National Roads Authority Plot 3-5 New Portbell Road Nakawa UAP Business Park P.O. Box 28487, Kampala Uganda

PROGRESS OF WORKS: UPGRADING AND REHABILITATION ROAD PROJECTS (APRIL, 2021).

ROADS UNDER CONSTRUCTION / UPGRADING Length S/N Road Length (Km) S/N Project Funder Progress (Km) Length 8. Busia Town Roads 4.89 S/N Project Funder Progress Mobilization & Detailed (Km) 26. Najjanankumbi – Busabala GOU 11 Design Ongoing. 9. Mayuge Town Roads 12.97 1. Kampala Northern Bypass EU/EIB/ GOU 17.5 89.0% Camp Establishment & 10. Katakwi Town Roads 7 27. Moroto- Lokitanyala GOU 42 Kanoni – Sembabule and Mobilization Ongoing 11. Soroti Town Roads 12 2. GOU 110 Substantially completed Sembabule – Villa Maria 12. Kapchorwa, Kween and Bukwo Town Roads 20 ROADS UNDER REHABILITATION 13. Masaka Town Roads 7.3 3. Musita-Lumino/Busia-Majanji GOU 104 Substantially completed Length 14. Mityana Town Roads 14 S/N Project Funder Progress (Km) 4. Bulima – Kabwoya AfDB/DFID/GoU 66 Substantially completed BRIDGES UNDER CONSTRUCTION Namunsi – Sironko – Muyembe / 5. Kyenjojo – Kabwoya IDA/GoU 100 92% 1. Kapchorwa (Phase II -Kaserem- 36 66% No of GOU S/N Project Name Supervision Progress 6. Mubende – Kakumiro – Kagadi road GOU 107 Substantially completed Kapchorwa) Bridges BADEA, OFID 2. Nakalama – Tirinyi – road GOU 102 Substantially Completed Mpanga-6, Mpondwe, Nsongi, Ruzairwe, 96% 7. Masaka-Bukakata road 41 89.66% 1 5 In-house & GOU Completed, under Defects Waiga, Bridges in Western Uganda Substantially Completed 3. Kyenjojo – Fort Portal GOU 500 8. Rukungiri-Kihihi-Ishasha/Kanungu ADB/GOU 78.5 41.16% Liability Period Odroo, Ayugi, Wariki, Ceri, Adidi, Opio 97% 4. Fort Portal – Hima Road GOU 55 97% 2 6 In-house Completed, under Defects in West Nile 9. Bumbobi – Lwakhakha ADB/GOU 44.5 Hima – Katunguru (Section I Substantially Completed Liability Period 5. GOU 28 Substantially Completed -Katunguru-Muhokya) Ajeleik Box Culvert Bridge in Eastern 10. Soroti-Katakwi-Akisim GOU 100 Substantially completed 3 1 In-house 52% 6. Ishaka – Katunguru GOU 58 Substantially Completed Uganda 11. Akisim-Moroto Road GOU 50.3 Substantially completed 98% Rehabilitation Design 4 Aji and Ora Bridges in Okollo District 2 In-house Tororo – Mbale – Soroti (Output and 12. Tirinyi –Pallisa-Kumi IDB/GOU 67 93% 7. WB/ GOU 150.8 Completed, awaiting Substantially Completed Performance Based Road Contract) stakeholder’s approval 13.. Pallisa- IDB/GOU 44 98% 5 Enyau Bridge in Arua District 1 In-house Substantially Completed Soroti – Dokolo – Lira – Kamdini Rehabilitation Design Masindi Park Junction and Tangi Kampala Flyover Construction and Road 8. (Output and Performance Based Road WB/ GOU 189.4 Completed, awaiting 6 1 Consultant 16.33% 14. Junction-Para-Bulisa Roads – Exim Bank/GOU 159 73.50% Contract) stakeholder’s approval Upgrading Project (KFCRUP) Phase 1 (Critical Oil Road Package 1) 9. Buddo and Nabingo Access Roads GOU 5.5km Substantially Completed Chololo, Sironko and Kibimba Bridges in Hoima-Butiaba-Wanseko– (Critical GOU/EXIM 7 3 In-house 32.27% 15. 111 79.90% Eastern Uganda Oil Road Package 2) Bank of China Works commenced on 10. Mityana-Mubende GOU 86 15th April Ora 1, Ora 2, Awa and Olemika Bridges Buhimba-Nalweyo-Bulamagi & 8 4 In house 93.53% 16. Bulamagi-Igayaza-Kakumiro – Exim Bank/GoU 93 57.40% in West Nile (Critical Oil Road Package 3) 9 Alla, Gazi and Aca Bridges in West Nile 3 In house 25.8% TOWN ROADS UNDER CONSTRUCTION 10 Jure and Amua in West Nile 2 In house 37.24% Masindi-Biiso, Hohwa-Nyairongo- S/N Road Length (Km) Kyarusheesha-Butoole, And 11 Kagandi and Dungulwa in Western Uganda 2 In House Substantially Completed 17. Kabaale-Kiziranfumbi Roads Exim Bank/GoU 97 30.31% 1. Mpigi Town Roads 20 Upgrading Project 97.5% Substantially 2. Sironko Town Roads 4.9 12 Awoo in Northern Uganda 1 In house (Critical oil Road Package 5) Completed 3. Mbarara Town Roads 20.2 13 Nariamabune in Karamoja 1 In house Substantially Completed 18. Kitala-Garuga-Gerenge GOU 10 82% 4. Anaka Town roads 7 5. Mubende, Kakumiro, Kibale and Kagadi Town Roads 15.84 ADF, DFID and Isimba Bridge connecting Kayunga and Completed, under 19. Kigumba-Bulima 69 83% 14 1 In house GOU 6. Nabumali, Manafwa and Lwakhakha Town roads 4 Kamuli districts Defects Liability Period 20. Kapchorwa-Suam ADB/ ADF/ GOU 73 36.24% 7. Bugiri and Namayingo Town Roads 1.64 21. Busega-Mpigi Expressway AFDB 23.7 1.79% 15 Lugogo Swamp Crossing 1 In house 6% Emergency Repair of Kazinga Channel 22. Muyembe-Nakapiripirit IsDB/ GOU 92 2.5% 16 1 In house Mobilisation Ongoing Bridge 23. Atiak-Laropi EU/ GOU 66 20.13% For more Information: Please call our Toll Free Lines: 0800100811 and 0800100812 24. Rwenkunye-Apac-Lira-Puranga IsDB & GOU 191 Bush Clearing and Grubbing Total No. of Bridges 35 @UNRA_UG Uganda National Roads Authority 0714651187 Mobilization & Detailed www.unra.go.ug 25. Kiira-Matugga GOU 16 Design Ongoing UNRA, Connecting Uganda!