Vidhan Sabha Question Name of Department : Public Works Starred Question No. : 3422 Date of Reply : 03-03-2021 Subject
Total Page:16
File Type:pdf, Size:1020Kb
Vidhan Sabha Question Name of Department : Public Works Starred Question No. : 3422 Date of Reply : 03-03-2021 Subject : MLA Priority Asked by : Smt. Asha Kumari (Dalhousie) Concerned Minister : Chief Minister Question Reply (a) during the last three years upto 31.01.2021, how many roads and bridges under Public Works Divisions have been listed under MLA priority; what is the latest (a) & (b) The information has been laid on the position of these roads and Table of the House. bridges; and (b) how many roads have been started, completed and how many DPRs are under preparation during this period ? Information relating to Starred Assembly Question No. 3422 asked by Smt. Asha Kumari (Dalhousie):- (a) During the last three year upto 31/01/2021, 673 roads and bridges under PWD Divisions have been listed under MLA priority. The status of these schemes is as under:- STATUS OF SCHEMES Sr.No. Schemes listed DPRs prepared (In Nos) Draft DPR DPR yet to DPR not MLA priority Sanctioned Under prepared be prepared required w.e.f. 2017-18 (In Nos) Scrutiny and under for want of due to to 31/01/2021. with checking Pvt./ forest sanction Planning/ (In Nos) land / of work in Nabard (In alignment CRIF/ Nos) issues (In priority Nos) repeated / urban area 1 673 98 109 196 261 9 STATUS OF SANCTIONED PROJECTS Sr. Status of sanctioned projects. No. Total work Work Work Tender work under process (In Nos) sanctioned Completed started (In RIDF RIDF State Total (In Nos) (In Nos) Nos) (XXV) (XXVI) Head 1 98 1 39 4 52 2 58 (b) Status of under preparation DPRs for Schemes listed under MLA Priority during last three years Total No. Schemes for which DPRs yet to be prepared = 466 Nos. (i) DPRs under preparation = 196 Nos (ii) DPRs which could not be prepared for Various reasons. Involvement of Private /Forest land = 261 Nos Priority repeated = 4 Nos Urban area = 2 Nos Sponsored under CRIF = 3 Nos The details (workwise) is appended as annexure-A Annexure-A CONSTITUENCY / WORK WISE DETAIL OF HON'BLE M.L.As PRIORITY SCHEMES W.E.F. YEAR 2003-04 TO 2020-21 UPTO 24-02-2021 Sr.N Constitue Year of Name of Scheme Pr Present Status Division o ncy Priority No. 1 2 3 5 6 7 8 1 Chopal 2017-18 C/O road from Daiya to Mashot I The existing road executed by the Chopal via Serti Malat. forest department & forest land involved. FCA case for motorable road yet to be prepared at Sub-Divn. level. 2 Chopal 2017-18 C/O road from Nevti to Rana II Forest case prepared & submitted to Chopal Kyar via Civil Hospital Nerva DFO Chopal & joint inspection bye pass. conducted. 3 Chopal 2018-19 C/o Road from Main road to II The alignment has been finalized . Chopal Thekra, Bangana, Gunsa, Total length of this road is 6.000 Km. Nakoud Pul G.P. Nerwa. which involves Forest / Private land. Partial Gift deeds have been received and Forest case will be prepared after receipt of all Gift deeds. 4 Chopal 2018-19 C/o road from Batveri Kainchi IV The alignment is finalized and forest Theog to Devathi, Shirgali, Kadharan , land is 9.500 Kms. and 4.500 Kms. Alidhar, Ghog Adshala Jatheri. Private land.. The Joint inspection is (Scheme given by the MLA in fixed for 27.01.2021 for FCA case. place of MI schemes). Gift deeds of private land are also awaited. 5 Chopal 2019-20 Up-gradation Metaling,Tyring I Road constructed by other agency Theog of road from Deha to Khatori upto 4.000 Kms and also passed for Pundar Butali Balah Ghalana Vehicular Traffic. Beyond 4.00 Km. Kishore. forest landis involved and .Joint inspection has been fixed on 27.01.2021. 6 Chopal 2019-20 Up-gradation Metaling,Tyring III DPR under preparation Chopal of road from Matal to Bamta, Shingroli Mamvi. 7 Chopal 2019-20 Up-gradation Metaling, Tarring VI This requires clearance under FCA Chopal of road from Nawan to which under process. Malkohat Kaloon Dasheya Dhagun Tuil Jhina Gheylot. 8 Chopal 2020-21 C/O road from Thithroli, II Alignment to be finalized gift deeds yet Chopal Ramdara, Telor, Karag, Banan to be received and forest case will be to Kashak and Kashak Gaad. prepared after receipt of gift deeds. 9 Chopal 2020-21 C/O road from G.P.Dewat III Alingment is finalized, total length of Chopal Shilikayan, Mashdoh. this road is 4.600 km . Gift deeds received and forest case under preparation . 10 Chopal 2020-21 C/O road from Navi Khudah, V The alignment has been finalized . Chopal Auli G.P. Tharoach. Total length of this road is 6.000 Km. which involved Forest / Private land. Partial Gift deeds have been received and Forest case will be prepared after receipt of all Gift deeds. 11 Chopal 2020-21 C/O road Deiya Kidakuffta VI The existing road was constructed by Chopal Rehosti to Churayn. the forest department The DFO Chopal has been asked to hand over the road to this department by EE letter No. 1269 dt. 5.11.2020 . 12 Theog 2017-18 C/O road from Jai-Kashoo- I The alignment has been finalized. The Theog Dhanoo-Kalahar Mandir total length is 8.00 Km.out of which Length 8Kms. forest land is 3.000 Kms. and private land is 5.000 Kms..AE Matiana vide his office letter NO.450-53 dt.17.07.2017 has requested GP Pradhan for Gift deeds. It has come to the knowledge that land owner are not ready to donate land. 13 Theog 2017-18 C/o road from village Reog- I Alignment finalized. Total length of Kumarsain Dwala -Galanaghati in GP road is 8.050 km.out of which Jadroon Tehsil Kumarsain 5.00km.Pvt.land & 3.050km. forest (Substituted from MI scheme land. FCA case has been re-uploaded on dated 23/08/2017). online on dated 4/7/19 After attending the observations. Forest case resubmitted on dt. 08/09/2020 but received back with observations. Submitted to DC Shimla for revise non availaility of Non forest land certificate by EE Kumarsain on dt. 04/12/2020. 14 Theog 2018-19 C/O road from Reog, Dawala, II Total length of this road is 8.050 Km Kumarsain Glanghatti in GP Jadhoon out of which 5.00 Km is private land Tehsil Kumarsain. and 3.050 Km is forest land. Gift deed of private land have been received and forest case has been sent to D.C. Shimla for approval vide Executive Engineer, Kumarsain letter No.9154-55 dated 4.12.2020 for non availability of forest land certificate which is still awaited. 15 Kasumpti 2017-18 C/O road from Chtog to Satoh I Pvt./foest land involved. Shimla (via Shilli Mohalla). No.I 16 Kasumpti 2018-19 C/O road from Thalot to Jhagog I The total length is 5.00 Km. which is Shimla (GP Darbhog). 4.00 Km. is forest land and 1.00 Km. is No.I private land. The alingnment of road has been fixed some gift deeds have been recived. Letter has been written to the SDM(R ) to conduct the Joint inspection vide this office letter No. 7570-72 dated 1.08.2019, but the dated has not been fixed till date. 17 Kasumpti 2018-19 C/O roads from Kamyana to III The Survey work has been completed Shimla Bisk/ Tud/ Lachot (GP Bhont). and length of road is 1.700 Km. ( total No.I forest land ).Requested to SDM, Shimla for joint inspection vide letter No. 12301-04 dated 28.09.2020. The Pradhan GP Bhont requested to provide relevant record vide letter No. 427-28 dated 03.08.2020. After collecting all relevant record from concerned department. The FCA case will be up loaded on line. 18 Kasumpti 2019-20 C/O road from Koti to village I The total length is 7.00 Km. which 6.00 Shimla Bhararia via Paradi. Km. is forest land and 1.000 Km. is No.I private land. The alingnment has been fixed all the gift deeds have been received. The forest case being submitted. 19 Kasumpti 2019-20 C/O road from Paobo Talab to II The total length is 5.330 Km.which is Shimla Kaltu via Obna. 4.00 Km. forest land and 1.330 Km. is No.I private land. The Gram Panchyat pradhan Bhont, Dumi and Cheri has been requested to provide the gift deed from private land owner which is still awaited. 20 Kasumpti 2020-21 C/O road from Kelti to Chari I The total length is 3.500 Km. which Shimla (G.P.Chari). 1.500 Km. is forest land and 2.000 Km. No.I is private land.The Pradhan GP Cheri requested for providing gift deed on dated 12.01.2021. which is still awaited. 21 Kasumpti 2020-21 C/O road from Godpa to II The total length is 1.000 Km. which Shimla Village Shildi (G.P.Pujarli). 0.300 Km. is forest land and 0.700 Km. No.I is private land.The Pradhan GP requested for providing gift deed on dated 12.01.2021. which is still awaited. 22 Shimla 2017-18 C/O link roads from Holiday I Survey work yet to be done & joint Shimla Home to bye pass road Nabha- inspection has been conducted. The No.I Phagli to Lal Pani and Lal Pani starting portion of the road about to Bye Pass road.