Power Generation

Year Country Owner Main Features Completed Abu Quir – WDEPC Abu Quir Thermal Power Plant 2×650 MW 2012 1- Steam Turbine CP-106 El-Nubaria – Egypt WDEPC El-Nubaria III Combined Cycle 1×750 MW 2010 1- Steam Turbine 1*250 MW CP-106 2- Mechanical Package CP-118 El-Kureimat – Egypt NUEEPC El-Kureimat III Combined Cycle 1×750 MW 2010 1- Steam Turbine 1*250 MW CP-106 2- BOP-of HRSG CP-105 El-Atf – Egypt MDEPC El-Atf Combined Cycle 1×750 MW 2010 1- Mechanical Package CP-118 2- Electrical Package CP-117

El-Tebbin - Egypt CEPC El-Tebbin Thermal Power Plant 2×350 MW 2010 1- Steam Turbine CP-106 2- Mechanical Package CP-118 3- Electrical Package CP-117

El-Atf - Egypt MDEPC El-Atf 2×250 MW CP 101 combined cycle 2009 Sidi Krir - Egypt WDEPC Sidi Krir 2×250 MW CP 101 combined cycle 2009 El Kureimat - Egypt NUEEPC El Kureimat II-Combined Cycle 1*750 M.W 2008 Talkha – Egypt EDEPC New Talkha-Combined Cycle 1*750 M.W 2008 Talkha – Egypt EDEPC New Talkha-Combined Cycle 1*750 M.W 2008 North - Egypt CEPC Cairo North II-Combined Cycle 1*750 M.W 2007 Nubaria -Egypt WDEPC Nubaria I,II-Combined Cycle 2*750 M.W 2006 Nubaria -Egypt WDEPC Nubaria I,II-Combined Cycle 2*750 M.W 2006 Nubaria -Egypt WDEPC Nubaria I,II-Combined Cycle 2*750 M.W 2006 Cairo North –Egypt CEPC Cairo North I-Combined Cycle 1*750 M.W 2005 Oman, Al Kamil International Al Kamil Gas Turbine Power Plant (3X 92)MW 2004 Power Company - Egypt Intergen / Sidi Krir Power Station 1& 2, 3&4, 5 & 6 combined 2003 Bechtel cycle

Page 1

Year Country Owner Main Features Completed Toshkey-Egypt EEA Pumping Stations 2003 Tunisia Carthage power Radis Combined cycle Power Plant 2002 Company “Ltd” ( Capacity 470 MW ) (CPC) Gulf Egypt EEA Ayoun Moussa Power Station 1999 Alex-Egypt EEA Gas Turbine Power Station 2x320 MW 1999 Suez Gulf Egypt EEA Ayoun Moussa Power Station 1999 Quena-Egypt EEA Sub Stations 220kV X 66 X 11 1999 2X75 CONV. Abou Soltan-Egypt EEA 34 km combined cycle 1998 Edfo-Egypt EEA Sub Stations 220kV X 66 X 11 1996 Extension to Boilers in Edfo Sugar Factories Al-Kuraiemat EEA Thermal Power 2X600 ME 1995 Egypt Cairo- Egypt EEA Thermal Power 8X30 MW Power Plant 1994 Damanhour-Egypt EEA Thermal Power 4X30 MW 1994 Al-- Egypt EEA Thermal Power Unit 1&2 1994 El-Omaied-Egypt EEA Sub Stations 220kV X 66 X 11 1994 2X75 CONV. -Egypt EEA Sub Stations 220kV X 66 X 11 1994 2X75 CONV. Al-Arish-Egypt EEA Thermal Power 2X30 MW 1993 Talkha -Egypt EEA Thermal Power 1X220 MW 1993 Cairo-Egypt EEA Thermal Power 2X300 MW 1992 Beni-Suef- Egypt EEA Thermal Power Unit 1,2,3,4,5 1992 Abu-Qir, Alex. EEA Thermal Power Boiler Replacement 1992 Egypt El-Negeah Marsa EEA Thermal Power Foundation for 220 KG Towers 1992 Egypt Talkha - Egypt EEA Thermal Power Boiler 140 ST. Ton/Hr 1992

Page 2

Year Country Owner Main Features Completed Three Units 3X30 MW Kafr El-Dawar EEA Power Station Unit 1,2,3X110 1992 Egypt El-Kousir-Egypt EEA Diesel Generation Plants 3X600 kW 1992 Dekhila-Egypt EEA Sub Stations 220kV X 66 X 11 1992 2X125 GIS Marsa Matrouh EEA Sub Stations 220kV X 66 X 11 1992 Egypt 2X75 CONV. - Egypt EEA 3X145 MW Combined Cycle 1991 El-Siof- Alex. EEA Boiler 140 ST. Ton/Hr 1991 Egypt Five Units 5X30 MW Taba-Egypt EEA Diesel Generation Plants 3X600 kW 1991 Siwa-Egypt EEA Diesel Generation Plants 4X600 kW 1990 Sidi Barani-Egypt EEA Diesel Generation Plants 4X600 kW 1990 El-Salloum-Egypt EEA Diesel Generation Plants 4X600 kW 1990 Abu Simbul Egypt EEA Diesel Generation Plants 3X600 kW 1990 Alexandria-Egypt EEA Thermal Power 325 MW Abu-Quir- Unit5 1989 Talkha-Egypt EEA Thermal Power Unit 1,2,3 1989 Ghazala EEA Boiler 65 ST. Ton/Hr 1989 Egypt 2 Units 2X60 MW Marina El-Alamin EEA Gas Turbine Power Station 2X20 MW 1989 Egypt Marsa Matrouh EEA Gas Turbine Power Station 2X15 MW 1989 Egypt Talkha - Egypt EEA Thermal Power 1X220 MW 1988 Talkha- Unit1 Abu-Qir- Alex. EEA 1X250 MWUnit1 1984 Egypt Kafr El-Dawar Egypt EEA Thermal Power 1X110 MW 1981 Kafr El-Dawar – Unit3 Alexandria-Egypt EEA Thermal Power 1x110 MW 1981 Kafr El-Dawar- Unit4 EEA Gas Turbine Power Station 2X20 MW – 2 Units 1981 Egypt

Page 3

Year Country Owner Main Features Completed El-Iwmaila-Egypt EEA Sub Stations 220kV X 66 X 11 1981 2X75 CONV. Cairo North-Egypt EEA Gas Turbine Power Station 1X20 MW 1980 Karmoz-Cairo EEA Gas Turbine Power Station 2X12,5 MW 1980 Egypt Al-Siouf- Alex. EEA Gas Turbine Power Station 1X25 MW 1980 Egypt Heliopolis EEA Gas Turbine Power Station 3X12.5 MW 1980 Egypt Cairo East-Egypt EEA Gas Turbine Power Station 2X20 MW 1979 El-Fayoum-Egypt EEA Sub Stations 220kV X 66 X 11 1979 3X125 QIS Cairo East-Egypt EEA Sub Stations 220kV X 66 X 11 1978 3X75 CONV. Ismalia -Egypt EEA Gas Turbine Power Station 1X20 MW 1977 El-Tebbin-Egypt EEA Sub Stations 220kV X 66 X 11 1977 2X125 CONV. Suez Gulf EEA Gas Turbine Power Station ST. 1X15 MW 1976 Egypt Alexandria - Egypt EEA Thermal Power Boiler Unit 57 1975 ST. Ton/Hr-El-Tebin Alexandria-Egypt Egyptian Thermal Power 1X110 MW 1973 Electricity Kafr El Dawar Unit 1&2 Authority (EEA) Cairo- Egypt EEA Thermal Power 1X87.5 MW 1973 Cairo West- Unit 4

Page 4

Overhead Transmission Lines Year Country Owner Main Features Completed Cairo North-Egypt EEA Overhead Transmission Lines 220 kV 64 km 1992 Borg El-Arab-Egypt EEA Overhead Transmission Lines 220 kV 37 km 1991 Marsa Matrouh EEA Overhead Transmission Lines 220 kV 150 km 1991 Egypt Nag Hamadi-Egypt EEA Overhead Transmission Lines 220 kV 100 km- Abu 1990 Tartour El-Mahmoudia EEA Overhead Transmission Lines 220 kV 60 km 1989 Egypt El-Mahala-Egypt EEA Overhead Transmission Lines 220 kV 35 km 1989 -Egypt EEA High Voltage Cables 220,66 kV 16 km 1986 Suez Ataka-Egypt EEA Overhead Transmission Lines 220 kV 65 km 1985 Cairo East-Egypt EEA High Voltage Cables 220,66 kV 32 km 1985 Port-Said-Egypt EEA High Voltage Cables 220,66 kV 18 km 1985 Giza-Egypt EEA High Voltage Cables 220,66 kV 33 km 1984 Talkha -Egypt EEA Overhead Transmission Lines 220 kV 65 km 1982 El-Amria-Free Zone- EEA High Voltage Cables 220,66 kV 11.5 km 1982 Egypt Cairo North-Egypt EEA High Voltage Cables 220,66 kV 2X7.5 km 1981 Heliopolis-Egypt EEA High Voltage Cables 220,66 kV 14 km 1980 El-Amria-Egypt EEA High Voltage Cables 220,66 kV 15 km 1980

Page 5