September 2016 Newsletter

Total Page:16

File Type:pdf, Size:1020Kb

September 2016 Newsletter Eyre Peninsula Railway Preservation Society Inc. PO Box 2736, Port Lincoln SA 5606 NEWSLETTER September 2016 HEAVY WORK AT FREIGHT SHED Museum members have been the station building and had a large cherry- undertaking two major projects in recent picker machine on site. We were fortunate months. For years now, pigeons have been a to get permission to borrow it one Saturday, big problem along the covered siding housing and two of John McGeever’s sons with the rollingstock displays. Don Atkinson has tried appropriate qualifications ‘volunteered’ their various approaches to deter them, with time to help us out, installing the netting. limited success. Our members have also installed netting The latest effort has seen large nets at the western end of the siding. It appears (recycled from the fishing industry) installed that some pigeons are still getting in by at each end of the covered siding. The devious means, so the battle hasn’t yet been installation of these nets at the eastern end won. Don still has a couple of tricks to deploy, was almost impossible using just ladders. At so hopefully we will be able to report success the time, GWA contractors were working on in a later Newsletter. Christopher and Shaun McGeever put their specialist skills to good use installing a large net across the eastern gate to the freight shed, as part of our ongoing battle to keep pigeons out. Several committee members kept a close eye on proceedings. Peter Knife EPRPS NEWSLETTER - September 2016 Page 2 Heavy Work at Freight Shed The other major effort at the freight shed assisted by Don Atkinson, Trevor Hoskin, John is still ongoing, and involves the retaining wall McGeever and Bob Prout. Unfortunately it’s around the pad on which the freight shed is not just a case of dropping the steel sleepers erected. in place. They need to be oxy-cut to fit, and For some time now deterioration of the then welded to secure them in place. wooden sleepers used in the retaining wall has been getting worse. Some of the sleepers broke, potentially allowing the fill behind the wall to spill out. Murray Wright began installing spare steel sleepers in front of the wooden ones, to strengthen the wall. Earlier this year a routine inspection of the premises by GWA revealed the presence of termites. As owners of the structure, GWA decided that all of the wooden sleepers would eventually have to be removed from the retaining wall and replaced with steel ones. They have supplied a quantity of steel sleepers to Above: The original retaining wall structure, using second- assist. hand wooden sleepers. For the last couple of months working bees have been held. Murray has been Below: Work in progress on the rebuilt wall. Peter Knife EPRPS NEWSLETTER - September 2016 Page 3 FRESH LOOK FOR STATION BUILDING The roof of Port Lincoln’s lovely stone to their original state. The most obvious station building has been leaking for some difference is the adoption of ‘Heritage Red’ time, threatening to damage the structure. for the roof and much of the trim. Over the last few months GWA have engaged The end result is a building which is not contractors to re-roof the building and to only waterproof, but now presents a stunning repaint all external woodwork and metalwork. face – the red is a huge improvement on the As the building is heritage listed, approval AN-era yellowish colour! for the work from the Heritage Council was We congratulate GWA on undertaking the needed. The approval included using specific work. The building is now in pristine condition, colours, and returning the external details ideally timed for its 90th anniversary early such as downpipes as closely as possible next year. Above: Initial work saw the verandah roofing replaced. Left: All roofing was renewed and all external wood and metalwork was repaired (if needed) and repainted. Below: The final result. Superb! Peter Knife EPRPS NEWSLETTER - September 2016 Page 4 TRAIN FROM LOCK TO PORT LINCOLN – 1920s This story was written by the late Violet Irene Grace Berryman (later Lear, then Solly). It describes a journey she made by train which didn’t quite work out as anticipated. Thanks to Sue Olsen for this very interesting piece. Late in the year 1927 I took a job as The train consisted of engine, guards companion to a lady by the name of Mrs van, 13 freight trucks, 1 passenger carriage Christmas. Her husband was stationed at Lock in and brake van. Near Warrachie siding we Central Eyre Peninsula. He was overseer of the struck trouble. The line was built on a high water pipe line from the Tod Reservoir. His job embankment of red clay which had been was to check the pipe line for leaks or damage softened by the heavy rain causing the and necessitated his absence from home for sleepers to sink and rails to spread. We felt a several days, travelling by horse and buggy. giant tug and the train stopped. Heads popped They had recently arrived from South Africa out from windows and what a sight we saw. and Mrs Christmas had a mild heart complaint The engine and guards van were still on the and was nervous of being left on her own, so line as were our carriage and the brake van. I was offered the job of ‘companion’ which In between the thirteen freight trucks hung turned out to be ‘maid of all work’ as well. suspended over the side of the embankment The job was not without its ‘perks’, as like a giant necklace. sometimes Mr C would only have to be away We couldn’t believe our luck when we saw one day in which case (weather permitting) how close our carriage had come to derailment. we would accompany him in the cart, taking We all clambered out on to the wet clay and lunch and boiling the billy in true Aussie style cameras began to click. Then we noticed the – crossed green stick from the gum tree, on guard shinning up the nearest telephone pole top of the billy to prevent the water from with a portable phone. When he came down tasting smoky. I loved the outdoor trips. he started counting the passengers. ‘Why are Towards the end of summer in 1928, the you counting us’ I asked, feeling like one of district suffered one of the longest and most a load of sheep. Port Lincoln wants to know severe heat waves on record. For 10 days the if it’s worthwhile sending a relief train was temperature soared between 114 and 122 his reply. After another conversation on the degrees Fahrenheit. Every day birds came in portable phone he announced that a relief from the mallee scrub which surrounded the train was on its way from Cummins. With 4-roomed corrugated iron house in which we the help of the passengers everything was lived to drink the water we put out for them unloaded from the brake van (including mail under the verandah. Some toppled over and and our luggage) and piled up in the mud died there. awaiting the relief train. Feeling low after the long hot spell I A woman with 5 children had been began to suffer from tooth ache and when travelling since early morning and had no food the summer ended with a severe thunder left. The little ones began to cry and say they storm and rain I decided to go to Port Lincoln were hungry. Among the passengers, on the for dental treatment. I boarded the train in first leg of his trip to England was Mr Malby, early afternoon. It was due in Port Lincoln store keeper and Postmaster from Pygery. He at 6pm in time for the mail to go aboard the did a whip around among the passengers and Motor Vessel Minnipa which left Port Lincoln collected food for the children. I remember for Port Adelaide at 7pm. handing over a packet of orange slice biscuits EPRPS NEWSLETTER - September 2016 Page 5 Train From Lock to Port Lincoln – 1920s (bought from Mr Cliff Cabot at the Lock General Please keep your seats when we get to Port Store). Others had sandwiches and cake which Lincoln as we will be going straight down the they willingly parted with for the kids. After jetty where the Minnipa is waiting for the a couple of hours the relief train arrived. mail – she is already 2 hours late. Everyone cheered but were rather taken This took about ½ hour. What tired aback when it turned out to be an engine and but thankful people tumbled out on to the a guards van. However the 14 passengers and platform when at last we returned to the our luggage were squeezed in like sardines and station. I climbed into the buggy for the 12 we set off. On reaching Cummins it was dark. mile trip home. Mr Malby and another passenger alighted and came back with hot pasties and buns From thePort Lincoln Port Times Lincoln (SA : 1927 - 1954), Times, Friday 7 June7 June1929, page 1929: 1 and coffee for everyone. A very kind gesture I never forgot. We then continued on to Port Lincoln – leaving our coffee cups at Edillilie to Accident Near Wstrrachie. be returned on the next train. The remainder of the trip was very quiet R jnnipa Delayed Two Hours. as we were all tired and the children asleep Owing to the derailment of the pcesenger train near Warrachie on on our laps. the ', Wednesday, Minuipa,' which was due to leave for Port Adelaide at 7 I remembered my father telling me when p.m.
Recommended publications
  • Professional Report
    Rail Tram & Bus Union National Office Attachment 1 RTBU Analysis of Eyre Peninsula Grain Transport February 2003 Contents Introduction .......................................................................................................1 Grain Product Diversification............................................................................2 Continued Growth in Grain Production............................................................2 Operational Efficiency of Eyre Peninsula Rail .................................................3 a) Summer Heat Restrictions ......................................................................3 b) Inland Silo load-out rates .........................................................................3 c) Track Speeds ...........................................................................................3 d) Port Lincoln wagon discharge rates........................................................3 e) Short crossing loops ................................................................................3 f) Grain receival time at Port Lincoln ...........................................................4 g) Track and loco quality..............................................................................4 Security in Grain Supply to Export Shipping....................................................5 True Cost of Road Transport ...........................................................................5 Cooperation in a networked industry ...............................................................5
    [Show full text]
  • Annual Report Details the Last 12 Months Activity Undertaken by the EPLGA, Its Financial Accounts, and Operative Regional Collaborative Partnerships
    EYRE PENINSULA LOCAL GOVERNMENT ASSOCIATION A N N U A L R E P O R T 2019-20 W W W . E P L G A . C O M . A U Authors: Peter Scott Executive Officer Eyre Peninsula Local Government Association Sue Henriksen Business Support Officer Regional Development Australia Eyre Peninsula Inc. Cover photo: Murphy's Haystacks, Eyre Peninsula. Photo: SATC. Eyre Peninsula Local Government Association THE PRESIDENT’S REPORT This annual report details the last 12 months activity undertaken by the EPLGA, its financial accounts, and operative regional collaborative partnerships. The vision and goal of the EPLGA, to “enable Eyre Peninsula councils to excel, innovate, and thrive”, has never been more relevant for the region than now. We have been facing many challenges and opportunities, with the need for the councils of the EP to be working closely together. The EPLGA has seen a change in the position of Executive Officer, with Tony Irvine retiring at the end of 2019. The contribution which Tony has made over many years of involvement with local government on the Eyre Peninsula deserves recognition, especially his time as the EPLGA Executive Officer. The EPLGA is in a much stronger position due to the work which has been done by Tony over his tenure. Peter Scott was appointed in February 2020, bringing with him already established knowledge and relationships from his prior employment. With this appointment, there was also developed a shared service agreement with RDAEP to deliver economic development projects agreed with a joint workplan arrangement. These new and unique arrangements will help local government have a strong interest in economic development and also make economic savings for both organisations.
    [Show full text]
  • Annual Report 2009-2010
    Annual Report 2009 - 2010 Adopted 1 November 2010 N20101358 City of Port Lincoln Annual Report 2009 - 2010 Table of Contents Message from the Mayor .......................................................................................................................................... 1 Chief Executive Officers Message .............................................................................................................................. 2 City of Port Lincoln Map ............................................................................................................................................ 4 City of Port Lincoln Statistics ..................................................................................................................................... 5 Members of Council .................................................................................................................................................. 6 Business Premises...................................................................................................................................................... 6 Structure & Functions of Council ............................................................................................................................... 7 Meeting Attendance .................................................................................................................................................. 7 Ordinary Council ...................................................................................................................................................
    [Show full text]
  • Attachment 04
    CENTRAL EYRE IRON PROJECT MINING AND DEVELOPMENT APPLICATION GOVERNMENT REQUEST FOR RESPONSE DOCUMENT LETTER Attachment 04 105 Public Submissions Volume 3 of 4 Submissions 050 to 074 Submission Public Submission Name Page Number Number 050 STRINGER LAND P/L - STRINGER ENGINEERING P/L 248 051 NAME & ADDRESS WITHHELD 251 052 RADCLIFFE, BARBARA, DR 252 053 ROCKWELL AUTOMATION 253 054 NAGEL, JAMES 255 055 WUDINNA DISTRICT COUNCIL 256 056 MURPHY, KANE 266 057 NAME & ADDRESS WITHHELD 270 058 NAME & ADDRESS WITHHELD 283 059 OSMOFLO 286 060 BROUGHAM, PETER & PAM 288 061 HEGARTY, KM 319 062 NAME & ADDRESS WITHHELD 323 063 EDWARDS, MARK 325 064 EP CRUSHING 330 065 SKYDEN FARMS 332 066 SMEC 333 067 MURPHY, WENDY 335 068 MURPHY, DAVID 343 069 DISTRICT COUNCIL OF KIMBA 349 070 ADAMS, JAMES 350 071 NAME & ADDRESS WITHHELD 351 072 NAME & ADDRESS WITHHELD 354 073 KRACMAN, BORVIN 356 074 DODD, GEOFFREY 358 Central Eyre Iron Project - Public Submissions 03/09/2016 Page 247 of 917 Central Eyre Iron Project - Public Submissions 03/09/2016 Page 248 of 917 Central Eyre Iron Project - Public Submissions 03/09/2016 Page 249 of 917 Central Eyre Iron Project - Public Submissions 03/09/2016 Page 250 of 917 Central Eyre Iron Project - Public Submissions 03/09/2016 Page 251 of 917 Central Eyre Iron Project - Public Submissions 03/09/2016 Page 252 of 917 Central Eyre Iron Project - Public Submissions 03/09/2016 Page 253 of 917 Central Eyre Iron Project - Public Submissions 03/09/2016 Page 254 of 917 Central Eyre Iron Project - Public Submissions 03/09/2016 Page 255
    [Show full text]
  • Port Lincoln Locomotive Depot and Workshops PLACE: 26501 ADDRESS
    HERITAGE ASSESSMENT REPORT NAME: Port Lincoln Locomotive Depot and Workshops PLACE: 26501 ADDRESS: Le Brun Street, Port Lincoln, 5606 DESCRIPTION Coal dump & crane Divisional Store (6) Railcar Shed (5) Turntable (1) Carpenters’ MIC Shed (7) Shop Painters’ Shop Roundhouse (2) Loco Shop (3) Amenities (4) Aerial image of the Port Lincoln Locomotive Depot and Workshops as it was in 1967 Source: Map Land courtesy of the nominator The Port Lincoln Locomotive Depot and Workshops is comprised of several buildings, sheds and structures and a network of railway tracks; including a turntable (1), roundhouse (2) and workshop (3), amenities building (4), divisional store (6) and motor inspection car shed (7). Note: each (number) refers to the component identified in the Site Plan for the depot and workshops at the time of Assessment. Heritage South Australia, DEW 1 Port Lincoln Locomotive Depot and Workshops (26501) Turntable (1) Turntable 1927 Source: DEW Files 24 October 2019 The turntable is 75ft. (approx. 23m) in diameter and comprises a pit with an earth floor and concrete-lined sides. A rail around the circumference of the pit supports a large metal-framed rail platform that rotates within the pit. A small shed is located at one end of the platform for the driver. There is also an A-frame metal gantry that sits across the rail platform and once supplied electricity to the turntable. Roundhouse (2) & Railcar Shed (5) 5-Bay Roundhouse 1932 (right) and Railcar addition 1934 (left) Source: DEW Files 24 October 2019 Although initially proposed as a 13-bay roundhouse1, only a 5-bay roundhouse was constructed in 1932.
    [Show full text]
  • Annual Report 2018-2019
    City of Port Lincoln ANNUAL REPORT 2018-2019 Adopted by Council 18 November 2019 FINAL201956 18.68.1 $BQUVSF 1PSU Courtesy of Kane Taylor -JODPMO JO B Courtesy of Kane Taylor 'SBNF Front Cover Photo: Courtesy of Callum Forsyth Courtesy of Craig Musselwhite 2018-2019 ANNUAL REPORT Contents MESSAGE FROM THE MAYOR ................................................................................................................. 6 MESSAGE FROM THE CEO ....................................................................................................................... 7 CITY OF PORT LINCOLN OUR COMMUNITY, OUR PLACE ........................................................................ 9 Introduction ........................................................................................................................................ 9 Our Vision ............................................................................................................................................ 9 Our Mission ....................................................................................................................................... 10 Our Principles and Values ................................................................................................................. 10 Our Goals .......................................................................................................................................... 11 Council’s Goals for 2016-2026 .....................................................................................................
    [Show full text]
  • E-F-82-TEM-0026 0 (Geology Govermental
    Central Eyre Iron Project Environmental Impact Statement APPENDIX Y SOCIAL IMPACT ASSESSMENT COPYRIGHT Copyright © Iron Road Limited, 2015 All rights reserved This document and any related documentation is protected by copyright owned by Iron Road Limited. The content of this document and any related documentation may only be copied and distributed for the purposes of section 46B of the Development Act, 1993 (SA) and otherwise with the prior written consent of Iron Road Limited. DISCLAIMER Iron Road Limited has taken all reasonable steps to review the information contained in this document and to ensure its accuracy as at the date of submission. Note that: (a) in writing this document, Iron Road Limited has relied on information provided by specialist consultants, government agencies, and other third parties. Iron Road Limited has reviewed all information to the best of its ability but does not take responsibility for the accuracy or completeness; and (b) this document has been prepared for information purposes only and, to the full extent permitted by law, Iron Road Limited, in respect of all persons other than the relevant government departments, makes no representation and gives no warranty or undertaking, express or implied, in respect to the information contained herein, and does not accept responsibility and is not liable for any loss or liability whatsoever arising as a result of any person acting or refraining from acting on any information contained within it. CENTRAL EYRE IRON PROJECT SOCIAL BASELINE AND SOCIAL IMPACT ASSESSMENT TECHNICAL REPORT E-F-34-RPT-0037 APRIL 2015 Revision Issue Date Revision Description Document Writer Authorised By B 8/4/15 Final Rose Bowey H Franks This page intentionally left blank Final CEIP Social Baseline and Social Impact Assessment Report 30/10/2015 Page 2 of 201 Prepared by Rose Bowey and Associates Contents List of Figures ...........................................................................................................................................................
    [Show full text]
  • June 2012 Newsletter
    Eyre Peninsula Railway Preservation Society Inc. PO Box 2736, Port Lincoln SA 5606 NEWSLETTER June 2012 EP RAILWAY PEOPLE A display of photographs of railway some of those in the photos whose names people on Eyre Peninsula was prepared as the were not known. museum’s contribution to the 2012 History Les Walter was responsible for putting Festival. The photos were taken from the the display together, and produced a large museum’s archives, and ranged from the number of panels which were on display earliest days of the railway to more recent in the breezeway area. We had quite a few times. The opportunity was also taken during interested visitors during May, looking to see preparation of the displays to try to identify if family members were included. A portion of the displays which Les Walter put together for the History Festival. The breezeway area has been put to good use since the gates were installed. EPRPS NEWSLETTER - June 2012 Page 2 850’s BIRTHDAY PARTY The 50th anniversary of SAR loco 850 was marked at the Port Lincoln Railway Museum on 24th March 2012. Leading up to the event it was increasingly unlikely that 850 itself would be present as it was working out at Thevenard on the gypsum trains. However, a locomotive transfer unexpectedly occurred and 850 arrived back in town at 6:30 that morning hauling 1601 and 1604. GWA very kindly placed the locomotive adjacent to the museum for the day. A pleasing crowd of over 40 people attended the occasion. The museum had mounted a photographic display covering 850’s delivery to Port Lincoln and subsequent working life on Eyre Peninsula.
    [Show full text]
  • Whalers Way Orbital Launch Complex Release of an Eis for Public Comment
    DEVELOPMENT ACT 1993 WHALERS WAY ORBITAL LAUNCH COMPLEX RELEASE OF AN EIS FOR PUBLIC COMMENT Pursuant to Section 46 of the Development Act 1993 on 29 August 2019 the then Minister for Planning declared the Whalers Way Orbital Launch Complex proposal by SouthernLaunch.Space Pty Ltd (Southern Launch) a Major Development. The proposal is for the development of a multi-user rocket launch facility (for placing small satellites in orbit) at Sleaford, approximately 25km south-west of Port Lincoln. The Guidelines were referred to the State Planning Commission (SPC) for examination in accordance with the requirements of the Development Act 1993. The SPC confirmed that the proponent must prepare a detailed Environmental Impact Statement (EIS) in respect of the proposal, and accordingly issued assessment Guidelines outlining the key issues which the EIS must address. These were publicly released on 20 August 2020. The delegate for the Minister advises that Southern Launch has now prepared the EIS, which has been released for public comment from Thursday 5 August 2021 until Thursday 16 September 2021. Obtaining a copy of the EIS The full EIS document is available online, without cost, via the following link: https://plan.sa.gov.au/en/state_developments. Hard copies are also be available for viewing at the locations listed below. USB copies of the full EIS along with a hard copy of the Executive Summary are available free of charge. • Attorney-General’s Department, Planning and Land Use Services (AGD-PLUS): Level 5, 50 Flinders Street, Adelaide • City of Port Lincoln Council: Level 1, Civic Centre, 60 Tasman Terrace, Port Lincoln • District Council of Lower Eyre Peninsula: Railway Terrace, Cummins Hard copies of the full EIS may be purchased at a cost of $500 per copy from the addresses above, or by mail order for an extra $10 (includes GST and postage) from AGD-PLUS, telephone (08) 7109 7018.
    [Show full text]
  • Eyre Peninsula Local Government Association Immediately Started the Lobbying Process for Upgrades to Roads Across the Region to Deal with the Increased Road Activity
    Mission Statement As an elected level of government, the Wudinna District Council will provide leadership, representation and advocacy for its community. It will be accessible and work with the community to identify and provide for its needs efficiently and meet its aspirations. The Council will operate with integrity and be open and accountable to the community in all of its activities. Mayor’s Message Mayor Eleanor Scholz How quickly another year has gone by! We had the Council Elections last November. A big thank you to Tony Griffin for his contribution to Council over the past 5 and a half years. With Tony leaving we then welcomed Liz Habermann as our new Councillor and begun our next four-year term. We were soon into another busy year. It was with great pleasure that we saw the final section of the Kyancutta- Mt Wedge Road sealed. A big project between the two Councils, assisted with the Commonwealth’s Special Roads Funding. We celebrated with an Opening by Federal Member for Grey, Rowan Ramsey and the Works Teams from both Elliston and Wudinna Councils. Thanks to our local Works Team for their efforts and for keeping up with our local road works program as well. With 2018-19 being a drier season, we soon saw paddocks drifting over local roads, a reminder of just how fragile our land is. Our Council along with others from across Eyre Peninsula and drier sections of the State were invited to attend a session with the Commonwealth Drought Commissioner, as a result we were included in the Drought Funding Project for Councils with a 6- month timeframe to spend the funds.
    [Show full text]
  • Annual Report and Financials 2020
    Annual Report 2019/2020 www.epcf.com.au [email protected] Our Mission: The Eyre Peninsula Community Foundation enables the people of the Eyre Peninsula to proactively contribute to the long term benefit of our region by: Building community endowment Addressing local needs through charitable grant making Encouraging philanthropy Geographical Area of the Eyre Peninsula Community Foundation This is a vast area stretching from the Gawler Rangers in the north to Port Lincoln in the south and from the Spencer Gulf in the east to the border of South Australia and Western Australia This region encompasses the cities of Port Lincoln and Whyalla and the District Councils of Ceduna, Cleve, Elliston, Franklin Harbour, Kimba, Lower Eyre Peninsula , Streaky Bay, Tumby Bay and Wudinna as well as part of the region serviced by the Outback Communities Authority Eyre Peninsula Community Foundation Patrons Peter Treloar MP—Patron Tony Irvine—Patron Born and raised on a farm near Cummins, Peter Treloar MP is a fierce and devoted advocate for the Eyre Peninsula. Tony Irvine commenced a career in Local Government from Peter went straight into agriculture after finishing school (at September 1991 and has been a Chief Executive Officer in Cummins Area School and Prince Alfred College) where he Local Government from 1993 to 2020 (except for a break of enjoyed a long and rewarding career. twelve months in 2011 where he managed his own consulting From this he has a particular understanding of small business business). and the pressures the sector experiences. He is a member of the Australian Institute of Company Peter believes that the natural environment underpins our Directors, an Associate of the Institute of Municipal communities.On Eyre Peninsula the issue of water security is Management, member of the Local Government Managers of forefront, and one of his first achievements as an MP was to Australia and a Justice of Peace (since September 1992).
    [Show full text]
  • EYRE PENINSULA COMMUNITY FOUNDATION Annual Report 2017
    EYRE PENINSULA COMMUNITY FOUNDATION Annual Report 2017/2018 “YOUR SUPPORT STRENGTHENS OUR COMMUNITY” www.epcf.com.au or [email protected] Our Mission: The Eyre Peninsula Community Foundation enables the people of the Eyre Peninsula to proactively contribute to the long term benefit of our region by: Building community endowment Addressing local needs through charitable grant making Encouraging philanthropy Geographical Area of the Eyre Peninsula Community Foundation This is a vast area stretching from the Gawler Rangers in the north to Port Lincoln in the south and from the Spencer Gulf in the east to the border of South Australia and Western Australia This region encompasses the cities of Port Lincoln and Whyalla and the District Councils of Ceduna, Cleve, Elliston, Franklin Harbour, Kimba, Lower Eyre Peninsula , Streaky Bay, Tumby Bay and Wudinna as well as part of the region serviced by the Outback Communities Authority General Fund is a “TCC” Tax Concession Charity NON TAX DEDUCTABLE DONATIONS It holds money for specific ”Theme” &“Named” Funds. It can make grants to DGR’s and other organisations and individuals deemed appropriate by the Trustee Trust Fund is a “DGR” Deductable Gift Recipient TAX DEDUCTABLE DONATIONS It holds money for GENERAL FUND specific “Theme” & TRUST FUND “Named” Funds DISASTER FUND It can make grants only to other DGR’s Disaster Fund is a “DGR” Deductable Gift Recipient TAX DEDUCTABLE DONATIONS It can make grants to other DGR’s & individuals in necessitous circumstances Eyre Peninsula Community Foundation Patrons Peter Treloar MP—Patron Tony Irvine—Patron Born and raised on a farm near Cummins, Peter Treloar MP is a fierce Tony Irvine has been a Chief Executive Officer in Local Government and devoted advocate for the Eyre Peninsula.
    [Show full text]