FORM-1, 1A & CONCEPTUAL PLAN FOR PROPOSED GROUP HOUSING PROJECT AT KHASRA NO. 68/1, 68/2, 69, 70M, 95M, 96, 97M, 100 AT VILLAGE CHHAJARSI, TEHSIL-DADRI, DISTT. GAUTAMBUDHNAGAR,

SUBMITTED BY M/S RAMPRASTHA NXT PROJECTS PVT. LTD. 15, HARCHARAN BAGH, ANDHERIA MORE, MEHRAULI, NEW - 110030

LABORATORY ENGAGED IND RESEARCH & DEVELOPMENT HOUSE PVT. LTD.,NOIDA NABL ACCREDITED LABORATORY

ENVIRONMENTAL CONSULTANT

IND TECH HOUSE CONSULT (An ISO 9001:2015 Certified Organization) G-8/6, Ground Floor, Sector 11, Rohini, Delhi – 110 085 Tel: +91 11 2757 1410, 6460 7252, Fax: +91 11 2757 2241 (NABET/EIA/1821/RA 0098 VALID TILL 31.01.2021)

TABLE OF CONTENTS

S. No. Contents Page No.

I Form 1 1 to 15 II Form 1 A 16 to 35 III Conceptual Plan 36 to 49 IV Annexure A DESCRIPTIVE Site Location Map Annexure-A1 500 mts buffer Map Annexure-A2 10 km RadiusTopomap Annexure-A3 Water balance Diagram Annexure-A4 B DOCUMENTS Land Ownership Document Annexure-B1 C CONSULTANT NABET ACCREDITATION LETTER NABET Accreditation letter Annexure-C1 D DRAWINGS Site Plan Annexure-D1

Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

Application for Prior Environmental Clearance (EC) FORM 1 (See Paragraph – 6 Notification dated14th September 2006) as amended to EIA Notification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009.

Basic Information

SN Item Details 1. Name of the project/s Proposed Group Housing Project At Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh 2. S. No. in the schedule 8(a) 3. Proposed capacity/area/length /tonnage Gross Plot area : 23794 m2 to be handled/ command area/lease Total Built up area: 81118.001 m2 area/ number of wells to be drilled No. of DU's: 376 No. EWS & LIG DUs: 76 No. Number of Building Blocks: 9 Nos. (7+2) 4. New/Expansion/Modernization New 5. Existing capacity/area etc. Nil 6. Category of the project i.e. „A‟ or „B‟ B 7. Does it attract the general condition? If No yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location - Plot/Survey/Khasra No. Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, 97M, 100

Village Chhajarsi Tehsil - District Dadri State Uttar Pradesh 10. Nearest railway station/airport along Railway Station: 4.24 KM NE with distance in kms. Vaishali : 4.70 KM NW Indira Gandhi International Airport: 27.14 KM SW Hindon Airbase: 7.85 KM NW 11. Nearest town, city, district Headquarters Ghaziabad along with distance in Km 12. Village Panchayats, Zilla Parishad, Ghaziabad Nagar Nigam Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s Ramprastha Nxt Projects Pvt. Ltd. 14. Registered Address 15, Harcharan Bagh, Andheria More, Mehrauli, New Delhi- 110030. 15. Address for correspondence: 15, Harcharan Bagh, Andheria More, Mehrauli, New Delhi- 110030. Name Ajit Singh Designation (Owner/Partner/CEO) Director

ITHC/PRJ/19-20/EIA/220/REV.01 1 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

Address 15, HARCHARAN BAGH, ANDHERIA MORE, MEHRAULI, NEW DELHI- 110030. Pin Code 110030 E-mail [email protected] Telephone No. 9810005499 Fax No. - 16. Details of Alternative Sites examined, if Not applicable. any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects Nil 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason. Not Applicable 21. Whether the proposal involves No, Project proposal does not involves approval/ clearance under: if yes, approval/clearance under subhead a, b & c. details of the same and their status to be given. (a) The forest (Conservation) Act, 1980? (b) The wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991?

22. Whether there is any Government No order/policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending No against the project and/or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project.

(I) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

SN Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data

ITHC/PRJ/19-20/EIA/220/REV.01 2 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or temporary change No The site for proposed project is designated for in land use, land cover or residential purpose as per Master Plan. topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No Tree cutting is not involved. Trees are available vegetation and buildings? along with boundary of the project site only.

1.3 Creation of new land uses? No. There will be no creation of new land use. The land for proposed project is for Residential development as per Master Plan. 1.4 Pre-construction investigations Yes Geotechnical Soil investigation has been carried out. e.g. bore houses, soil testing? 1.5 Construction works? Yes The major construction works are given below: Site Development  Internal roads, Paths, Parking Lots, Green area Utilities/Services  Water Supply  Sewerage  Drainage  Storm Water Drainage & Rain Water Harvesting Structures  Power supply and back up facility, Buildings  Residential Towers  Surface, Basement, Stilt & Podium Parking provisions, commercial, Community Hall 1.6 Demolition works? No Demolition work is not involved in the project. 1.7 Temporary sites used for Yes Mostly, local labors will be employed. However construction works or housing of temporary labour camps will be established for construction workers? labourers and a dormitory for the site supervisors during the construction stage. All the construction activities including storage of raw materials will be confined to the storage spaces & spaces earmarked on project site only. 1.8 Above ground buildings, Yes Above ground building structures will include 9 (7+2) structures or earthworks including numbers of building blocks. linear structures, cut and fill or excavations The earthwork is involved for foundation, basements and laying of underground services etc. Excavated soil will be used for site leveling, back filling/filling and road construction. Top 200 mm layer of soil will be separately stored and used for landscaping/horticulture development work. 1.9 Underground works including Yes Underground works includes excavation of earth for mining or tunneling? construction of basements & foundation. 1.10 Reclamation works? No Not involved.

ITHC/PRJ/19-20/EIA/220/REV.01 3 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.11 Dredging? No Not involved. 1.12 Offshore structures? No Not involved. 1.13 Production and manufacturing No This is a Group Housing Project. Hence no processes? production or manufacturing activities will be involved. 1.14 Facilities for storage of goods or Yes Temporary storage facilities will be created during materials? construction phase for storage of construction materials.

1.15 Facilities for treatment or disposal Yes Solid Waste of solid or liquid effluents? Construction Stage : During construction stage generated solid waste will comprise mainly of construction waste. The construction waste will be reused within the site for filling work.

In addition to that there will be generation of small quantity of solid waste from 15.60 kg/day (40 at camp and 24 floating) construction labors. It will be ensured that the generated waste will be sent to nearest designated waste storage bins.

Operation Stage: Solid waste generation from the facility will be approximately 1.2 TPD including 0.74 TPD bio- degradable.

Solid waste generated from the residential block and other areas will be collected daily on door to door basis by the dedicated and trained housekeeping staff. Twin bin systems will also be provided for segregation at sources. Recyclable wastes will be sold to vendors and non- recyclable wastes will be disposed through authorized agency to municipal waste disposal site.

Biodegradable waste will be treated in onsite OWC.

Solid waste including horticulture waste will be handled as per the Solid Waste Management & Handling Rules, 2016.

Sewage sludge 118 kg/day of sewage sludge will be generated which will be used as manure for plants.

Hazardous waste: 0.51 liters/ day of waste Lube oil will be generated from operation of DG Sets which will be sold to authorized recyclers.

ITHC/PRJ/19-20/EIA/220/REV.01 4 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data E Waste : The E-waste generated from the proposed project will be stored at a designated place. Waste will be disposed as per E waste management and handling rules, 2016.

Liquid Effluent Construction Stage: During the construction stage domestic liquid effluent generation will be limited to small quantity from labor camp proposed at site.

Wastewater generated from construction site contains suspended materials, and washings from various areas. Construction wastewater shall be collected in a separate basin and shall be reused after primary treatment for sprinkling on roads.

Mobile toilets and potable water facilities will be provided at site during construction phase for labor and staff.

Operation Stage: Approx. 178 KLD of domestic waste water will be generated from the proposed facility which will be treated in on-site STP of 215 KLD. 65 KLD treated water from onsite STP will be reused for flushing, horticulture and DG cooling. Surplus treated water of 77 KLD will be discharged into public sewer with prior permission. 1.16 Facilities for long term housing of No Not applicable operational workers? 1.17 New road, rail or sea traffic No Not applicable during construction or operation? 1.18 New road, rail, air waterborne or No Not applicable other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not applicable or pipelines? 1.21 Impoundment, damming, No Not applicable. culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable

ITHC/PRJ/19-20/EIA/220/REV.01 5 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data

1.23 Abstraction or transfers of water No There is no ground water extraction for the form ground or surface waters? construction of project. Treated Water will be sourced through Tanker supplies will be used after testing and confirmation of fitness for construction. During operation phase, fresh water will be supplied by Ghaziabad Municipal Corporation. 1.24 Changes in water bodies or the Yes Surface drainage may affect due to construction of land surface affecting drainage or the project. run-off. By considering run off prior to development & run off after development there is some increment in storm water runoff. However runoff generated from the project site during monsoon season will be used to recharge ground aquifer. Network of drainage system developed in the site will be used to collect roof as well as surface runoff. 1.25 Transport of personnel or Yes During construction phase transport of personnel as materials for construction, well as construction materials would be required. operation or decommissioning. The personnel would preferably be engaged from nearby areas. Precaution will be taken to reduce the impact of vehicular movement by trying to avoid the vehicular trips during peak hours.

For operation phase parking is planned on surface, stilt, podium & basement. 1.26 Long-term dismantling or No Not applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Construction phase – either temporarily or permanently? Temporary influx of people about 64 (40 Camp + 24 Floating) from the nearby areas is expected. Operation phase – 2828 (2260 persons residential in complex + 568 floating population) 1.29 Introduction of alien species? No Not applicable 1.30 Loss of native species or genetic No Not applicable diversity? 1.31 Any other actions? No None

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply):

SN Information/checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data

ITHC/PRJ/19-20/EIA/220/REV.01 6 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes The proposed project site and its surrounding areas agricultural land (ha) have been designated for residential development.

2.2 Water (expected source & Yes Water requirement during construction phase will be competing users) unit: met through STP treated water supply through tanker. During operation phase fresh water demand will be met from Ghaziabad Municipal Corporation. Treated water demand for flushing, gardening and DG Set cooling shall be met from treated water from STP installed at Site.

65 KLD of treated water will be used within site premises from STP installed at site. 2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, YConstruction materials such as Cement, Steel, aggregates, sand / soil (expected Yes Bricks, Stone aggregates, and Sand would be source – MT) required for construction of the project. These will be preferably procured from local reputed licensed vendors. 2.5 Forests and timber (source – MT) No Limited use of timber will be done and it will be restricted to selected locations. 2.6 Energy including electricity and Yes Power for the proposed project will be supplied by Uttar fuels (source, competing users) Pradesh power corporation Ltd. Maximum power Unit: fuel (MT), energy (MW) demand for the proposed project is 3187 KW. DG sets of 1760 KVA will be used as power backup during power failure. HSD (ultra low sulphur variety as per availability) fuel will be used for DG sets. 2.7 Any other natural resources (use No _ _ appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 3.1 Use of substances or materials, No Not applicable. which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No Not applicable. disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. No Not Applicable. by changing living conditions?

ITHC/PRJ/19-20/EIA/220/REV.01 7 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

3.4 Vulnerable groups of people who No Not applicable. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 4.1 Spoil, overburden or mine No Top soil generated during earth excavation will be wastes stacked, covered, preserved for reuse as top layer for horticulture development. Remaining soil will be used for site leveling, back filling/filling in raft foundation and road construction. 4.2 Municipal wastes (domestic and Yes Construction Phase: or commercial wastes) Solid waste – 15.60 kg/day (12 kg/day from labour camp and 3.60 kg/day from floating)

Operation Phase: Solid wastes – 1.20 TPD. The solid waste includes paper, card board, plastic cans etc. and kitchen wastes from houses. Recyclable wastes like card boards and plastic cans will be sold to vendors.

As this is a group housing project so commercial activity is not involved, hence there will not be any commercial waste. 4.3 Hazardous wastes (as per Yes Waste Lube oil of 0.51 Lts/day on annual basis from Hazardous Waste Management DG sets will be the only hazardous waste generated Rules) from the project. This waste oil will be carefully stored in HDPE drums in isolated covered space and sold to recyclers authorized by CPCB/SPCB.

Suitable care will be taken so as to prevent spills/ leaks of used oil from storage. 4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge Yes Dried sludge from the STP will be used as manure for from effluent treatment horticulture development. Surplus manure will be sold to end users: farmers/Nursery. 4.7 Construction or demolition Yes Demolition work is not involved. wastes Construction Work: Excavated soil will be used for landscaping and back filling. Other construction waste like bricks, concrete etc will be used in sundry / road works / manholes etc. Gunny bags, cardboards will be sent to authorize recycler. The inert waste will be sent to land fill site.

ITHC/PRJ/19-20/EIA/220/REV.01 8 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 4.8 Redundant machinery or No Not applicable equipment 4.9 Contaminated soils or other No Not applicable materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 5.1 Emissions from combustion of Yes Emission will be from fossil fuels from stationary or . Stationary Sources: DG sets 1760 KVA mobile sources . Mobile Sources: Vehicular emissions

CPCB approved DG sets with acoustic canopy will be used only during power failure. 5.2 Emissions from production No Not applicable in this project. processes 5.3 Emissions from materials No Fugitive dust emission due to handling and handling including storage or loading - unloading activities is envisaged during transport construction. Frequent water sprinkling will be done to minimize the fugitive emissions. 5.4 Emissions from construction Yes During the construction phase, major emission will be activities including plant and Margi in the form of fugitive dust, use of DG sets and equipment nal transportation of construction material. 5.5 Dust or odours from handling Yes The project may cause rise in dust levels during of materials including construction phase. Precautions would be taken to construction materials, sewage reduce dust generation during construction phase: and waste  RMC use will reduce the handling of cement, sand and concrete thus dust emission will be minimized.

 Tarpaulins will be used to cover trucks carrying debris.

Water sprinkling will be practiced at regular intervals to reduce dust emissions. Dust is likely to be generated during operation phase due to movement of vehicles and blowing of air. But the impact is negligible. 5.6 Emissions from incineration of No Not applicable waste 5.7 Emissions from burning of No Burning of any substances including biomass, slash waste in open air (e.g. slash materials and/ or construction debris will be materials, construction debris) prohibited 5.8 Emissions from any other No Nil

ITHC/PRJ/19-20/EIA/220/REV.01 9 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 6.1 From operation of equipment Yes Noise is expected to be generated during e.g. engines, ventilation plant, construction phase mainly from operation of heavy crushers machinery, DG sets, and traffic. The indicated noise levels from certain construction plants/equipment are indicated below: . Concrete Mixer - 85 dBA . Generator - 95 dBA . Pumps - 90 - 95 dBA . Trucks - 85 – 90 dBA

For control of noise following measures shall be adopted:

 Properly maintained equipment with mufflers will be used.

 High noise generating construction activities would be carried out only during day time.

Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs.

During operation noise from operation of DG sets is envisaged. However, the generator sets installed will operate at noise level less than 75 dB (A) as the generators will be placed either in acoustic chambers or a canopy. 6.2 From industrial or similar No Not applicable processes 6.3 From construction or Yes Noise Pollution Control: Noise pollution will be due demolition to operation of machinery as well as transportation vehicles. As there is habitation in nearby area but there will be negligible impact. However following precautions shall be taken to control noise pollution:  High noise generating construction activities would be carried out only during day time.  Installation, use and maintenance of mufflers on equipment.  Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. 6.4 From blasting or piling No Blasting & piling work is not involved in the project.

ITHC/PRJ/19-20/EIA/220/REV.01 10 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data Only cast in situ stone piling for soil strengthening. 6.5 From construction or Yes Construction Phase: operational traffic Welding is light and heat generating activity during construction. Appropriate safety measures will be taken as per I.S. code. Supply of Materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours.

Operation Phase: Car parking is provided on surface, stilt/ podium and in basement.

Vehicular movement is restricted to roads and parking areas. Provision of plantation along plot boundary & on road side & vegetated surface will help in reduction of noise level. 6.6 From lighting or cooling No Nil systems 6.7 From any other sources No Nil

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 7.1 From handling, storage, use or Yes The waste lube oil generated from DG Sets during spillage of hazardous materials operation phase from the DG sets will be collected and separately stored in HDPE drums over concrete floor within the premises before final disposal. All precautionary steps will be taken to avoid spillage It will be directly transferred to authorized recyclers. 7.2 From discharge of sewage or No 178 KLD of domestic waste water will be generated other effluents to water or the from the proposed facility which will be treated in on- land (expected mode and place site STP of 215 KLD. 77 KLD excess treated water of discharge) will be discharged into public sewer after getting prior permission. 7.3 By deposition of pollutants No Dust generation during construction phase from emitted to air into the land or earthworks and movement of vehicles is a into water temporary phenomenon and will have short term impact during construction phase.

Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts.

DG exhaust will be discharged at height stipulated by CPCB.

ITHC/PRJ/19-20/EIA/220/REV.01 11 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 7.4 From any other sources No Nil 7.5 Is there a risk of long term build No No. up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 8.1 From explosions, spillages, No During construction phase, no such risk is anticipated. fires etc from storage, However, the contractors shall comply with the safety handling, use or production of procedures, norms and guidelines as per applicability hazardous substances and mentioned in the National Building Code of India and Bureau of Indian Standards.

During Operation Phase, all precautionary and safety measures will be taken to minimize any accident hazard. 8.2 From any other causes No Nil 8.3 Could the project be affected Yes The proposed project site has no history of natural by natural disasters causing disasters such as floods, landslides, cloudburst etc. environmental damage (e.g. Floods, earthquakes, The site lies in Seismic Zone IV. The construction will landslides, cloudburst etc)? be carried out as per the guidelines prescribed for Seismic Zone IV.

All the civil structures will be seismically resistant and designed in accordance with provisions recommended related IS codes: IS 4326: 1993 IS 1893 (Part I),2002

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 9.1 Lead to development of Community facilities, social & infrastructure supporting. facilities, ancillary development be as per Master Plan. development or development Yes The project will stimulate development of supporting stimulated by the project, which facilities, utilities etc.. Hence, planned development of could have impact on the support facilities, infrastructure, utilities will happen environment e.g.: without any negative impact on environment

ITHC/PRJ/19-20/EIA/220/REV.01 12 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data  Supporting infrastructure Yes  Appropriate infrastructure like, roads, power supply (roads, power supply, and waste management facility will be developed waste or waste water within the site so that chances of occurrence of any treatment, etc.) adverse impacts are minimized.  External development will be done by development authority.  extractive industries No No  supply industries Yes Construction materials  other No No 9.2 Lead to after-use of the site, No No which could have an impact on the environment 9.3 Set a precedent for later Yes This is a Group Housing project; there will be developments generation of employment during construction & operation phase. 9.4 Have cumulative effects due to Yes Impacts on water availability, storm water drainage, proximity to other existing or availability of electricity, traffic congestion etc. planned projects with similar effects

(II) Environmental Sensitivity

SN Areas Name/ Aerial distance (within 15 km) of proposed Identity project location boundary 1 Areas protected under Yes Okhla Bird Sanctuary, 11.29 Km/SW international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Yes Hindon River: 0.20 Km/NE sensitive for ecological reasons - Canal: 2.21 Km/NW Wetlands, watercourses or other Drain (Near project site): 0.41 km/SW water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, Yes Okhla Bird Sanctuary, 11.29 Km/SW important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or No Not located within 15 km of the proposed project underground waters location. 5 State, National boundaries Yes UP- Delhi Border: 4.89 KM SW

6 Routes or facilities used by the Yes NH-91, 4.44 KM NE public for access to recreation or NH-24, 0.32 KM SE other tourist, pilgrim areas NH-58, 4.51 KM NE SH-57, 4.26 KM NE

ITHC/PRJ/19-20/EIA/220/REV.01 13 IND TECH HOUSE CONSULT Environment Clearance for Proposed Group Housing FORM 1 M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

SN Areas Name/ Aerial distance (within 15 km) of proposed Identity project location boundary 7 Defense installations Yes Hindon Airbase, 7.85 km/NW

8 Densely populated or built-up No Density of surrounding development is as per area master plan. 9 Areas occupied by sensitive Yes Manmade community facilities such as, schools, man-made land uses (hospitals, places of worship will not have any impact due to schools, places of worship, construction of proposed project. community facilities)

10 Areas containing important, high Yes The project site falls in the notified areas for quality or scarce resources control and regulation of ground water. The (ground water resources, surface ground water will be extracted by prior permission resources, forestry, agriculture, from competent authority. fisheries, tourism, minerals) 11 Areas already subjected to No Nothing specific pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural Yes The project is located at seismic zone IV hazard which could cause the according to Indian Standard Seismic Zoning project to present environmental Map. Structural design will be done for this problems (earthquakes, seismic zone as per code. subsidence, landslides, erosion, flooding or extreme or adverse There are no possibilities of the proposed project climatic conditions) site getting flooded as per available records.

Landslides not applicable as the project site & surrounding land is flat.

ITHC/PRJ/19-20/EIA/220/REV.01 14 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

FORM-1 A

1. LAND ENVIRONMENT

1.1. Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use, if any and the statutory approval from the competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans.

The proposed project site is located at Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh. The Land use of Project site is Residential which is in conformity with master plan. The following maps are attached.

(i) 500 M Radius Map with location of site. (ii) 10 KM Radius Map (iii) Layout (Conceptual) plan.

1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc.

The brief description of the proposed project is given below in Table-1:

Table-1: Brief description of the Project Sl. Description Quantity Unit No. GENERAL 1 Gross Plot Area 23794 SQMT 2 Proposed Built Up Area 81118.001 SQMT 3 Number of Building Blocks 9 (7+2) No. 4 Total no of Saleable DU's 376 No. 5 EWS & LIG DU's 76 No. 6 Max Height of Building (Upto Terrace) 108.2 M 7 Max No of Floors 2B+ST+34 No. Expected Population (2700 Residential+744 8 2828 No. Floating) 9 Cost of Project 122 CR AREAS 10 Permissible Ground Coverage Area (40%) 9517.6 SQMT 11 Proposed Ground Coverage Area (15.9%) 3785.171 SQMT 12 Proposed FAR Area 153 36454.11 SQMT 13 Non FAR areas - Total Basement Area 31121.24 SQMT 14 Non FAR areas - Stilt/Podium Area 3175.38 SQMT 15 Other Non FAR Service areas 15019.42 SQMT 16 Proposed Total Built Up Area 81118 SQMT WATER

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

17 Total Water Requirement 224.45 KLD 18 Fresh water requirement 159.51 KLD 19 Treated Water Requirement 64.93 KLD 20 Waste water Generation 177.84 KLD 21 Proposed Capacity of STP 215 KLD 22 Treated Water Available for Reuse 142.27 KLD 23 Treated Water Recycled 64.93 KLD Surplus treated water to be discharged in Municipal 24 77 KLD Sewer RAIN WATER HARVESTING 25 Rain Water Harvesting Potential 4856.11 KL 26 No of RWH of Pits Proposed 6 No. PARKING 27 Total Parking Required as / Building Bye Laws 414 ECS 28 Proposed Total Parking 1252 ECS 29 Parking on Surface 248 ECS 30 Stilt & Podium Parking 86 ECS 31 Parking in Basements 918 ECS GREEN AREA 32 Required Green Area (15% of plot area) 3569.1 SQMT 33 Proposed Green Area (15.01% of plot area) 3570 SQMT WASTE 34 Total Solid Waste Generation 1.2 TPD 35 Organic waste 0.74 TPD 36 Quantity of E-Waste Generation- Kg/Day 7.74 KG/DAY 37 Quantity of Hazardous waste Generation 0.51 LPD 38 Quantity of Sludge Generated from STP 118 KG/DAY ENERGY 39 Total Power Requirement 3187 KW 40 DG set backup 1760 KVA 41 No of DG Sets 2 No.

1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology).

The project is being developed in accordance with GDA, approved building plans and NBC - 2016 norms. The development will not cause any disturbance to local ecology and surrounding establishments. Peripheral green belt will be developed.

Proposed project will provide all the basic utilities such as proper drainage, sewerage treatment & water supply system, Rain Water Harvesting Structures to recharge ground water aquifer, green area development and sufficient parking so that it will not have negative impact on the surroundings.

The proposed development will have a positive impact on environment; it will provide organized open spaces and green areas adding to aesthetics and improvement of surrounding environment.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given).

The proposed site is almost flat and is not prone to erosion. The proposed construction involved cutting and filling operations, construction of paved areas and development of green areas, which would reduce the chances of erosion. Excavation carried out for foundation & basement would be protected with strutting and shoring where ever required.

Structural design of building will be vetted by the Govt. agency nominated by local body & structural stability certificate will be submitted to local body as per rules. Soil investigation has been done.

Slope Analysis: From the topographical map and survey map it was observed that the site is almost flat land.

Seismo-Tectonic Appraisal of the Area: Bureau of Indian Standards (BIS) has prepared a seismic zoning map of India based on tectonic features and records of past earthquakes. The project site falls under Zone-IV as per the Seismic Zoning map of India (IS 1893, Part I, 2002.) Necessary seismic factors as per codes shall be incorporated suitably while designing the structures to safeguard against earthquake risks.

1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site)

No, proposal will not involve alteration of natural drainage system. There will be increase in hard area & storm water runoff rates due to construction activities at project site. But with the implementation of proposed RWH scheme, the runoff rate will be less than the preconstruction runoff rate.

1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.)

During construction stage excavation for foundation & basement will be done. The excavated top soil will be stored & preserved separately for reusing the same for landscaping, and remaining soil will be properly stored at site under cover and will be reused for backfilling purpose, road construction etc. There will be no requirement of additional filling material to be brought from outside.

1.7 Give details regarding water supply, waste handling etc. during the construction period.

Water Supply: During construction stage, Tanker water supply or STP Treated waste water from the nearest STP will be taken for construction works. Waste Generation and Handling: Excavated soil will be stored and covered at site and it will be reused for site leveling, back filling/filling in raft and road construction. The fertile top soil will be reused for landscaping purpose. Construction waste generated at site will be reused in road construction, recyclable waste shall be disposed off through authorized

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

vendor and unused waste shall be sent to approved dumping/land fill site through authorized agency.

Spillage of oil from the machinery will be properly collected in drums and disposed off. Handling of the waste will be done by agency approved by Ghaziabad Municipal Corporation. For construction laborers, proper sanitary facilities, wash areas, potable water will be provided and good hygienic conditions will be maintained.

1.8 Will the low lying areas and wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity)

No, there is no low lying area observed within and in the vicinity of the project site.

1.9 Whether construction debris and waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labor and the means of disposal)

The waste generated during construction phase can broadly be classified as construction waste and domestic waste. 3245 MT of construction waste (Calculated using TIFAC (Technology Information, Forecasting, and Assessment Council standards, @ 40 Kg / sq m) and domestic waste would be generated from construction labours.

Construction waste generated will be used on the site as filler material for internal roads and pavements. Remaining construction waste if any will be sent to an approved dumping site/landfill site.

The waste generated will be collected and disposed of through an authorized agency. Approx. 64 labors per day will be employed during the construction period. Required sanitary facilities will be provided to Construction laborers through mobile toilets. Wash areas will be constructed and good hygienic conditions will be maintained for labor camp.

2. WATER ENVIRONMENT

2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement.

Total water requirement for this project is 224 KLD out of which approx. 65 KLD treated waste water from onsite STP will be reused. The fresh water demand of 159 KLD will be met through water supply department of Ghaziabad Municipal Corporation. Breakup of water requirements for various uses is given below. Efficient dual plumbing system will be provided to achieve conservation of fresh water. Details of water requirement are given in Table 2 below:

Table 2: Total Water Requirement Details of the Project

SN Particulars Water Demand (KLD)

1 Total Water Demand 224 2 Fresh Water Requirement 159

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

3 Total Waste water Generation 178 4 Total treated waste water 142 5 Treated water Recycled 65 Flushing 55 DG Cooling 6 Gardening 4 6 STP Proposed 215 7. Excess treated water 77

Water requirement for horticulture, D.G. cooling and dual flushing purpose will be fulfilled by recycling the treated waste water from onsite STP; it will help in conservation of fresh water. Water Balance Diagram is given below.

2.2 What is the capacity (dependable flow or yield) of the proposed source of water?

159 KLD of fresh water will be sourced from water supply department of Ghaziabad Municipal Corporation. Rest of the requirement shall be met through treated water generated from STP installed at site.

2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality)

During operation phase, fresh water will be sourced from water supply department of Ghaziabad Municipal Corporation. The quality of water would confirm to the desirable drinking water standards as per IS: 10500. 2012

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

2.4 How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage)

Approx. 65 KLD of treated waste water from onsite STP will be used to meet 100% demand of water required for flushing, horticulture & D.G. cooling.

2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption)

Fresh water confirming to the drinking water standard will be supplied by water supply department of Ghaziabad Municipal Corporation. No diversion of water from other user is expected and no impact on the existing users is anticipated.

2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity)

178 KLD of domestic waste water will be generated from the proposed facility which will be treated in on-site STP of 215 KLD.

2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created.

It is proposed to provide Rain Water Harvesting structures as per details given to recharge rain water to ground water aquifer.

The rain water collected from the roof top, will be collected through the network of storm water drainage lines & conveyed to RWH system. RWH system shall consist of de-silting cum filter chamber, oil and grease separator and pits are designed to store 15 minutes peak hour rainfall, for recharge into ground aquifer & to prevent flooding in the complex.

2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way?

Due to construction of the project on vacant land there would be change in the runoff characteristics quantitative and qualitative as well

The quantitative change: Runoff coefficient from the project site prior to development of project = 0.2 Runoff coefficient from the project site after development of project = 0.504 (Considering different coefficients for paved area, soft area, terrace etc)

Hence incremental runoff = 0.504 – 0.2 = 0.304

Qualitative change: Runoff form parking areas may contain spilled oil- Provision of oil & grease separator made to separate it before recharge.

Storm water drainage & Rain water harvesting system as described in item no: 2.7 above meet quantitative, qualitative & over flooding/ water logging requirements.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any)

There will be no tapping of ground water. This will be strictly prohibited during construction and operation phase of the project. It is proposed to provide 06 nos. of RWH pits to store rainwater to recharge ground water aquifer.

2.10 What precautions/measures are taken to prevent the run-off from construction activities polluting land and aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts)

The major underground construction activity will not be taken during monsoon period.

During the construction stage construction water will be channelized to sedimentation basin with silt trap. The water will be reused after testing for construction. Requirement of water for construction purposes will be 40 KLD and the runoff is not likely to be more than 5 KLD. This will be filtered and reused for sprinkling on roads.

2.11 How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels)

There will be a network of storm water drainage lines to collect runoffs, which will be channelized to rain water harvesting system. Water so collected will pass through de- silting-cum-filter chamber, oil and grease separators. RWH pits are designed to store 15 minutes peak hour rainfall, for recharge into ground aquifer & to prevent flooding in the complex on roads.

2.12 Will the deployment of construction laborers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation)

Labour camp for 40 labours with provision of mobile toilets will be planned at the site. Proper maintenance of the area and facility would be done regularly to maintain hygienic condition. Estimated generation of waste water from labour camp is 2.44 KLD.

2.13 What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology and facilities for recycling and disposal)

During operation phase, the estimated 178 KLD of domestic waste water will be generated from the proposed facility.

2.14 Give details of dual plumbing system if treated waste water is used for flushing of toilets or any other use.

Estimated generation of treated water from onsite STP is 142 KLD out of which 65 KLD will be used for Flushing, DG Cooling and gardening.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

3. VEGETATION

3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any)

Tree cutting is not involved in this project. Trees are available along with boundary of the project site only which will be retained.

3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project)

Tree cutting is not involved in this project. Trees are available along with boundary of the project site only which will be retained.

3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale)

Proposed project will have a dedicated 3570 sq m (15.01% of plot area) green area. Landscape development plan prepared for the project includes peripheral & avenue plantation with local species, ornamental as well as large and dense foliage plants especially on the periphery. Green area also includes ground cover, lawns at selected locations and shrubs for shade and reduction of Air and Noise pollution. Trees and plant species for plantation in the project will be selected from the list given below.

Table 3: List of Plant Species that are likely to be plant

SN Botanical Name Common Name 1 Ficus Infectoria Pakur 2 Delonix regia Gulmohur 3 Cassia fistula Amaltas 4 Azadirachtha Indica Neem 5 Peltophorum ferrugineum Copper pod 6 Ficus retusa Usha 7 Alstonia Scholaris Scholar tree 8 Thespesia populnea Paras Pipal 9 Churasia tabularis Chukrasia 10 Anthocephalus cadamba Kadamba 11 Jacaranda mimosifolia Jacaranda 12 Mimusops Elengi Maulsari 13 Plumeria alba Temple tree 14 Terminalia arjuna Arjuna 15 Bauhinea Variegata Kachnar 16 Sarca indica Ashoka 17 Silver oak Grevillea Robusta 18 Semal Bombax Ceiba 19 Pilkhan Ficus

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

4. FAUNA

4.1 Is there likely to be any displacement of fauna-both terrestrial and aquatic or creation of barriers for their movement? Provide the details.

No threatened, rare, endangered or endemic faunal species were observed during the survey. No displacement of fauna is envisaged due to this project. This site is not a natural host to any sensitive creature. Therefore, no animal habitat is likely to be affected due to construction of the proposed building.

4.2 Any direct or indirect impacts on the avifauna of the area? Provide details.

No direct or indirect impact on the fauna of the area is envisaged. However after commissioning of the project better environmental condition may provide better habitat to the avifauna of the area.

4.3 Prescribe measures such as corridors, fish ladders etc. to mitigate adverse impacts on fauna.

Not applicable for this project.

5. AIR ENVIRONMENT

5.1 Will the project increase atmospheric concentration of gases and result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions)

Proposed development will increase hard areas (Terrace, Roads, Paths and parking area). The traffic volume due to proposed project will increase marginally. Heat island effect will be negligible due to shading of hard surfaces by proposed plantation along periphery of the plot, roads and paths.

Construction Phase

The important activities during the construction phase that produce particulate matter which affect the air quality are material storage, transportation and handling of excavated earth and construction materials like cement, sand and aggregates. Gaseous pollutants like SO2, NOx, CO emitted from the various machineries and vehicles used in construction activities.

Appropriate mitigation measure will be employed during this stage of the project to reduce the pollution level to the acceptable limit.

Operational Phase

During this stage, there will be no major impact on air environment. Vehicular emission and DG sets are the only source which will cause air pollution. Separate entry and exit will be provided to maintain the smooth flow of traffic and for DG sets APCM will be provided to mitigate the pollution load on air environment.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters.

During construction phase, Dust, Particulate Matter is the main pollutant, generated during construction activities. Other emission sources are intermittent and include

emissions of SO2, NOx and CO from materials transport of heavy vehicles on site etc. Proper upkeep and maintenance of vehicles, sprinkling of water on roads and construction site are some of the measures that would reduce the impact during construction phase.

Sources of Air pollution during operational phase  The gaseous emission from vehicles.  Emissions from DG set while in operation only during power failure.

Mitigation measures:  The traffic congestion will be avoided by well-designed parking lots and maintaining smooth traffic flow.  Regular PUC checkup for vehicles.  CPCB approved DG sets only will be used.  Regular maintenance of DG sets shall be done & Ultra low sulphur diesel shall be used.

5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site.

No, well organized parking arrangement has been designed for the project. Proposed parking is as per local building byelaws. Separate Entry & exit is planned to avoid congestion at these point.

5.4 Provide details of the movement patterns with internal roads, bicycle tracks, Pedestrian pathways, footpaths etc with area under each category.

There is a provision of road network for internal traffic movement on the project site. The detail of the road system had been clearly demarcated in the layout plan.

5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above.

The source of noise is mainly vehicular traffic noise. Entry & Exit have been planned to distribute traffic on these roads. Well organized parking arrangement is designed to maintain smooth traffic flow which would help in reducing traffic congestion and noise levels. Maximum parking has been planned in the basement to minimize noise level and traffic on surface.

Trees planned along road & periphery would act as noise barrier and will reduce the noise level.

5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

D.G. Sets will be operated only in case of power failures during construction and operational phase. The Pollutants like SPM, SO2 that may arise from emissions from D.G. sets will be discharged through vent of proper height. D.G. sets will be installed with inbuilt acoustic enclosures to reduce the noise of D.G. sets while in construction or operation. Plantation of trees would act as noise barrier and will reduce noise level.

DG sets with a capacity of 1760 KVA have been proposed during operation phase as power backup during power failure.

6. AESTHETICS

6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents?

No, the use of proposed site is in conformity with the planned land use. There is no scenic amenity or landscape in its surrounding.

6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account?

The design development of the proposed project will be done on the basis of development control norms and as per approved master plan of the local body, the construction of the proposed project will not have any adverse impact on the existing structures.

6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out.

There are no mandatory guidelines issued by local body for development of urban form; however project architect and landscape architect have designed the project keeping in mind principles of urban design & urban form and setting in overall contexts.

6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered.

Anthropological or archeological sites of significance do not exist in the vicinity of the project site. However measures will be taken to reduce the impact on air and noise pollution during construction and operation phase.

7. SOCIO-ECONOMIC ASPECTS

7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details.

Project site will not affect the nearby population in any way so there is no need to displace the nearby population. That’s why there is no change in the demographic structure of local population.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

7.2 Give details of the existing social infrastructure around the proposed project.

The proposed project site is located at Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh, Site is easily accessible through public transport such as buses, Auto, Taxis etc, Apart from this Hospitals/Clinics, facilities like post office, schools and other services are easily accessible from the project site.

7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed?

No the project site will not cause any adverse effects on local communities, sacred sites or other cultural values.

8. BUILDING MATERIALS

8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency)

ISI marked building materials of reputed brands to be procured from 400 km range as far as possible. Preference will be given to locally available building materials which conserve energy, low energy in entire processes of manufacturing & uses manufacturing. Use of alternative technologies for each component of the buildings of envelope, superstructure, finishes and the road and surrounding areas will be as per guidelines provided in NBC 2016. Some of them are given below:

 Building material with low embodied energy will be given preference.  Ready mix concrete with fly ash 15 to 20%.

Some of the alternate materials for openings in construction are:-  Use of rapidly renewable timber for doors where ever wooden doors are proposed.  Use of steel manufactured from recycled content of smaller diameter.  Saw dust based particle board for panels.  Use Ceramic tile in flooring.

The use of the above alternative building materials will help reduce the use of non renewable resources.

8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts?

Detail construction management plan shall be prepared by the construction management team showing location of storage of different building materials in the godown, covered places and in open yards, location of various machineries required for construction, location of DG sets to be used for construction in case of power failure Construction waste collection and disposal point. These locations shall be decided with consideration to reduce air, noise and soil pollution and nuisance to the public.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

8.3 Are recycled materials used in roads and structures? State the extent of savings achieved?

Locally available recycled materials would be given preference.

However, bricks made from the fly-ash/AAC blocks for construction. Readymade concrete (RMC) will be used in construction. This will result in significant saving.

8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project.

As estimated, approx. 1.2 TPD solid wastes will be generated from the project site. Out of which, approx. 0.74 TPD waste will be of bio-degradable in nature. Waste will be collected door to door. Dry & wet garbage will be managed separately.

Waste Management during operation phase: Solid Waste Sweepers will be engaged for door to door collection and handling municipal waste. Location for bin/container at common places would be identified for collection of waste. Adequate number of collection bins separately for biodegradable and non-biodegradable waste shall be provided as per the Solid Waste (Management and Handling) Rule, 2016. Wastes from such bins shall be collected on daily basis and biodegradable waste shall be treated in OWC installed onsite. Non-biodegradable waste shall be segregated into recyclable & inert waste. Recyclable waste like glass, Card Board, Paper Waste shall be sold to authorized recycler. Remaining inert waste shall be sent to landfill site through authorized vendor.

Appropriate site for storage and segregation and treatment of biodegradable waste (OWC) will be identified in the project.

 All waste collection bins shall be properly maintained on regular basis.  Arrangement will be made with local civic authority, for providing garbage station or transfer point (preferably near the entry/ exit point of the site), for collection and disposal of inert waste. It will be assured that there is no spillage of waste along the internal roads during collection of wastes.  The garbage storage/transfer point will be covered and cleaned every day to as to avoid any nuisance, vectors and unhygienic conditions.

Landscape waste comprises of fallen leaves and other vegetative material which shall be collected and treated along with other biodegradable waste in the OWC installed at site.

9. ENERGY CONSERVATION

9.1 Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption?

 Power will be sourced from Uttar Pradesh Power Corporation Ltd.: The Maximum Power demand for the project is estimated to be as around 3187 KW. The power shall be supplied by Uttar Pradesh Power Corporation Ltd. DG sets of Capacity: 1760 KVA are proposed to meet requirement of power back up during power failure.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

 Energy Conservation Measures & Management Plan: During operation phase, appropriate energy conservation measures & management plan will be adopted in order to minimize the consumptions of conventional energy. The following measures are suggested for adoption. Details of energy saving measures are:

o Incorporate solar passive techniques in a building design to minimize load on conventional systems. o Day light provision to all habitable room. o Use energy efficient light fixtures with good photometric properties. o Use LED’s in external lighting bollards, and in areas such as staircases, corridors & lift lobbies, where lights burn on 24 hrs. basis. o LED lamps in place of T-8 lamps (36W) in basements, stilts & underground parking areas. o Using time switch control/time control for common area, basements lighting & external lighting. o Using high efficiency motors ‘EF1’ for pumps & ventilation fans. o Use of local building material (400 Km range) to reduce pollution & transportation energy. o Use of Fly Ash in RMC. o Use of AAC block in all external walls.

9.2. What type of, and capacity of, power back-up do you plan to provide?

I) Type: Diesel Generator Set II) Capacity: 1760 KVA

9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation?

Suitable single high performance glass of appropriate thickness depending on glass panel size and keeping in mind U values and SHGC recommended in ECBC norms will be selected.

9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. Passive solar technique:-

Passive solar architectural feature- Optimizing building envelope & window design to reduce cooling demand (selection of energy efficient low U value materials for envelop is application of high reflecting white paint to terrace). Day light integrated to reduce artificial lighting demand. Shading devices provide shade to windows & external façade. Planned buffer spaces, like balconies, cupboards on external façade of building - to reduce heat gain & there by cooling load. Adopting low energy passive cooling strategies: Landscaping to alter micro climate for better condition – Large green areas, peripheral plantation and avenue plantation provided to shed the hard areas & reduce heat island effect, reduction of noise & air pollution & provide buffer to sun heat.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details.

Yes, the layout of streets & buildings has been designed to maximize the potential for solar energy devices. Further, solar energy will also be used for common area lighting,

9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected?

It is proposed to reduce cooling/ heating load through careful selection of plantation- planting deciduous trees on south side and evergreen trees on east and west side.

Passive solar architectural measures have been adopted to provide shades to windows and roof which would effectively reduce heating of building envelope. Sunshades, balconies & buffer space designed on external façade will protect external façade from heat gain & reduce heat gain/energy consumption.

9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications.

Building is not centrally air conditioned. However energy efficient (low U Value) materials shall be used. Conventional GSL/ flurocent lamps have been replaced with energy efficient LED’s lamps. This reduces lighting power density. 0.95 or higher power factor shall be maintained This will reduce electrical power distribution losses in the installation. Pumps & Motors: shall be of BEE 4 star rating. Chillers are not used as building is not centrally air-conditioned. All cables shall be de-rated to avoid heating during use. This also indirectly reduces losses and improves reliability.

9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects?

The proposed project will increase hard surfaces like building, terraces, roads, pavement. This will increase the ambient air temperature and heat island effect, if not properly taken care off. To reduce heat island effect the ground coverage is deliberately kept minimum to increase green area. Peripheral and avenue plantation, grass pavers lawns planned in the proposed project will shade hard surfaces which will help to reduce heat gain and formation of Heat island effect. Hence alteration in microclimate with this measures will be negligible.

9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

This is multi storied group housing project with RCC framed structure. Energy efficient materials for building envelope & heat reflecting terrace surfaces shall be provided to reduce heat gain and cooling load.

9.10 What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans.

Adequate measures have been taken as per local fire norms and National Building Code 2016 to provide fire protection. Proposed measures include building structure designed for appropriate fire rating, provision of Fire detection & alarm and rescue system ,provision of infrastructure required by Fire Service Department to suppress the fire, Provision of fire suppression system –All these provisions shall be appropriate to the classification and use of the building as per National Building Code.

9.11 If you are using glass as wall material provides details and specifications including emissive and thermal characteristics.

Not applicable, as this is a group housing project which doesn’t have any glass wall (Structural glazing).

9.12 What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration.

This is not centrally air conditioned building project which rely more on natural ventilation. However during extreme weather (Summer/ Winter) it is essential to have control on air filtration. With use of modern building Materials & technology it is possible to make air tight construction and control air infiltration rate. Application of sealants/weather-strips proposed shall take care of this aspect.

9.13 To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used.

Non-conventional (Solar) energy will be used to reduce burden on conventional energy. In addition to this following technologies would be used to conserve energy

 Electric meter with timer  Replacement of high energy consuming incandescent lights with fluorescent LED lamps.  Shading devices and other passive solar technique.

10. Environment Management Plan

The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

Table4: Environment Management Plan

Parameters for SN Potential Impact Action Timing Monitoring I. Construction Phase All equipments will be Random checks of operated within Construction activities equipment logs/ specified design manuals parameters. Vehicle trips to be Vehicle logs Site clearance and minimized to the extent construction activities possible Any dry, dusty materials stored in Absence of stockpiles Construction activities 1. Air Emission sealed containers or or open containers of

prevented from dusty materials. blowing. Compaction of soil Construction logs Construction activities during various

construction activities Ambient air quality within the premises of PM10, PM2.5, SO2, As per SPCB requirement. the proposed unit to be NO2 and CO monitored. List of all onsite noise generating machinery Equipment logs, noise During construction with age to be reading phase. prepared. Equipment to

be maintained in good working order. Working during night to Working hour records Construction activities be minimized. Generation of vehicular Maintenance records of During construction phase. noise vehicles Implement good working practices (equipment selection and sitting) to minimize noise and also reduce Site working practices During construction its impacts on human records, noise reading Phase. health (ear muffs, safe distances, and 2. Noise enclosures). No machinery running when not required. Acoustic Mufflers/enclosures in mufflers/enclosures to Prior to use of equipment. place. be provided in large

engines Noise to be monitored in ambient air within the plant premises. As per SPCB requirement The Noise level will not Noise reading or quarterly whichever is exceed the permissible lesser. limit both during day and night. All equipment operated Random checks of During construction within specified design Equipment logs/ phase. parameters. manuals

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

Vehicle trips to be During construction Vehicle logs minimized to the extent Phase.

possible No untreated discharge No discharge hoses in During construction to be made to surface vicinity of phase. water, groundwater or watercourses. soil. Waste water will be Discharge norms for Wastewater discharged to outside effluents as given by 3. Discharge drainage. SPCB. During construction Take care in disposal of Discharge norms for Phase. wastewater generated effluents as given by such that soil and PCB. groundwater resources

are protected. Minimize area extent of Site boundaries not During construction site clearance, by extended / breached as Phase. staying within the per plan document. 4. Soil Erosion defined boundaries Protect topsoil stockpile During construction Effective cover in place. where possible at edge Phase.

of site. Ensure drainage system and specific design measures are Visual inspection of Drainage and working effectively. drainage and records During construction phase 5. effluent The design to thereof Management incorporate existing

drainage pattern and avoid disturbing the same. Implement waste management plan that Comprehensive Waste identifies and Management Plan in characterizes every place and available for waste arising inspection on-site. Prior to site Waste associated with Compliance with MSW 6. Clearance. Management proposed activities and Rules, and Hazardous

which identifies the Wastes (Management, procedures for Handling and Trans collection, handling & Boundary Movement disposal of each waste Rules), 2016 arising. Plan to be drawn up, Non-routine considering likely Mock drills and records events and During construction phase 7. emergencies and steps of the same accidental required to prevent/limit releases consequences. The Environmental Management Cell/Unit A formal letter from the Environmental is to be set up to management indicating During construction phase 8. Management ensure implementation formation of

Cell/Unit and monitoring of Environment environmental Management Cell safeguards. II. Operational Phase Stack emissions from PM, SO , NO , CO DG set to be monitored 2 2 Ambient air quality PM10, PM2.5, SO2, NO2, During operation 9. Air Emission within the premises of and CO as given by phase the proposed unit to be SPCB. Vehicle logs to monitored. be maintained Exhaust from vehicles

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

to be minimized by use of fuel efficient vehicles and well maintained vehicles having PUC certificate. Vehicle trips to be Vehicle logs minimized to the extent

possible Noise generated from operation of DG set to be optimized and monitored. DG sets are to be provided with Maintain records of acoustic enclosures vehicles During operation 10. Noise with appropriate height Phase of chimney above roof level or as specified by PCB Generation of vehicular Maintain records of noise vehicles No untreated discharge No discharge hoses in to be made to surface vicinity of water, groundwater or watercourses. soil. Wastewater During operation phase. 11. Take care in disposal of Discharge Discharge norms for wastewater generated effluents as given by such that soil and SPCB groundwater resources

are protected Ensure drainage system and specific design measures are Visual inspection of Drainage and working effectively. drainage and records During operation phase 12. Effluent Design to incorporate thereof Management existing drainage pattern and avoid disturbing the same. Replacement of conventional luminaries During operation phase 13. Energy Usage Luminary parameters to energy efficient luminary fittings Fire protection and Emergency safety measures to Mock drill records, on preparedness, take care of fire and site emergency plan, During operation phase 14. such as fire explosion hazards, to evacuation plan fighting be assessed and steps taken for prevention. The Environment Management Cell/Unit A formal letter from the Environment to be set up to ensure management indicating During operation phase 15. Management implementation and formation of

Cell/Unit monitoring of Environment environmental Management Cell safeguards.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing FORM 1A M/s Ramprastha NXT Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

Table 5: Environment Monitoring Plan (Construction Phase)

S. Particulars Parameters Frequency No.

1. Ambient Air Monitoring PM10, PM2.5, SO2, NOx, CO Half Yearly

2. Water Quality Monitoring Drinking Water Standard Half yearly

3. Noise Level Monitoring 24 Hrs. Noise Level Once in a month

Table 6: Environment Monitoring Plan (Operation Phase)

S. No. Particulars Parameters Frequency PM 2.5, PM 10, SO2, NOx, 1. Ambient Air Monitoring Half yearly CO

2. Stack Emission Monitoring PM, SO2, NOx Half yearly pH, BOD, COD, O& G, 3. Treated Effluent Monitoring Monthly Total Suspended Solids 4. Noise Level Monitoring 24 Hrs. Noise Level Quarterly

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

1. INTRODUCTION

The proposed project is located at Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh. The developer of the project is M/s Ramprastha Nxt Projects Pvt. Ltd. The Land use of project site is residential which is in conformity with the master plan.

The objective of the study is to carry out Environmental Impact Assessment (EIA) for the proposed project to meet the environmental compliance laid down by the Ministry of Environment and Forest (MoEF), Govt. of India. The scope of the study would be as per the EIA guidelines outlined by the MoEF for new construction project.

2.0 PROJECT DETAILS

The proposed project is planned at Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh on a Gross Plot area of 23794 sq m. The total built-up area is approximately 81118.001 sq m. The project will provide following facilities for comfortable living.

 Parks equipped with children’s play equipments, jogging & walking tracks.  Adequate Parking facility,  Community Hall & Club  DG set Power back up.

The Design approach shall be sensitive to environmental issues. The main thrust shall be laid on Energy conservation, safety and ease of maintenance and current technological development. The Design Philosophy is to ensure fulfillment of all functional requirements in accordance with Design Guidelines, Relevant Standards and Codes as well as local Bye laws. The salient features of the project are given in table: 1 below

Table1. Salient features of Proposed Group Housing Project

Sl. Description Quantity Unit No. GENERAL 1 Gross Plot Area 23794 SQMT 2 Proposed Built Up Area 81118.001 SQMT 3 Number of Building Blocks 9 (7+2) No. 4 Total no of Saleable DU's 376 No. 5 EWS & LIG DU's 76 No. 6 Max Height of Building (Upto Terrace) 108.2 M 7 Max No of Floors 2B+ST+34 No. Expected Population (2700 Residential+744 8 2828 No. Floating) 9 Cost of Project 122 CR AREAS

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

10 Permissible Ground Coverage Area (40%) 9517.6 SQMT 11 Proposed Ground Coverage Area (15.9%) 3785.171 SQMT 12 Proposed FAR Area 153 36454.11 SQMT 13 Non FAR areas - Total Basement Area 31121.24 SQMT 14 Non FAR areas - Stilt/Podium Area 3175.38 SQMT 15 Other Non FAR Service areas 15019.42 SQMT 16 Proposed Total Built Up Area 81118 SQMT WATER 17 Total Water Requirement 224.45 KLD 18 Fresh water requirement 159.51 KLD 19 Treated Water Requirement 64.93 KLD 20 Waste water Generation 177.84 KLD 21 Proposed Capacity of STP 215 KLD 22 Treated Water Available for Reuse 142.27 KLD 23 Treated Water Recycled 64.93 KLD Surplus treated water to be discharged in Municipal 24 77 KLD Sewer RAIN WATER HARVESTING 25 Rain Water Harvesting Potential 4856.11 KL 26 No of RWH of Pits Proposed 6 No. PARKING 27 Total Parking Required as / Building Bye Laws 414 ECS 28 Proposed Total Parking 1252 ECS 29 Parking on Surface 248 ECS 30 Stilt & Podium Parking 86 ECS 31 Parking in Basements 918 ECS GREEN AREA 32 Required Green Area (15% of plot area) 3569.1 SQMT 33 Proposed Green Area (15.01% of plot area) 3570 SQMT WASTE 34 Total Solid Waste Generation 1.2 TPD 35 Organic waste 0.74 TPD 36 Quantity of E-Waste Generation- Kg/Day 7.74 KG/DAY 37 Quantity of Hazardous waste Generation 0.51 LPD 38 Quantity of Sludge Generated from STP 118 KG/DAY ENERGY 39 Total Power Requirement 3187 KW 40 DG set backup 1760 KVA 41 No of DG Sets 2 No.

3.0 CONNECTIVITY

The Project site is well connected to network of roads. The site is located at the distance of 4.44 km, NE from NH-91, 0.32 km, SE from NH-24, 4.51 km, NE from NH-58 & 4.26 km, NE from SH-57. Ghaziabad Railway Station is around 4.24 km in ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

NE direction. Google image showing location and connectivity of project site is as given below (Ref, fig.2, 3 & 4).

Fig 2: Project site Location on Google Image

Fig 3 500 Meter buffer Map

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

Fig 4. 10 km Radius Map

4.0 PROJECT SURROUNDINGS

Project site is located at Khasra No. 68/1, 68/2, 69,70M, 95M, 96, 97M, 100 at Village Chhajarsi, Distt Dadri, Gautam Buddha Nagar, Uttar Pradesh. The location coordinate of project site are 28° 38' 15.53"N, 77° 23' 13.53" E.

Table-2: Site and Surrounding of the project Site

S. No. Particulars Details 1. Nearest National Highway NH 24: 0.32 Km/SE NH 91: 4.44 km/NE NH 58: 4.51 km/NE 2. Nearest Railway Station Ghaziabad Railway Station: 4.24 Km/NE 3. Nearest Airport Indira Gandhi International Airport: 27.14 km/SW Hindon Airbase: 7.85 km/NW 4. Nearest Town/ City Ghaziabad 5. River Body Hindon: 0.20 Km/NE 6. Hills/ Valleys Not within 10 km from the project site 7. Site Topography Plain 8. Archaeologically Important Site Nil 9. National Parks/ Wildlife Okhla Bird Sanctuary- 11.29 Km/SW Sanctuaries (Not within 10 KM from the project site) 10. State Boundary Delhi UP Border: 4.89 km/SW 11. Seismicity The study area falls under Seismic Zone-IV

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

5.0 OCCUPANCY DETAILS

The total population of the project will be approx. 2828 persons including 2260 residents, 568 floating. Details of population are given below in Table -3.

Table -3 Population Detail

TOTAL DU'S POP/DU RESIDENTIAL POPULATION SALEABLE DU'S 376 5 1880 ES & LIG UNITS 76 5 380

TOTAL 2260 NON RESIDENTIAL COMMUNITY HALL/COMMERCIAL Area (Employees etc. ) COMMERCIAL/CONVT SHOPPING 150.00 L.S. 15 COMMUNITY HALL/CLUB 356.91 L.S. 7 SCHOOL 494.38 L.S. 124 FACILITY MANAGEMENT STAFF L.S. 43

TOTAL 189 VISITORS RESIDENTIAL 226 COMMERCIAL, COMMUNITY HALL 153 TOTAL VISITORS 379 TOTAL POPULATION 2828

6.0 WATER DEMAND

6.1 Water supply & source The water supply for the residential project during operation phase will be sourced from water supply department of Ghaziabad Municipal Corporation. The total water demand is approximately 224 KLD. After recycling and reuse of 65 KLD treated water, the net fresh water requirement will be 159 KLD. Details of daily water requirement, waste water generation & reuse of treated water are given below in Table 4 and water balance diagram is given in Figure-5. below.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

Table 4: Calculations for Daily Water Demand for the Project

TOTAL POPULATION/ RATE IN QTY IN AREA/UNIT LTS KL RESIDENTIAL DOMESTIC 2260 65 146.90 FLUSHING 2260 21 47.46

NON RESIDENTIAL (Working) DOMESTIC 189 25 4.72 FLUSHING 189 20 3.77

VISITORS DOMESTIC 379 5 1.90 FLUSHING 379 10 3.79

TOTAL POPULATION 2828 Area in sqm GARDENING 3570 1 3.57 KVA D G COOLING 1760 0.9 6.34

SWIMMING POOL/WATER BODY 1 6 TOTAL WATER REQUIREMENT 224.45

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

Fig 5: Water Balance Diagram for the Project

7.0 SEWAGE GENERATION

Construction phase: Quantity of sewage generated during the construction phase will be negligible and proper management will be done by providing mobile toilets. Septic tank & soak pit will be provided on site for treatment.

Operational Phase: Sewage generated during operation phase would be approx. 178 KLD. Excess treated water of 77 KLD of waste water will be discharged into public sewer after getting prior permission.

8.0 WASTE GENERATION, COLLECTION, TRANSPORT AND DISPOSAL

Solid waste would be generated both during the construction as well as during the operation phase. The solid waste expected to be generated during the construction phase will comprise of excavated materials, used bags, bricks, concrete, MS roads, tiles, wood etc. The following steps are to be followed for the management solid waste:

 Construction yards are used for storage of construction materials.  The excavated material such as topsoil and stones will be stacked for reuse during later stages of development.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

 Excavated top soil will be stored in temporary constructed soil bank and will be reused for landscaping of the Project.  Remaining soil will be utilized for back filling / road work /raising of site level at locations.

Waste generation during Operation Phase During operation phase solid waste would be generated from the project. The quantification of different type of waste likely to be generated are given below in table: 5 below

Table 5: Quantity of Waste Generation during operation phase

Total Waste Generation 1.22 TPD Organic Waste Generation 0.74 TPD E- Waste Generation 7.7 KG/Day Sludge Generation 118 KG/Day Hazardous Waste Generation (DG Waste Oil) 0.51 Lts/ Day

(Source: The solid waste generation has been calculated @ 0.5 kg per capita per day basis ad per guideline of (CPHEEO) manual.)

Following arrangements will be made at the site in accordance to Solid Waste (Management and Handling) Rules, 2000 and amended Rules, 2016.

 Collection and Segregation of waste

1. A door to door collection system will be adopted for collection of domestic waste in colored bins from household units. 2. Biodegradable & non biodegradable waste shall be separately collected to ensure segregation at source. 3. For community hall & commercial occupancy, adequate number of colored bins separate for Bio-degradable and Non Bio-degradable will be placed at planned location. 4. Litter bin will also be provided in open areas like parks etc.

Treatment of Bio-Degradable wastes Biodegradable /Organic Waste would be shall be treated on site OWC and will be used as manure.

Non Biodegradable waste Recyclables, such as plastic, rubber, wood pieces, glass etc will be segregated from non biodegradable waste & sold to authorize vendors for recycling & remaining inert waste shall be sent to land fill site through authorized vendor as per the guidelines of Solid Wastes (Management and Handling) Rules, 2016 STP sludge will also be used for horticultural purposes as manure.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

9.0 POWER REQUIREMENT DETAILS

The power supply shall be supplied by Uttar Pradesh Power Corporation Ltd (UPPCL) the estimated electrical demand load & proposed power back to be used during power failure shall be as per details given in Table:6 below.

Table: 6 Power & DG detail

ELECTRICAL LOAD & DG BACK UP` ELECTRICAL - DEMAND LOAD 3187 KW POWER BACK UP - DG SETS 1760 KVA DETAILS OF DG SETS 1 X 750 + 1 X 1010 DG STACK HEIGHT AS/CPCB NORMS

9.1 BACKUP POWER DETAILS

There is provision of 1760 KVA DG sets for power back up in the Project. The DG sets will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion.

Energy Conservation Measures: The energy conservation measures shall be taken as per ECBC norms

10.0 STORM WATER DRAINAGE & RAIN WATER HARVESTING SYSTEM

A network of covered/underground storm water drain will be developed to collect rain water runoff from roof tops. Strom water would be channelized to rain water harvesting structure designed to charge the rain water to ground water aquifer.

The storm water will pass through the desilting chamber/oil& grease separator before finally discharging to percolation tank. Design details of Rain Water Harvesting structure are given in the table 7 & Figure 8 below

Table 7: RAIN WATER HARVESTING STRUCTURE/PIT

OTHER ROOF ROAD/PAVEMENT/PARKING PARTICULARS OPEN GREEN TOP AREAS AREAS AREA AREA Area (Sq.m.) 8391.7 8047 3570 3785.2 Runoff coefficient 0.3 0.8 0.15 0.9 Peak Hour Rainfall (m) 0.045 0.045 0.045 0.045 Volume of one hour 113.29 289.70 24.10 153.30 Rainfall 15 Minutes Volume 28 72.4 6.02 38.32 Total 15 Minutes 145.10 Volume ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

Volume of one 25 recharge Pit No. of recharge pits 5.8 required Proposed no. of 6 recharge pits

Total of 06 Rain Water Harvesting pits are planed rain water recharge within the project premises.

25

Figure-6: A typical Recharge pit

11.0 LANDSCAPE DEVELOPMENT

Total green area measures 3570 m2 i.e. 15.01% of the total plot area. Green Area will be utilized for peripheral tree plantation, road side plantation & for plantation of shrubs, lawn, and ground cover. For tree plantation preference will be given to local

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

tree with large leafs & dense foliage for shading & reduction of air & noise pollution. The plant species would be selected from the list given below:

THE LIST OF PLANT SPECIES LIKELY TO BE PLANTED

SN Botanical Name Common Name 1 Ficus Infectoria Pakur 2 Delonix regia Gulmohur 3 Cassia fistula Amaltas 4 Azadirachtha Indica Neem 5 Peltophorum ferrugineum Copper pod 6 Ficus retusa Usha 7 Alstonia Scholaris Scholar tree 8 Thespesia populnea Paras Pipal 9 Churasia tabularis Chukrasia 10 Anthocephalus cadamba Kadamba 11 Jacaranda mimosifolia Jacaranda 12 Mimusops Elengi Maulsari 13 Plumeria alba Temple tree 14 Terminalia arjuna Arjuna 15 Bauhinea Variegata Kachnar 16 Sarca indica Ashoka 17 Silver oak Grevillea Robusta 18 Semal Bombax Ceiba 19 Pilkhan Ficus

12.0 PARKING FACILITIES

For smooth circulation of vehicles & reduction of pollution separate entry & exits with gates of adequate sizes are planned. Provision for car/vehicle parking is planned in the surface, stilt, podium & basements. Apart from peripheral roads for vehicular movement internal roads/pavements are planned for traffic free movement of pedestrians. Details of parking provision are given in table: 8

Table-8: Parking Details

Total Parking Required as / Building Bye Laws 414 ECS Proposed Total Parking 1252 ECS Parking on Surface 248 ECS Stilt Parking & Podium Parking 86 ECS Parking in Basements 918 ECS

13.0 Risk and Hazards

13.1 Seismicity

Based on the tectonic features and records of earthquake, a Seismic Zoning map has been developed for the country by Bureau of Indian Standard (BIS). The project

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

site falls in Seismic Zone-IV. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structures. The structural design shall be vetted by the agency nominated by local body. Earthquake resistant construction techniques will also be used.

13.2 Fire Safety

 Fire Fighting Designed: As per National Building Code 2016  Provision fire detection, alarm & rescue system.  Provision of infrastructure required for suppression of fire as per norms.  Provision of Fire Extinguishers, Fire Hose Cabinet, Internal & External hydrant, Fire sprinkler system in basements & residential towers are planned as per applicable codes & norms of local fire department.  Approval of project from Fire Department shall be obtained.

14.0 ENVIRONMENTAL POLLUTION MITIGATION MEASURES

14.1 Air Pollution

Increased traffic generation due to project Nos. 1252 of parking space proposed for the project is not going to cause significant increase in atmospheric concentration of gases and will not result in heat island formation as adequate landscaping has been provided.

Mitigation Measures for Air Pollution during Construction Stage Air quality around the project site will be impacted during construction stage. Various construction activities especially related to handling of loose material are likely to generate fugitive dust that will affect the air quality of the surrounding area of the project site. To minimize such impacts following measures has been proposed:

. All the loose material either stacked or transported will be provided with suitable covering such as tarpaulin, etc. . Water sprinkling shall be done at the locations where dust generation is anticipated. . To minimize the occupational health hazard, proper personal protective gears i.e. mask shall be provided to the workers who are engaged in dust generation activity.

Mitigation Measures for Air Pollution during Operational Stage Operation of DG Sets is the only source of air pollution during operational phase. Stack height (as per CPCB norms) will be provided for proper dispersion of pollutants. Also, it is proposed to minimize air pollution by providing plantation as buffer on the periphery of the project site and on the open spaces. An area of 3570 m2 i.e. 15.01% of the total area has been kept for green development & plantation purposes.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

14.2 Water Pollution

The source of water pollution during construction and operation phase is due to waste water generated from toilets and washing.

14.3 Noise Environment

It is envisaged that within the Group Housing complex there shall be maximum movement of light motor vehicles like cars and 2-wheelers which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the sides of internal roads, on the open spaces inside and around the periphery of whole complex. Proper maintenance of the internal roads will also be carried out and Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities. DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits.

Mitigation Measures for Noise Pollution during Construction Stage During the construction stage, expected noise levels shall be in the range of 80-85 dB (A) which will decrease with increase in distance as per the Inverse Square Law. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver’s end. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimize such impact.

Mitigation Measures for Noise Pollution during Operation Stage It is envisaged that there shall be maximum movement of light motor vehicles like cars and 2-wheelers which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the open spaces and around the periphery of whole complex. Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities. DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits.

15.0 CONSTRUCTION MATERIALS The following construction materials are required for residential construction;

1. Coarse sand 11. P.V.C. conduit 2. Fine sand 12. MCBs/DBs 3. Stone aggregate 13. Overhead water tanks 4. Cement 14. Pavors 5. Fly Ash 15. Conc, CI, GI, CPVC, UPVC pipes 6. Reinforcement steel 16. Sanitary fittings & fixtures 7. Plywood & steel shuttering 17. Stainless steel sink 8. Pipe scaffolding (cup lock system) 18. Glass 9. Bricks 19. Joinery hardware 10. Marble/vitrified/ceramic floor & wall tiles 20. Aluminium Frames 21. Electrical equipments, fittings & fixtures.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

Environment Clearance for Proposed Group Housing CONCEPTUAL PLAN Project on Khasra No. 68/1, 68/2, 69, 70M, 95M, 96, M/s Ramprastha NXT Projects Pvt. Ltd. 97M, 100 at Village Chhajarsi, Tehsil-Dadri, Distt. Gautambudhnagar, Uttar Pradesh

16.0 LIST OF MACHINERY USED DURING CONSTRUCTION (i) Dumper (ii) Concrete mixer with hopper (iii) Excavator (iv)Concrete Batching Plant (v) Cranes (vi) Road roller (vii Bulldozer (viii) Tower Cranes (ix) Hoist (x) Labor Lifts (xi) Concrete pressure pumps (xii) Mobile transit mixer

17.0 PROJECTCOST The total construction cost of the Group Housing project is approximately Rs 122 Crore.

ITHC/PRJ/19-20/EIA/220/REV.01 IND TECH HOUSE CONSULT

PROJECT SITE LOCATION ON GOOGLE EARTH

SECTOR 16 PREM NAGAR HINDON RIVER GHAZIABAD RAILWAY STATION DRAIN PROJECT SITE AHINSA KHAND-1 CANAL SANDEEP GB NAGAR TOWARDS NEW DELHI NH-24 ENCLAVE

RASOOLPUR NAWADA PRATAP CHAUTPUR VIHAR SECTOR 4

Project site Coordinate 28°38’15.53” N, 77°23’13.53” E Project Site Road River/Drain 3 KM Railway line 500 METER BUFFER MAP ON GOOGLE EARTH

PROJECT SITE

HINDON RIVER S. NO. COORDINATE A B A 28°38’17.98” N, 77°23’16.66” E C B 28°38’17.33” N, 77°23’16.86” E C 28°38’17.70” N, 77°23’17.96” E D 28°38’15.39” N, 77°23’19.10” E E 28°38’12.31” N, 77°23’09.28” E D F 28°38’14.36” N, 77°23’08.64” E G 28°38’15.65” N, 77°23’09.71” E E

DRAIN

WATER BALANCE DIAGRAM

Residential Fresh : 146 KLD Waste Water : 117 KLD

Residential Flushing : 47 KLD Waste Water : 47 KLD Total Waste Non Residential Fresh : 5 KLD Waste Water : 4 KLD water : 178 Total Water KLD Demand of project : 224 Non Residential Flushing: 4 Waste Water : 4 KLD KLD KLD Proposed Visitors Fresh : 2 KLD Waste Water : 1.6 KLD STP : 215 KLD Total Fresh Treated Visitors Flushing: 4 KLD Waste Water : 4 KLD Water water reuse : Demand: Treated Water 65 KLD 159 KLD D.G Cooling : 6 KLD : 142 KLD Recycled Treated Waste Gardening: 4 KLD water : 65 KLD

Swimming Pool : 6 KLD

Surplus treated water : 77 KLD discharged into public sewer with prior permission