Phase Wise Polling Station and Elector
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
W.B.C.S.(Exe.) Officers of West Bengal Cadre
W.B.C.S.(EXE.) OFFICERS OF WEST BENGAL CADRE Sl Name/Idcode Batch Present Posting Posting Address Mobile/Email No. 1 ARUN KUMAR 1985 COMPULSORY WAITING NABANNA ,SARAT CHATTERJEE 9432877230 SINGH PERSONNEL AND ROAD ,SHIBPUR, (CS1985028 ) ADMINISTRATIVE REFORMS & HOWRAH-711102 Dob- 14-01-1962 E-GOVERNANCE DEPTT. 2 SUVENDU GHOSH 1990 ADDITIONAL DIRECTOR B 18/204, A-B CONNECTOR, +918902267252 (CS1990027 ) B.R.A.I.P.R.D. (TRAINING) KALYANI ,NADIA, WEST suvendughoshsiprd Dob- 21-06-1960 BENGAL 741251 ,PHONE:033 2582 @gmail.com 8161 3 NAMITA ROY 1990 JT. SECY & EX. OFFICIO NABANNA ,14TH FLOOR, 325, +919433746563 MALLICK DIRECTOR SARAT CHATTERJEE (CS1990036 ) INFORMATION & CULTURAL ROAD,HOWRAH-711102 Dob- 28-09-1961 AFFAIRS DEPTT. ,PHONE:2214- 5555,2214-3101 4 MD. ABDUL GANI 1991 SPECIAL SECRETARY MAYUKH BHAVAN, 4TH FLOOR, +919836041082 (CS1991051 ) SUNDARBAN AFFAIRS DEPTT. BIDHANNAGAR, mdabdulgani61@gm Dob- 08-02-1961 KOLKATA-700091 ,PHONE: ail.com 033-2337-3544 5 PARTHA SARATHI 1991 ASSISTANT COMMISSIONER COURT BUILDING, MATHER 9434212636 BANERJEE BURDWAN DIVISION DHAR, GHATAKPARA, (CS1991054 ) CHINSURAH TALUK, HOOGHLY, Dob- 12-01-1964 ,WEST BENGAL 712101 ,PHONE: 033 2680 2170 6 ABHIJIT 1991 EXECUTIVE DIRECTOR SHILPA BHAWAN,28,3, PODDAR 9874047447 MUKHOPADHYAY WBSIDC COURT, TIRETTI, KOLKATA, ontaranga.abhijit@g (CS1991058 ) WEST BENGAL 700012 mail.com Dob- 24-12-1963 7 SUJAY SARKAR 1991 DIRECTOR (HR) BIDYUT UNNAYAN BHAVAN 9434961715 (CS1991059 ) WBSEDCL ,3/C BLOCK -LA SECTOR III sujay_piyal@rediff Dob- 22-12-1968 ,SALT LAKE CITY KOL-98, PH- mail.com 23591917 8 LALITA 1991 SECRETARY KHADYA BHAWAN COMPLEX 9433273656 AGARWALA WEST BENGAL INFORMATION ,11A, MIRZA GHALIB ST. agarwalalalita@gma (CS1991060 ) COMMISSION JANBAZAR, TALTALA, il.com Dob- 10-10-1967 KOLKATA-700135 9 MD. -
Government of West-Bengal Office of the Assistant Engineer, RWS
Government of West-Bengal Office of the Assistant Engineer, RWS Howrah Sub Division, Public Health Engineering Directorate 254, Panchanantala Road Howrah-1 Memo No 346/R.W.S Dated the Howrah 06.07.2015 NOTICE INVITING TENDER NO:-02/R.W.S./2015-2016 Scaled Tenders are hereby invited by the Assistant Engineer,RWS Howrah Sub-Division,PHEDte from the Bonafied working contractor of PHE Dte .The work mention here under by filing the rates in enclosed schedule Last date of application 04.08.2015 up to 2.00 p.m. at the office of the AE RWS Howrah sub Divn .PHE Dte. Date of permission 04.08.2015 After 3.30 p.m. at the office of the AE RWS Howrah sub Divn. PHE Dte. Date of purchase of Tender 05.08.2015 Up to 3.30 p.m.from the office of the EE paper Howrah Divn. PHE Dte. Date of dropping of Tender 07.08.2015 Up to 2.00 p.m. in the office of the AE RWS paper Howrah sub-Divn. PHE Dte. Date&time of opening of 07.08.2015 at 3.00 p.m. in the office of the AE RWS Tender paper. Howrah Sub Divn. PHE Dte. Sl. Name of Work Estimated Cost Earnest Date of Reserved for No. Money completion 1. Road Crossing, Culvert Rs.85,595/- Bonafied crossing, Canal crossing and 2% of 21 days working other ancilary works at Estimated Contractor different position in LDS cost as of PHE Dte. System for Sahapur and applicable having adjoingmouzas at Panchla credential Block under Howrah of same Division,PHEDte. -
Howrah, West Bengal
Howrah, West Bengal 1 Contents Sl. No. Page No. 1. Foreword ………………………………………………………………………………………….. 4 2. District overview ……………………………………………………………………………… 5-16 3. Hazard , Vulnerability & Capacity Analysis a) Seasonality of identified hazards ………………………………………………… 18 b) Prevalent hazards ……………………………………………………………………….. 19-20 c) Vulnerability concerns towards flooding ……………………………………. 20-21 d) List of Vulnerable Areas (Village wise) from Flood ……………………… 22-24 e) Map showing Flood prone areas of Howrah District ……………………. 26 f) Inundation Map for the year 2017 ……………………………………………….. 27 4. Institutional Arrangements a) Departments, Div. Commissioner & District Administration ……….. 29-31 b) Important contacts of Sub-division ………………………………………………. 32 c) Contact nos. of Block Dev. Officers ………………………………………………… 33 d) Disaster Management Set up and contact nos. of divers ………………… 34 e) Police Officials- Howrah Commissionerate …………………………………… 35-36 f) Police Officials –Superintendent of Police, Howrah(Rural) ………… 36-37 g) Contact nos. of M.L.As / M.P.s ………………………………………………………. 37 h) Contact nos. of office bearers of Howrah ZillapParishad ……………… 38 i) Contact nos. of State Level Nodal Officers …………………………………….. 38 j) Health & Family welfare ………………………………………………………………. 39-41 k) Agriculture …………………………………………………………………………………… 42 l) Irrigation-Control Room ………………………………………………………………. 43 5. Resource analysis a) Identification of Infrastructures on Highlands …………………………….. 45-46 b) Status report on Govt. aided Flood Shelters & Relief Godown………. 47 c) Map-showing Govt. aided Flood -
'10 9Fi~
Of~ DH FWS/HOW /2267 /17 ~: 08.09.2017 ~ ~ ~"15\!)t ~ ~ ~ ~ \Q~ ~q/o~/~o~~ ~ 9fi£r ~ HFWINRHM-20/2006/Part-III1631 \£l~ 15T~1"'l1~1 I5lt~l~ ~'8~ ~ ~ '8 @1f<1~~1 ~~t~l~ ~~ ~ ~ ~ ~~ ~ \£l~ I5Tl~ll"15~ ~~ @c:ttCAfJ~ \£l~ ~~ ~~ <1>1<1Pi"15l~~ W~ ~ C~ @'8> ~ ~ ~~~~~~I "h'l<1~ g ~) ~<1(;'j~I~ R<1I~\!) / ~ / I5Tll1l(;'j\!)"15'1"15~FQ.~(ft1 ~ ~ ~~(;'jl~ 15T1C<1I1"'l~ ~I ~) 15l'f~ W~ I5l<1A~ ~~~ ~ ~ <11~"'11~ ~I ~~I"'l~*9f ~ ~ \!)1M"15I I5lt>1IC~ w~ \5Bf EPIC '8 ~1"'l"1511$ \Q~ ~\!)J@\!) ~ ~ ~ ~ ~I~ <11>1-aJ"'l'>1M<1'¢"'lfl W~ ~ \!)I~ '>1M<1IC~~c<n9f ~ ~ ~ ~I e) Jfl~ W~ <IWf ~/~/~o~q ~ ~o C~ 80 ~ ~~ ~ ~I \!)~ ~/~~ ~~(;'jICI1~ ~ ~~ - 80 ~ ~I 8) W~ I5l<1A~ ~ <n >1~~(;'jj ~ 15l<1~;f ~ ~I ~~ <n >1~~(;'jj ~ W~ ~ ~ ~ ~I @tlj\!)~ ~~ c<n9fJ\5i mr W~ ~ ~ ~ ~ ~<ijJI~"'l <n RC<1[j"'lI~~ ~ onl c) ~ '8~ \£l~~ ~ ~ ~H~~C'}~ JfVfJUi, ~ W~ ~ \Q~~ ~~<p '8m<Pm9fr1~~~ ~~ "1~Jfl9fi£r~ ~ 15T$'~ f<k<1[j"'lI~c<n9fJ~I ~) >11<1C>14Jr~~ 'ri111"'l"15I~~1~>1~C~~(~~ BWu) ~oo~ ~ ~~ \!)~ ~9fiOf ~ \!)~ ~/~~ "1~Jfl9fi£r~ ~ ~~~,*C"'l~ ~ RC<1f5\!)~ (~~ C<f~~)1 q) 15T1C<1I1"'l"15JlVlfI~~ C<f~ ~~ ~\!)Jlrn\!) ~ ~ ~ ~ :- <p) \St;U\!)IMC~ "1~Jfl9fi£r<n ~~ <n >1~~(;'jJ ~ \!iU\SMG *1 ~) \Q~ <11~"'11~ ~ ~ 9fi£r (EPIC)/~l"'l"1511$1 9f) ~~ ~~ V1"8m ~~ ~9fi£r (\!)~ ~, ~~ '8 15l"'ll1"'ll GT;r~ ~~, ~~ ~ C<f~ ~)I '4) ~~ ~~ V1"8m ~ ~ '8 ~ ~HI$~ C9fI~~'8>>1I1>jJ/ ~ W~ ~ / ~~<p '8m<Pm ~I (~ ~)I @) W~ ~1,*~>1~ ~ <1Sf9r 9ftJfC9f11~; ~B Wil ~9ft£f ~~ ~~ C<f~ \£l~ 15T1C<1I1"'l~ JlVlf ~'8> "iff ~ 15T1C<1I1"'l9fi£r ~ ~ ~I ~~ '10 9fi~ I5l<1A~ <p) C~ @) ~ ~ ~~ ~ ~~I '0-) ~~ ~ ~~ W~ >11,*IC\!)~~ >11,*IC\!)~~, -
Route Chart in Connection with Election to the House of People from 3-Jalpaiguri (SC) Parlamentary Constituency-2019
Route Chart in Connection with Election to the House of People from 3-Jalpaiguri (SC) Parlamentary Constituency-2019 DISTANCE FROM DC/RC. TO No. & Name of Polling Station Description of Route Last point Type of Type of Sl. No AC No. Pucca Kuchha Total distance where Vehicle Sector No Vehicies Vehicies will stay 1 2 4 5 6 7 8 9 10 11 5 1 19 Starting from DCRC,Jalpaiguri proceed towards Gosala More to Rangdhamali to Balakoba Battale to Ambari Falakata to Gorar More via Sahudanghi Hut then . Turn right and proceeds to Eastern Bypass to Bhaktinagar P.S via Salugara Range Office, SMC dumping ground. 60x 2=120 19/01 Bhanu Bhakta Pry School Sumo From Bhaktinagar PS (Checkpost) N.H. -31 then 05 x 2=10Km 65 x 2=130 Km PS 1 Sumo Km Proceed to 8th Mile forest range office. Turn right forest Kuchha and proceed to Chamakdangi Polling Station and drop the Team at PS No 19/1 and Halt. next day after completion of poll the vehical will back to DCRC alongwith the same route with the team . Starting from DCRC,Jalpaiguri proceed towards Gosala More to Rangdhamali to Balakoba Battale to Ambari Falakata to Gorar More via Sahudanghi Hut then. Turn right and proceeds to Eastern Bypass to Bhaktinagar P.S via Salugara Range Office, SMC dumping ground. 19/02, 03, 04, 05 From Bhaktinagar PS (Checkpost) N.H. -31 and turn 52 x 2=104 2 19 Salugara High School Maxi taxi right then Proceed upto S.B.I. Salugara Branch near 0 52 x 2=104 Km PS Maxi taxi Km (1st, 2nd & 3rd, 4th Room) Salugara Bajar then turn Right and Proceed on Devi Choudharani road up to I.O.C. -
ANNEXURE – II Schedule for Holding General Election to The
ANNEXURE – II Schedule for holding General Election to the Legislative Assembly of West Bengal. st nd rd 4th Phase 5th Phase 6th Phase S. 1 Phase 2 Phase 3 Phase No. Poll Event (56 ACs) (62 ACs) (49 ACs) ( 53 ACs) ( 25 ACs) 1 (a) 1(b) (18 ACs) (31 ACs) 1. Issue of 11.03.2016 14.03.2016 22.03.2016 28.03.2016 01.04.2016 04.04.2016 11.04.2016 Notification (FRI) (MON) (TUE) (MON) (FRI) (MON) (MON) 2. Last date for 18.03.2016 21.03.2016 29.03.2016 04.04.2016 08.04.2016 11.04.2016 18.04.2016 making (FRI) (MON) (TUE) (MON) (FRI) (MON) (MON) Nominations 19.03.2016 22.03.2016 30.03.2016 05.04.2016 09.04.2016 12.04.2016 19.04.2016 3. Scrutiny of Nominations (SAT) (TUE) (WED) (TUE) (SAT) (TUE) (TUE) 21.03.2016 26.03.2016 01.04.2016 07.04.2016 11.04.2016 16.04.2016 21.04.2016 4. Last date for withdrawal (MON) (SAT) (FRI) (THU) (MON) (SAT) (THU) of candidature 04.04.2016 11.04.2016 17.04.2016 21.04.2016 25.04.2016 30.04.2016 05.05.2016 5. Date of Poll (MON) (MON) (SUN) (THU) (MON) (THU) (SAT) 19.05.2016 19.05.2016 19.05.2016 19.05.2016 19.05.2016 19.05.2016 19.05.2016 6. Counting of Votes (THU) (THU) (THU) (THU) (THU) (THU) (THU) 21.05.2016 21.05.2016 21.05.2016 21.05.2016 21.05.2016 21.05.2016 21.05.2016 7. -
Hazardous Waste Generating Units in West Bengal (2011
HAZARDOUS WASTE GENERATING UNITS IN WEST BENGAL (2011) [as per the Hazardous Waste (Management, Handling & Transboundary Movement) Rules, 2008] (Source: WBPCB Inventory) Quantity of HW in MTA Landfill SL Type & Quantity Disposal Name Of The Industry Address NO of Products / Landfill Inciner After ation Treatme nt DIST. Bankura 1 Damodar Valley Corporation- PO. MTPS, PS. Thermal Power Mejia Thermal Power Station. Gangajalghati, Plant PIN- 722183, Dist. Bankura (Electricity- 840 MW) 2 Exodus Knitwear (P) Ltd. Shyamsundarpur, PO. Dyeing & 4.20 Darika, Bleaching Bishnupur, Dist. Bankura (Knitted Fabric - 1192.92 MTA) 3 Lafarge India Pvt. Ltd. Mejia Cement Plant, Vill. Cement Amdanga, PO. MTPS(DVC), Manufacturing 4 Manaksia (Galv. Div.) PIN.Plot No.722183 471, Birsinghapur, PortlandGalvanizing Cement 4.50 (Formerly Hindustan Seals) PO. - 83330 MTA) & PS. Barjora-722202, (Galvanized Dist. Bankura Items-36000 Pcs/A) 5 Rishabh Sponge Ltd. Durgapur Bankura Main Metallurgical Road, PO. & PS. Barjora, PIN. (Sponge iron - 722202, Dist. Bankura 14400 MTA/Kiln) 6 Rohit Ferro Tech Pvt. Ltd. PO. Dwarika, P.S. Metallurgical 19,200. Bishnupur, (Ferro-alloys - 00 Dist. Bankura 57600 MTA) 7 Rohit Ferro Tech Pvt. Ltd. PO. Dwarika, P.S. Metallurgical 12,144. (Unit-II) Bishnupur, (Ferro-alloys - 00 Dist. Bankura, PIN. 722122 18000 MTA) Metallurgical 14,628. (Ferro-alloys - 00 12192MTA) DIST. Burdwan 1 Alloy Steel Plant Durgapur, Dist. Burdwan Metallurgical (Alloy Steel- 208149 MTA) 2 Alstom Projects Durgapur, Dist. Burdwan Engineering 0.20 India Ltd. (Steel (formerly Alstom Fabrication - Power Boilers Ltd.) 1500 MTA) 3 Associated Trade G. T. Road, PO. Ningha, PS. Oxyzen gas Link Jamuria, Asansol, PIN. filling & storing 713370 centre Dist. -
SASEC Road Connectivity Investment Program – Tranche 1
Social Safeguard Due Diligence Report July 2017 IND: SASEC Road Connectivity Investment Program – Tranche 1 Prepared by Ministry of Road Transport and Highways, Government of India for the Asian Development Bank. CURRENCY EQUIVALENTS (as of May 2017) Currency unit – Indian Rupee (Rs) INR1.00 = $ 0.01555 $1.00 = INR 64.32 ABBREVIATIONS ADB – Asian Development Bank BSR – Basic Schedule of Rates DC – District Collector DH – Displaced household DP – Displaced person EA – Executing Agency GRC – Grievance Redressal Committee IA – Implementing Agency IAY – Indira Awaas Yojana LA – Land acquisition LAA – Land Acquisition Act, 1894 L&LRO – Land and Land Revenue Office RFCT in LARR – The Right to Fair Compensation and Transparency in Land Act - 2013 Acquisition, Rehabilitation and Resettlement Act, 2013 LVC – Land Valuation Committee MORTH – Ministry of Road Transport and Highways NGO – Nongovernment organization NHA – National Highways Act, 1956 NRRP – National Rehabilitation and Resettlement Policy, 2007 PD – Project Director PIU – Project implementation unit MPWD – Manipur Public Works Department WBPWD – West Bengal Public Works (Roads) Department R&R – Resettlement and rehabilitation RF – Resettlement framework RO – Resettlement Officer ROW – Right-of-way RP – Resettlement plan SC – Scheduled caste SPS – Safeguard Policy Statement ST – Scheduled tribe NOTE In this report, "$" refers to US dollars. This social due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. -
(1) Hospital, Nursing Home & Day Cre Centre
(1) Hospital, Nursing home & Day Cre Centre (with indoor beds & /or diagnostic facility) AS ON 31/12/2010 Eye SL.N Type(N.Home,Polyclin Indoor Genera ICCU,IT Dialysi NICU/SI Patholo Surgur Polycli O Name of CE,Address & Phone NO. ic etc.) Bed l Bed U Bed s Bed CU Bed Day Care Bed X-Ray gy MRI CT USG y nic Name of Licensee 35 [Thirty 4 [Four] 1 Alpha Medical Services Pvt. Ltd. Nursing Home Yes five] beds Yes Yes Yes Yes DR. VIJAY KEJRIWAL 21/1, DOBSON ROAD, Howrah 15[fiftee 2 Apanjan Nursing Home Pvt. Ltd. Nursing Home Yes n] Yes Yes Yes Yes Somnath Chatterjee Howrah Amta Road, Makardaha,, Howrah 711409 3 APEX NURSING HOME Nursing Home Yes 10 SK. AFTAB RAHAMAN Bazarpara, Uluberia, Howrah 4 ARCADIA NURSING HOME Nursing Home Yes 5 [Five] DR AJIT KR. KAUNGO 100, D.P. SASMAL RD., Howrah 5 AROGYA Nursing Home Yes 4 [Four] SUDATTA SOM 205, M.BHATTACHARJEE RD., Howrah-4 6 AROGYA NIKETAN Nursing Home Yes 5 [Five] PRATIMA PAUL P.O. + VILL : DOMJUR, Howrah 7 ARTEMIS Nursing Home DR. MOUSUMI KHAN (DEY) Khan Industrial Estate, Makardh Rd., Shanpur, Howrah SUMIT RANJAN KANRAR [ Managing Director 8 ASHOKA POLYCLINIC & NURSING HOME PVT. LTD. Nursing Home Yes 10[Ten] Yes ] 20/1/1, MOTI GHOSH LANE, Howrah-711 101 20 [Twenty 9 ASTHA MEDICAL CENTRE - A unit of RASHRAJ PLAZA PVT. LTD. Nursing Home Yes ] beds Yes DR. ANIL KR. GUPTA 121/95/98, J.N.,MUKHERJEE GHOSH RD., GHUSURI, Howrah 10 BAGNAN J.N.S. -
266 CHAPTER 6 PROBLEMS of URBANIZATION in NORTH BENGAL 6.1 Introduction the Process of Urbanization in Developing Countries Is A
CHAPTER 6 PROBLEMS OF URBANIZATION IN NORTH BENGAL 6.1 Introduction The process of urbanization in developing countries is associated with their own problems. The problems range from proliferation of slums, drinking water problems, housing problems, sanitation problems and urban environmental problems and pollution. With rapid urbanization taking place in most of the districts of North Bengal, the urban centres of this region are facing their own problems which are quite similar to those being faced in other parts of the country. In this chapter the main objective will be to analyze the problems related to proportion of slum households, access to safe drinking water, availability of electricity facility, availability of latrine facility, availability of bathroom within house, availability of drainage facility and availability of separate kitchen within house. All these parameters will be analyzed for individual urban centres of North Bengal for 2001 and 2011 respectively. Moreover, their change during this period will also be analyzed for individual urban centre. To analyze the change in the percentage of households without access to any facility across the urban centres of North Bengal during 2001 – 2011, only those urban centres which existed during 2001 and 2011 i.e. in both the census years have been taken into consideration. Therefore, although there were 48 urban centres in 2001 and 131 urban centres in 2011, only 47 urban centres which were common in both the census years have been taken into consideration to analyze the temporal change in their share of households without access to any facility. The decadal variation in the percentage of household without access to facility „x‟ of any urban centre has been calculated by the formula as under. -
West Bengal Assembly Election 2021
WEST BENGAL EXIT POLL - 2021 Dr. Sajjan Kumar @sajjanjnu 29th April, 2021 PORIBARTHAN HOBE… Peoples Pulse, a Hyderabad based research organisation in association with a leading Hindi News TV Channel ‘INDIA TV’ conducted West Bengal Assembly Elections Exit Poll 2021 in all the 294 Assembly Segments. As per the Exit Poll conducted Peoples Pulse – INDIA TV, BJP will win with comfortable margin in West Bengal. BJP will win 172 – 191, TMC 64 - 88, Left Front+ 7 - 12. Having conducted the pre-poll study in all the 294 Assembly Constituencies in Bengal, where after two reports, underlying the methodology of the study, ground scenario, the shifting political dynamics as well as the expected seat prediction for various parties were mentioned in detail, Peoples Pulse and India TV, undertook a second round of study of the state to come up with Exit Poll predictions. It would be desirable to study this report along with the previous two studies which are available on the website of People’s Pulse. For the sake of coherence, it was decided that rather than doing a sub-region wise study as has been the case in the previously, a phase wise mapping of the political mood at the assembly constituency level would be more useful. The overall finding are not much different from the previous ones, though there are certain shifts which unambiguously reveal a popular mood for change. Therefore, at the outset, it is pertinent to mention the shifts which we observed in the respondents’ articulations as compared to my previous visit. 2 Regime Change as a Positive Phenomenon along with Anti-Incumbency Based on the two round of our field study, it can be confidently inferred that there is a popular mood for change. -
12 Assembly Constituencies)
GOVERNMENT OF WEST BENGAL Office of the District Magistrate, Bardhaman District Election Department, NAB, 2nd Floor, Bardhaman - 713101 PRESS NOTE The date of General Elections to the Assembly election 2011 has already been declared by the Election Commission of India. The total 25 (twenty five) Assembly Constituencies of this district are going for poll as per the schedule below A) IV Phase (13 Assembly Constituencies) Sl. No. Event Date Name & Number of the ACs 1. Issue of Press note and application 01.03.2011 260- Bardhaman Dakshin of model code of Conduct in the 262-Jamalpur(Sc) Entire District of Bardhaman 263-Monteswar 2. Issue of Notification 7.04.2011 264-Kalna(Sc) 265-Memari 3. Last date of making Nominations 14.04.2011 266-Bardhaman Uttar(Sc) 4. Scrutiny of Nominations 16.04.2011 267-Bhatar 5. Last date for withdrawal of 18.04.2011 268-Purbasthali Dakshin Candidature 269-Purbasthali Uttar 6. Date of Poll 3.05.2011 270- Katwa 7. Counting of Votes 13.05.2011 271-Ketugram 8. Date before which election shall be 18.05.2011 272-Mongolkote completed 273-Ausgram(Sc) B) Vth Phase (12 Assembly Constituencies) Sl. No. Event Date Name & Number of the ACs 1. Issue of Press note and application 01.03.2011 259- Khandaghosh(Sc) of model code of Conduct in the 261-Raina(sc) entire District of Bardhaman 274- Galsi(Sc) 2. Issue of Notification 11.04.2011 275-Pandabeswar 276-Durgapur Purba 3. Last date of making Nominations 18.04.2011 277-Durgapur Paschim 278-Ranigang 4. Scrutiny of Nominations 19.04.2011 279-Jamuria 280-Asansol dakshin 5.