Urban Form Analysis CARNEGIE

Total Page:16

File Type:pdf, Size:1020Kb

Urban Form Analysis CARNEGIE Urban Form Analysis CARNEGIE December 2018 Page | 0 Contents Report Appendices 1. Introduction Appendix A: Appendix B: Appendix C: Existing Context Review Commercial and mixed use areas Residential Precincts 2. Existing context Appendix A outlines the existing context for Appendix B outlines the key design aspects Appendix C outlines the key design aspects 3. Design response the activity centre in relation to built form. that influenced proposed controls for that influenced proposed controls for Discussion is separated into four parts: commercial and mixed use areas. residential areas. Discussion is separated 4. Recommendations Discussion is separated into nine parts: into three parts: A1. Strategic city context 4.1 Summary B1. Summary (design approach) C1. Summary (design approach and A2. Glen Eira Planning Scheme recommendations) 4.2 Commercial and mixed use areas B2. Active streets and laneways A3. Land analysis C2. Key preferred character outcomes 4.3 Residential areas B3. Supporting employment by design A4. Built form and character analysis C3. Impact on development B4. Street wall height and design opportunity (housing yield) B5. Setbacks above the street wall B6. Building height B7. Building separation, outlook and privacy B8. Responding to sensitive Interfaces B9. Shadow protection Page | 1 1. Introduction Purpose Study Area This report documents the built form The report reviews land within the suburb of elements of the Carnegie Structure Plan Carnegie identified as the Carnegie 2018-2031, seeking to: Activity Centre study area (see map). Consolidate and document all The study area is located in the City of Glen background research, analysis and Eira and approximately 11km from the central business district of metropolitan recommendations that inform the built form aspects of the Structure Plan. Melbourne. The study area has been extended since original adoption of the Outline the rationale for proposed Structure Plan to include land between building heights, setbacks, open space Truganini Road and Munroe Avenue, which Carnegie Station protection controls and preferred built was the subject of further heritage analysis form character in support of a planning included in the Structure Plan scheme amendment to implement implementation process. relevant policy and controls. Limitations of this report Context The report is limited to issues affecting In 2017-18, Council prepared, consulted on, planning controls for building height, and adopted the Carnegie Structure Plan setbacks, open space protection controls 201 8-2031. To inform the development of and preferred built form character the Plan, Council completed six stages of consultation with the Carnegie community While the report is cognisant of and and received a total of 780 submissions. reinforces other strategic work relating to housing, economy, place-making, A key aspect of the structure planning transport and public realm projects for the process was to create a vision and new Structure Plan; it is not the source urban structure for the centre, with a range document for these matters. of housing, economic, place-making, transport, urban design and public realm The report does not address matters of project recommendations. strategic planning assessment, such as adherence to Planning Practice Notes Aspects of the plan will be implemented as advice, Ministerial Directions or directions statutory planning controls through a formal and objectives of Plan Melbourne as set amendment to the Glen Eira Planning out by the Victorian Government. The Scheme. This report documents the process report provides background information for of urban form analysis and provides a comment on these matters elsewhere summary of the key urban form through the Planning Scheme Amendment recommendations and rationale in support process. of the Planning Scheme Amendment. Page | 2 2. Existing context Key opportunities Overall Issues and opportunities Revise planning controls to introduce clear guidance and priorities for building height and character. Appendix A contains a detailed review and Commercial areas analysis of the existing context in Carnegie. Preserve the low-scale traditional The following provides a summary of key character of the Koornang retail core. issues and opportunities identified. Explore increased building heights in abutting surrounds that complement but Key issues do not prejudice the low-scale character of Koornang Road and Residential areas surrounding residential areas. New development has high site Explore taller forms north of the railway coverage, limited setbacks, and line forming part of an urban renewal limited overall response to local precinct. Ensure these forms respond character. Existing controls provide appropriately to adjoining residential limited character guidance for areas and public open spaces. Housing Diversity and Urban Village Encourage design that supports Policy areas. employment floorspace. Commercial and mixed use Heritage Current policy does not provide Review heritage opportunities and adequate built form guidance, introduce Heritage Overlay controls in including preferred character and identified locations such as the building height controls. Koornang Road retail core. Employment Residential areas New developments in commercial Plan shows maximum height of existing zones / Explore ways to support growth and a areas provide low proportions of precincts: diversity of housing options while commercial floor space and often retaining local character elements – Residential fail to deliver a measurable NRZ – 2 storeys community benefit. rearrange residential zone boundaries and revise design guidance to balance GRZ – 3 storeys RGZ – 4 storeys Open space the need for growth while reinforcing There is limited provision of public local character. Commercial/Mixed Use open space within walking distance Define preferred character C1Z & MUZ1 – No height controls of the activity centre, particularly requirements. *model shows 6-8 storeys based on current trends in major activity centres. ‘green areas’ like traditional parks. Open spaces Co-ordinate a network of new open Note: interim controls were introduced in 2017- spaces. Provide guidance for 18 in conjunction with structure planning. This developments to enhance activation model shows the original context, before and protect public spaces from structure planning or interim controls. overshadowing. Page | 3 4. Shadow Protection Controls 3. Design response Design controls will protect identified existing and future public realm and Creating a new urban form public open spaces from overshadowing 5. More employment opportunities in Appendices B & C contain detailed commercial areas discussion and rationale for the proposed The employment aspect of commercial urban form. The following provides a areas will be reinforced through policy summary of key recommendations: and by introducing minimum floor to floor heights in commercial precincts. 1. Main street character protection Moderate scale (4-5 storeys) and 6. Residential Growth around transport characterful built forms will protect and corridors and infrastructure enhance the historic and finegrain Higher scale and density residential character of Koornang and Neerim areas will be positioned towards the Roads. heart of the precinct around the retail core, train station, selected main roads 2. Strategic sites adjoining the main street and tram routes. Taller built forms (6-8 storeys) adjoining the mainstreet and train station will: 7. Diverse housing and built forms Provide opportunities for additional In residential areas, a greater spread of growth while respecting the low- building typologies (precinct scale main street, residential requirements) will provide options that surrounds and identified open meet housing needs of the community. spaces. This includes a more varied mixture of Establish a contemporary character low to medium density town housing and repair the disjointed urban and apartment options. fabric with built-to-boundary Plan shows maximum height of proposed requirements and new laneway 8. Identify preferred built form and zones/precincts: connections that facilitate a larger character outcomes grid pattern strengthening the retail Identifying preferred character Residential Commercial/mixed use core. outcomes will improve design responses 2 storeys 4 storeys to local character and provide greater 3 storeys 5 storeys 3 storeys 6-8 storeys 3. Urban Renewal north of the railway line clarity and certainty for the community Transformational built forms of 6-12 4 storeys 8-12 storeys and developers. 4 storeys storeys will be positioned in a new urban renewal area fronting Dandenong Road 9. Manage transition and remove conflict north of the railway line. These forms will Redistributing zone boundaries and built respond appropriately to adjoining form outcomes will help to improve the sensitive residential areas and public transition between areas of different open spaces and accommodate a development intensities. Where possible, greater quantity of housing and zones will be separated by roads rather employment. than property boundaries. Page | 4 4. Recommendations 4.1 Summary Building typologies The activity centre applies building typology recommendations from the Quality Design Guidelines. Each building typology will be applied as a built form precinct in the Planning Scheme. Precincts/Building typologies HC Heritage character housing MC Minimal change area GT Garden townhouse TA Townhouse and apartment mix
Recommended publications
  • Carnegie Online Feedback – Raw Data
    GLEN EIRA CITY COUNCIL TRANSFORMING OUR NEIGHBOURHOODS TOGETHER CARNEGIE ONLINE FEEDBACK – RAW DATA BENTLEIGH BENTLEIGH EAST BRIGHTON EAST CARNEGIE CAULFIELD ELSTERNWICK GARDENVALE GLEN HUNTLY MCKINNON MURRUMBEENA ORMOND ST KILDA EAST ONLINE FEEDBACK – RAW DATA CONTENTS CARNEGIE RAW DATA ........................................................................................................................................ 3 SURVEY ........................................................................................................................................................ 3 VISION – ARE THERE ANY PARTS YOU WOULD CHANGE? .................................. 3 OBJECTIVES – IS THERE ANYTHING MISSING? ............................................................. 9 CONCEPT ONE ....................................................................................................................... 12 CONCEPT TWO ..................................................................................................................... 17 CONCEPT THREE ................................................................................................................... 21 FACEBOOK .............................................................................................................................................. 29 GLEN EIRA CITY COUNCIL PAGE 2 CARNEGIE RAW DATA SURVEY VISION – ARE THERE ANY PARTS YOU WOULD CHANGE? I am not certain that I agree with an increase in overall parking. More focus should be on local residents accessing the area
    [Show full text]
  • LEGISLATIVE COUNCIL UNANSWERED QUESTIONS on NOTICE Edition No. 64
    LEGISLATIVE COUNCIL UNANSWERED QUESTIONS ON NOTICE Edition No. 64 As at 25 February 2021 (Notice received 19 December 2018) 8924 MS CROZIER — To ask the Minister for Health: In relation to conversion therapy: (1) How many complaints has the health commissioner had regarding conversion therapy and of those complaints — (a) how many related to psychological treatment; (b) how many related to pharmacological treatment; and (c) how many related to both psychological and pharmacological treatment. (Notice received 19 March 2019) 28525 MS CROZIER — To ask the Minister for Health: How many paramedics in Victoria are employed, in total, in each of the 79 Local Government Areas. (Notice received 28 May 2019) 40925 MS CROZIER — To ask the Minister for Health: How many staff from the North Richmond Community Health Centre have assisted with attending to people who have overdosed on drugs within the vicinity of the North Richmond Community Health Centre between — (a) 1 January 2018 to 30 June 2018; (b) 1 July 2018 to 31 December 2018; and (c) 1 January 2019 to 30 April 2019. (Notice received 13 August 2019) 630 MR DAVIS — To ask the Minister for Employment (for the Minister for Public Transport): In relation to the 2015-16 Bus Package which describes the deliverables of this project as ‘Victoria’s bus networks will be improved by adding more routes, expanding others, restoring cut services and fixing missing links in Melbourne’s growth areas’ on page 25 in the 2015-16 Budget Paper No. 3: (1) Could the Minister provide, expressed in table form — (a) the cut services that were restored in — (i) 2015-16; (ii) 2016-17; (iii) 2017-18; (iv) 2018-19; 25 February 2021 2 (b) the commencement date of each cut service that was restored; and (c) the output cost for each cut service restored, in the year it started and each successive year to 2018-19.
    [Show full text]
  • Envrionmental Audit Report
    INFORMATION REGARDING ENVIRONMENTAL AUDIT REPORTS August 2007 VICTORIA’S AUDIT SYSTEM AUDIT REPORT CURRENCY An environmental audit system has operated in Audit reports are based on the conditions encountered Victoria since 1989. The Environment Protection Act and information reviewed at the time of preparation 1970 (the Act) provides for the appointment by the and do not represent any changes that may have Environment Protection Authority (EPA Victoria) of occurred since the date of completion. As it is not environmental auditors and the conduct of possible for an audit to present all data that could be independent, high quality and rigorous environmental of interest to all readers, consideration should be audits. made to any appendices or referenced documentation An environmental audit is an assessment of the for further information. condition of the environment, or the nature and extent When information regarding the condition of a site of harm (or risk of harm) posed by an industrial changes from that at the time an audit report is process or activity, waste, substance or noise. issued, or where an administrative or computation Environmental audit reports are prepared by EPA- error is identified, environmental audit reports, appointed environmental auditors who are highly certificates and statements may be withdrawn or qualified and skilled individuals. amended by an environmental auditor. Users are Under the Act, the function of an environmental advised to check EPA’s website to ensure the currency auditor is to conduct environmental audits and of the audit document. prepare environmental audit reports. Where an environmental audit is conducted to determine the PDF SEARCHABILITY AND PRINTING condition of a site or its suitability for certain uses, an environmental auditor may issue either a certificate or EPA Victoria can only certify the accuracy and statement of environmental audit.
    [Show full text]
  • Minutes of Ordinary Council Meeting
    GLEN EIRA CITY COUNCIL ORDINARY COUNCIL MEETING TUESDAY 11 JUNE 2019 MINUTES Meeting was held in the Council Chambers, Corner Hawthorn & Glen Eira Roads, Caulfield at 7.30pm Present The Mayor, Councillor Jamie Hyams Councillor Tony Athanasopoulos Councillor Anne-Marie Cade Councillor Clare Davey Councillor Mary Delahunty Councillor Dan Sztrajt ORDINARY COUNCIL MEETING MINUTES 11 JUNE 2019 INDEX 1. ACKNOWLEDGEMENT .......................................................................................... 4 3. OATH OF OFFICE AND DISCLOSURES OF INTERESTS ..................................... 4 4. CONFIRMATION OF MINUTES OF PREVIOUS COUNCIL MEETINGS ................. 5 5. RECEPTION AND READING OF PETITIONS AND JOINT LETTERS .................... 5 5.1 Petition: Objection to the Safe Cycling Corridor Pilot ....................................... 5 6. DOCUMENTS FOR SEALING ................................................................................. 6 Nil 7. REPORTS BY DELEGATES APPOINTED BY COUNCIL TO VARIOUS ORGANISATIONS ................................................................................................... 6 8. REPORTS FROM COMMITTEES ............................................................................ 6 8.1 Advisory Committees ................................................................................... 6 8.1.1 Advisory Committee Minutes ........................................................................... 6 8.2 Records of Assembly ...................................................................................
    [Show full text]
  • Legislative Council Unanswered Questions On
    LEGISLATIVE COUNCIL UNANSWERED QUESTIONS ON NOTICE Edition No. 60 As at 13 November 2020 (Notice received 19 December 2018) 8924 MS CROZIER — To ask the Minister for Health: In relation to conversion therapy: (1) How many complaints has the health commissioner had regarding conversion therapy and of those complaints — (a) how many related to psychological treatment; (b) how many related to pharmacological treatment; and (c) how many related to both psychological and pharmacological treatment. (Notice received 19 March 2019) 28525 MS CROZIER — To ask the Minister for Health: How many paramedics in Victoria are employed, in total, in each of the 79 Local Government Areas. (Notice received 28 May 2019) 40925 MS CROZIER — To ask the Minister for Health: How many staff from the North Richmond Community Health Centre have assisted with attending to people who have overdosed on drugs within the vicinity of the North Richmond Community Health Centre between — (a) 1 January 2018 to 30 June 2018; (b) 1 July 2018 to 31 December 2018; and (c) 1 January 2019 to 30 April 2019. (Notice received 13 August 2019) 630 MR DAVIS — To ask the Minister for Employment (for the Minister for Public Transport): In relation to the 2015-16 Bus Package which describes the deliverables of this project as ‘Victoria’s bus networks will be improved by adding more routes, expanding others, restoring cut services and fixing missing links in Melbourne’s growth areas’ on page 25 in the 2015-16 Budget Paper No. 3: (1) Could the Minister provide, expressed in table form — (a) the cut services that were restored in — (i) 2015-16; (ii) 2016-17; (iii) 2017-18; (iv) 2018-19; 13 November 2020 2 (b) the commencement date of each cut service that was restored; and (c) the output cost for each cut service restored, in the year it started and each successive year to 2018-19.
    [Show full text]
  • Faster Enterprises Ltd Acn 604 113 206
    FASTER ENTERPRISES LTD ACN 604 113 206 SUPPLEMENTARY PROSPECTUS IMPORTANT INFORMATION This is a supplementary disclosure document (Supplementary Prospectus) dated 20 September 2016 that was lodged with ASIC on that date. The Supplementary Prospectus contains particulars of changes to, and supplements the replacement prospectus lodged with ASIC on 2 August 2016 (Replacement Prospectus) by Faster Enterprises Ltd (Company). This Supplementary Prospectus and the Replacement Prospectus are important documents that must be read in conjunction with each other. Investors should read both documents in full and are advised to consult with their professional advisers before deciding whether to apply for Shares under this Supplementary Prospectus or if they have any queries. This Supplementary Prospectus is a “refresh document” as defined in Section 724(3H) of the Corporations Act and has been lodged with ASIC in accordance with Section 724(3G) of the Corporations Act. ASIC, the ASX and their respective officers take no responsibility for the content of this Supplementary Prospectus or the merits of the investment to which this Supplementary Prospectus relates. Other than as set out in this Supplementary Prospectus, all details set out in the Replacement Prospectus remain unchanged. In the event of inconsistencies between the Supplementary Prospectus and the Replacement Prospectus, the Supplementary Prospectus prevails. The Company will send a copy of the Supplementary Prospectus to all Applicants that have applied for securities under the Replacement Prospectus as at the date of this Supplementary Prospectus. OBTAINING A COPY OF THIS PROSPECTUS For personal use only A paper copy of this Supplementary Prospectus and the Replacement Prospectus may be obtained free of charge from the Company by any person in Australia by calling +61 3 9897 4540 between 9.00am and 5.00pm (AEST), Monday to Friday during the Offer Period.
    [Show full text]
  • Glen Eira Heritage Review of Bentleigh and Carnegie Structure Plan Areas (Commercial) 2018 Stage 2 Report
    Centre Road, Bentleigh Koornang Road, Carnegie Glen Eira Heritage Review of Bentleigh and Carnegie Structure Plan Areas (Commercial) 2018 Stage 2 Report City of Glen Eira RBA ARCHITECTS + CONSERVATION CONSULTANTS P T Y L T D FITZROY STREET 4 C / 1 7 1 ST KILDA VIC AUSTRALIA 3182 +613 9525 5666 TEL +613 9525 4906 FAX [email protected] EMAIL www.rbaarchitects.com.au WEB TABLE OF CONTENTS 1 Introduction 1.1 Overview 1 1.2 Brief 1 1.3 Project Structure 2 1.4 Phase One – Commercial Areas 3 1.5 Background 3 1.6 Study Team 4 1.7 Acknowledgements 4 2 Methodology 2.1 Introduction 5 2.2 Site Inspections 5 2.3 Research 5 2.4 Assessment of Significance 6 2.5 Citation Format 7 3 Stage One 3.1 Overview 8 3.2 Findings 8 4 Stage Two 4.1 Findings 10 4.2 Bentleigh 10 4.3 Carnegie 12 Appendix Citations Glen Eira Heritage Review of Bentleigh and Carnegie Structure Plan Areas (Commercial) 2018 Report 1 INTRODUCTION 1.1 Overview This report relating to Phase One, Stage Two of the Glen Eira Heritage Review – Bentleigh & Carnegie Structure Plan Areas (Commercial), has been prepared by RBA Architects + Conservation Consultants for the City of Glen Eira. It provides citations for ten recommended (nine new and one revised) heritage places, both precincts and individual sites, within the commercial zones of the Bentleigh and Carnegie Structure Plan areas. The residential parts of these Structure Plan areas will be the subject of review during Phase Two of the project.
    [Show full text]
  • Biodiversity-In-Glen-Eira-2018.Pdf
    Biosphere Pty Ltd ABN 28 097 295 504 Version 1.1, 7 February 2018 Contents ACKNOWLEDGMENTS .................................................................... II EXECUTIVE SUMMARY ................................................................... 1 1. INTRODUCTION ........................................................................ 2 2. THE IMPORTANCE OF NATURE AND BIODIVERSITY ..................... 4 3. THE STUDY APPROACH ........................................................... 5 3.1 Survey of Literature and Pre-existing Information .......... 5 3.2 Fieldwork ....................................................................... 6 4. GLEN EIRA’S VEGETATION PRIOR TO COLONISATION ................. 8 5. WILD PLANT SPECIES ............................................................ 10 5.1 Indigenous Plants ......................................................... 10 5.2 Significant Trees .......................................................... 11 5.3 Non-indigenous Plants.................................................. 12 6. FAUNA AND HABITAT ............................................................. 13 6.1 Fauna Species ............................................................... 13 6.2 Habitat Features ........................................................... 14 7. HOTSPOTS FOR INDIGENOUS FLORA AND FAUNA ..................... 16 7.1 Sandringham Railway Line Verge, Elsternwick ............ 17 7.2 Rippon Lea Lake and Surrounds ................................... 22 7.3 Caulfield Park .............................................................
    [Show full text]
  • Connecting to the Future
    CONNECTING TO THE FUTURE The Alternative to the Victorian Transport Plan Contents 1 Introduction........................................................................................................................1 2 Victoria’s Transport Crisis.................................................................................................3 2.1 Responding to Traffic Congestion.............................................................................3 2.2 Victoria’s Freeway Fetish: From CityLink to ‘Missing Link’...................................5 2.3 Climate Change and Transport ..................................................................................8 2.4 Petrol Prices and Peak Oil........................................................................................11 2.5 A Rail Capacity Crisis?............................................................................................13 3 Distractions and Blind Alleys: Why the Crisis Continues...............................................21 3.1 Urban Myths From the Road Lobby........................................................................21 3.2 The Sorry Legacy of Privatisation ...........................................................................23 3.3 Melbourne 2030 and ‘MOTC’: Action Through Inaction .......................................25 3.4 Eddington and the VTP: Back to the Future............................................................29 4 The Solution: Learning From Experience........................................................................36
    [Show full text]