"L F,H:"B- Ttts/Zt
Total Page:16
File Type:pdf, Size:1020Kb
Acknowledgement Slip This is to certify that hard copy of the proposal seeking prior approval of Centra I Government under the Forest (Conservation) Act 1980, as per detaiis given below along with all necessary enclosures has been received in the Office of the Gujarat on 43145t2021 F P/GJ/P i p eline I 1 420 1 5 I 2021 1. Proposal No. Proposed B" O Steel Gas Pipeline Across SH-11Anand - Umeta Road 2. Proposal Name SH for Connecting Pipeline from GSPL Terminal at Joshikuva To H.P. Petrol Pump atAnklav in Tal. Anklav of Dist. Anand. 3. Category of the rroposar : HlPellne 4. Date of submission ' o3lo5l2o21 5. Name of the User Agency with Contact Details Name Parin Mobile No. 9099953937 State Gujarat District Ahmedabad Pincode 380054 6. Area Applied (ha.) 0.0012 (System Administrator) f7r' ttts/zt tqt-.;r6"l f,h:"b- &t?lI "ti,i.{.'q qq dQ,A* &&uw& q43q,w [{(|tlqq& crc{\ = GUJARAT GAS Ref. No. : GGL/Anand GA/Taluka-Anklav/PF-0.0.0012HA/2021/01 Date : /04/2021 Fc-i-477t1 To Deputy Conservator of Forest, Social Forest Division, Old Seva Sadan, 2nd Floor, Anand - Sojitra Road, Anand. Sub: Request for granting Permission for Laying of Proposed 8" 0 Steel Gas Pipeline Across SH-11 (Anand — Umeta) Road for Connecting Pipeline from GSPL Terminal at Joshikuva To H.P. Petrol Pump at Anklav in Taluka Anklav of Dist. Anand. (12.00 Sq.m. i.e. 0.0012 Hectares Area.) Dear Sir, Please find enclosed herewith a proposal along with Annexure in four Copies for granting of No Objection Certificate for laying of 8" dia Steel Gas Pipeline in Protected Forest land as mentioned above. it may kindly be lioted that pipeline will be laic; tai 16 District —Across SH-1 (Ai — Uniea) Road for Connecting Pipeline from GSPL Terminal at Joshikuva To H.P. Petrol Pump at Anklav in Taluka Anklav of Dist. Anand as said herein. The pipeline will be laid by excavation of a narrow strip of trench of 40 cm, and by horizontal directional drilling (HDD) for pushing the casing pipe wherever required. The same strips of the trench will be reinstated to its original condition and the land area in question will not be required to be handed over to the Gujarat Gas Limited for its exclusive use. The Applicant will not have any right other than that of the user. It is also intimated that no structure will be erected on the pipeline route. The pipeline route proposed is most economical and it is badly necessary to lay Across SH-11 (Anand — Umeta) Road for Connecting Pipeline from GSPL Terminal at Joshikuva To H.P. Petrol Pump at Anklav in Taluka Anklav of Dist. Anand as stated herein above. It is not possible now any other alternative route except to use the proposed route of pipeline. The Executive Engineer, R&B Div., Anand have been requested to allow to lay pipeline as stated herein above and permission is likely to be received shortly. It is not possible to get land for laying the pipeline other than the road being used by the Forest Department. Considering the above you are requested to grant the permission for the above„works at the earliest and oblige. 1 (9 GUJARAT GAS LIMITED (A GSPC Group Company - Government of Gujarat Undertaking) (Formerly known as GSPC Distribution Networks Limited) Corporate Office : 2, Shanti Sadan Society, Near Parimal Garden, Ellisbridge, Ahmedabad - 380 006, Gujarat, India. Tel.: +91-79-26462980,26460095 Fax : +91-79-26466249 Registered Office : Gujarat Gas CNG Station, Sector 5/C, Gandhinagar - 382 006, Gujarat, India. Tel.: +91 -79-23264777, 23264999 Website : www.gujaratgas.com, www.gspcgroup.com CIN : L40200GJ2012SGC069118 9th Floor, Avdhesh House, Opp. Shri Govind Gurudwara, S. G. Highway, Ahmedabad - 380 054, Gujarat, India. Tel.: +91 -79-26737400 Fax : +91-79-26737456 - 2 - M/s. DESHPANDE-PATIL CONSULTANTS, 26 "Guru Dakshina", Mahavir Nagar, Near Sai Ganesh Temple, Bharuch — 392 001, Phone / Fax No. (02642) 250052 Mobile No. 9898256679, 9687505017 have been retained as bonafide consultant by us in connection with ROU and statutory clearance work for said project. They would provide further information and clarifications as required. They would also accompany authorities for field inspection. Hope you will be kind enough to take the appropriate action for the act of which we shall be grateful to you. Thanking you Yours Sincerely, For Gujarat Gas Limited,-,,,\ UJARAT CAS 0' Parin Patel Deputy Manager (PR-ROU) Annexure – 7 Statement showing the details i.e. Survey No. I Coupe. No./ F.S. No. I Compartment. No. etc. of the forest area involved with its boundaries, along item wise break up of the forest proposed for diversion 1. Authority Gujarat Gas Limited, Ahmedabad 2. Project Report to be from process/coordinator : Copy Enclosed 3. Route Particulars Laying of Proposed 8" 0 Steel Gas Pipeline Across SH-11 (Anand – Umeta) Road for Connecting Pipeline from GSPL Terminal at Joshikuva To H.P. Petrol Pump at Anklav in Taluka Anklav of Dist. Anand. 4. The breakup of forest area required for laying Gas Pipeline. Chainage (m) Length/ RoU Sr. Along Dia of Area Area Description ___T Width 1 No. /Across Pipeline (Sq.Mtr) (Ha) From ------To - I (m) (m) 4-- 1— SH-1 1 (Anand - Umeta SH Road) Across 0.00 1 24.0C 24.00 8" 0.50 12.00 0.0012 1-- near 15/950 kms. Total 24.00 12.00 0.0012 No. of villages affected Nil Place : Ahmedabad Parin Patel Deputy Manager (PR-RoU) Gujarat Gas Limited .