Local Railway Items from Ottawa Papers - 2011
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Croa 3266: Bullen, N.: Discipline Rule Violation Dismissed
CANADIAN RAILWAY OFFICE OF ARBITRATION CASE NO. 3266 Heard in Montreal, Wednesday, 12 June, 2002 concerning VIA RAIL CANADA INC. and BROTHERHOOD OF LOCOMOTIVE ENGINEERS EX PARTE DISPUTE: The 45 demerit marks assessed Locomotive Engineer N. Bullen. EX PARTE STATEMENT OF ISSUE: On November 12, 2000, Locomotive Engineers P. Kozusko and N, Bullen were assigned to train no. 45 travelling from Ottawa to Toronto. While stopped at Brockville entraining and detraining passengers, Engineer P. Kozusko was at the controls of the locomotive and Engineer Bullen was on the platform. Following the completion of the station work the locomotive passed signal 1257N1 indicating stop located at the west end of the platform. The incident was reported and an investigation was held. Both engineers were heavily disciplined as a result. The Brotherhood appeals the discipline assessed to Engineer Bullen who was not on the locomotive at the time of the incident. FOR THE BROTHERHOOD: (SGD.) J. R. TOFFLEMIRE GENERAL CHAIRMAN There appeared on behalf of the Corporation: E. J. Houlihan – Senior Manager, Labour Relations, Montreal G. Benn – Officer, Labour Relations, Montreal G. Selesnic – Manager, Customer Services And on behalf of the Brotherhood: J. R. Tofflemire – General Chairman, Oakville M. Grieve – Local Chairman, Toronto CROA 3266 AWARD OF THE ARBITRATOR The material before the Arbitrator confirms that while operating Train No. 45 from Ottawa to Toronto on November 12, 2000 Locomotive Engineers Bullen and Kozusko made a regular scheduled stop at Brockville. As they entered the Brockville station they stopped at the station platform facing signal 1257N1 on the Kingston Subdivision. In accordance with normal procedure, once the passengers had been detrained and entrained, Mr. -
Summary of the 2018 – 2022 Corporate Plan and 2018 Operating and Capital Budgets
p SUMMARY OF THE 2018 – 2022 CORPORATE PLAN AND 2018 OPERATING AND CAPITAL BUDGETS SUMMARY OF THE 2018-2022 CORPORATE PLAN / 1 Table of Contents EXECUTIVE SUMMARY ............................................................................................................................. 5 MANDATE ...................................................................................................................................... 14 CORPORATE MISSION, OBJECTIVES, PROFILE AND GOVERNANCE ................................................... 14 2.1 Corporate Objectives and Profile ............................................................................................ 14 2.2 Governance and Accountability .............................................................................................. 14 2.2.1 Board of Directors .......................................................................................................... 14 2.2.2 Travel Policy Guidelines and Reporting ........................................................................... 17 2.2.3 Audit Regime .................................................................................................................. 17 2.2.4 Office of the Auditor General: Special Examination Results ............................................. 17 2.2.5 Canada Transportation Act Review ................................................................................. 18 2.3 Overview of VIA Rail’s Business ............................................................................................. -
Stronger Ties: a Shared Commitment to Railway Safety
STRONGER TIES: A S H A R E D C O M M I T M E N T TO RAILWAY SAFETY Review of the Railway Safety Act November 2007 Published by Railway Safety Act Review Secretariat Ottawa, Canada K1A 0N5 This report is available at: www.tc.gc.ca/tcss/RSA_Review-Examen_LSF Funding for this publication was provided by Transport Canada. The opinions expressed are those of the authors and do not necessarily reflect the views of the Department. ISBN 978-0-662-05408-5 Catalogue No. T33-16/2008 © Her Majesty the Queen in Right of Canada, represented by the Minister of Transport, 2007 This material may be freely reproduced for non-commercial purposes provided that the source is acknowledged. Photo Credits: Chapters 1-10: Transport Canada; Appendix B: CP Images TABLE OF CONTENTS 1. INTRODUCTION ...............................................................1 1.1 Rationale for the 2006 Railway Safety Act Review . .2 1.2 Scope . 2 1.3 Process ....................................................................................3 1.3.1 Stakeholder Consultations . .4 1.3.2 Research . 6 1.3.3 Development of Recommendations .......................................6 1.4 Key Challenges for the Railway Industry and the Regulator.................7 1.5 A Word of Thanks .................................................................... 10 2. STATE OF RAIL SAFETY IN CANADA ...................................11 2.1 Accidents 1989-2006 ................................................................. 12 2.2 Categories of Accidents . 13 2.2.1 Main Track Accidents...................................................... 14 2.2.2 Non-Main Track Accidents ............................................... 15 2.2.3 Crossing and Trespasser Accidents . 15 2.2.4 Transportation of Dangerous Goods Accidents and Incidents . 17 2.3 Normalizing Accidents . 18 2.4 Comparing Rail Safety in Canada and the U.S. -
Ottawa Central Railway, Spareboard, December 2007
December, 2007 V3N12 NB GOVERNMENT LOOKING AT IMPROVING FREIGHT RAIL SERVICE As momentum builds to fast track an Atlantic Gateway initiative and a Southern New Brunswick Gateway around Saint John, the time is right to look at how rail transportation can be improved, says Doug Johnson, an assistant deputy minister for the New Brunswick Department of Transportation. It's the right idea at the right Photo courtesy OCR time, says Johnson, who sees railway Getting set for the journey ahead, Canadian military vehicles are loaded and transportation as a means to combat ready to roll from Pembroke, ON. Ottawa Central Railway commenced rising oil prices and climate change. loading on January 10th with completion January 18th. "We only see the opportunity as being more important on rail over time for our people in New Brunswick," he said. "There are New Power for Inside The Spareboard some types of commodities that GO Transit Vol 3 No 12 move best in a railcar." • “Backtrack” 2 An added benefit of rail is the GO trains will soon carry more • Fern’s Rule of the Month 2 significant reductions in greenhouse passengers thanks to a fleet of • From the ‘Dining Car’ 3 gas emissions versus truck traffic. A powerful new locomotives. Ontario • Incidents & Accidents 4 locomotive can carry the capacity of Premier Dalton McGuinty and GO • Performance Indicators 5 & 10 • “Steele Rail” by Don Steele 6 20 transport trucks, emitting 50% Transit officials unveiled the new • Birthdays/Anniversaries 8 less carbon dioxide per kilometre. locomotive January 14th at Toronto’s • From “The Corner Office” 9 Johnson said the Liberal Union Station. -
This Railroad Makes a Good Case for Keeping up With
NEWS&PHOTOS gallons of diesel fuel, indicating a burn of roughly 30 gallons per equipment required, and that’s when OCR entered with its offer to less and adds more customer value in terms of stewardship of the carload, high by U.S. standards. One reason is train speed. OCR provide equipment assuming certain operating parameters were customers’ goods than any of the other five indicators. In its month- shares the 117 miles between Coteau and its Walkley Yard terminal met. Adding two days per turn would kill the economics for OCR ly “Spareboard” employee newsletter (one of the nicest such letters in Ottawa with VIA, where track speeds are in excess of 60 mph. It as well, thus the emphasis on car-cycle times. I’ve seen), OCR posts monthly observations by employees, as well as ROY BLANCHARD also maintains its own 90-mile main to Pembroke at 50 mph. Another of the OCR performance measures is the percentage of a running total of noncompliance by rule. Even though engineers are instructed to keep speeds below 40 weekly car placements that fall within guarantees made to custom- The railroad averages nearly 200 observations per month yet the This short line makes a good mph to conserve fuel, that’s still double the speed found on most of ers. James Allen, OCR’s general manager, said the line expects 98 incidence of noncompliance per month can be counted on the fin- the 500-plus U.S. short lines. So why, you ask, does OCR run at percent, but that placements were on time 99 percent this year. -
2004-1101-Ottawa-Central-ETT-4.Pdf
OUR MISSION To be our customers’ preferred supplier of transportation logistics services to help them meet the needs of their own customers. BASIS OF OUR MISSION To make a significant contribution to our customers’ commercial success by providing safe, efficient and cost- effective transportation logistics services. OTTAWA CENTRAL RAILWAY TIME TABLE NO. 4 Effective Monday November 1st, 2004 REFER TO PAGE 2 FOR EFFECTIVE TIME AND FOR OTHER TIME AND DATE CHANGES THAT WILL OCCUR JAMES ALLEN GENERAL MANAGER OTTAWA ONT LUC LAROSE TRANSPORTATION SUPERVISOR OTTAWA ONT. TIME TABLE NO 4 OTTAWA CENTRAL RAILWAY Page 2 November 1st 2004 MAJOR CHANGES TO TIME TABLE NO 4 Information previously contained in the monthly- re-issue of bulletins has been placed in the subdivisions to which it applies. System Special Instructions containing Rule changes and Special Instructions have been revised. General Operating Instructions have been revised Rule 105(a) is applicable on all non-main tracks except tracks at Smurfit Stone. Beachburg Sub RTC Standby Channel has Changed. Main track ends at mile 85.0 Speeds on the North and South Freight shed leads and the Sheffeild Industrial have changed Renfrew Sub RTC Standby Channel has Changed Vankleek Sub RTC Standby Channel, tones and DTMF Codes have Changed L'Orignal Sub RTC Standby Channel, tones and DTMF Codes have Changed TIME TABLE NO 4 OTTAWA CENTRAL RAILWAY Page 3 November 1st 2004 EFFECTIVE 0001 Monday November 1st, 2004 on Beachburg, Renfrew ,Vankleek and L'Orignal Subdivisions Governed by: Eastern Standard Time Commencing at 0100 Sunday, October 31st, 2004 Eastern Daylight Saving Time Commencing at 0300 Sunday April 3rd, 2005 Eastern Standard Time Commencing at 0100 Sunday, October 30th, 2005 THIS TIME TABLE IS FOR THE INFORMATION AND GUIDANCE OF OCR EMPLOYEES AND OTHERS WHO HAVE BEEN AUTHORIZED TO USE IT. -
Summary of the 2017 – 2021 Corporate Plan and 2017 Operating and Capital Budgets
SUMMARY OF THE 2017 – 2021 CORPORATE PLAN AND 2017 OPERATING AND CAPITAL BUDGETS 2017-2021 SUMMARY OF THE CORPORATE PLAN / 1 Table of Contents EXECUTIVE SUMMARY .................................................................................................................................. 5 1. MANDATE ............................................................................................................................................ 15 2. CORPORATE MISSION, OBJECTIVES, PROFILE AND GOVERNANCE ..................................................... 15 2.1 Corporate Objectives and Profile ................................................................................................ 15 2.2 Governance and Accountability .................................................................................................. 15 2.2.1 Board of Directors ............................................................................................................... 15 2.2.2 Train Services Network Changes ......................................................................................... 17 2.2.3 Travel Policy Guidelines and Reporting .............................................................................. 18 2.2.4 Audit Regime ....................................................................................................................... 18 2.2.5 Office of the Auditor General: Special Examination Results ............................................... 18 2.2.6 Canada Transportation Act Review ................................................................................... -
Revitalization of Rail Passenger Service
REVIVING RAIL PASSENGER SERVICE IN NORTHERN ONTARIO ‘IS IT POSSIBLE AND HOW CAN IT HAPPEN’ A DISCUSSION PAPER Prepared and developed by: W.H. (Howie) Wilcox, cmilt Transportation Logistics Consultant Sault Ste. Marie, ON September 21, 2009 INTRODUCTION: This paper has been produced to give a brief history of the dilution of passenger train service in the north, what it looks like today and how it could possibly be revised with the right attention in key areas. The concepts contained herein are those of the writer only with very little input from any other source other than research of information available in the public domain. Some of the ideas put forth are easily implemented with few adjustments to current systems while others are more complicated – possibly requiring government intervention, especially from the Province of Ontario. HISTORY: With advent of the opening of the Trans Canada Highway around Lake Superior and the introduction of regularly, scheduled air services from the north, the rail passenger services of both Canadian Pacific and Canadian National slowly declined and VIA Rail was created to take their places. Eventually, VIA consolidated its runs so that it only operates on the CN Transcontinental line through Sudbury to Winnipeg. Communities like Thunder Bay, Dryden and Kenora lost their passenger services. The Sault Ste. Marie to Sudbury Budd car that was so badly marketed (poor connections and slow service), many abandoned it for other means and service was discontinued in 1976. Only a few services survived until today and they are maintained because the areas serviced are considered remote with no other means of conveyance. -
CN Makes Superior Proposal to Combine with Kansas City Southern
Superior Proposal to Combine With Kansas City Southern INVESTOR PRESENTATION April 2021 Forward-Looking Statements Certain statements included in this presentation constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and under Canadian securities laws, including statements based on management’s assessment and assumptions and publicly available information with respect to KCS, regarding the proposed transaction between CN and KCS, the expected benefits and synergies of the proposed transaction, future opportunities for the combined company and future shareholder returns. By their nature, forward-looking statements involve risks, uncertainties and assumptions. The Company cautions that its assumptions may not materialize and that current economic conditions render such assumptions, although reasonable at the time they were made, subject to greater uncertainty. Forward-looking statements may be identified by the use of terminology such as “believes,” “expects,” “anticipates,” “assumes,” “outlook,” “plans,” “targets,” or other similar words. Forward-looking statements are not guarantees of future performance and involve risks, uncertainties and other factors which may cause actual results, performance or achievements of CN, or the combined company, to be materially different from the outlook or any future results, performance or achievements implied by such statements. Accordingly, readers are advised not to place undue reliance on forward-looking statements. Important -
The Toronto Railway Club1931
NEWS Since TheThe TorontoTorontoNEWS RailwayRailway ClubClub1931 Volume 27, Number 3, Fall 2008 COMING NEWS EVENTS Put these dates on your calendar! Annual Golf Tournament The Club’s popular annual golf tournament took place at the beautiful Glen Eagle Club 74th Annual Dinner in Bolton on Friday, June 13 under ideal conditions - sunny skies and warm temperatures! The tournament had approximately 244 golfers teeing off in a 9 am shotgun start with Friday, December 5, 2008, great prizes up for grabs at many of the holes. Fairmont Royal York Hotel, Toronto. See details on page 4. The tournament wrapped up with an excellent hot dinner of steak, chicken and schnitzel, Annual Meeting followed by the awarding of golf prizes and Monday, Jan. 26, 2009 a large assortment of raffle prizes. Toronto Annual Meeting and election of officers, Railway Club President Susan Reid Tanaka 5 pm at Union Station. (shown at left) welcomed the golfers and guests and thanked the members of the Annual Valentine’s Dinner- tournament organizing committee: Al Lusk, Dance Bernie Maskerine, Christopher Jones, Dan Saturday, February 14, 2009 Jagos, Bob McKeracher, James Allan, Paul Fairmont Royal York Hotel, Toronto. Kerry, Brian Kirk, Ron Hogan, Dennis Ryan and Kirk McDonald. On behalf of the Annual Golf Tournament Club, Susan also thanked the many suppliers Friday, June 19, 2009 who generously donated an magnificent array Glen Eagle Golf Club, Bolton, Ontario of prizes. The prize donors are listed on page three. More photos next page! Other Events: CANADIAN RAILWAY CLUB - 101st Annual Dinner Friday, February 6, 2009, Hotel Bonaven- ture, Montreal. -
Local Railway Items from Area Papers
Local Railway Items from Area Papers - Beachburg subdivision 19/01/1894 Renfrew Mercury Beachburg From an item in the District News this week, it will be seen that it is now proposed to bring a railway from Pembroke to Renfrew by way of Beachburg and Foresters' Falls: in order to connect with the several railways already centering here. The scheme is being gone into with some vim, evidently, and between the natural desire of Pembroke to get a line competing with the C.P.R., and the very probably willingness of the O.A. & P.S. to have all possible feeders for their traffic, - it is quite possible that the new project will get beyond the charter stage. It must be remembered, too, that a road following the route suggested would pass through just that section og Ross or Horton where the proposed line from Pontiac county would srike after crossing the Ottawa river; and if a combination of forces could be effected, one track would do for both roads for some miles before entering Renfrew, with consequent saving of construction expenses. Some such scheme as this may yet evolve; and if Renfrewites see a chance to put in a helping word or hand at any time it would be good policy to say the word or do the deed. With the best of wishes for the prosperity of every town arouns - still, let all roads lead to Renfrew. 23/08/1906 The Equity, Shawville Beachburg The engineers of the C.N. railway are now engaged in preliminary survey work on the proposed line along the front of this county-- the staff was at Bristol Corners last week. -
Canadian Railway Observations (Cro)
CANADIAN RAILWAY OBSERVATIONS Updated Version 04/15/07 _______________________________________________________ By William Baird MAY 2007 CANADIAN NATIONAL CN Locomotives Retired in March and April: IC SW14 1507 on March 20th, DMIR SD38-2 209, on March 26th. CN C44-9W 2540 on March 29th, WC GP40 3005 on April 3rd. DMIR SD40-3 418 on April 10th (Note: This is not an SD40T-3, as there were two ex-CSXT units included in this rebuild with the Tunnel Motors). CN SD50F 5439 was released from NRE-Dixmoor in March 2007. This unit has received a Tier II zero emissions compliant engine, and new yellow frame striping. Photo - Ken Lanovich http://csxchicago.gotdns.com:6003/CN_Trains/SmallPicsRoll57/0024025-R1-059-28.jpg In late March, CN GMD-1 1436 was placed in the storage lines at the Woodcrest shop. 1436 arrived on March 19th from Toronto, with fire damage. This unit joins CN GMD-1’s 1414 and 1443 which have been in storage at Woodcrest for almost two years. When 1414 and 1443 first arrived they were to have truck change outs. Both units have had their trucks removed, but have never been replaced. Over the last year they have had quite a few parts removed, so it is unlikely that these two will ever run again. CN GMD-1 1436 appears to have suffered a main generator fire. Safety conscious CN has modified CN SD70M-2 8020 at MacMillan Yard shop on 3- 27-2007 with new bright CN orange steps / grab irons on the rear of the raised walkway behind the cab.