Temporary Riverside Expressway Night Closures for Southbound Traffic Only

Total Page:16

File Type:pdf, Size:1020Kb

Temporary Riverside Expressway Night Closures for Southbound Traffic Only 15 APRIL 2021 Temporary Riverside Expressway night closures for southbound traffic only On select nights, over three weeks, starting 9pm Tuesday 27 April - the southbound lanes of the Riverside Expressway between Tank St and Alice St will be closed to motorists for nighttime works. Please use alternate routes. Queen’s Wharf Brisbane When: Queen’s Wharf Brisbane will be a transformational city The temporary road closures will occur on intermittent nights (detailed below) changing project for Brisbane with southbound lane closures from 9.00pm until 5am the next morning. that will see an underutilised The closures are scheduled when traffic volumes are at their lowest. Daytime area of the CBD brought traffic will not be affected with all lanes open. back to life with new purpose and exciting energy. When complete there will be Week Tuesday Wednesday Thursday 1 27 April 28 April 29 April 50 restaurants, cafes and bars; a signature sky deck approximately 100 metres Week Tuesday Wednesday Thursday above William St and open to 2 4 May 5 May 6 May the public, five and six-star luxury hotels, the equivalent Week Tuesday Wednesday Thursday Sunday of 12 football fields of public 3 11 May 12 May 13 May 16 May space, world-class gaming, a new pedestrian bridge, four key retail zones and 2,000 residential apartments. The core of the development is expected to open in 2022 with the transformation of For more information visit Treasury Hotel and Casino www.queenswharfbrisbane.com.au into a high end retail centre and The Ritz-Carlton Destination Brisbane Consortium For construction enquiries contact: Brisbane to be complete PO Box 13226 George street P: 1800 931 760 (toll free) in 2024. Brisbane Q 4003 E: [email protected] P: 1800 104 535 E: [email protected] facebook.com/queenswharfbrisbane Where: Southbound lanes on the Riverside Expressway between Tank St and Alice St will be closed while construction work occurs overhead. Motorists are encouraged to use alternative routes prior to the road closure at Tank St, however a detour will be in place via the city (see map). Access from the Alice St on-ramp to the Riverside Expressway will remain open for southbound traffic. The temporary closure is required for safety reasons while structural steel is lifted into position over the Riverside Expressway. Alternative routes: Motorists can bypass the closure via: - Go Between Bridge* or William Jolly Bridge via Merivale Street and Vulture Street - Story Bridge - Roma Street then Turbot Street, Edward Street and Alice Street. *Toll waived when using the Go Between Bridge for southbound travel - only valid when the Riverside Expressway is closed due to construction works (construction timing is dependent on weather and site conditions). CBD detour: For southbound motorists who have not opted for an alternative route, a CBD detour will be in place to direct traffic around the closure and back onto the Riverside Expressway via the Alice St on-ramp. Please follow the direction of traffic control and detour signage at all times (see map). Bus routes: TransLink bus route 340 (Carseldine to Woolloongabba) will be diverted via the South East Busway to Woolloongabba from 9pm, on the above-mentioned dates. For more information download the MyTransLink app, visit translink.com.au or call 13 12 30 anytime. What to expect: In addition to advance notice for motorists to use alternative routes, the following is also expected: - Southbound lane closures and reduced speed limits on the approach to the road closure - Detour signage and traffic control to direct motorists through the city and to the Alice Street on-ramp For more information visit www.queenswharfbrisbane.com.au Destination Brisbane Consortium For construction enquiries contact: PO Box 13226 George street P: 1800 931 760 (toll free) Brisbane Q 4003 E: [email protected] P: 1800 104 535 E: [email protected] facebook.com/queenswharfbrisbane - Police traffic control from 9.00pm to 12.00am at the intersections of Elizabeth St / Edward St and Turbot St / Tank St - Engine noise from cranes lifting material within the site and on Queens Wharf Rd - Bright portable lighting towers within the construction site - Intermittent noisy works, including hammering and rattle guns used on steel - Temporary road closure of Queens Wharf Rd, with access maintained for entry and exit via the Victoria Bridge entrance for authorised vehicles only - Pedestrian movements around the city will remain unchanged. For more information visit www.queenswharfbrisbane.com.au Destination Brisbane Consortium For construction enquiries contact: PO Box 13226 George street P: 1800 931 760 (toll free) Brisbane Q 4003 E: [email protected] P: 1800 104 535 E: [email protected] facebook.com/queenswharfbrisbane .
Recommended publications
  • Brisbane City Council (Council)
    volume 1 environmental impact statement supplementary report June 2009 Northern Link Environmental Impact Statement Supplementary Report June 2009 PAGE i PAGE 1-3 Northern Link Supplementary Report Table of Contents 1. Introduction 1-7 1.1 Purpose of the Supplementary Report 1-7 1.2 Consultation on the EIS 1-7 1.3 Coordinator General’s Evaluation Report 1-8 2. Overview and Development of the Project 2-9 2.1 Background to the notification of the EIS submission period 2-9 2.2 Further development of the Project 2-9 2.3 Overview of Submissions Received 2-10 2.3.1 Submissions from Government Agencies 2-10 2.3.2 Public Submissions 2-12 2.3.3 Response to submissions 2-14 2.4 Draft Outline Environmental Management Plan 2-14 2.5 Urban Mitigations 2-14 3. Description of the Project 3-16 3.1 General Description of Northern Link 3-16 3.2 Project Design 3-16 3.2.1 Surface Road Connections 3-17 3.2.2 Ventilation Stations and Outlets 3-18 3.3 Project Delivery Mode 3-18 3.3.1 Program and Responsibilities 3-18 3.3.2 Establishment and Preliminary Works 3-20 3.3.3 Tunnel Construction 3-20 3.4 Project Operations Mode 3-22 4. Assessment of the Northern Link Project 4-25 4.1 Traffic and Transport 4-28 4.1.1 Forecast Demand for Northern Link 4-29 4.1.2 Function of Northern Link 4-33 4.1.3 Function of the Project connections 4-36 4.1.4 Traffic Volume Effects on Regional and Connecting Roads and Intersections 4-37 4.1.5 Effects on Local Roads 4-54 4.1.6 Metropolitan Area Network Performance 4-62 4.1.7 Travel Time Benefits 4-65 4.1.8 Local Access Effects 4-72
    [Show full text]
  • 143 Coronation Drive Milton Introduction Knight Frank and Colliers Are Extremely Proud to Present 143 Coronation Drive, Available for Sub-Lease Or Direct Lease
    CDOP2 Overview CDOP2, 143 Coronation NLA (m2) 7,143 Drive benefits from its No. of levels 6 2 prime location. Typical floor size (m ) 1,256 Site area (m2) 3,495 It places tenants on Brisbane’s busy Coronation No. of car spaces 164 Drive and beside some of Australia’s leading Car park ratio 1:44m2 businesses who share the Precinct. The building offers six levels of prestige office accommodation and two levels of secure basement car parking. It provides an optimum working environment for all employees and creates a big impression with clients. CORONATION DRIVE OFFICE PARK I CDOP I PAGE 15 FOR LEASE INFORMATION MEMORANDUM 143 coronation drive milton Introduction Knight Frank and Colliers are extremely proud to present 143 Coronation Drive, available for sub-lease or direct lease. 143 Coronation Drive forms part of the prestigious Coronation Drive Office Park in Milton. Coronation Drive Office Park is widely recognised as Brisbane’s premier business office park only a very short distance from the Brisbane CBD. Tenants benefit from being close to a range of services and amenities in a unique campus style environment. The park boasts of some of Australia’s leading businesses across a broad range of industries, and the location and amenities provide an optimum working environment for every business or employee. 143 coronation drive milton Building 143 Coronation Drive is perfectly positioned to take advantage of panoramic Brisbane river and Brisbane CBD views. Situated on a prominent edge of the business park, the building has great exposure to passing traffic along Coronation Drive creating excellent signage opportunities and recognition for your business.
    [Show full text]
  • Inner Brisbane Heritage Walk/Drive Booklet
    Engineering Heritage Inner Brisbane A Walk / Drive Tour Engineers Australia Queensland Division National Library of Australia Cataloguing- in-Publication entry Title: Engineering heritage inner Brisbane: a walk / drive tour / Engineering Heritage Queensland. Edition: Revised second edition. ISBN: 9780646561684 (paperback) Notes: Includes bibliographical references. Subjects: Brisbane (Qld.)--Guidebooks. Brisbane (Qld.)--Buildings, structures, etc.--Guidebooks. Brisbane (Qld.)--History. Other Creators/Contributors: Engineers Australia. Queensland Division. Dewey Number: 919.43104 Revised and reprinted 2015 Chelmer Office Services 5/10 Central Avenue Graceville Q 4075 Disclaimer: The information in this publication has been created with all due care, however no warranty is given that this publication is free from error or omission or that the information is the most up-to-date available. In addition, the publication contains references and links to other publications and web sites over which Engineers Australia has no responsibility or control. You should rely on your own enquiries as to the correctness of the contents of the publication or of any of the references and links. Accordingly Engineers Australia and its servants and agents expressly disclaim liability for any act done or omission made on the information contained in the publication and any consequences of any such act or omission. Acknowledgements Engineers Australia, Queensland Division acknowledged the input to the first edition of this publication in 2001 by historical archaeologist Kay Brown for research and text development, historian Heather Harper of the Brisbane City Council Heritage Unit for patience and assistance particularly with the map, the Brisbane City Council for its generous local history grant and for access to and use of its BIMAP facility, the Queensland Maritime Museum Association, the Queensland Museum and the John Oxley Library for permission to reproduce the photographs, and to the late Robin Black and Robyn Black for loan of the pen and ink drawing of the coal wharf.
    [Show full text]
  • Download the City Reach Waterfront Masterplan
    City Reach Waterfront Master Plan AUGUST 2020 Contents Introduction to the City Reach Waterfront 4 History 5 Inner-city context 7 Evolving active transport network 10 What makes a great waterfront? 12 Six qualities of great waterfronts 13 The City Reach Waterfront today 14 Analysis of the City Reach Waterfront 15 City Reach Waterfront opportunities 18 City Reach Waterfront Master Plan 20 Vision 21 Port Office section 22 Customs House section 24 Admiralty section 26 Next steps 28 2 City Reach Waterfront Master Plan Background Brisbane City Council is planning for Brisbane’s future and transforming access to the river, to give everyone new ways to explore Brisbane and connect with the places that make our city great. The City Reach Waterfront is one of Brisbane’s iconic riverside locations – bookended by the City Botanic Gardens and Howard Smith Wharves. The area is a popular leisure destination and is one of the city's key economic precincts, known for its concentration of high-value professional services and picturesque riverside dining. The City Reach Waterfront Master Plan (the master plan) is an action from the Brisbane City Centre Master Plan 2014 that establishes an ambitious vision for the waterfront. Achieving the vision of the master plan will take time and will require a collaborative approach between stakeholders, including Council, the Queensland Government and landholders. Council welcomes the opportunity to work with precinct stakeholders to deliver on the master plan’s vision. Community consultation The master plan is based on extensive technical investigations and community consultation. The draft master plan was released for public consultation in late 2019 and Council received more than 400 submissions.
    [Show full text]
  • City Reach Waterfront Master Plan – Draft for Consultation
    City Reach Waterfront Master Plan DRAFT FOR CONSULTATION Contents Introduction to the City Reach Waterfront 4 History 5 Inner-city context 7 What makes a great waterfront? 10 Six qualities of great waterfronts 11 The City Reach Waterfront today 12 Analysis of the City Reach Waterfront 13 City Reach Waterfront opportunities 16 City Reach Waterfront Master Plan 18 Vision 19 Port Office section 20 Customs House section 22 Admiralty section 24 Next steps 26 2 City Reach Waterfront Draft Master Plan Background Brisbane City Council is planning for Brisbane’s future and transforming access to the river, to give everyone new ways to explore Brisbane and connect with the places that make our city great. The City Reach Waterfront Master Plan is an action from the Brisbane City Centre Master Plan 2014, and establishes a vision that will inform future development and public works in the waterfront area. The City Reach Waterfront is one of Brisbane’s iconic riverside locations – bookended by the City Botanic Gardens and Howard Smith Wharves. The area is a popular leisure destination and one of the city's key economic precincts. The draft master plan is based on feedback received from residents, property owners, businesses, commuters and visitors who completed the master plan survey in late 2018, as well as responses to the Move Safe Brisbane consultation. In addition, research into international waterfront examples has provided a set of key qualities to ensure future development will transform the City Reach Waterfront into a New World City riverside destination. The master plan will be a non-statutory document that complements Brisbane’s planning scheme (Brisbane City Plan 2014).
    [Show full text]
  • River Report Riverfront Director
    2010 JOSEPHINE JOHNSTON-ROWELL RIVER REPORT RIVERFRONT DIRECTOR JOHNSTON DIX ON QUALITY PRopERTY 2 RIVE2010R RIVE REPOR RREPOT 2009RT JOHNSTON DIXON Quality Property 3 ABSOLUTE RIVERFRONT HOME SALES 28% ABSOLUTE RIVERFRONT LAND SALES 48% ISSUE 32 (Sales settled in calendar year 2009) LAND “WELCOME TO OUR ABSOLUTE RIVERFRONT HOUSE AND LAND SALES The value of absolute riverfront land sales fell a dramatic 48% this past year from $27,468,000 to $14,100,942. The ANNUAL RIVER Report” number of sales also fell 36% from 11 to 7. The average land sale price also came off 19% from $2,497,090 to $2,014,418. HOUSES The cheapest riverfront land sale for the year was recorded in Morley St, Chelmer at $1,345,000, and the highest was The top end strength of the The total value of absolute riverfront house sales for calendar year 2009 has posted in Laidlaw Parade, East Brisbane at $3,500,000. riverfront housing market was come in at $113,528,000, a 28% increase on 2008’s disappointing total of revitalised over 2009 with a record $88,571,700 (in itself down 37.29% on 2007’s bumper figures). This year’s 2009/08/07 Comparative - Absolute Riverfront Sale Numbers and Value 4 sales registered over $7 million. numbers represent a healthy turnaround in the riverfront market. NUMBER OF SALES Prominent among them was the all The number of sales also rose 13.8% from 29 to 33. The average house sale price Houses Vacant Land Development Sites Total time record $9.5 million paid for a rose also, from $3,054,196 to $3,440,242, a healthy 12.64% increase.
    [Show full text]
  • in Brief Environmental Impact Statement
    :: in brief environmental impact statement OCTOBER 2006 Contents 1. Introduction 1 4.2.1 Tunnel Alignment 20 1.1 Background to the Airport Link Project 1 4.2.2 Tunnel Profile 21 1.1.1 Strategic Planning 1 4.2.3 Connections to the Surface Road Network 21 1.1.2 Pre-Feasibility Study 1 4.2.4 Ventilation Systems & Outlets 24 1.1.3 Detailed Feasibility Studies 1 4.3 ‘Do Nothing’ Option 24 1.2 Who are the Proponents? 2 1.3 What is the purpose of the EIS? 2 1.3.1 Consultation & Engagement 2 5. Traffic & Transport 25 1.3.2 On-going Process 4 5.1 Study Approach 25 5.1.1 Modelling & Forecasting 25 2. What is the Airport Link Project? 5 5.2 Existing Transport System Performance 26 5.3 Future Conditions without Airport Link 27 2.1 What is the Purpose of the Project? 5 5.4 Operational Effects 27 2.2 What is the Project? 5 5.4.1 Demand for Airport Link 27 2.2.1 Airport Link Overview 5 5.4.2 Traffic Volume Effects, 2.2.2 Project Design 6 Mitigations and Benefits 28 2.2.3 Project Delivery (Construction) 9 5.4.3 Network Performance Effects 28 2.2.4 Tunnel Management 11 5.4.4 Intersection Performance Effects 29 2.3 EIS & Approvals 11 5.4.5 East-West Arterial & Nudgee Road 30 2.3.1 Environmental Impact Statement 11 5.5 Construction Effects 32 2.3.2 State Legislation 12 5.6 Traffic & Transport Conclusions 34 3.
    [Show full text]
  • Record of Proceedings
    PROOF ISSN 1322-0330 RECORD OF PROCEEDINGS Hansard Home Page: http://www.parliament.qld.gov.au/hansard/ E-mail: [email protected] Phone: (07) 3406 7314 Fax: (07) 3210 0182 Subject FIRST SESSION OF THE FIFTY-SECOND PARLIAMENT Page Thursday, 22 February 2007 PETITION .......................................................................................................................................................................................... 485 MINISTERIAL STATEMENTS .......................................................................................................................................................... 485 World Athletics Championships, Athletes Village ................................................................................................................. 485 Tabled paper: Copies of two concept sketches for the proposed Gabba Urban Village for the Brisbane bid to host the 2011 World Athletics Championships. .............................................................................................. 485 Tabled paper: Copies of two further sketches in connection with the bid to host the 2011 World Athletics Championships. ....................................................................................................................................................... 486 Government Air Wing, Organ Retrievals .............................................................................................................................. 486 Purified Recycled Water ......................................................................................................................................................
    [Show full text]
  • Project Rationale
    Airport Link Phase 2 – Detailed Feasibility Study CHAPTER 2 PROJECT RATIONALE October 2006 Contents 2. Background and Project Rationale 2-1 2.1 Background and Strategic Context 2-1 2.1.1 The Transport Plan for Brisbane (2002-2016) 2-1 2.1.2 TransApex 2-2 2.1.3 South East Queensland Regional Plan 2005-2026 2-2 2.1.4 Project Objectives 2-3 2.2 Problem Definition and Project Justification 2-4 2.2.1 Population Growth 2-4 2.2.2 Increased Vehicle Trips 2-5 2.2.3 Issues with Existing Road Network 2-7 2.2.4 Declining Levels of Service 2-7 2.2.5 Journey Times 2-8 2.2.6 Cost Savings 2-11 2.3 Need for the Project 2-13 2.3.1 Regional Planning 2-13 2.3.2 Regional Transport Planning 2-14 2.3.3 Brisbane Transport Planning 2-14 2.3.4 Integrated Transport Planning 2-15 2.4 Justification for the Project 2-16 2.4.1 Environmental Effects 2-16 2.4.2 Social Costs 2-17 2.5 Benefits of Airport Link 2-17 PAGE i 2. Background and Project Rationale This chapter addresses elements of Section 2 of the Terms of Reference. It provides the background leading to the project proposal, including general information on the local, regional and strategic context. It provides the specific objectives and justification for the project and the likely consequences of not proceeding with the project. Particular reference is made to the anticipated economic and social benefits of the project and the project’s relationship with the objectives of integrated transport and land use planning for both Brisbane and the South East Region of Queensland.
    [Show full text]
  • Queensland Transport and Roads Investment Program (QTRIP)
    Queensland Transport and Roads Investment Program 2016-17 to 2019-20 Cover image: Clockwise from top left - Riverside Expressway and Victoria Street Bridge in Brisbane; Cairns City Busway Platform; Far North Cycleway; Gold Coast Highway at Surfers Paradise; Peninsula Developmental Road gravel laid on wet bitumen at Sorayas Hill. Copyright © Department of Transport and Main Roads, the Queensland Government. Department of Transport and Main Roads Advancing Queensland: Investing in economic growth, creating jobs now and for the future Transport infrastructure plays a critical role in the long-term to deliver significant programs such as the ongoing jointly The State Infrastructure Fund (SIF) has been established to prosperity, liveability and sustainability of Queensland. funded $8.5 billion Bruce Highway Upgrade, the $635 million support the implementation of the State Infrastructure Plan. The Queensland Transport and Roads Investment Program Warrego Highway Upgrade, and the $260.5 million Cape With an initial investment of $500 million, the SIF has already (QTRIP) 2016-17 to 2019-20 outlines approximately York Region Package. In addition, funding for infrastructure allocated more than $300 million to progress significant $20 billion in investment for transport infrastructure over the projects has been fast-tracked statewide, to the value of road and rail upgrades across Queensland. It has provided coming four years, and supports an estimated 15,900 direct $144.6 million, under the Accelerated Works Program. the funding required to match the Australian Government’s jobs over the life of the program. commitment for the $400 million Ipswich Motorway A $10 million allocation for the Transport and Tourism (Rocklea-Darra) Stage 1 to allow this important project to The Palaszczuk Government is listening to communities and Connections program will allow local governments to access progress.
    [Show full text]
  • Slicing Through Space': Mobility, Rhythm and the Abstraction of Modernist Transport Planning
    ‘Slicing through space': mobility, rhythm and the abstraction of modernist transport planning Author Butler, Chris Published 2008 Journal Title Griffith Law Review Copyright Statement © 2010 Griffith Law School. The attached file is reproduced here in accordance with the copyright policy of the publisher. Please refer to the journal's website for access to the definitive, published version. Downloaded from http://hdl.handle.net/10072/24603 Link to published version https://www.tandfonline.com/toc/rlaw20/17/2?nav=tocList Griffith Research Online https://research-repository.griffith.edu.au SLICING THROUGH SPACE Mobility, Rhythm and the Abstraction of Modernist Transport Planning Chris Butler* Providing for the movement of people and things is an inevitable and increasingly important element of urban governance. Urban life in Australian cities has been physically structured around the private motor vehicle, and transport policies have historically focused on the public funding of large-scale public roadways. There is no better example of this approach to transport planning than in Southeast Queensland, where government departments associated with responsibilities for road infrastructure have traditionally wielded enormous power, and have repeatedly attempted to impose large-scale technological solutions for transport problems without regard for their wider impacts on urban life. Despite an emerging awareness of the need to reduce carbon emissions by establishing alternative models of urban mobility, local authorities in Brisbane have recently followed in this well- established tradition by embarking on an ambitious expansion of river crossings and underground road tunnels as a way to increase the capacity of private vehicular flows through the inner city. This article is an exploration of the philosophical framework driving these political decisions and their inevitable imposition of new spatio-temporal laws on Brisbanes inhabitants.
    [Show full text]
  • Temporary Riverside Expressway Closure This Weekend
    16 June 2021 Media release First section of new CBD bridge in place – temporary Riverside Expressway closure this weekend Brisbane’s newest bridge in more than 10 years is now reaching towards the CBD from South Bank with a section of deck installed over the Clem Jones Promenade. Another 40-metre deck section will be lifted into position this weekend temporarily closing part of the Riverside Expressway to all traffic in both directions from 10pm Friday 18 June until 5am Monday 21 June. Destination Brisbane Consortium Project Director Simon Crooks said these are major critical works that would build a new lasting asset for the residents of Queensland. “This week is the start of works to assemble the 13 sections of bridge decking that make up the 320- metre span of Brisbane’s new Neville Bonner Bridge,” Mr Crooks said. “We’ve safely installed the first section of the pedestrian bridge at South Bank that will connect Brisbane’s busiest entertainment precinct to the restaurant and retail level of Queensland’s newest entertainment and tourism drawcard. “However, this coming weekend for safety reasons, we must temporarily close the Riverside Expressway to all traffic between Elizabeth Street and Margaret Street from 10pm Friday 18 June until 5am Monday 21 June. “We have been working and planning this weekend’s lift for more than 18 months with BCC and the Queensland Government to ensure minimum disruption to motorists. “This weekend was chosen as there are no major sporting events or other significant transport closures planned that may impact on increased traffic through the area.
    [Show full text]