Phase I Environmental Site Assessment Woodhouse Business and Enterprise College
Total Page:16
File Type:pdf, Size:1020Kb
Phase I Environmental Site Assessment Woodhouse Business and Enterprise College On Behalf of: Staffordshire County Council 5th May 2009 Final Issue No 2 49309293/ DERP0001 DERP0001 Phase I ESA Woodhouse FINAL.doc Phase I Environmental Site Assessment Woodhouse Business and Enterprise College, Tamworth, UK Project Title: Phase I Environmental Site Assessment Report Title: Woodhouse Business and Enterprise College, Tamworth, UK Project No: 49309294 Report Ref: DERP0001 Status: Final Client Contact Name: Michelle Corbett Client Company Name: Staffordshire County Council Issued By: URS Corporation Ltd Derwent Business Centre Clarke Street Derby DE1 2BU Tel: + 44 (0) 1332 364 159 Fax: + 44 (0) 1332 340 357 www.urseurope.com Document Production / Approval Record Issue No: Name Signature Date Position 1 Prepared Louise Butler 16 th April 2009 Senior by Environmental Consultant Prepared Gavin Campbell 17 th April 2009 Project Engineer by Checked Peter Gratwick 17 th April 2009 Senior Project by Manager Approved Russell Cullen 17 th April 2009 Project Director by Document Revision Record Issue No Date Details of Revisions 1 17 th April 2009 Original draft issue. 2 5th May 2009 Final issue. DERP0001 Phase I ESA Woodhouse FINAL.doc Final 5th May 2009 49309294 / DERP0001 Phase I Environmental Site Assessment Woodhouse Business and Enterprise College, Tamworth, UK LIMITATION URS has prepared this Report for the sole use of Staffordshire County Council in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by us. This Report may not be relied upon by any other party without the prior and express written agreement of URS. Unless otherwise stated in this Report, the assessments made assume that the site and facilities will continue to be used for their current purpose without significant change. The conclusions and recommendations contained in this Report are based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested. Information obtained from third parties has not been independently verified by URS, unless otherwise stated in the Report. Where assessments of works or costs required to reduce or mitigate any environmental liability identified in this Report are made, such assessments are based upon the information available at the time and where appropriate are subject to further investigations or information which may become available. Costs may therefore vary outside the ranges quoted. No allowance has been made for changes in prices or exchange rates or changes in any other conditions, which may result in price fluctuations in the future. Where assessments of works or costs necessary to achieve compliance have been made these are based upon measures which, in URS’ experience, could normally be negotiated with the relevant authorities under present legislation and enforcement practice, assuming a reasonable approach by site management. Whilst cost estimates are provided for individual issues in this report these are based upon information at the time which can be incomplete. Cost estimates for such issues may therefore vary from those provided. Where costs are supplied, these estimates should be considered in aggregate only. No reliance should be made in relation to any division of aggregate costs, including in relation to any issue, site or other subdivision. Issues and liabilities in this report relate to one-off exceptional expenditure only. Such issues will include those items that would normally be included in ‘Capital Expenditure’ budgets but only where these are in excess of any specified materiality threshold specific to this project. Issues or costs, which would normally be included within the ongoing operational expenditure of the site, are excluded, except where specifically included. COPYRIGHT © This Report is the copyright of URS Corporation Limited. Any unauthorised reproduction or usage by any person other than the addressee is strictly prohibited. DERP0001 Phase I ESA Woodhouse FINAL.doc Final 5th May 2009 49309294 / DERP0001 Phase I Environmental Site Assessment Woodhouse Business and Enterprise College, Tamworth, UK CONTENTS Section Page No EXECUTIVE SUMMARY................................................................................................................ I 1. INTRODUCTION.............................................................................................................. 1 1.1. Objectives......................................................................................................................... 1 1.2. Scope of Services ............................................................................................................ 1 1.3. Report Organisation ......................................................................................................... 2 2. SITE DESCRIPTION........................................................................................................ 3 2.1. Site Location..................................................................................................................... 3 2.2. Site Features .................................................................................................................... 3 2.3. Adjacent and Surrounding Land Use ............................................................................... 3 3. ENVIRONMENTAL SETTING ......................................................................................... 5 3.1. Topography ...................................................................................................................... 5 3.2. Geology ............................................................................................................................ 5 3.3. Hydrogeology ................................................................................................................... 5 3.4. Hydrology ......................................................................................................................... 6 3.5. Coal Mining Search.......................................................................................................... 6 3.6. Designated Sensitive Sites .............................................................................................. 6 3.7. Radon............................................................................................................................... 6 3.8. Overall Sensitivity............................................................................................................. 6 4. SOIL & GROUNDWATER CONTAMINATION ISSUES................................................. 8 4.1. History of the Site and Surrounding Area ........................................................................ 8 4.1.1. Site History....................................................................................................................... 8 4.1.2. Surrounding Land History ................................................................................................ 8 4.2. Regulatory Database Search ........................................................................................... 8 4.3. Previous Reports............................................................................................................ 10 4.4. Potential On-Site Sources of Contamination ................................................................. 10 4.4.1. Current Sources ............................................................................................................. 10 4.4.2. Historic Sources ............................................................................................................. 10 4.5. Potential Off-Site Sources of Contamination ................................................................. 10 4.5.1. Current Sources ............................................................................................................. 10 4.5.2. Historic Sources ............................................................................................................. 11 4.6. Summary of Soil & Groundwater Issues ........................................................................ 11 5. CONCLUSIONS............................................................................................................. 12 FIGURES PHOTOGRAPH LOG APPENDIX A - ENVIROCHECK REPORT DERP0001 Phase I ESA Woodhouse FINAL.doc Page i 5th May 2009 49309294/ DERP0001 Phase I Environmental Site Assessment Woodhouse Business and Enterprise College, Tamworth, UK EXECUTIVE SUMMARY URS Corporation Ltd (‘URS’) was appointed by Staffordshire County Council (the Client) to conduct a Phase I Environmental Site Assessment (‘ESA’) of Woodhouse Business and Enterprise College (‘WBEC’) located at Highfield Avenue, Amington, Tamworth, B77 3JB, UK. The objective of the Phase I ESA was to identify significant potential environmental issues within a 1km radius that may become a constraint to the Tamworth Academy development, and allow the design of a targeted Phase II investigation. Information about the subject site and surrounding properties was obtained from URS’ site reconnaissance and a document review, which included an Envirocheck Report commissioned from Landmark Information Group Ltd. No significant risk of contamination was identified from the current operation of the site as