Contains Confidential Or Exempt Information NO Title Energy

Total Page:16

File Type:pdf, Size:1020Kb

Contains Confidential Or Exempt Information NO Title Energy Report for: ACTION Item Number: 11 Contains Confidential NO or Exempt Information Title Energy Strategy for Ealing Responsible Officer(s) Pat Hayes, Executive Director Regeneration & Housing [email protected] Author(s) Jo Mortensen, Sustainability Programme Manager Portfolio(s) Hitesh Tailor – Housing; Bassam Mahfouz – Environment For Consideration By Cabinet Date to be Considered 17 December 2013 Implementation Date if 3 January 2014 Not Called In Affected Wards All Keywords/Index Energy, fuel poverty, affordable warmth, efficiency, sustainability Purpose of Report: To update cabinet on the development of the energy strategy and to seek specific authority for activities related to implementing the strategy. 1. Recommendations That Cabinet agrees to: 1.1 Note and agree the attached Energy Strategy and the strategic priorities identified in the strategy. 2. Reason for Decision and Options Considered 2.1 The purpose of the Energy Strategy is to establish the intentions of the council related to energy use and production and to recognise the significant relationship between energy and health. The Strategy identifies the ambitions of the council organised by the key drivers: a. Meeting our regulatory obligations b. Reducing energy consumption and improving operations c. Utilising renewable energy to secure the cleanest supply possible d. Delivering value by achieving the best price for energy e. Protecting the health and wellbeing of our most vulnerable residents f. Seeking inspired solutions that deliver learning and results g. Achieving community benefits as a result of our actions 2.2 Targets have been agreed as part of this Strategy, which will guide internal resource allocation and decision making. The action taken as a result of this strategy will improve domestic and corporate energy efficiency in Ealing, save council resources and assist vulnerable residents in both social and private housing. 2.3 Targets include: a. Reduce domestic CO2 emissions by 40% on 2010 levels by 2020 b. Raise SAP rating of all properties judged to be in lowest EPC bands (G, F and E) to minimum SAP 70 (EPC ‘C’) by 2018 c. Reduce corporate CO2 emissions by 22% on 2012/13 levels by 2017/18 d. Reduce corporate energy consumption (KWh) by 20% on 2012/13 levels by 2017/18 e. Complete the first phase of renewable technology installation by March 2015 f. Deliver additional solar photo voltaic (PV) panels on council owned homes, bringing the total to 500 across the estate g. Reduce fuel poverty by 30% by 2016 from 2011 levels 2.4 The council has improved energy efficiency of its corporate portfolio and housing stock, but strategic decision making and investment is required to deliver greater savings and benefits as well as to protect the health of residents. 2.5 The price of energy has changed significantly in recent years. The price has increased from 2004 to 2011 by 121% for gas and 79% for electricity. It is difficult to accurately predict the future prices of energy as they are sensitive to multiple factors. Current predictions from The Department for Energy and Climate Change (DECC) include a gas price increase of 37% by 2018. National Grid estimates that the worst case scenario for electricity prices would be a 30% increase by 2018. Large scale renewable energy is increasing nationally (driven by government policy) meaning the UK’s dependency on fossil fuels will gradually be reduced. 2.6 Increasing costs impact the operating budget of the council as well as residents of the borough. In some cases, the cost of energy threatens the health and well-being of residents. 3. Key Implications 3.1 Prioritising resources to achieve the targets identified in paragraph 2.3 will deliver the following expected benefits: a. Financial savings to residents and the council through reduced energy and building maintenance costs b. Reduction in the council’s Carbon Reduction Commitment and Energy Efficiency Scheme (CRC) liability c. Income generation through utilising feed-in tariffs (FITs) for renewable energy generation d. Demonstrating leadership in the borough with flagship energy saving projects e. Development of local case studies f. Positive changes in staff behaviour at work, which could also lead to positive changes in behaviour outside work g. Reduced cold-related ill health (excess winter deaths and winter hospital admissions) 4. Financial 4.1 Financial background The high increase and volatility of energy prices over the past few years has had a significant impact on the cost of the council’s energy consumption. The most effective way to manage this cost is to control the consumption of energy through implementing programmes to reduce energy use and raise energy awareness. 4.2 Financial impact on the budget Any bids for funding would need to be identified through the Council’s budget review process, in the context of reducing overall council resources and through detailed individual business cases as additional projects seek to be added to the Councils Capital programme. Business cases will include implementation costs, e.g., technical support and impacts to maintenance budgets. All internal project management costs will be managed within existing Regeneration & Housing and Business Services Group budgets. Examples of funding to be sought: a. Schemes identified through the HRA Asset Management Strategy which include improving thermal efficiency of HRA stock, reducing carbon emissions and fuel poverty b. Re-fit projects on Ealing’s office buildings c. Boiler Replacement Programme d. Energy surveys within the Council’s Corporate Portfolio e. Energy efficiency campaign f. Resourcing and training staff to deliver energy advice provision, project and programme management Management of the Strategy will come from the Sustainability Team within the Regeneration & Housing Directorate and staff from Housing, Planning, Business Services Group and Finance will be involved in ensuring the objectives and targets are met. 4.3 Financial background In order to finance these potential initiatives, the following funding streams could be used: Internal: capital funded projects, Communities Infrastructure Levy, Invest to Save initiatives and prudential borrowing External: EU funded projects, GLA and other central government funded projects, Salix Energy Efficiency Loan Scheme, Energy Company Obligations, Feed in Tariff and Renewable Heat Incentive Projects and programmes could receive funding from multiple and combined sources. 5. Legal The UK and European Union have used policy and legislation to counteract climate change and encourage the improvement of building energy performance. In particular the Climate Change Act 2008 requires the UK to reduce its Greenhouse Gas Emissions by 80% (from a 1990 baseline) by 2050. Further details of the council’s legal obligations are set out in the Strategy itself. 6. Value For Money 6.1 Value for Money is integral to the Energy Efficiency Strategy. The strategic priorities have value for money and health and well-being at their core. 6.2 When planning projects and programmes of work, value for money will be driven by the selection of contractors on the basis of Most Economically Advantageous Tender where the successful contractor is selected on the basis of both price and quality. All contracts will be procured under the Council’s Contract Procedure Rules, applied as appropriate to the value of contract. In many cases the contract value will exceed the £500,000 threshold and requires full Cabinet approval. 6.3 Monitoring progress toward targets is an important aspect of the strategy and updates will be provided to corporate board on an annual basis. 7. Sustainability Impact Appraisal 7.1 The strategy represents a commitment from the council to consider its use of natural resources and take action to reduce the negative impacts associated with energy use. The strategy considers financial, environmental and socio- economic costs and benefits and represents the council’s commitment to understanding the impact of each of these on future generations. This implementation of the strategy will contribute to reducing carbon emissions and to reducing fuel poverty. 8. Risk Management 8.1 Energy cost increases: By reducing energy consumption, this strategy will protect residents and the council to some extent from increased energy prices. 9. Community Safety None 10. Links to the 5 Priorities for the Borough If none, say so. Please keep to one paragraph. The 5 Priorities are: Making Ealing Safer None Securing Public Services By realising the aims of using less energy and securing the best price possible for its energy supplies, the savings and avoided costs improve the operating budget of the council. This savings may contribute to securing public services. Securing Jobs and Homes Delivering this strategy will contribute to a growth in the green economy. All projects that arise from the adoption of this strategy will look for training and employment opportunities for local residents. Delivering Value for Money A key aim of the strategy is to deliver value for money by securing the best energy price. The aims related to affordable warmth and alleviating fuel poverty directly relate to reducing costs to health services. Making Ealing Cleaner Securing the cleanest energy supply possible improves air quality by reducing the greenhouse gasses emitted as a result of burning fossil fuels. 11. Equalities, Human Rights and Community Cohesion After the initial equalities impact assessment, it was determined that a full EIA was not necessary. 12. Staffing/Workforce and Accommodation implications: None 13. Property and Assets All property related projects that arise as a result of adopting the Energy Strategy will be reviewed against the planned disposals list and/or with the housing asset management team to ensure any investment is appropriate. 14. Any other implications: None 15. Consultation Internal consultation was conducted to bring together views from across the council. All reviewers are listed in the Consultation table. 16. Timetable for Implementation This strategy covers 2013-2018. Action plans will be developed and revised annually, corresponding to progress reports to corporate board.
Recommended publications
  • GUNNERSBURY PARK Options Appraisal
    GUNNERSBURY PARK Options Appraisal Report By Jura Consultants and LDN Architects June 2009 LDN Architects 16 Dublin Street Edinburgh EH1 3RE 0131 556 8631 JURA CONSULTANTS www.ldn.co.uk 7 Straiton View Straiton Business Park Loanhead Midlothian Edinburgh Montagu Evans LLP EH20 9QZ Clarges House 6-12 Clarges Street TEL. 0131 440 6750 London, W1J 8HB FAX. 0131 440 6751 [email protected] 020 7493 4002 www.jura-consultants.co.uk www.montagu-evans.co.uk CONTENTS Section Page Executive Summary i. 1. Introduction 1. 2. Background 5. 3. Strategic Context 17. 4. Development of Options and Scenarios 31. 5. Appraisal of Development Scenarios 43. 6. Options Development 73. 7. Enabling Development 87. 8. Preferred Option 99. 9. Conclusions and Recommendations 103. Appendix A Stakeholder Consultations Appendix B Training Opportunities Appendix C Gunnersbury Park Covenant Appendix D Other Stakeholder Organisations Appendix E Market Appraisal Appendix F Conservation Management Plan The Future of Gunnersbury Park Consultation to be conducted in the Summer of 2009 refers to Options 1, 2, 3 and 4. These options relate to the options presented in this report as follows: Report Section 6 Description Consultation Option A Minimum Intervention Option 1 Option B Mixed Use Development Option 2 Option C Restoration and Upgrading Option 4 Option D Destination Development Option 3 Executive Summary EXECUTIVE SUMMARY Introduction A study team led by Jura Consultants with LDN Architects and Montagu Evans was commissioned by Ealing and Hounslow Borough Councils to carry out an options appraisal for Gunnersbury Park. Gunnersbury Park is situated within the London Borough of Hounslow and is unique in being jointly owned by Ealing and Hounslow.
    [Show full text]
  • It Alians in Lo Ndo N
    Newsletter Exploring London and environs 21 Esplorando Londra e dintorni 21 Questa newsletter si presenta con la veste grafica rinnovata, pur riprendendo alcuni temi della precedente newsletter. Esprimete le vostre impressioni, come pure suggeri- menti, critiche e proposte, compilando il seguente modulo sul nostro sito web. Mercati - Markets Camden Lock Market Animatissimo ed interessante mercato di Londra che trovate nella zona nord della capitale britannica. (Pagg. 2-3) Chiese - Churches St Peter’s (Italian) Church Parks La prima parrocchia italiana a Londra, nel- Boroughs la zona di originaria concentrazione degli Markets and Italiani durante il XIX secolo. (Pagg. 4-5) gardens Municipalità - Boroughs Ealing Nella zona occidentale di Londra, sulla Days out direttrice che conduce all’aeroporto di He- Secrets English athrow, Ealing è una vivace municipalità londinese. (Pagg. 6-7) Parchi e giardini St Olave Events Attractions Resta il nome di un’antica chiesa dedicata Churches al Re Olaf di Norvegia, alleato degli Inglesi Italians in London Italians nella lotta contro i Danesi nell’XI secolo. (Pagg. 8-9) Italians Week-end Londra in Info Multietnicità abroad Londra è cosmopolita! (Pagg. 10-11) London Think about Oltre ad alcune informazioni, utili anche per contattarci, Vi invitiamo a farc giun- gere le Vostre impressioni compilando il modulo (cliccate per iniziare). (Pag. 12) www.italiansinlondon.co.ukwww.italiansinlondon.co.uk 2 Mercati - Markets Camden Lock Market Senza perderci in frottole, andando subito al “sodo”, vi diciamo schiettamente che, di tutti i mercati di Londra, non solo di Camden, Cam- den Lock Market è quello che ci piace di più, per l’atmosfera che vi si respira.
    [Show full text]
  • Final Report BOSTON MANOR HOUSE and PARK
    BOSTON MANOR HOUSE AND PARK: AN OPTIONS APPRAISAL Final Report June 2011 With financial support from English Heritage Peter McGowan Associates 7 Straiton View 57 - 59 Bread Street, Landscape Architects and Heritage Straiton Business Park Edinburgh EH3 9AH Management Consultants Loanhead, Midlothian EH20 9QZ tel: +44 (0)131 222 2900 6 Duncan Street T. 0131 440 6750 Edinburgh F. 0131 440 6751 fax: +44 (0)131 222 2901 EH9 1SZ E. [email protected] 0131 662 1313 www.jura-consultants.co.uk [email protected] CONTENTS Section Page Executive Summary i. 1. Introduction 1. 2. Conservation Management Plan – Boston Manor House 5. 3. Conservation Management Plan – Boston Manor Park 17. 4. Summary of Consultation 31. 5. Summary of Strategic Context 41. 6. User Market Appraisal 51. 7. Options 61. 8. Options Appraisal 101. 9. Conclusions and Recommendations 111. Appendix A List of Previous Studies Appendix B Market Appraisal Boston Manor House and Park EXECUTIVE SUMMARY E1.0 INTRODUCTION Jura Consultants was appointed by London Borough of Hounslow (LBH) to carry out an options appraisal for Boston Manor House and Park. The options appraisal has considered each element of the House and the Park to identify the most appropriate means of achieving the agreed vision set out in the Conservation Management Plans (CMP) for the House and Park developed in partnership with LDN Architects and Peter McGowan Associates respectively. E1.1 Background London Borough of Hounslow commissioned the options appraisal for Boston Manor House and Park to evaluate existing and potential uses for the House (and ancillary buildings) and the Park, and to determine the ability to sustain a long-term future for the House and Park.
    [Show full text]
  • Appendix 1 Ealing Heritage Strategy Draft 2010
    Appendix 1 Ealing Heritage Strategy Draft 2010 - 2015 1 Contents 1. Introduction 2. Ealing’s Heritage 3. National and local context 4. Ealing’s Heritage: issues and opportunities 5. A new vision for Ealing’s Heritage, Objectives & Delivery Plan 2 1. Introduction 1.1 Ealing has a rich and deep built, natural and material heritage highly valued by residents. As with most councils responsibility for managing and promoting the borough’s heritage is divided amongst council departments. The Executive Director for Environment and Customer Services is responsible for the strategic lead for heritage development and is responsible for the management of important built, natural and material heritage assets. There are further responsibilities including planning, conservation, regeneration and ownership of some heritage assets which sit across the council. 1.2 The development of a sustainable future for key heritage assets has become a higher priority for the council over recent years and it is now necessary to adopt a strategic approach to this area of activity. The heritage strategy is intended to have the following benefits: a framework for maximising investment in Ealing’s heritage set a direction and define priorities within and between heritage initiatives and reconcile competing demands inform the management of the Council’s assets, detailed service plans and the work of individual officers, departments and other agencies encourage innovation and improved partnership working act as a lever and rationale for gaining funding from external agencies and partners demonstrate links with the long term vision for Ealing, central government agendas and with strategies of national and regional agencies 1.3 There are many definitions of heritage in the public domain including built, natural and material elements.
    [Show full text]
  • Motorcycles, Spares and Memorabilia Bicester Heritage | 14 - 16 August 2020
    The Summer Sale | Live & Online Including The Morbidelli Motorcycle Museum Collection Collectors’ Motorcycles, Spares and Memorabilia Bicester Heritage | 14 - 16 August 2020 The Summer Sale | Live & Online Including The Morbidelli Motorcycle Museum Collection Collectors’ Motorcycles, Spares and Memorabilia Hangar 113, Bicester Heritage, OX26 5HA | Friday 14, Saturday 15 & Sunday 16 August 2020 VIEWING SALE NUMBER MOTORCYCLE ENQUIRIES CUSTOMER SERVICES In light of the current government 26111 ON VIEW AND SALE DAYS Monday to Friday 8:30am - 6pm guidelines and relaxed measures +44 (0) 330 3310779 +44 (0) 20 7447 7447 we are delighted to welcome CATALOGUE viewing, strictly by appointment. £30.00 + p&p ENQUIRIES Please see page 2 for bidder All the lots will be on view at Ben Walker information including after-sale Bicester Heritage in our traditional +44 (0) 20 8963 2819 collection and shipment Hangar 113. We will ensure social BIDS ENQUIRIES INCLUDING [email protected] distancing measures are in place, VIEW AND SALE DAYS Please see back of catalogue with gloves and sanitiser available +44 (0) 330 3310778 James Stensel for important notice to bidders for clients wishing to view [email protected] +44 (0) 20 8963 2818 motorcycle history files. Please [email protected] IMPORTANT INFORMATION email: motorcycles@bonhams. LIVE ONLINE BIDDING IS The United States Government com or call +44 (0) 20 8963 2817 AVAILABLE FOR THIS SALE Bill To has banned the import of ivory to book an appointment. Please email [email protected] +44 (0) 20 8963 2822 into the USA. Lots containing with “Live bidding” in the subject [email protected] ivory are indicated by the VIEWING TIMES line no later than 6pm the day symbol Ф printed beside the Wednesday 12 August before the relevant auction Andy Barrett lot number in this catalogue.
    [Show full text]
  • Focus Area 1 South Acton Estate Fuel Consumption New from All Assets Number of Data Name Address Ownership Typology Heating Supply Fuel Source Dev
    Page 1 of 11 Focus Area 1 South Acton Estate Fuel consumption New from all assets Number of Data Name Address Ownership Typology Heating supply Fuel source dev. including CHP Dwellings source (MWh/year) Part Of South Acton Estate-Including Land On/Adj To Part Bollo Bridge Road, Stanley Road, Palmerston Road, South Acton Estate / Subsequent phases Vincent Road, All Saints' Road and southern part of Private Yes Multi-address buildings 5,670 2,444 Estimate Recreation Ground, excluding Charles Hocking House, Barwick House Woolf And Wodehouse Courts A Acton Health Centre Community Clinic 35 – 61 Church Road Acton Other public NHS Natural gas 4,187 Real Acton Sports Centre (Acton Pool) Salisbury Street, Acton, Local government No Sport & Leisure facilities Natural gas 3,649 Real Barrington Court Cheltenham Place Local government No Multi-address buildings Central Boilers Natural gas 3,503 Real Part Of South Acton Estate-Including Land On/Adj To Part Bollo Bridge Road, Stanley Road, Palmerston Road, South Acton Estate Vincent Road, All Saints' Road and southern part of Private Yes Multi-address buildings 3,237 756 Estimate Recreation Ground, excluding Charles Hocking House, Barwick House Woolf And Wodehouse Courts A Sheltered Housing 2-62 Neville Close, Acton Local government No Multi-address buildings Central Boilers Natural gas 1,434 Real Ludlow Court Ludlow Court 1-54 (South) Local government No Multi-address buildings Central Boilers Natural gas 768 Real Carisbrooke Court 1-54 North Carisbrooke Court Local government No Multi-address buildings
    [Show full text]
  • Table of Contents
    TABLE OF CONTENTS INTRODUCTION The Final Proposals Document Policy Context Ealing’s Spatial Objectives Sustainability Appraisal Consultation THE DEVELOPMENT SITES Site Selection Process Planning Submission Requirements The Sites ACTON EALING GREENFORD HANWELL SOUTHALL OTHER IMPORTANT SITES APPENDICES Appendix A Sites Not Carried Forward From Initial Proposals Appendix B Sites Put Forward During Consultation Not Carried Forward Appendix C UDP Sites Not Carried Forward Appendix D Evidence Base INTRODUCTION The Development Sites DPD supports the delivery of the Development Strategy through allocating land for a particular use or type of development. Site allocations seek to deliver specific objectives within the Development Strategy and support/promote proposals for the use of land. Therefore only those sites that are considered central to delivering the policies and objectives of the Development Strategy DPD, and likely to come forward during the lifetime of the Local Plan (2011-2026), are included in the Development Sites DPD. The Development Sites DPD supports a strategic and proactive approach to development and change, by ensuring the most suitable sites are brought forward, and that the most appropriate combination of uses and scale of development are promoted on each site. This certainty about the nature and location of future development also supports the more effective planning of the infrastructure necessary to support growth. The individual allocations incorporate an appropriate degree of flexibility, in recognition of the changing
    [Show full text]
  • Draft Timetable for the Hearing Sessions
    London Borough of Ealing Development Sites and Development Management Development Plan Documents Draft timetable for the hearing sessions Tuesday 4 June 2013 Venue: Committee Room 3, Ealing Town Hall** Week 1 Morning session 10am Afternoon session 2pm Day 1 • Opening ● General issues continued Development • Matter 1: Overall ● Matter 3 – Other Important Sites DPD Approach Sites • Matter 2: General issues Wednesday 5 June 2013 Venue: Committee Room 2, Ealing Town Hall** Week 1 Morning session 10am Afternoon session 2pm Day 2 • Matters 3 and 4* • Southall Development • Acton • Greenford Sites DPD • Hanwell Thursday 6 June 2013 Venue: Committee Room 3, Ealing Town Hall** Week 1 Morning session 10am Afternoon session 3pm Day 3 • Matters 3 and 4 • Matter 4 – Any other continued * sites being put forward Development that have not been Sites DPD • Ealing Area heard under the area sessions. London Borough of Ealing Development Sites and Development Management Development Plan Documents Tuesday 11 June 2013 Venue: Committee Room 3, Ealing Town Hall** Week 2 Morning session 10am Afternoon session 2pm Day 4 • General approach • Policies continued Development • Policies Management DPD Wednesday 12 June 2013 Venue: Elizabeth Cantell Toom, Ealing Town Hall** Week 2 Morning session 10am Afternoon session 2pm Day 5 • Overrun • Any other matters Notes The general sessions will include an overview of the plan but not representations about other sites put forward by representors. *The area specific sessions will include a general overview of the site allocations for the area, representations about the soundness or otherwise of specific allocations and representations about other sites that have been put forward.
    [Show full text]
  • Planning Committee 14/08/2013 Schedule Item 01
    Planning Committee 14/08/2013 Schedule Item 01 Ref: PP/2013/1486 Address: RAVENOR PARK, OLDFIELD LANE SOUTH, GREENFORD, UB6 9LB Ward: Greenford Broadway Proposal: Construction of two storey building to accommodate a children & adult services centre with associated car/minibus parking provision, cycle and refuse storage, boundary fences and widening of access road and footpaths (following demolition of existing buildings) Drawing numbers: 497-SY 01P1, 02P1, 03; 497-SKD 001P1, 002P2, 003P1, 004P1, 005P2, 006P2, 007P1, 008P2, 009P2, Tree Constrains Plan, Design and Access Statement produced by Dannat, Johnson Architects, Transport Statement and Travel Plan produced by URS, Tree Survey produced by ARBTECH Consulting, BREEAM Planning Statement, BREEAM Offices and Land Use and Ecology Assessment Site Drainage Strategy Report produced by Lucking & Clark LLP, Ecological Desktop Study produced by RSK Group PLC, Updated Acoustical Review produced by Paragon Acoustic Consultants, Phase I Desktop Study report and Phase II Environmental Report produced by Herts & Essex Site Investigations, Initial Bat Survey produced by RSK (Received 17/04/2013) Type of Application: Full Application (Deemed Consent) Application Received: 17/04/2013 Revised: Report by: Miguel Martinez Recommendation: Grant, subject to conditions. Executive Summary: This proposed application is for a two storey building to accommodate Adult and Children’s Services to be provided by the London borough of Ealing on a brownfield site currently containing several sheltered stores, sheds and concrete storage bunkers, all remaining from its 1 of 28 Planning Committee 14/08/2013 Schedule Item 01 previous use as a Council depot. The principle of re-development for community/social purposes is considered acceptable and accords with local policies and designations for this site.
    [Show full text]
  • The Anthony Powell Society Newsletter
    The Anthony Powell Society Newsletter Issue 27, Summer 2007 ISSN 1743-0976 Important Announcements Contents From the Secretary’s Desk … 2 2007 Conference Dance as Local History Guide … 3 Saturday 8 September Powell and the Smile of Fortune … 8 Terence Blacker Book Review … 12 Now Booking Event: Visit to Widmerpool … 14 Dates for Your Diary … 15 See coloured centrefold Annual Anthony Powell Lecture … 15 Local Group News … 16 Annual General Meeting 2007 … 17 Subscriptions … 18 Inaugural Annual Cuttings … 19 Anthony Powell Lecture From the APLIST … 20 Letters to the Editor … 25 Saturday 17 November Society Merchandise … 26 Membership Form … 28 To be given by Tariq Ali 2007 Conference … Centrefold See page 15 Widmerpool Visit Saturday 14 July Now Booking See page 14 Notice of AGM 2007 See page 17 Important Subscription Changes See page 18 Anthony Powell Society Newsletter #27 The Anthony Powell Society From the Secretary’s Desk Registered Charity No. 1096873 We are entering another period of The Anthony Powell Society is a activity for the Society, with a number charitable literary society devoted to the of important activities over the next few life and works of the English author months. Anthony Dymoke Powell, 1905-2000. As will be seen elsewhere in this Officers & Executive Committee Newsletter we are delighted to be announcing the inauguration of the Patron: John MA Powell annual Anthony Powell Lecture. While President: Simon Russell Beale the trustees have long had the idea of an Hon. Vice-Presidents: annual lecture, the realisation is being Julian Allason made possible through our association Hugh Massingberd with The Wallace Collection and we *Chairman: Patric Dickinson must thank their Assistant Director, *Hon.
    [Show full text]
  • Arts and Cultural Strategy 2013 – 2018
    Ealing Arts and Cultural Strategy 2013 – 2018 Environment and Leisure Introduction This strategy is an important statement of how we will work with the Arts and Cultural Sector to raise the profile of the rich diversity of the arts and culture we have in Ealing. There are competing demands on our resources. This means we need to focus the resources we have for arts and cultural activity and be transparent in our relationship with the arts and cultural sector by setting out how we will work together. We already invest over £2m in revenue and £0.5m in capital expenditure on arts and culture priority projects. This strategy gives a clear commitment to work to help the sector attract additional funds to extend the opportunities for participation and development of arts practice. The arts contribute to our sense of who we are as a place and as a community. They contribute to our social, economic and educational value systems, building bridges and connections across our diverse communities. We believe this is important. The Arts and Cultural Strategy will enable us to champion the value of the arts more widely and in particular, reposition culture as a catalyst in our plans for the regeneration and transformation of our town centres and localities. 2 Ealing Arts and Cultural Strategy 2013 – 2018 Contents Executive Summary 4 1. Context 9 2. Why are the Arts and Culture Important? 12 3. Why an Arts and Cultural Strategy for Ealing? 15 4. Ealing Arts and Cultural Strategy 2013 – 2018 16 5. Place Making 21 6. Resources 36 7.
    [Show full text]
  • Region 1 South Central Ealing Fuel Consumption New from All Assets Number of Name Address Ownership Typology Heating Supply Fuel Source Data Source Dev
    Page 1 of 16 Region 1 South Central Ealing Fuel consumption New from all assets Number of Name Address Ownership Typology Heating supply Fuel source Data source dev. including CHP Dwellings (MWh/year) Ealing Hospital Uxbridge Road, Southall Other public No NHS Natural gas 22,363 Real St Bernard's Hospital Uxbridge Road, Southall Other public No NHS Natural gas 12,400 Real Clayponds Hospital In-Patient & Outpatient Rehab Sterling PlaceOff Occupational LaneEaling Other public NHS Natural gas 10,674 Real & Stroke Unit Tintern Court Tintern Court, Williams Road Local government No Multi-address buildings Central Boilers Natural gas 6,202 Real Perceval House 14-16 Uxbridge Road, Ealing, Local government No Other public buildings Natural gas 3,857 Real Land At Dickens Yard & The Church Of Christ The Saviour & 2- Dickens Yard Private Yes Multi-address buildings Mixed source 3,827 698 Estimate 12 New Broadway Ealing London Mattock Lane Health Centre Community Health 78 Mattock LaneEaling Other public NHS Natural gas 3,781 Real Centre Ealing Town Hall New Broadway, Ealing, Local government No Other public buildings 1,969 Estimate Arcadia Centre (all), 9 - 29 (consecutive) and 36 - 42 (consecutive) The Broadway 1 - 10 (consecutive) Central Private residential (> 149 Arcadia Centre Chambers 1 - 4 (consecutive) Haven Place Flower Haven Private Yes Natural gas 1,315 567 Estimate units or 9,999 m2) Springbridge Road, land over the Railway between Springbridge Road and Central Chambers Broughton Court Communal Broughton Road Local government No Multi-address
    [Show full text]