14/8/2013 14/8/2013 30/10/2013 14/8/2013 18Months 14/8

14/8/2013 14/8/2013 30/10/2013 14/8/2013 18Months 14/8

APPROVED CONTRACT SN PROJECT TITLE CONTRACTOR(S) SUM(S) =N= DATE OF AWARD COMPLETION PERIOD Appointment of A Tier One Carrier as Internet Bandwidth Provider for the 174 State Government Main One 152,000,000.00 14/8/2013 6 Weeks Enhancing the Lagos State Disaster 175 Recovery Mechanisim Dimension Data 266,694,193.50 14/8/2013 25weeks Remodeling /Improvement Works and Equipping of the Official Residence of the Hon. Chief Judge of Lagos State at No. 4 , 176 Thompson Avenue, Ikoyi, Lagos No. 1 Property 510,000,000.00 30/10/2013 Training and the Continuous Development of Verbatim Repoters; 177 Appointment of a Trainer NAFS S. G. Nigeria Limited 147,900,000.00 14/8/2013 18months Proposed Residential Development at No. 8 178 Falomo Close, Ikoyi, Lagos Intergrated Projects 850,000,000.00 30/10/2013 12months Completion of 48 Bedroom Hotel at 179 Lagos State V.I.P Chalets, Badagry Anatolia International Ltd 1,900,000,000.00 25/9/2013 12months Rehabilitation of Liasu Road, Egbe (Phase ll) 180 in Alimosho LGA Mosefem Ventures 880,000,000.00 14/8/2013 12months Construction of Jetty at Ibeshe in 181 Ikorodu LGA Steelways Nigeria Limited 480,000,000.00 14/8/2013 8months Surface Dressing of Ikola Road (Phase Cloverleaf Engineering 182 1) in Alimosho LGA Services Limited 268,500,000.00 14/8/2013 6months Surface Dressing of Akinrinlo/Shoyinka/Latols Streets, in 183 Alimosho LGA Takullah Mandate Ventures 103,500,000.00 14/8/2013 6months Surface Dressing of Outskirt Roads at Ajara-Erekiti-Iragon-Ikoga Road (Agbovikpe-Erekiti) Phase VI - Road 184 Works in Badagry LGA SAS Progress Ventures 117,500,000.00 14/8/2013 6months Dualization of Alaba Cemetery Road in Ajeromi Ifelodun LGA- (Underground Conduit Drain & Surfacing of Bakare 185 Faro) Banci Nig. Ltd 315,000,000.00 25/9/2013 4 months Dualization of Alaba Cemetery Road in Ajeromi Ifelodun LGA- (Additional 186 Works) Banci Nig. Ltd 479,333,690.10 25/9/2013 4 months Construction of Two Boreholes at Lagos 187 House, Ikeja Deux Projects Limited 139,000,000.00 14/8/2013 12 Months Facility Management of Mother & Child Filmo Facilities Management 188 Centre, Ifako Ijaiye (Clinical) Limited 143,200,000.00 14/8/2013 12 Months Facility Management of Mother & Child Inspire Facility Management 189 Centre, Ikorodu (Clinical) Ventures 140,000,000.00 14/8/2013 12 Months Rehabilitation of Bishop Aboyade Cole Street, Sir Samuel Manuwa Street and To be completed in line 190 Abimbola Awoniyi Close, Victoria Island CCECC Nigeria Limited 7,148,357,901.46 23/10/2013 with the initial award Construction of Lagos Rail Mass Transit Blue Line Project-Additional Works 191 (Phase II) CCECC Nigeria Limited 99,600,000,000.00 23/10/2013 Blue Line Rail Project - Bridge Crossing 192 from National Theatre to Marina CGC Nigeria Ltd 1,200,000,000.00 23/10/2013 12 months Construction of Chevy Estate-Regional Road (Chevron) Collector Drain III, Eti 193 Osa Niran Badmus Ltd 130,000,000.00 30/10/2013 28 weeks Construction of (Ogungbesan/Gemini/Akinwande) 194 Collector Drain, Amuwo Odofin LGA Lukade Construction Nig. Ltd 449,000,000.00 30/10/2013 12 months Lining of Abraham Adesanya/Ado Badore 195 Drainage Collector, Lekki ModeHouse Projects Ltd 160,000,000.00 30/10/2013 38 weeks Construction of 2 Blocks of 2-Bedroom Flats 196 at Odo Onosa/Odo Ayandelu, Agbowa Lion Unisco Enterprises 126,291,812.44 25/92013 14 Months Construction of 2 Blocks of 2-Bedroom Flats 197 at Odo Onosa/Odo Ayandelu, Agbowa Courtney Ltd 136,000,000.00 25/92013 8 months Housing Project at Odo-Onosa/Odo- Ayandelu, Agbowa (Road & Drainage 198 Lot 1) Lion Unisco Ent. 108,982,413.86 25/92013 8 months Housing Project at Odo-Onosa/Odo- Ayandelu, Agbowa (Road & Drainage 199 Lot 3) Ladtop Nigeria Ltd 155,000,000.00 25/92013 8 months Housing Project at Odo-Onosa/Odo- 200 Ayandelu, Agbowa (Fence Works) Fawaz Investment Ltd 200,000,000.00 30/10/2013 6 months Construction of 2 Blocks of 12 Flats Lagos HOMS at Omole , Ikeja with Ancilliary/Car Park (Additional 201 Works/Change of Scope) Bomis Ltd 259,000,000.00 25/9/2013 6 months Construction of C. Hani Okoroafor Close, 202 Lekki Scheme I Xcicon Nig. Ltd 114,000,000.00 30/10/2013 32 weeks Construction of Rufus Giwa Road, Lekki 203 Scheme I Fastline Development Ltd 133,000,000.00 30/10/2013 32 weeks 204 Rehabilitation of Road 3, Lekki Scheme II Yarilos Ltd 127,000,000.00 30/10/2013 32 weeks Upgrading/Installation of Fire Hydrants in Lagos Metropolis Linked to Mini/Macro 205 Water Works in Lagos State Rotello Ltd 113,761,068.75 25/9/2013 Renovation of (8no. 3 Bedroom with Adjoining 1no. Bedroom Boys Quarters Ensuite each Flat) as Staff Quarters at 206 Ikorodu General Hospital Aron Nigeria Limited 769,661,505.48 30/10/2013 6months Renovation of Staff Quarters at Badagry 207 General Hospital, Badagry JNC International 205,078,293.21 30/10/2013 6 months Construction of Garri Processing, Cold Room, Viewing Centre, Market Stall and Community Hall in Ibeshe Town, Amuwo- 208 Odofin LGA Megaron Project Limited 201,000,000.00 30/10/2013 12 Months Remodeling /Improvement Works and Equipping of the Official Residence of the Hon. Chief Judge of Lagos State at No. 4 , Thompson 209 Avenue, Ikoyi, Lagos No. 1 Property 510,000,000.00 30/10/2013 Proposed Residential Development 210 at No. 8 Falomo Close, Ikoyi, Lagos Intergrated Projects 850,000,000.00 30/10/2013 12 months Lining of Abraham Adesanya/Ado Lukade Construction Nig. 220 Badore Drainage Collector, Lekki Ltd 449,000,000.00 30/10/2013 12 months Lining of Mobil Drainage Collector 221 (Outfall), Lekki ModeHouse Projects Ltd 160,000,000.00 30/10/2013 38 weeks Construction of Wastewater Treatment Plant at Odo-Iyaalaro Messrs Fawaz Investment Ojota, Kosofe LGA - (Upward Limited 222 Review) 2,642,649,056.17 30/10/2013 18 months Housing Project, Odo Onosa/Odo Ayandelu, Agbowa- External Electrification( Street lighting & 223 Supply Network) Fawaz Investment Ltd 200,000,000.00 30/10/2013 6 months Construction of 9 Blocks of 108 Units (2:2:3 Flats) for Lagos HOMS 224 Project, Oko-Oba, Agege CKAFS Resources Ltd 230,000,000.00 30/10/2013 6 months Construction of Grace Anjos Street, 225 Lekki Scheme I Xcicon Nig. Ltd 114,000,000.00 30/10/2013 32 weeks Construction of Waterfront Access 226 (Dual), Lekki Scheme I Fastline Development Ltd 133,000,000.00 30/10/2013 32 weeks Completion of Mobil Road, Lekki 227 Scheme II Yarilos Ltd 127,000,000.00 30/10/2013 32 weeks Supply and Installation of Neo-Natal Medical Equipment in the State General 228 Hospitals and LASUTH - A JNC International 205,078,293.21 30/10/2013 6 months Upgrading and Redevelopment of Isheri Rehabilitation and Vocational Cleovenus Essential 229 Training Centre – Phase III Services 250,000,000.00 30/10/2013 6 months Completion of Egan-Igando Mixed Housing Scheme,Egan-Igando, Lagos IGA Nigeria Limited 110,000,000.00 9 months 230 Lot 13 14/12/2013 Completion of Egan-Igando Mixed Dear Born Global Investment Housing Scheme,Egan-Igando, Lagos 110,000,000.00 9 months Ltd. 231 Lot 14 14/12/2013 Completion of Egan-Igando Mixed Shegflo Enterprises Nigeria Housing Scheme,Egan-Igando, 105,000,000.00 9 months Limited 232 Lagos Lot 16 14/12/2013 Completion of Egan-Igando Mixed Housing Scheme,Egan-Igando, Batter Sea Nigeria Limited 180,000,000.00 9 months Lagos Lot 18 233 14/12/2013 Rehabilitation of Meiran Road (Phase ll) in First August Nigeria Ltd 2,300,000,000.00 24 months Alimosho LGA 234 14/12/2013 Rehabilitation of Ago Palace Way (Phase IV) CCECC Nigeria Ltd 5,650,000,000.00 30 months Ch0+000 to Ch3+050 235 14/12/2013 Rehabilitation/Upgrading of Igi Olugbin/Okuta/Deji Aladejobi Streets H.F.P Nigeria Limited 2,200,000,000.00 15 months Somolu LGA 236 14/12/2013 Contract award: for the Replacement of Extension Joint and Julius Berger Nigeria Plc 478,688,066.91 14/12/2013 5 Months Roller Bearings on Eko Bridge 237 Relocation of Sawmillers from Okobaba to Agbowa-Ikosi Ejinrin First World Communities 260,000,000.00 6 months 238 LCDA - (Additional Works) 14/12/2013 Development of Ilubinrin CYROU Investment Foreshore(Piling Works & Access 1,867,567,012.50 4 months Ventures Ltd 239 Road) 14/12/2013 Construction of Road 110 at Abijo Vestadio Construction 210,000,000.00 12 months 240 Residential Scheme 14/12/2013 Construction of Ayodele Ipaye/Adigun Avenue/Rasaq Bishi at Breathlife Construction 145,000,000.00 8 months Magodo Residential Scheme (Other Limited 241 Govt. Estates) 14/12/2013 Proposed Development of Beach ECAD Architects Limited 945,400,000.00 14/12/2013 12 months Resort at Ileshe, Lagos (Phase I) 242 Construction of 18-Classroom Block at Ajara Senior Grammar School, M.B. Projects Limited 165,000,000.00 36 weeks 243 Ajara, Badagry 14/12/2013 Construction of 18-Classroom Block at Community Senior/Junior Feyi Fash Nigeria Limited 165,000,000.00 36 weeks Secondary School, Bayeku, Ikorodu 244 14/12/2013.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us