Tripp 2018 Nep (16 Projects)

Total Page:16

File Type:pdf, Size:1020Kb

Tripp 2018 Nep (16 Projects) DOT-DPWH CONVERGENCE PROGRAM PROPOSED FY 2018-2022 PROJECTS INCLUDED IN THE NEP 2018 PROPOSED SCOPE OF PROJECT COST (NEP PROJECT LENGTH DEO PROJECT NAME/ LOCATION PHYSICAL TARGET AMOUNT REQUESTED BY REMARKS WORK 2018) (P'000) (NEP 2018) (KM) (P'000) AURORA 1 Construction of Access Roads leading Road Opening 67,500.000 New Road Gov. Gerardo A. Noveras/ INCOMPLETE (2 Projects) to Sabang Tourism Loop Project, 2.70 km Construction Mayor Nelianto C. Bihasa Baler, Aurora Baler, Aurora 67,500.00 2.7 2 Opening/Construction of Dinadiawan- Opening/Construction 460,000.000 New Road Mayor Joanna Wilma C. INCOMPLETE Ditawini By-pass Road Leading to 6.47 km Construction Salamanca Tourism Sites/Destinations, Dipaculao, Aurora 70,000.00 6.47 Dipaculao, Aurora BATAAN 3 Improvement and Concreting of 1.36 km 12,000.000 Improvement and Ms Vicky S Garcia COMPLETE (4 Projects) Access Road leading to Tarak Base Concreting Chairperson, Bataan Camp, Alas-Asin, Mariveles, Bataan Peninsula Tourism Council 40,000.00 1.36 Foundation Inc. 4 Construction and Improvement of Construction 25,150.000 Construction and COMPLETE Access Road leading to declared Mt. 2.33 km Improvement Samat Flagship, TEZ, Pilar, Bataan -do- 60,000.00 2.33 NUEVA ECIJA 5 Concreting of Access Road through Concreting of Access 100,000.000 Concreting of Engr. Ferdinand P Bote COMPLETE (4 projects) Brgy. Rio Chico Leading to Road/ 6.35 km Access Road Mayor of General Tinio, Minalungao National Park, Gen. Tinio Nueva Ecija 100,000.00 3.2 6 Construction of Access Road at Brgy. Concreting of Access 10,780.222 Construction of COMPLETE Liberty, Pantabangan Lake Sport Road/ 2.00 km Access Road Fishing Area 50,000.00 2 7 Construction of Access Road at Brgy. 8.00 km 44,641.298 Construction of COMPLETE Cadaclan, Pantabangan leading to Access Road Ditabuyan Falls 70,000.00 2.8 TARLAC 8 Concreting of Access Road leading to 5.77 km 237,100.000 Concreting of Gov Susan A Yap COMPLETE (5 Projects) Dueg Ecotourism Nature's Park Access Road (Phase 1-3), San Clemente, Tarlac 1st 80,000.00 5.77 LD 9 Rehabilitation/Improvement of 15.12 km 386,300.000 Rehabilitation/Imp Gov Susan A Yap COMPLETE Lawacamulag Road leading to Tarlac rovement Ecotourism Park (Phase 1-4), San 80,000.00 15.12 Jose, Tarlac 2nd LD ADDITIONAL: BATAAN 10 Access Road leading to Pinsal Falls Road Concreting (1 Projects) Ecotourism Park, Nueva Ecija 93,950,000.00 3.13 TARLAC 11 Clark Green City-Mac Arthur Access Road Concreting (4 Projects) Road leading to Clark Green City, including bridge, Tarlac 100,000,000.00 4.74 12 Clark-Bamban-Capas Access Road Road Concreting leading to Clark City (Section I), Capas, Tarlac 180,000,000.00 9 13 Clark-Bamban-Capas Access Road Road Concreting leading to Clark City (Section II), Capas, Tarlac 100,000,000.00 5 14 SCTEX Service Road to Mac-Arthur Road Concreting leading to Clark Green City, Tarlac 100,000,000.00 3.08 ZAMBALES 15 Dampay Salaza Access Road leading Road Concreting (2 Projects) to Mount Tapulao Ecotourism Project, Palauig, Zambales 70,000,000.00 2.25 16 Access Road leading to Sagrada Road Concreting Familia Cave, Sta. Cruz, Zambales 100,000,000.00 3.34 TOTAL 744,567,500.00 30.54 Page 1 of 1.
Recommended publications
  • A Historical Evaluation of the Emergence of Nueva Ecija As the Rice Granary of the Philippines
    Presented at the DLSU Research Congress 2015 De La Salle University, Manila, Philippines March 2-4, 2015 A Historical Evaluation of The Emergence of Nueva Ecija as the Rice Granary of the Philippines Fernando A. Santiago, Jr., Ph.D. Department of History De La Salle University [email protected] Abstract: The recognition of Nueva Ecija’s potential as a seedbed for rice in the latter half of the nineteenth century led to the massive conversion of public land and the establishment of agricultural estates in the province. The emergence of these estates signalled the arrival of wide scale commercial agriculture that revolved around wet- rice cultivation. By the 1920s, Nueva Ecija had become the “Rice Granary of the Philippines,” which has been the identity of the province ever since. This study is an assessment of the emergence of Nueva Ecija as the leading rice producer of the country. It also tackles various facets of the rice industry, the profitability of the crop and some issues that arose from rice being a controlled commodity. While circumstances might suggest that the rice producers would have enjoyed tremendous prosperity, it was not the case for the rice trade was in the hands of middlemen and regulated by the government. The government policy which favored the urban consumers over rice producers brought meager profits, which led to disappointment to all classes and ultimately caused social tension in the province. The study therefore also explains the conditions that made Nueva Ecija the hotbed of unrest prior to the Second World War. Historical methodology was applied in the conduct of the study.
    [Show full text]
  • Province, City, Municipality Total and Barangay Population AURORA
    2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population AURORA 201,233 BALER (Capital) 36,010 Barangay I (Pob.) 717 Barangay II (Pob.) 374 Barangay III (Pob.) 434 Barangay IV (Pob.) 389 Barangay V (Pob.) 1,662 Buhangin 5,057 Calabuanan 3,221 Obligacion 1,135 Pingit 4,989 Reserva 4,064 Sabang 4,829 Suclayin 5,923 Zabali 3,216 CASIGURAN 23,865 Barangay 1 (Pob.) 799 Barangay 2 (Pob.) 665 Barangay 3 (Pob.) 257 Barangay 4 (Pob.) 302 Barangay 5 (Pob.) 432 Barangay 6 (Pob.) 310 Barangay 7 (Pob.) 278 Barangay 8 (Pob.) 601 Calabgan 496 Calangcuasan 1,099 Calantas 1,799 Culat 630 Dibet 971 Esperanza 458 Lual 1,482 Marikit 609 Tabas 1,007 Tinib 765 National Statistics Office 1 2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Bianuan 3,440 Cozo 1,618 Dibacong 2,374 Ditinagyan 587 Esteves 1,786 San Ildefonso 1,100 DILASAG 15,683 Diagyan 2,537 Dicabasan 677 Dilaguidi 1,015 Dimaseset 1,408 Diniog 2,331 Lawang 379 Maligaya (Pob.) 1,801 Manggitahan 1,760 Masagana (Pob.) 1,822 Ura 712 Esperanza 1,241 DINALUNGAN 10,988 Abuleg 1,190 Zone I (Pob.) 1,866 Zone II (Pob.) 1,653 Nipoo (Bulo) 896 Dibaraybay 1,283 Ditawini 686 Mapalad 812 Paleg 971 Simbahan 1,631 DINGALAN 23,554 Aplaya 1,619 Butas Na Bato 813 Cabog (Matawe) 3,090 Caragsacan 2,729 National Statistics Office 2 2010 Census of Population and
    [Show full text]
  • Appendix a Water Pollution in the Philippines: Case Studies
    Foreword CLIMATE CHANGE is undoubtedly the biggest challenge the Philippines faces today, and the vulnerability of our water resources to this phenomenon is a reality that can no longer be ignored. But while water scarcity is perhaps one of the most alarming projected effects of climate change on water resources, two recent typhoons in the Philippines— Ketsana and Parma—have driven home the message that over-abundance can be equally devastating. Both typhoons, along with several others in the past few years, have shown how the country is sorely ill-prepared to handle the impacts brought on by a warming world. Indeed, climate change and the ensuing extreme weather events which have brought too little—or too much—water, have caused periods of water crisis that have destroyed thousands of lives and billions of pesos worth of property and agricultural crops. At the same time, water resources in the country are already confronted with many persistent problems: widespread pollution, over-extraction, and the degradation of watersheds. The present situation, set against the backdrop of climate change, is far from promising. While climate change will affect all sectors, it is its effects on freshwater—society’s, and the Earth’s, life support system—which will be most seriously felt. Water insecurity cuts across all other sectors and will negatively affect agriculture, health, and the economy. But the country’s water systems are still far from being climate-proofed, and current climate change adaptation plans lack the necessary emphasis on addressing impacts on water. This report therefore puts forward the case for the improved management of water resources as a key climate change adaptation strategy.
    [Show full text]
  • MANILA BAY AREA SITUATION ATLAS December 2018
    Republic of the Philippines National Economic and Development Authority Manila Bay Sustainable Development Master Plan MANILA BAY AREA SITUATION ATLAS December 2018 MANILA BAY AREA SITUATION ATLAS December 2018 i Table of Contents Preface, v Administrative and Institutional Systems, 78 Introduction, 1 Administrative Boundaries, 79 Natural Resources Systems, 6 Stakeholders Profile, 85 Climate, 7 Institutional Setup, 87 Topography, 11 Public-Private Partnership, 89 Geology, 13 Budget and Financing, 91 Pedology, 15 Policy and Legal Frameworks, 94 Hydrology, 17 National Legal Framework, 95 Oceanography, 19 Mandamus Agencies, 105 Land Cover, 21 Infrastructure, 110 Hazard Prone Areas, 23 Transport, 111 Ecosystems, 29 Energy, 115 Socio-Economic Systems, 36 Water Supply, 119 Population and Demography, 37 Sanitation and Sewerage, 121 Settlements, 45 Land Reclamation, 123 Waste, 47 Shoreline Protection, 125 Economics, 51 State of Manila Bay, 128 Livelihood and Income, 55 Water Quality Degradation, 129 Education and Health, 57 Air Quality, 133 Culture and Heritage, 61 Habitat Degradation, 135 Resource Use and Conservation, 64 Biodiversity Loss, 137 Agriculture and Livestock, 65 Vulnerability and Risk, 139 Aquaculture and Fisheries, 67 References, 146 Tourism, 73 Ports and Shipping, 75 ii Acronyms ADB Asian Development Bank ISF Informal Settlers NSSMP National Sewerage and Septage Management Program AHLP Affordable Housing Loan Program IUCN International Union for Conservation of Nature NSWMC National Solid Waste Management Commission AQI Air Quality Index JICA Japan International Cooperation Agency OCL Omnibus Commitment Line ASEAN Association of Southeast Nations KWFR Kaliwa Watershed Forest Reserve OECD Organization for Economic Cooperation and Development BSWM Bureau of Soils and Water Management LGU Local Government Unit OIDCI Orient Integrated Development Consultants, Inc.
    [Show full text]
  • Status of Monitored Major Dams
    Ambuklao Dam Magat Dam STATUS OF Bokod, Benguet Binga Dam MONITORED Ramon, Isabela Cagayan Pantabangan Dam River Basin MAJOR DAMS Itogon, Benguet San Roque Dam Pantabangan, Nueva Ecija Angat Dam CLIMATE FORUM 22 September 2021 San Manuel, Pangasinan Agno Ipo Dam River Basin San Lorenzo, Norzagaray Bulacan Presented by: Pampanga River Basin Caliraya Dam Sheila S. Schneider Hydro-Meteorology Division San Mateo, Norzagaray Bulacan Pasig Laguna River Basin Lamesa Dam Lumban, Laguna Greater Lagro, Q.C. JB FLOOD FORECASTING 215 205 195 185 175 165 155 2021 2020 2019 NHWL Low Water Level Rule Curve RWL 201.55 NHWL 210.00 24-HR Deviation 0.29 Rule Curve 185.11 +15.99 m RWL BASIN AVE. RR JULY = 615 MM BASIN AVE. RR = 524 MM AUG = 387 MM +7.86 m RWL Philippine Atmospheric, Geophysical and Astronomical Services Administration 85 80 75 70 65 RWL 78.30 NHWL 80.15 24-HR Deviation 0.01 Rule Curve Philippine Atmospheric, Geophysical and Astronomical Services Administration 280 260 240 220 RWL 265.94 NHWL 280.00 24-HR Deviation 0.31 Rule Curve 263.93 +35.00 m RWL BASIN AVE. RR JULY = 546 MM AUG = 500 MM BASIN AVE. RR = 253 MM +3.94 m RWL Philippine Atmospheric, Geophysical and Astronomical Services Administration 230 210 190 170 RWL 201.22 NHWL 218.50 24-HR Deviation 0.07 Rule Curve 215.04 Philippine Atmospheric, Geophysical and Astronomical Services Administration +15.00 m RWL BASIN AVE. RR JULY = 247 MM AUG = 270 MM BASIN AVE. RR = 175 MM +7.22 m RWL Philippine Atmospheric, Geophysical and Astronomical Services Administration 200 190 180 170 160 150 RWL 185.83 NHWL 190.00 24-HR Deviation -0.12 Rule Curve 184.95 Philippine Atmospheric, Geophysical and Astronomical Services Administration +16.00 m RWL BASIN AVE.
    [Show full text]
  • DENR-BMB Atlas of Luzon Wetlands 17Sept14.Indd
    Philippine Copyright © 2014 Biodiversity Management Bureau Department of Environment and Natural Resources This publication may be reproduced in whole or in part and in any form for educational or non-profit purposes without special permission from the Copyright holder provided acknowledgement of the source is made. BMB - DENR Ninoy Aquino Parks and Wildlife Center Compound Quezon Avenue, Diliman, Quezon City Philippines 1101 Telefax (+632) 925-8950 [email protected] http://www.bmb.gov.ph ISBN 978-621-95016-2-0 Printed and bound in the Philippines First Printing: September 2014 Project Heads : Marlynn M. Mendoza and Joy M. Navarro GIS Mapping : Rej Winlove M. Bungabong Project Assistant : Patricia May Labitoria Design and Layout : Jerome Bonto Project Support : Ramsar Regional Center-East Asia Inland wetlands boundaries and their geographic locations are subject to actual ground verification and survey/ delineation. Administrative/political boundaries are approximate. If there are other wetland areas you know and are not reflected in this Atlas, please feel free to contact us. Recommended citation: Biodiversity Management Bureau-Department of Environment and Natural Resources. 2014. Atlas of Inland Wetlands in Mainland Luzon, Philippines. Quezon City. Published by: Biodiversity Management Bureau - Department of Environment and Natural Resources Candaba Swamp, Candaba, Pampanga Guiaya Argean Rej Winlove M. Bungabong M. Winlove Rej Dumacaa River, Tayabas, Quezon Jerome P. Bonto P. Jerome Laguna Lake, Laguna Zoisane Geam G. Lumbres G. Geam Zoisane
    [Show full text]
  • From Baler Bus/Van: with EJ Liner, D'liner and Maria Au
    192 Central Luzon From Baler terminal (3 hrs). Destination could be Aparri, Ba - Bus/Van: With EJ Liner, D’Liner and Maria Au - ler, Casiguran, San Jose or Tuguegarao. De par - rora Express (4 hrs). Vans take 3 hrs. Genesis ture for Aparri and Tuguegarao from the Baliwag Transport buses to Manila go via Cabanatuan. Transit Cubao terminal hourly from 6-11am and 6-11pm. From Banaue Bus: With Ohayami Trans (6 hrs). Destination n Manila. Doesn’t get into Cabanatuan until mid - Baler o Pop 36,000 / Postcode 3200 / Tel (042) z night, so it would perhaps be better to first take u L a bus or jeepney to Bagabag or Solano in the Baler is the capital of Aurora Province on the wild l a morn ing and board one of the many buses there east coast of North Luzon where the famous r t heading for Manila. ‘Charlie don’t surf’ scene in Francis Ford Cop - n e pola’s multi-award winning anti-war movie C From Manila Apocalypse Now was shot in 1978. After the Bus: With Baliwag Transit, Five Star (few depar - filming had been completed, Coppola handed tures) an d Genesi s Transpor t fro m thei r Cubao the surfboards over to the youth of Baler and Cabanatuan, Baler 193 single-handedly started a surfing craze. Since pine Surfing Circuit season opens on the dark then, this place has been known as the cradle of sandy beach at Sabang with the three-day com - surfing in the Philippines. petition for the Aurora Surfing Cup , further From the peaceful little Baler Church in the cen - events taking place in Catanduanes, La Union, tre of the town, footsteps in cement lead to the Mindanao (Siargao Island and Surigao del Sur) nearby Doña Aurora House , a model of the and Samar.
    [Show full text]
  • Dltb Bus Schedule to Bulan Sorsogon
    Dltb Bus Schedule To Bulan Sorsogon Antlike Sarge expostulate no levers dilutees latest after Baillie ranging doggone, quite weather-bound. Circumstantial and desmoid Skipp never impawn homologically when Charlton enchains his wallower. Frank disentomb his crambo tie-ins unflatteringly or unwholesomely after Jacob conglobing and overcropped mesially, unstaunchable and sartorial. Advertise with them directly to the place and dispose them to sorsogon bus schedule re boarding pass along west If premises are planning to carbon from Manila to Bicol taking the bus going to Bicol is the cheapest and most readily available option too you DLTB offers the best bus going to Bicol from Manila and vice-versa. MORE TRAVEL GUIDES BELOW! Rawis Laoang Northern Samar Sorsogon Sorsogon Maasin Southern Leyte Select Destination Search go More Routes Powered by PinoyTravel Inc. Nasha sajna da honda na po kalimutan mg mga bus from here on it is located on a jeepney terminal. Rizal while aboard a dltb co greyhound bus schedules are. Hi guys, Isarog and DLTB are all fully booked. If pain from Sorsogon City car a bus bound for Bulan and alight at Irosin. By commuters, though is key, NCR Giftly. Below we provide an importance of the bus schedules for policy route. From Wikipedia the free encyclopedia Del Monte Land Transport Bus Co Slogan Wherever you are. From Minalungao National Park in General Tinio, all in Camarines Norte. On a tight budget? Two types of dogs. Well theres cavite sa pamasahe ng van terminal lky metro bus or lrt dltb bus stations are. Philtranco Regular Aircon Bulan EDSA-Cubao Legazpi City 700 AM Php795.
    [Show full text]
  • Pampanga River Basin: Flood of August 2004 (Southwest Monsoon As Enhanced by Typhoon Marce)
    PRB Flood: SW Monsoon due to T.Marce – Aug2004 Pampanga River Basin: Flood of August 2004 (Southwest Monsoon as enhanced by Typhoon Marce) Summary Typhoon Marce (August 20-24, 2004) became the first destructive tropical cyclone to affect the Pampanga River Basin for the year 2004. Widespread rains for more than 3 days spawned by the intensified southwest monsoon as enhanced by Typhoon Marce inundated extensive areas of the western and central sections of Luzon, including Metro Manila. As a result, 64 persons died, more than 2.1 million people affected, and an estimated damage cost of P 2.3 Billion in both agriculture and infrastructure were incurred. An investigative survey team of the Pampanga River Flood Forecasting and Warning Center (PRFFWC) composed of Messrs. Armando P. Taruc (Senior Weather. Specialist), Hilton T. Hernando (Weather Facilities Specialist II) and Pablito Villablanca (Weather Observer III), was dispatched to the Pampanga River Basin to take on the following tasks: 1. Conduct a post-flood survey from September 7 to 12, 2004, to assess and make scientific evaluation of the flooding in the area; 2. Coordinate with other concerned agencies (LGU’s and NGO’s) and entities on the conduct of the study in connection with the flooding event; and 3. To recommend measures focusing on the non-structural means to minimize and mitigate flood losses in both life and property. This disastrous flood is considered the major flood of 2004. A record high of river stage for Pampanga River at Arayat station and, likewise, a record water level for the Candaba Swamp area were attained during this event.
    [Show full text]
  • Download the Full Paper
    J. Bio.Env. Sci. 2018 Journal of Biodiversity and Environmental Sciences (JBES) ISSN: 2220-6663 (Print) 2222-3045 (Online) Vol. 13, No. 3, p. 56-62, 2018 http://www.innspub.net RESEARCH PAPER OPEN ACCESS First report of tree species of Minalungao National Park, Nueva Ecija, Philippines Erwin G. Dela Cruz, Paul Henric N. GojoCruz,Eden S. David, Evaristo A. Abella, Khristina G. Judan Cruz* Department of Biological Sciences, Central Luzon State University, Science City of Munoz, Nueva Ecija, Philippines Article published on September 13, 2018 Key words: Minalungao National Park, tree species, IUCN. Abstract Minalungao National Park in Nueva Ecija, Central Luzon, Philippines is a protected Key Biodiversity Area and a priority for conservation studies. With its high level of biodiversity, sthis area offers vast opportunities in research especially in species identification and composition. Quadrats measuring 20 × 20 meters were laid out along ten (10) transect lines measuring 100 meters each with a total sampling area of 1200 m2. Identification was done using morphological characters. A total of 55 species of trees were recorded from the study area belonging to 25 families and 46 genera, 22% of which are endemic. Four (4) species were listed in the updated 2017 list of threatened plants issued by the Department of Environment and Natural Resources (DENR)-Philippines. All members of the family Dipterocarpaceae, Lamiaceae and Burseraceae recorded from the area were listed in IUCN Red List. This paper presents an initial inventory of tree species that presents prospects for formulation of actions for its conservation. *Corresponding Author: Khristina G. Judan Cruz [email protected] 56 | Cruz et al.
    [Show full text]
  • AWARDED SOLAR PROJECTS As of 30 JUNE 2020
    AWARDED SOLAR PROJECTS as of 30 JUNE 2020 . ISLAND / POTENTIAL INSTALLED REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT GRID CAPACITY (MW) CAPACITY (MW) LUZON I Pangasinan Anda 1 MWp Anda Solar Power Project Pangasinan I Electric Cooperative, Inc. Pre-Development Stage 0.00 Bolinao 5 MWp Bolinao Solar PV Power Plant EEI Power Corporation Pre-Development Stage 5.00 Bugallon & San Carlos City Bugallon Solar Power Project Phinma Energy Corporation Pre-Development Stage 1.03 Labrador Labrador Solar Power Project IJG1 Philippines Inc. Development Stage 5.00 Labrador, Mabini and 90 MW Cayanga- Bugallon SPP PV Sinag Power Inc. Pre-Development Stage 90.00 Infanta Mapandan and Santa OneManaoag Solar Corporation (Formerly Sta. Barbara Solar Power Project Development Stage 10.14 Barbara SunAsia Energy Inc.) Rosales Rosales Solar Power Project C Squared Prime Commodities Corporation Pre-Development Stage 0.00 San Manuel San Manuel 2 Solar Power Project Pilipinas Einstein Energy Corp. Pre-Development Stage 70.00 San Manuel 1 Solar Power Project Pilipinas Newton Energy Corp. Pre-Development Stage 70.00 Sison and Binalonan Binalonan Solar Power Project PV Sinag Power Inc. Pre-Development Stage 50.00 Ilocos Norte Burgos Burgos Solar Power Project Phase I Energy Development Corporation Commercial Operation 4.10 Burgos Solar Power Project Phase 2 Energy Development Corporation Commercial Operation 2.66 NorthWind Power Development Bangui Solar Power Project Pre-Development Stage 2.50 Corporation Currimao Currimao Solar Power Project. Nuevo Solar Energy Corp. Pre-Development Stage 50.00 Currimao Solar Power Project.. Mirae Asia Energy Corporation Commercial Operation 20.00 .
    [Show full text]
  • January 10, 2015  Hawaii Filipino Chronicle  1
    JAnuAry 10, 2015 hAwAii fiLiPino chronicLe 1 ♦ JANUARY 10, 2015 ♦ CANDID PERSPECTIVES PHILIPPINE NEWS MAINLAND NEWS MAriotA’s isLAnd Pride Lower AirfAres fiLiPinA nAMed Bests winston’s in seen As fueL cALiforniA stAte More wAys thAn one surchArge Lifted teAcher of the yeAr PRESORTED HAWAII FILIPINO CHRONICLE STANDARD 94-356 WAIPAHU DEPOT RD., 2ND FLR. U.S. POSTAGE WAIPAHU, HI 96797 PAID HONOLULU, HI PERMIT NO. 9661 2 hAwAii fiLiPino chronicLe JAnuAry 10, 2015 EDITORIALS FROM THE PUBLISHER Publisher & Executive Editor appy 2015—the Year of the Charlie Y. Sonido, M.D. Addressing the Filipino Ram! We trust that you had a Publisher & Managing Editor joyous Holiday Season with Chona A. Montesines-Sonido Physician Shortage family and friends. Commuters Associate Editors enjoyed a reprieve from traffic he ‘Ekahi Health System, through the ‘Ekahi In- H Dennis Galolo tegrated Practices and ‘Ekahi Urgent Care, during the Christmas break, but Edwin Quinabo opened a new clinic in Waipahu which is a crucial with public schools and the University of Contributing Editor step towards addressing the shortage of physi- Hawaii-Manoa resuming classes on January Belinda Aquino, Ph.D. T cians in Hawaii, particularly for Filipino doctors. 12th, expect gridlock to resume. This means leaving home a Creative Designer According to statistics from the University of little earlier and allowing more time for our commute. Junggoi Peralta Hawaii, the state is about 750 physicians short of the number In the political arena, Gov. David Ige begins his term and Photography that should be treating patients, based on Hawaii’s overall pop- is still assembling members of his cabinet, which includes re- Tim Llena ulation.
    [Show full text]