fo/kku lHkk iz”u foHkkx dk uke % yksd fuekZ.k iz”u la[;k rkjkafdr % 2936 mÙkj dh frfFk % 08&09&2020 fo"k; % fo/kk;d izkFkfedrk iz”udrkZ dk uke % eksgu yky czkDVk ¼jksgMw½ lEcfU/kr eU=h % eq[; eU=h

iz'u mÙkj xr 3 o’kksZa esa fnukad 31-07-2020 rd yksd fuekZ.k foHkkx ds vUrxZr fo/kk;d izkFkfedrk dh lwpuk lHkk iVy ij j[k nh xbZ fdruh Mh0ih0vkjt0 yfEcr gSa( gSA C;kSjk ;kstukokj nsa \

rkjkafdr fo/kku lHkk iz”u la[;k% 2936 tksfd eksgu yky czkDVk ¼jksgMw½ }kjk iwNk x;k gS] ls lEcfU/kr mÙkj%&

xr rhu o"kksaZ esa fnukad 31&07&2020 rd fo/kk;d çkFkfedrk dh 634 ;kstuk,a yfEcr gSa ftlesa ls 67 ;kstuk,a ukckMZ o 8 ;kstuk,a ;kstuk foHkkx dks Loh—rh gsrq Hksth xbZ gSaA 22 ;kstuk,a vU; en ds rgr Loh—r gks pqdh gaS o 5 izLrkfor gSA 217 ;kstukvksa dh Mh0 ih0 vkj0 ou o futh Hkwfe ds dkj.k rFkk 2 ;kstukvksa dks iqu% çLrkfor gksus ds dkj.k ugha cuk;k tk ldk gSA 313 ;kstukvkas dh Mh0 ih0 vkj0 foHkkx }kjk fofHku Lrj ij çfØ;k/khu gSaA Ldheokj C;kSjk vuqcU/k ^d^ esa n'kkZ;k x;k gSA

vuqcU/k ^^d** SCHEME WISE STATUS OF MLA PRIORITY SCHEMES PENDING FOR PREPARATION/ SANCTION

Constituency Year of Sr. Name of Scheme Pr Present Status Priority No. No. 1 2 3 4 5 6 Chopal 2017-18 1 C/O road from Daiya to I Alignment under Mashot via Serti Malat. finalization. The existing road executed by the forest department & FCA case for motorable road yet to be prepared at SubDivn.level. Chopal 2017-18 2 C/O road from Nevti to II Alignment under Rana Kyar via Civil finalization. Hospital Nerva bye pass. Chopal 2017-18 3 C/O road from Morog to III DPR sent to Nabard by Gorli Koti, Teen Khamba- Adviser (Plg.) on dated Ghadind Bhutli Nallah. 24/09/2018 for amounting to Rs.738.48 lacs. Chopal 2017-18 4 Up-gradation/MT Tikkar to IV DPR sent to Nabard by Badog via Chakna Bnada Adviser (Plg.) on dated road. 14/06/2019 for amounting to Rs.597.05 lacs. Chopal 2017-18 5 Up-gradation/MT Kuthar to V DPR sent to Adviser (Plg.) Mandochli road Km.0/0 to on dated 22/12/2018 for 9/700. amounting to Rs.658.41 lacs. Received back with observations on dated 15/01/2019. The Chopal Constituency has been exhaused of Rs.90.00 crores. Again sent to Adviser (Plg.) on dt.07/03/2019 for amounting to Rs.658.41 lacs. Again received back from Adviser (Plg.) on dated 15/10/2019 with observation & sent to SE 4th Circle on dated 14/11/2019. The Chopal constituency has been exhaused of Rs.105.00 crores. Chopal 2018-19 6 Imp. & M/T Marog , Matal I Work sanctioned under to Lohuna Kelvi Tir Road SCCP. G.P. Marog. Chopal 2018-19 7 C/o Road from Main road to II Work is in progress under Thekra , Bangana , Gunsa , State Head (MNP) Nakoud Pul G.P. Nerwa. Chopal 2018-19 8 Imp. & M/T Pulbahal III DPR under preparation in ,Thundal Kainchi road to field office. connect Lihat Bhadah & Sarah.( Scheme given by the MLA in place of MI schemes) Chopal 2018-19 9 C/o road from Batveri IV Alignment finalized & Kainchi to Devathi, forest land 9.500km. Shirgali, Kadharan , Pvt.land 4.500km. Gift Alidhar, Ghog Adshala deeds are awaited. Jatheri. (Scheme given by the MLA in place of MI schemes). Chopal 2019-20 10 Up-gradation I DPR under preparation. Metaling,Tyring of road from Deha to Khatori Pundar Butali Balah Ghalana Kishore. Chopal 2019-20 11 Up-gradation II U/P in field office. Metaling,Tyring of road from Dhurla Kainchi to Ghichana Jubbar upto main road Rewalpul Maraog. Chopal 2019-20 12 Up-gradation III U/P in field office. Metaling,Tyring of road from matal to , Shingroli Mamvi. Chopal 2019-20 13 C/O road from Sainj Khad IV U/P in field office. to Harijan Basti Gawahi. Chopal 2019-20 14 Up-gradation V U/P in field office. Metaling,Tyring of road from Kutangan Nala to Kudhi Sarach. Chopal 2019-20 15 Up-gradation Metaling, VI U/P in field office. Tarring of road from Nawan to Malkohat Kaloon Dasheya Dhagun Tuil Jhina Gheylot. Chopal 2020-21 16 C/o road from Dakoli Sheila I Forest case under Reweti to Khokha. preparation. Chopal 2020-21 17 C/O road from Thithroli, II Forest case under Ramdara, Telor, Karag, preparation. Banan to Kashak and kashak Gaad. Chopal 2020-21 18 C/O road from G.P.Dewat III Forest case under Shilikayan, Mashdoh. preparation. Chopal 2020-21 19 Up-gradation of road IV U/P in field office. Metaling & tarring from Huli Dasana, Khar, Ghoond, Gaderi, Banari. Chopal 2020-21 20 C/O road from Navi V Forest case under Khudah, Auli preparation. G.P.Tharoach. Chopal 2020-21 21 C/O road Deiya Kidakuffta VI Forest case under Rehosti to Churayn. preparation. Theog 2017-18 22 C/O road from Jai-Kashoo- I Alignment finalized & Dhanoo-Kalahar Mandir forest land is 3.00 km., Length 8Kms. Pvt.land 5.00km. Gift deeds are awaited. Theog 2017-18 23 C/O road from Sandhu- II U/P in field office. Talash via Bagoo length 5kms. Theog 2017-18 24 C/o road from village Reog- I Alignment finalized. Total Dwala -Galanaghati in GP length of road is Jadroon Tehsil Kumarsain 8.050km.out of which (Substituted from MI 5.00km.Pvt.land & scheme on dated 3.050km.forest land. FCA 23/08/2017). case has been re-uploaded online on dated 4/7/19 & under process in Forest Deptt. Theog 2018-19 25 C/O road from Jal, Kasho, I Alignment is finalized & Dhano, Virgarh, Kalahar, forest land is 3.00 km., GP Kiar. Pvt.land 5.00km. Gift deeds are awaited. Theog 2018-19 26 C/O road from Reog, II Repeated-2017-18 (P-I). Dawala, Glanghatti in GP Jadhoon Tehsil Kumarsain. Theog 2019-20 27 C/Olink road from Firnoo I DPR sent to Nabard by Morah to Damorh via Adviser (Plg.) on dated Charan Km.0/0 to 2/300. 22/03/2019 for amounting to Rs.342.51 lacs. Theog 2020-21 28 C/O road from Kofni to I U/P in field office. Horu via Dora (IPH Pump House). Theog 2020-21 29 C/O road from Tharmati II Alignment yet to be Batiura Barog Dhamanderi. finalized. Kasumpti 2017-18 30 C/O road from Chtog to I Survey work yet to be done. Satoh (via Shilli Mohalla). Kasumpti 2017-18 31 C/O bridge over Majjar- II The work for providing Juggar Khad under GP consultancy services has Satlai. been awarded to the consultant M/S Civil Mantra Infracon Pvt.Ltd.vide EE on dated 6/11/2019. Kasumpti 2018-19 32 C/O road from Thalot to I The alignment of road has Jhagog (GP Darbhog). been finalized, some gift deeds have been received. Letter has been written to the SDM (R) to conduct the joint inspection by E.E. on dated 01/08/19, but the date has not been fixed till date. Kasumpti 2018-19 33 C/O roads from Kamyana to III The survey has been Bisk/tud/lachot (GP Bhont). completed on dated 15/11/2018 & all the revenue record has been collected. The SDM (Rural) has been requested by Executive Engineer on dated 13/7/18 to fix joint inspection of the road with all concerned deptt., so that FCA case can be processed accordingly & now again letter has been written to SDM(R) on dated 20/12/2019 by Executive Engineer. Kasumpti 2019-20 34 C/O road from Koti to I The alignment has been village Bhararia via Paradi. finalized , all the gift deeds have been received & joint inspection was conducted on dated 25/09/19 and FCA under preparation. Kasumpti 2019-20 35 C/O road from Paobo Talab II The survey work conducted to Kaltu via Obna. on 8/7/19 in presence of Panchayat Pradhan concerned. Next date fixed 5/8/19 to complete survey as well as finalize the alignment with consents of pvt.land owner whose land will be involved in the road. Again letter has been written to four Gram Panchyat Pradhan to fixed date for survery dated 13/10/19. Kasumpti 2020-21 36 C/O road from Kelti to I Alignment yet to be Chari (G.P.Chari). finalized. Kasumpti 2020-21 37 C/O road from Godpa to II Alignment yet to be Village Shildi (G.P.Pujarli). finalized. Shimla 2017-18 38 C/O link roads from I Survey work yet to be done Holiday Home to bye pass & joint inspection has been road Nabha- Phagli to Lal conducted. The starting Pani and Lal Pani to Bye portion of the road about Pass road. 700mtrs.CPWD land is involved but the NOC this deptt.still awaited. In this alignment MC land also involved & has raise objections as Housing scheme for Rajeev Awas Yojna is involved in this portion, NOC from MC still awaited. Shimla 2017-18 39 C/O link road/Ambulance II U/P in field office. road in all the Wards of Shimla Town. Shimla 2017-18 40 M/T and Maintenance of III U/P in field office. roads in Shimla Town. Shimla 2017-18 41 C/O Overhead Bridges at IV The work of C/O over head Sanjauli, near Tara Hall, bridge at Sanjouli & Tara Tutikandi, Phagli, Hall has been awarded to Ramnagar and Khalini. the contractor . Foundation work completed & superstructure is in progress. Shimla 2018-19 42 C/O link road from I U/P in field office. Golpahari Annadale to Village Behar Annadale. Shimla 2018-19 43 C/O Link road from Mist II U/P in field office. Chamber Khalini to BCS. Shimla 2019-20 44 C/O over Bridge on Sajouli I U/P in field office. Chowk. Shimla 2019-20 45 C/O over bridge on Talaind. II U/P in field office. Shimla 2020-21 46 C/O bridge over Sanjouli I U/P in field office. Chowk. Shimla 2020-21 47 C/O bridge over Talaind II U/P in field office. near Govt.Girls Sr.Sec.School. Shimla Rural 2017-18 48 C/O road Grom Dalog I Work awarded to the Ghatti to Dharogra contractor under PMGSY (Km.8.5) G.P. Dharogra. (A/A & E/S amounting to Rs.366.73 lacs). Shimla Rural 2017-18 49 C/O link road from Nalah- II U/P in field office. Shada-Natout (Km.5.00) G.P. Karyali. Shimla Rural 2018-19 50 C/O Motorable bridge in I U/P in field office. Thachi Raihna Chanaldi road at Thachi Khad (Substituted on dated 28/01/2020). Shimla Rural 2018-19 51 Upgradation and M/T of II Manscript estimate of Rs. link road Fageda. 568.37 lacs under process in Zonal office. Shimla Rural 2018-19 52 C/O link road from 16 mile II U/P in field office. to Sedan (Shakrah) GP Shakrah km. 0/0 to 3/105 (Substituted on dated 11/02/2020). Shimla Rural 2019-20 53 C/O link road from Gaulu to I DPR sent to Nabard by Palgar in G.P.Himri. Adviser (Plg) on dated 05/05/2020 for Rs. 648.24 lacs. Shimla Rural 2019-20 54 C/O link road Ghanahatti- II Forest land involved. Kalihatti-Shakoh-Pawri-Ka- Pipal. Shimla Rural 2019-20 55 Construction/Up-gradation III Forest land involved. of link road Mandolghat to Jamogvia Bhargan Km.0/0 to 5/0 (Substituted on dt.28/01/2020). Shimla Rural 2020-21 56 C/O link road Drol to I Private land involved. Village Jaishi. Shimla Rural 2020-21 57 Up-gradation/MT road from II DPR in manuscript shape of Chaunrighatti to Yan via Rs. 319.08 lacs is under Bhod Km.0/0 to 8/5. scrutiny in Zonal office. Shimla Rural 2020-21 58 Up-gradation/MT of road III DPR in manuscript shape of from Badrnain to Rs. 612.63 lacs is under Basantpur. scrutiny in Zonal office. Jubbal & 2017-18 59 C/O & M/T of Kadivan to I U/P in field office. Kotkhai Galoon-Umla Dwar (Tikkar) road. Jubbal & 2017-18 60 C/O & M/T of Riyoghatti to II U/P in field office. Kotkhai Galeha via Kufer Bag Shaktinagar road (substituted on dated 01/07/2017). Jubbal & 2017-18 61 C/O & MT Mihana Khad to III DPR sent to Adviser (Plg.) Kotkhai Badal-Laihroti, Banana on dated 06/02/2018 for Katarla & via Shoba amounting to Rs.974.03 road(Substituted on dated lacs. 01/07/2017). Jubbal & 2017-18 62 C/O road from Bagodi IV U/P in field office. Kotkhai Kainchi to Bakhol-Koti- Banogda via Kadai. Jubbal & 2018-19 63 C/o Tharola-Pajai-Chanj I Work being proposed under Kotkhai road-G.P. Tharola, Kotkhai. SCSP.

Jubbal & 2018-19 64 Jubbal-Dakher-Deem as 1st II DPR sent to Adviser (Plg.) Kotkhai Phase, Tehsil Jubbal on dated 22/08/2020 for (Substituted on dated amounting to Rs.564.99 13/01/2020). lacs. Jubbal & 2018-19 65 C/O -M/T Khorwi-Dalsar to III Alignment filanized. Gift Kotkhai Pragati Nagar (Baghi) deeds Pvt.land owners are (Scheme given by the MLA not agree to donate their in place of MI Scheme). land (app.200mtr.) possibilities of alternate alignment being explored. FCA case under preparation. Jubbal & 2019-20 66 Up-gradation of Bagodi I DPR amounting to Rs. Kotkhai Nallah to Ganganagar Kadai 542.74 lacs is under scrutiny via Koti Banogra road, GP in Zonal office. Bakhol (Substituted on dt.13/01/2020). Jubbal & 2019-20 67 C/O M/T from Baghi road II U/P in filed office. Kotkhai Bhalidhar in GP Tharola Purag & Rawlakyar. Jubbal & 2019-20 68 C/O link road from III U/P in filed office. Kotkhai Kathandi Nallah to Jhandoli via Shoshan (Substituted from MI Scheme on dated 03/01/2020). Jubbal & 2019-20 69 Up-gradation of Reoghatti IV U/P in filed office. Kotkhai to Galeha via Kuffer Bag- Bagainjubbad road (Substituted from MI Scheme on dated 03/01/2020). Jubbal & 2019-20 70 Up-gradation of Chaithla- V DPR amounting to Kotkhai Kadyog-Nagpuri road via Rs.901.62 lacs is under Jalath-Khanog-Bartog scrutiny in Zonal office. Tehsil Kotkhai (Substituted on dated 06/07/2020). Rampur 2017-18 71 C/O road from Bahlidhar to II DPR sent to Nabard by Govt.Senior Sec.School Adviser (Plg.) on dated Deothi upto village Deothi 20/09/2019 for Rs.328.89 Km.0/0 to 3/450. lacs. Rampur 2018-19 72 Imp.& Up-gradation of I DPR sent to Nabard by Jhakri-Khadkag-Makarola- Adviser (Plg.) on dated Gaura raod G.P. Gaura & 11/09/2019 for amounting Jhakri. to Rs.671.42 lacs. Rampur 2018-19 73 Nagadhar to Delath road II Alignment finalized. Total G.P. Delath. length of poposed road is 4.500km.out of which 0.500km.Pvt.land & 4.00km.forest land. Gift deeds are awaited from Pvt.land owners. As & when the gift deeds are received the FCA case shall be processed. Rampur 2019-20 74 C/O road to Khanortu from I Alignment finalized. Total Taklech RD in GP Taklech. length of poposed road is 3.00km.out of which 1.00km.Pvt.land & 2.00km.forest land. Gift deeds pvt.land stands received & FRA of forest land also received. DPR under preparation in Sub- Divnl.office. Rampur 2019-20 75 Bridge over Satluj at II The place for the Rampur from Bye-Pass RD construction of bridge is in MC Rampur. being finalized. Rampur 2020-21 76 C/O road from Bahli to I U/P in field office. Shangri-Devnagar- G.P.Bahli (Rampur). Rampur 2020-21 77 C/O road from Souddhar to II U/P in field office. Tangri-Dogri- G.P.Khamadi(Nankhari). Rohru 2017-18 78 Construction/Up-gradation II U/P in field office. of Lalpani, Dhumrera, Ambyasu road-8Kms. Rohru 2018-19 79 L/R Joban thach to Arthi- I Gift deeds awaited. FCA is Bajain (Bhaloon) Division under preparation. Rohru. Alignment finalized length 6.00km. Rohru 2018-19 80 L/R Main road to II Gift deeds awaited. FCA is Main road Nandla and under preparation. bridge. Division Rohru. Rohru 2018-19 81 Formation cutting of Shahid II DPR sent to Adviser (Plg.) Yashwant Singh Marg on dated 03/07/2020 for Rahari farm to Kewli amounting to Rs.397.73 Km.0/0 to 6/0 (Substituted lacs. from RWSS scheme on dated 25/05/2019). Rohru 2018-19 82 C/O Dhawna Koftu Rafad NP DPR sent to Nabard by Sharithach road Km.0/0 to Adviser (Plg.) on dated 5/00. 22/01/2020 for Rs.401.04 lacs. Rohru 2019-20 83 Up-gradation of Badiyara, I U/P in field office. Masli & Dakgaon road. Rohru 2019-20 84 Up-gradation/Construction II DPR sent to Adviser (Plg.) of Sungri Nasari Baltadhar on dated 26/06/2020 for Dalgaon road. amounting to Rs.1053.21 lacs. Rohru 2020-21 85 C/O link road Dodra to I Private land involved. Chamdhar. Rohru 2020-21 86 Up-gradation of Poudhar II Private land involved. Mandeori road up to Karasa. Arki 2017-18 87 M/T of Dhigal Jhager via I DPR sent to Nabard by Dalcham Km.2/400 to Adviser (plg.) on dated 6/640. 08/03/2019 for amounting to Rs.399.99 lacs. Arki 2017-18 88 Widening & M/T of Chanda II Manuscript estimate of Rs. Sehal Kishanpura Kurmula 1271.94 lacs is under Ukhoo road. process in Zonal office. Arki 2018-19 89 C/O Link road from Padyar I Total length to BOI. 4.630km.Survey work done alignment finalized. Pvt.land .200km.forest land 4.430km. Gift deeds awiated. Arki 2018-19 90 M/T of Ukhoo Badal Road. II DPR sent to Nabard by Adviser (Plg.) on dated 14/06/2019 for Rs.730.27 lacs. Arki 2019-20 91 Widening & MT of Kuiru I U/P in field office. Nala to mangarwari Bajot road. Arki 2019-20 92 M/T Rokhan to Katlu II U/P in field office. Bissian Chamara. Arki 2020-21 93 C/O road to village Bohi. I Forest land involved.

Arki 2020-21 94 C/O from to village Shelly. II Forest land involved. Nalagarh 2017-18 95 C/O Pucca link road Sirs- I Private land involved. Tarwal-Bhruwali-Khuibada, Teh.Nalagarh (Substituted on dt.29/08/2019). Nalagarh 2017-18 96 C/O Pucca link road Barian- II U/P in field office. Alyon-Dhano Ghat, Teh.Nalagarh (Substituted on dt.29/08/2019). Nalagarh 2017-18 97 C/O Pucca Link road III DPR sent to Nabard by Gujjarhatti-Talao-Purl- Adviser (Plg.) on dated Khobla-Kankrooghat 15/05/2020 for amounting (Substituted on to Rs.626.81 lacs. dt.07/07/2018). Nalagarh 2017-18 98 C/O link road Kalyanpur- IV Road construction under Kaonwali-Dolan-Haler in BBNDA. Tehsil Nalagarh. Nalagarh 2018-19 99 MT from NH-21 to Bagheri I Manuscript estimate of Rs. -Khatiwala Garmoda road. 361.39 lasc is under scrutiny in Circle office. Nalagarh 2018-19 100 C/O Bridge over Kanahan II GAD under process in river on Dherowal- Zonal office. Chandpur-Toranwala- Chhida-Maganpur road. Nalagarh 2019-20 101 C/O Bridge over Palli khad I Work is being executed between Ambwala Retad under SCSP. Rajwah road. Nalagarh 2019-20 102 C/O road from Gujjarhatti, II Private land involved. Gift Amb-da-Haar Panehli. deeds awaited. Nalagarh 2020-21 103 C/O Pucca road Barian- I Manuscript estimate of Rs. Alyon-Dhanoghat Tehsil 972.41 lacs under scrutiny Nalagarh. in Circle office. Nalagarh 2020-21 104 C/O Pucca road Galot- II U/P in field office. Banali-Riya-Kapoli-Syarli village Teh.Nalagarh. Doon 2017-18 105 Construction, MT/Drain and I DPR sent to Nabard by Up-gradation of Ghared Adviser (Plg.) on dated Patta road Stage-II (Bhud 30/10/2019 for amounting Batoli Patta) in Km.15/0 to to Rs.1181.17 lacs. 30/300. Doon 2017-18 106 CD & MT from Kanol II U/P in field office. Kainchi more to Aleta, Beh Mandi & Beh Kaneta (Substituted on dated 05/01/2019). Doon 2018-19 107 C/O road between Village I DPR sent to Nabard by Harraipur to Chunadi and Adviser (Plg.) on dated bridge over Sirsa river. 19/06/2020 for amounting to Rs.1227.99 lacs. Doon 2018-19 108 Imp. & M/T on Patta to II Total length 25.00km. DPR Banlagi via Goyala Chandi under process. Dadawa road. Doon 2019-20 109 C/O Balance work & I DPR of Rs. 535.40 lacs Metalling on Dheela Kasla under scrutiny in Zonal Abrani road. office. Doon 2019-20 110 Improvement & II Manuscript estimate of Rs. Strengthening Bairghat 1096.81 lacs is under Kathlig Gunai road. scrutiny in Zonal office. 2017-18 111 C/O road from Uprla I Sanction under SCSP. Badevla (GP Kot) to Nichla Badevla in GP Kot upto Shiv Mandir. Solan 2017-18 112 C/O road from Dooh to II Total length Bhola in GP Mamleeg. 3.00km.Pvt.land 3.00km. Gift deeds not available. Solan 2018-19 113 C/O Kiari Bainoo to Khinna I Total length road km. 0/0 to 7/820. 7.820km.Pvt.3.320km.forest 4.500km. Physical copies of forest case submitted to CF and are in process & DPR for 818.38 lacs checked by Zonal office & sent to EE Solan for fair out. Solan 2018-19 114 C/O Uperala Badyawal to II Total length Nichla Badyawala road GP 4.450km.Survey work done. Kot Kadaur. Gift deeds received manuscript DPR from SE for Rs.520.53 lacs & under scrutiny in Zonal office. Solan 2019-20 115 C/O road Malga to Koon I Alignment marked in the via Baneni Khad in GP field & letter has been Poudhna. written to Panchyat Pradhan to collect a gift deeds of Pvt.land. Solan 2019-20 116 C/O road from Kaithlighat II Alignment marked in the to Katoh, Lachog, Ganrodi field & letter has been via Garoo road in GP Kot. written to Panchyat Pradhan to collect a gift deeds of Pvt.land. Solan 2020-21 117 C/O MT village Shamlech I U/P in field office. to Chilla Km.0/0 to 4/0. Solan 2020-21 118 C/O road from Jounaji to II Private land involved. Diyarag Bukharag Km.0/0 to 4/0. Kasauli 2017-18 119 M/T of road from Bharti to I DPR sent to Nabard by Gamberpul via Deothal Adviser (Plg.) on dated (Substituted on dated 20/05/2019 for amounting 20/09/2018). to Rs.373.64 lacs. Kasauli 2017-18 120 C/O road Paidi to Banaghat II Re-alingment being G.P. Devathi. finalized.

Kasauli 2018-19 121 L/R Groni to Sari- M/T I Total length 18.00km.land from 0/6.500 and C/F,CD available 6.500 forest land etc. from 6.500/18. 11.500kms. Kasauli 2018-19 122 C/O L/R from Dhar to II Total length 6.500km. Jaliana via Dhaiyan, Androl Survey done alignment and Arni in G.P. Bhojnagar. finalized Pvt.land 5.00km. and forest land 1.50km. Gift deeds of Pvt.land being collected. Kasauli 2019-20 123 Improvement and I Manuscript estimate of Rs. Strengthening on 2154.06 lacs is under Kimmughat to Chakki-Ka- scrutiny in Zonal office. Mod road.Km.0/0 to 15/0. Kasauli 2019-20 124 Improvement or II Manuscript estimate of Rs. Strengthening of Sukhijori 1764.78 lacs is under kanda Katal-Ka-Bag road scrutiny in Zonal office. Km.0/0 to 15/500. Kasauli 2020-21 125 Improvement & widening I U/P in field office. of Gharkhal-Subathu road. Kasauli 2020-21 126 Improvement & Widening II U/P in field office. of Lohanji to Mari-Ka-Ghat road Km.0/0 to 13/200. Pachhad 2017-18 127 CD/MT on Banalag- I The MT work Km.0/0 to Dhamesha-Panjpir road. 2/500 is in progress under SCSP & the DPR is under preparation at Sub- Divn.level due to revised alignment under NABARD. Pachhad 2017-18 128 CD/MT on Kawal Bandali- II DPR sent to Nabard by Tharu road Km.0/0 to Adviser (Plg.) on dated 5/600. 26/10/2018 for amounting to Rs.422.64 lacs. Pachhad 2018-19 129 M/T on Maryog- Lana I DPR sent to Nabard by Ravna & C/O Sarsu via Adviser (Plg.) on dated Bahanar Km.0/0 to 20/265. 11/09/2019 for Rs.1830.95 lacs. Pachhad 2018-19 130 CD/MT on Naina-Tikker- II Private and forest land Janot road. involved.

Pachhad 2019-20 131 Up-gradation & I DPR sent to Adviser (Plg.) strengthening of Maryog on dated 30/09/2019 for Narag-Dharyar road Km.0/0 amounting to Rs.1857.70 to 40/00. lacs & received back from Adv.(Plg.) on dated 09/07/2020 with the remarks that this constituency has crossed the limit of Rs.120.00 crores under NABARD. Pachhad 2019-20 132 Up-gradation & II DPR has been checked in strengthening of Neripul- manuscript shape under Pulwahal road Km.0/0 to CUPL DRRP-II. 17/00. Pachhad 2019-20 133 Up-gradation & III DPR sent to Nabard by strengthening of Naina Adviser (Plg.) on dated Tikker-Deothal-Ochhghat 09/07/2020 for amounting road Km.0/0 to 22/00. to Rs.1085.95 lacs. Pachhad 2019-20 134 Up-gradation & III DPR sent to Adviser (Plg.) strengthening of Mari-Ka- on dated 29/08/2019 for Ghat-Kerry Shutia road amounting to Rs.3294.88 Km.0/0 to 20/00. lacs & received back from Adv.(Plg.) on dated 09/07/2020 with the remarks that this constituency has crossed the limit of Rs.120.00 crores under NABARD. Pachhad 2020-21 135 C/O Foot bridge in Giri I Private land involved river at Thor Niwar village GP. Thor Niwar, Community Block Rajgarh. Pachhad 2020-21 136 C/O L/R from Phagoo to II Private land involved Bathaudhar, Banalidhar via Ulakh Katoga to Serva, GP.Dahan & Nerti Baghot, Community Block Rajgarh.

Pachhad 2020-21 137 C/O L/R from Nohri to III Private land involved Kotla Bangi via Shaya Sanora i/c C/O bridge on Bajhethu Khad, GP.Shaya Sanora, Community Block Rajgarh. Pachhad 2020-21 138 Preparation of Dubloo IV Private land involved Mandiaghat road via Laharab Shamloh village & ITI (CDMP) scheme, GP Tikker, Community Block Rajgarh. 2017-18 139 C/O bridge over Markanda II Manuscript estimate Nadi on NH-7 to via Bankla amounting to Rs.1279.31 to Rakhni road including lacs sent to SE Nahan on MT and CD. dated 13/09/2018 for fairing out. Nahan 2017-18 140 C/O MT/CD on NH-7 Forest case stand submitted Jatanwal to Ambwala to Forest Deptt. but sanction Tappad to Sukhchainpur to awaited. Kheari to NH-7 (Paonta Division). Nahan 2018-19 141 MT & CD on Kanyoun I Survey work completed. Ghat to Ser Reshla to DPR under preparation & Gopatiya to Siyun Pudla to gift deeds required from Ser Badoun to Sanoga land owners. Bhagdat to Rain Kun Arawali to Balak Bratal to Bendali road upto Main road. Nahan 2018-19 142 Bridge over Batta River on II Manuscript estimate Badripur-Jamniwala-Majra amounting to Rs.1515.75 road Fatehpur gulabgarh lacs sent to SE Nahan on alongwith Improvement MT dated 1/10/2018 for fairing cross drain of the road . out. DPR could not be fair out due to limit exaushted in Nahan constituenchy. The appraisal report also sent to GOI under CRF. Nahan 2018-19 143 C/O road from village III U/P in field office. Doiyanwala to Village Ghunglon & Village Tokyon alongwith C/O Bridge at Bata Nadi (Substituted on dated 23/05/2020) Nahan 2018-19 144 C/O link road Bhogpur- IV Forest case res-submitted to Simbalwala, Jhajad, DFO Nahan by EE on dated Khajoorna, Kotla Shikadi 14/11/2019, the case is Sheel Chamyad Korad under examination with Panjahal Shilnu Suryananah Nodal officer Shimla. road i/c bridge & Metalling (Substituted on dt.09/05/2018). Nahan 2019-20 145 C/O CD/MT road Vailli I Mancuscript estimate of Rs. Aayran Pul to 367.85 lacs is under scrutiny Shamshanghat , GP. in Zonal office. Dholakuwan i/c Bridge (Substituted on dated 23/05/2020) Nahan 2019-20 146 C/O CD,MT road II Forest case has been Kolanwala Bhood to prepared & submitted to Neemwali, Kolanwal Bhood Forest Deptt. The to Kotdi, Nairo, Kolanwala observation has been raised Bhuood to Khanda, by the Forest Bohrlighat i/c bridge. deptt.regarding revenue papers which is still awaited from the Revenue deptt. Nahan 2019-20 147 C/O CD, MT road Kollar III DPR under preparation in i/c bridge. Divisional office. Nahan 2019-20 148 C/O CD/MT road from IV Private land involved. Village Haripur to Nalka, Sambhalka, Agdiwala & C/O bridge over Haripur Khad(Substituted on dated 23/05/2020). Nahan 2019-20 149 C/O CD, MT road Mattar to V Forst case under Manatra Mata Temple. preparation. Renuka 2017-18 150 C/O road Gheliyon to I The alignment of road has Palgech- Kuryan via Dhar, been done but gift deeds is Thanga, Kyarkoti, Bara still awaited from the land Khanara, Chumanu. owners. Renuka 2017-18 151 C/O road Fandi Bodi wala II The length of road to Janglot. 7.500km.& whole of this length passes through the reserve forest area. The case for diversion of 4.52 hactare of forest land for non forestry purpose has been re-submitted to DFO Nahan after attending all the observations vide EE on dated 30/11/18. Renuka 2017-18 152 C/O road from Koti Dhiman I Approximate length to Kota-Pab (Substituted 6.500km. Gift deeds not from MI scheme on dated available efforts are being 07/01/2019). made. Renuka 2017-18 153 C/O link road from Khala- II Gift deeds not available Kyar, Koti Dhiman road- efforts are being made. Tippra to Kyarik via Halayion-Rajaina- Pirtabi- Maila (Substituted from MI scheme on dt.07/01/2019). Renuka 2018-19 154 C/O link road from Charna I DPR sent to Nabard by to Gidagdhar Kheeldhar Adviser (Plg.) on dated Sayadhar road. 29/07/2019 for amounting to Rs.493.24 lacs. Renuka 2019-20 155 C/O road from Devamanal I Approximate length to Shiya via Bakhan-Kothi- 16.500km. 50%Gift deeds Begra-Charag-Jiyar. have been done & efforts are being made. Renuka 2019-20 156 C/O road from Gattadhar to II Approximate length Tandio via Chiyaro. 9.00km.Pvt.& forest land is involved & Demarcation from revenue deptt.is awaited. Renuka 2020-21 157 C/O link rod from village I U/P in field office. Khali Achhon to Kyari Dadua Km.12/0 to 16/0. Renuka 2020-21 158 C/O link road from village II U/P in field office. Kyari Dadua to Nadi Km.16/0 to 20/0. Paonta 2017-18 159 C/O road from Shamsherpur I DPR sent to Nabard by to Navada via Heerpur, Adviser (Plg.) on dated Matraloyon Rampurghat. 29/07/2019 for amounting to Rs.485.36 lacs. Paonta 2017-18 160 C/O Single lane bridge over II U/P in field office. Bata Nadi between Kiratpur and Toka (substituted on dt.15/06/2020). Paonta 2018-19 161 Balance work for the C/O I DPR sent to Nabard by Rajpur Nagheta Bharli Adviser (Plg.) on dated Shiva Banour Km.0/0 to 13/05/2020 for amounting 13/355 (Substituted on to Rs.463.74 lacs. dt.25/10/2019). Paonta 2018-19 162 C/O link road to Banaur II Total length of road is about ,Nigali ,Tilaurdhar (Length 13.00km. SDM Paonta has 8.00 kms). been requested on 19/09/19 & 03/01/2020 to get the alignment demarcated. But demarcation is still awaited. Further process can be initiated only after getting the demarcation. Paonta 2019-20 163 C/O road along Bata river I DPR is being sent to from Santosh Garh bridge Adviser(Plg) amounting to to village Fatehpur. Rs. 835.48 lacs. Paonta 2019-20 164 C/O road village Bhella to II Private land involved. Kallatha Badana.

Paonta 2019-20 165 C/O link road from I Survey work under process. Vill.Bhanour-Chcheti Aandhra & C/O bridge over Toans Khad (Substituted from RWSS scheme on dated 07/11/2019). Paonta 2019-20 166 C/O link road Gorkhuwala II DPR is being sent to Panchayat Ghar to Village Adviser (Plg) amounting to Dhundhla & Vill. Rs. 386.40 lacs. Khodowala in GP Gorkhuwala (Substituted from MI Scheme on dated 07/11/2019). Paonta 2019-20 167 C/o link road NH-07 I U/P in field office. Amargad, Johdon Kyarda, Jagapur upto IPH Colony Majra (Substituted from MI scheme on dated 16/06/2020). Paonta 2020-21 168 C/O link road Nageta to I Alignment under process. Aagro G.P.Nageta. Paonta 2020-21 169 C/O road from main road II Survey work is in progress. Kundiyon to Bhaba Basti, up to villagge Tobha to Khara. Paonta 2020-21 170 C/O link road Santosh basti III Survey work completed and near Shiv Mandir Patliyon DPR under process in upto Surajpur, Katta Pathar Divisional office. Khale. Shillai 2017-18 171 Link road Bhadlat to kanti I Survey of 4.00km.out of Mashwa via Dab, Pipli, total length 7.50 km.has Tilwadi Baag, Chowki been done but rest of land is Mirgwal. not available as land owners are not allowing to do the balance survey work. Shillai 2017-18 172 link road Feduwala to II Survey of 1.50km.out of Drabil via Mangtadi, total length 7.00 km.has Timba, Shanail Gatu, Bapil, been done but rest of land is Kuitheti. not available as land owners are not allowing to do the balance survey work. Shillai 2018-19 173 Dubor Lani Tityana road. I This road 6.00km.in length & its alignment has been finalized. But land owners are not ready to give gift deeds for their land in favour of HPPWD. Shillai 2018-19 174 Improvement of Chimy II Priority repeated 2015-16 Barwa Chankoli road. Shillai 2019-20 175 Jamli to Kharkha road. I Gift deeds obtained upto 4.00 kms . DPR being prepared. Shillai 2019-20 176 Chilon Bag Tilwagi Choki II Survey work has been Margwal road. completed . Joint Inspection done. FCA case shall be uploaded shortly. Shillai 2020-21 177 C/O link road from Baralani I Alignment is under process. to Nauna Bhatwar. Shillai 2020-21 178 C/O link road from Loja to II FCA case is under Manal. preparation. Joint Inspection done. Kinnaur 2017-18 179 C/O link road from Kalpa I Alignment finalized through Kanda. 1.50mtr.wide local path. The FRA of jeepable road received from DFO Kinnaur at R/Peo on dated 1/5/17. Funds amounting t Rs.30.00 lacs received under BADP and 1.200km.formation cutting of jeepable standard has been completed. 6.00km. motorable standard road id required to be construction as per the demand of local people up to Kalpa Kanda. Out of which 5.00km.road is passing through Pvt.land & 1.00km.road is passing through forest land . The gift deeds is stikll awaited from Pvt.land owners. As & when the gift deeds will be received the DPR under NABARD shall be prepared. Kinnaur 2017-18 180 C/O link road from Dot to II Alignment finalized. Total Nichar. length of road is 3.500 kms out of which 0.500 km is private land and 3.00 kms forest land. Gift deeds awaited. Kinnaur 2018-19 181 C/O link road from Batitas I Alignment finalized. Forest Somgas to Urabrang Kamo. land involved. FRA submitted to DFO Kinnary for approval on dated 13/07/2020. Kinnaur 2018-19 182 C/O Link road to Sungra II Manuscript estimate Kande. checked for Rs.351.32 lacs & sent to SE Rampur on dated 01/08/19 for fairing the DPR. Kinnaur 2019-20 183 NH-05 to Village Runang I Alignment finalized on 08/08/2020. Joint inspection has been conducted. FRA under process. Kinnaur 2019-20 184 Link road to Village Grang. II Alignment finalized. Forest & Private land involved. Approval of forest land under FRA 2006 has been received from DFO Kinnaur. Gift deeds are awaited from the land owners. Kinnaur 2020-21 185 C/O link road to Sangla I U/P in field office. Kanda. Kinnaur 2020-21 186 C/O link road Bodh Mandir II Local land dispute to Ti Nalha Thowaring (Moorang). Anni 2017-18 187 C/O road from Garshai to I Alignment finalized. Gift Ropru via sheugi, Lower dee awaited. Dhar (substituted on dt.28- 08/2019). Anni 2017-18 188 C/O road from Kansari II Alignment finalized. Gift Kainchi to Shailinala via dee awaited. Fanauti Juhal, Balel (Substituted on dt.258/08/2019). Anni 2017-18 189 C/O Motorable road from II Alignment finalized. Gift Jajar Kainchi to Ronala via deeds received. Joint Chowki under HPPWD inspection conducted on Divn.Nirman (Substituted 20/03/20. FCA case under on dated 28/09/2019 from prepartion . RWSS Scheme). Anni 2018-19 190 C/O road from Shamshar to I Alignment finalized. Total Panai. length of proposed road is 9.390 kms.out of which 6.965 kms.forest land & 2.425 kms is pvt.land. Gift deed received. Joint inspection has been conducted 6/9/18.FRA from DC Kullu has been received. FCA case is under preparation. Anni 2018-19 191 C/O road Sarahan to II Forest case under process. Bashleu Jot (Substituted on dt.28/02/2019). Anni 2019-20 192 C/O road from Manvi I DPR sent to Nabard by Kenchi to village Thaharvi. Adviser (Plg.) on dated 23/10/2019 for amounting Rs.537.19 lacs. Anni 2019-20 193 C/O road from Thachvi to II Forest case submitted on Ladair via Kui. line on 12/02/2019. Anni 2020-21 194 M/T Stage-II road from I Manuscript estimate under Ranabag to Kandibag upto process in Divisional office. Baloo. Anni 2020-21 195 C/O road from Thans to II Manuscript estimate under Kusheni via Dasholi, process in Circle office. Dandidhar, Jated, Shanu. Lahaul & 2017-18 196 C/O link road to village I DPR sent to Nabard by Spiti Jasrat including Bridge over Adviser (Plg.) on dated Chandra Bhaga river. 11/09/2019 for amounting to Rs.1163.45 lacs. Lahaul & 2017-18 197 C/O Bridge over Chandra II Work awarded to the Spiti Bhaga to connect Village Contractor for consultancy Yangla i/c approaches. Lahaul & 2018-19 198 C/O Shushuna Spiti bridge. I Drawing have been Spiti approved & DPR under preparation in Sub- Divnl.office. Lahaul & 2018-19 199 C/O Kurched road Lahaul. II Alignment now finalized. Spiti Total road length 6.500km. Entire road traverses through forest land. Case for diversion of forest land under preparation. Lahaul & 2019-20 200 C/O link road from I DPR sent to Adviser (Plg.) Spiti Kukumseri to village on dated 24/07/2020 for Chhating, Pinal & Cheli i/c amounting to Rs.827.24 3No.bailey bridge. lacs. Lahaul & 2019-20 201 C/O Karpat bridge. II Hydraulic data is under Spiti preparation in Divisional offie. Lahaul & 2020-21 202 Up-gradation on link road I U/P in field office. Spiti to Mooring Chowkhang Naingarh road Km.0/0 to 15/200 Teh.Spiti. Lahaul & 2020-21 203 C/O Tailing Bridge, II U/P in field office. Spiti GP.Sagnam, Tehsil Spiti. Manali 2017-18 204 C/O road Loran to Shitla I DPR sent to Nabard by Mata Mandir to Village Adviser (Plg.) on dated Khalada up to Sarli (2Km.). 09/07/2019 for amounting to Rs.497.63 lacs. Manali 2018-19 205 C/O Bridge over Manalsu I Hydraulic data prepared. Nallah Old Manali. Finalization of general arangement drawings under process. Manali 2018-19 206 C/o Archhandi- II Alignment finalized. Total Dhamasharni -Barnot road. length 7.250km. Forest 4.00km.,Pvt.land 3.250km. Gift deeds awaited from pvt.land owners. Manali 2019-20 207 C/O road from Bulang to I Alignment not finalized yet. Damchin via Bhatmeha to Bhujnu. Manali 2019-20 208 C/O road from Kasheni- II Alignment not finalized yet. Galoon-Marjan-Halan-II. Manali 2020-21 209 C/O motorable bridge from I U/P in field office. Police line Bashing to Vamtat Charoodoo. Manali 2020-21 210 C/O Bye Pass road from II U/P in field office. Manali pul to Club House. Kullu 2017-18 211 M/T & Up-gradation of I DPR sent to Nabard by Bradha-Shangchan road Adviser (Plg.) on dated (Substituted on dated 31/12/2019 for amounting 27/08/2018). to Rs.528.59 lacs. Kullu 2017-18 212 C/O road Balu-Ra-Ghera to II DPR sent to Nabard by Tipri upto Shaooth total Adviser (Plg.) on dated length 4.5kms. 28/01/2019 for amounting to Rs.475.47 lacs. Kullu 2017-18 213 C/O road from Fati Peej I Survey conducted, but Fati Barhhar, Fati alignment could not be Khaihar(Substituted on finalized due to involment dated 23/02/2018 from MI of Pvt.land of number of Scheme). adjoining villages & non receipt of FRA & Ban Adhikar Certificate from Panchyat & concerned villages. Kullu 2017-18 214 C/O Circular road in Kullu NOC from concerned Town (Substituted on dated Panchyat & MC awaited. 23/02/2018 for RWSS Gift deeds from Pvt.land Scheme). owners also awaited. Kullu 2018-19 215 C/o road from Gobha I Survey conducted, but Villages to Vijali Mahadev, alignment could not be Deugra, Braihan , Kraduful, finalized due to involment Ganakhla, Chhamahn, of number of villages & Danogi, Mandoli Sharsh, Panchyat. Tippari, Sharni, Bekta, Flati, Fagta, Blaghi, Pauhal, Chohki, Ktagala, Chhachhal, Chogh, Gadagi, Broun upto Manikarn. Kullu 2018-19 216 C/O road village Bhalyani II DPR under preparation. Gift Km.0/0 to 2/0 (Substituted deeds received from on dated 01/06/2019). Pvt.land owners. Kullu 2018-19 217 C/o road from village Work is in progress under Mouhal to upto SCSP. Total length Tariragran(Substituted on 2.600km.out of which dated 16/07/2019). 1.00km FC completed. Kullu 2019-20 218 C/O road Darka-Gadiyada, I Survey work completed. Nagoojhoud to Garamang- Gift deeds from Pvt.land II. owneres awaited. Kullu 2019-20 219 C/O Shishamati Bye pass II Forst case stand submitted road. to Dehradoon after attending the observationss. Kullu 2020-21 220 C/O link road Bagan to I U/P in field office. Darpoin via Bhedhar Bagan. Kullu 2020-21 221 Improvement & Metalling II U/P in field office. Tarring Chani-Ra-Roohad, Braind Deugra Bijli Mahadev. Kullu 2020-21 222 C/O link road Shangan to III U/P in field office. Shalani Badagan Mathala Khopri. Kullu 2020-21 223 M/T Chilaage Fagu road. IV U/P in field office. Kullu 2020-21 224 MT & Upgradation of V U/P in field office. Doogilag Dupkan road. Banjar 2017-18 225 C/O morable bridge over I Work sanctioed under Palchan khad on Gusheni PMGSY. road. Banjar 2017-18 226 C/O road from Talada to II Private land involved. Kulagad. Banjar 2017-18 227 C/O road from Jahol- III DPR prepared amounting to Jyeshtha-Aashni up to Rs. 445.66 lacs and sent to village Pudan (substituted Circle office by the Zonal from MI Scheme on dated office with observations 24/01/2019). with are being attended. Banjar 2018-19 228 C/O Jawali to Tindha via I DPR amounting to Rs. Seri Bella & Beogi road 402.00 lacs under scrutiny km. 0/0 to 4/750. in Zonal office Mandi. Banjar 2018-19 229 C/O road from Langhani to II DPR sent to Nabard by Chhuara km. 0/0 to 5/450. Adviser (Plg.)on dated 14/06/2019 for amounting to Rs.535.93 lacs. Banjar 2018-19 230 C/O road from Fagla to III Alignment finalized & gift Saila via Mobha deeds received. FCA is (Substituted from MI under preparation. Scheme on dt.24/01/2019). Banjar 2018-19 231 C/o road from Naglari IV DPR sent to Nabard by Nallah to village nahjin and Adviser (Plg.) on dated Ghat in Gram Panchyat 12/02/2020 for amounting Nohanda Banjar Distt. to Rs.1008.81 lacs. Kullu (substituted on dated 20/06/2019.) Banjar 2019-20 232 C/O road from village I Alignment finalized & gift Shanad to Shaplin & Dhar deeds awaited from Pvt.land to Kulthi. owners. Banjar 2019-20 233 C/O road from Jaipur-Jibhi II Alignment finalized & gift Kandi-Dalicha, Sum- deeds awaited from Pvt.land Bhumar. owners. Banjar 2020-21 234 C/O road from Tattapan to I U/P in field office. Khoohan , Salounu & Jagala to Dhameuli. Banjar 2020-21 235 C/O road from Chani Aage II U/P in field office. to Pigrang, Ukhldhin, Korpudhar-Maithig, Aaisa Bhatrang up to Nanja & C/O road from Udsoo Naal to upto vilage Udsoo. Karsog 2017-18 236 C/O Ruhni to Thangar road I U/P in fielf office. Km.0/0 to 11/200 (Substituted on dated 03/01/2020). Karsog 2017-18 237 C/O Kheel Pangna road II U/P in fielf office. Km.0/0 to 12/0 (Substituted on dated 03/01/2020. Karsog 2017-18 238 C/O road from Bagshad to I DPR sent to Nabard by Shawangi, Gaddari, Adviser (Plg.) on dated Kharahal, Kund, Besta 23/10/2019 for amounting (Substituted from MI to Rs.1869.69 lacs. Scheme on dated 30/07/2019). Karsog 2018-19 239 C/O road from Kao to I Alignment has been Charkufri via Lalag i/c finalized & gift deeds bridge. awaited. Karsog 2018-19 240 Bhanthal-Punni road II U/P in field office. Km.0/0 to 4/00 (Substituted on dated 30/12/2019). Karsog 2019-20 241 C/O road from village I FCA case under Sarahan to Haripur College preparation. i/c bridge. Karsog 2019-20 242 C/O Mohata to bagshair II Alignment yet to be Km.0/0 to 14/0 (Substituted finalized. on dated 30/12/2019). Karsog 2020-21 243 C/O road from Sartyola to I U/P in field office. Manjoo. Karsog 2020-21 244 C/O road from Shilh to U/P in field office. Thrmi via Pokhi. Sunder Nagar 2017-18 245 C/O road Nihri to Borat via I Alignment has been Bahi and Nehra. finalized. Total length 7.00km. Gift deeds awaited. FCA also involved. Sunder Nagar 2017-18 246 C/O road Neri to Badoo in II Private & forest land G.P. Dhanyara. involved. Sunder Nagar 2018-19 247 C/O link road from Bag to I FCA case under process. Seri via Lalag (Substituted Gift deeds from land owners on dated 02/12/2019). being arranged. Sunder Nagar 2018-19 248 C/O link road from Chalog II FCA case under process. to Cheuri via Dhanyara Gift deeds from land owners (Substituted on dated being arranged. 02/12/2019). Sunder Nagar 2018-19 249 Imp./MT on Chowki Segal II DPR amounting to Rs. road km. 6/500 to 14/0 874.75 lacs is being sent to (This scheme given by the Adviser (Planning) by MLA in place of MI Enginner-in-Chief. scheme). Sunder Nagar 2019-20 250 MT on Bhawana to I U/P in field office. Gamouhu road & C/O 19.75mtr.bridge over Plasi Khad alongwith approach road. Sunder Nagar 2019-20 251 MT on Bhawana to Maloh II U/P in field office. road Km.0/0 to 5/0. Sunder Nagar 2020-21 252 C/O road from Dharli to I FCA case under process. Balag via Majhas. Gift deeds from land owners being arranged. Sunder Nagar 2020-21 253 C/O M/T road from Jabal to II U/P in field office. Luhnu via Badaon Km.0/0 to 3/345. Nachan 2017-18 254 C/O road from Chourin I The alignment has been Pangliyur to Doul Bridge finalized & total length via Khaltu, Sapous, 10.235km. (Pvt.land Vihani,Fanipra ,Rahli, Seri 8.065km, forest land Dharmtani, Rosa Muratan 2.170km.). Forest case/DPR & C/O Bridge over Ghana will be prepared after the & jeuni Khad. received of land from Pvt.land owners. Nachan 2017-18 255 C/O road Sayosi to Fagoh II The process of finalization via Tamroh, Kuthai-Vangla of alignment is in progress. Lower Natan, and motorable bridge over Kansa Khad and C/O motorable bridge between Tamroh & Sayosi (Substituted on dated 13/09/2017). Nachan 2017-18 256 C/O road from Palouta to III Alignment is not being Sayanji i/c motorable bridge finalized due to non co- over Kansa Khad. operation of local people. Nachan 2017-18 257 C/O road Sarda to nagadhar IV Alignment is not being via Bunala, Sarad, Ghnaidi finalized due to non co- Shil Nallah, Kandhi, operation of local people. Munakhad, Kathla, Khanyarloo Dehra Seri & Nagadhar (Substituted on dated 23/05/2017). Nachan 2017-18 258 C/O Gohar Mouli ki Aal to V Alingment yet to be Kharsi via Kutahad, Gulad, finalized. Baihri, Gulad mod upper Badrsav, Lambidhar, Vuratan road i/c motorable bridge over Mouli ki Aal. Nachan 2017-18 259 C/O road from Devigad to VI U/P in field office. Sanhi Shikari. Nachan 2017-18 260 C/O road from I Alignment is being Jachh,Kansar, Dabroo finalized. Dawar, Kamroonag up to Shikari (Substituted from MI (RNS) on dated 15/03/2018). Nachan 2018-19 261 C/O road from Burahta, I Alignment has been Kasan , Dev Buniyari finalized. Gift deeds temple to Village Thedi, Pvt.land awaited. FCA Dulad, kutla Gallu i/c under process. motorable bridge over Jagrot and Kasan khad. Nachan 2018-19 262 C/O road from Khun Surahi II Alignment finalized. khad to Dalidar via Jurah i/c motorbale bridge over Suri Khad. Nachan 2018-19 263 C/O road from Dindla , I Alignment has been Darbehad, Kagar, Naitala, finalized. Gift deeds Hateshwari temple , Pvt.land awaited. Bhanard-Bihari to Sethal Patka (G.P. Rajwardi) & C/O Motorbale bridge over Panhaind khad. (This scheme given by the MLA in place of MI scheme). Nachan 2019-20 264 C/O road from Chailli to I DPR prepared but retuned shilnoo via Kyargi, upper back with observations by Mehli, Jaidevi, Pinkal the Zonal office mandi to Kotalu Dhrub Galu. Divisional office. Nachan 2019-20 265 C/o road from Sianj to U/P in field office. Nandi. Nachan 2019-20 266 C/o road Segli to Burahta. III U/P in field office. Nachan 2020-21 267 C/O road from Brakhmani I U/P in field office. to Dugrai via Samot. Nachan 2020-21 268 C/O road from Greding II U/P in field office. House Chail Chowk to Samoh via Chokhadri Lambidhar. Nachan 2020-21 269 C/O road from Bhagyar to III U/P in field office. Bhalana. Nachan 2020-21 270 C/O road from DAV School IV U/P in field office. Basa to Baihri via Gulad & C/O motorable bridge over Jyuni Khad. Seraj 2017-18 271 C/O Motorable road Saroa- I DPR sent to Adviser (Plg.) Daran-Shadan-Nihri- on dated 31/12/2019 for Baunghar-Sawandi Galoo. amounting to Rs.1623.69 lacs & returned back with observations. Seraj 2017-18 272 C/O Motorable road Bagi- II Alignment has been Dhar-Thach-Bharedi- finalized. Bhatkidhar. Seraj 2017-18 273 C/O Motorable road Saroa- III Proposed for substitution. Jhoat-Khuan-Gudah- Patkari. Seraj 2017-18 274 C/O Shilibagi to Deol IV DPR sent to Nabard by Jainshala road Km.0/0 to Adviser (Plg.) on dated 8.250. 06/06/2020 for amounting to Rs.1260.48 lacs. Seraj 2018-19 275 C/O Kalaini -Majhar-Lot- I Manuscript DPR amounting Swandingla road (G.P. to s. 982.98 lacs is under Tharjun, Bassi & Bada scrutiny in Zonal office Tehsil Chachiyot). Mandi. Seraj 2019-20 276 C/O road from Samgad- I Alignment yet to be Shalwad-Sandwas-Nalot- finalized. Boong-Dandheli, Tehsil Balichowki, Distt.Mandi. Seraj 2019-20 277 C/O road from hanogi II Manuscript DPR is under Bridge to Shaloi. scrutiny in Zonal office Mandi. Seraj 2020-21 278 C/O motorable road from I U/P in field office. Bahwa, Khanula, Sarhani, Tikkar, Dhar, Traimbalidhar, Tehsil Chachiot. Seraj 2020-21 279 Improvement and II U/P in field office. Upgradation of road from Khouli, Reshan, Bhalwar, Boong, Teh.& Distt. Mandi. Drang 2017-18 280 MT, CD & balance work of I Total length of this road is Shallanal Khinni Baggi 8.500kms. out of which Kashana road i/c One No. 8.300km.is forest land & bridge. (Subtituted on remaining 0.200km.is dt.27/11/2019). Pvt.land. Drang 2017-18 281 Tiun Bridge to Bulang- II Total length of this road is Ghagtian -Kampan- 15.00kms. out of which Dhangyan- Kashehar- 7.600km.is forest land & Kalangher- Hurang road 7.400 km.is Govt.& Pvt. Km.0/0 to 15/0. After receipt of gift deed forest case & DPR will be prepared. Drang 2017-18 282 C/O Dhamrehar to III Total length of this road is Tarswan- Drangar- 9.00kms. out of which Garhagoan, Samalang- 7.600km.is forest land & Dagwandhar road Km.0/0 1.400 km.is Pvt.land. After to 8/0. receipt of gift deed forest case & DPR will be prepared. Drang 2017-18 283 C/O Jorla Darlog IV Survey work is in progress. Bodandhar Kuthyar Badon Kufari road (Subtituted on dt.27/11/2019). Drang 2018-19 284 C/O Jamtehar Kalhog Kau I DPR prepared but returned Maman Dugh Tarwan back by Zonal office with Kohag road i/c C/O bridge observations. over Uhl river (Subtituted on dt.27/11/2019).

Drang 2018-19 285 C/O Radahan Suraj Bagala II Survey work is in progress. Badhala Pundal Kaloun Surahan road (Subtituted on dt.27/11/2019). Drang 2019-20 286 C/O Voching-Sachyan- I Private land involved.Gift Kadyan-Lachyan-Khaman- deeds awaited. Jhukan-Ganhag, Mad road. Drang 2019-20 287 C/O road from Basni Nalla II Private & forest land to Sangad Swadi, Teper, involved. Dagsi, Khandli, Kavdyana, Chambadhar. Drang 2020-21 288 C/O road from Tikker- I Private land involved.Gift Sharni-Jorla-Ukhal-Galoo- deeds awaited. Tapra-Sanvad. Drang 2020-21 289 C/O road from Kunnu- Hydraulic data under Badidhar via Gajaon process in Circle office. (including two No.bridges). Drang 2020-21 290 C/o road from Ropa- Private land involved.Gift Ghunag-Kathog-Batehad- deeds awaited. Jamtehad-Hurang-Swad. Drang 2020-21 291 C/o road from Batheri to Private land involved.Gift Bkalboot (including one deeds awaited. No.bridge). Joginder 2017-18 292 C/O Kuni Katakal Bhalera- I U/P in field office. Nagar Rains road Km.0/0 to 4/0 & C/O 1No bridge (Substituted on dated 01/07/2020). Joginder 2017-18 293 C/o Sparu Langha Ghadwan II U/P in field office. Nagar road Km.0/0 to 3/930 (Substituted on dated 21/01/2020). Joginder 2018-19 294 Balance work & M/T on I DPR sent to Nabard by Nagar Bagoda Bagla Hard Ropari Adviser (Plg.) on dated Mordoog Chandani road. 31/12/2019 for amounting to Rs.1168.67 lacs. Joginder 2018-19 295 Balance work & MT on II DPR sent to Nabard by Nagar Simus Naila Gawala road. Adviser (Plg.) on dt.20/09/2019 for Rs.378.19 lacs. Joginder 2019-20 296 Up-gradation of link road I U/P in field office. Nagar Aihju-Golvan to Chalahnu. Joginder 2019-20 297 C/O road Chontda Chakli, II U/P in field office. Nagar Marehad Dohag i/c C/O bridge over Bajgar Khad. Joginder 2020-21 298 C/O Bhala-Ka-Rihra Kut I U/P in field office. Nagar Khetru Namalri Gangoti road Km.0/0 to 7/075. Joginder 2020-21 299 C/O & MT of Panjalog- II U/P in field office. Nagar Kanarg-Fagla-Slahan Dhar road. Joginder 2020-21 300 C/O & MT of JalaKochu- III U/P in field office. Nagar Ropri-Dughli road. Mandi 2017-18 301 C/O road from Kenchi Mor I Alignment finalzed and to 7 Mile via janjohi, revenue papers collected. Lajhukhar Bahanidhar FRA case under Kasani (Substituted on preparation. NAC and FRA dated 09/05/2018). awaited. Work is in progress under OTMNP head. Mandi 2017-18 302 C/O link road from NH-70 II DPR sent to Nabard by to village Sathan. Adviser (Plg.) on dated 26/09/2018 for amounting to Rs.98.59 lacs. Mandi 2017-18 303 C/O road NH Dhar to IV Revenue papers has been Uparli Sooradi Chatred(GP prepared. Gift deeds Uparli Sarvadi). received from land owners & FCA case is under preparation. Joint inspection conducted, FRA awaited. Mandi 2017-18 304 C/O link road Rihan Dhar to V Alignment finalized. Gift Ayala Banot, GP Majhwar deeds awaited. FCA case (Substituted on dated under preparation. 23/05/2017). Mandi 2018-19 305 C/O road from Kalothar, I Alignment finalized. Gift Lohard, Chanalsa deeds being arranged. FCA Bhargram, Vadyar Harizan case under preparation. Basti Bhoura Naal Amla - Tala to Harizan Basti Rachhoda. Mandi 2018-19 306 Balance work,CD,MT & II DPR sent to Nabard by parapets on Kakarsal Sarvan Adviser (Plg.) on dated Vatahar road. 03/01/2019 for amounting to Rs.308.84 lacs. Mandi 2019-20 307 C/O link road Nichla I Alignment yet to be Thanout to Chalonh. finalized. Mandi 2019-20 308 C/O link road Baggi to II Alignment yet to be Lahanga. finalized. Mandi 2019-20 309 Balance work & MT,CD on III Alignment yet to be link road Jabhahi Nallah finalized. Barnota Kadkoh. Mandi 2019-20 310 Balance work & MT,CD on IV Alignment yet to be link road to Khad Kalyana finalized. to Dolra Balh Ropa Harijan Basti. Mandi 2019-20 311 C/O road Sain Chopra I Private and forest land Druman Saploh in GP, involved. Nichli Surrari (Substituted from RWSS Scheme on dated 24/01/2020). Mandi 2019-20 312 C/O road Kalothar to II Private and forest land Karnal in GP Dawah involved. (Substituted from RWSS Scheme on dated 24/01/2020). Mandi 2020-21 313 M/T Nagrehad to Taryasal I U/P in field office. Km.0/0 to 3/500. Mandi 2020-21 314 M/T Kench mod to II U/P in field office. Khafrehda road km.0/0 to 8/400. Mandi 2020-21 315 M/T Kushwahda, Samrahan III U/P in field office. Dandal via Middle School Dadni-Ri-Gahri road. Balah 2017-18 316 C/O Rigger Khuiri via I DPR amounting to Rs. Bangalow Km.0/0 to 5/0 504.88 lacs is under scrutiny (substituted on dated in Circle Office. 24/12/2018). Balah 2017-18 317 C/O Lunapani Roda manpur II Alignment finalized but gift singagalu Sihal Brhal deeds not received. People Kathlag road Km.0/0 to 7/0 not ready to donate their (Substituted on dated land. 24/12/2018). Balah 2018-19 318 C/O Panyali, Kamlu, I Alignment marked & gift Chhangehar Patha link road deeds being arranged. G.P. Samlauu. Balah 2018-19 319 C/O Lower shafru Grauru II u/P in field office. Ghaur link road G.P. Riur. Balah 2019-20 320 C/O Sakroha Naina Mata I Alignment has been Mandir Pipli Nodal Dausala finalized. Gift deed awaited. Malwan road Km.0/0 to 9/500. Balah 2020-21 321 C/o Dayoda pul Chhajwan I U/P in field office. Khabu Panchayat Ghar Dusra Khabu to Darbyas road Km.0/0 to 7/500. Balah 2020-21 322 C/O Nagchala Krehri II U/P in field office. Lakhora Dadaur & Chahri Ghat to Murai Mata Temple. Sarkaghat 2017-18 323 C/O road Bhadarwad- I Manuscript DPR checked Srohal-Pingla-Byola- by CE Mandi on dated Nabharyani-Kathogan up to 31/10/19 for Rs.1057.89 Sadoh. lacs & under scrutiny under EE Sarkaghat. Sarkaghat 2017-18 324 C/O road Jamsai-Jhijdu- II U/P in field office. Bagi-Ropdi-Banehardi- Rachot-Sandoa-Dharjol upto to Chowk. Sarkaghat 2017-18 325 C/O road Prasdda-Radoo- III Alignment yet to be Paplog-Samsai upto finalised. Damseda. Sarkaghat 2017-18 326 C/O road from Khuddi, IV Forest & Pvt.land involved Tamlehar, Tumrahan, & public is not willing to Kardhwan, Dameli road i/c donate their land. bridge over Kalthari Khad (Substituted on dt.07/12/2019). Sarkaghat 2017-18 327 C/O road Nai Mod-Barot- V DPR sent to Nabard by Badoin-Balh Maihra-Upper Adviser (Plg.) on dated Lunadha upto upper Barot. 06/02/2019 for amounting to Rs.472.77 lacs. Sarkaghat 2017-18 328 M/T on Nagla Redu Kaner VI U/P in field office. road Km.0/0 to 3/945 (Substituted on dt.07/12/2019). Sarkaghat 2018-19 329 CD/MT on Dabarwal, I DPR sent to Nabard by Jamanwal, Vanamgoh Adviser (Plg.) on dated ,Jabothi road Km.0/0 to 06/02/2019 for amounting 8/300. to Rs.634.06 lacs. Sarkaghat 2018-19 330 C/O road from Gaihra II Alignment has been School to Khandahar- finalized. Gift deeds Sadwal- upto Guhad Pvt.land is being collected Majhwad. & FCA case under preparation. Sarkaghat 2018-19 331 C/O Sarkaghat Khalard via I Manuscript DPR checked Lukanu & Surjpur Bari by CE Mandi on 30/11/19 Barswad road. (Scheme for Rs.745.07 lacs under given by MLA in place of scrutiny under EE WSS Scheme) Sarkaghat. Sarkaghat 2018-19 332 C/O 30.00mtr.span Box II DPR amounting to Girder Bridge over Bharnal Rs.192.05 lacs is under Khad at Bharnal on Bharnal scrutiny in zonal office. Nalah-Ra-Gehra Kolni road at Rd.0/015 (Substituted on dt.07/12/2019). Sarkaghat 2019-20 333 C/O road Narla to Dameli I Alignment yet to be via Chowk, Karakwahan finalized. GP Chowk. Sarkaghat 2019-20 334 C/o road Tarda-Ka-Khool to II Alignment yet to be Baggi via Chuhak. finalized. Sarkaghat 2019-20 335 C/O bridge over Kalthari III Manuscript DPR checked Khad between Tikkri- by CE Mandi forf Rs.438.63 Gaihra Bhadrol. lacs & under scrutiny with EE Sarkaghat. Sarkaghat 2019-20 336 C/O road from Mahila IV DPR sent to Nabard by Mandal Bhawan Kaas- Adviser (Plg.) on dated Dumaiher, Panyali, Gaihra 31/12/2019 for amounting up to Takrehad. to Rs.437.51 lacs Sarkaghat 2019-20 337 C/O road from Thouna, V Alignment yet to be Gaihra, Murahdevi. finalized. Sarkaghat 2019-20 338 C/O 19.75mtr.RCC T-Beam VI DPR returned by the Zonal Bridge on Nabahi to Thanda office with observations Pani link road Km.0/0 to which are being attended by 2/0 (Substituted on Divisional office. dt.07/12/2019). Sarkaghat 2020-21 339 MT road Amla Galoo- I DPR returned by the Zonal Andhrada-Harvan Km.6/0 office with observations to 8/500 including bridge which are being attended by over Kalthri Khad. Divisional office. Sarkaghat 2020-21 340 MT road Chmyanu-Bhatoh II U/P in field office. via Paira Kusti Km.0/0 to 6/0. Sarkaghat 2020-21 341 C/O link road Dabrog to III U/P in field office. Gaihra via Kufran Km.)/0 to 2/500. Sarkaghat 2020-21 342 C/O link road Badon to IV U/P in field office. Murari Devi in Km.4/0. Jaisingpur 2017-18 343 C/O road Suan Bhodi to I Private & forest land Baba Sidh Bhodi upto involved. Ashapuri Lad Galu.

Jaisingpur 2017-18 344 C/O road Ropdi Nagvan to II Forest land involved. Mata Ashapuri via Nagvan. Jaisingpur 2018-19 345 Improvement, Widening I DPR sent to Nabard by and Strengthening of Adviser (Plg.) on dated Panchrukhi road Km.22/0 to 07/01/2019 for amounting 28/800 (substituted on dated to Rs.350.88 lacs. 01/10/2018). Jaisingpur 2018-19 346 C/O road from Mand khad II DPR sent to Adviser (Plg.) bridge to Bari via Nadol on dated 31/08/2020 for (Bhunta Da Gram road km. amounting to Rs.362.76 0/0 to 3/0). lacs. Jaisingpur 2019-20 347 C/O road Pantehad School I Work proposed unde SCSP to Kujeshwar Mahadev i/c bridge. Jaisingpur 2019-20 348 C/O link road Village I Alignment is being Umbar i/c bridge over finalized. Hydraulic data Salyani Khad. under process in Divnl. office. Baijnath 2017-18 349 Balance work for the C/O I DPR sent to Nabard by Chobin Sansai & Kothi, Adviser (Plg.) on dated Kholi via patel Nagar road 06/02/2019 for amounting i/c 55.00mtr Span bridge to Rs.1175.14 lacs. approaches over Binwa Khad at Km.5/286. Baijnath 2017-18 350 C/O link road from II Private land involved Kumardha toMadho Nagar (Substituted on dated 14/07/2020). Baijnath 2018-19 351 C/O 35.00 mtr span bridge I DPR sent to Nabard by over Uhal river on Bid Adviser (Plg.) on dated Baragram Barot road. 24/10/2019 for amouonting to Rs.178.65 lacs. Baijnath 2018-19 352 C/O road from Uttrala to II Forest case has been Surahi Pass (Portion uploaded online on dated Baklood to Surahi 1/12/2019. On clearance of Pass)(Substituted on dated FCA case of GOI, the 18/09/2019). process for DPR preparation shall be taken in hand. Baijnath 2019-20 353 C/O road from village I DPR under process in Zonal Hared to Karnarath via office. Taras Shilla Nalla. Baijnath 2019-20 354 C/O link road Sansal to II Survey & alignment work Thathi & Tasijoug to completed. Forest & Pvt. Village Chandpur. land involved. Forest clearance obtained but Pvt.land portion gift deeds awaited. Baijnath 2020-21 355 Improvement/Upgradation I DPR under scrutiny in of road from Baijnath to Zonal office. BinvaNagar. Baijnath 2020-21 356 C/O link road Diyol Tatvani II DPR under scrutiny in via Karnarthoo Srajda. Zonal office. Nurpur 2017-18 357 C/O & maintenance link I Hydraulic data under road from village preparation in Divisional Bharmouli Kathal-Nagladh- office. Nagabadi. Nurpur 2017-18 358 C/O link road to Harijan II DPR sent to Nabard by Basti Mijgran. Adviser (Plg.) on dated 06/05/2020 for amounting to Rs.133.34 lacs. Nurpur 2018-19 359 C/O Sulilai to Relay to I Land dispute. Middle school Bardi via Band Hatli road -3.00km. Nurpur 2018-19 360 C/O Khajjan to Har road II DPR sent to Nabard by 2.300km. Adviser (Plg.) on dated 06/05/2020 for amounting to Rs.275.41 lacs. Nurpur 2019-20 361 C/O link road from Khajjan I U/P in field office. to Baluhi i/c bridge over Jabbar Khad. Nurpur 2019-20 362 C/O link road from Bhaloon II U/P in field office. to Garore via Bassa Samletian i/c 1No.Bridge. Indora 2017-18 363 C/O road from Bhatoli to I DPR amounting to Rs. Malahdi via Gangwal, Billi. 192.60 lacs under scrutiny in Zonal office Kangra Zone. Indora 2017-18 364 C/O road from Chabbi to II U/P in field office. Kharad via Majra & Chakki Alignment being finalized. Khad i/c C/O bridge over Naluan Nehar. Indora 2018-19 365 C/O Road from Manwal I DPR amounting to Rs. Jatan to Mandoli . 278.27 lacs is under scrutiny in E-in-Chief office. Indora 2018-19 366 C/O road from Mangwal to II DPR amounting to Rs. Sahauda Jattan . 143.06 lacs is under scrutiny in E-in-Chief office. Indora 2019-20 367 C/o road from Gheta to I U/P in field office. Chownka Jattan Brahmna. Alignment being finalized. Indora 2019-20 368 C/O link road to Village II DPR amounting to Traiyah Chamaran Rs.201.97 lacs is under (Substituted on scrutiny in Circle office. dt.25/07/2019). Indora 2020-21 369 C/O road from matoli to I U/P in field office. Ram Nagar i/c bridge over Malah-Ri-Khad Km.0/0 to 5/00. Fatehpur 2017-18 370 C/O road Dayal-Mandlai- I Forest land is falling in the Kohladi Dhaiyath. road & alignment is not finalized as yet. Fatehpur 2017-18 371 C/O road from Kodoo Bela II DPR sent to Nabard by to Paral via Jatt Beli. Adviser (Plg.) on dated 05/05/2020 for amounting to Rs.513.42 lacs. Fatehpur 2018-19 372 Priority has not been given by the MLA Jawali 2017-18 373 C/O balance work of link I Alignment finalized. road from Nagrotu Khad Investigation work done. Bridge to Sarola Ludhiar Pvt./forest land involved in road. some reaches. Forest case under preparation & Pvt.land owners are being motivated to donated their land. Jawali 2017-18 374 C/O road from Chieher to II DPR amounting to Rs. Naag Dramman Bari Da 182.55 lacs under scrutiny Balla (Substituted on with Zonal office. dt.02/02/2019). Jawali 2018-19 375 C/O road from PWD Rest I Drawing finalized. Forest House Kotla to Rajol Anuhi land also involved & forest up to Gambhirthal bridge case under preparation. i/c bridge over Dehar Khad (Substituted on dated 30/01/2019). Jawali 2018-19 376 C/O road from Jaryal Basti II DPR amounting to Rs. Jharad to Banderu Nadhan 237.14 lacs under scrutiny via Primary school Jharad with Zonal office. and upto Patwarkhane. Jawali 2019-20 377 C/O road Kharota to I DPR is being faired out by Thather, Souhda Guda, the Divisional office. Nargala Kut, Makdahan, Lab, Bhanai to nichla Kut upto Primary School Manlana. Jawali 2019-20 378 C/O link road Govt.School II Alignment finalized. to Gaddi Basti & Schedule Investigation work done. case Basti i/c Bridge. Pvt./forest land involved in some reaches. Forest case under preparation & Pvt.land owners are being motivated to donated their land. Jawali 2020-21 379 C/O link road from Banoli I U/P in field office. to Bhati-Dugloo-basa- Kotha-Harnera Jawali 2020-21 380 C/O bridge over Nyal- II Manuscript DPR amounting Jhalu-Buhalkhand i/c road. to Rs.467.78 lacs is under scrutiny in Zonal office. Dehra 2017-18 381 C/O link road from I DPR sent to Nabard by GP.Dhar to Village Trial via Adviser (Plg.) on dated Harijan Basti Pohal & 22/01/2020 for amounting Govt.Middle School Sapru to Rs.321.55 lacs. (Dehra S/D)(Substituted on dated 28/11/2019). Dehra 2017-18 382 C/O road Siran-Da-Bharo II U/P in field office (Kallar) to Mithi Aambal (Naoushran) via Tillu Bagrot. Dehra 2018-19 383 C/O road from Tutru Dehra I DPR prepared, but returned Bharwain road via by SE with some Bhangnouria Choudhary & observations which is being Harizan Basti up to GPS attended in Divisional Bharwara (Pragpur Sub- office. Division) (Substituted on dated 30-11-2019. Dehra 2018-19 384 C/O road from Thathar to II DPR prepared in manuscript Vasa Tripal . shape & got checked for 235.93 lacs vide CE(KZ) D/sala on dated 23/07/19 & being faired out by the Divisional office.

Dehra 2019-20 385 C/O road Dhar to Dhagad & I Manuscript DPR amounting Lunsoo. to Rs. 678.38 lacs is under scrutiny in Zonal office. Dehra 2019-20 386 C/O road from Ganua to II DPR sent to Adviser (Plg.) Tatahan. on dated 01/09/2020 for amounting to Rs.392.49 lacs. Dehra 2020-21 387 C/O road from Gambhirpur I U/P in field office. to Ludret to Sakri. Dehra 2020-21 388 C/O road from Badhal II U/P in field office. Bridge to Jambal Bassi RD via Kanol & Pinniamal. Jaswan 2017-18 389 Road from Dahi Pukhar to I DPR sent to Nabard by Pragpur Galua via Jole Km.0/0 to Adviser (Plg.) on 1/600. dt.24/10/2019 for Rs.114.55 lacs. Jaswan 2017-18 390 Road from Kanol (GP II U/P in field office. Pragpur Tikker) with one No.bridge to Chamubha via Handal, Brahman Basti & Gujjar Basti. Jaswan 2017-18 391 C/O Bani to Pragpur via III U/P in field office. Pragpur Dangra Sidh including 2No.bridges. Jaswan 2017-18 392 C/O Bharwaini to village IV U/P in field office. Pragpur Bhadyali road. Jaswan 2018-19 393 C/O road from Pucca I U/P in field office. Pragpur Bharoh to (At Chanour Tayamal Shitla road) Lower Sawana km. 0/0 to 2/600. Jaswan 2018-19 394 C/O link road from Pir - II DPR sent to Nabard by Pragpur Saluhi to Rakkad via Adviser (Plg.) on dated Sitpak-i/c 1 bridge (Phase- 30/10/2019 for amounting II). to Rs.627.42 lacs. Jaswan 2019-20 395 C/O road from Barnali to I U/P in field office. Pragpur upper Nari via Lower Nari, Alignment finalized i/c Bridge in Tehsil Jaswan. Jaswan 2018-19 396 C/O road from Kanol to II U/P in field office. Pragpur Dhounta, Km.0/0 to 5/0 via Dodra, Distt. Kangra. Jaswan 2020-21 397 C/O road Durgain- I U/P in field office. Pragpur Rakhalda-Kanpur Beri via Chakoli including Bridge. Jaswan 2020-21 398 C/O road Pirsaluhi (Kangra) II U/P in field office. Pragpur to Kitpal (Hamirpur) via Nauri including bridge. Jawalamukhi 2017-18 399 C/O link road Dodharoo to I Work for Stage-I i/c bridge Soud Kala via Kheriya Sour completed & DPR for Khurad. Stage-II will be prepared after forest clearance.Forest case under preparation. Jawalamukhi 2017-18 400 C/O road from Dhatehar II U/P in field office. Mahrana Duhak road in Km.0/0 to 6/310 (Substituted on dt.15/07/2020). Jawalamukhi 2018-19 401 C/O Link road from Ghatta I Forest & Pvt.land involved. to Bhauran Nichali via Forest case is under Uprali Bhauran km. 0/0 to preparation & department is 3/0. motivating to public to donate their land. Jawalamukhi 2018-19 402 C/O link road from Chowki II Forest & Pvt.land involved. to Sarvnati G.P.Panchayat Forest case is under Majhin km. 0/0 to 2/0. preparation & department is motivating to public to donate their land. Jawalamukhi 2019-20 403 C/O road Chouki to I Forest & Pvt.land involved. Dabkehad (GP Majhin) Forest case is under Km.0/0 to 3/0. preparation & department is motivating to public to donate their land. Jawalamukhi 2019-20 404 C/O road Langa-Lihas (via II DPR amounting to Rs. Ropa) to Mundal Km.0/0 to 610.35 lacs under scrutiny 7/500. in Zonal office. Kangra Jawalamukhi 2020-21 405 C/O road from Ambada to I U/P in field office. Bhaloch via Kidi. Jawalamukhi 2020-21 406 C/O road from Dehriyan to II U/P in field office. Balha. Sullah 2017-18 407 C/O road from Mahlag to I DPR under process in Zonal Malahu in GP Malahu & office. C/O motorable bridge over Moul Khad. Sullah 2017-18 408 C/O link road from Bharth II DPR under process in Zonal to Chowki Barsola via Dain office. i/c bridge over Salohi Khad (substituted on dt.12/09/2018). Sullah 2017-18 409 Imp.& Up-gradation of road III DPR sent to Nabard by from Panyali to Junga Devi Adviser (Plg.) on dated Mandir via Dhalera Kholi & 19/06/2020 for amounting Bhadrol Km.0/0 to 7/0 to Rs.644.05 lacs. (Substituted on dated 27/11/2018). Sullah 2017-18 410 C/O road Marhun to Nagni V Land not available via Jadoiya Vasdi and Bahedoo Mahadev Mandir G.P.Marhun (Substituted on dt.19/05/2017). Sullah 2018-19 411 C/O Link road Kharouth to I Land not available Kabrian to Nath Basti i/c Bridge over Tahal Khad km. 0/0 to 3/0. Sullah 2018-19 412 C/O road from Bari II DPR sent to Nabard by Samiyana Beharswar Adviser (Plg.) on dated Mandir to Bhoda. 11/11/2019 for Rs.286.66 lacs. Sullah 2019-20 413 C/O road Thatru-Thare to I Land not available Bhaitilu i/c bridge over Bhatlu Nallah. Sullah 2019-20 414 C/O road from Radh II DPR sent to Adviser (Plg) Panyali to Kolru, Ghamoo, on dated Galui,Kaluna, Chowki 05-09-2020 for Rs. 704.34 Barsolam Dhedi & Dein. lacs. Sullah 2020-21 415 Up-gradation of link road I U/P in field office. Panchrukhi to Kaswa Jugehar Km.5/10 to 10/0. Sullah 2020-21 416 C/O balance work on II U/P in field office. Henjha to Bhawarna via Garla Dai up to swargiain road i/c 2No.bridges over Soon Khad. Nagrota 2017-18 417 C/O road for village Malan I DPR sent to Nabard by Bagwan to Gujrehada, Pathyar & Adviser (Plg.) on dated Sukrehad. 20/07/2019 for amounting to Rs.567.84 lacs. Nagrota 2017-18 418 C/O Sarotari Uprehar to II U/P in field office. Bagwan Jamula Kalaban Pattari Sunhi Shaheedi Marg road Km.0/0 to 11/0 i/c 1No.bridge (Substituted on dated 08/11/2018). Nagrota 2018-19 419 C/O Sarotri Mangrela I Alignment being finalized, Bagwan Luhana Badoh Gadrana i/c involvement of Pvt.land & bridge over Bathu khad. forest land. Nagrota 2018-19 420 C/O Bridge over Daroo II DPR under process. Bagwan Khad alongwith both side approaches to connect the village Kaled to Karali- Ka- Bag. Nagrota 2019-20 421 C/O Rangehar Sadoon I DPR under process. Bagwan Malmu to Nera roads i/c bridge over Nera Khad (Substituted on dated 16/12/2019). Nagrota 2019-20 422 C/O Kaisthwari Kawari II DPR under scrutiny in Bagwan Bhadu Nianda Paddar road. Zonal office. Nagrota 2020-21 423 C/o road from Kalijan to I U/P in field office. Bagwan Sheedi Marg Balol via Tarbhna Degar Lahad & i/c bridge over Nareli Khad. Nagrota 2020-21 424 C/O road Baldhar Bhedoo II U/P in field office. Bagwan Ronkhar & C/O bridge over Bhaloon Khad. Kangra 2017-18 425 C/o link road Rahad Basti I Manuscript DPR under Tika Pantehar G.P.Gahliya scrutiny in CE (KZ) for length Km.1.5. Rs.108.94 lacs. Kangra 2017-18 426 C/O 68.00mtr.Span bridge II DPR sent to Nabard by over Baner Khad i/c Adviser (Plg.) on dated Railway over bridge on 12/02/2020 for amounting Bodar balla Kangra railway to Rs.582.98 lacs. station road(SH:-C/O 36mtr.span Railway over bridge at Rd.98/366 on Pathankot Joginder Nagar Section near Railway station Kangra Mandir (Substituted on dt.18/07/2019). Kangra 2018-19 427 Tiara to Kangra via I U/P in field office. Shamirpur Khas, Tiara Dehrian Kapparia, Upper Tiara Dehrian & Kalka Mandir km. 0/0 to 12/290 (Substituted on dated 03/02/2020). Kangra 2018-19 428 C/O road from Kalka Mata II DPR sent to Nabard by to Kaparian via Chibal Adviser (Plg.) on dated Km.0/0 to 2/500 06/07/2019 for amounting (substituted on dated to Rs.189.57 lacs. 27/09/2018). Kangra 2019-20 429 Imp. & widening of Ichhi to I U/P in field office. Pehag via Doadan Tyali Abdullapur, Manjhi khad bridge upto Bhown Kangra km. 0/0 to 9/0 (Substituted on dated. 03/02/2020). Kangra 2019-20 430 C/O GP Nanrool Kangdi to II Private land involved. Panchayat Ghar Nandrool via up to Munshi Ram house road. Kangra 2020-21 431 Improvement & Widening I U/P in field office. of Dehra Arla, Gabla Andrad Tarsuh, Lalehad, Virta Jogipur Ujjain Sevkara Natehad road Km.0/0 to 12/900. Kangra 2020-21 432 C/O road from II U/P in field office. Gahliyan(Palera) to Kalothar Matta. Shahpur 2017-18 433 C/O new road Ghera I DPR sent to Nabard by Sakughat- Chamiara- Adviser (Plg.) on dated Bhitloo. 11/09/2019 for Rs.1492.63 lacs. Shahpur 2018-19 434 C/O link road from Gadapa I Private land involved. to Lower Lanjot Damosti Basti km. 0/0 to 2/0 including bridge 13.75 mtr. span. Shahpur 2018-19 435 C/O Link road from Thulla II Hydraulic data under basti to Boie i/c process in Divisional office. 60.00mtr.span bridge. Shahpur 2019-20 436 C/O link road Gadappa I DPR sent to Nabard by Mod to Bagdoo-Basnoor up Adviser (Plg.) on dated to Puhada. 31/12/2019 for Rs.350.76 lacs. Shahpur 2019-20 437 C/O road from village II U/P in field office. Lanjhani to village Nargeta Km.0/0 to 1/885 (Substituted on dt.22/06/2019). Shahpur 2020-21 438 C/O link road Laleta to I U/P in field office. Vannu Mahadev, Dhanotoo & C/O bridge over Chambi Khad. Shahpur 2020-21 439 C/o road from Ghera road to II U/P in field office. Diyara, Bhitri & Varnet. 2017-18 440 Improvement/Balance work I DPR sent to Nabard by Yol-Banordoo-Barwala Adviser (Plg.) on dated road (Km.0/0 to 8/0). 20/05/2019 for amouanting to Rs.475.81 lacs. Dharamshala 2017-18 441 C/O Hiroo Dashalan road II Feasibility of general (Km.0/0 to 4/0) upto village arrangement drawing of Gamroo & Cholla & C/O 40.00mtr.span bridge bridge over Churan Khad. checked at site & drawing awaited, alignment falls in forest land. Land transfer case submitted to DFO D/sala by Divnl.office on dt.29/10/18 under FRA &FCA pending in DFO office regarding Hon'ble Supreme Court of has passed interm order on dated 11/3/19 O.A.No.3840. There shall be no diversion of forest lands allotted to protection working Circle under FRA & FCA till next date. Dharamshala 2018-19 442 C/O bridge over Bahal I Hydraulic data has been Khad & M/T link road to checked in Circle office. village Bahal. Dharamshala 2018-19 443 C/O link road Bangotoo to II DPR manuscript shape Lindi, Vehi & Lindi Vehi to checked by CE (KZ) on Tilla Mata Mandir. dated. 19/12/19 for Rs.426.75 lacs. Fair DPR return back to EE D/sala by SE on dated 11/2/19 with observations the FRA certificate due to Hon'ble Supreme Court of India has passed interm order on dated 11/3/19 O.A. No.3840. There shall be no diversion of forest lands allotted to protection working Circle under FRA & FCA till next date. Dharamshala 2019-20 444 C/O link road from Ward I DPR under process in Zonal No.4 & 5, G.P. Kand office. Kardiyana. Dharamshala 2019-20 445 C/o link road Dagwar II DPR under process in Zonal Chakvan to Khas Dagwar office. upto Masred. Palampur 2017-18 446 C/O link road Panjouriya I Work is being executed Basti-Patti Bodhal-Angariya under State Head & DC Basti to Naga Baba, i/c deposit. bridge over Mand Khad. Palampur 2017-18 447 C/O link road Chouki- II Due to involvement of Punnoo Ram Mayul Shed to Pvt.land. Alignment could Nalahar via House of not be finalized. Ramesh Chander. Palampur 2018-19 448 Upgradation of road from I Due to involvement of Subhash Chowk to Pvt.land. Alignment could Jhanjarda connecting not be finalized. Bandla-Shan- Mata Vindyabasni Mandir and Chhid Chowk 0-9 km. Palampur 2018-19 449 C/O link road to village II Survey work completed. Gehar, Spedu, Kandwari Partly forest & Pvt.land Kalohi- Rajehar including involved in addition to 25 mtr span bridge over 3.00km. Existing road. Pung khad. Paper formalities for NOC under process. Also hydraulic data of proposed bridge over Pung Khad under preparation. Palampur 2019-20 450 C/O link road from GPS I DPR under process in Zonal Ghamrota-Balalan-Bhont- office. Arti i/c bridge over Lingti Khad (Substituted on dt.27/11/2019). Palampur 2019-20 451 C/O road from Patti to II DPR under preparation in Gorat (GP.Rajpur) via Divisional office. Harijan and Gujjar Basti Badehar and Panchayat Ghar Badehar. Palampur 2020-21 452 Construction & I U/P in field office. Upgradation of road from Rampur-Rajehar-Sarsawa via Kapen-Neelkanth mandir-Bhadrena-National Highway at Sungal. Palampur 2020-21 453 Upgradation of Kulani- II U/P in field office. Chandpdur-Bharmat Colony-Kamakhya Mandir- National Highway Holta- Simblu-Patti road. Churah 2017-18 454 C/O Tissa Satmas road I Hydraulic data prepared & bridge constuction at sent for Design (KZ) but Tarvai. returned back to SE with some observations which are being attended. Churah 2017-18 455 C/O link road from Aniuda II Alignment finalized & to Bhanodi via Malli Kundi forest case is being i/c bridge over Trell Nallah prepared. (Substituted on dated 19/08/2019). Churah 2018-19 456 C/O link road from Tarwai I Alignment finalized. Total to Banjal i/c C/O Bridges length 8.00km. Pvt.land from Km.0/0 to 8/0 involved for which gift (Substituted on dated deeds awaited.FCA also 23/07/2018). involved. Churah 2018-19 457 C/O link road from Guila to II Alignment finalized. Total Mansa (Substituted on dated length 4.500km. Forest case 23/07/2018). is being prepared. Churah 2018-19 458 C/O balance work of III DPR sent to Nabard by Chandi to Baroh via Bhatoli Adviser (Plg.) on dated road i/c CD and MT work 21/04/2020 for amounting from Km.0/0 to 6/0 to Rs.683.03 lacs. (Substituted on dt. 23/07/2018). Churah 2018-19 459 Metalling & Tarring work IV DPR sent to Nabard by of link road to village Adviser (Plg.) on dated Ghatta (Substituted on dated 21/06/2019 for amounting 23/07/2018). to Rs.195.40 lacs. Churah 2019-20 460 Improvement, Widening & I DPR sent to Nabard by Metalling/ Tarring of Adviser (Plg.) on dated Kandla Bangati Bhalod 13/05/2020 for amounting road. to Rs.423.22 lacs. Churah 2019-20 461 C/O road Jarourgad to II Alignment has been Gadyog. finalized & forest case is being prepared. Churah 2019-20 462 C/O bridge over Aayal III Alignment has been Nallah & C/O road from finalized & forest case is Aayal to Guwadi. being prepared. Churah 2020-21 463 C/O main road Kenthal- I Forest case under Papadoo to Masrund via preparation. Aiharvad-Gurenta-Minda road. Churah 2020-21 464 C/O road from Bhanraooo- II Forest case under Salancha-Sakloga-Phultva- preparation. Dudra road. Bharmour 2017-18 465 C/O Khanni Garima Retan I DPR amounting to Rs. road (Substituted on 1046.55 lacs is under dt.20/07/2019). scrutiny with Zonal office. Bharmour 2017-18 466 C/O Lahal Bagaru road II Manuscript DPR amounting (Substituted on to Rs. 866.67 lacs is under dt.20/07/2019). scrutiny with Zonal office.

Bharmour 2018-19 467 Imp. CD & MT on Lujai I DPR approved under Vailey road. PMGSY Package No.HP- 02-357. Bharmour 2018-19 468 Improvement/ Widening on II Gift deeds is not yet Dakog to Banni road. received. Bharmour 2019-20 469 C/O road from Kandi to I DPR under preparation. Mindra. Bharmour 2019-20 470 C/o road from Hadsar to II DPR under preparation. Serkaw i/c bridge over Bhel Nallah. Bharmour 2020-21 471 C/O Channi bridge Elakalca I U/P in field office. Mata Jalsu Jot road. Bharmour 2020-21 472 C/O link road to village II Manuscript DPR amounting Lech. to Rs. 876.99 lacs is under scrutiny with Zonal office. Chamba 2017-18 473 M/T on Ghoom Janjla road I DPR sent to Nabard by Km.0/0 to 4/800. Adviser (Plg.) on dated 07/01/2019 for amounting to Rs.316.43 lacs. Chamba 2017-18 474 Metalling/Tarring of Kandu II U/P in field office. Panjoh road (Upper Panjoh) Km.0/0 to 3/560 (Substituted on dated 08/07/2020). Chamba 2018-19 475 Metalling/Tarring of Kandu II U/P in field office. Panjoh (lower Panjoh) road Km.0/0 to 3/460 (Substituted on dated 08/07/2020). Chamba 2019-20 476 C/O Bhatalwan to Gadadi I Alignment being finalized. Ora road. Work pending due to non execution of gift deeds of the Pvt.land owners. Chamba 2019-20 477 Link road to left out villages II Alignment being finalized. of Sirh Panchayat (Baloo to Work pending due to non Housing Board colony). execution of gift deeds of the Pvt.land owners. Chamba 2020-21 478 Kotla to Karangar nag road I U/P in field office. (Substituted on dated 22/05/2020). Chamba 2020-21 479 Upgradation/Widening & II Manuscript DPR under MT of road from Kohladi to scrutiny in CE (KZ) Talai road. Dalhousie 2017-18 480 C/O link road alongwith I Total length of road is bridges to village Dind. 3.600km. Work has been sanctioned under BASP for jeepable road. Clearance for diversions of forest land received under FRA. Dalhousie 2017-18 481 C/O Jeepable bridge over II hydraulic data collected & Siul river to connect village forest case under Matoon with jeepable road. preparation. Dalhousie 2017-18 482 C/O link road to Village III Total length of road is Sarar. 5.600km. The work has been sanctioned under PMGSY package No.HP- 02-350. Dalhousie 2017-18 483 C/O link road to village IV Total length of road is Jagot. 4.500km. Efforts are being made for gift deeds of Pvt.land. FCA case uploaded. Dalhousie 2018-19 484 Link road from Lohani to I U/P in field office. Kilod under PWD Division Salooni. Dalhousie 2018-19 485 Link road from village II DPR sanctioned under Lahra via Dhalla in G.P. PMGSY Batch-II 2018-19 Kharjouta under Division (Chakoli road to Dhalla Salooni. package No.HP-02-347 for Rs.712.88 lacs. Dalhousie 2018-19 486 Link road from Hathni to III The total length of road is Biana in G.P. Biana under 3.460km. FCA case PWD Division Salooni. uploaded & approval is awaited. Dalhousie 2018-19 487 Link road from Rulyani to IV Total length 3.00km.forest Bathri via Dhrota under land 2.193km. & pvt.land PWD Division Dalhousie. 0.807km.involved. From Rulyani to Dharota thick forest is coming in the alignment & Drota to bathri is jeepable road & grade of existing road is very steep. The Pvt.land owners have been requested to gift their land to improve the grade of road but, they have refused to do so. As soon as the gift deeds are received the process of diversion of forest land for construction of road will be initiated.46- Dalhousie 2019-20 488 C/O 120.00mgtr.motorable I Hydraulic data under bridge over river Siul process. between Sundla and Koti. Dalhousie 2019-20 489 C/o balance work of II DPR is under preparation. Dalhousie/ Talai road in HPPWD Division Dalhousie. Dalhousie 2019-20 490 C/O link road village Sagoti III FCA case under in GP Bhajotra Km.0/0 to preparation. 7/500. Dalhousie 2019-20 491 C/O link road from Panoga IV Forest case under to Daneta Km.0/0 to 7/500. preparation. Dalhousie 2020-21 492 C/O link road to village I U/P in field office. Tribhol. Dalhousie 2020-21 493 Improvement & Metalling II Forest case sent to RO Tarring of link road to Surkhigala. village Sakrera. Dalhousie 2020-21 494 C/O road from village Kilod III U/P in field office. to village Talai. Bhatiyat 2017-18 495 C/O road from Dawala I Alignment has been Danga to Chamber Km.0/0 finalized. Total length of to 5/0 (Substituted on road is 3.700km.out of dt.05/01/2019). which length 8.330km.falls in forest area where as length of 1.670km.falls in Pvt.land. Revenue papers are being collected for preparation of forest case and the pvt.land owners have been requested to donate theif land for road construction by way of gift deeds in the name of deptt.as per Govt. policy. Bhatiyat 2017-18 496 C/O Jolna Bhated Kotla II DPR under preparation. road (Substituted on dt. 05/01/2019). Bhatiyat 2018-19 497 C/O road from Basoldha to I Total length of this road is Sukiyada via Khadander, 10.500km., forest land Draman, Bagga i/c bridges. 7.100km. & Pvt.land 3.400km. Involved. The Pvt.land owners were asked for gift deeds but they refused to do so. As soon as the people agree to give their land, forest case will be prepared. Now the concerned GP pardhan has been requested to motivate the land owners to donate their land in the name of deptt.in shape of gift deeds. Bhatiyat 2018-19 498 C/O road from Saila Mathla II The total length of the road to kainthali via Seren is 5.400km. Revenue paper Chundu Da Chulla, has been prepared the forest Dhanudi, Lahaini, Bhavled, land is 4.050km,& Fafradi i/c bridges. 1.350km.is Pvt.land. The FCA is unde preparation and loval people are being persuaded to make gift deeds for their Pvt.land coming in the agreement. Bhatiyat 2019-20 499 C/O road from Jandrog to I Private & forest land Chakki Km.0/0 to 13/0. involved. Bhatiyat 2019-20 500 C/O road from Kyod to II DPR under preparation. Malwan Km.0/0 to 3/400. Bhatiyat 2020-21 501 C/O link road from I U/P in field office. Chatrahar to Chakki, Purkhada to Rekhed, Sukyad to Bagga, Bsoldha link to Khadandar, Kakira to Katloo, Dibber Khola to Ksheer Bhotan. Dharampur 2017-18 502 C/O road Hayolag-Pangoh- I FRA got approved recently Kanda Pattan. & DPR preparation under Sub-Divn.office. Dharampur 2017-18 503 C/O Bridge over Samoun II U/P in field office. Khad on Challaila-Khadoon road. Dharampur 2018-19 504 C/O fifteen roads in Sajao- I DPR sent to Nabard by Cholthra-Gryoh Tihra area Adviser (Plg.) on dated (Substituted on 22/10/2019 for amounting dt.18/06/2019). to Rs.2724.94 lacs. Dharampur 2018-19 505 C/O fifteen roads in II DPR sent to Nabard by Sandhole-Garli- Baroti Adviser (Plg.) on dated Mandap area (Substituted 19/10/2019 for amounting on dt.18/06/2019). to Rs.1255.69 lacs. Dharampur 2018-19 506 C/O road Dossa-Ra-Daru, II DPR sent to Nabard by Putlifald, Chah, Lower Adviser (Plg.) on dated Bhrahmfald, Jhared Galu, 20/07/2019 for amounting Chanouta i/c bridge to Rs.1191.50 lacs. (Scheme given by the Hon'ble MLA in place of I&PH-RWSS scheme on dated 04/12/2018). Dharampur 2019-20 507 C/O bridge over Beas river I PPR has been sent to Govt. from Sidhpur GP, Sidhpur of India for inclusion under to Kothi Pattan. CRIF. Dharampur 2019-20 508 C/O Thana-Jhadiyar-Giroh- II U/P in field office. rosho road (substituted on dated 02/08/2019). Dharampur 2019-20 509 C/O Bridge from Brang to III Hydraulic data under Riur over Kindri Khad. preparation at Sub- Divn.level. Dharampur 2019-20 510 C/O Bridge on Barchhwad I U/P in field office. Bakrta road (Substituted from MI Scheme on dated 18/01/2020). Dharampur 2020-21 511 C/O road from Saklana- I U/P in field office. Khanoud-Bhaletoo-Kaltri. Dharampur 2020-21 512 C/O bridge over Seer Khad. II U/P in field office. Dharampur 2020-21 513 C/O bridge over Paplog on III U/P in field office. Redu road. Jhandutta 2017-18 514 C/O link road Bothu to I Pvt./ forest land involved. main road Chonta via Pump Gift deeds not available. House and Gadiyana. Jhandutta 2017-18 515 C/O link road from main II Pvt./ forest land involved. road Dharad to Samleta via Gift deeds not available. Kakkdughat & Bareta. Jhandutta 2018-19 516 C/O link road Nakhlera to II DPR sent to Nabard by Lulhar via Pasol. Adviser (Plg.) on dated 18/09/2019 for amounting to Rs.290.28 lacs. Jhandutta 2018-19 517 C/O Bridge Chhajoti to III Sanctioned under CRF in Nand-Nagraon on 2/2019. Jhandutta-Jinwin (MDR) road. (Scheme given by MLA in place of MI Scheme). Jhandutta 2019-20 518 C/o road from Jhamrarian to I Private & forest land Bharoli Kalan via Dadhog- involved. tappe i/c bridge on Saryali Khad. Jhandutta 2019-20 519 C/o road from Beri-Miyan II Private land involved. to sherad via Baghra i/c CD & MT. Jhandutta 2020-21 520 C/O road from Damehda to I Private land involved. Lower Bukhar via Upper Bukhar Km.0/0 to 6/200. Jhandutta 2020-21 521 C/O road from Bhadol to II Private land involved. Baddi Billour Km.0/0 to 3/00. Ghumarwin 2017-18 522 C/O road in Bhager, Fatoh, I Pvt./forest land involved. Khurari, Kalari, Dharai, Gift deeds not available. Sarti, Panoh i/c bridge (substituted on dated 06/10/2017). Ghumarwin 2017-18 523 Up-gradation of Lethwin to II U/P in field office. Lanta-Bela road Km.0/00 to 3/400 (substituted on dt.07/03/2020). Ghumarwin 2017-18 524 C/O road Saloua-Fagat- III Pvt./forest land involved. Dardehda-Thyula- Gift deeds not available. Pantehda-Khubban. Ghumarwin 2017-18 525 C/O link road from New IV Pvt./forest land involved. NH-21 (4-lane road) to Gift deeds not available. NH-103 via Village Palanth in GP Oahar. Ghumarwin 2017-18 526 C/O link road Daloh-Jol- V Pvt./forest land involved. Galiyan. Gift deeds not available. Ghumarwin 2017-18 527 C/O link road from Gadheru VI DPR sent to Nabard by to Bhabba-Rang-Unda- Adviser (Plg.) on dated Kawal-Kotla-Bari- 08/06/2018 for amounting Majherwan (Substituted on to Rs.215.89 lacs. Received dt.05/04/2017). back with observations on dated 30/10/2018 & reply sent to Nabard by EE Ghumarwin on dated 26/02/2019 after attend the observations. Ghumarwin 2018-19 528 C/O Link road from I Pvt./forest land involved. Dangar-Chokhna to Village Gift deeds not available. Dhaloh-Jol-Dakhyoda School upto Hamirpur Boundary i/c bridge over Sukkar khad. Ghumarwin 2018-19 529 C/O Link road from NH - II DPR under scrutiny in 103 to village Bhagdwan, Circle office. lalwan, Lethavi i/c bridge over Rohal khad. Ghumarwin 2018-19 530 C/o link road from Daghol III Pvt./forest land involved. ladraur at Vilage Koti to Gift deeds are being Kamali, Samlah ,Bhatwad, collected. Paplan, Malot i/c bridge over Drug khad. (Scheme given by MLA in place of MI scheme). Ghumarwin 2018-19 531 C/O bridge over Seer Khad IV U/P in field office. i/c approaches on Kot- Tagiar- road at RD.2/00(Substituted on dated 07/03/2020). Ghumarwin 2019-20 532 C/O link road from Bum I Pvt./forest land involved. Jahu road to Glah Galahi Gift deeds not available. Hatwar near school via Brahmli Nallah Km.0/0 to 2/0. Ghumarwin 2019-20 533 C/O Link road from Barota- II Pvt./forest land involved. Domehar-Unda Gift deeds not available. (Mihara)Km.0/0 to 3/800 i/c culvderts. Ghumarwin 2020-21 534 C/O road Ghumarwin to I Gift deeds being arranged Tikker Silh via Marohal, Soi, Ropri. Ghumarwin 2020-21 535 C/O road Nihari to II Gift deeds being arranged Chanjyar via Klot . Bilaspur 2017-18 536 C/O link road from I Pvt. Land involved. Gift Mandona to Kapkara in GP deeds not available. Saryun Khas & link road to Bhangleda. Bilaspur 2017-18 537 C/O link road Bardi to II Pvt. Land involved. Gift Bardi School and C/O link deeds not available. road to village Jukhap to Maswad i/c bridge. Bilaspur 2018-19 538 M/T on link road from I DPR sent to Nabard by Ghalyana to Jol Plakhin via Adviser (Plg.) on dated Middel School. 29/07/2019 for amounting to Rs.368.29 lacs. Bilaspur 2018-19 539 M/T on link road to villages II DPR sent to Nabard by Dharwasar upto Hadimwa Adviser (Plg.) on dated Temple Km.0/0 to 2/500. 29/07/2019 for amounting to Rs.414.96 lacs. Bilaspur 2019-20 540 C/O link road Dayoli to I DPR amounting to Rs. Ambara Sua-Suadi VP 253.13 lacs in Zonal office. Dayoli. Bilaspur 2019-20 541 C/o link road Nalti Mour to II Private land involved gift Talwada i/c bridge & C/O deeds not available. link road Baroti to Mandridhar via Nanava. Bilaspur 2020-21 542 Improvement & widening I U/P in field office. of Sakroha, Manjhwar, Jablyana, Sohar road. Bilaspur 2020-21 543 C/O road from Dharbada, II U/P in field office. Dharbyan to Halwari & C/O road from Bairi Rajadiyan to Changroo via Judani. Shri Naina 2017-18 544 C/O link road from S.N.B. I U/P in field office. Devi Ji road to village Khal Tibba in Distt. Bilaspur (Substituted on dated 13/01/2020). Shri Naina 2017-18 545 C/O road Tunnidhar to II Private/ forest land Devi Ji Shikroa via Bag Chamyara. involved. Gift deeds not available. Shri Naina 2017-18 546 C/O balance work of 317.50 NP DPR sent to Nabard by Devi Ji mtr. Span prestressed Adviser (Plg.) on dated concerete bridge at 21/03/2018 for amoounting Bagchhal over Govind to Rs.3269.02 lacs. Sagar reservoir in Bilaspur Received with observations Distt. from Nabard office & reply sent to Nabard after attend the observations by EE Bilaspur Divn.No.2 on dated 21/02/2019. Shri Naina 2018-19 547 C/O Shawahan to Katirad, I DPR amounting to Rs. Devi Ji Pagwana road km to 6/930. 959.34 lacs under Scrutiny (SH: ROFD,CD, Soling in Circle office. ,Wearing,Tarring,parapets and side drain). Shri Naina 2018-19 548 C/O road from Ghohadi to II DPR sent to Nabard by Devi Ji Sayar km. 0/0 to 3/500 (SH: Adviser (Plg.) on dated ROFD,CD,Soling,Wearing, 06/05/2020 for amounting Tarring,parapets and side to Rs.260.07 lacs. drain). Shri Naina 2019-20 549 C/O link road villages I Private/Forest land Devi Ji Gasoud to Lower aur Upper involved. Gift deeds Bholi i/c bridge over Alli awaited. Khad. Shri Naina 2019-20 550 C/O link road Neri to II Private/Forest land Devi Ji Badnoo ghanser Tunnighat. involved. Gift deeds awaited. Shri Naina 2020-21 551 C/O link road Janali, I Private/Forest land Devi Ji Kyariyan, Bharsda to involved. Gift deeds Maloun GP. Tarwad. awaited. Shri Naina 2020-21 552 C/O link road Noa to Sai II Private/Forest land Devi Ji Kanaita, Sai Bharaman i/c involved. Gift deeds C/O bridge over Gambhrola awaited. Khad. Bhoranj 2017-18 553 C/O road from village Joh II Survey work is in progress to village Chamboh via & DPR under preparation in ward No.4 in vill. Chamboh Sub-Divnl.office. a/w 2No. Bridges. Bhoranj 2018-19 554 C/O Road from Lathwan to I Gift deeds are awaited. Ladrour . Bhoranj 2018-19 555 C/O road from Awahdevi II Gift deeds are awaited. By pass to Harizan Basti via Bohan. Bhoranj 2019-20 556 C/o road Jahu to Chandruhi I Gift deeds are awaited. via Badehar, Jol Kohta i/c 2No.bridges. Bhoranj 2019-20 557 C/O road Samlog to Gouta II Gift deeds are awaited. i/c 1No. Bridge. Bhoranj 2020-21 558 C/O link road Badhani, I Gift deeds are awaited. Nagrotta, lajhyani, Kalyal, Bahanwin RSSB Bhawan i/c bridge. Bhoranj 2020-21 559 C/o link roads in left out II Gift deeds are awaited. habitation in village Saharwin, Bhiar to Kot, Seu toKasiyana, Pehanjwin to Badiyana bridge, upper Karha to Buthwin Tangre. Sujanpur 2017-18 560 C/O link road from I DPR amounting to Rs. Chabutra to Ree via Lahul. 108.38 lacs prepared. Gift deeds awaited. Sujanpur 2017-18 561 C/O link road from Sainuan II Gift deeds are awaited. Thathi via Nichla-Manjhla Bherda to Bherda Km.0/0 to 4/0 (Substituted on dt.23/07/2018). Sujanpur 2017-18 562 C/O link road from Bhaleth IV Gift deeds are awaited. to Village Ropa. Sujanpur 2018-19 563 Link road from Banalagto I Gift deeds are awaited. Rangad (G.P. Pouhanj & Rangad). Sujanpur 2018-19 564 C/O & M/T on Bajrol- II Alignment finalized & Gift Lamber-Chamarda road ( deeds are awaited. Pradhan G.P. Bajrol). GP was requested by AE for persuad the owner to donate the land. Sujanpur 2018-19 565 C/O link road from Banal to III Gift deeds are awaited. Dharkad, Dhiman Basti Pradhan GP was requeted Saluhi, Beri Vet.Hospital to for persuad the owner to Nagari Village, Bagehada to donate the land. SC Basti Bid Khas, Dhail Village to upto Jamiri khad, Thanadhar main road to upto Mehli Khad via Ropa Km.2.5 (Substituted on dt.21/10/2019). Sujanpur 2019-20 566 C/O link road from Pohanj- I Gift deeds awaited from Andral to village Bandroh. land owners. Sujanpur 2019-20 567 C/O link road from Jamer II Gift deeds awaited from khad to village Racho on land owners. Patlandar-Rangad road. Sujanpur 2020-21 568 C/O link road Tapaldhar to I U/P in field office. Bjaher via Patiyal basti. Sujanpur 2020-21 569 C/o link road Puad to Tikkri II U/P in field office. via Dharli, main road village Saghun Hira, main road village Janddu (Ridi)upto house of Bhag singh, main road village Chloh upto house Daulat Ram & C/O road Bhadmeli- Majhog-Chabot i/c const./height of bridge. Hamirpur 2017-18 570 C/O road from Village I DPR under prepation. Fafan to G.P. Ukhali. Hamirpur 2017-18 571 C/O Khatvin-Lingvi road i/c II Hydraulic data under bridge over Shukkar Khad process in Zonal office. near by Dalyahoo. Hamirpur 2018-19 572 C/O Bridge over Kunah I Alignment finalized and khad to link Bomana & Gift deeds are awaited. Lundri (PWD-Division Barsar). Hamirpur 2018-19 573 C/O Link road alongwith II Gift deeds are awaited. bridge over Nallah Dug Pradhan GP & Member of from village Bhatwara to Zila Parishad requested to Nalti via Avdhyal (PWD persuade the land owners Division Hamirpur). for gifting the land. Hamirpur 2019-20 574 Widening & Improvement I DPR amounting to Rs. of Hamirpur Galore road 2438.89 lacs under scrutiny Km.0/0 to 18/0. in Zonal office. Hamirpur 2019-20 575 Widening & Improvement II DPR prepared in Division of Kudhiar Masiana road office. Km.0/0 to 12/0. Hamirpur 2020-21 576 C/O link road Pandwin to I Private land involved. Saned via Tikker, Bhuran to Balh Km.0/0 to 4/0. Hamirpur 2020-21 577 C/o link road Jungle to II Private land involved. Galota via Gugga i/c bridge Km.0/0 to 4/0. Barsar 2017-18 578 C/O road from Ropri to I Alignment finalized. Total Kharal via Hansara Jandroh, length 11.760km. Gift deeds Choa Kathiana Saryana awaited from Pvt. Land (Substituted on dated owners. 30/10/2018). Barsar 2017-18 579 Up-gradation of road II Work being executed under Badaran to Garli via Jol State Head. Dhabriana Garli, Usnar Kalan Nara, Darkoti to Harsour (Substituted on dated 30/10/2018). Barsar 2018-19 580 C/O road from Balh, Bihal, I Alignment finalized. Total Lakhoh, Gardi to Tikker, length 3.825km. Gift deeds Sagi Da Tiyala upto Main are awaited from Pvt. Land road. owners. Barsar 2018-19 581 C/O road from Kuriyah to II Alignment finalized, total Ghangot Badu via Thedu, length 5.3km. Gift deeds are Usnad-Kotlu etc (i/c awaited from Pvt.land bridges). owners. Barsar 2019-20 582 C/O bridge over shukker I Gift deeds are awaited from Khad on Balh Rantu, Choa, Pvt.land owners. Dhamani road Tehsil Bijhari. Barsar 2019-20 583 C/o link road from Ganoh II Alignment finalized, total Brhamana via MIT Bani length 3.850km. Gift deeds Harizan Basti Ganoh are awaited from Pvt.land Brhamana Tehsil Barsar. owners. Barsar 2020-21 584 C/O link rod Dandwin to I Private / forest land Dhangota via Kharal involved. alongwith slab culverts. Barsar 2020-21 585 C/o link road Kakkar to II Private land involved. Kalwara, Peepal wala Pind via Loharka, Dabrani. Nadaun 2017-18 586 C/O Pansai-Jasai-Behrad, I Alignment finalized, total Dhanoa-Tuhni-Kashmir length 21.00km. Gift deeds with upgradation of Paniyali are awaited from Pvt.land road. owners. DPR under preparation in Divisional office. Nadaun 2017-18 587 C/O road II DPR for Rs.175.21 lacs is Pathriyan(Lachruhi)-Tikroo under scrutiny in circle Barota-Chodoo Kandrola- office. Rangas. Nadaun 2017-18 588 C/O road NH-70 to Kuthar III Survey work is in progress college- Rakkad-Kallar- & gift deeds are awaited. Bhatta. Nadaun 2018-19 589 C/O road from lower Hareta I Alignment finalized, total to Lashmai, Nagarda to length 1.9km. Gift deeds are Shani Dev Mandir Bandos, awaited. Reepul Balh Kotlu Tihari road including construction of bridge over Hareta khad at Lower Hareta Sub Division Dhaneta, XEN Barsar. Nadaun 2018-19 590 C/O link road from Thai II Gift deeds are awaited. More to Bann Jandli Gujrian, Bhaloon Panyala Amlehra road in Tehsil Nadaun Sub Division Nadaun XEN Hamirpur. Nadaun 2019-20 591 C/O road from Manpul- I DPR amounting to Rs. Mazihar-Sera road-Proa 420.29 lacs is under scrutiny Bar-Tutoo-Bangana. in E-in-Chief office. Nadaun 2019-20 592 C/O road from Seradi sidh- II Private land involved Jandoo Bahal SC basti i/c bridge. Nadaun 2020-21 593 C/O road including bridge I U/P in field office. from Kuthera Chowk-Ropa, GP.Sareri. Nadaun 2020-21 594 C/O ingtermediate road II Private land involved from Sera road-Sera- Pakhro-Manpul. Chintpurni 2017-18 595 C/O & MT of link road I There are different branches village Panglu to Mairi via of this road & land is not Meosh, Gawalsar, Snow available on all the including One Bridge. branches. However the work under State Head has been taken up in portion Gawsalasar Sanoh on which the land is available. Hence the DPR is not required for the road. Chintpurni 2017-18 596 C/O & MT of link road II DPR sent to Nabard by village Kuthiari to Kataur Adviser (Plg.) on dated Kalan via Bijapur road to 29/07/2019 for amounting Bandukian Muhalla to Rs.490.83 lacs. Hamboli Km.0/0 to 7/455. Chintpurni 2018-19 597 C/O & MT Shaheed Amol I Survey work of road has Kalia Basti Chintpurni to been complete. Hydraulic Kinnu via Raida paida data of bridge is being Duhal Bangwalan road prepared. including bridges (Substituted on dt.04/01/2019). Chintpurni 2018-19 598 C/O Road from Kharoh to II DPR prepared in Bhatehar, Behar upto Divnl.office. Godhri Sidh. Chintpurni 2019-20 599 c/O & MT of link road I Survey work of road has Kotla to mairi via Nehri been complete. Hydraulic Khalsa 1No.bridge and data of bridge is being connect DSP Mohalla prepared. Kuthera Khairla. Chintpurni 2019-20 600 C/O & MT of link road II Survey work of road has Jawar to Ghagoh High been complete. Hydraulic School via Nari Villanda data of bridge is being thapal Maslana i/c Bridge. prepared. Chintpurni 2020-21 601 C/O & MT L/R to village I Private land involved. Maloon Awarla via Mahashiya Basti U/GP Gindpur Maloon. Chintpurni 2020-21 602 C/O & MT L/r Palian II U/P in field office. Jaswanla to Basantpur under GP.Chowar. Gagret 2017-18 603 Up-gradation/ Improvement I 4Nos.Hydraulic data of link road Guglehad to submitted to Zonal office Kaloh via Upper Kutheda for evolving the GAD. Jaswala Mawa sidhiya tatehda, Oayal, Badoh road km.0/0 to 16/500 i/c 4No. bridges. Gagret 2017-18 604 Up-gradation/ Improvement II Pvt. Land involved. Efforts of link road Bhadrakala to are being made to obtain the Pirthipur Joj chowk via gift deeds from land Dagoh, Daulatpur, Dagoh lowners. Khurad road. Gagret 2018-19 605 Improvement/widening/stre I DPR approved under ngthening on Gagret Oel PMGSY-II. Ispur road at Kaloh to Shivwari, Ambota, Dhawali upto NH-3 km. 0/0 to 12/500 i/c bridge over Shivwari khad. Gagret 2018-19 606 C/O Bridge over swan river II Appraisal report sent to on Loharli to Charudoo Ministry GOI on dated road. 21/2/2019 for Rs.43.37 crores under CRF being MDR-98. Gagret 2019-20 607 C/O & MT on link road I U/P in field office. Bane-di-Hatti to Ghevat Bahed. Gagret 2019-20 608 C/O & MT on link road Joh II Pvt.land is involved. Efforts chowk to Tappa Sidh upto are being made to obtain the Gindpur Maloun i/c Bridge. gift deeds from land owners. Gagret 2020-21 609 C/O bridge over Swan river I Pvt.land is involved. Efforts on link road Marwadi to Joh are being made to obtain the via Sandhani Km.0/0 to gift deeds from land owners. 3/870. Gagret 2020-21 610 Const.& Metaling on link II Pvt.land is involved. Efforts road Raipur to Bkhana via are being made to obtain the Mallan Da-Pind Km.0/0 to gift deeds from land owners. 4/0. Haroli 2017-18 611 C/o link road village Vat- II U/P in field office. Kala via IPH Tank to Gurpalah Gondpur via Kamrota to Harijan basti Bathu. Haroli 2018-19 612 C/O road from Gondpur I Hydraulic data under Behli to Bathu Gurplah i/c finalization bridge over Gondpur Jaichand Khad. Haroli 2018-19 613 C/O road from Singa to II Private land involved. Bathri i/c bridge in between. Haroli 2019-20 614 c/O & MT of link road I Survey work completed and Labana Basti, Ispur to Dera DPR under process in Baba Bharthari (Damanian, Divisional office. GP Ispur). Haroli 2019-20 615 Improvement/widening of II Work sanctioned under Saloh Bhadouri road from PMGSY-II for amounting to Bhai Jee Mor to palakwah- Rs.815.00 lacs. Karmpur Chowk. Haroli 2020-21 616 C/O road from Baba I U/P in field office. charange Nath Ashram to Pubjab Border Jaijon via Tibian & widening of janani Polia road and C/O bridges over polian & Pubowal roads. Haroli 2020-21 617 C/O road fromLowe II U/P in field office. panjawar covering Saini Muhalla, Dhakki Muhalla up to Daulatpur link road & Nagdoli Petrol Pump via ward No.5 up to Shiv Mandir Panjawar & Maadu Ki Nihali se madan-Ka- Ghar tak village Panjawar. Una 2017-18 618 C/O link road from village I DPR sent to Nabard by Malukpur to Binewal via Adviser (Plg.) on dated G.H.S. Mjara MT, C/O link 13/05/2020 for amounting roads, village Majara to to Rs.330.14 lacs. Suchha Singh etc, Puna to Saint Soldger School, Bashdehada to Pir Sathan, IPH Scheme, Village Sanoli to Mahender Singh etc.Shanidev Temple to Punjab Border, Widening & strengthening of Village Fatehpur roads & C/O road upto Bakshi Ram house. Una 2017-18 619 C/O link road from Shiv II Field survey has been made Temple Malahat to Chatada at site & finalization of DPR via Dhesi Mohalla Village under process in Divisional Basoli & upto Majra Khai office. Basoli, Una Hamirpur road to Ward No.1 & Mohalla Brahaman to Harda wala Bag, Gurdwara Lower arni yala , Una Satoshgarh road to Swan Vela , Windeing & strengthening of Circular road village Bhadoliyan Kalan & C/O road to 10+2 school & Panchayat Ghar. Una 2018-19 620 C/O New link road from I Proper land width is not Sasan village to Pekhubela. available. Una 2018-19 621 C/O New link road from II DPR under preparation in Lalsinghi (Via Baba Beli field office & survey work Ram) to Jhalera near Brick is in progress. However Kiln. work under progress in MNP Head. Una 2019-20 622 C/O link road to Kamoon & I Proper land width is not Labana Basti from village available. Fatehwal in GP Bangarh of Una Constituency & re- construction of link road Mehatpur Handola to Ward No.5 in GP Mehatpur. Una 2019-20 623 C/O link road from village II Proper land width is not Basoli Ward No.1 (Labana available. Mohalla) to Lamlehri via Sandhal. Una 2020-21 624 Improvement & I U/P in field office. Strengthening of link road to village Malahat & Mohalla Dehrian Km.0/0 to 3/600 & C/o ring road throughout outer area of Una City from Rakkar to Jhalera. Una 2020-21 625 Improvement & II U/P in field office. strengthening of Mehatpur to santoshgarh via Basdehra Km.0/0 to 7/200. Kutlehar 2017-18 626 C/O & MT link road from I DPR sent to Adviser (Plg.) UAM road to Tiyasar via on dated 02/08/2018 for Ghuggal, Turkal, Dhabera amounting to Rs.673.63 upto Dam to Kohdra Abadi lacs. Received bk on Harijan etc. dt.15/10/18 & returned to CE(HZ) on dt.30/10/2018. Kutlehar 2018-19 627 C/O & M/Link road from I Bridge designed & DPR Dhamandari Bus Stand to under preparation. Dhamandari Devi Mandir via Rajputtan and Harizan Basti i/c 2 Nos Bridges i.e. Bridge over Sanjhot Khad- II & Bridge over Barnah khad. Kutlehar 2018-19 628 M/T Link road from Upper II DPR sent to Nabard by Thana to Kut , Chatrar to Adviser (Plg.) on dated Alsan Harizan Basti 30/06/2020 for amounting Bhiambi & village lower to Rs,404.55 lacs. Thana km. 0/0 to 6/615. Kutlehar 2019-20 629 C/O & MT of road from I U/P in field office. Olinda to Bohru Km.0/00 to 11/090 (Substituted on dt.26/05/2020). Kutlehar 2019-20 630 M/T road from Saily to II U/P in field office. Handola via Kamoon Pattian road Km.0/0 to 10/290 and C/O link road Saily to Mahadev Mandir via GPS Laubowal. Kutlehar 2020-21 631 Metalling & Tarring of road I U/P in field office. from Olinda to Bohru in Km.0/0 to 11/090. Kutlehar 2020-21 632 C/O Boul to Jhamber, Lam II U/P in field office. Nari, takka Mohalla Sainian and abadi Jhingra i/c 2No.bridges over Takka Khad & Dhamandari Khad in Km.0/00 to 12/800. Kutlehar 2020-21 633 C/O link road from III U/P in field office. Jagatkhana to upper Raipur via Baroti, ghat, Gharwarsa. Kutlehar 2020-21 634 C/O road from TMBD to IV U/P in field office. , Bagdhar & Bharari Mata Mandir Paroian Km.0/0 to 6/00.