Bedford Borough Council Employment monitoring report

2006 - 2007 EMPLOYMENT MONITORING REPORT 2006-2007

INVESTOR IN PEOPLE

This Employment Monitoring Report was prepared by the Planning Policy Group of Planning and Housing Services

Copies of this report may be obtained at a price of £3.00 or £3.50 by post from Planning Support Services at the address below.

David K Bailey,,, BSc(Hons), DipTP, MRTPI,,, Head of Planning & Housing Services Town Hall, St Paul’s Square, MK40 1SJ Telephone: (01234) 267422 - Facsimile: (01234) 325671 e-mail: [email protected] Contents

Introduction 3 methodology 3 definitions 4

Potential Employment sites (S106) 4 allocated employment sites without planning permission 4

Table 1 Summary of B1, B2 and B8 Completions 1996 - 2006/7 5

Table 2 Summary of Outstanding B1, B2 and B8 Consents 1996 - 2006/7 5

Table 3 Schedule of B1, B2 and B8 Completions and Outstanding Consents at 31 March 2007 7

BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 Page 1 Page 2 BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 Introduction

This report is the latest in a series of reports monitoring the supply of employment land within the Bedford Borough Council area.

This Monitoring Report looks at the supply of employment land in the context of the adopted Structure Plan 2011 and the adopted Local Plan 2002 which identify the need for each of the constituent districts to audit its own land supply position. The Monitoring Report takes account of B1, B2 and B8 sites which have been granted planning permission, or/and been completed between 1st April 2006 and 31st March 2007.

Table 1 summarises the total area of employment land completed for each year from a base date of 1996.

Table 2 summarises the outstanding planning permission for employment use which existed at the end of each year from the base date of 1996.

Table 3 is in the form of a schedule listing details of all B1, B2 and B8 completions and outstanding permissions for 2006/7.

Methodology

The monitoring has been carried out in conformity with the general processes adopted by the other districts in the county and by the County Council who monitor land on a countywide basis.

The development control system is utilised to obtain the basic information on sites and uses, backed up by site visits where appropriate to confirm if the planning permission has been completed (partially or fully). If a site has been granted planning permission subject to a S106, the site is not included in the schedule of outstanding permissions until the agreement has been completed. These may however be listed separately in the year when a planning permission is granted subject to a S106 agreement being finalised, as an indication of potential employment use.

For the purposes of practical monitoring, the Borough Council has concluded that it is sensible to employ a lower range cut-off point which excludes very small sites of less than 0.025ha. Previous monitoring indicates that such sites account for approximately only 1% of the total B1, B2, B8 provision and in monitoring terms are therefore inconsequential. The County Council has adopted a similar cut-off point for its monitoring.

Both gains and losses of B1, B2, B8 sites are monitored to show development trends and to provide an overall net figure. Site areas given in the report are stated in gross terms in that they include any internal road layout, landscaping, carparking etc which forms part of the scheme indicated on the planning application. The exception to this approach is on larger business or industrial parks where the site area is a net figure excluding general infrastructure and structural landscaping and is therefore a better reflection of available employment land.

From the monitoring year 2005/6, floorspace as well as site area is recorded in the report. Employment floorspace is broken down into B1, B2 and B8 as well as combinations of these types where information is available, to enable more detailed monitoring. Parking spaces are also recorded.

BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 Page 3 Definitions

Definitions of development included and excluded from monitoring.

Included in the listing are:

z all new (greenfield) B1, B2, B8 developments

z redevelopment within the B1, B2, B8 range

z changes of use of non B1, B2, B8 to a B1, B2, B8 use or vice versa

z vehicle service (B2), tyre and exhaust fitting centres (B1) and builders', contractors’ and plant hire yards (B8).

Excluded from the listing are:

z expired permissions (these may be listed separately if significant)

z new B1, B2, B8 provision within the operational curtilage of an existing firm, except where this results in an increase in floorspace.

Where the gross internal floorspace is not determined by the application/permission it has been calculated at an appropriate site ratio shown in brackets, eg. (40%).

Potential Employment Sites (S106)

App. No. location Development Gross int floorspace site area sq metres Hectares

97/01163/OUT H13 Land at B1, B2, B8 development 9,600 (40%) 2.40

01/02199/OUT H8 Land north of Bromham Rd, B1, B2 development 25,000 (max) 4.00

02/01322/OUT H11 Land at Wootton B1, B2, B8 development 36,000 (40%) 9.00

allocated employment sites without planning permission

Allocation location Gross int floorspace site area sq metres Hectares

Local Plan (2002) H17 Clapham Folly 1,600 (40%) 0.40 Local Plan (2002) E4 Land west of B530, Bedford 13,600 (40%) 3.40 Local Plan (2002) E5 Land east of B530, Bedford 5,440 (40%) 1.36 Local Plan (2002) E10 Brickworks 32,000 (40%) 8.00 LDF TCAAP TC13 Railway Station, Bedford 8,000 (40%) 2.00

Page 4 BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 TABLE 1 Summary of B1, B2 and B8 Completions 1996 - 2006/7

Gross Internal Floorspace Site Area Sq Metres Hectares Year Gain Loss Net Gain Loss Net 1996 2.49 -0.95 1.54 1997 94.59 -5.21 89.38 1998 2.68 -6.01 -3.33 1999 4.38 -20.72 -16.34 2000 1.55 -0.21 1.34 2001 15.24 -4.80 10.44 2002 21.77 -8.90 12.87 2003 17.11 -5.37 11.74 2004/5* 14.85 -5.24 9.61 2005/6 6,736 -2,956 3,780 1.55 -0.59 0.96 2006/7 17,100 -3,717 13,383 7.88 -0.75 7.13 Total 23,836 -6,673 17,,, 163 184.09 -58.75 125.34

TABLE 2 summary of Outstanding B1, B2 and B8 Consents 1996 - 2006/7

Gross Internal Floorspace Site Area Sq Metres Hectares Year Gain Loss Net Gain Loss Net 1996 48.15 -6.19 41.96 1997 37.66 -4.25 33.40 1998 39.53 -8.27 31.26 1999 33.67 -5.36 28.31 2000 65.75 -7.21 58.54 2001 76.81 -4.42 72.39 2002 65.65 -5.07 60.58 2003 67.53 -7.17 60.36 2004/5* 64.53 -3.23 61.30 2005/6 252,486 -8,388 244,098 71.98 -3.19 68.79 2006/7 332,203 -17,142 315,061 78.54 -2.87 75.67 * 15 month survey

BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 Page 5 SCHEDULE OF COMPLETIONS & OUTSTANDING CONSENTS

TABLE 3 Schedule of Completions & Outstanding Consents at 31 march 2007

Page 6 BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 SCHEDULE OF COMPLETIONS & OUTSTANDING CONSENTS S S S S S 14 14 14 14 14 .. .. . / / / / / 0.10 0.76 -0.11 0.22 1.23 1.23 1.23 1.23 1.23 0.30 2.00 0.66 0.00 -0.15 12 12 12 12 12 -0.05 -0.03 -0.40 -0.90 -0.08 -0.06 A - HAS A - HAS A - HAS A - HAS A - HAS ed O ed O ed O ed O ed O et et et et et 9 9 9 9 9 3 3 3 3 3 .22 .22 .22 .22 .22 ompl ompl ompl ompl ompl SITE ARE SITE ARE SITE ARE 2 2 SITE ARE SITE ARE 2 2 2 -0.30 C C -0.03 C C C -0.30 -0.06 -0. -0. -0. -0. -0. S S S S S 10 10 10 10 10 / / / / / 350 0.00 7 7 7 7 7 40360 10.09 40 40 40 40 40 (40%) B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 omp . O omp . O omp . O omp . O omp . O 91 91 91 91 91 C C C C C 8 8 8 8 8 S S S S S / / / / / 3458 0.99 3458 3458 3458 3458 3458 B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 omp . O omp . O omp . O omp . O omp . O C C C C C 2 2 2 2 2 8 8 8 8 8 S S S S S 7 7 / / 7 / 7 7 / / 412 0.00 S S S 300 0.03 S S -210 9 9 9 113 113 9 9 113 113 113 B8 B8 B8 B8 B8 9 9 9 9 9 5 5 5 5 5 omp .omp O . O omp . O omp . O omp . O 432 0.11 -891 891 0.00 C C C C C 12218 2.41 117 117 117 117 117 CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE A A A A A S S S S S / / / / / OORSP OORSP OORSP OORSP OORSP B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 2 2 2 2 2 omp. O omp. O omp. O omp. O omp. O C C C C C -19 -19 -19 -19 -19 S S S S S S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL / / / / / S S S S S O O O O O GR GR GR GR GR B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 omp . O omp . O omp . O omp . O omp . O C C C C C S S S S S / / / / / 280 280 280 280 280 -236 -236 -236 -236 -236 -236 B2 B2 B2 B2 B2 1 1 1 1 1 2 2 2 2 2 omp . O omp . O omp . O omp . O omp . O 7 7 7 7 7 C C C C C 19 19 19 19 19 -1171 -500 -16 -16 -16 -16 -16 7 7 7 7 7 S S S S S 3 3 3 3 3 / / / / / 916 916 916 916 916 -350 1888 -256 -550 -580 -1250 46 46 46 46 46 6 6 6 6 6 - - - - - B1 B1 B1 B1 B1 7 7 7 7 7 omp. O omp. O omp. O omp. O omp. O C C C C C 466 466 466 466 466 -35 -35 -35 -35 -35 - - - - - S S S S S CE CE CE CE CE A A A A A SP SP SP SP SP PARKING PARKING PARKING PARKING PARKING S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) B1/C3 residential B1/C3 -466 OPMENT OPMENT OPMENT OPMENT OPMENT ONSENT ONSENT ONSENT ONSENT ONSENT ONSENT ONSENT ONSENT ONSENT ONSENT B1 developmentB1 26 216 DEVEL DEVEL DEVEL DEVEL DEVEL ANDING C ANDING C ANDING C ANDING C ANDING C T T T T T ANDING C ANDING C ANDING C ANDING C ANDING C S S S S S T T T T T S S S S S e B8 extension S S S S S S S S S S omham Rd residential C3 B1 to c/u TE TE TE TE TE A A A A A AD (E2) AD (E2) AD (E2) AD (E2) AD (E2) T T T T T O O O O O S S S S S TE TE TE TE TE A A A A A T T T T T ARK ARK ARK ARK ARK SITE ADDRE SITE ADDRE 16-17 Ronald Clos 16-17 Ronald 166-168 Bedford Rd166-168 Bedford to B1 c/u 34-36 Br Unit3, Manton Lane B2 B1/B8 to c/u 2 192 -192 0.00 16-18 Cauldwell Steet 16-18 Cauldwell SITE ADDRE SITE ADDRE SITE ADDRE S S S S S MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT S P S P S P S P S P S S S S S MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT O O O O O AD IND E AD IND E AD IND E AD IND E AD IND E O O O O O O O O O O AMBRIDGE R AMBRIDGE R AMBRIDGE R AMBRIDGE R AMBRIDGE R ON C ON C ON C ON C ON C ON ON ON ON ON ARK IND E ARK IND E ARK IND E ARK IND E ARK IND E T T T T T T T T T T , C , C , C .. .. , C , C . S S S S S S S S S S Y BUSINE Y BUSINE Y BUSINE Y BUSINE Y BUSINE S P S P S P S P S P S S S S S . NO . NO . NO . NO . NO ARK ARK ARK ARK ARK O O O O O OBURN R OBURN R OBURN R OBURN R OBURN R PP PP PP PP PP BEDFORD BEDFORD BEDFORD C BEDFORD C KEMP KEMP KEMP KEMP PRIOR PRIOR W W CR CR G P G P A A 06/03042/COU06/03343/FUL 33-39 High Street02/00787/OUT Rd Wolseley of H7 Land west development B1 C3 residential B1 to c/u development B2/B8 27 7722 280 930 05/03091/FUL St College The Old Saddlery, 5/6, residential C3 to B2 c/u 06/01687/FUL 05/03042/S73 1 Stuart Road r/o residential C3 to B8 c/u BEDFORD PRIOR BEDFORD C W KEMP 04/01220/REM04/00585/FUL Street College Saddlery, Old 05/00778/FUL Stuart 12a Road C3 residential B2 to c/u C3 residential B8 to c/u 4 98/00975/OUT Road Land south of Cambridge development B1/B2/B8 CR G P 04/00886/FUL WayTelford Land at development B1/B2/B8 63 455 06/01902/FUL (north site) Road Land off Fraser development B1 81 2774 06/01901/FUL site) Road (south Land off Fraser development B1 59 1920 06/00419/COU 5-7 Melbourne Street car sales to c/u B8 2 05/00540/COU 05/00598/FUL05/00980/FUL Street site, St John’s Tower BT 05/03055/COU St Havelock Brewery, 06/01791/COU06/03340/DC3 to C3 & redevelopment c/u Rd 23 Shuttleworth 07/00115/DC3 Rd Murdock 53 35 Brunel Rd B2 B1 from Redevelopment 6 B8 to B1/B2/B8 c/u -8510 B8 B1 to c/u B1/B2/B8 to B1 c/u 20 526 10 -678 678 0.00 06/01576/REM Road Land south of Cambridge 01/02384/FUL02/01465/FUL04/00236/OUT 7 Union Streetdevelopment B8 04/02030/FUL 99 Ashburnham Road04/02584/COU Ampthill 239 Road Clever, Box 04/03179/FUL Heights, Manton Lane Bedford 05/00110/FUL End Rd 28 Ford B1 1 Endsleigh Rd D1/mixed to c/u B1 to D2 c/u 94 residentialC3 to B1 c/u B1 to C3 residential c/u residential B8/C3 to A1 c/u C3 from B1 development -357 -330 -718 KEMP A PRIOR PRIOR W W CR CR G P G P BEDFORD BEDFORD BEDFORD C BEDFORD C KEMP KEMP KEMP KEMP A A

BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 Page 7 SCHEDULE OF COMPLETIONS & OUTSTANDING CONSENTS 2 2 2 2 2 6 6 6 S S 6 6 S S S 18 18 18 19 19 18 18 19 19 19 13 13 13 13 13 7 7 7 / / 7 7 4 4 / 4 / / .. .. 4 4 . 0.17 0.10 2 2 2 2 2 0. 0. 0. 0. 0. 0.05 0.07 11. 11. 11. 0.06 11. 11. 0.30 0.30 11. 11. 0.30 11. 0.30 0.30 0.09 11. 11. 0.20 0.20 0.20 0.20 0.20 0.09 0.09 0.09 0.09 0.09 -0. -0. -0. -0. -0. A - HAS A - HAS A - HAS A - HAS A - HAS ed O ed O ed O ed O ed O et et et et et ompl ompl ompl ompl ompl SITE ARE SITE ARE SITE ARE SITE ARE SITE ARE C C C C C S S S S S / / / / / 1716 0.86 3808 1.15 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S / / / / / 33754 B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S / / / / / S S S S S 1850 9000 11.00 B8 B8 B8 B8 B8 omp . O omp . O omp . O omp . O omp . O C C C C C CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE A A A A A S S S S S / / / / / OORSP OORSP OORSP OORSP OORSP B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 omp . O omp . O omp . O omp . O omp . O C C C C C S S S S S S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL / / / / / S S S S S O O O O O GR GR GR GR GR B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 omp . O omp . O omp . O omp . O omp . O C C C C C S S S S S / / / / / -500 B2 B2 B2 B2 B2 omp . O omp . O omp . O omp . O omp . O C C C C C S S S S S / / / / / B1 B1 B1 B1 B1 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S CE CE CE CE CE A A A A A SP SP SP SP SP PARKING PARKING PARKING PARKING PARKING opment 28500 9000 OPMENT OPMENT OPMENT OPMENT OPMENT DEVEL DEVEL DEVEL DEVEL DEVEL H14 B1/B2/B8 devel S S S S S S S S S S arm, School LaneB1/B2/B8to agricultural c/u 81 SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE TH TH T T TH T TH TH T T ON ON ON ON ON S S S S S T T T T T T T T T T OR OR OR OR OR T T T T T ON RURAL ON RURAL ON RURAL ON RURAL ON RURAL T T .. .. T . T T O O O W W O O W W W S S S S S OLD OLD OLD OLD OLD C C C C C O O O O O T T T T T T T T T T . NO . NO . NO . NO . NO APHAM APHAM APHAM APHAM APHAM ARDING ARDING ARDING OLMW OLMW ARDING ARDING OLMW OLMW OLMW AS AS AS AS AS APP APP APP APP APP BOLNHURS BOLNHURS C C CL CL C C E E ELS ELS KEMP KEMP HARR HARR BOLNHURS C CL C E ELS KEMP 06/00937/FUL West Row Farm, Wychtree to B1(a) agricultural c/u 8 225 04/01232/FUL F Tythe 99/01645/OUT06/02493/OUTWixams LP Land at School Lower Elstow Former D1 to B1(a) c/u 10 217 05/02773/COU School Lane Farm, Mount Pleasant (a)B1 to agricultural c/u 05/01758/FUL06/00590/FUL Road Summerhill Farm, Rd Cople Home Farm, B1(c)/B8to agricultural c/u 05/03128/S73 356 6to B1 agricultual c/u Road Twinwood Farm, Fairfield 04/00595/FUL to B8 agricultural c/u Road Church Farm, Church 15B1 to agricultural c/u 97/01416/OUT 269 RAF Cardington Land at 699/00957/FUL Rd Lynn Farm, development B1/B2/B8 300 446B1 to agricultural c/u 04/03004/OUT 177 119 Odell Rd Works, Leather Former residential C3 to B2 c/u 5734 1306/01368/FUL End Rd 59 Green Nurseries, Kempston B1 to c/u 235 24 462 0.04 05/02654/OUT Road Farm, Dacca development B1/B2/B8 72 HARR BOLNHURS BOLNHURS C C CL CL C C E E ELS ELS KEMP KEMP HARR HARR

Page 8 BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 SCHEDULE OF COMPLETIONS & OUTSTANDING CONSENTS 7 7 7 7 7 7 4 4 7 7 7 7 4 4 4 S S S S S 4 4 4 7 7 4 4 7 7 7 / / / / / 0.31 0.31 0.31 0.31 0.31 0.21 0.21 0.21 0.21 0.21 0.03 0.28 4. 4. 4. 0.04 0.36 0.36 0. 0. 0.36 0.36 4. 4. 0.36 0. 0.36 0.36 0.36 0. 0. 0.36 0.36 0.08 0.08 0.0 0.0 0.08 0.0 0.08 0.08 0.0 0.0 -0.05 A - HAS A - HAS A - HAS A - HAS A - HAS ed O ed O ed O ed O ed O et et et et et .05 .05 .05 .05 .05 .06 .06 .06 .06 .06 ompl ompl ompl ompl ompl 2.05 2 2 2 2 2 2 2 2 2 2 SITE ARE SITE ARE SITE ARE SITE ARE SITE ARE C C C C C S S S S S / / / / / B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 omp. O omp. O omp. O omp.omp. O O C C C C C S S S S S / / / / / B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S / / / / / S S S S S B8 B8 B8 B8 B8 omp.omp. O O omp. O omp. O omp. O 400 2.06 C C C C C CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE A A A A A S S S S S / / / / / OORSP OORSP OORSP OORSP OORSP B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL / / / / / S S S S S O O O O O GR GR GR GR GR B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S / / / / / B2 B2 B2 B2 B2 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S / / / / / 1120 -184 -310 B1 B1 B1 B1 B1 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S CE CE CE CE CE A A A A A SP SP SP SP SP PARKING PARKING PARKING PARKING PARKING OPMENT OPMENT OPMENT OPMENT OPMENT /u to B1/B2/B8/u 35000 9110 9900 4.52 DEVEL DEVEL DEVEL DEVEL DEVEL S S S S S d B1 development 360 S S S S S SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE T T T T T S S S S S OOK OOK ON ON OOK ON OOK OOK ON ON T T T T T OP OP OP OP OP .. .. . OE OE OE OE OE ON ERNE ON ERNE ON ERNE ON ERNE ON ERNE GSDEN GSDEN T T GSDEN T GSDEN GSDEN T T . NO . NO . NO . NO . NO VENHAM VENHAM VENHAM VENHAM VENHAM APL APL A A APL A APL APL A A AKLEY AKLEY AKLEY AKLEY AKLEY T T T T T T A A T T T T A OULDR OULDR A A OULDR OULDR OULDR MIL MIL O O P P PODING PODING SHARNBR SHARNBR S S S S S S APP APP APP MIL O P PODING SHARNBR S S 06/01733/REM Airfield Fm, N of Gorerong development land/B8 c/u 05/02986/COM06/02163/FUL Rushden Rd Farm, House Winsey Rd Embankment, Station Old B2 to agricultural c/u development B1 15 31 792 970 02/00885/OUT06/03177/COU Site DERA Tunnel Park Business Twinwoods 03/02160/OUT D2 to bldg c/u Highfield Road Land at c 02/01426/FUL RoadFarm, Stafford Bedford development B1(a) 04/01848/FUL Extensions to B2 use Farm, Grange 27 605/02052/FULB1 to agricultural c/u Roa Station 750 805/01320/OUT Rushden Rd Turn, 292 316 04/03407/FULdevelopment B1/B8 Firs EndFarm, West 05/02789/COU 70 Upper Cottage Fm Bldings, to agricultural B1 c/u B1/B1 development to c/u 32 4 132 2900 S APP APP S S MIL MIL O O P P PODING PODING SHARNBR SHARNBR S S S S

BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 Page 9 SCHEDULE OF COMPLETIONS & OUTSTANDING CONSENTS 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 19 19 19 19 19 7 7 7 4 4 7 7 4 7 7 4 4 7 7 7 S S S S S 1. 1. 1. 1. 1. / / / / / 0.13 3. 3. 3. 3. 3. 0.22 0.23 0.93 0. 0. 0. 0. 0. 0.05 0.20 0.27 0.27 0.27 0.27 0.27 0.09 0.09 0.09 0.09 0.09 17.80 18. 18. 18. 18. 18. A - HAS A - HAS A - HAS A - HAS A - HAS ed O ed O ed O ed O ed O et et et et et 1.09 1.09 1.09 1.09 1.09 0.07 ompl ompl ompl ompl ompl SITE ARE SITE ARE SITE ARE SITE ARE SITE ARE -0.06 -0.06 -0.06 -0.06 -0.06 -0.06 C C C C C S S S S S / / / / / 2676 1.06 14960 3.74 (40%) B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 omp . O omp . O omp . O omp .omp O . O C C C C C S S S S S / / / / / B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 omp .omp O . O omp . O omp . O omp . O C C C C C S S S S S / / / / / S S S S S B8 B8 B8 B8 B8 919 1.02 omp . O omp . O omp . O omp . O omp . O C C C C C CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE A A A A A S S S S S / / / / / OORSP OORSP OORSP OORSP OORSP B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 omp . O omp . O omp . O omp . O omp . O C C C C C S S S S S S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL / / / / / S S S S S O O O O O 71200 GR GR GR GR GR (40%) B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S / / / / / B2 B2 B2 B2 B2 omp. O omp. O omp. O omp. O omp. O C C C C C S S S S S / / / / / B1 B1 B1 B1 B1 omp. O omp. O omp. O omp. O omp. O -140 C C C C C S S S S S CE CE CE CE CE A A A A A SP SP SP SP SP PARKING PARKING PARKING PARKING PARKING OPMENT OPMENT OPMENT OPMENT OPMENT u C3 residential to B1(a & b) & to B1(a residential C3 u 16 545 c/u agricultural to B1 to agricultural c/u 79 2000 DEVEL DEVEL DEVEL DEVEL DEVEL ARK (E11) ARK (E11) ARK (E11) ARK (E11) ARK (E11) S P S P S P S P S P S S S S S S S S S S S S S S S Bakery, Church Road Church Bakery, residential C3 B1 to c/u SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE Y Y Y Y Y ON ON TB TB ON ON ON TB TB TB AD AD AD AD AD T T T T T .. .. . T T T T T AR AR AR AR AR TE TE TE TE TE VEY VEY VEY VEY VEY . NO . NO . NO . NO . NO OO OO OO OO OO TEW TEW TEW TEW TEW S S THURLEIGH TUR TUR WILDEN WILDEN WILS WILS W W THURLEIGH AIRFIELD BUSINE THURLEIGH AIRFIELD BUSINE 06/01770/M73 Airfield Thurleigh Land at development B1/B2 S THURLEIGH THURLEIGH AIRFIELD BUSINE TUR WILDEN WILS W 06/03170/FUL Rd Farm, Crowhill development B1 06/00296/S7306/00781/COU Former Drive 2-8 Longmeadow 5 c/ 05/00289/FUL Fm, Bourne End Whitworth 285 B1 to agricultural c/u 22 475 06/01062/S73 (E9) Brickworks Coronation development B1/B2/B8 05/01186/FUL Road Barn, Carlton New 06/02512/OUT Chequers Hill GarageB1(a)to agricultural c/u 705/00890/S73development B1(b/c) Road off Watson 9 185 04/01724/COUdevelopment B1(c)/B2/B8 End Road 68 Hall End Farm, Hall B1 to agricultural c/u 468 61 23 448 07/00436/FUL07/00480/COU Road C P Farm, Woburn Road C P Farm, Woburn to B8 & bldgs land c/u B2 to agricultural c/u 234 04/00168/FUL Rd Whitwick Green Manor Farm, THURLEIGH AIRFIELD BUSINE THURLEIGH AIRFIELD BUSINE S S THURLEIGH THURLEIGH TUR TUR WILDEN WILDEN WILS WILS W W APP APP APP APP APP

Page 10 BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 SCHEDULE OF COMPLETIONS & OUTSTANDING CONSENTS 7 7 7 7 7 S S S S S S S S S S 12 12 12 12 12 / / 30 30 / 30 / / 30 30 / / / / / .. .. . 6. 6. 6. 6. 6. AS AS AS AS AS 5.80 5.6 5.6 5.6 5.6 5.6 2 2 2 2 2 -0.62 -0.30 -0.30 -0.30 -0.30 -0.30 7 7 7 7 7 6 6 6 6 6 A - HAS A - HAS A - HAS A - HAS A - HAS A - H A - H A - H A - H A - H ed O ed O ed O ed O ed O ed O ed O ed O ed O ed O et et et et et et et et et et 13 13 16 16 13 16 13 13 16 16 .. .. . 0.16 0.19 7 7 7 7 7 ompl ompl ompl 0. 0. ompl ompl 0. ompl ompl 0. 0. ompl ompl ompl SITE ARE SITE ARE SITE ARE SITE ARE SITE ARE SITE ARE SITE ARE SITE ARE SITE ARE SITE ARE 5.30 5.30 5.30 5.30 5.30 C C C C C C C C C C 0 0 0 0 0 S S S S S S S S S S / / / / / / / 7 7 / 7 / / 7 7 38 38 38 38 38 23160 23160 23160 23160 23160 6 6 6 6 6 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 B1/B2/B8 omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp.omp. O O 91 91 91 91 91 C C C C C C C C C C 8 8 8 8 8 S S S S S S S S S S / / / / / / / 54 54 / / / 54 54 54 212 212 212 212 212 7 7 7 7 7 7 7 7 7 7 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 B2/B8 omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O C C C C C C C C C C S S S S S S S S S S / / / / / / / / / / 50 50 50 50 50 S S S S S S S S S S 7 7 7 7 7 20 20 20 20 20 22860 22860 22860 22860 22860 B8 B8 B8 B8 B8 B8 B8 B8 B8 B8 8 8 8 8 8 7 7 7 7 7 omp . O omp . O omp . O omp . O omp . O omp .omp O . O omp . O omp . O omp . O C C C C C C C C C C 1319 1319 1319 1319 1319 130 130 130 130 130 CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE CE - SQ METRE A A A A A A A A A A S S S S S S S S S S / / / / / / / / / / 3666 3666 3666 3666 3666 3666 3666 3666 3666 3666 OORSP OORSP OORSP OORSP OORSP OORSP OORSP OORSP OORSP OORSP B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 B1/B8 2 2 2 2 2 omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O C C C C C C C C C C -19 -19 -19 -19 -19 S S S S S S S S S S S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL S INTERNAL FL / / / / / / / / / / S S S S S S S S S S O O O O O O O O O O 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 GR GR GR GR GR GR GR GR GR GR 7 7 7 7 7 7 7 7 7 7 B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 B1/B2 omp . O omp . O omp . O omp . O omp . O omp . O omp . O omp . O omp . O omp . O C C C C C C C C C C S S S S S S S S S S / / / / / / / / / / 112 112 112 112 112 156 156 156 156 156 15 15 15 15 15 15 15 -2480 15 15 15 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 3 3 3 3 3 omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O omp. O 26 26 26 26 26 C C C C C C C C C C 45 45 45 45 45 10 10 10 - - 10 10 - - - 7 7 7 7 7 S S S S S S S S S S / / / / / / / / / / 98818 98818 98818 98818 98818 10109 10109 10109 10109 10109 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 2 2 9 9 2 9 2 2 9 9 5 5 5 5 5 omp . O omp . O omp . O omp . O omp . O omp . O omp . O omp . O omp . O omp . O C C C C C C C 88 88 C C C 88 88 88 S S S S S S S S S S CE CE CE CE CE CE CE CE CE CE A A A A A A A A A A SP SP SP SP SP SP SP SP SP SP PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) S (NET) lopment 60 1022 1150 OPMENT OPMENT OPMENT OPMENT OPMENT OPMENT OPMENT OPMENT OPMENT OPMENT ONSENT ONSENT ONSENT ONSENT ONSENT DEVEL DEVEL DEVEL DEVEL DEVEL DEVEL DEVEL DEVEL DEVEL DEVEL ONSENT ONSENT ONSENT ONSENT ONSENT ANDING C ANDING C ANDING C ANDING C ANDING C T T T T T S S S S S ANDING C ANDING C ANDING C ANDING C ANDING C T T T T T S S S S S SDEN SDEN SDEN SDEN SDEN OLE OLE OLE OLE OLE S S S S S S S S S S S S S S S S S S S S ARK ARK ARK ARK ARK ON & C ON & C ON & C ON & C ON & C T T T T T S P S P S P S P S P S S S S S S S S S S W W W W W SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE SITE ADDRE MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT O O O O O C C C C C ON ON ON ON ON MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT MPLETIONS (NET) & OUT TH BUSINE TH BUSINE TH BUSINE TH BUSINE TH BUSINE T T T T T ON, CHA ON, CHA ON, CHA ON, CHA ON, CHA O O O O O T T T T T ARK ARK ARK ARK ARK OR OR OR OR OR S S S S S ...... OUGH OUGH OUGH OUGH OUGH ON P ON P ON P ON P ON P . NO . NO . NO . NO . NO . NO . NO . NO . NO . NO T T T T T OLMW OLMW OLMW OLMW OLMW A A A A A BOR BOR APP APP APP BOR APP APP BOR BOR WYBO WYBO WYMING WYMING RURAL C RURAL C E E C C APP APP 05/00651/FUL LaneFarm, View Spinney B1/B8 to agricultural c/u 10 324 0.13 E 06/01128/S73 Land off A428, development B1(b) 18500 APP WYBO C WYMING RURAL C 06/00564/FUL Plot 4deve B1 04/01908/COU04/00621/FUL High Street 61 Farm, Poplar 87-89 Rushden RdB1(c)/B8to agricultural c/u 4residential C3 to B2 c/u 265 0.32 APP APP E E C C WYBO WYBO WYMING WYMING RURAL C RURAL C

BEDFORD BOROUGH - EMPLOYMENT MONITORING REPORT 31 MARCH 2007 Page 11