Technical Report Documentation Page 1. Report No. FHWA/TX-09/0

Total Page:16

File Type:pdf, Size:1020Kb

Technical Report Documentation Page 1. Report No. FHWA/TX-09/0 Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA/TX-09/0-5546-1 4. Title and Subtitle 5. Report Date Protecting and Preserving Rail Corridors Against Encroachment September 2007; Rev. January 2008 of Incompatible Uses 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Lisa Loftus-Otway, C. Michael Walton, Lynn Blais, Nathan 0-5546-1 Hutson 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Center for Transportation Research 11. Contract or Grant No. The University of Texas at Austin 0-5546 3208 Red River, Suite 200 Austin, TX 78705-2650 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Texas Department of Transportation Technical Report Research and Technology Implementation Office September 2006–August 2007 P.O. Box 5080 14. Sponsoring Agency Code Austin, TX 78763-5080 15. Supplementary Notes Project performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration. 16. Abstract Rail Corridor preservation and planning for the purpose of reducing or restricting incompatible development is an area of growing importance. This report provides an overview regarding encroachment and the elements that contribute to potentially incompatible development along rail corridors. The report reviews the legal tools that currently exist within Texas for corridor preservation and provides recommendations for new legislation, including draft legislation. The report then reviews the state of practice of corridor planning and preservation with mitigation against encroachment both in Texas and in selected other states around the country. The report pays special attention to incidents in which rail corridors are envisioned to host both freight and passenger services and the implications on land use. Finally, the report provides a review of costs associated to deal with encroachment, whether by planning, preservation, collaboration, or mitigation. 17. Key Words 18. Distribution Statement Corridor Preservation, Encroachment, Transit Oriented No restrictions. This document is available to the Development, Incompatible Land Use, Shared Track, public through the National Technical Information Rail Relocation Service, Springfield, Virginia 22161; www.ntis.gov. 19. Security Classif. (of 20. Security Classif. (of 21. No. of pages 22. Price report) this page) 194 Unclassified Unclassified Form DOT F 1700.7 (8-72) Reproduction of completed page authorized Protecting and Preserving Rail Corridors Against Encroachment of Incompatible Uses Lisa Loftus-Otway C. Michael Walton Lynn Blais Nathan Hutson CTR Technical Report: 0-5546-1 Report Date: September 2007; Revised January 2008 Project: 0-5546 Project Title: Protecting Rail Corridors Against Encroachment Sponsoring Agency: Texas Department of Transportation Performing Agency: Center for Transportation Research at The University of Texas at Austin Project performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration. Center for Transportation Research The University of Texas at Austin 3208 Red River Austin, TX 78705 www.utexas.edu/research/ctr Copyright (c) 2007 Center for Transportation Research The University of Texas at Austin All rights reserved Printed in the United States of America iv Disclaimers Author's Disclaimer: The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official view or policies of the Federal Highway Administration or the Texas Department of Transportation (TxDOT). This report does not constitute a standard, specification, or regulation. Patent Disclaimer: There was no invention or discovery conceived or first actually reduced to practice in the course of or under this contract, including any art, method, process, machine manufacture, design or composition of matter, or any new useful improvement thereof, or any variety of plant, which is or may be patentable under the patent laws of the United States of America or any foreign country. Engineering Disclaimer NOT INTENDED FOR CONSTRUCTION, BIDDING, OR PERMIT PURPOSES. Project Engineer: C. Michael Walton Professional Engineer License State and Number: Texas No. 46293 P. E. Designation: Research Supervisor v Acknowledgments The authors express appreciation to Wilda Won, TxDOT Project Director; Jennifer Moczygemba, P.E., TxDOT Project Coordinator; the TxDOT Project Management Committee Mark Werner, P.E., John Ewald, Gil Wilson, Jack Heiss, Peggy Thurin, P.E., Rich O’Connell, Sarah Stroman, and Cady North. The authors would also like to acknowledge the contributions from Duncan Stewart, P.E. and Loretta Brown from RTI. The author’s also express their appreciation to Dennis Kearns—Burlington Northern Santa Fe Railway, Ron Olson—Union Pacific Railway, Craig Lewis—Norfolk Southern Railway, Craig Rockey—Association of American Railroads, Phil Hooser—Industrial Acoustics Company, Lance Meister—Harris Miller Miller Hanson, Bob Deeds—City of Littleton and Kathryn Pett—Ballard, Spahr, Andrews & Ingersoll LLP who provided valuable input, information and insight to the project. The authors also want to thank Graduate Research Assistants, Kate Flanagan, Eric Larson, and Matt Swinehart who provided assistance to this project. vi Table of Contents Chapter 1. Executive Summary ................................................................................................... 1 Chapter 2. Overview of Potentially Incompatible Encroachment ........................................... 3 2.1 Problems Caused by Incompatible Encroachment ................................................................4 Chapter 3. Survey of Effective Corridor Protection Strategies .............................................. 11 3.1 Discussion ............................................................................................................................11 3.2 Conclusion ...........................................................................................................................15 Chapter 4. Existing Legal Tools in Texas for Implementing Effective Rail Corridor Protection Strategies ................................................................................................................... 17 4.1 Overview ..............................................................................................................................17 4.2 State Authorities: The Texas Transportation Commission and the Department of Transportation ............................................................................................................................17 4.3 Regional Transportation Authorities ...................................................................................20 4.4 Regional Mobilitfy Authorities ............................................................................................21 4.5 Freight Rail Districts ............................................................................................................22 4.6 Intermunicipal Rail Districts ................................................................................................22 4.7 Rural Rail Transportation Districts ......................................................................................22 4.8 Municipal Land Use Authority ............................................................................................23 4.9 County Powers .....................................................................................................................25 4.10 80th Texas Legislative Update ..........................................................................................28 Chapter 5. The Texas Rail Context ........................................................................................... 31 5.1 Overview ..............................................................................................................................31 5.2 Current Authority .................................................................................................................31 5.3 The Texas Rail Network ......................................................................................................32 5.4 Freight Rail ..........................................................................................................................34 5.5 Passenger Rail ......................................................................................................................45 5.6 Future Corridors ...................................................................................................................59 Chapter 6. U.S. Rail Corridor Practices ................................................................................... 63 6.1 Rail Inventories and Planning Activities .............................................................................65 6.2 Legislation before the U.S. Congress Regarding Rail Development ..................................66 6.3 High-Speed Rail Corridor Planning .....................................................................................66 6.4 Amtrak Rail Planning ..........................................................................................................69 6.5 Arizona .................................................................................................................................70 6.6 Indiana .................................................................................................................................71
Recommended publications
  • Gateway District SPECIFIC PLAN
    CITY OF SOUTH GATE Gateway District FACT SHEET SPECIFIC PLAN Upcoming Opportunities for Community CITY OF SOUTH GATE Participation South Gate’s collaboration with business and residential communities is of paramount importance to the development of the Specific Plan. The City will host three community meetings between January and Fall 2016. 1 Community Meeting 1: Project Initiation Meeting Wednesday, January 27, 2016 Gateway The focus of the initial meeting is to increase project awareness, provide interested residents and business groups information about the Specific Plan’s purpose, study goals and timeline, and to gather feedback on the TOD vision for South Gate. 2 Community Workshop 2: Project Specific Workshop Spring/Summer 2016 The second meeting will be a workshop where the information gathered from the first meeting, as well District as technical work, will be shared. Participants will provide feedback and input on preliminary land use and design scenarios, including public access and open space. Information gathered from the SPECIFIC PLAN workshop will help define the Specific Plan’s goals and policies, and will be used to develop the Public Review Draft Specific Plan. Community Meeting 3: Public Review Draft Specific Plan 3 Summer/Fall 2016 The third meeting will provide the community an opportunity to review and comment on the Public Review Draft Specific Plan. Participants will have the chance to review key components of the Specific Plan, such as site design concepts, proposed land uses, pedestrian- and transit-oriented concepts, and strategies for public access and open space. Comments will be documented and be responded to in the Final Gateway Specific Plan.
    [Show full text]
  • City Council Agenda Report
    CITY COUNCIL AGENDA REPORT MEETING DATE: 4/12/2021 ITEM NO: 15 TO: Mayor and Members of the City Council SUBJECT: Approval of a Letter to the Los Angeles County Metropolitan Transportation Authority in Support of Federal Funding for the West Santa Ana Branch Light Rail Project FROM: Karen Lee, Management Analyst REVIEWED AND APPROVED BY: Melissa Burke, Administrative Manager HongDao Nguyen, City Attorney William Rawlings, City Manager RECOMMENDATION: Staff recommends that the City Council authorize the Mayor to sign, and direct staff to submit, the attached letter to the Los Angeles County Metropolitan Transportation Authority. BACKGROUND: The West Santa Ana Branch (WSAB) light rail line is a substantial public works and transportation project that will have a permanent impact on the region. This project will have tremendous impact on the City as the City’s planned station location in the Downtown will be the line’s terminus. The Los Angeles County Metropolitan Transportation Authority (Metro) is overseeing this project. During the January 12, 2021 meeting of the WSAB City Manager Technical Advisory Committee, and the board meeting of the Orangeline Development Authority/Eco-Rapid Transit on January 13, 2021, Metro staff reported that it intends to lobby for federal funding for the WSAB project to help pay the estimated cost of $6.3 to $6.5 billion in 2018 dollars based on 5% design level plus the addition of project revisions. The project costs will be updated this month based on the 15% design level. 1 ANALYSIS: Metro has requested that cities along the WSAB corridor provide letters in support of the WSAB project and Metro’s efforts to pursue federal funding for this project.
    [Show full text]
  • Oei Office of Extraordinary Innovation
    Tab 9 INNOVATION Defining the Problem Problem: Mobility in Los Angeles County is not working Thesis: We need to do things very differently to reduce Single Occupancy Vehicle (SOV) use Proposed solutions: Set a course, accelerate projects, and try new stuff 2 “We have to have stretch goals that area realistic” 3 ROLE OF METRO STRATEGIC PLAN • Foundation that aligns all plans, programs, and services to achieve a common vision • Establishes mission, vision, and goals to be adopted by other plans (e.g. Long Range Transportation Plan, NextGen Bus Study, etc.) • Sets principles for making decisions and conducting business 4 STRATEGIC MOBILITY: SUPPLY • Increase capacity for non-SOV modes • Improve quality of existing transit system Common Interest 5 STRATEGIC MOBILITY: DEMAND • Manage demand • Pricing beyond transit fares • CongestionCommon pricingInterest • Regulate TNCs 6 “This is a really innovative idea but we can’t do it. It’s never been done before” 7 MicroTransit Pilot Can Metro increase customer satisfaction & attract new riders? > A cross between a pooled ride and a shuttle bus > Meets increasing expectation for convenience > Expands FMLM solutions > Flexible and seamless o Integrated with transit system o Serves non-linear travel On Demand | Dynamically Routed Data Driven | Corner to Corner 8 “If we improve our service more people will use it and we can’t afford that.” 9 Mobility on Demand Partner with a transportation network company to provide better and more equitable access to 3 pilot transit stations “We could have thought of that on our own.” 11 Unsolicited Proposals: Background In February 2016, Metro opened its doors to the private sector, at an Industry> Pledged our Forumcommitment.
    [Show full text]
  • City Council Agenda Report
    CITY COUNCIL AGENDA REPORT MEETING DATE: 11/9/2020 ITEM NO: 7 TO: Mayor and Members of the City Council SUBJECT: Informational Report Regarding the 3% Local Contribution Required Under Measure M to Fund the West Santa Ana Branch Light Rail Line FROM: Karen Lee, Management Analyst REVIEWED AND APPROVED BY: Melissa Burke, Administrative Manager Christi Hogin, City Attorney William Rawlings, City Manager RECOMMENDATION: Staff recommends that the City Council receive and file the report. BACKGROUND: Los Angeles County voters approved Measure M on November 8, 2016, which implemented a permanent county-wide sales tax increase to fund projects to greatly expand the County’s public transit system, including new rail lines, roads, and related infrastructure. The Los Angeles County Metropolitan Transportation Authority (Metro) administers Measure M funds. Funding for the West Santa Ana Branch (WSAB) line is provided by Measure M. One of Measure M’s requirements is a local contribution by jurisdictions for constructing a rail project with a new station within their boundaries. The rationale for the contribution is that local jurisdictions receive a direct benefit due to the increased access to transit service that is above and beyond the project’s benefit to the County as a whole. The contribution amount is 3% of the project’s total costs at the 30% level of its final design. It is capped at this amount for local contribution purposes, even if the total project cost increases. This amount is then divided by the number of new rail stations constructed on the line. Jurisdictions located within a one-half mile area of the new station will proportionally share the costs based on each jurisdiction’s share of the area.
    [Show full text]
  • October /November 2007
    Washington Rail News October /November 2007 www.AllAboardWashington.org Publication of All Aboard Washington A NotNot----forforforfor----profitprofit Consumer Organization “Moving forward...On Rail ."."." passenger system in the U.S. and continu- Update on the Amtrak Cascades and the ing to develop state partnerships. The Legislature has asked WSDOT for Northwest Corridor from Ken Uznanski an updated midrange Cascades vision. The Ken Uznanski, WSDOT Rail Office quently adjusted two more times to provide report is due Dec. 2008. Ken said we would manager, spoke at the Aug. 11 All more consistent operation. “Amtrak has be looking at 7-8 Seattle-Portland round- Aboard Washington picnic in Puyallup. done a tremendous job” restoring trips a day. He noted that several key leg- Everyone, of course, wanted to know Northwest rail service, concluded Ken. islators are saying 2009 will be the rail about the Talgo trainsets being pulled He recounted his trip to Spain in June session. from service on Thursday Aug. 2 when as part of a trade mission. Also on the trip Ridership on the Cascades has been were Amtrak Pres. Alex Kummant and gov- cracks were discovered in the upper strong this year, up 11% through August. ernment affairs Vice Pres. Joe McHugh. This despite the August drop due to the parts of some of the suspension systems. They met with various government officials These systems provide the ability for the days of cancelled and reduced service. and with Renfre, the Spanish National Rail- Even with the substitute equipment, rider- trains to travel faster through curves than ways. Renfre is spending 1.2-1.6 bill.
    [Show full text]
  • 1981 Caltrans Inventory of Pacific Electric Routes
    1981 Inventory of PACIFIC ELECTRIC ROUTES I J..,. I ~ " HE 5428 . red by I58 ANGELES - DISTRICT 7 - PUBLIC TRANSPORTATION BRANCH rI P37 c.2 " ' archive 1981 INVENTORY OF PACIFIC ELECTRIC ROUTES • PREPARED BY CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) DISTRICT 07 PUBLIC TRANSPORTATION BRANCH FEBRUARY 1982 • TABLE OF CONTENTS PAGE I. EXECUTIVE SUMMARY 1 Pacific Electric Railway Company Map 3a Inventory Map 3b II. NQR'I'HIRN AND EASTERN DISTRICTS 4 A. San Bernardino Line 6 B. Monrovia-Glendora Line 14 C. Alhambra-San Gabriel Line 19 D. Pasadena Short Line 21 E. Pasadena Oak Knoll Line 23 F. Sierra Madre Line 25 G. South Pasadena Line 27 H. North Lake Avenue Line 30 10 North Fair Oaks Avenue Line 31 J. East Colorado Street Line 32 K. Pomona-Upland Line 34 L. San Bernardino-Riverside Line 36 M. Riverside-Corona Line 41 III. WESTERN DISTRICT 45 A. Glendale-Burbank Line 47 B. Hollywood Line Segment via Hill Street 52 C. South Hollywood-Sherman Line 55 D. Subway Hollywood Line 58 i TABLE OF CONTENTS (Contd. ) -PAGE III. WESTERN DISTRICT (Conta. ) E. San Fernando valley Line 61 F. Hollywood-Venice Line 68 o. Venice Short Line 71 H. Santa Monica via Sawtelle Line 76 I. westgate Line 80 J. Santa Monica Air Line 84 K. Soldier's Home Branch Line 93 L. Redondo Beach-Del Rey Line 96 M. Inglewood Line 102 IV. SOUTHIRN DISTRICT 106 A. Long Beach Line 108 B. American Avenue-North Long Beach Line 116 c. Newport-Balboa Line 118 D. E1 Segundo Line 123 E. San Pedro via Dominguez Line 129 F.
    [Show full text]
  • Metro Set to Begin Environmental Clearance Process for West Santa Ana Branch Rail Line Connecting Southeast L.A
    Latest Measure R Transit Project Moving Forward Metro Set to Begin Environmental Clearance Process for West Santa Ana Branch Rail Line Connecting southeast L.A. County to the regional transit system moved one step closer to reality today when the Los Angeles County Metropolitan Transportation Authority (Metro) Board approved contracts to proceed with environmental work and community outreach for the West Santa Ana Branch Transit Corridor project to connect L.A. Union Station and Artesia via a new rail line. The Board approved contracts with Parsons Brinkerhoff, Inc. to complete the environmental clearance for the project and a contract with Arrellano Associates, LLC for community outreach. The Board also approved a funding agreement with the Gateway Cities Council of Governments to help the 13 cities along the project corridor participate in the study. The effort will be led by the Eco-Rapid Transit Joint Powers Authority, which was created to study rail transit in the corridor. The West Santa Ana Branch Transit Corridor travels through the cities of Artesia, Bell, Bellflower, Bell Gardens, Cudahy, Cerritos, Downey, Huntington Park, Lynwood, Los Angeles, Maywood, Paramount, South Gate and Vernon. During the environmental clearance phase, various rail alignments will be studied between Los Angeles Union Station and a southern terminus in Artesia. The preferred route will ultimately be approved by the Metro Board. “Connecting southeast L.A. County to the regional transit system is an important part of Metro’s broad vision for better regional mobility,” said John Fasana, Metro Board Chair and Duarte City Council Member. “But this milestone is particularly good news for the Gateway Cities communities.
    [Show full text]
  • ATN]Tha Lll]L]L
    RECEIVED Item No. 2 i\W 7 Z018 of CITYOFSOUTH GATE City South Gate WFICEOFTHECITYMANAGER3bpm CITY COUNCIL ATN]ThA Lll]L]L For the Regular Meeting of August 14, 2018 Orj4ating Deartment: ftZ4’ i7’frC1t Manager Department Director Joe Perez! SUBJECT: COMMENT LETTER FOR THE WEST SANTA ANA BRANCH TRANSIT CORRIDOR PROJECT PURPOSE: To submit comments and concerns to the Los Angeles County Metropolitan Transportation Authority (Metro) regarding potential impacts related to the West Santa Ana Branch Transit Corridor Project. Metro is receiving public input until August 24, 2018, which marks the end of their formal public comment period for a revised Notice of Preparation of a Draft Environmental Impact Statement (EIS)/Environmental Impact Report (EIR). RECOMMENDED ACTION: Authorize the Mayor to execute the comment letter regarding potential impacts related to the West Santa Branch Transit Corridor Project to the Los Angeles County Metropolitan Transportation Authority prior to August 24, 2018. FISCAL IMPACT: None. ANALYSIS: Metro is evaluating a new light rail transit line that would connect downtown Los Angeles to southeast LA County, serving the cities and communities of downtown Los Angeles, unincorporated Florence-Graham community of LA County, Vernon, Huntington Park, Bell, Cudahy, South Gate, Downey, Paramount, Bellflower and Artesia. The West Santa Ana Branch (WSAB) Transit Corridor Project is a 20-mile corridor that is undergoing an Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) process to prepare the corridor for light rail use. The project’s name originates from the southern portion of the route south of the Metro Green Line that follows the old Pacific Electric streetcar alignment known as the West Santa Ana Branch Corridor.
    [Show full text]
  • West Santa Ana Branch Transit Corridor Study
    What is the GATEWAY DISTRICT? The Gateway District encompasses approximately 59 acres located at the north-east corner of Firestone Blvd and Atlantic Ave. It is: • The future site of the planned South Gate Transit Station along the West Santa Ana Branch Corridor Transit Line. • Identified to become a dense“transit village” designed to support a high-level of pedestrian activity. • Envisioned as a visual and functional transit gateway feature for the City of South Gate. • The optimal location for future transit- oriented development (TOD) to support the future transit station. CITY OF SOUTH GATE • Currently characterized by existing light- to heavy-industrialGatewa usesy and emerging retail uses.District Conceptual Sketch of the Gateway District SPECIFIC PLAN Fostoria Street Salt Lake Avenue South Gate City Limit Fostoria Street Wilcox Avenue Los Angeles River Angeles Los Patata Street River Angeles Los South Gate City Limit Patata Street Project Area Reisner Way Reisner Way Rayo Avenue Avenue Rayo Rayo Mason Street Patata Street Rayo Avenue Wilcox Avenue Wilcox Wilcox Avenue Atlantic AvenueWilcox Firestone Place Los Angeles River y t N a PLA Firestone Boulevard May Court Firestone Place Burke Avenue Burke Avenue E Dudlext Avenue Dudlext Avenue T Vossler Avenue w Vossler Avenue GA H T e SPECIFIC Map of the Gateway District Rayo Avenue Rayo Firestone Boulevard Avenue Rayo SOU t West Santa Ana Branch OF Patata Street Y Transit Corridor a Distric Rayo Avenue CIT G Southern Avenue Project Area Potential Station Location Mason Street Salt Lake
    [Show full text]
  • Los Angeles Equity Maps Large.Ai
    S and Can yo ! Newhall n Placerita Canyon Sand C any on Ventura County ra Los Angeles County er Si Th e Ol d Measure R Expansion l el rn Bradl ey Exi Ya d t 3 xfor Ro S lk an Fe Po d Big rnan T ujung do Hubbar n a Cany yo on sn SylmarSan Fernando on Se a ga Can Moorpark un ay Canyon mp ! cl uj ch T ! Ta Ma le Gl Litt Lopez Ran enoak er xton on Pa ce s er e Port Pi Rinaldi l Cany rn age bo HWY 118 and ys K Os San Fernando Mission Br ! an Nu V Simi Valley x on Chatsworth Fo Chatsworth Wentworth eas Ar le ta Devonshire Ar Mount Gl le ! boa ta Chatsworth and e ah Bal da rn unl Ma lz rilla oodley bo S INTERSTATE W Ze per la Os el Rese 5 Plummer B Sant Plummer a Plummer Ves rra a e Manor ed Te Carlotta Lak lv Nordhoff Ar Laur l Nordhoff epu heldon ! le S on Orange S ny ta el una Ca Fo C La T INTERSTATE othill Lowel o an ! d 210 a e Orange Line Extension ot anford yo or cl n xf ose Northridge Br ani Tu Honolul enr v De S P yl ey Cir u ll Roscoe Roscoe a W Rosc ! ! oe enns ka Va ebb ent P et Gl sc rch Sun Valley enoak Fo Van Nuys re othi Ma Winn ll im a s Los Angeles County Canoga San Fernando BRT Corridors S an ! La C sh oodlake Saticoy ed i nd cle Fe lv er W ir la rnando C ne epu Naom Lank ys ey Sherman Way Sherman S Vi Verdugo ll ! Sherman Glendora Ridge Va t Sc Fo rs k ot an Nu n ott hi V k Ramp ll oo yo an Alta a Burbank/ Bob Hope Airport den Oa Vanowen enhu San Ber a t De Soto ks Canoga ! e hi yv ! Empi Can re re mp it at Fallbr ! Gl Victory Woodley el Fe Pl Ha Ta ctory enoaks ! Vi Woodm d r K Wh ! ! Victory nan enne oo Reseda Laur do d
    [Show full text]
  • Gateway Cities COG Agenda
    West Santa Ana Branch City Manager Technical Advisory Committee Thursday, July 15, 2021, 2:00 PM – 3:30 PM TELECONFERENCE MEETING VIA ZOOM Register in advance for this webinar: https://us02web.zoom.us/webinar/register/WN_z7dIEX8pRvC-IzboBukZ0Q Phone: 669.900.6833 Meeting ID: 820 6603 0727 AGENDA 1. Welcome John Moreno, Chair 2. Approval of Minutes 15 min. 3. Update on Environmental Process Meghna Khanna Senior A. Document Release and Review Period Director, Mobility Corridor, B. Comment Submittal & Public Participation Countywide Planning 15 min. 4. Update on Federal Funding Efforts Raffi Hamparian, Senior A. Congressional Efforts Director for Federal Affairs, B. Metro Efforts Government Relations 20 min. 5. Update on First/Last Mile Guidelines Jacob Lieb, Senior Director, A. Adopt FLM Guidelines FLM Planning B. FLM Planning Process, Roles and Responsibilities Katie Lemmon, Senior C. 3% Local Contribution Guidance Manager, FLM Planning D. Metro Support for Implementation 10 min. 6. Update on WSAB Project Efforts John Moreno, Chair A. Metro Board Action on Subregional Funding B. Request for Economic Information C. City Manager TAC Public Involvement Schedule D. Master Cooperative Agreements 7. Other City Manager TAC Items and Discussion 8. Propose Next CM TAC Meeting – Thursday, August 12, 2021, Via ZOOM Focus: Environmental Document Review and Initial LPA Discussion 9. Adjournment 2. Approval of Minutes MINUTES OF THE MEETING OF THE GATEWAY CITIES COUNCIL OF GOVERNMENTS West Santa Ana Branch City Manager Technical Advisory Committee June
    [Show full text]
  • Woodinville Subdivision - North Rail Line
    PURCHASE AND SALE AGREEMENT (Woodinville Subdivision - North Rail Line) THIS PURCHASE AND SALE AGREEMENT is made and entered into as of the ___ day of April, 2008, by and between BNSF RAILWAY COMPANY (“BNSF”), the PORT OF SEATTLE, a municipal corporation of the State of Washington ("Port”) and KING COUNTY, a political subdivision of the State of Washington (“County”). RECITALS A. BNSF owns certain real property (the "Woodinville Subdivision," or "Subdivision") in King County, Washington and Snohomish County, Washington, and operates over such Subdivision, a railroad line from the City of Renton, Washington to the City of Snohomish, Washington. B. The Port desires to enter into this Agreement for the purchase of a portion of such BNSF property and railroad facilities thereon, subject to a easement for freight operations on the Freight Portion of the Property (defined below) under which at Closing the holder of the easement for freight operations will provide freight rail service and will have the exclusive right and obligation to provide such freight service on the Freight Portion of the Property. C. BNSF is willing to sell the North Rail Line (defined below) portion of the Subdivision in the manner described in this Agreement. D. The County desires to use the Railbanked Portion (defined below) for public trail and other transportation purposes following the acquisition of the Woodinville Subdivision by the Port, and, accordingly, the County and BNSF will enter into at Closing an agreement for railbanking and for public space pursuant to and in accordance with 49 C.F.R. 1152.29 and Section 8(d) of the National Trails System Act (also known as the “Rails-to-Trails Act”), 16 U.S.C.
    [Show full text]