Pre-Feasibility Report

for

Mill Development Plan (MDP)

February, 2017

Submitted to

WEST COAST PAPER MILLS LIMITED, DANDELI

SPB PROJECTS AND CONSULTANCY LIMITED Chennai West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Mill Development Plan ( MDP )

TABLE OF CONTENTS

CHAPTER # TITLE PAGE #

1 EXECUTIVE SUMMARY ...... 3 1.1 Introduction ...... 3 1.2 Project Cost ...... 3 1.3 Environmental Management ...... 3 2 Introduction ...... 5 2.1 Background ...... 5 2.2 Project Promoters ...... 6 2.3 Need for the project and its importance to the country and or Region ...... 7 2.4 Employment generation ...... 8 3 PROJECT DESCRIPTION ...... 9 3.1 Project Location ...... 9 3.2 Environmental Setting of the Site ...... 10 3.3 Alternative Sites Considered ...... 11 3.4 Overview of the Existing Mill ...... 11 3.5 Proposed Mill Development Plan ...... 18 3.6 Salient Features of the Project ...... 18 3.8 Proposed Tissue Machine ...... 20 3.8.5 Water and Waste water Treatment ...... 22 3.9 Input Requirements and Sources ...... 22 3.10 Wastewater Generation ...... 26 3.11 Resource Optimisation ...... 27 3.12 Environmental Impact Assessment and Management Plan...... 28 3.13 Environmental Management plan...... 30 4 SITE ANALYSIS ...... 31 5 PLANNING BRIEF ...... 32 1. 5.1 Planning Concept...... 32 2. 5.2 Population Projection ...... 32 3. 5.3 Land Use Planning...... 32 4. 5.4 Assessment of Infrastructure Demand (Physical, Social) ...... 32 6 Proposed infrastructure ...... 33 6.1.Industrial Area (Processing Area) ...... 33 6.2.Residential Area (Non Processing Area) ...... 33 6.3.Drinking Water Management ...... 33 6.4.Drains and Sewerage System...... 33 7 Rehabilitation and resettlement (R & R) plan ...... 34 8 project schedule and cost estimates ...... 35 8.1.Implementation Schedule ...... 35 8.2.Project Cost ...... 35 8.3 Environmental Protection ...... 35 6. 8.4 Economic Viability ...... 36 9 Analysis of Proposals (final recommendations) ...... 37 9.1.Improvement in the Infrastructure ...... 37 9.2.Improvement in the social infrastructure...... 37

Prepared by 2 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

1 EXECUTIVE SUMMARY

1.1 Introduction

West Coast Paper Mills Limited (WCPM), Dandeli established in the year 1955 is one of the oldest and largest producers of printing, writing papers and packaging boards.

The mill spread in a area of 375.73 acres on the banks of River Kali, has production capacity of 3,20,000 TPA.

In order to further strengthen its position in paper/board segment and in tissue paper, WCPM is contemplating Mill Development Plan (MDP) consisting of the following;

¾ Installation of new tissue paper machines

¾ Modernisation/ Augmentation of existing paper machines

¾ Augmentation of Pulp Mill

¾ Augmentation of Captive Power Plant

¾ Augmentation of utilities as per requirement to meet post MDP operations

1.2 Project Cost

The estimated project cost for the MDP is Rs. 500 Crores. Of this budget, about Rs. 37 Crores is allocated towards Environmental Control, Protection and Monitoring.

1.3 Environmental Management

1.3.1 Land Environment

Area required for the MDP facilities is available as vacant land within the mill premises and no impact is envisaged on the topography during construction as well as operation phase.

1.3.2 Air Environment

There will be an increase in the coal consumption due to the proposed project. The stack attached to the new proposed FBC boiler will be designed to meet the emissions concentration of the particulate matter less than 100 mg/ Nm3 as per stipulated norms

1.3.3 Water and Wastewater Environment

There will be reduction in specific water consumption by adopting various

Prepared by 3 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

conservation measures and recycling within the process. The treated waste water discharged into the Halmaddi Nallah leading to River Kali will meet treated waste water characteristics as per CPCB and KSPCB.

1.3.4 Solid Waste Generation and Disposal

The additional fly ash generated from the boiler ash will be sold to brick and cement manufacturing industries. The remaining solid waste generated from the proposed MDP will be treated/ disposed as per the existing practices.

Prepared by 4 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

2 INTRODUCTION

2.1 Background

2.1.1 WCPM (Project Proponent)

Initially, the plant was designed to manufacture 18,000 TPA of writing, printing and packaging paper, the commercial production of which commenced in May 1959. The Company obtained licence from the Government of in December 1964 for enhancing the production capacity to 45,000 TPA by installing balancing equipments, which was completed in 1972. Subsequently, the company had implemented Crash programme in 1974 to further increase the production capacity to 60,000 TPA against the licence issued in July 1972. The licenced capacity was re-endorsed for 69,000 TPA in November 1991 on the basis of actual production. The Paper Industry has been de-licenced from July 1997 onwards. The production capacity has been increased to 1,19,750 TPA after successful implementation of modernization/expansion programme in 1996-97 – diversifying into new product – duplex board – apart from the existing varieties of paper and paperboard. This also included rebuilding of Paper Machine No.III [by adding Trinip Press, Dryers and Calendar Stack, Size Press, Colour Kitchen and Process Automation], balancing of Pulp Mill, Power House and other sections of the Mills, besides setting up of 75 TPD Duplex Board M/c. (Paper M/c No.V). After commissioning of 100 TPD duplex board machine (PM IV), coupled with rebuilding of Paper M/c. No.II, the total production capacity has further increased to 1,57,750 TPA in 2001-02 and to 1,63,750 TPA in 2003-04 on rebuilding of PM I and achieving higher production of duplex board on Paper M/c No.IV. The Company has taken up in 2007 further expansion programme to increase production capacity from 1,80,000 TPA to 3,20,000 TPA which was completed in May 2010 at a cost of Rs.1450 Cr . To improve the operational and financial performance of the mill, to meet the emerging trends in the market, and further to make the mill more environment- friendly, WCPM plans to implement Mill Development Plan (MDP) to increase the capacity of its integrated pulp and paper mill. 2.1.2 Mill Development Plan

The mill currently has facilities to produce printing and writing papers and packaging boards with licensed capacity of 320,000 tpa.

The proposed Mill Development Plan (MDP) would increase the mill’s installed capacity to 450,000 tpa (increase by 130,000 tpa) comprising of tissue papers, printing and writing papers and packaging boards.

The proposed MDP includes the following:

Prepared by 5 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

¾ Addition of two (2) no’s of tissue paper machines with total capacity of 72,000 tpa ¾ Upgradation of existing six (6) Paper/Board Machines by adding de- bottlenecking equipment to increase production capacity from 320,000 tpa to 378,000 tpa (increase by 58,000 tpa) ¾ To meet the pulp demand after MDP, the existing pulp mill will be retrofitted/augmented to enhance the pulp production from 725 BD tpd to 785 BD tpd Increasing the captive power generation capacity from 74.8MW to 109.8 MW to meet 100% power requirement of post MDP, by installing a new 35 MW TG and 135 TPH capacity FBC coal fired boiler ¾ Up-gradation / augmentation of the existing utilities and services to support the post MDP operations ¾ Adopting efficient water management and waste water management programme to reduce specific water consumption significantly This Mill Development Plan has been drawn up in a comprehensive manner to meet the requirement of the Ministry of Environment and Forests climate change (MoEF&CC). MoEF&CC has released the Charter on Corporate Responsibility for Environmental Protection (CREP) as applicable to pulp and paper industries. The CREP enlists time-bound action plans in respect of highly polluting industries, including pulp and paper, for progressive up- gradation of technologies and in plant practices for reduction of pollutants as well as improvement in waste management systems. Already mill has complied with CREP guidelines. The capacity build up shall also help to consolidate and further improve on the operational and financial performance, meet the emerging demands of paper and paperboards, and develop into a more environmentally friendly technology to meet the guidelines and to achieve economy of scale of operation. Through the proposed MDP, adopting Best Available Technologies (BAT), the mill will enhance its reputation as a reliable, high quality, environmentally conscious supplier of printing and writing grades and coated paperboards and also enter in to market in specialty tissue paper. As per the guideline requirement of the MoEF&CC, the unit desired to go in for Environment Impact Assessment (EIA) for the proposed project. SPB Projects and Consultancy Limited (SPB-PC), Chennai together with Cholamandalam MS Risk services Chennai, has undertaken a study of the Environmental Impact Assessment and to prepare an Environmental Management Plan (EMP) for various components, which may be affected due to the impacts arising out of the proposed project. 2.2 Project Promoters

WCPM has its manufacturing facilities at Dandeli in Uttar Dist of

Prepared by 6 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Karnataka state. WCPM through the proposed project, intends to continue the vision of a valued player in the global paperboards industry by ¾ Adopting of more environmentally friendly processes as far as practicable

¾ Maintaining leadership in quality – products, paper and coated board processes, service and people Upholding societal values and expectations.

WCPM also aims to achieve the mission of a customer driven company with a strong focus on:

¾ Customer’s needs and total satisfaction ¾ Continuous product innovation to develop new environment friendly paper /paper board packaging solution ¾ To create and sustain a work culture in the organisation, which unleashes the creative talent and brings about excellence in the performance of its people and gives an equal opportunity to all employees to learn, perform and grow ¾ To manage the business of the Company in tune with national priorities adopting high standards of Corporate Governance and Business Practices. 2.3 Need for the project and its importance to the country and or Region

The paper industry is highly cyclical in nature. The performance of the industry is closely intertwined with global and domestic economic factors, as well as global and domestic demand-supply situation. The Indian industry is going through a transition phase, as it enters into an era of deregulation and market-determined pricing mechanism. Competition has emerged from both domestic and international players. It has been the endeavor of WCPM to be in the lead in technology acquisition, technology absorption and adaptation, up-gradation and innovation in technology, nurturing a well-established infrastructure, even while maintaining its focus on being environmentally friendly. Environment management is the “top-of-the-agenda” priority issue, and this focus has been maintained throughout the MDP. The challenge is to achieve more growth with optimum use of raw materials, water, chemicals and energy while delivering better quality of finished products. Environmental concerns have, therefore, been mainstreamed in the choice of the process/equipment. In order to cope with the ever-changing industrial scenario, WCPM desires to

Prepared by 7 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

seize and utilise the available windows of opportunity in the market and remain as one of the leading players in the paper sector, with a sense of purpose and vision for the future. The significant infusion of state-of-the-art technology that will be brought into operation based on the MDP, besides improving performance and efficiency, will enable WCPM to be more environmental-friendly, while offering the market a range of superior products. There will be reduction in cost of production, as well as benefits from economies of scale. The MDP is a “brown-field” revamp for enhancing the environmental friendliness and the operational efficiency, with improved economies of scale. The MDP presents an analytical and practical framework for using resources, whether internal or external, quite effectively, by making a judicious selection of various process options. The major advantages of implementation of the MDP will be improved environmental-friendliness, reduced emission and discharge, reduction in specific consumption of fresh water, higher generation of steam from biomass (black liquor), overall reduction in energy consumption, improved efficiency of the production operations, and increased production, resulting in more efficient and profitable operations. 2.4 Employment generation

The project will provide scope for indirect employment of about 500 people during construction stage and about 175 people during operation in the areas of production and maintenance and indirect employment of about 400 people in material handling, transport and auxiliary units.

Prepared by 8 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3 PROJECT DESCRIPTION

3.1 Project Location

The proposed Mill Development Plan (MDP) will be located in the existing mill at Dandeli Village, Taluk, District, Karnataka. The site is located at the intersection of latitude 15°15'11.21"N and longitude 74°37'38.30"E.

Prepared by 9 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Google Map Showing the Mill Site

3.2 Environmental Setting of the Site

The details of environmental setting around the proposed expansion site are given in the following table.

Table-1 Environmental Setting of the Site S.No. Particulars Details Location Town/Village Dandeli 1 Taluk Haiyal District Uttara Kannada State Karnataka 2 Latitude 15°15'11.21"N 3 Longitude 74°37'38.30"E Predominant annual wind direction: W and WSW Climatic conditions as per IMD o 4 Annual mean max temp: 38.4 C Belgaum o Annual mean min temp: 10.9 C Total annual rainfall: 1507.1 mm Present land use at the proposed Industrial land use 5 site SH-46 Haliyal-Dandeli Road), and 6 Nearest highway/road SH-93, 12.8-km in W direction) 7 Defence installations Nil within 7-km radius 8 Nearest railway station Alnavar Junction –22 km , NE 9 Nearest airport/air strip Goa ( 85-km, W) 10 Nearest village Subash Nagar (0.25-km, N) 11 Nearest town Dandeli (1.5-km, W)

Prepared by 10 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

S.No. Particulars Details 12 Nearest river Kali River (0.5-km, S) Undulating tarrain consisting of 13 Hills/valleys residual hills and valleys formed over Dharwad Super Group Rocks 14 Archaeologically important places Nil within 7-km radius Project site is located at about 2 km Ecologically sensitive areas from the Eco sensitive zone 15 (National Parks/ Wildlife boundary of Dandeli-Anshi Tiger sanctuaries/bio-sphere reserves) Reserve & Hornbill Conservation Reserve boundary. Dandeli-Anshi Tiger Reserve & Reserved/Protected forests within 16 Hornbill Conservation Reserve 10 km radius boundary is located Parrys Sugar Industries Limited, 17 List of industries 15.5 Km, NE 18 Topography of the plant site Plain 19 Nature of soil Clay and Silty clay type

3.3 Alternative Sites Considered

The mill site has adequate space for project facilities and has well developed infrastructure like water intake, approach roads, internal roads, offices etc. Hence, no alternate site is considered.

3.4 Overview of the Existing Mill

The mill is also equipped with coal-fired boilers for generating the steam required for process, as well as for power generation, as well as turbo alternators for production of power from the steam generated in both the recovery and coal-fired boilers.

The mill is also equipped with a dedicated water intake and treatment system, as well as a dedicated wastewater collection and treatment system.

The mill has following production facilities with their production capacities as below;

Table-2 Existing Plant and Capacities Description Units Existing Paper Machines Paper production (1-6) tpa 320,000 -PM #1 tpd 100 -PM # 2 tpd 95 -PM # 3 tpd 130 -PM # 4 tpd 110 -PM # 5 tpd 55 -PM # 6 tpd 440 Pulp Production tpa 250,000 Pulp Plant BD tpd 725 Chemical Recovery Plant -Evaporator plant tph of water 330

Prepared by 11 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Description Units Existing evaporation - Recovery Boiler tpd of black liquor 1600 solids -Recaustising plant tpd of AA 350 - Lime kiln tpd of lime 365 Power boilers FBC# 1 tph of steam 60 FBC# 2 tph of steam 65 FBC# 3 tph of steam 80 FBC# 4 tph of steam 125 Total tph of steam 330 Turbo Generators Escher Wyss MW of power 5.0 TG# 1 MW of power 5.3 TG# 2 MW of power 14.5 TG# 3 MW of power 15.5 TG# 4 MW of power 34.5 Total MW of power 74.8 Water Treatment Plant m³/day 1,00,000 Waste Water Treatment Plant m³/day 85,885

3.4.1 Pulp Plant

The pulp mill is based on the kraft process, using wood as the main raw material. The flow diagram of the pulp mill is given below. Wood is chipped in chippers and fed to the state of the art super batch digesters. Cooking chemicals, consisting of chemicals recovered in the chemical recovery section along with some amount of make-up chemicals are added to the chips in the digesters. After cooking, the pulp is first screened and washed in a counter-current fashion, using hot process water , followed by oxygen delignification process The pulp is then bleached using Chlorine dioxide based ECF (DHT-EOP-DnD) bleaching sequence, and stored.

Prepared by 12 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Pulp Mill- Press Retention Tanks Super Batch Cooking

3.4.2 Chemical Recovery System

The weak black liquor generated in the Twin roll press unbleach pulp washing stage, after meeting the internal requirements of the pulp mill, is sent to the chemical recovery section for recovery of cooking chemicals.

The chemical recovery section consists of evaporators (where the spent liquor from pulp mill is concentrated), chemical recovery boiler (where the concentrated black liquor from the evaporation section is fired for generation of steam and smelt), a recausticising plant (where the alkali, which consists

primarily of Na2CO3, is reacted with burnt lime produced in a rotary lime mud reburning kiln to produce NaOH required for the cooking process) and a lime reburning kiln for producing lime from the lime mud produced in the recausticising section together with lime stone as a make-up.

Prepared by 13 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3.4.3 Paper Machines

Pulp is refined in the stock preparation section and treated with sizing chemicals, dyes and loading materials, before being transferred to the paper machine section for production of paper.

The mill is having six (6) paper/board machines producing 320,000 tpa of printing and writing grade papers and paper boards using captive bleached wood pulp, purchased pulp and waste paper.

Paper machines #1, #2, #3, and #6 are dedicated for the production of writing and printing papers, while paper machines #4 and #5 are dedicated for the production of multi-layered boards ,cup stock board etc .

3.4.4 Power Plant

Power plant consists of high pressure and high temperature steam generation units and power generation units with auxiliary plants as below;

¾ Boiler House

¾ Coal Handling System

¾ Ash Handling System

¾ DM Plant for water conservation

¾ Turbo generator

¾ Pressure reducing and de-superheating stations

¾ Air compressors

¾ Cooling tower

Prepared by 14 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Captive Power Plant

Closed Coal Conveyor Fly ash Silos

3.4.5 Water Treatment Plant (WTP)

Water from the pump house is supplied to filter house through three pipe lines 18”,21” &24” respectively ,and this water is again distributed through 4 channels and to 4 Nos of clarifiers .Clarifiers over flow will be taken to water reservoirs &blow down water will be drained . Over flow from 1&2 clarifier is taken through separate channel and chemical treatment is done and taken to jewel sand filter for residential colony supply .

The size of clarifier #1 and #2 is 25.75 m diameter and 4.24 m side, water depth (SWD) each. The capacity of each of the clarifier #1 and #2 is 13500 m³/day. . Alum dosing and pre-chlorination is done at the inlet of clarifier.The capacity of storage reservoir#1 is 1600 m³ and reservoir #2 is 2700m3.

The clarifier #3 is of size 33 m dia x 3.75 m SWD. The capacity of clarifier #3 is 22500 m3. Clarifier #4 is of size 45.72 m dia x 3.85 m SWD, and has a capacity of 49500 m3. . Alum dosing and pre-chlorination is done at the inlet of clarifier . A common alum preparation unit is dedicated for both the water treatment lines. The process water from the reservoir is pumped to mill.

Prepared by 15 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3.4.6 Wastewater Treatment Plant (WWTP)

3.4.6.1 Pulp Mill and other Combined Wastewater Streams

The wastewater from pulp mill and the overflow of sedimentation tank (meant for collection of waste water from chemical recovery plant, power house and bleach liquor slurry) is mixed together prior to screening. At screening chamber, chemical dosing is carried out. The screened wastewater is pumped to a primary clarifier #1 of size 39.5 m diameter and 3 m SWD having a capacity of 3677 m³ by three (3) dedicated pumps (2 W+1 SB). The overflow from the primary clarifier flows by gravity to two (2) parallel aeration basins of size 25 m x 60 m x 5 m SWD, equipped with diffused aeration system. Four (4) blowers each of capacity 12500 Nm3/hr and 0.6 kg/cm2(g) pressure are installed for supplying air through 1200 diffusers. Nutrients are added at the inlet of aeration basin. Domestic effluent from colony is also added prior to aeration tank.

The wastewater line leading to aeration tank has on line ph measurement and flow measurement. Also, the activated sludge process has got a provision for surge tank for holding waste water in case of emergency for 6-8 hours.

The underflow from this primary clarifier #1 is dewatered in hydra sieves and further dewatered in a screw press. The sludge generated from primary clarifier #1 is utilized on all duplex machines. The overflow from the aeration basin is sent to secondary clarifier of size 41 m x 3 m SWD. The underflow from secondary clarifier is recycled partially into the aeration basin to maintain a required MLSS concentration in the basin. The overflow from secondary clarifier is taken in to polishing pond through ring channel for 3rd stage treatment. The polishing pond is equipped with four (4) 30 HP fixed aerators, which are being used to boost up the dissolved oxygen. The overflow from polishing pond goes through an open channel to nallah, which leads to the river Kali.

3.4.7 Paper Machine Wastewater Stream

The raw wastewater flows by gravity to an inlet sump through a manual bar screen. The raw wastewater from this sump is pumped to a primary clarifier #2 of size 35.5 m dia x 3.5 m SWD, having a capacity of 3462.3 m3.

The underflow of paper machine clarifier-cum-thickener is processed on Andritz twin-wire machine regularly.The thickened sludge from the Andritz machine (at around 30% consistency) is sold to board manufacturers in the nearby areas to make boards.

Two (2) sludge drying beds have been provided to process excess biological sludge from the secondary clarifier as and when required.

Prepared by 16 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

In emergency condition, when Andritz machine is under any maintenance work, the paper machine clarifier underflow can also be processed on sludge drying beds.

The collected sludge from sludge drying beds is also given to board manufacturers for making boards.

The mill has dedicated electronic flow measuring and recording devices at the following points

¾ Single point discharge

¾ Paper machine raw wastewater

¾ Sewage

¾ Combined pulp mill wastewater

Also the mill has on-line bio-monitoring (aquarium with fishes grown from Kali river) and on-line pH metering at single point discharge

3.4.8 Domestic Wastewater (colony Sewage)

The entire domestic wastewater is treated in the existing effluent plant (ETP) as it also provides nutrients and bacteria.

3.4.9 Combined Wastewater

At Single point discharge (SPD), provision has been made for continuous flow measurement of all streams and treated wastewater. Treated wastewater of about 64,200 m³/day is finally let out to Halmaddi nallah through single point discharge, which leads to the river Kali.

The typical characteristics of the various streams are given below.

Table-3 Wastewater Characteristics Wastewater stream to ETP Final Treated Pulp mill Stream, Paper water discharge Characteristics Unit Recovery, Power Machine to Halmaddi plant, Bleach stream Nallah liquor pH 4.0 to7.0 6.5 to7.5 7.0 to8.5 Temperature °C 35-60 35-36 <40 Total Suspended Solids mg/l 147 929 34 (TSS) Total Dissolved Solids (TDS) mg/l 3969 111 631 Bio Chemical Oxygen mg/l 376 15 17 Demand (BOD) Chemical Oxygen Demand mg/l 800 600 <250 (COD)

Prepared by 17 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3.5 Proposed Mill Development Plan

The proposals covered under the Mill Development Plan (MDP) project are

¾ Addition of two (2) no’s of tissue paper machines with total capacity of 72,000 tpa

¾ Upgradation of existing six (6) Paper/Board Machines by adding de- bottlenecking equipment to increase production capacity from 320,000 tpa to 378,000 tpa (increase by 58,000 tpa)

¾ To meet the pulp demand after MDP, the existing pulp mill will be retrofitted/augmented to enhance the pulp production from 725 BD tpd to 785 BD tpd

¾ One (1) FBC boiler of 135 tph

¾ Increasing the captive power generation capacity from 74.8MW to 109.8 MW to meet 100% power requirement of post MDP, by installing a new 35 MW TG.

¾ Up-gradation / augmentation of the existing utilities and services to support the post MDP operations

¾ Adopting efficient water management and waste water management program to reduce specific water consumption significantly

3.6 Salient Features of the Project

Some of the salient features of the proposed MDP are as below;

¾ Tissue Machine with Energy and water efficiency.

¾ Atmospheric Fluidised Bed Combustion Boiler (AFBC) with high efficiency and low unburnt carbon in ash by increasing temperature and pressure

¾ Higher efficiency Turbo Generator to generate power consuming less steam/kcal.

¾ DM and condensate plant to maximise condensate recycle and to minimise fresh water requirement.

¾ ESP designed to maintain emission of particulate matter (PM) of less than 100mg /Nm3 as per stipulation.

Prepared by 18 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3.7 Plant capacities

The existing and post MDP mill capacities are as below;

Table-4 Existing and Post MDP Mill Capacities Description Unit Existing Post MDP Incremental Proposal Paper Machines Paper/Board Modernisation Production tpa 320,000 378,000 58,000 /Upgradation PM #1 to # 6 Tissue Machines tpa -- 72,000 72,000 New Total Paper/board tpa 320,000 450,000 130,000 Production Pulp Plant BD tpd 725 785 60 Upgradation tpd of black 1600 1600 Existing adequate. No Recovery plant -- liquor solids change tpd of lime 365 365 Existing adequate. No Lime kiln -- change Recausticising tpd of AA 350 350 Existing adequate. No

plant change Power Boilers tph of 330 405 Existing FBC #1 – 60 steam (FBC#1 (FBC#1 retired tph will be retired and FBC#2 – 65 tph will - Power Boiler s standby) and FBC#2 135 standby) be kept as standby. Addition of one more

135 tph boiler. 74.8 109.8 (1x5 (1x5 (Standby) (Standby) +1x5.3 +1x5.3 (Standby) - Turbo MW of Addition of one 35 (Standby) 1x14.5 (partial 35 Generators power MW TG +1x14.5+ running) 1x15.5 +1x15.5 (Standby) (standby)+1x34. +1x34.5) 5+1x35) tpd 15 15 Existing adequate. No ClO2 plant -- change Water Treatment Existing adequate. No m³/day 1,00,000 1,00,000 -- Plant change Waste Water Existing adequate. No m³/day 85,885 85,885 -- Treatment change

Prepared by 19 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3.8 Proposed Tissue Machine

The tissue paper machine and system design will specifically take into account to meet requirement of tissue paper production with regard to softness, dry and wet strength, porosity, water absorption, etc A modern paper machine specially designed for the manufacture of tissue paper with head box, suction press roll, shoe press ,yankee (MG) cylinder, high velocity hood and pope reel Three-ply winder will be installed.

The machine will incorporate a quality control system to measure and control basis weight and moisture with optional features for profile measurement of caliper and speed optimisation. The control of stock preparation and the paper machine will be through a dedicated distributed control system (DCS). The machine is provided with the following auxiliary equipment.

¾ LPG gas/steam for hood air heating &Steam and condensate system

¾ AC Drive system

¾ Central Oil Lubrication (COL) system

¾ Vacuum system etc

3.8.1 Up-gradation of existing Paper/Board Machines

In paper machines section, it is proposed to de-bottleneck imbalances in the machines section to optimize the production capacities from 320,000 tpa to 378,000 tpa.

3.8.2 Pulp Plant section

In chemical wood pulp plant section, it is proposed to de-bottleneck the imbalances by adding few equipment such as Digester, Hot black liquor Accumulator ,Thickener, Post washing press/post ODLpress etc, The above modification will result in additional production of 60 BD tpd of pulp and the overall pulp production will be 785 tpd.

Prepared by 20 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

The proposals in the pulp plant are also aimed to reduce the specific steam, chemical consumption and the level of the pollutant in the final waste water.

3.8.3 Chemical Recovery

The chemical recovery section has capacity to handle 1600 tpd Black Liquor solids. With current pulp production level of 725 BD tpd, around 1400 tpd BL solids are generated. After MDP with 785 BD tpd pulp production, around 1550 BL solids will be generated. Hence the chemical recovery section equipment has adequate capacities to process additional BL solids of 150 tpd. Marginal additional air emissions from recovery boiler and lime kiln will be within the consented norms.Addition of 1No compact Disc filter is considered to take care of additional white liquor requirement .The other equipments like evaporator Rotary lime Kiln are adequate to handle the increased requirements.

3.8.4 Captive Power Plant (CPP)

Mill’s past experience justifies the installation of CPP to make the mill self reliant in power front as well as dependable quality of power (both voltage and frequency). As the scenario has not changed in the State it is prudent to augment captive power plant to meet 100% steam and power requirement after MDP.

Existing and post MDP steam and power balance scenario is summarised in the following table.

Table-5 Existing and Post MDP Steam and power scenario

Description Unit Existing Post MDP Incremental Proposal Paper/Board tpd 930 1300 370 production Pulp production BD tpd 725 785 60 Existing Rec Black liquor solids tpd 1400 1550 150 boiler is generation adequate 330 405 (65 tph 65 Addition of new Total Cogen power tph (60 tph standby) 135 tph boiler. boilers capacity standby) Retiring of FBC 4 4 #1 – 60 tph. (one (one boiler FBC #2 – 65 tph No. of power boilers No boiler standby) standby standby) Power requirement MW 48 66 18 Addition of one 74.8 109.8 35 new 35 MW TG. TGs capacities MW (3- TGs (3 TGs standby) standby) Imp coal Imp coal and Fuel -- and local local coal -- -- coal 920 1470 550 Additional qty Fuel tpd from import/local

Prepared by 21 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

In order to meet the steam and power of the mill after MDP, Captive power plant (CPP) will be augmented with auxiliary plants as below; ¾ FBC boiler with ESP and ash collection systems

¾ Turbo Alternator

¾ Coal Handling Plant

¾ Ash Handling Plant

¾ DM for water conservation

¾ Cooling tower

3.8.5 Water and Waste water Treatment

Existing water treatment plant and wastewater treatment plants are adequate to handle the post project requirement. Hence no proposals/modifications are envisaged.

3.9 Input Requirements and Sources

3.9.1 Major Inputs

The major inputs for the production of the paper and pulp are

¾ Wood for pulping ¾ Chemicals ¾ Steam ¾ Power ¾ Water Major inputs requirement for MDP during the operation will be as below

3.9.2 Raw Material

Table-6 Raw Materials Requirement S.No Description Unit Existing Post MDP Incremental Source Procuring from 1 Wood tpa 9,58,000 10,62,000 1,04,000 Local /imported Mumbai, Vapi, 2 Waste Paper AD tpa 24000 33000 9000 Pune Market Pulp 4 tpa 800 81400 80600 Indonesia (HWP) Market Pulp USA, Canada, 5 tpa 3700 27400 23700 (SWP) Russia

Prepared by 22 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3.9.3 Chemicals

The MDP proposals in the pulp mill are more focused on conservation of energy, water and reduction in specific chemical consumption in bleaching. It is estimated that the bleaching specific chemicals consumption will get reduced by 5%. As a result, the annual chemicals requirement will marginally increase after MDP.

The major process chemicals required to be used and procured for the production is given in the following table. All the process chemicals shall be procured from suppliers from Andhra Pradesh/Karnataka/Maharashtra/Tamil Nadu. The materials will be transported by trucks.

Table-7 Chemicals Requirement Chemicals Unit Existing Post MDP Caustic tpa 7,100 7,600 Hydrogen Peroxide tpa 3,750 4060 Chlorine for make up in ClO2 production tpa 2,500 2,500 Sulphuric Acid tpa 3,750 4,060 HCl tpa 3,795 5520 Lime stone tpa 7,600 8200 ClO2 (captive generation) tpa 4,600 4,700 Oxygen (captive generation)&local purchase tpa 7,500 8125

3.9.4 Fuel

Black liquor (generated in-house), Imported coal and furnace oil are the fuels used in the mill. Furnace oil is used in lime mud reburning kiln for reburning of lime mud and in start up and stabilising the operations of chemical recovery boilers. Coal is used for power and steam generation. Additional fuel oil and coal requirements are given in the following table

Table-8 Fuel Requirement Post Increme Source Fuel Unit Existing MDP ntal Additional coal will be Coal tpa 3,18,000 5,08,000 190,000 Imported from Indonesia/ local Furnace oil kl 15300 16400 1,100 Local Market

The characteristics of the fuel used are presented in the following table.

Description Unit Coal Furnace Oil Black Liquor Indian Imported Moisture % 7 17.7 1 30 Ash (max) % 37.6 4.2 1 - Sulphur (max) % 0.28 0.23 4.5 2.0 Gross Calorific Kcal/kg 4200 5490 10500 3200 Value

Prepared by 23 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3.9.5 Mass, Steam and Power Balance

The steam, coal consumption and power requirement for the existing and proposed MDP is given in Table 9.

Table 9- Steam and Power requirement Existing Parameter Units Post MDP Remarks scenario 1x60+1X6 1x65(standby) The existing 60 TPH power boiler Power boiler 5+1X80+1 +1x80+1x125 will be scrapped and 65TPH will installed tph X125 = +1x135(new)= be kept as standby during the capacities 330 405 post project scenario The existing recovery boiler is Recovery boiler adequate and hence no additional tph 253.7 253.7 capacity capacity enhancement is envisaged under MDP. The proposed 135 TPH boiler is Total installed envisaged for better reliability, steam generation tph 583.7 658.7 operational flexibility and energy capacity & process efficiency. Additional steam will be required 500 Total steam 380 for power generation and also tph (280PB+220R demand (180+200) process requirement in the Tissue B) machine. Steam consumption per ton of the Specific steam t/t 9.8 9.2 paper produced will be reduced demand after MDP. 5,08,000 The proposed 135 TPH boiler will (Imported coal be operated on imported coal, will be used in thereby Indian coal linkage for the the proposed additional coal need not be 3,18,000 135 TPH submitted. Please note that coal Coal consumption tpa boiler and 65 linkage for Indian coal is essential TPH boiler will for obtaining the EC. be under standby mode) 1.12 (power Due to increased power demand in generation capacity, the specific Specific coal t/t of tissue coal consumption per ton of paper 1:1 consumption paper machine is is increased in the power boilers. relatively higher) 1x5(standby)+ 5MW, 5.3MW, will be kept as 1x5.3(standby standby and 14.5/15.5MW will be )+1x14.5(parti operated on part load during the 1x5+1x5.3 al post project scenario +1x14.5+1 Total TG capacity MW running)+1x15 x15.5+1x3 .5(part 4.5 = 74.8 load)+1x34.5 +1X35 (New) = 109.8 Actual electrical - MW 48 66 energy needed Specific electrical kWhr/t 1237 1211 Specific energy consumption per

Prepared by 24 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Existing Parameter Units Post MDP Remarks scenario energy tone of paper will get reduced marginally.

3.9.6 Water

In the current operations, WCPM could bring down the fresh water consumption for the plant to a level of 73,000 m3/day equivalent to around 78 m3/t of paper. In order to be in line with new norms of fresh water consumption WCPM is further implementing water conservation and recycling systems. As part of MDP some more proposals are being planned to bring the fresh water requirement for the plant well within the stipulated norms during the post project scenario.

The mill has water drawal permission of 1,00,000 m³/day. The water drawal permission letter is enclosed as Annexure 1.

The water requirement of the existing and proposed is given in below table and water balance diagram is enclosed as Annexure 5

Prepared by 25 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Table-10 Water Requirement Average daily requirement S.No. Category (in m³/day) Existing Post MDP 1 Water Supply to Plant 73,000 72,800 Water supply to colony for domestic 2 7,000 7200 needs 3 Total fresh water demand 80,000 80,000

3.10 Wastewater Generation

The wastewater from the mill is divided mainly into two separate streams. One is pulp mill wastewater stream and the other one is paper machine wastewater stream. Total wastewater generated after MDP from the plant will be about 77,000 m³/day.

The wastewater generation of the existing and proposed is given below table and water wastewater balance diagram can be seen in Annexure 5.

Prepared by 26 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Table-11 Wastewater Generation Wastewater Generation S.No. Category (in m³/day) Existing Post MDP 1 Wastewater to ETP 76,500 77,000 2 ETP sludge loss 100 200 3 Treated waste water from ETP 76,400 76,800 4 Greenbelt 2,200 2,200 Treated wastewater Recycle to 5 10,000 11,200 Process Treated wastewater discharged 6 64,200 63,400 (to Halmaddi Nallah)

3.11 Resource Optimisation

The following recycling or resource optimization are envisaged in MDP

¾ To reduce the water consumption following measures will be taken ¾ By improving general housekeeping measure such as x Water leakage from valve leaks x Automatic shut down of pumps when the section is out of production x Daily monitoring water consumption by installing flow meters on all major consumption point. ¾ Segregation of wastewater from various processes into clean wastewater, (that can be reused directly) and contaminated water for treatment ¾ Installation of efficient equipment / process which reduces the water consumption in the process areas such as; x To achieve desired brightness in the finished product, proper raw materials are selected. This reduces use of water for washing and bleaching. x All pumps are provided with mechanical seals. x Use of self cleaning showers x Using Save-all for Clarifying the paper machine waste water The following water from the process will be reused after treatment if any required

¾ Reuse of clarified water from paper machine in other sections such as pulp dilution, showers, stock preparation area, etc.

¾ Condensate from power boilers is reused.

¾ Use of back water or recycled water for low pressure showers

Prepared by 27 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

¾ Installation of vacuum flume tank to recycle vacuum pump sealing water

¾ Use of treated effluent for plantation, gardening, floor washing, dust prevention, etc.

The following energy optimization measures will be employed;

¾ While ordering plant and equipment, emphasis will be given for lower energy consumption.

By improving general housekeeping measures such as

¾ Prevention of steam leakages by using good quality steam valves

¾ Using high voltage electrical equipment to conserve energy

¾ Using energy efficient fluorescent lighting

¾ Using variable frequency drive for fluctuating load for energy conservation

¾ Maintain higher power factor by installing suitable electrical equipment to optimize the power consumption.

¾ Installing heat recovery systems to recover the heat from the process.

¾ State-of-the-art boiler of pressure 64 kg/cm2(g)

3.12 Environmental Impact Assessment and Management Plan

3.12.1 Construction Phase

The construction activities of new installation will not necessitate any displacement of people, as the construction will be carried out in the existing mill premises. This phase does not involve major changes in the terrain.

3.12.2 Operational Phase

3.12.2.1 Air Environment

The major pollutants from the project are Particulate Matter (PM) and sulphur dioxide (SO2) from the proposed FBC boiler. High efficiency ESP will be installed to reduce the particulate matter. Adequate stack will be provided for wider dispersion and concentration of PM and SO2 will be kept below the standards prescribed by CPCB/SPCB.

Dust collection systems for the tissue machine areas will be provided to contain the fine fiber dust generated during the tissue making process, will be reused.

Prepared by 28 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3.12.2.2 Wastewater Generation and Disposal

The wastewater quantity to the ETP after MDP will increase slightly from 76,500 m3/day to 77,000 m3/day. The existing ETP is designed to handle about 85,885 m3/day of wastewater and hence the existing ETP will be adequate to process the wastewater after MDP.

The treated wastewater discharge into river will get reduced from the current level of 64,200 m3/day to 63,400 m3/day in the post project scenario.

3.12.2.3 Solid Waste Generation and Disposal

The expected solid wastes generation from proposed project is non-hazardous in nature. The solid waste generation will be ash from the proposed FBC boiler. In addition to this, there will be fibre sludge generation from the effluent treatment plant. The details of solid waste generation and quantities with disposal methods are given in the following table.

Table-12 Details of Solid Waste Generation & Disposal Quantity in tpd S.No Source Composition Post Disposal method Existing MDP Cement 1 Fly ash Silica 370 590 manufacture/ brick manufacture. Calcium Recycled using 2 Lime Mud carbonate and 375 400 lime kiln with silica make-up lime Fired in boiler/ Sold 3 Saw dust Organic 60 70 to external party for secondary use Waste ETP Used for card Fines and 4 sludge pulp 55 80 board /egg tray fibre from WWTP manufacture Used Oil, Sold to KSPCB 5 0.05 0.06 KLD approved recyclers

Prepared by 29 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

3.12.2.4 Noise Environment The noise level of the all the equipment will be kept within the CPCB / SPCB standard in and around the work zone

3.12.2.5 Socio – Economics

¾ The proposed project is located at existing mill premises. Hence, there will not be any resettlement and rehabilitation. Thus, there will not be any adverse socio economic implications.

¾ The economic status of the area is likely to improve, as there will be direct/indirect employment generation during construction and operational phase

3.12.2.6 Risk Assessment & DMP

No major hazards with potential for any emergency situation exist in the process plants. On site and off site emergency measures shall mitigate the effect on any risk.

3.13 Environmental Management plan

3.13.1 Land Environment

The area required for installation of the two new Tissue Paper Machines is 185m x 64 m. The site selected is a vacant land within the mill premises and no impact is envisaged on the topography during construction as well as operation phase

3.13.2 Air Quality Management

The coal consumption will be increased from 3,18,000 TPA to 5,08,000TPA after the proposed project. The ESP attached to the proposed new FBC boiler (135 tph capacity), will be designed to meet the emissions concentration of the particulate matter will be less than 100mg/ Nm3 as stipulated .

3.13.3 Water and Wastewater Management

There will be reduction in specific water consumption by adopting various conservation measures and recycling within the process. The treated water discharged into the Halmaddi Nallah leading to River Kali will meet treated water characteristics as per norms of CPCB and KSPCB.

3.13.4 Solid and Hazardous Waste Management

Additional solid waste generated from the proposed MDP will be treated/ disposed as per the existing practices.

Prepared by 30 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

4 SITE ANALYSIS

Being MDP project and as adequate land with basic infrastructure is available within the existing mill site, no other alternative sites have been considered. The proposed MDP site is located within the existing mill premises at Dandeli in the district of Uttar Kannada, Karnataka State. Hence no acquisition of land is required.

Prepared by 31 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

5 PLANNING BRIEF

5.1 Planning Concept

Project is conceptualised for modernising the existing facilities and involves

¾ Augmentation of paper machines, pulp mills, chemical recovery complex, CPP and augmentation of utilities and auxiliaries

¾ All the above facilitates will be within the existing plant premises and will use the existing infrastructure facilitates

5.2 Population Projection

The proposed project will be located within the existing mill premises and the population is negligible around the mill. However the population is likely to go up in the region due to direct and indirect employment with their family members.

5.3 Land Use Planning

The mill has total land of 375.73 acres, with vacant spaces and well covered with greenery.

9 acres of land is required for project as per the broad break-up given in the following table. The vacant spaces available in the mill premises have been identified and found to be suitable and adequate to accommodate all the new facilities planned under project.

The overall mill layout is enclosed as Annexure 6.

Table-13 Land Requirement for MDP Post MDP, S.No Category Existing Area, Acres MDP Acres 1 Plants and buildings 115.00 4.00 119.00 Raw material & other storage 2 45.00 2.50 48.00 yards, roads, drains etc 3 Green belt/ Green Cover 103.00 2 105 4 Waste disposal areas 62.23 0.50 62.75 5 Area for future development 50.00 -- 41.00 6 Total 375.73 9.0 375.73

5.4 Assessment of Infrastructure Demand (Physical, Social)

Infrastructure /amenities/facilities required for the proposed project will be assessed based on the need based survey in the surrounding area. The infrastructure development will be taken-up under CSR activity.

Prepared by 32 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

6 PROPOSED INFRASTRUCTURE

6.1. Industrial Area (Processing Area)

This is being a mill modernization/ upgradation project; most of the infrastructure like water in-take system, power in take, roads, railway for raw material/product transportation is available. The same will be augmented according to requirement.

6.2. Residential Area (Non Processing Area)

Residential area is already available near the plant premises and required additional residential accommodations including all infrastructures such as roads, drains etc shall be created.

6.3. Drinking Water Management

Drinking water will be sourced from the Kali River. The water treatment plant is installed at factory to treat the intake water and distributed to various sections of the plant and residential area.

6.4. Drains and Sewerage System

Drains sewerage system will be designed according to needs of plant and residential area and shall be properly connected and linked.

Prepared by 33 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

7 REHABILITATION AND RESETTLEMENT (R & R) PLAN

The land proposed for project is within the existing mill premises. Hence the project will not involve any rehabilitation and resettlement.

Prepared by 34 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

8 PROJECT SCHEDULE AND COST ESTIMATES

8.1. Implementation Schedule

The major activities are highlighted below and the completion time indicated are from the “zero date” which is the date of Environment Clearance (EC)

Start date “Zero Date”

- Ordering of long delivery plant and equipment 3rd month - Commencement of Civil Construction 9th month - Commencement of start-up trial & commissioning 23rd month - Commencement of commercial production 25th month

8.2. Project Cost

Total investment for the installation of project is Rs 500 Crores as per broad break up is given in the following table.

Table-14 Project Cost Description Rs Crores Civil Works 60 Plant & Machinery Cost (including erection and engineering) 360 Other Capitalisation Cost (pre operative expense, escalation and 80 contingency, start up expenses and interest during construction) Total 500

8.3 Environmental Protection

As environmental protection will be monitored and implemented by a centralized environmental management cell. The fiscal estimate has been arrived for the proposed project is as below.

About Rs. 37 Crores is allocated towards pollution control equipment and implementation of environmental pollution control measures.

The details of investment for procuring the equipment for effluent control and monitoring of pollution are as below.

Prepared by 35 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Table-15 Investment for Environmental Monitoring and Control

Section Rs Crore Existing boiler ESP 20.00 Power boiler ESP and stack 10.00 Ash handling 1.50 Online environmental protection and monitoring 0.50 Effluent treatment plant upgradation 2.00 Water conservation/recycling 2.00 Additional Green belt 1.00 Total 37.00

8.4 Economic Viability

The economic viability of proposed project is as below

Table-16 Economic Viability Value Description (Rs. In crores) Income 740 Variable cost 580 Contribution 160 Fixed Costs 18 PBIDT 142 Cost of capital 50 Operating cash flow 92 Investment 500 ROI (%) 28 Expected IRR (%) 24 Payback 5Y5 M

Prepared by 36 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

9 ANALYSIS OF PROPOSALS (FINAL RECOMMENDATIONS)

It would be somewhat difficult to quantify all the benefits of a project of this type and nature of state and national economy because there are too many “spin-off” indirect benefits in addition to direct benefits.

Some of the specific benefits are presented below:

9.1. Improvement in the Infrastructure

This being a mill modernisation project, most of the infrastructure like water intake system, power in take system, roads, drains, hospitals schools, etc are already available in the vicinity of the plant location. However the above infrastructure / amenities / facilities available near the plant will be assessed based on need based survey and will be taken up under CSR scheme for development.

9.2. Improvement in the social infrastructure

Some of the specific benefits from the improvement of the social infrastructure due to project implementation are as under.

9.2.1. Employment

The project will create direct employment to about 175 persons. In addition it would generate indirect employment to about 500 persons in the industries and service organizations and material handling, etc., which will be supported by the operations of the mill.

In addition during the implementation and construction stage of the project, it will generate employment to about 400 in direct persons for about a year.

9.2.2 Contribution to State Exchequer

The project is likely to generate additional income to the state by way of sales tax to the tune of Rs 12 Crores per annum and by way of excise duty to the tune of Rs 65 Crores per annum.

9.2.3 Non dependence on grid power

The unit will be generating additional power requirement using its captive power plant and thus becoming self reliant in power front and will not be dependant on the state grid for the supply.

9.2.4 Development of ancillary industries

The implementation of the project will undoubtedly provide stimulation for added growth to a number of other industries some of which are given below

Prepared by 37 West Coast Paper Mills Limited Pre-Feasibility Report Dandeli, Karnataka Mill Development Plan ( MDP )

Trucking industry, which will load and haul raw materials, coal, and other supplies to the mill and also mill outputs. The haulage requirement due to project would be around 0.5 million tonnes per annum comprising both inputs and outputs.

Establishment of ancillary industries such as core for paper reels, core plugs, machining and welding units, etc.

Indigenous machinery suppliers / manufacturers.

Establishment of indirect industries and shops near the project site such as small scale work shops, hardware shops, small-scale restaurants, petty civil and electrical contractors, grocery and provision shops, etc.

Construction industry during erection and construction period of Ancillary Business

Prepared by 38 2017

West Coast Paper Mill Limited, Dandeli

` EMP-MillDevelopmentPlan

Ă Cholamandalam MS Risk Services Limited

Parry House, 3rd Floor, No: 2, N.S.C Bose Road, Chennai- 600001, India

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Table of Content

EXECUTIVE SUMMARY ...... 4 1 ENVIRONMENTAL MANAGEMENT ASPECTS IN THE EXISTING FACILITIES ...... 7 1.1 Introduction ...... 7 1.2 Overview of the Existing Facilities ...... 7 1.3 Compliance with Earlier EC ...... 8 1.4 Process Description of the Existing facilities ...... 15 1.4.1 Raw Material Preparation ...... 15 1.4.2 Super Batch Cooking ...... 16 1.4.3 Pulp Screening &Washing and Oxygen Deligninification ...... 16 1.5 Pulp Bleaching ...... 16 1.5.1 Paper Making ...... 17 1.6 Utilities ...... 18 1.6.1 Water ...... 18 1.6.2 Power ...... 19 1.6.3 Steam Requirement ...... 20 1.7 Effluent Treatment Plant ...... 20 2 Environmental Management Plan for the Existing Facility ...... 24 2.1 Existing Pollution Sources ...... 24 2.2 Air Emissions Control at the facility...... 25 2.3 Fugitive Emission ...... 27 2.4 Noise Levels at the Facility ...... 27 2.5 Waste Water Management ...... 28 2.6 Bio Assay Test ...... 29 2.7 Solid & Hazardous Waste Management ...... 30 2.8 Green Belt and Green Cover ...... 31 2.9 Safety Systems ...... 33 2.10 Occupational Health and Safety ...... 34 2.11 Corporate Social Responsibility ...... 35 3 PROPOSED ENVIRONMENTAL MANAGEMENT PLAN...... 38 3.1 Land Environment ...... 38 3.2 Air Quality Management ...... 38 3.3 Noise Management ...... 38 3.4 Water and Waste water Management ...... 38 3.5 Solid and Hazardous Waste Management...... 39 4 PROJECT BENEFITS ...... 40 5 CONCLUSION ...... 41

List of Tables

Table 1 Existing Stack Details ...... 25 Table 2 AAQ -Plant Data ...... 25 Table 3 Air Emissions Test Report - KSPCB ...... 26 Table 4 Ambient Noise Levels, Plant Data ...... 28 Table 5 Treated Effluent Quality– KSPCB...... 29 Table 6 Analysis Report of Bio Assay test of treated wastewater, KSPCB Report ...... 30 Table 7 Health Monitoring Data at WCPM ...... 35

List of Figures

Prepared by & 2

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Figure 1 Wood Preparation Process ...... 15 Figure 2 Bleached Pulp ...... 17 Figure 3 – Finished Product ...... 18 Figure 4- Effluent Treatment Plant ...... 21 Figure 5 ETP- Block Diagram...... 22 Figure 6 Final Discharge Monitoring System ...... 23 Figure 7 WCPM- Environmental Policy ...... 24 Figure 8 Electrostatic Precipitator...... 26 Figure 9 Continuous Ambient Air Quality Stations at WCPM ...... 27 Figure 10 Closed Compressor Rooms ...... 28 Figure 11 Fish Tank at Single Point discharge for Bio Assay Test...... 30 Figure 12 Plantation Activities by WCPM ...... 32 Figure 13 Fire Hydrant Systems ...... 34 Figure 14 –WCPM Dandeli Hospital ...... 35 Figure 15 CSR Activities carried out by WCPM ...... 37

Prepared by & 3

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

EXECUTIVE SUMMARY

West Coast Paper Mills Limited (WCPM) has its manufacturing facilities at Dandeli in Uttar Kannada District of Karnataka state. It is one of the oldest and largest producers for printing, writing and packaging in India. WCPM has adapted modern paper manufacturing technologies to ensure sustainable development over the years. It was established in the year 1955. The proposed Mill Development plan (MDP) project will be located in the existing mill at Dandeli Village, Haliyal taluk, Uttara Kannada District, Karnataka and it comprises of:

¾ Addition of two (2) no’s of tissue paper machines with total capacity of 72,000 tpa

¾ Upgradation of existing six (6) Paper/Board Machines by adding appropriate equipment to increase production capacity from 320,000 tpa to 378,000 tpa (increase by 58,000 tpa)

¾ To meet the pulp demand after MDP, the existing pulp mill will be retrofitted/augmented to enhance the pulp production from 725 BD tpd to 785 BD tpd

¾ Increasing the captive power generation capacity from 74.8MW to 109.8 MW to meet 100% power requirement of post MDP, by installing a new 35 MW TG and FBC Boiler of 135TPH.

¾ Up-gradation / augmentation of the existing utilities and services to support the post MDP operations

¾ Adopting efficient water management and waste water management program to reduce specific water consumption.

The mill is spread over an area of 375.73 acres of land .Initially the plant was designed to manufacture 18,000 TPA of writing, printing and packaging paper, the commercial production of which commenced in May 1959. The Company obtained license from the Government of India in December 1964 for enhancing the production capacity to 45,000 TPA by installing balancing equipments, which was completed in 1972. Subsequently, the company had implemented Crash programme in 1974 to further increase the production capacity to 60,000 TPA against the license issued in July 1972. The licensed capacity was re-endorsed for 69,000 TPA in November 1991 on the basis of actual production. The Paper Industry has been de-licensed from July 1997 onwards.

The production capacity has been increased to 1,19,750 TPA after successful implementation of modernization/expansion programme in 1996-97 – diversifying into new product – duplex board – apart from the existing varieties of paper and paperboard. This also included rebuilding of Paper Machine No.III [by adding

Prepared by & 4

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Trinip Press, Dryers and Calendar Stack, Size Press, Colour Kitchen and Process Automation], balancing of Pulp Mill, Power House and other sections of the Mills, besides setting up of 75 TPD Duplex Board M/c. (Paper M/c No.V). After commissioning of 100 TPD duplex board machine (PM IV), coupled with rebuilding of Paper M/c. No.II, the total production capacity has further increased to 1,57,750 TPA in 2001-02 and to 1,63,750 TPA in 2003-04 on rebuilding of PM I and achieving higher production of duplex board on Paper M/c No.IV. The Company has taken up in 2007 further expansion programme to increase production capacity from 1,80,000 TPA to 3,20,000 TPA which was completed in May 2010 at a cost of Rs.1450 Cr . Currently, the company operates six versatile paper machines with an installed capacity of 3,20,000 TPA. The mill is also equipped with coal-fired boilers for generating the steam and power, dedicated water intake and treatment system and dedicated wastewater collection and treatment system. The proposed Mill Development Plan (MDP) would increase the mill’s installed capacity to 4,50,000 tpa (increase by 1,30,000 tpa) comprising of tissue papers, printing and writing papers and packaging boards. There will be increase in raw material, chemical & fuel requirements for the proposed MDP. However the specific fresh water requirement will be reduced due to various water recycling programs envisaged under proposed project. Mill has permission to draw 1,00,000 m³/day of water from River Kali. Hence, the required water for the project will be available from the existing source. Total wastewater generated from the paper production, pulping, chemical recovery and domestic activities after expansion will be about 77,000 m³/day. Since the existing ETP capacity is 85,885m3/day, it is adequate to treat the effluent post expansion. The proposed project will be developed for expansion taking into consideration all the aspects of environment as the company is committed towards green production, resource conservation and responsible waste management. The estimated project cost for the MDP is Rs. 500 Crores, out of which about Rs. 37 Crores is allocated towards Environmental Control, Protection and Monitoring. The overview of the Environmental Management for the proposed MDP is shown below:

¾ The area required for installation of the two new Tissue Paper Machines is a vacant land within the mill Land Environment premises and no impact is envisaged on the topography during construction as well as operation phase. No additional land will be acquired for the proposed project. ¾ Adequate stack will be installed for the proposed 135 TPH boiler as per CPCB guidelines for minimum stack height requirements. Air Environment ¾ High efficiency ESP will be installed to achieve the

particulate matter levels less than 100 mg/Nm3 from the proposed 135 TPH boiler. ¾ The non-condensable gases from the pulp making unit

Prepared by & 5

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

are being burnt in lime kiln. ¾ The dust emissions (fine fiber) from the proposed Tissue paper machines will be controlled by installing equipment ventilation systems followed by dust collection systems. ¾ The specific water consumption will be reduced from the current levels. ¾ Existing ETP is adequate to treat the additional pollution Water and Wastewater and hydraulic loads and the treated wastewater quality Environment levels will comply with the discharge norms stipulated by

KSPCB. ¾ The treated water discharged into the Halmaddi Nala to River Kali will be maintained within the consented levels. ¾ The additional fly ash generated from the boiler ash will Solid Waste be sold to brick and cement manufacturing industries. Generation and ¾ The remaining solid waste generated from the proposed Disposal MDP will be treated/ disposed as per the existing

practices.

Prepared by & 6

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

1 ENVIRONMENTAL MANAGEMENT ASPECTS IN THE EXISTING FACILITIES

1.1 Introduction West Coast Paper Mills Limited is one of the oldest and largest producers of paper for printing, writing and packaging in India. WCPM was established in 1955 at Dandeli in Karnataka near the banks of River Kali. The mill features well established brands of commercial and premium grades of paper and boards ranging from 54 to 600 GSM, catered across six different product segments namely writing, printing, business, specialty, industrial and packaging.

1.2 Overview of the Existing Facilities This section presents an overview of the existing facilities WCPM, its environmental compliance aspects and Environmental Management Program implemented in the existing facility. The existing facilities of WCPM are located at Bangur Nagar, Dandeli, Haliyal Taluk, Uttara Kannada district, Karnataka at the intersection of Latitude 15°15'6.52"N and Longitude 74°37'39.94"E. The mill is located in a wide area of 375.73 acres connected through a broad gauge line on Miraj-Bangalore section at Alnavar Junction, with railway lines that run up to the factory. The mill has six paper machines with an installed capacity of 3,20,000 TPA. Initially, the plant was designed to manufacture 18,000 TPA of writing, printing and packaging paper, the commercial production of which commenced in May 1959. The Company obtained licence from the Government of India in December 1964 for enhancing the production capacity to 45,000 TPA by installing balancing equipments, which was completed in 1972. Subsequently, the company had implemented Crash programme in 1974 to further increase the production capacity to 60,000 TPA against the licence issued in July 1972. The licenced capacity was re-endorsed for 69,000 TPA in November 1991 on the basis of actual production. The Paper Industry has been de-licenced from July 1997 onwards. The production capacity has been increased to 1,19,750 TPA after successful implementation of modernization/expansion programme in 1996-97 – diversifying into new product – duplex board – apart from the existing varieties of paper and paperboard. This also included rebuilding of Paper Machine No.III [by adding Trinip Press, Dryers and Calendar Stack, Size Press, Colour Kitchen and Process Automation], balancing of Pulp Mill, Power House and other sections of the Mills, besides setting up of 75 TPD Duplex Board M/c. (Paper M/c No.V). After commissioning of 100 TPD duplex board machine (PM IV), coupled with rebuilding of Paper M/c. No.II, the total production capacity has further increased to 1,57,750 TPA in 2001-02 and to 1,63,750 TPA in 2003-04 on rebuilding of PM I and achieving higher production of duplex board on Paper M/c No.IV. The Company has taken up in 2007 further expansion programme to increase production capacity from 1,80,000 TPA to 3,20,000 TPA which was completed

Prepared by & 7

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

in May 2010 at a cost of Rs.1450 Cr .The mill has environmental clearance for the expansion -cum -modernization of paper unit and captive power plant 30MW) from MoEF &CC vide no: J-11011/408/2006-IA.II (I) dated 19.07.2007 . The EC copy is attached as Annexure 1. WCPM obtained Consent for Establishment under the Water and Air Act for expansion and Modernization from Karnataka State Pollution Control Board Vide No: CFE-EIA/WCPM/EIA-685/2007-2008 dated, 16th November 2007. Copy of CTE is attached as Annexure 2. Consent for Operation and discharge of effluents under the Water (Prevention and Control of Pollution) Act, 1974 and emissions under the Air (Prevention and Control of Pollution) Act, 1981 was obtained vide consent order No: PCB/164/HP1/2010/798 dated on 18th Aug 2015. The CTO is attached as Annexure 3. The mill is regularly submitting the Environmental compliance report to the Regional Office, Bangalore of MoEF&CC and WCPM has complied with all conditions of the Environmental Clearance issued by MoEF for expanding capacity from 1,78,000tpa to 3,20,000 tpa

1.3 Compliance with Earlier EC The summary table showing the compliance with earlier Environmental Clearance and Copy of the six month compliance report submitted to MoEF&CC Regional office is enclosed as Annexure 4 Half Yearly EC Compliance Status Report Compliance submitted to MoEF&CC S.No Consent Conditions Regional office for the EC Granted in Year 2007 A. Specific Condition The gaseous emissions (SPM, SO2, The gaseous emissions from the entire NOX & H2S) from various process unit are maintained within stipulated 1 units should not go beyond the norms. The parameters are continuously prescribed standard at any event. monitored and the results of the analysis are sent to the KSPCB as monthly reports Three on-line monitoring station for Already 4 numbers of online CAAQM ambient air near the boundary of the station are installed in the mill area and plant to be set up along with another also in city area. The stations are 2. on line stack monitoring system for connected to Rotary Lime Kiln, chemical recovery boiler for various parameter Recovery Boiler and Power boilers. and the online data to be submitted to CPCB and KSPCB.

Prepared by & 8

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Compliance submitted to MoEF&CC S.No Consent Conditions Regional office for the EC Granted in Year 2007 The Elemental Chlorine shall be The new cooking system is based on the phased out from the pulp bleaching state of art technology having modified process. Obsolete bleaching super batch cooking process, new brown sequence to be replaced by Oxygen stock washing, oxygen de-lignifications, de-lignification combined with knot separation & screening plant. 3 elemental chlorine free bleaching Obsolete bleaching sequence technology sequence. followed by elemental chlorine free bleaching sequence. Thus use of elemental chlorine in pulp bleaching has been completely eliminated. ESP shall be provided to the new All the stacks of coal fired boiler, chemical boiler viz. Coal fired boilers, chemical recovery boiler & lime mud re-burning kiln recovery boiler & lime mud reburning are provided with ESP units and PM kiln and SPM emission shall be emissions are maintained below stipulated maintained below 150mg/ Nm3. Low norms of 150mg/ Nm3. NOx burners shall be installed to the boilers. Dust suppression system The company has technologically shall be provided to coal yard. upgraded chemical recovery plant by replacing old multiple effect evaporators and direct contact evaporators with falling film evaporators. The black liquor from FFE at higher concentration (above 70%) 4 is fired in a new chemical recovery boiler.

These changes have resulted into reduction of malodorous gases generation. The H2S emission from CR boiler is negligible. Hence installation of NOx burner is not necessary and the company has requested to exempt them from the condition. Water sprinklers are installed at coal handling area for dust suppression using ETP treated effluent. Fugitive emission shall be controlled All the stacks of coal fired boiler, chemical by providing dust collectors and water recovery boiler & lime mud re-burning kiln spraying system at material transfer were provided with ESP units to conform points. Odour shall be controlled by PM concentration below 150 mg/Nm3. installing odour collection system and Water sprinklers are installed at coal 5 subsequently incineration at rotary handling area for dust suppression using kiln and monitoring of H2S & ETP treated effluent. H2S testing is being Mercaptans shall be carried out once carried out quarterly as it is non- in a month in the work environment detectable in the test reports and Mercaptans testing is done by external agency

Prepared by & 9

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Compliance submitted to MoEF&CC S.No Consent Conditions Regional office for the EC Granted in Year 2007 Total fresh water requirement from Permission received to draw up to River Kali shall not exceed 1, 00,000 1,00,000 m3/day fresh water from Kali m3/day and prior permission from the river in the consent for establishment from government of Karnataka for the Government of Karnataka & agreement is remaining 15,000 m3/day shall be signed on 15-01-2009 with Water obtained. Efforts shall be made to Resource Department G.O.K. reduce water consumption by recycle and reuse. No ground water shall be Water consumption in the plant is 6 extracted. The waste water from the maintained within the consented levels. process shall not exceed 85,885 m3/day. The wastewater shall be No ground water being extracted. segregated into pulp mill & paper machine stream and treated Treated wastewater quantity of 59,950 independently in the effluent m3/day, after utilizing for greenbelt, is treatment plant before discharge to discharged into River. Halmaddi Nala leading to River Kali. The company shall make continued The average consumption of water drawn effort in reducing the volume of from river is 72,000 m3/day for paper effluent discharge into the through production of 1,80,000 TPA. After a recycling/ reuse techniques and increased production to 3,20,000 TPA, the reducing the pollution load by additional water intake was raised by an adopting advanced wastewater order of 15,000 m3/day. treatment technologies The average water consumption in the 7 plant is maintained at 73,429 m3/day during the past six months. This has been achieved by internal recycling/reuse system of the modernized plants & also the reuse of effluent of oxygen stage of fiber line into recovery system. Thus the treated trade effluent discharged is well within the stipulated norms. The performance of the Effluent At present there is no viable technology Treatment Plant shall be improved available for colour removal. However the and effort shall be made to bring use of state of art technology in the fiber down the colour, total suspended line, the colour of treated effluent is solids in the final treated effluent by reduced to 80 Co-Pt from 120 Co-Pt. 8 adopting processes like Activated Carbon filter, use of better flocculating & de-colorizing agent etc., The quantity of treated effluent shall conform to the prescribed standards & used for irrigation

Prepared by & 10

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Compliance submitted to MoEF&CC S.No Consent Conditions Regional office for the EC Granted in Year 2007 Effort shall be made to reduce colour At present there is no viable technology in wastewater substantially after available for colour removal. However the installation of advance cooking use of state of art technology in the fiber 9 system and ECF bleeding. The use of line, the colour of treated effluent is Ferric/Ferrous chloride shall be reduced to 80 Co-Pt from 120 Co-Pt. In optimized to further reduce the colour view of this Ferric/ Ferrous chloride is not in the treated effluent. necessary. AOX level should not exceed The AOX level are maintained less than 1.0kg/ton of paper production and the 1.0 kg/Ton of paper production. This has water quality shall be regularly been achieved by adopting new cooking monitored at discharge point and in system with super batch cooking 10 the river. The company also shall technology followed by Oxygen have their own instrument for the delignification & elemental chlorine free measurement of AOX, TOC level in bleaching. the treated effluent shall also be measured once in a month. Solid waste generated in the form of Fly ash is sold to cement and brick boiler ash shall be provided to manufacturers for secondary use. Lime cement/bricks manufacturing units. sludge is used to fill in the low lying areas. Lime brick shall be disposed off in The chip dust is used as fuel in the 11 low-lying areas. Chip dust shall be existing boilers and also sold to external used as fuel in existing boiler. Waste parties to use as fuel. pulp from ETP shall be given to Waste pulp from the ETP is given to cardboard/ egg tray manufacturers board/ tray manufacturers. Efforts shall be made to bring down Acoustic hood, silencers and enclosures the noise level in the paper mill plant are provided on the source of noise 12 generation, wherever required for the prescribed standard could be maintained. As per the recommendations made in CREP guidelines are complied with. the charter on Corporate 13 Responsibility for Environmental Protection (CREP) issued by the CPCB shall be followed Green belt shall be raised in at least Total area of 375.73 acres 48 ha. (30%) out of total 155 ha to Total existing green belt area: ~103 Acres mitigate the effect of fugitive Additional 2 acres has been identified 14 emissions all round the plant in as within the existing facility to develop the per the CPCB guidelines and in additional greenbelt within the plant. consultation with local DFO The company shall undertake Due to clay soil types and also shallow rainwater harvesting measure to groundwater table, the feasibility of ground recharge the ground water. water recharge through rainwater harvesting is not feasible in the area. 15 However, the feasibility of implementing rainwater harvesting structures in the region will be explored in consultation with local authority.

Prepared by & 11

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Compliance submitted to MoEF&CC S.No Consent Conditions Regional office for the EC Granted in Year 2007 Prior permission from the State State Government cleared project vide Forest Department as the proposed letter G.O.CI 19 SPI 2008 Bangalore 16 expansion of the paper unit is located dated 27-02-2008. at 0.5 km of the Dandeli Reserve Forest. Prior approval of the National Board As per the letter used by State Forest for Wild life shall be obtained since Department, the WLS is located beyond 17 the proposed expansion of the paper 10Km radius. unit is located within 2.0 km radius of the Dandeli Wild Life Sanctuary. B. General Condition The project authorities must strictly Being adhered to. adhere to the stipulations made by 1 Karnataka State Pollution Board (KSPCB) and the state Government No further expansion or The execution of the project has been modernization in the plant shall be completed as per the approval of Ministry carried out without prior approval of of Environment & Forest. The plant is the Ministry of Environmental & running satisfactorily and hence complied Forests. In case of deviation or with. alteration in the project proposal from 2 those submitted to this Ministry for clearance, a fresh reference shall be made to ministry to assess the adequacy of commissions imposed and to add additional environmental protection measure if required any. Proper housekeeping and cleanliness Proper housekeeping is maintained in and 3 to be maintained within and outside around mill area. the plant The overall noise level in and around Acoustic hood, silencers and enclosures plant area shall be kept well within are provided on the source of noise the standards (85 db(A)) by generation, wherever required for the providing noise control measure prescribed standard could be maintained. including acoustic hoods, silencers, 4 enclosures etc., and all source of noise generation. The ambient noise levels should confirm to the standards prescribed under EPA rules 1989 viz 75 db (A) during day time & 70 db (A) during night time.

Prepared by & 12

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Compliance submitted to MoEF&CC S.No Consent Conditions Regional office for the EC Granted in Year 2007 Occupational health surveillance A full-fledged occupational health centre is program shall be undertaken as in place and various occupational health regular exercise for the entire programs are being implemented as per employee, especially for those Factories Act and other applicable engaged in handling hazardous regulations. 5 substances. The first aid facilities in the occupational health centre shall be strengthened and the medical records of each employee to be maintained separately The project proponent shall also Being complied with. comply with all the environmental 6 protection measures and safe guards recommended EIA/EMP report The implementation of the project vis- The compliance report is being sent to à-vis environmental action plans shall MoEF&CC regional office on regular be monitored by ministry’s regional basis. The execution of the project has 7 office at Bengaluru/CPCB. A six been completed as per the approval of monthly compliance status shall be Ministry of Environment and Forest. The submitted to the monitoring agencies plant is running satisfactorily, hence complied with. Adequate provisions for infrastructure The compliance report is being sent to the facilities such as water supply, fuel, monitoring agencies. The execution of the sanitation etc., shall be ensured for project has been completed as per the construction workers during the approval of Ministry of Environment and 8 construction phase, so as to avoid Forest. The plant is already running falling of trees and pollution of water satisfactorily. The construction workers and surroundings were provided with the necessary infrastructure as per the applicable rules and regulations. Hence Complied with The project proponent shall have a Complied. scheme for social up liftment in the surrounding villages with reference to contribution in road construction, education , establishment of health 9 centre, sanitation facilities, drinking water supply, community awareness and employment to local people whenever and wherever possible both for technical and non technical jobs A separate environmental Environmental management cell equipped management cell equipped with full with full fledged laboratory exists. fledged laboratory facilities to carry 10 out the various environmental management and monitoring functions shall be set up under the control of senior executive.

Prepared by & 13

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Compliance submitted to MoEF&CC S.No Consent Conditions Regional office for the EC Granted in Year 2007 As proposed in EIA/EMP, Rs.241.75 Super batch Cooking plant, ECF fiber line, Crores and Rs. 150 Lakhs earmarked chlorine dioxide generation plant, oxygen towards the capital cost and recurring delignification plant, chimneys with ESP, cost per annum for Environmental limekiln, wastewater up gradation Pollution Control measures comprising of effluent clarifier, mist cooling respectively shall be judiciously to system & dewatering press for effluent implement the conditions stipulated sludge. Online stack monitoring system for by the Ministry of Environment & all boilers has been installed. 11 Forests as well as the state government and an implementation schedule for implementing all the conditions stipulated here in shall be submitted to the ministry’s Regional Office, Bangalore. The funds so provided shall not be diverted for any other purposes. Six monthly status report on the Complied with. project vis-à-vis implementation of 12 Environmental measures shall be submitted to this Ministry’s Regional Office at Bangalore/CPCB/KSPCB The project proponent shall inform Advertised in newspapers the public that the project has been accorded environment clearance by the Ministry & copies of the clearance letter are available with Karnataka State Pollution Control Board/ Committee & may also be seen at website of the ministry of Environment & Forest at http:// 13 www.envfor.nic.in.This shall be advertised within seven days from the date of issue of clearance letter at least two local news papers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned & a copy of the same shall be forwarded to the regional office The project authorities shall inform Financial assistance from various banks the regional office as well as the and the Government of Karnataka had Ministry, the date of financial closure approved the project vide letter no G.O.CI 14 & final approval of the project by the 19 SPI 2008 Bangalore dated 27-02-2008. concerned authorities & the date of commencing the land development work.

Prepared by & 14

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

1.4 Process Description of the Existing facilities The manufacture of pulp and paper at the WCPM has adopted conventional Kraft process which involves the following process.

1.4.1 Raw Material Preparation

1.4.1.1 Wood preparation The woods derived from casuarinas, Eucalyptus, Subabul, Accacia & other hardwoods are the raw material for manufacturing of paper at WCPM. The woods received at the raw material end are debarked , and the logs are chipped by two numbers of Vecoplan Drum chippers each of capacity 50tph into suitable pieces and are then screened to remove any oversize chips ,which are send to Rechipper .

Figure 1 Wood Preparation Process

Prepared by & 15

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Mill also imports wood chips, which are directly sent to cooking process after screening unevenly large sized chips which are sent to the rechippers. Chipper house also includes chips screen and re-chipper. Each chipper has a dedicated log feeding system. The chips are stored in a chips silo . The thickness of the chips is an important parameter which determines the speed and thoroughness of the cooking chemicals into the wood chips. The woods are sprayed with recycled water to avoid generation of dust during chipping process.

1.4.2 Super Batch Cooking Super batch cooking is the state of art of cooking &energy efficient cooking process. Cooking is the main process in which delignification of the wood takes place. White liquor is the chemical used for cooking. The cooking is carried out in 4 numbers of super batch digesters, each of volume 400 m3, The super batch cooking cycle consists of , chips filling & cooking liquor impregnation, hot liquor filling, heating and cooking to get required H-factor ,displacement of hot liquor, discharge of cooked pulp from the digester. The average temperature during cooking is maintained in the range of 160C to 165 C.

1.4.3 Pulp Screening &Washing and Oxygen Deligninification As cooked pulp contains uncooked knots, shives, sand and grits, these are separated in 3-stage hot screening. After hot screening, pulp processed to washing stage. The washing process is carried out by displacing the dissolved solids by spraying hot water .The screened pulp is then washed in 2-stage Twin roll press washer where pulp is washed and de watered. After 2 -stage washing pulp is processed to Oxygen deligninfication stage, where some quantity of residual lignin will be removed. After Oxygen deligninfication unbleached pulp is stored in blow tank, and washed and de watered in Twin press roll washer, before process to bleaching stage. The 1st Twin press washed liquor collected in seal tank is send to soda recovery for further process, to make cooking liquor again.

1.5 Pulp Bleaching The unbleached pulp is brown in colour, due to the presence of residual lignin and chemicals. In order to obtain good brightness of pulp, suitable for various grade of paper, the pulp is bleached using strong oxidants like oxygen, chlorine dioxide, NaOH and hydrogen peroxide, etc. The aim is to obtain good brightness with minimum degradation or loss of cellulosic fiber. The utilization of elemental chlorine has been dispensed with, by way of a change over to chlorine dioxide and at present Elemental Chlorine Free (ECF) bleaching is in operation. After ODL stage pulp enters to 1st stage of bleaching ie DHT stage ,where pulp is mixed with H2SO4 &Chlorine Dioxide in the mixer and then send to retention tower where temperature is maintained 82-85 0C,then pulp send to 2nd stage of bleaching ie - EOP stage ,where pulp is mixed with NaOH , Hydrogen peroxide and Oxygen ,pulp then send to retention tower ,temperature is maintained 75-76 0C then pulp processed to 3rd stage of bleaching ie- DnD stage where pulp mixed with Chlorine Dioxide and send to retention tower, temperature is

Prepared by & 16

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

maintained 76-77 0C to achieve pulp brightness of 88+/-1 degree ISO. After final stage of bleaching, pulp is dewatered through twin roll press and stored in High density towers and supplied to paper machines for paper making process.

Figure 2 Bleached Pulp

1.5.1 Paper Making Pulp from pulp mill is supplied to stock preparation where Pulp is processed through refiners to increase the pulp strength & freeness .Then sizing chemicals like starch, alum, dyes and other chemicals are added .The pulp from stock preparation is send to paper machine head box through approach flow system ,from head box pulp is taken on paper machine wire to form paper. The wet web is formed in the wire section and further web is pressed mechanically in the press rolls to increase sheet dryness more than 40.0% .Afterward paper enter drying section where it comes in contact with cast iron steam heated drying cylinder in order to dry the paper sheet in controlled manner. In some of the paper machines, after pre drying section the paper is surface sized with starch solution to impart better smoothness and surface properties for better printability .The paper is then passed through calendar rolls for controlling caliper and smoothness of paper finally paper is reeled in roll form in contact with pope reel. The final paper roll is processed in a slitter rewinder to make smaller width & diameter reels, as per market requirement .Reels are also converted to folio size sheets while processed through sheet cutters. Finally reels are packed in reel form& sheet is packed in reams with processing through Automatic ream packing machine. Afterward paper is ready for dispatch to various destination as per customer requirement. The production capacity of the paper machines are shown in the following table. Type of Paper Paper Machine Existing Capacity Machine PM 1 Writing/printing 100 TPD PM 2 Writing/printing 95 TPD PM 3 Writing/printing 130 TPD PM 4 Cupstock/board 110 TPD PM 5 Cupbase/board 55 TPD PM 6 Writing/printing 440 TPD

Prepared by & 17

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Total 930 TPD

Figure 3 – Finished Product

1.6 Utilities

1.6.1 Water Water from the pump house is supplied to filter house through three pipe lines 18”,21” &24” respectively ,and this water is again distributed through 4 channels and to 4 Nos of clarifiers .Clarifiers over flow will be taken to water reservoirs &blow down water will be drained . Over flow from 1&2 clarifier is taken through separate channel and chemical treatment is done and taken to jewel sand filter for residential colony supply .

Prepared by & 18

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

The capacity of each of the clarifier #1 and #2 is 13500 m³/day. The capacity of clarifier #3 is 22500m3/day &clarifier #4 capacity is 49500 m3/day Alum dosing and pre-chlorination is done at the inlet of clarifier.The capacity of storage reservoir#1 is 1600 m³ and reservoir #2 is 2700m3.The water from reservoir is pumped to mill.

River Kali Water Intake Point

Fresh water Canal from WTP to Clariflocculator No- 1 @ WTP Reservoir

Fresh Water Storage Reservoir Digital Flow Meter @ WTP

1.6.2 Power The mill has 74.8 MW captive co-generation power plant which satisfies the complete power requirement of the entire mill including the colony. In addition Mill also has a 4.04 MW Diesel Generator which is utilized if any critical power requirement arises.

Prepared by & 19

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

1.6.3 Steam Requirement The steam requirement for the mill is about 350 tph and it is met by operating four coal fired FBC boilers and two chemical recovery boilers. Indonesian coal/ Indian coal and saw/wood dust is used as fuels. In chemical recovery boiler the black liquor from pulp mill section is used. Furnace oil is used as start-up. The details of the existing boilers in the mill are shown in the following table. S. No Boilers Capacity (TPH) 1 FBC-1 60 2 FBC-2 65 3 FBC-3 80 4 FBC-4 125 5 CRB-1 & 2 253.7 6

1.7 Effluent Treatment Plant Mill has dedicated ETP of capacity 85,885KLD to treat the effluent generated from pulp mill section and paper machine, chemical recovery &sewege . The ETP consists of primary and secondary treatment which has an efficient Activated Sludge Process biological to treat the effluent streams. The block diagram of the existing ETP is shown in the figure 5.

Primary clarifier Activated Sludge Process Tank

Single Point Discharge- Monitoring Room Display of Treated Effluent Quality

Prepared by & 20

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03/ February Development Plan for the West Coast Paper Mills Ltd, 2016 Dandeli , Karnataka

Filter Press ETP Pulp sludge from Filter Press Figure 4- Effluent Treatment Plant

Prepared by & 21

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

Figure 5 ETP- Block Diagram

22 Prepared by &

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

The treated effluent is discharged in to the Halmaddi Nalla through a SPD (single point discharge) facility, which leads to River Kali. The treated water quality before discharge in to Nalla is monitored through online monitoring system and the discharge water quality limits are well within the prescribed norms by the CPCB and KSPCB.

Online Treated Water Quality Monitoring Treated Water System Figure 6 Final Discharge Monitoring System

23 Prepared by &

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

2 Environmental Management Plan for the Existing Facility

The mill has been implementing various Environmental Management Programs and is complying with all environmental regulations and standards. The company has a dedicated Industrial Pollution Control (IPC) department for monitoring and implementing various environmental programs in the existing facility. Mill has the committed Environmental Policy. Six months compliance reports for the EC conditions have been regularly submitted to the MoEF&CC regional office. WCPM is certified by ISO 14001 for designing and implementing comprehensive Environment Management system (EMS) in line with global standards.

Figure 7 WCPM- Environmental Policy

2.1 Existing Pollution Sources In the mill along with useful products, certain by products are also generated in the processes. These waste products include flue gases, waste water and solid wastes. The flue gases generated are from Boilers and Rotary lime kilns. The atmospheric pollutants from the stacks of these sources include Particulate Matter, Sulphur dioxide, Nitrogen Oxides. The quantities and the composition of the gaseous, liquid and solid waste that are generated in the mill are regulated such that their final disposal into the environment meets all the statutory requirements and the environmental impacts are minimized.

Prepared by & 24

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

2.2 Air Emissions Control at the facility The flue gases generated from Boilers, and Rotary lime kilns are vented out through stacks of adequate dimensions after passing through ESPs and pollution control systems resepctively. The atmospheric pollutants from the stacks of these sources include particulate matter, Sulphur Dioxide, Nitrogen Oxides. The boilers are connected to an efficient Electrostatic Precipitators to control the PM emissions in to the atmosphere. The NCGs and Mercaptans formed at the pulp mill section in digesters, blow tank systems and evaporators are collected and burned at Rotary Lime Kilns. There are three Ambient Air Quality Stations inside the mill premises and one in the nearby town. It is observed based on the test reports and plant data that the AAQ values are well within the NAAQS standards prescribed by CPCB. The details of the stacks and the AAQ plant data are given in table 1 & 2. The KSPCB test report of the air emissions from stacks are shown in table 3. Table 1 Existing Stack Details Stack Gas Stack Gas Stack Stack Stack Stack attached to Velocity Temperature No Height (m) Diameter (m) (m/s) (°C) 1 Chemical Recovery 60 m AGL 2.0 12 – 18 150 – 160 Boiler Stack -1 2 Chemical Recovery 85 m AGL 3.25 14- 20 150 – 160 Boiler Stack -2 3 Rotary Lime Kiln -1 51 m AGL 1.4 5 – 7 120 -130 4 Rotary Lime mud 55 m AGL 1.35 8 – 9 130 – 140 reburning Kiln -2 5 FBC Boiler – 1 55 m AGL 1.8 12 – 16 115 – 125 6 FBC Boiler – 2 68 m AGL 1.8 12 – 15 120 -130 7 FBC Boiler – 3 85 m AGL 2.2 10 –12 130 – 150 8 FBC Boiler – 4 85 m AGL 3.0 10 – 12 120 -130

Table 2 AAQ -Plant Data AAQ PM2.5 PM 10 SO NO Location 2 x Station (µg/m3) (µg/m3) (µg/m3) (µg/m3) AAQ 1 Fire Station 41 55 14 21 P.M/c effluent AAQ 2 46 58 13 20 Old clarifier Pulp Mill effluent AAQ 3 39 51 14 21 old ETP AAQ 4 Kerwad Village 38 49 16 20 NAAQ - 100 60 80 80 Standard

Prepared by & 25

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

Table 3 Air Emissions Test Report - KSPCB Date of Emission Location Report No. Parameter Unit Result Monitoring Standard Chemical PCB AR Particulate Recovery Boiler 22.12.2015 STACK-183 mg/Nm3 150 87 Matter No-1 RLW 16 PCB AR Rotary Lime Kiln Particulate 28.01.2016 STACK-201 mg/Nm3 150 55 No-1 Matter RLW 16 PCB AR Rotary Lime Kiln Particulate 28.01.2016 STACK-202 mg/Nm3 150 66 No-2 Matter RLW 16 PCB AR Particulate FBC-III Boiler 29.08.2015 STACK-112 mg/Nm3 150 73 Matter RLW 15 PCB AR Particulate FBC-IV 29.09.2015 STACK-127 mg/Nm3 150 70 Matter RLW 15 Source: Analysis Report from Karnataka State Pollution Control Board vide test report

Figure 8 Electrostatic Precipitator

Prepared by & 26

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

Figure 9 Continuous Ambient Air Quality Stations at WCPM

2.3 Fugitive Emission

The fugitive dust emissions in the mill is controlled by implementing the following Environmental Management Plan

¾ The Coal is stored in a closed shed and treated effluent sprinklers are installed to control the dust emissions.

¾ Back Water Sprinklers are installed in the chipper area which is used to spray water continuously on the woods that are entering the chipper machine to avoid dust emissions.

¾ The vehicular Emissions are kept in check.

2.4 Noise Levels at the Facility The noise generating equipments, especially the compressors are operated in a closed circuit/ room to keep the noise levels under check.

Prepared by & 27

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

Figure 10 Closed Compressor Rooms

The ambient noise level quality during day and night were monitored inside the project site. Summary plant data of Ambient Noise Level Data is given in Table 4. Table 4 Ambient Noise Levels, Plant Data Location Day, dB (A) Night, dB (A) Gate No - 3 72.6 61 TRT Cross 70 63.9 Gate no 2 72 58

It is observed that the values are well within the Ambient Noise Level Standards for industrial zone prescribed for day and night by the CPCB.

2.5 Waste Water Management Existing facility consumes about 80,000 KLD of water from Kali River. Necessary water cess has been paid to Karnataka Pollution Control Board for the permitted withdrawal limit. The total wastewater generated at the existing facility is about 76,400 m³/day. The existing ETP is designed for a capacity to handle 85,885 m³/day effluent from the mill. The wastewater from the mill is divided mainly into two separate stream, pulp mill and paper machine stream.

Prepared by & 28

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

Some quantity of treated effluent is utilized for dust suppression and greenbelt purpose and the remaining treated effluent is discharged in to the Halmadi Nalla which is connected to Kali River. The summary of the treated effluent quality tested by KSPCB is given in table 5. Table 5 Treated Effluent Quality– KSPCB S.No. Parameter Unit Limits Single Point Discharge 1 pH - 7-8.5 7.7 2 BOD mg/L 30 23.4 3 COD mg/L 250 180 4 Suspended Solids mg/L 50 40 5 Oil & Grease mg/L 10 BDL* 6 Chloride mg/L 350 164 7 Sulphate mg/L 1000 76.4 8 Sulphide mg/L 2 BDL 9 Total Residual Chlorine mg/L 1 BDL 10 Ammonical Nitrogen mg/L 50 4 11 Total Kjeldahl Nitrogen mg/L 100 5.0 12 Free Ammonia mg/L 5 0.065 13 Dissolved Phosphate mg/L 5 0.073 14 Dissolved Solids mg/L 2100 760 * BDL: Below Detectable Limit; Source: Analysis Report from Karnataka State Pollution Control Board dated 16.04.2016

The treated effluent quality is monitored in an online system and is well within the standards discharged standard prescribed by the CPCB.

2.6 Bio Assay Test Bio Assay test is conducted in treated wastewater samples to check the toxicity condition by using a living organism. The mill uses a fish tank in the single point discharge room in which the final treated waste water is added and the health of the fish is monitored on a continuous basis. The KSPCB analysis report of bio-assay test is shown in table 6.

Prepared by & 29

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

Figure 11 Fish Tank at Single Point discharge for Bio Assay Test

Table 6 Analysis Report of Bio Assay test of treated wastewater, KSPCB Report

100% Effluent Time Control A B C (hours) pH DO Death pH DO Death pH DO Death pH DO Death 0 7.6 7.3 Nil 7.2 3.8 Nil 7.2 3.8 Nil 7.2 3.8 Nil 24 7.6 7.3 Nil 7.2 4.1 Nil 7.2 4.1 Nil 7.2 4.1 Nil 48 7.6 7.6 Nil 7.2 4.3 Nil 7.2 4.3 Nil 7.2 4.3 Nil 72 7.7 7.6 Nil 7.3 4.5 Nil 7.3 4.5 Nil 7.3 4.5 Nil 96 7.7 7.5 Nil 7.3 4.8 Nil 7.3 4.8 Nil 7.3 4.8 Nil Report No: PCB BIO-A 162 RLW 15. Test Start Date: 08.05.2016 @ 5.20 PM Test End Date: 12.05.2016 @ 5.20 PM

Based on the mortality rate of the test animal, the bioassay test is analyzed. As per the KSPCB standards, at the end of the test, at least 90% of the test animal has survived and hence the water quality has passed the standard norms.

2.7 Solid & Hazardous Waste Management During mill process there is notable quantity of solid and hazardous waste generated. The Solid waste generated or mainly recycled and reused within or outside the mill premises. The various methods followed in handling the solid and hazardous wastes are described as follows,

¾ The fly ash generated from the coal fired boilers are collected and sold to cement/ brick manufacturers in and around Dandeli region.

¾ The waste pulp from ETP (Primary clarifier sludge) is sold to cardboard/ egg tray manufacturers.

¾ The municipal solid waste generated at the colony is collected and converted to manure by vermiculture

Prepared by & 30

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

¾ The used/ spent oil generated from the mill maintenance activities is send to the Pollution Control Board authorized reseller/ recycler.

¾ The wood dust generated at the chipper area is collected and used as an alternative fuel for Boiler.

2.8 Green Belt and Green Cover A massive greenbelt has been developed in an area of 103 acres in the existing facility. Apart from the industrial green belt, the mill has developed plantation in an area of 45,000 acres in the region. The mill has planted approximately 27,000,000 trees planted as on date in the region in association with local farmers and plantation agriculture land holders. The photographs of the existing green cover is given in figure 12.

Greenbelt inside the Mill

Prepared by & 31

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

Plantation Outside the Mill Figure 12 Plantation Activities by WCPM

Prepared by & 32

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

2.9 Safety Systems In order to ensure safety and security for all the employees, the company has set up a fully equipped safety department consisting of highly qualified and trained professionals. The company also has a fire brigade and positioned hydrants at strategic locations throughout manufacturing units.

Fire Hydrant Pumps Details of the Fire Hydrant Pumps

Fire Water Storage Tank Fire Hydrant Point near chipper

Fire Hydrant Point near chipper Fire Hydrant Point near chipper silo

Prepared by & 33

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

Fire Hydrant Point near digester Fire Extinguisher in mill premises Figure 13 Fire Hydrant Systems

2.10 Occupational Health and Safety WCPM is equipped with a full fledged Occupational Health Centre within the mill premises. OHC is manned by a qualified Medical Officer supported with paramedical staffs. The OHC hospital conducts regular periodic occupational health and safety monitoring for all the employees. Pre-employment medical test is done and the necessary counseling is done by the Company Medical Officer It is claimed that the persons examined were not found to have any deviation in health related to their occupation. The hospital acts dedicatedly in treating the employees and workers on any health concern and accidents. An ambulance with basic facilities like retractable stretcher, first aid boxes with medicines and oxygen cylinders is parked in front of the hospital 24 x 7 to attend any accident or critical cases in case of any mis- happenings.

WCPM Hospital

Prepared by & 34

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

First Aid Box at Pulp Mill Ambulance Figure 14 –WCPM Dandeli Hospital

First aid boxes are provided in all the company vehicles and also at numerous specific points inside the mill premises. The Company is conducting various health camps like Cardio, diabetic, eye, dental, respiratory etc., for employees and findings are updated in the employee medical history cards at OHC. Lung function test, audio metric test are being conducted periodically for the employees working in strategic places and reviewed. Health Awareness Programme by a qualified Doctor from outside on various diseases is conducted every month for the benefit of employeesThe details of the recent Occupational Health Monitoring as shown in table 7. Table 7 Health Monitoring Data at WCPM

No of Persons Date of S.No Health Monitoring Examined Examination 1 Medical Examination of Food 73 April & May 2015 Handlers at Factory Canteen 2 Audiometric Test 270 April 2015 3 Lung Function Test 396 April 2015 4 Eye Examination under Rule 65B of the Karnataka Factories 61 May & June 2015 Rules 1969 5 Medical Examination of all the April 2014 & March 351 Employees 2015

2.11 Corporate Social Responsibility The WCPM maintains a self sufficient colony with temple, shopping complex, hospital, club, theatre, cable TV network and a Gym. The Dandeli Education Society is the education wing of WCPM through which schools, colleges for pre-university and degree courses and post graduation courses in paper & pulp technology is operated. The company has prescribed a CSR expenditure of Rs.29 Lakhs in the

Prepared by & 35

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

financial year 2015-2016 and the manner in which the amount has been spent during the financial year is shown in the table. S.No Sector CSR Activity Amount Spent Protection of National Heritage, Art 1 Local Rs. 20,000 & Culture etc “Karavalli Utsav” Supporting the Kannada Sahitya 2 Rural Rs. 53,261 Parishat Medical camps for rural population Rs. 94,726 3 Rural Maintenance of water supply line under Jal Nirmal Yojna Rs. 2,34,207 Development and maintenance of 4 Local Rs. 1,85,778 Local Garden Providing assistance to trust 5 Local maintaining temples & places of Rs. 2,83,750 worship 6 Local Promoting Education Rs. 3,77,613

The company has spent Rs 12 Lakhs from the allotted CSR budget for the year 2015 to 2016. The WCPM board took all possible initiatives to ensure that the amount of Rs.29 Lakhs to be spent on CSR activities in accordance with the provisions of section 135 of the Companies Act, 2013 and Rules made under. Since the project time extended beyond the financial year, the company could not spend the remaining Rs. 17 Lakhs on CSR. Apart from this, the mill runs an organization named SHRSITI as a long term process, to serve the community in terms of Corporate and Social Responsibility.

Distribution of Scholarships for School College for Local Community Children

Prepared by & 36

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

Umbrella distribution to Local School Inauguration for Post Graduation Courses Children Figure 15 CSR Activities carried out by WCPM

Prepared by & 37

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

3 PROPOSED ENVIRONMENTAL MANAGEMENT PLAN

Based on the Pre-Feasibility Report (PFR), the following Environmental Management Plan (EMP) is proposed to leave the environment with minimized or no impact after the proposed expansion of the mill.

3.1 Land Environment The area required for installation of the two new Tissue Paper Machines is 9 acres. The site selected is a vacant land within the mill premises and no impact is envisaged on the topography during construction as well as operation phase. No additional land will be acquired under this project.

3.2 Air Quality Management

The following systems are recommended to minimize the impact on environment in concern to the ambient air quality.

¾ The stack height for the proposed new FBC boiler (135 tph capacity) will be designed to meet the minimum stack height requirements stated by CPCB.

¾ The proposed ESP for the 135 TPH boiler will be designed to meet the PM levels below 100 mg/nNm3 as against the KSPCB norms of 100 mg/Nm3.

¾ The dust emissions from the tissue machines will be collected in central ventilation system and will be treated in bag filters.

¾ An efficient steam condensate recovery system will be adopted to recover at least 85% of condensate steam from the boiler and Tissue paper machine section in accordance with the industry best practices.

¾ The existing ESP will be adequate to meet the additional emissions generated from the Chemical Recovery Boiler.

3.3 Noise Management

As the proposed expansion is to be operated in a closed circuit, it is envisaged that the noise environment would remain unaffected during the operation of the proposed facilities.

3.4 Water and Waste water Management

There will be reduction in specific water consumption in the plant during the post MDP due to adoption of various conservation measures and recycling of wastewater within the process. The total fresh water requirement after the proposed MDP will be maintained within the existing permitted level of 80,000 m3/day. Mill has permission

Prepared by & 38

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

to draw 1,00,000 m³/day of water from river Kali. The envisaged wastewater generation from the plant during post project scenario will be about 76,800 m3/day. Hence the existing ETP with 85,885 m3/day capacity is adequate. The treated water, after utilizing partial quantities for greenbelt and plantation activities, will be discharged to Halmaddi Nallah leading to River Kali as per the discharge standards prescribed by KSPCB.

3.5 Solid and Hazardous Waste Management There will be slight increase in the generation of solid waste due to the proposed MDP. Expected solid wastes are additional fly ash from the proposed FBC boiler, fibre sludge from the effluent treatment plant, lime mud, saw dust and used oil. Existing solid and hazardous waste handling practices will be followed in future also, after the proposed expansion. The details of solid waste generation and quantities with disposal methods are given in the following table Additional Post Solid Existing S.No Quantity Project Disposal Method Waste (TPD) (TPD) (TPD) Cement manufacture/ 1 Fly ash 370 220 590 brick manufacture. Fired in boiler/ Sold to 2 Saw Dust 60 10 70 external party for secondary use Recycled using lime kiln 3 Lime Mud 375 25 400 with make-up lime Waste ETP Used for card board /egg 4 SLUDE 54 26 80 tray manufacture from WWTP Used Oil, Sold to KSPCB 5 0.05 0.01 0.06 KLD approved recyclers

Prepared by & 39

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

4 PROJECT BENEFITS

As India’s demand for paper is expected to rise 53% in the next three years, primarily due to a sustained increase in the number of school going children in rural areas [ref1] and the tissue paper mill in India is growing at an average of 20-25% annually depending on the region [ref2]. The proposed MDP will help to bridge the gap of demand-supply for the tissue paper in the local and national market. While the existing mill is providing direct and indirect employment to several local people in the region, the proposed MDP will further enhance the livelihood opportunities in the region.

1http://www.business-standard.com/article/markets/indias-paper-demand-to-rise-53-by2020- 114041800784_1 2www.tissueworldmagazine.com

Prepared by & 40

Document Ref: PJ-ENVIR- Environmental Management Plan for the Proposed Mill 20161031-993/03 EMP Development Plan for the West Coast Paper Mills Ltd, November 2016 Dandeli , Karnataka

5 CONCLUSION

Based on detailed review of the existing plant operations, various environmental management plans adopted in the existing facility and Pre-feasibility report of the proposed MDP, the following aspects can be summarized and concluded:

¾ The proposed tissue paper plant will be constructed within the existing premises. No additional land will be acquired.

¾ The bag filter and ventilations systems for the proposed new tissue paper machines

¾ ESP will be installed for new boilers will control the air emissions from stack less than 100 mg/Nm3.

¾ Water consumption will be limited to within the existing permitted levels of 100,000 m3/day. Hence no additional water drawl permits are envisaged.

¾ The existing ETP is adequate to treat the wastewater generated during the post MDP.

¾ The additional solid waste (ash, ETP sludge) generated will be handed over for reuse and recycle purpose within the mill as well for outside parties. The hazardous waste like used/spent oil will be handed over to the authorized hazardous waste reseller or recycler.

Thus, it can be concluded that the proposed project will not create any negative impact on the environment.

Prepared by & 41