appraising a new 1 Butler Place, SW1H 0PT. route corridor in the west, to Kingston via Richmond. This addendum to the If it is decided to take this option Stakeholder Consultation describes further forward there will be full this route corridor. opportunity to comment in more detail as part of the continuing process of consultation and project development. ‘© Crown copyright. Allrightsreserved’(GLA) (100032379) (2002) ‘©

To Aylesbury Great Missenden Chesham

Watford Chalfont & Latimer Amersham Junction

Watford ENFIELD Chorleywood High Street Bushey Rickmansworth Shenfield

Brentwood Moor Park Carpenders Park BARNET

HARROW Northwood Hatch End Headstone Lane WALTHAM FOREST REDBRIDGE HARINGEY Harrow & Chadwell Kenton HAVERING Seven Heath Harrow-on-the-Hill Kings South Kenton Park Manor Goodmayes Forest Park BARKING AND HACKNEY Gate Maryland BRENT Wembley Central CAMDEN Stonebridge Stratford Park Junction NEWHAM Farringdon Acton Main Alternative Bond West Line TOWER HAMLETS Street Ealing Liverpool Isle of routes Street Dogs Royals Acton Maidenhead Langley Iver Ealing CITY OF Court Road Central Hayes Broadway Belvedere ParkHAMMERSMITH Arsenal Slough AND KENSINGTON Woolwich AND CHELSEA Charlton Dockyard Gardens BERKSHIRE

T2 Richmond Stone Crossing Twyford Swanscombe Reading Greenhithe Ebbsfleet Strawberry Hill RICHMOND UPON THAMES International

Teddington

Hampton Wick Kingston Norbiton

MERTON

KINGSTON UPON THAMES

SUTTON beyond Richmond. stations east of Richmond and with Underground services at and There would be interchange with the Key Interchanges on to Kingston. Line from Gunnersbury to Richmond, then From there it would use the North London via a new line in tunnel to Chiswick Park. using the North London Line via Acton or Western Main Line and Richmond, either The corridor would run between the Great Key Areas Served Corridor 6: Key Surface Alternative termination stations Possible service Major interchange Major interchange Norbiton Richmond and Kingston

Kingston

Hampton Wick

Teddington West Trains services there could be alterations to some Line services would remain but line at Chiswick Park. Silverlink North Passengers could change to the District line Richmond services would be replaced. If the tunnelled route is chosen all District some South West Trains services. There could also be alterations to would be diverted to Hounslow. The Silverlink North London Line service to enhance the service Wimbledon. Richmond. These trains could be diverted line trains between Gunnersbury and services would replace some District If line 1 were to run via Acton, Crossrail Impact on Other Services Tunnelled Alternative Alternative Norbiton Strawberry Hill

Kingston Twickenham

Hampton Wick Richmond junction Grade separated

Teddington Kew Gardens at some stations. Platforms would need to be extended to access the Kingston Loop. would be required to enable Crossrail trains East of Richmond station a rail underpass under Wormwood Scrubs to Chiswick Park. The alternative tunnelled route would run Main Line tracks. a new bridge across the Great Western lands at depot with viaduct would be required in the railway To access the North London Line a new Engineering of new viaduct Approximately 1.5km Strawberry Hill Gunnersbury

Twickenham Acton Central junction Grade separated

Richmond Paddington junction Grade separated

Kew Gardens to the West End, City and Docklands. Gunnersbury, Richmond and Kingston opportunities from areas such as This option would provide new journey and possibly at Wimbledon. frequencies at all stations served Waterloo. It would improve train relief benefits to passengers and from This corridor would provide congestion Benefits of new tunnel Approximately 5.3km Gunnersbury

Chiswick Park

Paddington