Major Winter Storm/Blizzard Impacting the State
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
2011 at a Glance Nonprofit Org
FINANCIAL REPORT 2011 AT A GLANCE NONPROFIT ORG. U.S. POSTAGE HOUSATONIC VALLEY ASSOCIATION HOUSATONIC VALLEY ASSOCIATION, INC. AND HVA FOUNDATION, INC. The Housatonic Valley Association’s mission is to save the PAID PERMIT NO. 19 natural character and environmental health of our communities by CORNWALL BRIDGE HVA CONNECTICUT 2011 ANNUAL REPORT protecting land and water in the Housatonic River valley. Cornwall Bridge, CT 06754-0028 CONSOLIDATED STATEMENT OF ACTIVITIES CONSOLIDATED STATEMENT FOR THE YEAR ENDED JUNE 30, 2011 OF FINANCIAL POSITION JUNE 30, 2011 How we spent our THE HOUSATONIC WATERSHED TEMPORARILY PERMANENTLY ASSETS resources UNRESTRICTED RESTRICTED RESTRICTED TOTAL Current Assets Cash and Cash Equivalents $ 237,257 SUPPORT AND REVENUE Accounts Receivable 94,345 Membership Dues $ 52,294 $ - $ - $ 52,294 Prepaid Expenses 7,050 Massachusetts Contributions Above Dues 247,138 - - 247,138 __________ Grants 266,936 44,900 - 311,836 22% Total Current Assets __________338,652 HVA STAFF Events 191,462 - - 191,462 LAND PROTECTION Fees 21,169 - - 21,169 Lynn Werner BARON DAVID Executive Director Rent 10,292 - - 10,292 30% Investment Income 4,523 20,701 - 25,224 Property and Equipment MASSACHUSETTS Dennis Regan Donated Goods and Services 8,736 - - 8,736 Land 216,206 WATER Buildings and Renovations 306,414 Berkshire Program Director Unrealized Gains on Investments 51,718 99,294 - 151,012 PROTECTION Northern Furnishings and Equipment 166,848 ADMINISTRATIVE/ Alison Dixon Net Assets Release From Restrictions _________78,646 ___________(78,646) -
Berkshire Passenger Rail Station Location and Design Analysis, Draft for Public Comment—August 2014
BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS, DRAFT FOR PUBLIC COMMENT—AUGUST 2014 BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS, DRAFT FOR PUBLIC COMMENT—AUGUST 2014 ACKNOWLEDGEMENTS Staff, Elected Officials, and Residents of the Berkshire Line Communities Karen Christensen and the Bring Back the Trains Campaign Bill Palmer, MassDOT Dustin Rhue, MassDOT Gary Sheppard, Berkshire Regional Transit Authority Bob Malnati, Berkshire Regional Transit Authority John R. Hanlon Jr., Housatonic Railroad Company Colin Pease, Housatonic Railroad Company Deborah Menette,Housatonic Railroad Company Berkshire Regional Planning Commission Nathaniel Karns, AICP, Executive Director Thomas Matuszko, AICP, Assistant Director Clete Kus, AICP, Transportation Manager Mark Maloy, GIS, Data and IT Manager Brian Domina, Senior Planner Patricia Mullins, Senior Planner Gwen Miller, Planner Jaclyn Pacejo, Planner BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS Page 1 ACKNOWLEDGEMENTS This page intentionally left blank. BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS Page 2 EXECUTIVE SUMMARY Executive Summary rail service. In some instances, the nearly significant challenge in locating a passen- Map 1: Locus Map The Housatonic Railroad Company (HRRC) century old historic passenger rail stations ger rail station in a downtown area was has proposed re-establishing passenger rail may meet these needs and in other instances, finding sites with sufficient room for park- service between Danbury, Connecticut and new locations may better serve them. ing. Thus, for the recommended down- Pittsfield, Massachusetts on the former town passenger rail stations a smaller To address this issue, the Berkshire Regional Berkshire Line. The passenger rail service amount of parking, compared to a regional Planning Commission (BRPC) partnered between these two locations last operated passenger rail station, will likely be availa- with HRRC to conduct this passenger rail in 1971 shortly after the Penn Central ble. -
Ocm57326772-1934.Pdf (340.9Kb)
*6^ 5-7 36" Public Document No. 142 <5hr Cnmmnnruralth nf Mw&aatliUBtttB ANNUAL REPORT OF THE DIVISION OF METROPOLITAN PLANNING FOR THE YEAR ENDING NOVEMBER 30 1934 Publication of this Document Approved by the Commission on Administration and Finance 300—4-'35. Order 4293. Oil)? Cummnttuwaltlj of M&BmtfyuwttB DIVISION OF METROPOLITAN PLANNING 20 Somerset St., Boston, November 30, 1934. To the Honorable Senate and House of Representatives in General Court' Assembled: The Division of Metropolitan Planning herewith respectfully submits its annual report for the year ending November 30, 1934. Special Reports In accordance with instructions from the General Court, this Division has been engaged this year in the investigation and preparation of reports on the following matters having to do with proposed rapid transit extensions or im- provements in the District. 1. Removal of the Washington Street Elevated Structure in Boston, Rox- bury and West Roxbury and substitution therefor of a subway in accordance with Chapter 36 of the Resolves of 1933. This resolve called for a joint report by the Metropolitan Planning Division and the Boston Transit Department. 2. Advisibility of extending the Cambridge Subway to Arlington and the rapid transit system from Lechmere Square in Cambridge to Arlington in accordance with Chapter 22 of the Resolves of 1934. 3. Advisability of extending the rapid transit system in the city of Boston from Forest Hills Station to Spring St. or the Dedham line in accordance with Chapter 40 of the Resolves of 1934. These reports must be filed early in December of 1934. In none of these re- ports is the Division making definite recommendations but we feel that a sin- cere effort must be made to provide for the future financing of desirable and needed rapid transit extensions or improvements and therefore we are filing a bill providing for the setting up of a fund which will accumulate for this purpose and make such improvements possible without the burden of long- term bond issues. -
Designation of the Upper Housatonic River As Area Of
Upper Housatonic River Page 1 of 1 The Official Website of the Executive Office of Energy and Environmental Affairs Energy and Environmental Affairs EEA Home Agencies Department of Conservation and Recreation Conservation ACEC Upper Housatonic River Upper Housatonic River Designation Date: 03/30/09 Total Approximate Acreage: 12,280 acres Watershed(s): Housatonic River Municipalities (acres; % of ACEC): approximately 1,614 acres in Lee (13% of the ACEC), 3,517 acres in Lenox (29%), 3,166 acres in Pittsfield (26%), and 3,978 acres in Washington (32%). Resource Summary The Upper Housatonic River Area of Critical Environmental Concern (ACEC) encompasses the 13-mile corridor of the Housatonic River from southern Pittsfield to northern Lee, and portions of the supporting watersheds that drain into the river from the east and west. This section of the Housatonic River includes a complex ecosystem of the river, adjacent Documents wetlands and floodplains, coldwater tributary streams, large expanses of wildlife and rare species habitat, and the steep, Designation Upper Housatonic River forested, western slopes of October Mountain State Forest. There are also historical and archaeological resources, ACEC 1MB farmland and open space, and scenic and recreational areas. The ACEC includes all nine of the inland resource features listed in the ACEC Regulations - including fisheries, wetlands and surface waters, water supply areas, floodplains and steep slopes, agricultural and forested areas, historical and archaeological resources, wildlife and rare species habitats, Maps and public recreational and natural areas. Housatonic River Area of Critical The regionally significant biodiversity and wildlife habitat in the designated area is indicated by the exceptional number of Environmental Concern 2MB rare species (32), Certified and Potential Vernal Pools (46), and the combined total of 11,405 acres or 93% of the area delineated as viable habitat by the Division of Fisheries and Wildlife’s (DFW) Natural Heritage & Endangered Species Program (NHESP). -
Weekend Getaways to Berkshires, MA from Boston Or New York | Fodor's
Arts and Culture Weekend Getaway in the Berkshire Mountains Distance from New York City: 169 miles Best time: May to November Best for: Girl's GetawayArts and CultureFood and Wine It's little wonder that culture hounds makes their way to Western Massachusetts each summer. The hamlets nestled in the Berkshire Mountains are blessed with terrific art, music, theater, and antiquing. Here, eight museums join renowned stage productions and dance festivals, plus a little music venue called Tanglewood. All that, plus a gorgeous natural setting of mountains and meadows—accessible on foot, bike, raft, balloon, horse, or even llama—is enough to uplift spirits. And there's no shortage of spas here, in the event you need extra help working out the kinks. –By Lisa Oppenheimer Friday The Berkshire Mountains Cheat Sheet View a printable list of all sights, restaurants, entertainment, and hotels from this itinerary. View 1. Get your bearings by venturing into Downtown Lenox. Poke your head in and around the shops and galleries located along the main thoroughfares of Main, Franklin, Church, and West streets. 2. Enjoy a lovely dinner in the outdoor courtyard of Cafe Lucia, a Berkshires favorite that's been dishing up Italian specialties based on local ingredients for the last three decades. 3. In season, there's nothing more soothing than al fresco entertainment on the historic grounds of Tanglewood. (Even with no show on, it's still worth visiting to experience the setting.) Classical greats perform at the Koussevitzky Shed, while smaller shows go on at the newer Ozawa Hall. Economical lawn seats are almost always available on the fly except during big events such as James Taylor nights. -
Federal Register/Vol. 68, No. 109/Friday, June 6, 2003/Notices
Federal Register / Vol. 68, No. 109 / Friday, June 6, 2003 / Notices 33967 ADDRESS: Foster Armstrong House, or faxed comments should be submitted the significance of these properties Montague NJ 07827. by June 23, 2003. under the National Register criteria for evaluation may be forwarded by United The agenda will include reports from Carol D. Shull, Citizen Advisory Commission members States Postal Service, to the National Keeper of the National Register of Historic Register of Historic Places, National including setting dates and times for Places. future meetings, and other topics as Park Service, 1849 C St. NW., 2280, deemed necessary by the members. ILLINOIS Washington, DC 20240; by all other carriers, National Register of Historic Acting Superintendent Doyle Nelson Pike County will give a report on various park issues, Places, National Park Service, 1201 Eye Shastid, John, House, 326 East Jefferson, St. NW., 8th floor, Washington DC including an update on the park’s Pittsfield, 03000579. historic leasing program. The agenda is 20005; or by fax, 202–371–6447. Written set up to invite the public to bring MARYLAND or faxed comments should be submitted issues of interest before the Baltimore Independent City by June 23, 2003. Commission. These issues typically Baltimore City College, 3320 The Alameda, Carol D. Shull, include treatment of historic buildings Baltimore (Independent City), 03000573. Keeper of the National Register of Historic within the recreation area, monitoring of Places. waste water facilities outside the MASSACHUSETTS recreation area but empyting into the Norfolk County ALASKA Delaware River, and wildlife Blue Hills Parkway, (Metropolitan Park Juneau Borough—Census Area management issues. -
Residences on Morrissey Boulevard, 25 Morrissey Boulevard, Dorchester
NOTICE OF INTENT (NOI) TEMPORARY CONSTRUCTION DEWATERING RESIDENCES AT MORRISSEY BOULEVARD 25 MORRISSEY BOULEVARD DORCHESTER, MASSACHUSETTS by Haley & Aldrich, Inc. Boston, Massachusetts on behalf of Qianlong Criterion Ventures LLC Waltham, Massachusetts for US Environmental Protection Agency Boston, Massachusetts File No. 40414-042 July 2014 Haley & Aldrich, Inc. 465 Medford St. Suite 2200 Boston, MA 02129 Tel: 617.886.7400 Fax: 617.886.7600 HaleyAldrich.com 22 July 2014 File No. 40414-042 US Environmental Protection Agency 5 Post Office Square, Suite 100 Mail Code OEP06-4 Boston, Massachusetts 02109-3912 Attention: Ms. Shelly Puleo Subject: Notice of Intent (NOI) Temporary Construction Dewatering 25 Morrissey Boulevard Dorchester, Massachusetts Dear Ms. Puleo: On behalf of our client, Qianlong Criterion Ventures LLC (Qianlong Criterion), and in accordance with the National Pollutant Discharge Elimination System (NPDES) Remediation General Permit (RGP) in Massachusetts, MAG910000, this letter submits a Notice of Intent (NOI) and the applicable documentation as required by the US Environmental Protection Agency (EPA) for temporary construction site dewatering under the RGP. Temporary dewatering is planned in support of the construction of the proposed Residences at Morrissey Boulevard in Dorchester, Massachusetts, as shown on Figure 1, Project Locus. We anticipate construction dewatering will be conducted, as necessary, during below grade excavation and planned construction. The site is bounded to the north by the JFK/UMass MBTA red line station, to the east by William T. Morrissey Boulevard, to the south by paved parking associated with Shaw’s Supermarket, beyond which lies the Shaw’s Supermarket, and to the west by MBTA railroad tracks and the elevated I-93 (Southeast Expressway). -
The History of the Strong Family and the Farm Written by Norman R
The history of the Strong family and the farm written by Norman R. Strong in the winter of 2009. …. In writing the history of the Strong Farm, it is beneficial that you have the history of the Strong family as given to me by father as given to him by his grandfather. So it is with me working with my dad being in partnership with him and later operating the farm by myself. He told me of Elder Jonathan Strong coming from England to Taunton, Mass. and later on drifting down to Connecticut to Hebron and later to Bolton with his family. He told me of Daniel Strong in Bolton running a gin mill and selling it in New York City. He lost all his money and broke up his large family. He was the father of Nathan Morgan Strong in 1829. He gave Nathan at 6 years of age to a cousin in Glastonbury. At a young age, Nathan worked in a mill in East Glastonbury and also in Cheney Mills in Manchester. Later he worked for a man named Ellis now on Route 85 making charcoal. One afternoon when he was about 15, he gave him a pair of cattle and a horse to take a load of charcoal to Hartford to pedal. He put the cattle in a livery stable with the horse and he slept under the wagon on a blanket so the other wagons wouldn’t run over him as they came in. He pedaled the charcoal all day and got home about 12 a.m. -
Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office
Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office Environmental Notification Form For Office Use Only EEA#: MEPA Analyst: The information requested on this form must be completed in order to submit a document electronically for review under the Massachusetts Environmental Policy Act, 301 CMR 11.00. Project Name: Merrymount Park Pedestrian Boardwalk Project Street Address: Vietnam Veterans Drive Municipality: Quincy Watershed: Boston Harbor Universal Transverse Mercator Coordinates: Latitude: 42.265164 334866.27 E, 4681158.76 N, Zone 19T Longitude: -71.002239 Estimated commencement date: Fall 2022 Estimated completion date: Spring 2023 Project Type: Park, Bridges Status of project design: 75 %complete Proponent: City of Quincy, Park & Forestry Department Street Address: One Merrymount Parkway Municipality: Quincy State: MA Zip Code: 02169 Name of Contact Person: Emily Tully Firm/Agency: Tighe & Bond, Inc. Street Address: 53 Southampton Road Municipality: Westfield State: MA Zip Code: 01085 Phone: (413) 875-1622 Fax: (413) 562-5317 E-mail: [email protected] Does this project meet or exceed a mandatory EIR threshold (see 301 CMR 11.03)? Yes No If this is an Expanded Environmental Notification Form (ENF) (see 301 CMR 11.05(7)) or a Notice of Project Change (NPC), are you requesting: a Single EIR? (see 301 CMR 11.06(8)) Yes No a Special Review Procedure? (see 301CMR 11.09) Yes No a Waiver of mandatory EIR? (see 301 CMR 11.11) Yes No a Phase I Waiver? (see -
Housatonic River Monsters
Housatonic River Monsters by Harry Desmond There is something truly beautiful about a species of fish, that not only has no natural predators, but also wants to eliminate everything moving across its path. This makes for an exciting and addicting fish to chase. More and more over the past few seasons fishing pike, my clients have started saying “what a hit!” When I first started my fly fishing business five years ago, I naturally took all of my clients out to fish for trout. I had been fishing for trout most of my life. Two and a half years ago, I decided to do a mid- summer mission for northern pike to see what the possibilities were in my local river. The Housatonic River in Western Massachusetts, which weaves its way through the hills of the Berkshires, has many different faces. With six top water fed dams over the 25 river miles that I fish, each section can be quite different, depending on what set of dams you are in between. I have always had good luck fishing the trout sections due to abundant bug life. While trout feed on small patterns, like nymphs and dry flies, pike will chase huge patterns, making for fun takes. I had been hearing rumors about a very pikey section of this river, which really peaked my interest. After a little research, I found myself in pursuit of these river gators. I remember dropping my drift boat into this particular section of river and thinking that it seemed slower and murkier than what I’m used to in the trout sections. -
Tuesday, April 3, 2018
Department of Conservation and Recreation 2018 Monthly Street Sweeping Schedule (April - November) Parkways with Parked Cars AM sweeping starts at 8 AM unless other arrangements are made PM sweeping starts at 12 Noon Monday Tuesday Wednesday Thursday Friday Troop H Troop H Troop H Week 1 AM Coastal District Lynn-Fells Pkwy [LFPW] Quincy Shore Drive [QSDR] Day Blvd [WDBV] Day Blvd [WDBV] Mary O'Malley Park (Westbound Rt. 1 to West Wyoming Ave.) (East Squantum St. to Sea St.) (Columbia Rd. to Castle Island) (Castle Island to Columbia Rd.) Commandant's Way PM Constitutions Beach Rd. (See Parking Lot Lynn-Fells Pkwy [LFPW] Furnace Brook Parkway [FBPW] Old Colony Avenue (IB) [OCAV] Old Colony Avenue (OB) [OCAV] Sweeping Schedule) (Eastbound West Wyoming Ave. to Rt. 1) (Quincy Shore Dr. to Rt. 93 Rotary) (Kosciusko Circle to Columbia Rd.) (Columbia Rd. to Morrissey Blvd. Troop H Troop H Troop H Troop H Week 2 AM Boston Rivers District Blue Hills Pkwy [BHPW] *Inner Arborway (OB) [ARBO] Riverway [RIWY] Fenway [FENW] Parking Lots (Both Sides) Willow Pond Road [WPRD] (Areas w/cars) Forsyth Way [FOWY] Parkman Drive [PMST] PM (See Parking Lot Sweeping Schedule) Brush Hill Road [BHRD] Centre Street [CENT] Jamaicaway [JWAY] Charlesgate Extension [CHGT] Truman Highway [TRPW] (Murray Circle to VFW Pkwy) Perkins Street [PERK] Fenway [FENW] (Both Sides) (Areas w/cars) Boylston Street [BOYL] Troop H Troop H Troop A Troop H Week 3 AM Middlesex & Park Drive [PKDR] Cambridge Parkway [CBPW] Winthrop Shore Drive [WINT] Chestnut Hill Driveway [CHDR] Essex District Boylston Street [BOYL] Memorial Drive [MMDR] (Areas w/cars) St. -
National Register of Historic Places Inventory-Nomination
FHR-8-300 (11-78) United States Department of the Interior Heritage Conservation and Recreation Service National Register of Historic Places Inventory Nomination Form See instructions in How to Complete National Register Forms Type all entries complete applicable sections________________ 1. Name__________________ historic Housatnnir. Railroad Station_______________ and/or common New Milford Railroad Station 2. Location street & number Railroad not for publication city, town New Milford ftrtdgre~~S£^ vicinity of congressional district state CT code 09 county Litchfield 3. Classification Category Ownership Status Present Use __ district x public occupied agriculture museum x building(s) private x unoccupied commercial park structure both work in progress educational private residence site Public Acquisition Accessible entertainment religious object in process yes: restricted government scientific being considered yes: unrestricted industrial transportation N/A X no military ^x_ other: unused 4. Owner of Property name Town nf IStew Mi 1 ford street & number 10 Main street city, town New Milford vicinity of state 5. Location of Legal Description courthouse, registry of deeds, etc. New Milford Town Hall street & number 10 Main Street city, town New Milford, state CT 6. Representation in Existing Surveys State Register has this property been determined elegible? yes no date 1983 federal state county local depository for survey records Connecticut Historical Commission 59 South city, town Hartford, state CT 06106 7. Description Condition Check one Check one excellent deteriorated unaltered x original site good ruins x altered moved date _ X-fair unexposed (roof) Describe the present and original (if known) physical appearance Setting The New Milford Railroad Station is a simple, one-and-one- half-story, gabled-roof frame building which stands on an open site on a commercial street on the west edge of the village center.