U La[;K Rkjkafdr % 2936 Mùkj Dh Frffk % 08&09&2020 F
Total Page:16
File Type:pdf, Size:1020Kb
fo/kku lHkk iz”u foHkkx dk uke % yksd fuekZ.k iz”u la[;k rkjkafdr % 2936 mÙkj dh frfFk % 08&09&2020 fo"k; % fo/kk;d izkFkfedrk iz”udrkZ dk uke % eksgu yky czkDVk ¼jksgMw½ lEcfU/kr eU=h % eq[; eU=h iz'u mÙkj xr 3 o’kksZa esa fnukad 31-07-2020 rd yksd fuekZ.k foHkkx ds vUrxZr fo/kk;d izkFkfedrk dh lwpuk lHkk iVy ij j[k nh xbZ fdruh Mh0ih0vkjt0 yfEcr gSa( gSA C;kSjk ;kstukokj nsa \ rkjkafdr fo/kku lHkk iz”u la[;k% 2936 tksfd eksgu yky czkDVk ¼jksgMw½ }kjk iwNk x;k gS] ls lEcfU/kr mÙkj%& xr rhu o"kksaZ esa fnukad 31&07&2020 rd fo/kk;d çkFkfedrk dh 634 ;kstuk,a yfEcr gSa ftlesa ls 67 ;kstuk,a ukckMZ o 8 ;kstuk,a ;kstuk foHkkx dks Loh—rh gsrq Hksth xbZ gSaA 22 ;kstuk,a vU; en ds rgr Loh—r gks pqdh gaS o 5 izLrkfor gSA 217 ;kstukvksa dh Mh0 ih0 vkj0 ou o futh Hkwfe ds dkj.k rFkk 2 ;kstukvksa dks iqu% çLrkfor gksus ds dkj.k ugha cuk;k tk ldk gSA 313 ;kstukvkas dh Mh0 ih0 vkj0 foHkkx }kjk fofHku Lrj ij çfØ;k/khu gSaA Ldheokj C;kSjk vuqcU/k ^d^ esa n'kkZ;k x;k gSA vuqcU/k ^^d** SCHEME WISE STATUS OF MLA PRIORITY SCHEMES PENDING FOR PREPARATION/ SANCTION Constituency Year of Sr. Name of Scheme Pr Present Status Priority No. No. 1 2 3 4 5 6 Chopal 2017-18 1 C/O road from Daiya to I Alignment under Mashot via Serti Malat. finalization. The existing road executed by the forest department & FCA case for motorable road yet to be prepared at SubDivn.level. Chopal 2017-18 2 C/O road from Nevti to II Alignment under Rana Kyar via Civil finalization. Hospital Nerva bye pass. Chopal 2017-18 3 C/O road from Morog to III DPR sent to Nabard by Gorli Koti, Teen Khamba- Adviser (Plg.) on dated Ghadind Bhutli Nallah. 24/09/2018 for amounting to Rs.738.48 lacs. Chopal 2017-18 4 Up-gradation/MT Tikkar to IV DPR sent to Nabard by Badog via Chakna Bnada Adviser (Plg.) on dated road. 14/06/2019 for amounting to Rs.597.05 lacs. Chopal 2017-18 5 Up-gradation/MT Kuthar to V DPR sent to Adviser (Plg.) Mandochli road Km.0/0 to on dated 22/12/2018 for 9/700. amounting to Rs.658.41 lacs. Received back with observations on dated 15/01/2019. The Chopal Constituency has been exhaused of Rs.90.00 crores. Again sent to Adviser (Plg.) on dt.07/03/2019 for amounting to Rs.658.41 lacs. Again received back from Adviser (Plg.) on dated 15/10/2019 with observation & sent to SE 4th Circle Shimla on dated 14/11/2019. The Chopal constituency has been exhaused of Rs.105.00 crores. Chopal 2018-19 6 Imp. & M/T Marog , Matal I Work sanctioned under to Lohuna Kelvi Tir Road SCCP. G.P. Marog. Chopal 2018-19 7 C/o Road from Main road to II Work is in progress under Thekra , Bangana , Gunsa , State Head (MNP) Nakoud Pul G.P. Nerwa. Chopal 2018-19 8 Imp. & M/T Pulbahal III DPR under preparation in ,Thundal Kainchi road to field office. connect Lihat Bhadah & Sarah.( Scheme given by the MLA in place of MI schemes) Chopal 2018-19 9 C/o road from Batveri IV Alignment finalized & Kainchi to Devathi, forest land 9.500km. Shirgali, Kadharan , Pvt.land 4.500km. Gift Alidhar, Ghog Adshala deeds are awaited. Jatheri. (Scheme given by the MLA in place of MI schemes). Chopal 2019-20 10 Up-gradation I DPR under preparation. Metaling,Tyring of road from Deha to Khatori Pundar Butali Balah Ghalana Kishore. Chopal 2019-20 11 Up-gradation II U/P in field office. Metaling,Tyring of road from Dhurla Kainchi to Ghichana Jubbar upto main road Rewalpul Maraog. Chopal 2019-20 12 Up-gradation III U/P in field office. Metaling,Tyring of road from matal to Bamta, Shingroli Mamvi. Chopal 2019-20 13 C/O road from Sainj Khad IV U/P in field office. to Harijan Basti Gawahi. Chopal 2019-20 14 Up-gradation V U/P in field office. Metaling,Tyring of road from Kutangan Nala to Kudhi Sarach. Chopal 2019-20 15 Up-gradation Metaling, VI U/P in field office. Tarring of road from Nawan to Malkohat Kaloon Dasheya Dhagun Tuil Jhina Gheylot. Chopal 2020-21 16 C/o road from Dakoli Sheila I Forest case under Reweti to Khokha. preparation. Chopal 2020-21 17 C/O road from Thithroli, II Forest case under Ramdara, Telor, Karag, preparation. Banan to Kashak and kashak Gaad. Chopal 2020-21 18 C/O road from G.P.Dewat III Forest case under Shilikayan, Mashdoh. preparation. Chopal 2020-21 19 Up-gradation of road IV U/P in field office. Metaling & tarring from Huli Dasana, Khar, Ghoond, Gaderi, Banari. Chopal 2020-21 20 C/O road from Navi V Forest case under Khudah, Auli preparation. G.P.Tharoach. Chopal 2020-21 21 C/O road Deiya Kidakuffta VI Forest case under Rehosti to Churayn. preparation. Theog 2017-18 22 C/O road from Jai-Kashoo- I Alignment finalized & Dhanoo-Kalahar Mandir forest land is 3.00 km., Length 8Kms. Pvt.land 5.00km. Gift deeds are awaited. Theog 2017-18 23 C/O road from Sandhu- II U/P in field office. Talash via Bagoo length 5kms. Theog 2017-18 24 C/o road from village Reog- I Alignment finalized. Total Dwala -Galanaghati in GP length of road is Jadroon Tehsil Kumarsain 8.050km.out of which (Substituted from MI 5.00km.Pvt.land & scheme on dated 3.050km.forest land. FCA 23/08/2017). case has been re-uploaded online on dated 4/7/19 & under process in Forest Deptt. Theog 2018-19 25 C/O road from Jal, Kasho, I Alignment is finalized & Dhano, Virgarh, Kalahar, forest land is 3.00 km., GP Kiar. Pvt.land 5.00km. Gift deeds are awaited. Theog 2018-19 26 C/O road from Reog, II Repeated-2017-18 (P-I). Dawala, Glanghatti in GP Jadhoon Tehsil Kumarsain. Theog 2019-20 27 C/Olink road from Firnoo I DPR sent to Nabard by Morah to Damorh via Adviser (Plg.) on dated Charan Km.0/0 to 2/300. 22/03/2019 for amounting to Rs.342.51 lacs. Theog 2020-21 28 C/O road from Kofni to I U/P in field office. Horu via Dora (IPH Pump House). Theog 2020-21 29 C/O road from Tharmati II Alignment yet to be Batiura Barog Dhamanderi. finalized. Kasumpti 2017-18 30 C/O road from Chtog to I Survey work yet to be done. Satoh (via Shilli Mohalla). Kasumpti 2017-18 31 C/O bridge over Majjar- II The work for providing Juggar Khad under GP consultancy services has Satlai. been awarded to the consultant M/S Civil Mantra Infracon Pvt.Ltd.vide EE on dated 6/11/2019. Kasumpti 2018-19 32 C/O road from Thalot to I The alignment of road has Jhagog (GP Darbhog). been finalized, some gift deeds have been received. Letter has been written to the SDM (R) to conduct the joint inspection by E.E. on dated 01/08/19, but the date has not been fixed till date. Kasumpti 2018-19 33 C/O roads from Kamyana to III The survey has been Bisk/tud/lachot (GP Bhont). completed on dated 15/11/2018 & all the revenue record has been collected. The SDM (Rural) has been requested by Executive Engineer on dated 13/7/18 to fix joint inspection of the road with all concerned deptt., so that FCA case can be processed accordingly & now again letter has been written to SDM(R) on dated 20/12/2019 by Executive Engineer. Kasumpti 2019-20 34 C/O road from Koti to I The alignment has been village Bhararia via Paradi. finalized , all the gift deeds have been received & joint inspection was conducted on dated 25/09/19 and FCA under preparation. Kasumpti 2019-20 35 C/O road from Paobo Talab II The survey work conducted to Kaltu via Obna. on 8/7/19 in presence of Panchayat Pradhan concerned. Next date fixed 5/8/19 to complete survey as well as finalize the alignment with consents of pvt.land owner whose land will be involved in the road. Again letter has been written to four Gram Panchyat Pradhan to fixed date for survery dated 13/10/19. Kasumpti 2020-21 36 C/O road from Kelti to I Alignment yet to be Chari (G.P.Chari). finalized. Kasumpti 2020-21 37 C/O road from Godpa to II Alignment yet to be Village Shildi (G.P.Pujarli). finalized. Shimla 2017-18 38 C/O link roads from I Survey work yet to be done Holiday Home to bye pass & joint inspection has been road Nabha- Phagli to Lal conducted. The starting Pani and Lal Pani to Bye portion of the road about Pass road. 700mtrs.CPWD land is involved but the NOC this deptt.still awaited. In this alignment MC land also involved & has raise objections as Housing scheme for Rajeev Awas Yojna is involved in this portion, NOC from MC still awaited. Shimla 2017-18 39 C/O link road/Ambulance II U/P in field office. road in all the Wards of Shimla Town. Shimla 2017-18 40 M/T and Maintenance of III U/P in field office.