West Santa Ana Branch Transit Corridor Study

Total Page:16

File Type:pdf, Size:1020Kb

West Santa Ana Branch Transit Corridor Study What is the GATEWAY DISTRICT? The Gateway District encompasses approximately 59 acres located at the north-east corner of Firestone Blvd and Atlantic Ave. It is: • The future site of the planned South Gate Transit Station along the West Santa Ana Branch Corridor Transit Line. • Identified to become a dense“transit village” designed to support a high-level of pedestrian activity. • Envisioned as a visual and functional transit gateway feature for the City of South Gate. • The optimal location for future transit- oriented development (TOD) to support the future transit station. CITY OF SOUTH GATE • Currently characterized by existing light- to heavy-industrialGatewa usesy and emerging retail uses.District Conceptual Sketch of the Gateway District SPECIFIC PLAN Fostoria Street Salt Lake Avenue South Gate City Limit Fostoria Street Wilcox Avenue Los Angeles River Angeles Los Patata Street River Angeles Los South Gate City Limit Patata Street Project Area Reisner Way Reisner Way Rayo Avenue Avenue Rayo Rayo Mason Street Patata Street Rayo Avenue Wilcox Avenue Wilcox Wilcox Avenue Atlantic AvenueWilcox Firestone Place Los Angeles River y t N a PLA Firestone Boulevard May Court Firestone Place Burke Avenue Burke Avenue E Dudlext Avenue Dudlext Avenue T Vossler Avenue w Vossler Avenue GA H T e SPECIFIC Map of the Gateway District Rayo Avenue Rayo Firestone Boulevard Avenue Rayo SOU t West Santa Ana Branch OF Patata Street Y Transit Corridor a Distric Rayo Avenue CIT G Southern Avenue Project Area Potential Station Location Mason Street Salt Lake Avenue CITY OF SOUTH GATE Atlantic Avenue Gateway District SPECIFIC PLAN 27 January 2016 May Court Vossler Avenue Vossler Vossler Avenue Vossler Dudlext Avenue Dudlext Dudlext Avenue Dudlext Burke Avenue Burke Burke Avenue Burke Southern Avenue CITY OF SOUTH GATE WhereGate areway you COMINGDistri FROMct OR GOING TO? SPECIFIC PLAN The West Santa Ana Branch Transit Corridor is a corridor connecting southeastWest Santa Los Angeles Ana Branch County Transit(including Corridor South Gate) Study to Area Downtown Los Angeles via the abandoned Pacific Electric Right-of-Way (ROW). Los Angeles Map of the West Santa Ana Branch Transit Corridor Portions of the alignment are still being studied and are not yet final. Little Tokyo Union Station 7th/Alameda Soto St. Pacic/Vernon Vernon Leonis/District Pacic/Randolph Maywood Huntington Park Gage/Salt Lake Bell Cudahy South Gate Firestone Blvd. Downey Gardendale St. I-105/Green Line Bellower Paramount/Rosecrans CITYParamount OF SOUTH GATE GatewayBellower Blvd. Cerritos Legend District Artesia SPECIFIC PLAN WSAB Station Blue Line Gridley/183rd Southern Alignment GreenWest Line Santa Ana Branch Transit Corridor Study AreaPioneer Blvd. Northern Alignment Red Line Purple Line East Bank Los Angeles West Bank, Option 3 Gold Line Little Tokyo Miles Source: SCAG AA Union Station 0 2.5 5 7th/Alameda Soto St. CITY OF SOUTH GATE Pacic/Vernon Vernon Leonis/District Gateway District SPECIFIC PLAN 27 January 2016 Pacic/Randolph Maywood Huntington Park Gage/Salt Lake Bell Cudahy South Gate Firestone Blvd. Downey Gardendale St. I-105/Green Line Bellower Paramount/Rosecrans Paramount Bellower Blvd. Cerritos Legend Artesia WSAB Station Blue Line Gridley/183rd Southern Alignment Green Line Pioneer Blvd. Northern Alignment Red Line East Bank Purple Line West Bank, Option 3 Gold Line Miles Source: SCAG AA 0 2.5 5 Where are you COMING FROM OR GOING TO? The West Santa Ana Branch Transit Corridor is a corridor connecting southeast Los Angeles County (including South Gate) to Downtown Los Angeles and the greater LA regional transit system. Map of the Los Angeles Regional Transit System Portions of the alignment are planned and not yet finalized. To the Antelope Valley SAN FERNANDO VALLEY BURBANK To Ventura County BUR PASADENA HOLLYWOOD DOWNTOWN LOS ANGELES To San Bernardino County EL MONTE UNION EAST LOS ANGELES STATION To Riverside County CULVER CITY SOUTH GATE LAX NORWALK SOUTH BAY ARTESIA LONG BEACH To Orange and San Diego Counties CITY OF SOUTH GATE Gateway District SPECIFIC PLAN 27 January 2016 Examples of LIGHT RAIL TRANSIT The Expo Line is an example of typical elevated light rail systems currently being constructed in Los Angeles County. Expo Line through Culver City, CA Expo Line through Culver City, CA Hackescher Markt is a good example of a building-integrated rail station. Here, the station platform is located on the second level, with retail tucked below at ground level. Hackescher Markt Station in Germany. Hackescher Markt Station in Germany. In the Netherlands, the Randstadrail is designed to be iconic and unique as it traverses through the city. Charlotte South Corridor Light Rail Transit System in Charlotte, SC. Randstadrail in Rotterdam, Netherlands. Charlotte South Corridor Light Rail Transit System in Charlotte, SC. CITY OF SOUTH GATE Gateway District SPECIFIC PLAN 27 January 2016 Examples of TRANSIT PLAZAS Transit plazas should accommodate all modes of transportation - Successful transit plazas are those that are framed by active foot, bike, bus, train, and car. ground floor uses, like retail and restaurants. Mariachi Plaza Gold Line Station in East Los Angeles, CA Transit plazas can become hubs of community life and activity, to host special events like concerts, farmer’s markets, and more. Wilshire/Vermont Red Line Station in Los Angeles, CA Succsseful transit plazas provide safe, convenient, and legible connections for people to get to and from destinations. Mariachi Plaza Gold Line Station in East Los Angeles, CA Transit plazas are opportunities to showcase local art and history. Mission Street Gold Line Station in South Pasadena, CA. Del Mar Gold Line Station in Pasadena, CA CITY OF SOUTH GATE Gateway District SPECIFIC PLAN 27 January 2016 Examples of TRANSIT-ORIENTED DEVELOPMENT Transit stations can become gateway portals into communities. Successful transit stations allow riders to arrive to and depart Stations can be integrated into the architecture of residential, from transit plazas that are safe, convenient, legible, and activated retail, office, and other uses. by other uses, like retail or restaurants. Del Mar Gold Line Station in Pasadena, CA Transit-oriented developments provide a vibrant mix of uses in station areas, giving communities more options for living, working, shopping, playing, and learning. Del Mar Gold Line Station in Pasadena, CA Because transit-oriented developments provide a mix of uses, they become iconic, local destinations and centers of community life and activity. Wilshire/Vermont Red Line Station in Los Angeles, CA Transit-oriented developments clusters uses within a comfortable walkable or bikeable distance from a transit station, which encourages healthy and active lifestyles. Mission Street Station in South Pasadena, CA Wilshire/Vermont Red Line Station in Los Angeles, CA CITY OF SOUTH GATE Gateway District SPECIFIC PLAN 27 January 2016 What amenities WOULD YOU MOST LIKE TO SEE? Residential Restaurants Townhouse residential in Seattle, WA. Active ground floor retail/restaurants in Washington, DC. Office Hotel Office space in Playa Vista (Los Angeles), CA. Best Western, Long Beach source: www.minitime.com Day Care Food Market source: www.boulderrealestatenews.com source: www.dwarthur.com Parking Movie Theater source: www.seattletransitblog.com source: www.amctheaters.com Use stickers to vote for type of uses CITY OF SOUTH GATE Gateway District SPECIFIC PLAN 27 January 2016 What amenities WOULD YOU MOST LIKE TO SEE? Plaza Space Boutique Retail source: www.nerdsandnomsense.com Different types of boutique retail shopping Industrial Flex Brewery Office space in Culver City, CA. source: www.columbuscrave.com Mixed-Use Health Care (Homes over retail) Mixed-use (ground floor retail with residential above) in Little Tokyo (Los Angeles), CA. source: www.scripps.org Farmers Market Fitness/Gym source: www.activerian.com source: www.24hourfitness.com Use stickers to vote for type of uses CITY OF SOUTH GATE Gateway District SPECIFIC PLAN 27 January 2016.
Recommended publications
  • Gateway District SPECIFIC PLAN
    CITY OF SOUTH GATE Gateway District FACT SHEET SPECIFIC PLAN Upcoming Opportunities for Community CITY OF SOUTH GATE Participation South Gate’s collaboration with business and residential communities is of paramount importance to the development of the Specific Plan. The City will host three community meetings between January and Fall 2016. 1 Community Meeting 1: Project Initiation Meeting Wednesday, January 27, 2016 Gateway The focus of the initial meeting is to increase project awareness, provide interested residents and business groups information about the Specific Plan’s purpose, study goals and timeline, and to gather feedback on the TOD vision for South Gate. 2 Community Workshop 2: Project Specific Workshop Spring/Summer 2016 The second meeting will be a workshop where the information gathered from the first meeting, as well District as technical work, will be shared. Participants will provide feedback and input on preliminary land use and design scenarios, including public access and open space. Information gathered from the SPECIFIC PLAN workshop will help define the Specific Plan’s goals and policies, and will be used to develop the Public Review Draft Specific Plan. Community Meeting 3: Public Review Draft Specific Plan 3 Summer/Fall 2016 The third meeting will provide the community an opportunity to review and comment on the Public Review Draft Specific Plan. Participants will have the chance to review key components of the Specific Plan, such as site design concepts, proposed land uses, pedestrian- and transit-oriented concepts, and strategies for public access and open space. Comments will be documented and be responded to in the Final Gateway Specific Plan.
    [Show full text]
  • City Council Agenda Report
    CITY COUNCIL AGENDA REPORT MEETING DATE: 4/12/2021 ITEM NO: 15 TO: Mayor and Members of the City Council SUBJECT: Approval of a Letter to the Los Angeles County Metropolitan Transportation Authority in Support of Federal Funding for the West Santa Ana Branch Light Rail Project FROM: Karen Lee, Management Analyst REVIEWED AND APPROVED BY: Melissa Burke, Administrative Manager HongDao Nguyen, City Attorney William Rawlings, City Manager RECOMMENDATION: Staff recommends that the City Council authorize the Mayor to sign, and direct staff to submit, the attached letter to the Los Angeles County Metropolitan Transportation Authority. BACKGROUND: The West Santa Ana Branch (WSAB) light rail line is a substantial public works and transportation project that will have a permanent impact on the region. This project will have tremendous impact on the City as the City’s planned station location in the Downtown will be the line’s terminus. The Los Angeles County Metropolitan Transportation Authority (Metro) is overseeing this project. During the January 12, 2021 meeting of the WSAB City Manager Technical Advisory Committee, and the board meeting of the Orangeline Development Authority/Eco-Rapid Transit on January 13, 2021, Metro staff reported that it intends to lobby for federal funding for the WSAB project to help pay the estimated cost of $6.3 to $6.5 billion in 2018 dollars based on 5% design level plus the addition of project revisions. The project costs will be updated this month based on the 15% design level. 1 ANALYSIS: Metro has requested that cities along the WSAB corridor provide letters in support of the WSAB project and Metro’s efforts to pursue federal funding for this project.
    [Show full text]
  • Oei Office of Extraordinary Innovation
    Tab 9 INNOVATION Defining the Problem Problem: Mobility in Los Angeles County is not working Thesis: We need to do things very differently to reduce Single Occupancy Vehicle (SOV) use Proposed solutions: Set a course, accelerate projects, and try new stuff 2 “We have to have stretch goals that area realistic” 3 ROLE OF METRO STRATEGIC PLAN • Foundation that aligns all plans, programs, and services to achieve a common vision • Establishes mission, vision, and goals to be adopted by other plans (e.g. Long Range Transportation Plan, NextGen Bus Study, etc.) • Sets principles for making decisions and conducting business 4 STRATEGIC MOBILITY: SUPPLY • Increase capacity for non-SOV modes • Improve quality of existing transit system Common Interest 5 STRATEGIC MOBILITY: DEMAND • Manage demand • Pricing beyond transit fares • CongestionCommon pricingInterest • Regulate TNCs 6 “This is a really innovative idea but we can’t do it. It’s never been done before” 7 MicroTransit Pilot Can Metro increase customer satisfaction & attract new riders? > A cross between a pooled ride and a shuttle bus > Meets increasing expectation for convenience > Expands FMLM solutions > Flexible and seamless o Integrated with transit system o Serves non-linear travel On Demand | Dynamically Routed Data Driven | Corner to Corner 8 “If we improve our service more people will use it and we can’t afford that.” 9 Mobility on Demand Partner with a transportation network company to provide better and more equitable access to 3 pilot transit stations “We could have thought of that on our own.” 11 Unsolicited Proposals: Background In February 2016, Metro opened its doors to the private sector, at an Industry> Pledged our Forumcommitment.
    [Show full text]
  • City Council Agenda Report
    CITY COUNCIL AGENDA REPORT MEETING DATE: 11/9/2020 ITEM NO: 7 TO: Mayor and Members of the City Council SUBJECT: Informational Report Regarding the 3% Local Contribution Required Under Measure M to Fund the West Santa Ana Branch Light Rail Line FROM: Karen Lee, Management Analyst REVIEWED AND APPROVED BY: Melissa Burke, Administrative Manager Christi Hogin, City Attorney William Rawlings, City Manager RECOMMENDATION: Staff recommends that the City Council receive and file the report. BACKGROUND: Los Angeles County voters approved Measure M on November 8, 2016, which implemented a permanent county-wide sales tax increase to fund projects to greatly expand the County’s public transit system, including new rail lines, roads, and related infrastructure. The Los Angeles County Metropolitan Transportation Authority (Metro) administers Measure M funds. Funding for the West Santa Ana Branch (WSAB) line is provided by Measure M. One of Measure M’s requirements is a local contribution by jurisdictions for constructing a rail project with a new station within their boundaries. The rationale for the contribution is that local jurisdictions receive a direct benefit due to the increased access to transit service that is above and beyond the project’s benefit to the County as a whole. The contribution amount is 3% of the project’s total costs at the 30% level of its final design. It is capped at this amount for local contribution purposes, even if the total project cost increases. This amount is then divided by the number of new rail stations constructed on the line. Jurisdictions located within a one-half mile area of the new station will proportionally share the costs based on each jurisdiction’s share of the area.
    [Show full text]
  • 1981 Caltrans Inventory of Pacific Electric Routes
    1981 Inventory of PACIFIC ELECTRIC ROUTES I J..,. I ~ " HE 5428 . red by I58 ANGELES - DISTRICT 7 - PUBLIC TRANSPORTATION BRANCH rI P37 c.2 " ' archive 1981 INVENTORY OF PACIFIC ELECTRIC ROUTES • PREPARED BY CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) DISTRICT 07 PUBLIC TRANSPORTATION BRANCH FEBRUARY 1982 • TABLE OF CONTENTS PAGE I. EXECUTIVE SUMMARY 1 Pacific Electric Railway Company Map 3a Inventory Map 3b II. NQR'I'HIRN AND EASTERN DISTRICTS 4 A. San Bernardino Line 6 B. Monrovia-Glendora Line 14 C. Alhambra-San Gabriel Line 19 D. Pasadena Short Line 21 E. Pasadena Oak Knoll Line 23 F. Sierra Madre Line 25 G. South Pasadena Line 27 H. North Lake Avenue Line 30 10 North Fair Oaks Avenue Line 31 J. East Colorado Street Line 32 K. Pomona-Upland Line 34 L. San Bernardino-Riverside Line 36 M. Riverside-Corona Line 41 III. WESTERN DISTRICT 45 A. Glendale-Burbank Line 47 B. Hollywood Line Segment via Hill Street 52 C. South Hollywood-Sherman Line 55 D. Subway Hollywood Line 58 i TABLE OF CONTENTS (Contd. ) -PAGE III. WESTERN DISTRICT (Conta. ) E. San Fernando valley Line 61 F. Hollywood-Venice Line 68 o. Venice Short Line 71 H. Santa Monica via Sawtelle Line 76 I. westgate Line 80 J. Santa Monica Air Line 84 K. Soldier's Home Branch Line 93 L. Redondo Beach-Del Rey Line 96 M. Inglewood Line 102 IV. SOUTHIRN DISTRICT 106 A. Long Beach Line 108 B. American Avenue-North Long Beach Line 116 c. Newport-Balboa Line 118 D. E1 Segundo Line 123 E. San Pedro via Dominguez Line 129 F.
    [Show full text]
  • Metro Set to Begin Environmental Clearance Process for West Santa Ana Branch Rail Line Connecting Southeast L.A
    Latest Measure R Transit Project Moving Forward Metro Set to Begin Environmental Clearance Process for West Santa Ana Branch Rail Line Connecting southeast L.A. County to the regional transit system moved one step closer to reality today when the Los Angeles County Metropolitan Transportation Authority (Metro) Board approved contracts to proceed with environmental work and community outreach for the West Santa Ana Branch Transit Corridor project to connect L.A. Union Station and Artesia via a new rail line. The Board approved contracts with Parsons Brinkerhoff, Inc. to complete the environmental clearance for the project and a contract with Arrellano Associates, LLC for community outreach. The Board also approved a funding agreement with the Gateway Cities Council of Governments to help the 13 cities along the project corridor participate in the study. The effort will be led by the Eco-Rapid Transit Joint Powers Authority, which was created to study rail transit in the corridor. The West Santa Ana Branch Transit Corridor travels through the cities of Artesia, Bell, Bellflower, Bell Gardens, Cudahy, Cerritos, Downey, Huntington Park, Lynwood, Los Angeles, Maywood, Paramount, South Gate and Vernon. During the environmental clearance phase, various rail alignments will be studied between Los Angeles Union Station and a southern terminus in Artesia. The preferred route will ultimately be approved by the Metro Board. “Connecting southeast L.A. County to the regional transit system is an important part of Metro’s broad vision for better regional mobility,” said John Fasana, Metro Board Chair and Duarte City Council Member. “But this milestone is particularly good news for the Gateway Cities communities.
    [Show full text]
  • ATN]Tha Lll]L]L
    RECEIVED Item No. 2 i\W 7 Z018 of CITYOFSOUTH GATE City South Gate WFICEOFTHECITYMANAGER3bpm CITY COUNCIL ATN]ThA Lll]L]L For the Regular Meeting of August 14, 2018 Orj4ating Deartment: ftZ4’ i7’frC1t Manager Department Director Joe Perez! SUBJECT: COMMENT LETTER FOR THE WEST SANTA ANA BRANCH TRANSIT CORRIDOR PROJECT PURPOSE: To submit comments and concerns to the Los Angeles County Metropolitan Transportation Authority (Metro) regarding potential impacts related to the West Santa Ana Branch Transit Corridor Project. Metro is receiving public input until August 24, 2018, which marks the end of their formal public comment period for a revised Notice of Preparation of a Draft Environmental Impact Statement (EIS)/Environmental Impact Report (EIR). RECOMMENDED ACTION: Authorize the Mayor to execute the comment letter regarding potential impacts related to the West Santa Branch Transit Corridor Project to the Los Angeles County Metropolitan Transportation Authority prior to August 24, 2018. FISCAL IMPACT: None. ANALYSIS: Metro is evaluating a new light rail transit line that would connect downtown Los Angeles to southeast LA County, serving the cities and communities of downtown Los Angeles, unincorporated Florence-Graham community of LA County, Vernon, Huntington Park, Bell, Cudahy, South Gate, Downey, Paramount, Bellflower and Artesia. The West Santa Ana Branch (WSAB) Transit Corridor Project is a 20-mile corridor that is undergoing an Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) process to prepare the corridor for light rail use. The project’s name originates from the southern portion of the route south of the Metro Green Line that follows the old Pacific Electric streetcar alignment known as the West Santa Ana Branch Corridor.
    [Show full text]
  • Los Angeles Equity Maps Large.Ai
    S and Can yo ! Newhall n Placerita Canyon Sand C any on Ventura County ra Los Angeles County er Si Th e Ol d Measure R Expansion l el rn Bradl ey Exi Ya d t 3 xfor Ro S lk an Fe Po d Big rnan T ujung do Hubbar n a Cany yo on sn SylmarSan Fernando on Se a ga Can Moorpark un ay Canyon mp ! cl uj ch T ! Ta Ma le Gl Litt Lopez Ran enoak er xton on Pa ce s er e Port Pi Rinaldi l Cany rn age bo HWY 118 and ys K Os San Fernando Mission Br ! an Nu V Simi Valley x on Chatsworth Fo Chatsworth Wentworth eas Ar le ta Devonshire Ar Mount Gl le ! boa ta Chatsworth and e ah Bal da rn unl Ma lz rilla oodley bo S INTERSTATE W Ze per la Os el Rese 5 Plummer B Sant Plummer a Plummer Ves rra a e Manor ed Te Carlotta Lak lv Nordhoff Ar Laur l Nordhoff epu heldon ! le S on Orange S ny ta el una Ca Fo C La T INTERSTATE othill Lowel o an ! d 210 a e Orange Line Extension ot anford yo or cl n xf ose Northridge Br ani Tu Honolul enr v De S P yl ey Cir u ll Roscoe Roscoe a W Rosc ! ! oe enns ka Va ebb ent P et Gl sc rch Sun Valley enoak Fo Van Nuys re othi Ma Winn ll im a s Los Angeles County Canoga San Fernando BRT Corridors S an ! La C sh oodlake Saticoy ed i nd cle Fe lv er W ir la rnando C ne epu Naom Lank ys ey Sherman Way Sherman S Vi Verdugo ll ! Sherman Glendora Ridge Va t Sc Fo rs k ot an Nu n ott hi V k Ramp ll oo yo an Alta a Burbank/ Bob Hope Airport den Oa Vanowen enhu San Ber a t De Soto ks Canoga ! e hi yv ! Empi Can re re mp it at Fallbr ! Gl Victory Woodley el Fe Pl Ha Ta ctory enoaks ! Vi Woodm d r K Wh ! ! Victory nan enne oo Reseda Laur do d
    [Show full text]
  • Gateway Cities COG Agenda
    West Santa Ana Branch City Manager Technical Advisory Committee Thursday, July 15, 2021, 2:00 PM – 3:30 PM TELECONFERENCE MEETING VIA ZOOM Register in advance for this webinar: https://us02web.zoom.us/webinar/register/WN_z7dIEX8pRvC-IzboBukZ0Q Phone: 669.900.6833 Meeting ID: 820 6603 0727 AGENDA 1. Welcome John Moreno, Chair 2. Approval of Minutes 15 min. 3. Update on Environmental Process Meghna Khanna Senior A. Document Release and Review Period Director, Mobility Corridor, B. Comment Submittal & Public Participation Countywide Planning 15 min. 4. Update on Federal Funding Efforts Raffi Hamparian, Senior A. Congressional Efforts Director for Federal Affairs, B. Metro Efforts Government Relations 20 min. 5. Update on First/Last Mile Guidelines Jacob Lieb, Senior Director, A. Adopt FLM Guidelines FLM Planning B. FLM Planning Process, Roles and Responsibilities Katie Lemmon, Senior C. 3% Local Contribution Guidance Manager, FLM Planning D. Metro Support for Implementation 10 min. 6. Update on WSAB Project Efforts John Moreno, Chair A. Metro Board Action on Subregional Funding B. Request for Economic Information C. City Manager TAC Public Involvement Schedule D. Master Cooperative Agreements 7. Other City Manager TAC Items and Discussion 8. Propose Next CM TAC Meeting – Thursday, August 12, 2021, Via ZOOM Focus: Environmental Document Review and Initial LPA Discussion 9. Adjournment 2. Approval of Minutes MINUTES OF THE MEETING OF THE GATEWAY CITIES COUNCIL OF GOVERNMENTS West Santa Ana Branch City Manager Technical Advisory Committee June
    [Show full text]
  • Passenger Rail
    TRANSPORTATION SYSTEM PASSENGER RAIL SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS TECHNICAL REPORT DRAFT FOR PUBLIC REVIEW AND COMMENT EXECUTIVE SUMMARY 1 INTRODUCTION 2 REGIONAL SIGNIFICANCE 2 REGULATORY FRAMEWORK 3 ANALYTICAL APPROACH 5 EXISTING CONDITIONS 6 STRATEGIES 27 NEXT STEPS 44 CONCLUSION 45 TECHNICAL REPORT PASSENGER RAIL DRAFT FOR PUBLIC REVIEW AND COMMENT connectsocal.org EXECUTIVE SUMMARY TRANSPORTATION SYSTEM This Connect SoCal Passenger Rail report lays out a vision of passenger rail services for the SCAG Region for the next three decades. It demonstrates Passenger Rail the progress that has been made over the last two decades in terms of growing ridership, new rail services, capital improvements and new funding opportunities. It demonstrates the regional importance and significance of passenger rail in the SCAG region, and why growing rail services by increasing frequencies in underserved corridors, as well as establishing service in unserved markets, is crucial to the future mobility and sustainability of our region. The report highlights recent success in establishing new funding opportunities for passenger rail, including the Transit and Intercity Rail Capital Program (TIRCP) and Senate Bill (SB) 1. Amtrak’s Pacific Surfliner intercity rail service is benefiting from these new funding opportunities as well as recent institutional arrangements that establish local control for the service. The Southern California Regional Rail Authority’s (SCRRA) Southern California Optimized Rail Expansion (SCORE) program is an ambitious
    [Show full text]
  • 001 Monthly IG Reports[Icon]
    ATTACHMENT 1A MEMORANDUM To: North County Transit District Board of Directors Matthew O. Tucker, Executive Director Lori Winfree, General Counsel From: Townsend Public Affairs, Inc. Christopher Townsend, President Richard Harmon, Senior Director Date: March 10, 2020 Subject: Monthly Report—February 2020 SUMMARY This memorandum is an overview of activities undertaken by Townsend Public Affairs (TPA) over the last month, working on behalf of the North County Transit District, including the following subjects: Legislative Activity and Updates o State Update . Legislative Activity . LAO Report on Governor’s Homelessness Plan . Governor’s State of the State . Housing Update . State Surplus Property . LEAP Funding o Tracked Legislation Potential Funding Opportunities State Capitol Office ▪ 925 L Street • Suite 1404 • Sacramento, CA 95814 • Phone (916) 447-4086 • Fax (916) 444-0383 Federal Office ▪ 600 Pennsylvania SE • Suite 207 • Washington, DC 20003 • Phone (202) 546-8696 • Fax (202) 546-4555 Central California Office ▪ 744 P Street • Suite 308 • Fresno, CA 93721 • Phone (949) 399-9050 • Fax (949) 476-8215 Southern California Office ▪ 1401 Dove Street • Suite 330 • Newport Beach, CA 92660 • Phone (949) 399-9050 • Fax (949) 476-8215 Northern California Office ▪ 300 Frank Ogawa Plaza • Suite 204 • Oakland, CA 94612 • Phone (510) 835-9050 • Fax (510) 835-9030 LEGISLATIVE ACTIVITY AND UPDATES State Update Legislative Activity In February, State lawmakers were primarily focused on introducing legislation prior to the February 21 bill introduction deadline. Since the new year, 2,309 bills have been introduced. Additionally, there are 410 two-year bills that can be acted upon in 2020, bringing the total number of active bills in the Legislature to 2,719.
    [Show full text]
  • Community Meetings #2
    The Pacific Electric Right-of-Way (PE ROW) / West Santa Ana Branch Corridor is a railroad right-of-way that extends for approximately 20 miles between the City of Paramount in Los Angeles County and the City of Santa Ana in Orange County. The Southern California Association of Governments, in coordination with the Los Angeles County Metropolitan Transportation Authority and the Orange County Transportation Authority, is conducting a Transit Alternatives Analysis. This study will explore potential transportation solutions for the corridor that could increase travel choices between the two counties. PLEASE JOIN US TO SHARE YOUR THOUGHTS AND IDEAS: COMMUNITY MEETINGS PARAMOUNT, CA Tuesday, Nov. 16, 2010 6:30 – 8:30 pm Progress Park Plaza, West Auditorium 15500 Downey Avenue CERRITOS, CA Tuesday, Nov. 23, 2010 6:30 – 8:30 pm Cerritos Park East Community Center 13234 E. 166th Street SERIES HUNTINGTON PARK, CA Wednesday, Dec. 1, 2010 6:30 – 8:30 pm #2 Huntington Park Community Center 6925 Salt Lake Street GARDEN GROVE, CA Thursday, Dec. 2, 2010 ! ! 6:30 – 8:30 pm ! ! The Courtyard Center ! ! ! ! ! ! ! ØA !( 12732 Main Street ! !( ! ! !( Union Pacific Electric Right-of-Way / !( West Santa Ana Branch Corridor !"`$ CYPRESS, CA ! ! ! Station! ! !( ¨ ! (!¬ ¨ Metro Rail Lines and Stations ! ! ! ! ! ! Tuesday, Dec. 7, 2010 ! !( Metrolink Rail Lines and Stations !"`$ ! ! ! ! ! ! Potential Connections Under Study 6:30 – 8:30 pm ! LOS ANGELES !( !( Complex Building, 4th Floor, Room 414 ! VERNON z? ! !( Cypress College HUNTINGTON MAYWOOD PARK u? ! BELL 9200 Valley View Street ! CUDAHY Los Angeles County Free Parking, Lots 1, 8, 9 ! SOUTH GATE ! Orange County ¨ DOWNEY ! ! ! ! LYNWOOD ! ¨¦§105 ! !( STANTON, CA ! ! Saturday, Dec.
    [Show full text]