Local Railway Items from Area Papers

Total Page:16

File Type:pdf, Size:1020Kb

Local Railway Items from Area Papers Local Railway Items from Area Papers - Chalk River subdivision 15/02/1861 Perth Courier Chalk River Smiths Falls (excerpt from B&O superintendent’s report) The want of water supply at Smiths Falls and Franktown is a cause of considerable detention to the trains in winter as it is not unusual that it is necessary to run five or six miles expressly for water. Were there tanks at these places, the men at the stations could do the pumping and therefore save the expense of keeping a man at Montague Ballast Pit. A statement of the various works necessary to be done during the present year, with the estimated cost of the same is hereby appended. 1861 Estimated Expenditures Tank Houses and fixtures at Smiths Falls and Franktown -..$1000 03/04/1868 Perth Courier Chalk River Almonte (excerpt from B&O annual report for 1867) …the tank-houses at Bellamy’s and Almonte were destroyed by fire, and had to be rebuilt; … 30/06/1871 Almonte Gazette Chalk River Almonte WIND MILL. – A windmill has recently been placed on the tank in this place by the B. & O. R. Co., for the purpose of raising water to the cistern. An immense amount of manual labor will be saved by thus utilizing the airy element. 30/06/1871 Almonte Gazette Chalk River Almonte Almonte Gazette 30 June 1871. WIND MILL. – A windmill has recently been placed on the tank in this place by the B. & O. R. Co., for the purpose of raising water to the cistern. An immense amount of manual labor will be saved by thus utilizing the airy element. 11/12/1879 Ottawa Free Press Chalk River Sand Point water The Canada Central Railway have constructed a new water tank at Sand Point. The water is pumped from the lake by a powerful engine. 06/02/1880 Ottawa Citizen Chalk River Franktown Brockville 4th. It appears that the train which arrives here at 7.40 in the evening is timed to cross the express going to Ottawa at Carleton Place Junction but last evening the Grand Trunk train was over an hour late and the Ottawa train waited for it. After waiting at Carleton Place for some time, the conductor of the express coming south received an order from the train dispatcher to cross the Ottawa train at Franktown. The above train proceeded to Franktown and the conductor and engineer went into the station to receive their orders. The station master was out, he having gone down the track to signal the train coming from the south. The conductor and engineer on coming out of the station house heard the other train coming, when the engineer jumped on his engine and reversed her, but by this time the train from the south was in close proximity and a collision could not be avoided. The engineer and fireman of the express coming south jumped and the two engines came together with a crash. The engine on the Ottawa train was not much damaged but the other was badly smashed, but not bad enough to stop its backward motion. It ran the train back for nearly two miles, the only employee on board being a brakeman who at last succeeded in stopping the train. The night was very stormy and signals could only be observed a short distance. An investigation will be held when further particulars may be expected. 23/08/1881 Ottawa Citizen Chalk River Pembroke Pembroke Post. A train of thirteen cars containing the first of Mr. Allan Grant's timber from Kippawa passed through Pembroke last Friday about noon. The timber was driven down in single sticks from Kippawa to Mackie's station where it was loaded on the cars and goes direct to the Commissioner's Wharf at Quebec by rail. It is a splendid lot of very fine white pine of good girth and dimension and in excellent condition. Quite a crowd of lumbermen viewed it while it stopped here and their comments and opinions on the manufacture and appearance after such a long drive were exceedingly complimentary. It will no doubt find a ready market when it reaches its destination. An extra engine had to be put on the train between here and the Government Road. There will now be a continuous freight travel between Mackie's eastward until the timber is all taken down, the authorities having promised to send down if possible two trains a day containing about 600 feet, to carry down the timber of the Scotch Syndicate represented by Mr. Allan Grant. Another train of cars went own last Saturday. 31/08/1881 Ottawa Citizen Chalk River water The Canadian Pacific Railway is finding some trouble in securing an adequate supply of water from the tanks along the line as for the past fortnight there has not been sufficient wind to move the mills with force enough to pump the water. The result has been that train hands have been compelled to pump the water into the tanks by hand. This is the first time in the history of the road that such a contingency has arisen. 19/04/1882 Ottawa Citizen Chalk River Upwards of 500 men arrived by the QMO&O at the Union Station at a late hour last night from Montreal on their way too commence work on the extension of the Canadian Pacific Railway near Pembroke. They proceeded by special train to Pembroke at an early hour this morning. 19/05/1882 Renfrew Mercury Chalk River Pembroke The railway company intend to straighten the track on the east end of the railway bridge at Pembroke. This will necessitate the removal of the present station and wood shed. The change will be made about the end of this month. 19/05/1882 Renfrew Mercury Chalk River Arnprior The C.P.R. is putting in another siding at the Arnprior station. The business of the road has been largely increased of late, and new sidings have been added to nearly all stations on the line. Arnprior Chronicle. 26/06/1882 Ottawa Citizen Chalk River Sand Point Sand Point. William O'Connor, working at the ballast pit at this station was accidentally run over by a ballast train this afternoon and only lived about thirty minutes after the accident. It seems that during the dinner hour this train was lying in a pit siding and the deceased laid down under one of the cars and fell asleep. 30/06/1882 Ottawa Citizen Chalk River Out of consideration for the wants of the public the Canadian Pacific Railway have put a mixed train on that portion of their line between Carleton Place and Pembroke. The new arrangement is a great boon to the travelling community. 14/08/1882 Ottawa Citizen Chalk River Trains are now running as far as Callendar on the CPR for conveying passengers. The telegraph has been constructed to that point to operate the road. September-21-21 Colin J. Churcher © Page 1 of 119 17/08/1882 Pontiac News Chalk River Sand Point The railway authorities have opened a gravel pit at Sand Point and now have a considerable number of men at work therein. It makes quite a stir in this little village. 07/09/1882 Pontiac News Chalk River Lumberman's Train Next week the Canadian Pacific will run a lumberman's train service, conveying lumbermen, employes, teams and supplies in the one train, making the distance to Mattawa Station from Ottawa in 12 hours. This will prove a very great accommodation and saving to the trade. Not many years ago the same distance took a couple of weeks. 23/11/1882 Ottawa Citizen Chalk River Almonte It is understood by the Almonte people that a new iron bridge will shortly replace the one at present spanning the river there, and that other important railway improvements are contemplated by the Canadian Pacific Railway authorities. The depot will in all likelihood be removed to the opposite side of the track from where it at present stands. 02/02/1883 Renfrew Mercury Chalk River Almonte The Almonte Railway Bridge. The wooden bridge on the Canadian Pacific railway over the Mississippi river there was removed on Sunday last, and replaced by an iron structure consisting of ten spans. The time occupied in removing the old bridge and completing the new one was only 20 hours. Considerable indignation was expressed by the citizens that the Sabbath should have been chosen to accomplish this work. 09/02/1883 Renfrew Mercury Chalk River Pembroke On Wednesday morning a smash up occurred on the railway at Pembroke which caused a temporary commotion. A number of cars were shunted out on to the pile bridge on Tuesday night and left there. Next morning, before daylight, the Mattawa train with a number of cars attached, came along and ran into them. There were a number of men sleeping in the stationary cars at the time. The men were heaved around the cars with much velocity, but fortunately none were seriously hurt. The cars were considerably wrecked. Had the engine been running at full speed the accident would have proved more serious. Observer. 15/03/1883 Ottawa Free Press Chalk River Carleton Place Messrs. Baker and Blackwell of the C.P.R. were in Carleton Place a few days ago. A local paper said their object was to consider the removal of the heaviest of the machinery in the works there to the new shops at Hochelaga. Since the destruction of the shops at Brockville the entire repairs and new work have been done at Carleton Place.
Recommended publications
  • Canada's G8 Plans
    Plans for the 2010 G8 Muskoka Summit: June 25-26, 2010 Jenilee Guebert Director of Research, G8 Research Group, with Robin Lennox and other members of the G8 Research Group June 7, 2010 Plans for the 2010 G8 Muskoka Summit: June 25-26, Ministerial Meetings 31 2010 1 G7 Finance Ministers 31 Abbreviations and Acronyms 2 G20 Finance Ministers 37 Preface 2 G8 Foreign Ministers 37 Introduction: Canada’s 2010 G8 2 G8 Development Ministers 41 Agenda: The Policy Summit 3 Civil Society 43 Priority Themes 3 Celebrity Diplomacy 43 World Economy 5 Activities 44 Climate Change 6 Nongovernmental Organizations 46 Biodiversity 6 Canada’s G8 Team 48 Energy 7 Participating Leaders 48 Iran 8 G8 Leaders 48 North Korea 9 Canada 48 Nonproliferation 10 France 48 Fragile and Vulnerable States 11 United States 49 Africa 12 United Kingdom 49 Economy 13 Russia 49 Development 13 Germany 49 Peace Support 14 Japan 50 Health 15 Italy 50 Crime 20 Appendices 50 Terrorism 20 Appendix A: Commitments Due in 2010 50 Outreach and Expansion 21 Appendix B: Facts About Deerhurst 56 Accountability Mechanism 22 Preparations 22 Process: The Physical Summit 23 Site: Location Reaction 26 Security 28 Economic Benefits and Costs 29 Benefits 29 Costs 31 Abbreviations and Acronyms AU African Union CCS carbon capture and storage CEIF Clean Energy Investment Framework CSLF Carbon Sequestration Leadership Forum DAC Development Assistance Committee (of the Organisation for Economic Co- operation and Development) FATF Financial Action Task Force HAP Heiligendamm L’Aquila Process HIPC heavily
    [Show full text]
  • Alternative North Americas: What Canada and The
    ALTERNATIVE NORTH AMERICAS What Canada and the United States Can Learn from Each Other David T. Jones ALTERNATIVE NORTH AMERICAS Woodrow Wilson International Center for Scholars One Woodrow Wilson Plaza 1300 Pennsylvania Avenue NW Washington, D.C. 20004 Copyright © 2014 by David T. Jones All rights reserved. No part of this book may be reproduced, scanned, or distributed in any printed or electronic form without permission. Please do not participate in or encourage piracy of copyrighted materials in violation of author’s rights. Published online. ISBN: 978-1-938027-36-9 DEDICATION Once more for Teresa The be and end of it all A Journey of Ten Thousand Years Begins with a Single Day (Forever Tandem) TABLE OF CONTENTS Introduction .................................................................................................................1 Chapter 1 Borders—Open Borders and Closing Threats .......................................... 12 Chapter 2 Unsettled Boundaries—That Not Yet Settled Border ................................ 24 Chapter 3 Arctic Sovereignty—Arctic Antics ............................................................. 45 Chapter 4 Immigrants and Refugees .........................................................................54 Chapter 5 Crime and (Lack of) Punishment .............................................................. 78 Chapter 6 Human Rights and Wrongs .................................................................... 102 Chapter 7 Language and Discord ..........................................................................
    [Show full text]
  • The Bonnechere River System W Y LER L IL I M E R Deep River D Lac Lac Mcdonald Sheen Dam Stream/River BAGGS RD Kean H !N Lake U N
    ! ! ! ! LAMURE RD Lac Esher RB ME A BAL Lac des Îles Head, Clara BANTING DR Y North G R U D T Lac Rouge & Maria Z M à l'Oiseau Lake A N R D BR ON SO N R D Lac LEADER RD Lackey D R Explore the Bonnechere River System W Y LER L IL I M E R Deep River D Lac Lac McDonald Sheen Dam Stream/River BAGGS RD Kean H !n Lake U N D T S R KINGS RD R Perch N D Lake B Bridge Bonnechere River System A )" OT E T AWA K S T Lac à la Truite ! Emm a LAW RD RAILWAYPLANT ST RD Communities Water Lake ! Chalk River S MAIN ST A N D Sturgeon Algonquin Park R County Road D Lake CART IER LAKE RD Young Corry Lake Lake Rorke C DELU RD LOUT THIER Provincial Park Lake HIER R Lac Provincial Highway D Hurdman D R Federal Land Lake E Municipal Maintained Road S C Travers W R L M A O D E E M S D H R R NE R P E ELI E AS I B D N S C L First Nation Reserve T S A I Municipal Seasonal Maintained Road A A A P R N K Y L B R E K RD A IN D K R L E D R D Eganville Cartier M Private Road ID Lake D L E Centre Lake R D Crown Road Municipal Boundary ORANGE RD B P A A RD T D E T S ALIZ S R TOT MESSER TRAIL L E C D H Roads Outside County E R R E S D E N R K A D O L A H R E E E L Lac Tucker K E C C CREST RD Allumette Lac H ickey Sopw ith A Lake U R T R Lake D VERITABLE RD Clemow Lake ARRAS RD D Garrison R ! Petawawa E Laurentian Y M P Lac M R E Hart Ro wan Lake O S Hills S B LVD Lac Noir IA ST TOR Petawawa VIC EAST ST D ! Petawawa ! LAURENTIAN DR R D JAN DR Lac E R Lily Lac S RD E E G NS Bellemare R T A MA T UET T HER O Q R PA PETAWAWA O CHAD ST Grand Lake H RD P P E E TERRACEPROVINCIAL T C Z A Lac du Bois Dur T PARK G A N C W A MURPHY RD A E L R R A N W R N L R LA BARRON SH IR A V H AM BA N L AC L L I E A TIMM RD RIVERPROVINCIAL SS A R A D B I S GUTZMAN RD ! MURPHY RD S D PARK ! L Québec R R T V KE L D T Barron A Black Bay E R L OELKE ST D T EY N Lac URV N Lake S BL D I ACK H R O Coulonge B O CK P AY SA C R BLACK BAY RD P L D K E I RADTKE RD M N R YA DORAN RD KA D B S TRAIL USKIE D KOSS LN RD White RD R R S RIVE Partridge ER SHADY LN M BRUMM RD St.
    [Show full text]
  • Transportation
    TRANSPORTATION POLICY BRIEFING THE HILL TIMES, APRIL 6, 2015 TRANSPORT MINISTER LISA RAITT NDP MP HOANG MAI Pilot behaviour seen in Germanwings crash Railway safety: a disconcerting lack of ‘would not happen in Canada’: Raitt regulatory oversight CONSERVATIVE MP LARRY MILLER LAC-MÉGANTIC Miller says House Transport Committee’s Getting the big picture right: regulating rail report will help strengthen transportation transportation of crude oil after safety in Canada Lac-Mégantic disaster LIBERAL MP DAVID MCGUINTY AIR TAXIS Canadians continue to be deeply concerned Government needs to support smaller about rail safety, and rightly so. airports as TSB investigates air taxis LASER STRIKES RAIL SAFETY Transport Canada data indicates rates of laser Opposition supporting rail safety bill to boost strikes continue to rise ministerial oversight, shipper liability ASIA TRADE Grain competing with other products in western rail as Asian trade prioritized 20 THE HILL TIMES, MONDAY, APRIL 6, 2015 TRANSPORTATION POLICY BRIEFING Q&A LISA RAITT Pilot behavior seen in Germanwings crash ‘would not happen in Canada’: Raitt BY RACHEL AIELLO to market. So if we’re signing all timistic that it’ll go through and I these free trade agreements, we am grateful for the support of the ransport Minister Lisa Raitt need to make sure the entire sup- opposition.” Tsays she’s confi dent the ply chain is ready to go and fi ring current annual medical checks and that’s what he’s doing. The new Railway Safety Manage- for Canadian pilots are enough “So for me, day-to-day, it’s ment System (SMS) regulations to ensure the safety of all aboard about safety, but the bigger picture came into effect April 1.
    [Show full text]
  • Stronger Ties: a Shared Commitment to Railway Safety
    STRONGER TIES: A S H A R E D C O M M I T M E N T TO RAILWAY SAFETY Review of the Railway Safety Act November 2007 Published by Railway Safety Act Review Secretariat Ottawa, Canada K1A 0N5 This report is available at: www.tc.gc.ca/tcss/RSA_Review-Examen_LSF Funding for this publication was provided by Transport Canada. The opinions expressed are those of the authors and do not necessarily reflect the views of the Department. ISBN 978-0-662-05408-5 Catalogue No. T33-16/2008 © Her Majesty the Queen in Right of Canada, represented by the Minister of Transport, 2007 This material may be freely reproduced for non-commercial purposes provided that the source is acknowledged. Photo Credits: Chapters 1-10: Transport Canada; Appendix B: CP Images TABLE OF CONTENTS 1. INTRODUCTION ...............................................................1 1.1 Rationale for the 2006 Railway Safety Act Review . .2 1.2 Scope . 2 1.3 Process ....................................................................................3 1.3.1 Stakeholder Consultations . .4 1.3.2 Research . 6 1.3.3 Development of Recommendations .......................................6 1.4 Key Challenges for the Railway Industry and the Regulator.................7 1.5 A Word of Thanks .................................................................... 10 2. STATE OF RAIL SAFETY IN CANADA ...................................11 2.1 Accidents 1989-2006 ................................................................. 12 2.2 Categories of Accidents . 13 2.2.1 Main Track Accidents...................................................... 14 2.2.2 Non-Main Track Accidents ............................................... 15 2.2.3 Crossing and Trespasser Accidents . 15 2.2.4 Transportation of Dangerous Goods Accidents and Incidents . 17 2.3 Normalizing Accidents . 18 2.4 Comparing Rail Safety in Canada and the U.S.
    [Show full text]
  • Lobbying of Canadian Diplomats (2010) of It,” She Says
    Canada’s Strategic Resources: Getting the ‘net benefit’ test right—Pages 11-18 EMBASSYCANADA’S FOREIGN POLICY NEWSWEEKLY OTTAWA, WEDNESDAY, JANUARY 12, 2011 ISSUE 336 • $3.00 A year later, Haiti remains a riddle wrapped HAITI in an enigma FINDING A WAY Anca Gurzu pages 8-9 early three months after a mas- Nsive earthquake left parts of Haiti in complete devastation, Foreign Affairs Minister Lawrence Cannon stood in front of hundreds of interna- tional delegates at the United Nations in New York speaking about a long- term vision. “While today’s conference is a land- mark event in Haiti’s reconstruction, it LOBBYING should by no means be interpreted as GARY DOER TOP TARGET the end of a process,” he said on March 31. “It is one of the first milestones on page 3 a long road upon which we have just embarked, and Canada is ready to stand by Haiti’s side as long as required.” At the time, with the Afghanistan mission set to wrap up in 2011, many IVORY COAST ‘DE-RECOGNITION’ had expected, if not outright encour- PHOTO: SAM GARCIA aged, the government to make Haiti CATCHES AFRICANS Canada’s next top foreign policy pri- UNAWARES ority. There were many reasons to EMBASSY do so, including geographic proxim- A new hand or chairs on the deck of the Titanic? Prime Minister Stephen Harper started the year off with a mini-Cabinet page 5 shuffle that saw Peter Kent become Canada’s new environment minister and Diane Ablonczy take over as minister of state for ity, the large number of Haitians in the Americas.
    [Show full text]
  • Ottawa Central Railway, Spareboard, December 2007
    December, 2007 V3N12 NB GOVERNMENT LOOKING AT IMPROVING FREIGHT RAIL SERVICE As momentum builds to fast track an Atlantic Gateway initiative and a Southern New Brunswick Gateway around Saint John, the time is right to look at how rail transportation can be improved, says Doug Johnson, an assistant deputy minister for the New Brunswick Department of Transportation. It's the right idea at the right Photo courtesy OCR time, says Johnson, who sees railway Getting set for the journey ahead, Canadian military vehicles are loaded and transportation as a means to combat ready to roll from Pembroke, ON. Ottawa Central Railway commenced rising oil prices and climate change. loading on January 10th with completion January 18th. "We only see the opportunity as being more important on rail over time for our people in New Brunswick," he said. "There are New Power for Inside The Spareboard some types of commodities that GO Transit Vol 3 No 12 move best in a railcar." • “Backtrack” 2 An added benefit of rail is the GO trains will soon carry more • Fern’s Rule of the Month 2 significant reductions in greenhouse passengers thanks to a fleet of • From the ‘Dining Car’ 3 gas emissions versus truck traffic. A powerful new locomotives. Ontario • Incidents & Accidents 4 locomotive can carry the capacity of Premier Dalton McGuinty and GO • Performance Indicators 5 & 10 • “Steele Rail” by Don Steele 6 20 transport trucks, emitting 50% Transit officials unveiled the new • Birthdays/Anniversaries 8 less carbon dioxide per kilometre. locomotive January 14th at Toronto’s • From “The Corner Office” 9 Johnson said the Liberal Union Station.
    [Show full text]
  • Arctic Policy &
    Arctic Policy & Law References to Selected Documents Edited by Wolfgang E. Burhenne Prepared by Jennifer Kelleher and Aaron Laur Published by the International Council of Environmental Law – toward sustainable development – (ICEL) for the Arctic Task Force of the IUCN Commission on Environmental Law (IUCN-CEL) Arctic Policy & Law References to Selected Documents Edited by Wolfgang E. Burhenne Prepared by Jennifer Kelleher and Aaron Laur Published by The International Council of Environmental Law – toward sustainable development – (ICEL) for the Arctic Task Force of the IUCN Commission on Environmental Law The designation of geographical entities in this book, and the presentation of material, do not imply the expression of any opinion whatsoever on the part of ICEL or the Arctic Task Force of the IUCN Commission on Environmental Law concerning the legal status of any country, territory, or area, or of its authorities, or concerning the delimitation of its frontiers and boundaries. The views expressed in this publication do not necessarily reflect those of ICEL or the Arctic Task Force. The preparation of Arctic Policy & Law: References to Selected Documents was a project of ICEL with the support of the Elizabeth Haub Foundations (Germany, USA, Canada). Published by: International Council of Environmental Law (ICEL), Bonn, Germany Copyright: © 2011 International Council of Environmental Law (ICEL) Reproduction of this publication for educational or other non- commercial purposes is authorized without prior permission from the copyright holder provided the source is fully acknowledged. Reproduction for resale or other commercial purposes is prohibited without the prior written permission of the copyright holder. Citation: International Council of Environmental Law (ICEL) (2011).
    [Show full text]
  • This Railroad Makes a Good Case for Keeping up With
    NEWS&PHOTOS gallons of diesel fuel, indicating a burn of roughly 30 gallons per equipment required, and that’s when OCR entered with its offer to less and adds more customer value in terms of stewardship of the carload, high by U.S. standards. One reason is train speed. OCR provide equipment assuming certain operating parameters were customers’ goods than any of the other five indicators. In its month- shares the 117 miles between Coteau and its Walkley Yard terminal met. Adding two days per turn would kill the economics for OCR ly “Spareboard” employee newsletter (one of the nicest such letters in Ottawa with VIA, where track speeds are in excess of 60 mph. It as well, thus the emphasis on car-cycle times. I’ve seen), OCR posts monthly observations by employees, as well as ROY BLANCHARD also maintains its own 90-mile main to Pembroke at 50 mph. Another of the OCR performance measures is the percentage of a running total of noncompliance by rule. Even though engineers are instructed to keep speeds below 40 weekly car placements that fall within guarantees made to custom- The railroad averages nearly 200 observations per month yet the This short line makes a good mph to conserve fuel, that’s still double the speed found on most of ers. James Allen, OCR’s general manager, said the line expects 98 incidence of noncompliance per month can be counted on the fin- the 500-plus U.S. short lines. So why, you ask, does OCR run at percent, but that placements were on time 99 percent this year.
    [Show full text]
  • 2004-1101-Ottawa-Central-ETT-4.Pdf
    OUR MISSION To be our customers’ preferred supplier of transportation logistics services to help them meet the needs of their own customers. BASIS OF OUR MISSION To make a significant contribution to our customers’ commercial success by providing safe, efficient and cost- effective transportation logistics services. OTTAWA CENTRAL RAILWAY TIME TABLE NO. 4 Effective Monday November 1st, 2004 REFER TO PAGE 2 FOR EFFECTIVE TIME AND FOR OTHER TIME AND DATE CHANGES THAT WILL OCCUR JAMES ALLEN GENERAL MANAGER OTTAWA ONT LUC LAROSE TRANSPORTATION SUPERVISOR OTTAWA ONT. TIME TABLE NO 4 OTTAWA CENTRAL RAILWAY Page 2 November 1st 2004 MAJOR CHANGES TO TIME TABLE NO 4 Information previously contained in the monthly- re-issue of bulletins has been placed in the subdivisions to which it applies. System Special Instructions containing Rule changes and Special Instructions have been revised. General Operating Instructions have been revised Rule 105(a) is applicable on all non-main tracks except tracks at Smurfit Stone. Beachburg Sub RTC Standby Channel has Changed. Main track ends at mile 85.0 Speeds on the North and South Freight shed leads and the Sheffeild Industrial have changed Renfrew Sub RTC Standby Channel has Changed Vankleek Sub RTC Standby Channel, tones and DTMF Codes have Changed L'Orignal Sub RTC Standby Channel, tones and DTMF Codes have Changed TIME TABLE NO 4 OTTAWA CENTRAL RAILWAY Page 3 November 1st 2004 EFFECTIVE 0001 Monday November 1st, 2004 on Beachburg, Renfrew ,Vankleek and L'Orignal Subdivisions Governed by: Eastern Standard Time Commencing at 0100 Sunday, October 31st, 2004 Eastern Daylight Saving Time Commencing at 0300 Sunday April 3rd, 2005 Eastern Standard Time Commencing at 0100 Sunday, October 30th, 2005 THIS TIME TABLE IS FOR THE INFORMATION AND GUIDANCE OF OCR EMPLOYEES AND OTHERS WHO HAVE BEEN AUTHORIZED TO USE IT.
    [Show full text]
  • Revitalization of Rail Passenger Service
    REVIVING RAIL PASSENGER SERVICE IN NORTHERN ONTARIO ‘IS IT POSSIBLE AND HOW CAN IT HAPPEN’ A DISCUSSION PAPER Prepared and developed by: W.H. (Howie) Wilcox, cmilt Transportation Logistics Consultant Sault Ste. Marie, ON September 21, 2009 INTRODUCTION: This paper has been produced to give a brief history of the dilution of passenger train service in the north, what it looks like today and how it could possibly be revised with the right attention in key areas. The concepts contained herein are those of the writer only with very little input from any other source other than research of information available in the public domain. Some of the ideas put forth are easily implemented with few adjustments to current systems while others are more complicated – possibly requiring government intervention, especially from the Province of Ontario. HISTORY: With advent of the opening of the Trans Canada Highway around Lake Superior and the introduction of regularly, scheduled air services from the north, the rail passenger services of both Canadian Pacific and Canadian National slowly declined and VIA Rail was created to take their places. Eventually, VIA consolidated its runs so that it only operates on the CN Transcontinental line through Sudbury to Winnipeg. Communities like Thunder Bay, Dryden and Kenora lost their passenger services. The Sault Ste. Marie to Sudbury Budd car that was so badly marketed (poor connections and slow service), many abandoned it for other means and service was discontinued in 1976. Only a few services survived until today and they are maintained because the areas serviced are considered remote with no other means of conveyance.
    [Show full text]
  • Archaeology Stage 1
    Stage 1 Archaeological Assessment Pinnacle View Subdivision Development Prepared for: Kevin Mooder Jp2g Consultants Inc. 1150 Morrison Dr, Suite 410 Ottawa, ON K2H 8S9 Phone: 613-828-7800 Fax: 613- email:[email protected] Prepared by: Cameron Heritage Consulting 5021-25 Civic Centre Road Petawawa, ON K8H 0B1 Phone (613) 281-3838 email: [email protected] C.H.C. Project #2017011A PIF Number:P371-0017-2017 Courtney Cameron (License Number P371) ORIGINAL REPORT March 2, 2018 Cameron Heritage Consulting Stage 1 Archaeological Assessment Pinnacle View Subdivision Development EXECUTIVE SUMMARY A Stage 1 Archaeological Assessment was completed under the scope of the Planning Act in preparation for the construction of a housing development in Renfrew, ON. The Proposed Development Area (PDA) is located within Lot 14 Concession 1, Horton Township (Geo.), Town of Renfrew, County of Renfrew, Ontario. The PDA is approximately 15 ha and is bounded on the southwest by an old rail bed, to the southeast and northeast by the backyards of houses along Aberdeen Street, Mason Avenue and McAndrew Ave, and to the northwest an agricultural field. The Stage 1 Archaeological Assessment included consultation with local heritage organizations, reviews of aerial imagery, archaeological potential maps, national topographic maps, physiographic maps and early maps of the area. In addition, information regarding known archaeological sites in the vicinity, land grants, and historical reference books for the PDA was reviewed. A site visit to assess archaeological potential was conducted November 29, 2017. Based upon the review of background material and the site visit, there are areas with and without potential for the presence of archaeological resources within the PDA.
    [Show full text]