FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act
Total Page:16
File Type:pdf, Size:1020Kb
FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office Region X 1,192 projects 31,325,740,000 Bukidnon 1st District Engineering Office 133 projects 4,586,967,000 BUKIDNON (FOURTH) 32 projects 1,140,842,000 OO1: Ensure Safe and Reliable National Road System 9 projects 750,000,000 Asset Preservation - Preventive Maintenance - Secondary Roads 150,000,000 1. P00302499MN 310102100239000 150,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1588 + 942 - K1593 + 000, K1596 + 000 - K1597 + 000, K1602 + 000 - K1605 + 140 P00302499MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 16.396 144,750,000 Central Office / Asphalt Overlay - at Specific Maintenance of Region X Locations along Road: Asphalt Kapalong-Talaingod-Valencia Overlay (Bukidnon) Rd (S00641MN) K1588 + 942 - K1605 + 140 P00302499MN-EAO 5,250,000 Central Office / Region X Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 150,000,000 Roads - Primary Roads 2. P00302849MN 310104100106000 150,000,000 Sayre Highway - K1527 + 520 - K1528 + 514, K1533 + 000 - K1534 + 000, K1537 + 240 - K1538 + 1012 P00302849MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 7.360 144,750,000 Central Office / Pavement - at Specific Locations Concrete Region X along Sayre Highway (S00639MN) Pavement K1527 + 520 - K1538 + 1012 P00302849MN-EAO 5,250,000 Central Office / Region X Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 10,000,000 National Roads - Primary Roads 3. P00300178MN 310110100089000 10,000,000 Sayre Highway - K1534 + 235 - K1534 + 250 P00300178MN-CW1 Upgrading of Drainage Structure Upgrading of Lineal 30.000 9,800,000 Bukidnon 1st along Road - along Sayre Highway Drainage meters District (S00639MN) K1534 + 235 - K1534 + Structure along Engineering Office 250 Road / Bukidnon 1st District Engineering Office P00300178MN-EAO 200,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office MYPS: 06/28/2019 03:23:34 pm Page 1 of 398 IO Report FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office Network Development - Road Widening - Secondary Roads 100,000,000 4. P00303668MN 310202100327000 100,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1597 + 000 - K1602 + 000 P00303668MN-CW1 Road Widening - along Road Widening Lane Km 10.000 96,500,000 Central Office / Kapalong-Talaingod-Valencia Bukidnon 1st (Bukidnon) Rd (S00641MN) K1597 District + 000 - K1602 + 000 Engineering Office P00303668MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office Network Development - Construction of By-Pass and Diversion Roads 300,000,000 5. P00303870MN 310204100539000 150,000,000 Sayre Highway Parallel Road II, (Valencia Section), Package 11, Bukidnon P00303870MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.484 144,750,000 Central Office / Sayre Highway Parallel Road II, Concrete Road Region X (Valencia Section), Package 11, Bukidnon P00303870MN-EAO 5,250,000 Central Office / Region X 6. P00303883MN 310204100542000 150,000,000 Valencia By-pass Road Extension, (Lantapan-Bagontaas Section), Package 3, Bukidnon P00303883MN-CW1 Construction of Steel Bridge - Construction of Square 1,183.200 144,750,000 Central Office / Valencia By-pass Road Extension, Steel Bridge meters Region X (Lantapan-Bagontaas Section), Package 3, Bukidnon P00303883MN-EAO 5,250,000 Central Office / Region X Network Development - Off-Carriageway Improvement - Primary Roads 20,000,000 7. P00302128MN 310207100071000 20,000,000 Sayre Highway - K1525 + 274 - K1525 + 571, K1533 + 692 - K1535 + 091, K1535 + 121 - K1535 + 349, K1536 + 356 - K1536 + 420 P00302128MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 5,003.000 19,600,000 Bukidnon 1st Shoulder Paving / Construction - at Improvement: meters District Specific Locations along Sayre Shoulder Paving / Engineering Office Highway (S00639MN) K1525 + 274 Construction / Bukidnon 1st - K1536 + 420 District Engineering Office MYPS: 06/28/2019 03:23:34 pm Page 2 of 398 IO Report FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00302128MN-EAO 400,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office Network Development - Off-Carriageway Improvement - Tertiary Roads 10,000,000 8. P00302127MN 310209100171000 10,000,000 Jct SH-Bangcud-Mailag Rd (By-Pass Rd) - K1529 + 561 - K1530 + 288 P00302127MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 2,019.000 9,800,000 Bukidnon 1st Shoulder Paving / Construction - Improvement: meters District along Jct SH-Bangcud-Mailag Rd Shoulder Paving / Engineering Office (By-Pass Rd) (S00619MN) K1529 + Construction / Bukidnon 1st 561 - K1530 + 288 District Engineering Office P00302127MN-EAO 200,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office Bridge - Retrofitting/ Strengthening of Permanent Bridges 10,000,000 9. P00301730MN 310303100693000 10,000,000 Malingon Br. (B01371MN) along Sayre Highway P00301730MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 9,800,000 Bukidnon 1st Bridge - Malingon Br. (B01371MN) Strengthening of Bridges District along Sayre Highway Bridge Engineering Office / Bukidnon 1st District Engineering Office P00301730MN-EAO 200,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office OO2: Protect Lives and Properties Against Major Floods 3 projects 256,842,000 Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins 256,842,000 and Principal Rivers 10. P00321946MN 320102100676000 100,000,000 Construction of Flood Control Structure (with Esplanade) along Pulangi River, Brgy. Batangan, Valencia City, Bukidnon MYPS: 06/28/2019 03:23:34 pm Page 3 of 398 IO Report FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00321946MN-CW1 Construction of Flood Mitigation Construction of Lineal 320.000 96,500,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Control Structure (with Esplanade) Structure District along Pulangi River, Brgy. Engineering Office Batangan, Valencia City, Bukidnon P00321946MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office 11. P00321947MN 320102100677000 100,000,000 Construction of Flood Control Structure (with Esplanade) along Pulangi River, Brgy. Poblacion (Purok 17A), Valencia City, Bukidnon P00321947MN-CW1 Construction of Flood Mitigation Construction of Lineal 500.000 96,500,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Control Structure (with Esplanade) Structure District along Pulangi River, Brgy. Engineering Office Poblacion (Purok 17A), Valencia City, Bukidnon P00321947MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office 12. P00321948MN 320102100678000 56,842,000 Construction of Flood Mitigation Structures within Mindanao River Basin (along Pulangui River), Brgy. Lumbayao Section, Bukidnon P00321948MN-CW1 Construction of Flood Mitigation Construction of Lineal 540.000 54,852,530 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Mitigation Structures within Structure District Mindanao River Basin (along Engineering Office Pulangui River), Brgy. Lumbayao Section, Bukidnon P00321948MN-EAO 1,989,470 Central Office / Bukidnon 1st District Engineering Office Convergence and Special Support Program 1 projects 15,000,000 Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 15,000,000 13. P00330632MN 300203100954000 15,000,000 Access Road leading to Salawao Cave, Valencia City, Bukidnon P00330632MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.700 14,700,000 Bukidnon 1st Access Road leading to Salawao Concrete Road District Cave, Valencia City, Bukidnon Engineering Office / Bukidnon 1st District Engineering Office MYPS: 06/28/2019 03:23:34 pm Page 4 of 398 IO Report FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00330632MN-EAO 300,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office Local Program 19 projects 119,000,000 Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 79,000,000 Program 14. P00343804MN 300104211566000 4,000,000 Construction (Completion) of Multi-Purpose Building at P-17, Brgy. Hindangon, Valencia City, Bukidnon P00343804MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,960,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building at P-17, Brgy. Hindangon, / Bukidnon 1st Valencia City, Bukidnon District Engineering Office