14/8/2013 14/8/2013 30/10/2013 14/8/2013 18Months 14/8

Total Page:16

File Type:pdf, Size:1020Kb

14/8/2013 14/8/2013 30/10/2013 14/8/2013 18Months 14/8 APPROVED CONTRACT SN PROJECT TITLE CONTRACTOR(S) SUM(S) =N= DATE OF AWARD COMPLETION PERIOD Appointment of A Tier One Carrier as Internet Bandwidth Provider for the 174 State Government Main One 152,000,000.00 14/8/2013 6 Weeks Enhancing the Lagos State Disaster 175 Recovery Mechanisim Dimension Data 266,694,193.50 14/8/2013 25weeks Remodeling /Improvement Works and Equipping of the Official Residence of the Hon. Chief Judge of Lagos State at No. 4 , 176 Thompson Avenue, Ikoyi, Lagos No. 1 Property 510,000,000.00 30/10/2013 Training and the Continuous Development of Verbatim Repoters; 177 Appointment of a Trainer NAFS S. G. Nigeria Limited 147,900,000.00 14/8/2013 18months Proposed Residential Development at No. 8 178 Falomo Close, Ikoyi, Lagos Intergrated Projects 850,000,000.00 30/10/2013 12months Completion of 48 Bedroom Hotel at 179 Lagos State V.I.P Chalets, Badagry Anatolia International Ltd 1,900,000,000.00 25/9/2013 12months Rehabilitation of Liasu Road, Egbe (Phase ll) 180 in Alimosho LGA Mosefem Ventures 880,000,000.00 14/8/2013 12months Construction of Jetty at Ibeshe in 181 Ikorodu LGA Steelways Nigeria Limited 480,000,000.00 14/8/2013 8months Surface Dressing of Ikola Road (Phase Cloverleaf Engineering 182 1) in Alimosho LGA Services Limited 268,500,000.00 14/8/2013 6months Surface Dressing of Akinrinlo/Shoyinka/Latols Streets, in 183 Alimosho LGA Takullah Mandate Ventures 103,500,000.00 14/8/2013 6months Surface Dressing of Outskirt Roads at Ajara-Erekiti-Iragon-Ikoga Road (Agbovikpe-Erekiti) Phase VI - Road 184 Works in Badagry LGA SAS Progress Ventures 117,500,000.00 14/8/2013 6months Dualization of Alaba Cemetery Road in Ajeromi Ifelodun LGA- (Underground Conduit Drain & Surfacing of Bakare 185 Faro) Banci Nig. Ltd 315,000,000.00 25/9/2013 4 months Dualization of Alaba Cemetery Road in Ajeromi Ifelodun LGA- (Additional 186 Works) Banci Nig. Ltd 479,333,690.10 25/9/2013 4 months Construction of Two Boreholes at Lagos 187 House, Ikeja Deux Projects Limited 139,000,000.00 14/8/2013 12 Months Facility Management of Mother & Child Filmo Facilities Management 188 Centre, Ifako Ijaiye (Clinical) Limited 143,200,000.00 14/8/2013 12 Months Facility Management of Mother & Child Inspire Facility Management 189 Centre, Ikorodu (Clinical) Ventures 140,000,000.00 14/8/2013 12 Months Rehabilitation of Bishop Aboyade Cole Street, Sir Samuel Manuwa Street and To be completed in line 190 Abimbola Awoniyi Close, Victoria Island CCECC Nigeria Limited 7,148,357,901.46 23/10/2013 with the initial award Construction of Lagos Rail Mass Transit Blue Line Project-Additional Works 191 (Phase II) CCECC Nigeria Limited 99,600,000,000.00 23/10/2013 Blue Line Rail Project - Bridge Crossing 192 from National Theatre to Marina CGC Nigeria Ltd 1,200,000,000.00 23/10/2013 12 months Construction of Chevy Estate-Regional Road (Chevron) Collector Drain III, Eti 193 Osa Niran Badmus Ltd 130,000,000.00 30/10/2013 28 weeks Construction of (Ogungbesan/Gemini/Akinwande) 194 Collector Drain, Amuwo Odofin LGA Lukade Construction Nig. Ltd 449,000,000.00 30/10/2013 12 months Lining of Abraham Adesanya/Ado Badore 195 Drainage Collector, Lekki ModeHouse Projects Ltd 160,000,000.00 30/10/2013 38 weeks Construction of 2 Blocks of 2-Bedroom Flats 196 at Odo Onosa/Odo Ayandelu, Agbowa Lion Unisco Enterprises 126,291,812.44 25/92013 14 Months Construction of 2 Blocks of 2-Bedroom Flats 197 at Odo Onosa/Odo Ayandelu, Agbowa Courtney Ltd 136,000,000.00 25/92013 8 months Housing Project at Odo-Onosa/Odo- Ayandelu, Agbowa (Road & Drainage 198 Lot 1) Lion Unisco Ent. 108,982,413.86 25/92013 8 months Housing Project at Odo-Onosa/Odo- Ayandelu, Agbowa (Road & Drainage 199 Lot 3) Ladtop Nigeria Ltd 155,000,000.00 25/92013 8 months Housing Project at Odo-Onosa/Odo- 200 Ayandelu, Agbowa (Fence Works) Fawaz Investment Ltd 200,000,000.00 30/10/2013 6 months Construction of 2 Blocks of 12 Flats Lagos HOMS at Omole , Ikeja with Ancilliary/Car Park (Additional 201 Works/Change of Scope) Bomis Ltd 259,000,000.00 25/9/2013 6 months Construction of C. Hani Okoroafor Close, 202 Lekki Scheme I Xcicon Nig. Ltd 114,000,000.00 30/10/2013 32 weeks Construction of Rufus Giwa Road, Lekki 203 Scheme I Fastline Development Ltd 133,000,000.00 30/10/2013 32 weeks 204 Rehabilitation of Road 3, Lekki Scheme II Yarilos Ltd 127,000,000.00 30/10/2013 32 weeks Upgrading/Installation of Fire Hydrants in Lagos Metropolis Linked to Mini/Macro 205 Water Works in Lagos State Rotello Ltd 113,761,068.75 25/9/2013 Renovation of (8no. 3 Bedroom with Adjoining 1no. Bedroom Boys Quarters Ensuite each Flat) as Staff Quarters at 206 Ikorodu General Hospital Aron Nigeria Limited 769,661,505.48 30/10/2013 6months Renovation of Staff Quarters at Badagry 207 General Hospital, Badagry JNC International 205,078,293.21 30/10/2013 6 months Construction of Garri Processing, Cold Room, Viewing Centre, Market Stall and Community Hall in Ibeshe Town, Amuwo- 208 Odofin LGA Megaron Project Limited 201,000,000.00 30/10/2013 12 Months Remodeling /Improvement Works and Equipping of the Official Residence of the Hon. Chief Judge of Lagos State at No. 4 , Thompson 209 Avenue, Ikoyi, Lagos No. 1 Property 510,000,000.00 30/10/2013 Proposed Residential Development 210 at No. 8 Falomo Close, Ikoyi, Lagos Intergrated Projects 850,000,000.00 30/10/2013 12 months Lining of Abraham Adesanya/Ado Lukade Construction Nig. 220 Badore Drainage Collector, Lekki Ltd 449,000,000.00 30/10/2013 12 months Lining of Mobil Drainage Collector 221 (Outfall), Lekki ModeHouse Projects Ltd 160,000,000.00 30/10/2013 38 weeks Construction of Wastewater Treatment Plant at Odo-Iyaalaro Messrs Fawaz Investment Ojota, Kosofe LGA - (Upward Limited 222 Review) 2,642,649,056.17 30/10/2013 18 months Housing Project, Odo Onosa/Odo Ayandelu, Agbowa- External Electrification( Street lighting & 223 Supply Network) Fawaz Investment Ltd 200,000,000.00 30/10/2013 6 months Construction of 9 Blocks of 108 Units (2:2:3 Flats) for Lagos HOMS 224 Project, Oko-Oba, Agege CKAFS Resources Ltd 230,000,000.00 30/10/2013 6 months Construction of Grace Anjos Street, 225 Lekki Scheme I Xcicon Nig. Ltd 114,000,000.00 30/10/2013 32 weeks Construction of Waterfront Access 226 (Dual), Lekki Scheme I Fastline Development Ltd 133,000,000.00 30/10/2013 32 weeks Completion of Mobil Road, Lekki 227 Scheme II Yarilos Ltd 127,000,000.00 30/10/2013 32 weeks Supply and Installation of Neo-Natal Medical Equipment in the State General 228 Hospitals and LASUTH - A JNC International 205,078,293.21 30/10/2013 6 months Upgrading and Redevelopment of Isheri Rehabilitation and Vocational Cleovenus Essential 229 Training Centre – Phase III Services 250,000,000.00 30/10/2013 6 months Completion of Egan-Igando Mixed Housing Scheme,Egan-Igando, Lagos IGA Nigeria Limited 110,000,000.00 9 months 230 Lot 13 14/12/2013 Completion of Egan-Igando Mixed Dear Born Global Investment Housing Scheme,Egan-Igando, Lagos 110,000,000.00 9 months Ltd. 231 Lot 14 14/12/2013 Completion of Egan-Igando Mixed Shegflo Enterprises Nigeria Housing Scheme,Egan-Igando, 105,000,000.00 9 months Limited 232 Lagos Lot 16 14/12/2013 Completion of Egan-Igando Mixed Housing Scheme,Egan-Igando, Batter Sea Nigeria Limited 180,000,000.00 9 months Lagos Lot 18 233 14/12/2013 Rehabilitation of Meiran Road (Phase ll) in First August Nigeria Ltd 2,300,000,000.00 24 months Alimosho LGA 234 14/12/2013 Rehabilitation of Ago Palace Way (Phase IV) CCECC Nigeria Ltd 5,650,000,000.00 30 months Ch0+000 to Ch3+050 235 14/12/2013 Rehabilitation/Upgrading of Igi Olugbin/Okuta/Deji Aladejobi Streets H.F.P Nigeria Limited 2,200,000,000.00 15 months Somolu LGA 236 14/12/2013 Contract award: for the Replacement of Extension Joint and Julius Berger Nigeria Plc 478,688,066.91 14/12/2013 5 Months Roller Bearings on Eko Bridge 237 Relocation of Sawmillers from Okobaba to Agbowa-Ikosi Ejinrin First World Communities 260,000,000.00 6 months 238 LCDA - (Additional Works) 14/12/2013 Development of Ilubinrin CYROU Investment Foreshore(Piling Works & Access 1,867,567,012.50 4 months Ventures Ltd 239 Road) 14/12/2013 Construction of Road 110 at Abijo Vestadio Construction 210,000,000.00 12 months 240 Residential Scheme 14/12/2013 Construction of Ayodele Ipaye/Adigun Avenue/Rasaq Bishi at Breathlife Construction 145,000,000.00 8 months Magodo Residential Scheme (Other Limited 241 Govt. Estates) 14/12/2013 Proposed Development of Beach ECAD Architects Limited 945,400,000.00 14/12/2013 12 months Resort at Ileshe, Lagos (Phase I) 242 Construction of 18-Classroom Block at Ajara Senior Grammar School, M.B. Projects Limited 165,000,000.00 36 weeks 243 Ajara, Badagry 14/12/2013 Construction of 18-Classroom Block at Community Senior/Junior Feyi Fash Nigeria Limited 165,000,000.00 36 weeks Secondary School, Bayeku, Ikorodu 244 14/12/2013.
Recommended publications
  • World Bank Document
    A'A February 17, 2014 Public Disclosure Authorized Dr. Jim Yong Kim The President The World Bank Headquarters 1818, H Street, NW Washington, DC, 20433, USA LETTER OF DEVELOPMENT POLICY A. Accelerating the Growth of the Lagos Economy through Infrastructural Public Disclosure Authorized Renewal and Development The various policy reforms of the present administration and its immediate predecessor have been driven, principally, by the key objectives of improving the capacity of government to deliver services, providing needed enabling infrastructure as well as social amenities, and strengthening institutions to support the implementation of a new socio-economic order in the State. Over the last five years 2008-2013, the State has focused on the key areas of new approaches to budget planning and preparation, ensuring fiscal and improving the investment climate in pursuit of a private sector Public Disclosure Authorized sustainability, led economic growth. In an attempt to enhance transparency and accountability in the use of fiscal resources, Lagos State has passed into Law the Lagos State Public Procurement Agency and the Board of the institution is soon to be inaugurated. Equally the State has passed the Office of the State Auditor General Law and created the Lagos State Financial System Management Bureau to anchor the full roll-out of the Oracle Financial System (IFMIS). It will be recalled that in the years 1999 to 2007, the State introduced the repositioning of the organs of government, creation of new offices within the government (separation of the economic planning & budgeting function from Public Disclosure Authorized the finance function), and partnered with multilateral institutions on reforms and modernization in specific sectors (agriculture, health, education, transportation, fiscal management, potable water and urban renewal).
    [Show full text]
  • Nigeria's Railway System
    NIGERIA’S RAILWAY SYSTEM: DEVELOPMENT, DECLINE AND REBIRTH 1 4TH EDITION 2020 MESSAGE FROM EDITOR-IN-CHIEF ........................................................................... 3 DG’S STATEMENT ......................................................................................................... 4 FEATURE STORY ............................................................................................................ 6 TRANSPORTATION SECTOR PPP PROJECTS ............................................................ 12 REBALANCING AIRPORT PPPS, EVEN AS THE COVID-19 WINDS STILL BLOW . 16 KNOWLEDGE MANAGEMENT ................................................................................. 19 4TH QUARTER 3PUCF MEETING REPORT ............................................................... 26 OBC/FBC COMPLIANCE CERTIFICATES PRESENTED IN 4TH QUARTER 2020 .... 28 ICRC IN THE NEWS ................................................................................................... 30 WORKSHOPS - TRAININGS - CONFERENCES – SUMMITS – SYMPOSIUMS ...... 35 HOW TO COMBAT ZOOM FATIGUE ...................................................................... 36 FROM THE NIGERIA INSTITUTE OF INFRASTRUCTURE AND PPP ........................ 40 HEALTH & WELLNESS ............................................................................................... 42 ON A LIGHTER NOTE ................................................................................................ 46 ABOUT THE PUBLICATION .....................................................................................
    [Show full text]
  • Optimization of Urban Rail Transportation in Emerging Countries Using Operational Research Techniques
    Applied Mathematics, 2016, 7, 1116-1123 Published Online June 2016 in SciRes. http://www.scirp.org/journal/am http://dx.doi.org/10.4236/am.2016.710099 Optimization of Urban Rail Transportation in Emerging Countries Using Operational Research Techniques M. C. Agarana, T. A. Anake, H. I. Okagbue Department of Mathematics, College of Science and Technology, Covenant University, Ota, Nigeria Received 29 March 2016; accepted 20 June 2016; published 23 June 2016 Copyright © 2016 by authors and Scientific Research Publishing Inc. This work is licensed under the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/ Abstract Rail systems are gradually becoming the most desirable form of transit infrastructure around the world, partly because they are becoming more environmentally friendly compared with airplanes and automobiles. This paper examines the place of emerging countries in this move of imple- menting modern rail system that will eventually enhance the realization of a low-carbon society. Network model, transportation model and linear programming algorithms are used to model the present urban rail transport system in Nigeria, as an emerging country, in order to optimize it. Operational research methods, including simplex method and MODI, with the aids of computer software (excel solver and LIP solver) were adopted to solve the resulting models. The results showed that optimization of rail transport system will not only reduce carbon emission but also bring about economic development which is required for the eradication of prevalent poverty in these emerging countries. Keywords Rail System, Emerging Countries, Operational Research, Network Model, Transportation Model, Linear Programming Algorithm 1.
    [Show full text]
  • Outstanding Liabilities As at 30Th April, 2018
    OUTSTANDING LIABILITIES AS AT 30TH APRIL, 2018. Date Of S/N MDA Amount (=N=) Receipt Purpose Payee Exp. Class. Ministry of Economic Fund released for insurance of LMRT blue line rai project elctric 1 Planning and Budget 37,433,593.75 1/19/2017 multiple unit (EMU) rolling stock for phase 1 operation. (LAMATA). LASACO ASSURANCE PLC Capital Fund released as 70% advance payment for the provision of a high Ministry of Economic specification for the fence along the Rail Way Mass Transit from Orile M/S SUNSTEEL 2 Planning and Budget 288,975,900.00 7/7/2017 Iganmu to Mile 2. INDUSTRIES LIMITED Capital Ministry of Works & Fund released for the part payment for 20% Advance payment for the HITECH CONSTRUCTION 3 Infrastructure 1,255,352,786.10 9/5/2017 reconstruction / upgrade of Igbogbo - Bola Ahmed Tinubu - Igbe road CO LIMITED Capital Lagos New Town Development Fund released as interim cert 1 for the construction of road no 132 at M/S C.C.E.C.C. NIGERIA 4 Authority 109,828,506.62 9/14/2017 Lps ii LIMITED Capital MESSRS DAR AL Ministry of Fund released as Drainage Masterplan for L/S and Pilot Area HANDASAH 5 Environment 306,134,000.00 9/19/2017 Integrated Infrastructure System CONSULTANTS LIMITED Capital Fund released as final payment for the settlement for the works executed and material supplied for the construction of 2 blocks of 2 M/S LION UNISCO 6 Ministry of Housing 22,461,180.27 9/26/2017 bedroom at Odo Onasa in Agbowa Ikosi ENTERPRISES Capital Ministry of Waterfront & Infrastructural Fund released for the retention for the removal of abandoned dredger M/S ABAPORT MARINE 7 Development 28,000,000.00 10/5/2017 and other wrecks from five cowries along admiralty way SERVICE LTD Capital Ministry of Waterfront & Infrastructural Fund released for the removal of beached/ abandoned vessel MT.
    [Show full text]
  • Lagos–Kano–Jibiya Transport Corridor Performance Analysis Final Report Global Food Security Response Trade and Transport Reform Program
    Lagos–Kano–Jibiya Transport Corridor Performance Analysis Final Report Global Food Security Response Trade and Transport Reform Program June 2010 Contract No. 620-C-00-05-00077-00 MAXIMIZING AGRICULTURAL REVENUES AND KEY ENTERPRISES IN TARGETED SITES This document was produced by Nathan Associates Inc. for review by the United States Agency for International Development. The author’s views expressed in this publication do not necessarily reflect the views of USAID or the United States Government Lagos–Kano–Jibiya Transport Corridor Performance Analysis Final Report Global Food Security Response Trade and Transport Reform Program DISCLAIMER This document is made possible by the support of the American people through the United States Agency for International Development (USAID). Its contents are the sole responsibility of the author or authors and do not necessarily reflect the views of USAID or the United States government. Contents 1. Introduction 1 Background 1 Objectives 2 FastPath 2 Report Structure 3 2. Lagos-Kano-Jibiya Transport Corridor 5 Lagos Port Complex 5 Customs 21 Inland Container Depots 23 Roads 25 Rail 29 3. Cargo Characteristics, Traffic Flow, and Transport Scenarios 35 Market and Cargo Characteristics 35 Freight Survey 38 Freight Flows and Modal Share 40 Corridor Growth 43 Transport Logistics Scenarios 44 4. Corridor Performance Scores 69 Logistics Scores 69 Scenario 1: Apapa Import Containers 70 Scenario 2: Tincan Island Import Containers 74 Scenario 3: Lagos Port Complex Export Containers 77 Scenario 4: Lagos Port Complex Import General Cargo 80 Scenario 5: Lagos Port Complex Export General Cargo 82 Scenario 6: Lagos Port Complex Import Bulk Cargo 83 5.
    [Show full text]
  • Local Regeneration in Nigeria Osikhuemhe Oshomiamhe Okwilagwe
    COLLABORATION PROCESSES IN PARTNERSHIP WORKING: LOCAL REGENERATION IN NIGERIA OSIKHUEMHE OSHOMIAMHE OKWILAGWE A thesis submitted in partial fulfilment of the requirements of Bournemouth University for the degree of Doctor of Philosophy SEPTEMBER 2017 BOURNEMOUTH UNIVERSITY Copyright Statement This copy of the thesis has been supplied on condition that anyone who consults it is understood to recognise that its copyright rests with its author and due acknowledgement must always be made of the use of any material contained in, or derived from, this thesis. 2 ABSTRACT Local regeneration partnerships are being actively implemented by the Nigerian government as an innovative policy to deliver public infrastructure and to improve the quality of public services, particularly to improve the living standards of the populace. Nigeria being the biggest economy in Africa has a huge amount of demands for high quality infrastructure projects and public services; this has necessitated socioeconomic reforms that have paved the way for Public Private Partnerships and partnership working. Nonetheless, the complexity of PPP arrangements in Nigeria, as it concerns bureaucratic practices in public institutions; limited competences of partner organisations in partnership arrangements; and opportunistic proponents in the collaboration processes of these partnerships amongst other challenges has constituted a dilemma for the public and private sectors to balance the interests of partner organisations. In this thesis, the collaboration processes that influence, shape and impact on partnership working in Nigerian local regeneration partnerships are studied and the implications that results from these partnership working are explained. A qualitative inductive approach is adopted in this research, using a case study strategy to address the overall research aim.
    [Show full text]
  • NATIONAL INTEGRATED INFRASTRUCTURE MASTER PLAN Iii
    FEDERAL REPUBLIC OF NIGERIA NATIONAL INTEGRATED INFRASTRUCTURE MASTER PLAN ` Classified as Confidential NATIONAL INTEGRATED INFRASTRUCTURE MASTER PLAN iii Foreword I am delighted to present the Revised National Integrated Infrastructure Master Plan (2020-2043) produced by the Federal Ministry of Finance, Budget and National Planning. The Revised National Integrated Infrastructure Master Plan (NIIMP) gives update on some of the infrastructure development activities, spending, and progress achieved on the capital projects executed across the seven key infrastructure asset classes namely: Transportation; Energy; Social Infrastructure; Information and Communications Technology; Housing; Agriculture, Water & Mining; Security and Vital Registration. The NIIMP provides the roadmap for building a world-class infrastructure that will guarantee sustainable economic growth and development. It would enable the nation to take advantage of the vast opportunities in the domestic and global economies to enhance the nation’s competitiveness and improve the quality of life of the citizenry. In recent years, the Federal Government adopted different strategies in addressing the huge infrastructure gap in all the sectors of the Nigerian economy. Some of these strategies include the Nigerian Vision 20:2020, the National Integrated Infrastructure Master Plan (NIIMP) and the Economic Recovery & Growth Plan (ERGP) that form the basic government blueprint for building world-class infrastructure required to grow the economy and improve Nigeria’s global competitiveness. The revised NIIMP provides an integrated view of infrastructure development in Nigeria, with clear linkages across key sectors. It identifies and elaborates on enablers for successful implementation in line with the current economic realities. It takes stock of existing infrastructure and identifies the required investments to bring infrastructure to the level desired by Nigerians in line with the country’s growth aspirations.
    [Show full text]
  • Bombardier Sets the Bar for Mobility Solutions
    ROLLING STOCK PERWAY INFRASTRUCTURE MINING OPERATORS LOGISTICS ISSUE 5:2016 Bombardier Sets The Bar For Mobility Solutions Feedback: The Collaboration Transnet’s MDS Investment InnoTrans 2016 Between Road And Rail: Propels TFR Towards A opportunities: An Argument For Intermodal Promising Future AT Tazara Solutions and NRZ THE AUTHORITATIVE AFRICAN RAILWAY PUBLICATION EDITOR’S COMMENT RAILWAYS AFRICA 5-2016 The last few weeks have been frantic - Electra Mining, InnoTrans, Transport Forum, GARA and the Rail and Ports Evolution events. Craig attended InnoTrans, the International trade show and convention, which saw the launch of some truly phenomenal technology and innovations for the railway sector. Many of the products and services displayed at InnoTrans have great potential for implementation in the African market, promising to deliver integrated, digitised, environmentally sustainable solution for our fast-growing railway sector. While showcasing some of the biggest and best the railway industry has to offer on the global stage, issue 5:2016 focuses on debates around implementing world-class land based transport solutions for developing economies. It is all very well to spend large proportions of our GDP on building railway lines, buying rolling stock and investing in state-of-the-art technology to implement the infrastructure required to fast-track development on our continent, but if we fail to build local supply chains, including human capacity, into development strategies at project inception, we run the risk of handing the greatest tool for our economic liberation over to external agencies – undermining the very development we are trying to achieve. With this in mind, we take a critical look at Transnet’s Market Demand Strategy (MDS), with particular focus on the potential gains that a capital spend of R300 billion could offer local suppliers, job creation programmes and economic growth for South Africa – or the lost opportunity that may pass our economy by, if not implemented with a well integrated local supply chain at the heart of the project planning.
    [Show full text]
  • Eth-50905-02.Pdf
    Research Collection Doctoral Thesis PLOTTING the prevalent but undertheorised residential areas of Lagos. Conceptualising a process of urbanisation through grounded theory and comparison Author(s): Sawyer, Lindsay Publication Date: 2016 Permanent Link: https://doi.org/10.3929/ethz-a-010898517 Rights / License: In Copyright - Non-Commercial Use Permitted This page was generated automatically upon download from the ETH Zurich Research Collection. For more information please consult the Terms of use. ETH Library LOTTING THE PREVALENT BUT UNDERTHEORISED RESIDENTIAL AREAS OF LAGOS. P ONCEPTUALISING A PROCESS OF URBANISATION THROUGH C GROUNDED THEORY AND COMPARISON A thesis submitted to attain the degree of DOCTOR OF SCIENCES of ETH ZURICH (Dr. sc. ETH Zurich) LINDSAY SAWYER 2016 DISS. ETH NO. 23932 PLOTTING the prevalent but undertheorised residential areas of Lagos. Conceptualising a process of urbanisation through grounded theory and comparison A thesis submitted to attain the degree of DOCTOR OF SCIENCES of ETH ZURICH (Dr. sc. ETH Zurich) presented by LINDSAY SAWYER MSc., University of Edinburgh born on 14.06.1985 citizen of United Kingdom accepted on the recommendation of Christian Schmid, AbdouMaliq Simone and Hubert Klumpner 2016 Plotting Lagos ii Plotting Lagos ACKNOWLEDGEMENTS I owe a great debt of gratitude to so many people who have helped and supported me in the past 5 years towards the production of this thesis. Without each of you the process would have been so much harder, less pleasurable and the thesis would not be the same. Without any of you, I simply could not have done it. Please consider these acknowledgements a heartfelt thank you for your contribution, in whatever form it took, I value you deeply.
    [Show full text]
  • Air-Rail AFRICA 2016
    Air-Rail AFRICA 2016 14 Air-Rail Links & Projects 2 Operational 5 Under construction 7 Planned www.globalairrail.com AirRail Africa Blueprint Event Dates: Rail links to airports act as a lifeline to the city and the 6-7 October 2016 airport, connecting businesses, visitors and residents to a major national and international gateway. Venue: Gallagher Convention Centre Rail services to airports have different challenges, to some extent, than a regular commuter rail service, in that it needs to 1-2 Day event including: accommodate a very diverse group of travellers – from first time visitors, to regular commuters, business, families and solo travellers. Sessions on: Airport rail trains need to spend more time at stations to • Air-Rail projects in Africa accommodate passengers with luggage, as well as additional staff • Planning and Financing present at the station and on-board to help international tourists, • Strategic Partnerships increase reliability and frequency to appeal to business customers and compete on price and convenience with private cars and taxis. • Environmental Commitment • Transit Oriented Development Global AirRail Alliance has partnered with the Gauteng Provincial • Operational Readiness Government, Gautrain and UATP to bring the first AirRail Africa • Airport Market Share Growth event to Johannesburg on 6-7 October 2016. • Marketing & Branding As the first dedicated airport express rail service in Africa, Gautrain International Case Studies is a great example of a world-class passenger rail service to an airport. Networking Reception We have identified a total of 14 air-rail links that are currently Roundtable Discussions operational, under construction, or planned in Africa. Site Visits The AirRail Africa event will look at the success story of Gautrain, www.globalairrail.com major air-rail link projects in Africa and best practices from international airport rail link operators.
    [Show full text]
  • Introduction Why Project Management?
    1 ■ ■ ■ Introduction Why Project Management? Chapter Outline 1.5 DEVELOPING PROJECT MANAGEMENT MATURITY PROJECT PROFILE 1.6 PROJECT ELEMENTS AND TEXT Development Projects in Lagos, Nigeria ORGANIZATION INTRODUCTION Summary 1.1 WHAT IS A PROJECT? Key Terms General Project Characteristics Discussion Questions 1.2 WHY ARE PROJECTS IMPORTANT? Case Study 1.1 MegaTech, Inc. PROJECT PROFILE Case Study 1.2 The IT Department at Hamelin “Throwing Good Money after Bad”: Hospital the BBC’s Digital Media Initiative Case Study 1.3 Disney’s Expedition Everest 1.3 PROJECT LIFE CYCLES Case Study 1.4 Rescue of Chilean Miners PROJECT MANAGERS IN PRACTICE Internet Exercises Stephanie Smith, Westinghouse Electric PMP Certification Sample Questions Company Notes 1.4 DETERMINANTS OF PROJECT SUCCESS Project Management Research in Brief Assessing Information Technology (IT) Project Success Chapter Objectives After completing this chapter, you should be able to: 1. Understand why project management is becoming such a powerful and popular practice in business. 2. Recognize the basic properties of projects, including their definition. 3. Understand why effective project management is such a challenge. 4. Differentiate between project management practices and more traditional, process-oriented business functions. 5. Recognize the key motivators that are pushing companies to adopt project management practices. 6. Understand and explain the project life cycle, its stages, and the activities that typically occur at each stage in the project. 7. Understand the concept of project “success,” including various definitions of success, as well as the alternative models of success. 1 M01_PINT8074_04_SE_C01.indd 1 12/02/15 12:09 PM 2 Chapter 1 • Introduction 8.
    [Show full text]
  • Lagos State Government Lagos Metropolitan Area
    LAGOS STATE GOVERNMENT LAGOS METROPOLITAN AREA TRANSPORT AUTHORITY (LAMATA) REQUEST FOR EXPRESSIONS OF INTEREST FOR DESIGN, BUILD, OPERATE, MAINTAIN AND TRANSFER (DBOMT) Date: 10 December, 2019 Background The Lagos Rail Mass Transit (LRMT) network is a major component of the Lagos Strategic Transport Master Plan (STMP) which was developed to guide the development of public transport infrastructure and services in Lagos State. The STMP is a transport plan put together under series of intensive researches, studies and analyses supported by World-Bank for future transportation demands and needs of Lagos State as Nigeria's commercial and economic hub and one of the world's fastest growing mega cities. As part of implementation of the STMP, the LASG is developing an integrated urban transportation networks that includes six (6) rail lines and one (1) monorail known as the Lagos Rail Mass Transit (LRMT) network, in support of the long-term strategic goals of the state. The LRMT network is conceived as a viable alternative to road transportation and covers six major corridors of high commuter traffic demand within and beyond the metropolitan Lagos extending to border areas of Ogun state. The Blue and Red lines are being implemented through LAMATA – the authorized agency of the State and funded by LASG. The other four (4) rail lines for DBOMF arrangement are: for the Projected Length state; Item Name Route – Alignment Passenger (km) Passenger/ /day 2032 Day 2017 Marina, Victoria Island Lekki 1, Ajah, Lekki 2, Ogombo, 1 Green Line 68km 495,000
    [Show full text]