Doing our utmost to fulfill our mission of Message from the President On behalf of Kansai Electric Power, I would like to express my sincerest condolences to all of those who were affected by the recent Great East Japan “serving customers and communities” Earthquake and to let you know that we are all praying for the earliest possible recovery of the region.

Since that earthquake, the accident at Tokyo Electric Power Company’s Fukushima Daiichi Nuclear has significantly shaken people’s faith in the electric power industry, and in nuclear power in particular. We who do business in the electric power industry are deeply cognizant of the grave nature of this situation.

Due to delays in the remobilization of nuclear plants that have been undergoing inspections nationwide, the electric power supply situation this winter is expected to prove challenging, compelling us to ask once again, as we did this summer, for our customers’ cooperation in trying to conserve electricity. Again I must apologize for the considerable inconvenience and trouble that this causes for everyone.

We are doing everything in our power to ensure the safety of our nuclear power business, and are taking all possible steps to ensure the stability of our electric power supply. We are doing our utmost to restore people’s faith in the electric power industry and in nuclear power in particular, one step at a time.

The Kansai Electric Power Group is utilizing its combined strength to continue fulfilling is unwavering mission of “serving customers and communities.” We ask for your continued support and cooperation going forward.

President and Director Makoto Yagi

1 2 In response to the TEPCO Fukushima Daiichi Nuclear Power Station accident, Kansai Electric Power is doing everything in its power to develop safety assurance measures.

The Great East Japan Earthquake struck on March 11, 2011. An accident Ensure access to electric power that should never have been allowed to happen soon followed. ■ Infrastructural Measures ■ Procedural Measures Immediately after the accident, we We have developed systems and A t 2 : 4 6 p . m . o n M a r c h 11, 2 011, a m a g n i t u d e 9 . 0 e a r t h q u a k e w i t h i t s e p i c e n t e r o f f t h e S a n r i k u c o a s t deployed vehicle-mounted genera- manuals for ensuring that the deployed rocked Japan. The earthquake and subsequent tsunami caused massive and widespread damage across tors to our nuclear power plants. At power source can be quickly the end of September 2011, we connected at the location where it is eastern Japan. At TEPCO’s Fukushima Daiichi Nuclear Power Station, the nuclear reactors automatically installed air cooling emergency needed, and we have conducted drills shut down in response to the quake, but the facility lost its cooling capabilities as a result of the earth- power generators with higher to test those systems. Conducting a drill to connect equipment to a vehicle-mounted generator quake and tsunami, resulting in a nuclear accident that should never be allowed to happen. voltage source capacity than Additional Measures vehicle-mounted generators on A total of 21 air cooling We are planning to install additional emergency power generators elevated ground so that they would have been installed on elevated permanent emergency power sources at not be affected by a tsunami. ground at our nuclear power our nuclear power plants (to be handled plants over the medium to long term). Kansai Electric Power immediately began taking concrete safety measures against earthquakes and tsunamis at its nuclear power plants. Ensure access to water Kansai Electric Power confirmed the soundness of essential safety equipment at its nuclear power ■ Infrastructural Measures ■ Procedural Measures We immediately deployed fire pumps We have developed systems and plants, immediately conducting startup tests of the emergency diesel generators that are kept on hand that can feed seawater or other manuals for ensuring that the for cooling reactors, and confirming the indicated values on each piece of equipment. We quickly began water needed for cooling nuclear deployed fire pumps can be quickly taking all possible steps to ensure the safety of our nuclear facilities. We also worked to collect informa- reactors and the spent fuel pools. installed at the locations where they We also deployed mobile engine- are needed, and we have conducted tion about the accident. Conducting a pump driven seawater pumps. drills to test those systems. installation drill A total of 70 engine-driven Additional Measures seawater pumps were installed We installed a total of three diesel- We are formulating and implementing an Execution Plan for Safety Assurance at our nuclear power plants powered large-capacity pumps at our Measures based on the causes of the accident as they gradually become known. power plants.

After the earthquake, the nuclear reactors at the Fukushima Daiichi To monitor reactors Nuclear Power Station automatically shut down, as they were and other equipment Take flood management measures designed to do, but the earthquake disrupted access to the external Ensure access to electric power ■ Infrastructural Measures Additional Measures electrical power supply, while the tsunami rendered the emergency To prevent tsunami-related flooding of We will gradually replace current doors with water- Breakwater the equipment necessary for supply- tight doors, and we plan to install breakwaters at backup power supply unusable. The result was a total loss of AC Concrete To cool reactors ing power to the central control room the Mihama and Takahama Power Stations to structure power. The seawater pumps used for cooling reactors were also and other equipment or the equipment needed for cooling mitigate the force of a tsunami. We also are Water surface destroyed by the tsunami, leaving the reactors unable to be cooled Ensure access reactors, we have properly sealed the planning to raise the height of the existing break- for a long period and creating a serious situation that included major to water building doors and other openings. water at Ohi Power Station (to be handled over the Watertight door Ground damage to the nuclear fuel. medium to long term). To prevent the flooding In response to these accidents, Kansai Electric Power is implementing of important equipment To implement these measures, we have formulated an Execution Plan for Safety Assurance Measures in which safety assurance measures that consist of ensuring access to electric Take flood we refer to measures that must be taken immediately as “Emergency Measures” and measures that will be power, which is needed for monitoring nuclear reactors and other management measures implemented to further improve the public trust in our business as “Urgent Measures.” equipment, ensuring access to water for cooling reactors and other In response to a request from Fukui Prefecture and instructions by the Ministry of Economy, Trade and Industry equipment, and taking flood management measures for preventing the flooding of important equipment. (METI), we also added “Additional Measures as Further Safety Assurance Measures.” Later, as instructed by We will continue implementing additional measures to improve safety as we move forward. METI, we compiled and reported information on the implementation status of five “Measures for Responding to Severe Accidents.” We are promptly implementing safety assurance measures and will move quickly and carefully to take any other necessary measures as soon as new information becomes available.

3 4 Our entire company remains united in its commitment to fulfilling our mission of ensuring a stable power supply.

We strive to respond flexibly to unforeseen events and have been working to Summer power interruptions were avoided thanks ensure the stability of our power supply capabilities, with particular emphasis to the support of our customers. on our thermal power and hydropower generation capabilities. Kansai Electric Power asked its customers to conserve energy using many different opportunities and means of communication, including direct visits, When the Great East Japan Earthquake struck, Kansai Electric Power’s Mihama Power Station Unit 1 direct mail, fliers, TV commercials, and newspaper ads. We posted an (340 MW) and Takahama Power Station Unit 1 (826 MW) were shut down for regular maintenance. Since “Electricity Forecast” on our website to provide customers with electric the quake, while our operational nuclear plants have undergone regular inspections as planned, it has power demand information on a daily basis, and worked hard to respond become unclear when those plants that had been undergoing regular inspections will be reactivated. to customer inquiries by setting up a toll-free number for energy conserva- Thus, we have been promoting power supply assurance measures centered around our thermal power tion questions. As a result, thanks to the cooperation of so many of our and hydropower plants. We have postponed some construction work that had initially been planned for customers and other members of the public, and to summer temperatures one of our pumped-storage hydropower plants (Okutataragi Power Station), and shortened the regular that were lower this year than last, we were able to avoid power interrup- inspection period on our thermal power plants. We also quickly restored operations at our Maizuru tions. Once again, we would like to extend our sincerest apologies for the Power Station Unit 1 (900 MW) and Himeji No. 2 Power Station Unit 5 (600 MW). We have also been inconvenience and trouble that this caused, and to express our heartfelt working to procure fuel by fully mobilizing our own coal carriers. Beyond this, we have been taking such gratitude for the dedicated support we have received. steps as increasing electric power purchases from customers that have their own power generation A banner hanging on equipment and power producers and suppliers (PPS), power trading with other power companies, and one of our office buildings making preparations to increase the output of our thermal power plants. Electricity Forecast provides information on TV commercials and fliers were used to electricity supply and use promote energy conservation

Tataragi Dam at Okutataragi Power Station Operation at Maizuru Power Station was Our coal carrier, the MAIZURU DAIKOKU swiftly restored Reducing peak summer demand to avoid large-scale power interruptions—customers were asked to cut use by 15%.

Kansai Electric Power had been promoting various supply assur- ■Trends in maximum power output in August

ance measures, but with temperatures expected to rise sharply in ● FY 2010 max output FY 2010 max output FY 2011 July, right in the heart of summer, there were concerns that elec- 30.95 GW (Thursday, August 19, 2010) In spite of these challenges, Kansai Electric Power remains tricity demand might outpace supply. On June 10, 2011, we asked (GW) 35 customers to cut their electricity use by approx. 15% during peak committed to ensuring a stable power supply. 30 ● hours, from 9:00 a.m. to 8:00 p.m. (and particularly in households ● 25 To ensure a stable power supply this winter, the Kansai Electric Power Group has been doing its utmost from 1:00 to 4:00 p.m.) on weekdays from July 1 to September 22 20 to firm up its supply capabilities. However, with no projected reactivation date for our currently idle (excluding August 12-16). This was a deeply troubling decision for 15 FY 2011 max output nuclear power plants, we have asked our customers to cooperate in efforts to continue conserving Kansai Electric Power, whose mission is to ensure a stable supply 10 27.84 GW energy through the winter. We sincerely apologize for having to extend the request we made this of electric power, and we are deeply sorry for the inconvenience (Tuesday, August 9, 2011) 5 summer, thereby causing additional inconvenience and trouble for our customers. Everyone at Kansai and trouble we caused our customers by making this request. 0 1 51015202531 Electric Power is working together to ensure that we will be able to fulfill our highest mission: to ensure (Day) a safe and stable supply of electric power.

5 6 We offer solutions for everyday living and the operation of society. Contents For everyday living and society...... 23

• Lifestyle and business solutions (Your trusted partner in energy and living / EcoCute and IH cooktops / Totally electric home plus / K-Opticom and Kanden SOS / Energy diagnosis / Utility service...... 25 Message from the President / Our mission...... 1

Responding to the Great East Japan Earthquake / Efforts to ensure the safety of our nuclear power stations...... 3

Responding to the Great East Japan Earthquake / Efforts to ensure a stable power supply ...... 5 We are promoting forward-looking businesses to build a better society. Low-carbon society / Research and development / Overseas operations ...... 27

• Low-carbon society (Kansai e-Eco Strategy / Low-carbon electric power / Kanden Smart Grid / Necessity of Kanden Smart Grid / Visualization of energy consumption patterns)... 29 We are taking various measures to ensure the uninterrupted delivery of electricity. • Research and development (R&D themes / Storage batteries / Carbon separation and recovery)...... 31 Ensuring a stable power supply...... 9 • Overseas operations (Objectives / Stable supply of electric power overseas / Personnel training)...... 32 • From the power station to the customer (From procurement of fuel to delivery of power / The world’s highest levels of quality)...... 11 • The best mix of power sources (Energy security / Optimal combination of energy sources) ...... 13 We support community development by working closely with local residents. • Stable procurement of fuels (Securing uranium / Procurement of thermal-power fuel) ...... 14 Hand-in-hand with the community...... 33 • Nuclear power generation (Safety as the top priority / Preparing for severe accidents / Tsunami sediment surveys / Stress tests)...... 15 • Activities as a member of the local community (Classical music concerts / Cleanup activities / Kanden Collabo Art 21 / Urban revitalization / Mobile classrooms / • Thermal power generation (Backup power / Maizuru Power Station Unit 2 / PR facilities / KidZania Koshien Theme Park)...... 35 Combined-cycle method) ...... 17 • Hydroelectric power generation (Role of hydroelectric power generation / Effective use of existing facilities / Variable-speed pumped-storage • Overview / Electric power supply facilities / generation)...... 18 Corporate data Electricity sales volume and system peak demand / System map...... 37 • Renewable energy (Introducing renewable energy / Solar power • Main business locations / Main sales offices / Main affiliated companies ...... 38 generation / River maintenance flow discharge / Biomass fuel) ...... 19 • From load dispatching to power distribution (Central Load Dispatch Center / This symbol indicates Eco Topics, specific measures Kansai Electric Power is taking toward Power transmission network / Substations / Power distribution) ...... 21 the achievement of a low-carbon society.

7 ■Our electric power transmission lines extend not only across the Kansai region, but are connected with power lines throughout Japan, 8 which allows for power interchange with other power companies beyond our service area. Ensuring a stable power supply

We are taking various measures to ensure the Electricity from power plants crosses uninterrupted delivery of electricity. over mountains and through cities.

There must be no disruptions.

Our lines extend a total length of 148,110 km.

9 ■Kansai Electric Power will continue to look after and protect its power transmission and supply lines, 10 which are long enough to encircle the earth more than three times. From the power station to the customer A sstabletable ppowerower ssupplyupply iiss eensurednsured onlyonly wwhenhen eeverythingverything iiss cconnected.onnected.

We conscientiously execute Fuel procurement We will continue to uphold our responsibilities, from Transport vessels the world’s highest levels procurement of fuel to delivery Hydropower of quality. of power to homes. plants Kansai Electric Power’s mission is to A stable supply of electric power to our provide a safe, reliable, high-quality customers—this is the promise that supply of electric power. To accom- Kansai Electric Power Group employees plish this mission, we maintain all of work every day to fulfill. Procuring fuel the facilities and equipment that supplies with a long-term viewpoint in Thermal power plants connect our power plants to our order to support the efficiency of our Power volume is adjusted to control customers’ businesses and households the flow of electric power operations is a part of that pledge. So is in the best possible condition at all our determination to deliver that energy Nuclear Dispatching Center, Regional Control Center times. In addition to inspecting, replac- power plants without waste or inefficiency. With safety ing and maintaining equipment at as our top priority, the Group is working regular intervals, Kansai Electric Power tirelessly to fulfill its responsibilities in applies its expertise in IT to develop each of these roles, providing customers Generation of electricity and apply leading-edge remote moni- with a stable supply of electricity. toring and control systems, ensuring Power plants Electricity is stepped customers of the world’s highest levels Sending power down to a lower of quality in electricity supply. voltage and distributed Transmission lines The generated electricity is stepped up Primary substation ● SAIDI (System average interruption duration index) to a higher voltage and transmitted of Kansai Electric Power *Outage = forced outage + Ultra-high-voltage substation Electricity is stepped (Unit: minutes/customer) scheduled outage Sending power down for each application 200 and distributed Due to the Great Transmission towers Hanshin-Awaji Earthquake Secondary substation

Railways ●Maintenance of transmission lines 100 Due to typhoon Due to typhoon

5 min

Delivering electricity 0 83 85 87 89 91 93 95 97 99 01 03 05 07 0910 to customers (FY) Distribution substations

Buildings

Electricity is delivered City lighting to homes, etc. Utility poles Small factories

Residences Large factories

SSmallmall aandnd Electricity is delivered mmedium-sizededium-sized to homes, etc. factoriesfactories Distribution lines

11 ■Transmission lines are the links between our power stations and customers. 12 The best mix Stable of power procurement sources TheThe keykey toto aachievingchieving tthehe ““bestbest mmix”ix” iiss ttoo sstriketrike aann ToTo eensurensure a sstabletable eenergynergy ssupply,upply, wwe’ree’re wworkingorking of fuels optimaloptimal bbalancealance bbetweenetween a wwideide rrangeange ooff eenergynergy toto securesecure a stablestable ssupplyupply ooff eenergynergy rresources.esources. sources.sources.

Energy security is important We’re striving to establish the ● How energy use varies during a typical day We participate in uranium We’re working to ensure a stable

for ensuring a stable supply “best mix” of power sources, Hydropower mining to secure a long-term, supply of thermal-power fuel by Peak Hydropower (pumped-storage) of electric power. combining nuclear power, energy (regulating pondage stable supply of nuclear fuel. strengthening the supply chain. thermal power, hydropower, supply and reservoir) For Japan, a country whose energy and other power formats in Stored in Given the increase in energy demand in Kansai Electric Power is participating in pumped-storage Thermal power self-sufficiency rate is only 4% and which an optimal balance. (Oil and other) the developing nations since around the Pluto LNG Project in Australia, and must depend on imports from overseas, Intermediate 2000, combined with the intensification of has concluded a long-term contract to energy energy security (i.e. stable access to To ensure stable access to energy re- supply Thermal power (LNG) the global warming problem, nuclear purchase liquefied natural gas (LNG) energy resources) is becoming an sources, Kansai Electric Power is devel- Thermal power (Coal) power generation has increasingly come from this project. We regard this project

increasingly important issue in terms of oping a mix of energy sources, avoiding Nuclear power to be regarded as a promising source of as one of our main sources of LNG from ensuring a stable supply of electric excessive dependence on any single Base energy. However, favorable attitudes 2012 onward, and consider the revenue energy Hydropower (Run-of-river) ● Developing a uranium mine in Australia power to users. source. In other words, we’re striving to supply Midnight 6 a.m. Noon 6 p.m. Midnight toward nuclear power have come under from the project as an additional revenue establish the “best mix” of power sourc- greater scrutiny since the Tokyo Electric for the Group. Also, to strengthen our ● Import-dependent primary energy sources es, combining nuclear power, thermal Power Company’s Fukushima Daiichi shipping capabilities, Kansai Electric in Japan power, hydropower, and other power Nuclear Power Station accident. While Power has placed into service its first formats in an optimal balance while com- some countries have announced that they LNG Hydropower 1% company-owned carrier, the Renewable energy 2% prehensively considering issues of energy are moving away from nuclear power EBISU. We have also introduced a fleet When nuclear power MAIZURU generation is included Domestic 4% security, economic efficiency and envi- generation, others are promoting the of three coal carriers, the among domestic energy (excluding nuclear ronmental performance. In Kansai Elec- introduction or expansion of their nuclear DAIKOKU, MAIZURU BENTEN, and sources 18% power generation) tric Power’s “best mix” of energy sources, programs. The future of the environment MAIZURU BISHAMON, to accommo- Nuclear 14% nuclear power forms the base, with ther- surrounding uranium resources is far from date our increased need for coal since mal power providing supplementary en- certain. Considering future priorities the start-up of Maizuru Power Station Natural gas Oil 43% ●The LNG EBISU, Kansai Electric Power’s Imported 17% ergy at peak times. related to achieving a low-carbon society Unit 2 in 2010. By playing an active role in 96% LNG carrier and managing risks related to resource every stage from production, to Coal 23% price increases and resource shortages, transport and receiving, the Kansai Kansai Electric Power remains intent on Electric Power Group is strengthening its Source: Energy Balances of OECD Countries (2010 Edition) maintaining stable access to nuclear fuel, supply chain and ensuring a long-term Notes: 1. Domestic oil, coal and natural gas account for approximately and is participating in several uranium stable supply of thermal fuels. 1% of the total for these sources. resource procurement projects. In 2006, 2. Totals may not tally due to rounding. we participated in a mine development project in Kazakhstan, and since 2008 we have been participating in an exploration and feasibility study in Australia through the Japan Australia Uranium Resources Development Co., Ltd. (funded by Kansai Electric Power).

13 ■The Pluto LNG Project in Australia will facilitate our long-term procurement of fuel. 14 Nuclear power generation ToTo eensurensure eenergynergy ssecurity,ecurity, wwee aarere ooperatingperating oourur ToTo eensurensure a stablestable eenergynergy ssupply,upply, wwe’ree’re wworkingorking nuclearnuclear ppowerower pplantslants wwithith ssafetyafety aass tthehe ttopop ppriority.riority. toto securesecure a stablestable ssupplyupply ooff eenergynergy rresources.esources.

Safety is the top priority in Kansai Electric Power is trol room during total power failure or flooding We have begun conducting We have confirmed the validity ber 17, 2011. We have confirmed that our nuclear power plant prepared to respond in the (Completed June 2011) tsunami sediment surveys of our Safety Assurance Measures our key safety-related facilities and operations. event of a severe accident at •Have handheld lights and headlamps at the along the shore of Wakasa through stress tests conducted at equipment have an adequate safety tol- ready (Completed April 2011) its nuclear power plants. Bay. Ohi Power Station Units 3 and 4. erance for phenomena (such as earth- •Install private branch exchange system for inter- In response to the Fukushima Daiichi quakes, tsunamis) that go beyond those nal lines, satellite communication equipment, and Nuclear Power Station accident, Kansai Based on the opinions of the Fukui Pre- Kansai Electric Power has been imple- for which they were designed, and that ■Conducting measures to prevent a other devices with enhanced functions at admin- Electric Power is implementing safety fecture Safety Commission and to col- hydrogen explosion from damaging istrative buildings with seismic isolation menting Safety Assurance Measures at their safety tolerance has been im- assurance measures that consist of en- lect information on the effects of a tsu- facilities (Completion planned for around FY 2017) its nuclear power plants in response to proved by the Safety Assurance Mea- suring access to electric power, which is •To manage hydrogen, establish procedures for nami in Wakasa Bay, three companies, ■Securing protective the Fukushima Daiichi Nuclear Power sures implemented thus far. The content needed for monitoring nuclear reactors maintaining operations by supplying power from Kansai Electric Power, the Japan Atomic clothing, etc. for high Station accident, and we were able to of the report is expected to be exam- and other equipment, ensuring access power source vehicles to hydrogen combustion Power Company, and the Japan Atomic levels of radioactivity quantitatively assess their effectiveness ined by the Nuclear and Industrial Safety to water for cooling reactors and other equipment (already installed) (Completed for Energy Agency have begun a joint proj- and establish system equipment, and taking flood manage- Ohi Units 1 and 2 in June 2011) by conducting stress tests at Ohi Power Agency (NISA) and confirmed by the Nu- for radiation control ect to survey the tsunami sediment ment measures for preventing the flood- •To prevent the accumulation of hydrogen, es- Station Units 3 and 4. We submitted the clear Safety Commission of Japan and management there. Researchers will perform boring ing of important equipment. We are al- tablish procedures for maintaining operations by results of these tests to the national other authorities. Kansai Electric Power •Have protective clothing surveys at nine inland and water surface supplying power to exhaust fans that blow out- government on October 28 and Novem- will pay careful attention to the results. so working to ensure that we are pre- for high levels of radioactiv- locations at the Mikatagoko Lakes and side (Completed for plants other than Ohi Units pared for severe accidents, including ity at the ready at each ●Protective clothing the surrounding area. The survey will in- 1 and 2 in June 2011) for high radiation worst-case events. plant (Completed June volve the analysis and evaluation of col- •Install equipment that reduces hydrogen con- levels 2011) lected samples, and is expected to take centrations without the need for electricity Primary Evaluation Results Summary (Evaluation related to reactor fuel) •Confirm that supplies like personal dose about one year. We will have the survey (static catalytic hydrogen recombiners) meters will be shared between nuclear power results evaluated by academic experts, After the Emergency Before the Emergency (Installation planned at plants other than Ohi Safety Measures Evaluation index station operators as necessary (Completed June and if any new in- (as of October 1, 2011) Safety Measures Units 1 and 2 in FY 2012 or 2013) 2011) formation is ob- ■Maintaining the working environment in Comparison of the earthquake motion •Established framework that allows people tained, it will be in- that would cut access to any means of the central control room 1.8 times Approx. 3% 1.75 times other than radiation control management work- corporated into Earthquake cooling the fuel due to equipment •Establish procedures to supply power from (equivalent to improvement (equivalent ers to help these workers in emergencies our tsunami as- 1,260 gal) damage caused by an earthquake against backup power generators already deployed to to 1,225 gal) (Completed June 2011) sessments and the standard earthquake motion*3 air conditioning systems that ventilate the cen- ■Deploying heavy equipment to countermeasures, ●Air cooling emergency power generators tral control room and use filters to remove radio- Comparison of the tsunami height that remove debris as needed. active materials in the air even if all power is lost would cut access to any means of cooling •Deploy one backhoe-bull- Approx. 4.0 times Approx. 145% Approx. 1.6 times (Completed in June 2011) Tsunami the fuel due to equipment damage dozer to each plant in ●An inland boring survey (11.4 m) improvement (4.65m) ■Securing means of communication caused by a tsunami, against the expect- order to remove debris ed tsunami height within plants in emergencies from plant premises after a •Have mobile, dry-cell communication devices, tsunami (Completed April Approx. 16 days etc. at the ready to provide a way for the field Total loss of Approx. 76-fold Approx. 5 hours 2011; replaced with larger *1 improvement operators to communicate with the central con- AC Power after the event after the event Time until there would be no access, models in June) ●The backhoe- bulldozer at the without outside support, to any means of Mihama Power cooling the fuel Loss of ultimate Approx. 16 days Approx. 2.6-fold Approx. 6 days Station heat sink*2 after the event improvement after the event

*1: Total loss of AC power: Loss of power from external electric power sources and emergency diesel generators; the power station is completely without electric power. *2: Loss of ultimate heat sink: The ability to obtain seawater to cool the fuel has been lost. *3: Standard earthquake motion: Amount of shaking that would occur during the largest earthquake predicted in the area around a nuclear power plant. Gal is a unit of acceleration that expresses the strength of shaking of the ground and buildings caused by an earthquake.

15 ■Ohi Power Station is Kansai Electric Power's highest output station (total output: 4.71 GW) 16 Thermal Hydroelectric power RespondingResponding flflexiblyexibly t oto fl ufluctuationsctuations i nin e leelectricctric po wpowerer EfficientlyEfficiently h aharnessingrnessing ththee p opowerwer o fof n anature,ture, power generation demand,demand, thermalthermal ppowerower ssupportsupports a ssafeafe aandnd sstabletable hydropowerhydropower ccontributesontributes ttoo a ccleanlean aandnd generation powerpower ssupply.upply. stablestable electricelectric ppowerower ssupply.upply.

Thermal power is capable of Unit 2 of Kansai Electric Replacing existing systems With a history of more than Shin-Kuronagi No. 2 Power Okutataragi Power Station’s responding flexibly to fluctuations in Power’s only coal-fired power a century, hydropower is an pumped-storage hydropower with combined-cycle power Station will effectively use electric power demand, and plays an station is now operational. important part of our stable contributes to power supply generation systems that the Kurobegawa river essential role in serving as a backup energy supply. efficiency and stability. power supply to renewable energies. emit less CO2. system’s abundant waters. Hydropower harnesses the energy Pumped-storage hydropower involves Conventional thermal power plants burn Shin-Kuronagi No. 2 Power Station is A key aspect of thermal power is its generated when water falls from a high using leftover nighttime electric power to fuel to turn water into steam, which drives Kansai Electric Power’s eleventh hydro- ability to allow a flexible response to a steam turbine and generates electric place to a low one, and emits no CO2 power station and the first new hydro- pump water back up to the top of a fluctuations in electric power demand, power. On the other hand, combined-cy- during generation. Keage Power Station, power construction project in 12 years dam, where it is then released to gener- enabling Kansai Electric Power to cle power plants burn fuel to produce a Japan’s first hydropower plant for within the Kurobegawa river system. ate electricity during daytime hours of increase or decrease the number of high-temperature combustion gas which commercial power generation, went Standing alongside the existing Kuronagi high demand. This method is used to drives a , and then exhaust gas No. 2 Power Station, it will take advan- operating units or adjust the output of ●Maizuru Power Station online in 1891, and contributed to the respond flexibly and accurately to the each unit, as needed. Because of this from this process is used to generate modernization of Kyoto. The year 1963 tage of existing facilities such as the continually fluctuating demand for advantage, thermal power is expected Maizuru Power Station is Kansai Electric steam that drives a steam turbine. With saw the completion of the Kurobegawa headrace and head tanks for an estimat- electric power. In addition, at Okutatara- this system, fuel is saved and CO2 to serve as a backup to renewable Power’s only coal-fired power station. No. 4 Power Station, which played an ed maximum output of 1,900 kW, gener- gi Power Station Units 1 and 2, we are emissions are reduced. Kansai Electric ating approximately 12,000 MWh each energies, including solar power and Kansai Electric Power uses LNG, oil, and essential role in overcoming the serious planning to introduce a variable-speed Power is in the process of replacing its old year. This will allow an annual CO2 wind power which are easily affected coal as fuel for its thermal power power shortages that gripped postwar pumped-storage hydropower system conventional thermal power plants with emissions reduction of around 3,600 by weather conditions and thus pose plants. Because coal is more plentiful Japan. These two historic plants are able to respond flexibly to fluctuations in more efficient combined-cycle plants. At tons, helping to promote the move challenges in terms of maintaining a and widely distributed than natural gas Sakaiko Power Station, replacement work among the 150 hydropower plants toward low-carbon-process electricity. electric power demand during the balance between the demand and and oil, it has great advantages in terms has been completed and all five units currently maintained by Kansai Electric process of pumping water at night. This ●Shin-Kuronagi No. 2 Power Station supply of electric power. Thermal of stable and low-cost procurement. commenced commercial operations in Power, which account for approximately facilitates a more precise control of Branch penstock power generation continues to play a Unit 1 of this power station went online 2010. At Himeji No. 2 Power Station, Unit 10% of overall power output and play a from existing Head Waterway demand and supply during the night and tank vital role in enabling a flexible response in 2004, while Unit 2 commenced 1 is undergoing replacement work and is vital role in ensuring a stable energy penstock the following day, allowing us to achieve Intake weir to fluctuations in power demand. commercial operations in 2010 scheduled to commence commercial supply. Penstock an even more stable supply of electric doubling the power station’s output to operations in 2013, and all six units are power. scheduled to be operational by 2015. The Kuronagi 1.8 GW. River thermal efficiency* of Himeji No. 2 Power

Station will be improved from about 42% Kuronagi SShin-Kuronagihin-Kuronagi to about 60%, putting it among the most No. 2 Power Station NNo.o. 2 PPowerower StationStation efficient in the world and resulting in a CO2 emissions reduction of about 30%. *Thermal efficiency is expressed on an LHV basis. ●Combined-cycle power plant ●Mechanism of combined-cycle power generation (rendering) (Sakaiko Power Station) Steam turbine power generation system Combined-cycle power generation system ●Tataragi Dam at the Okutataragi Power Station

Fuel Exhaust gas (LNG) (Oil) (Coal) Steam Steam Gas turbine turbine turbine Pump Pump

Generator Generator

Air Condenser Condenser Fuel (LNG)

17 ■Sakaiko Power Station uses a combined-cycle power system that emits less CO2. 18 Renewable energy RenewableRenewable eenergiesnergies llikeike solarsolar aandnd windwind ppowerower areare alsoalso vvitalital ttoo tthehe ddevelopmentevelopment ooff llow-carbonow-carbon electricity.electricity.

locations nationwide with a total power Kansai Electric Power is actively Kansai Electric Power is Building the Okuwa-Nojiri Power introducing renewable energies output of approximately 140 MW. Intake Initiatives in using biomass independently developing Station, Kansai Electric Power’s to realize a low-carbon society. Kansai Electric Power will identify fluctu- fuel reduce CO2 emissions. renewable energy projects to ations in output and voltage resulting first hydropower plant to use river Penstock from the operation of the Sakai Solar Renewable energies are essential alter- realize a low-carbon society. maintenance flow discharge. Power Station, and will examine various natives to oil and other fossil fuel energy Kansai Electric Power built the Sakai issues using data on solar power output Kansai Electric Power built its first Turbine and resources. However, although renewable Solar Power Station along the water- and solar radiation measured through- hydropower plant (max. output 490 generator technologies have been developed to front in Sakai City, Osaka Prefecture. It is out the Kansai region. The knowledge kW) using river maintenance flow the point that they are being used in expected to have the highest solar obtained through this endeavor will be discharge* and previously unused drop Outlet real-world practical applications, renew- power output capacity in Japan at 10 widely publicized and used to facilitate at the Yomikaki Dam in Okuwa-mura, River maintenance able energies have yet to be sufficiently MW and to reduce CO2 emissions by the wider promotion of solar power Kiso-gun, Nagano Prefecture. It became flow discharge introduced due to their high cost. The 4,000 tons a year. The facility began generation. In addition, Kanden Energy operational in June 2011. This is expect- ●Overview of the Okuwa-Nojiri Power Station achievement of low-carbon electricity is partial operations in October 2010, and Development Co., Inc., a wholly-owned ed to reduce CO2 emissions by 1,300 going to require the active adoption of launched full commercial operations in subsidiary of Kansai Electric Power, has tons/year. renewable energies, including not only September 2011. As output from solar embarked on a wind power project *The flow of water discharged to protect power generation is characterized by with a rated power output of 12 MW in the landscape and natural environment solar and wind power, but also biomass ●Wood pellets large and rapid fluctuations due to the northern part of Awaji City, Hyogo downstream from dams. and small-scale hydropower.* With steps changes in solar radiation, a massive Prefecture. In June 2008, Kansai Electric Power such as construction of a large-scale inflow of solar power into the power began using wood pellets, a biomass solar power station and co-combustion grid may affect the quality and stable fuel, at Unit 1 of coal-fired thermal plant of biomass and coal at our thermal supply of electricity in the future. Maizuru Power Station. Mixing biomass power plants, Kansai Electric Power is To verify the technical impact of large- fuel with coal before burning reduces actively promoting the adoption of scale penetration of solar power into coal consumption, and the estimated renewable energies. the power grid in the future, ten electric annual reduction of CO2 emissions is *Facilities with output of 1 MW or less power companies, including Kansai about 90 kt. Electric Power, plan to develop mega solar power plants in about thirty ●Sakai Solar Power Station

19 ■Sakai Solar Power Station went into full commercial operation in September 2011. 20 From load dispatching A 224/74/7 mmonitoringonitoring ssystemystem aandnd aadvanceddvanced IITT to power distribution technologytechnology ssecureecure tthehe ppowerower ddistributionistribution systemsystem thatthat ccoversovers thethe KKansaiansai aarea.rea.

The Central Load Dispatch Center Our high-voltage power Substations are used to lower the Power distribution is the final responds instantly to fluctuations in transmission network carries voltage of electricity in stage in delivering electricity demand and gives precise instructions. vast amounts of electricity. accordance with customer needs. to customers’ homes.

Demand for electricity fluctuates by the Electricity generated at our plants Electricity with its voltage lowered to second. Our Central Load Dispatch travels over transmission lines to primary between 77 and 22 kV is sent to distribution Center monitors demand 24 hours a substations, which lower the voltage to substations, where the voltage is further day, 7 days a week, and issues instruc- between 154 and 77 kV. It is delivered lowered to 6,600 V and fed to the power tions to our plants regarding the at these voltage levels to customers that lines on poles that extend to all of our service required volume of output. The Center require large amounts of electricity, such areas. This process is called “power distribu- plays a vital role in maintaining a high- as railways and large factories. Electrici- tion.” Electricity at this voltage is delivered to quality power supply, working with the ty for other customers is sent to second- tall buildings and medium-size factories, while ●Transmission lines regional grid operation center and ary substations, which further lower the electricity for home users is further lowered system operation centers throughout Our plants generate electricity at voltag- voltage to between 77 and 22 kV. This to 100 or 200 V by pole transformers. Electric- the Kansai region to adjust voltage and es of between several thousand and process of reducing the voltage in ity follows a long journey before reaching frequency as necessary. It also employs 20 kV, but to minimize power transmis- stages allows the electricity to be trans- customers at speeds of some 300,000 km per the latest information technology to sion loss, the electricity is boosted to mitted more efficiently, minimizing second. It takes a fraction of an instant for ●Distribution line maintenance exert control over the intricate network voltages between 275 and 500 kV. This power loss due to transmission over electricity to travel from the power plants to of power transmission lines that spread electricity is transmitted from our plants long distances. users who depend on it for their everyday throughout the region, monitoring such to the communities we serve along lives. things as repair activities, equipment power lines supported by huge steel failures and lightning strikes, and select- towers erected in the mountains. The ●Electricity route

ing the most appropriate transmission transmission lines extend beyond the Pole- Primary Secondary Distribution 6.6 kV 200/100 V routes accordingly. These efforts are all Kansai region, connecting to countrywide Power 275 to 500 kV 154 kV 22 to 77 kV mounted plant substation substation substation transformer Small-scale factory part of our efforts to ensure that our networks stretching from Hokkaido to

customers enjoy a stable supply of Kyushu, and the ability to transmit 6.6 kV 200/100 V 77 kV high-quality electricity. electricity to and from areas served by 154 kV Factory Store ●Primary substation Large factory other power companies helps to ensure a Shinkansen (bullet train) reliable supply of electric power. 77 kV 6.6 kV 200/100 V Electric railway Building Residence

21 ■The Central Load Dispatch Center, responsible for giving operating instructions to all power plants. 22 For everyday living and society

We offer solutions for everyday living and the operation of society.

To create a dynamic society where everyone can

enjoy a comfortable lifestyle, we will continue

taking steps toward a better tomorrow.

23 ■Kansai Electric Power is moving forward with efforts to promote electric vehicles and develop a recharging infrastructure. 24 Lifestyle and business solutions We help individuals and businesses any time, any place, with total solutions offered through our Group services.

The Kansai Electric Power Secure, comfortable, economical, Adding solar power and Supporting various aspects of Diagnostic services to Providing customers Group aims to be your trusted energy conservation to life from telecommunications improve energy efficiency with the best energy and environmentally friendly partner in energy and living. totally electric living. to security. at large facilities. usage solutions. living is delivered through totally As a comprehensive provider of electrici- electric homes. Totally electric homes allow residents The corporate sector consumes an The Kansai Electric Power Group not ty and other forms of energy, as well as to lead safe and comfortable lifestyles enormous amount of energy, and its only provides electricity, but also works By promoting safe and comfortable a variety of information and telecommu- while drastically reducing utility bills and ability to use energy efficiently is critical. to provide optimum solutions and meet “totally electric homes” incorporating nications (IT) services and lineup of CO2 emissions. Adding items such as Bringing together technologies and customer energy usage needs. Kanden energy-saving, environmentally friendly, Energy Solution (Kenes) meets custom- businesses providing comfort and safety solar power and electric vehicles, highly know-how from throughout the Group, economically efficient EcoCute electric ers’ needs to conserve energy, reduce services in daily life, the Kansai Electric compatible with the “totally electric” Kansai Electric Power provides diagnos- water heaters, we are providing custom- costs, and reduce CO2 primarily with its Power Group interacts with the people model, to the core concept of the total- tic services for equipment and facilities, ers with a “HAPI-e” (happy electricity) utility service, through which the compa- of the Kansai region in countless ways. ly electric home allows residents to lead help companies understand their specif- lifestyle. Effectively using air-source heat, ny aims to helps customers with their These interactions enable us to grow a more environmentally friendly and The Kansai Electric Power Group is ic energy needs and how to meet those an approved renewable energy, and energy supply equipment needs, closer to our customers and to further economical lifestyle. Kansai Electric working to bring greater comfort and needs in the most efficient way possi- utilizing heat pump technology, which ranging from design and construction to integrate our electricity and other Group Power is helping customers boost their convenience to our customers’ lives. ble. In order to respond quickly to produces more than three times the operation and maintenance. operations to provide total solutions. By standard of living with the new concept Group company K-Opticom Corp. offers various customer needs, we have also amount of electricity used, the EcoCute meeting and exceeding our customer of “totally electric home plus.” a package of three services—Internet, developed our own original measure- reduces the amount of energy needed to needs, our aim is to become our custom- phone, and television—under the eo- ment and analysis tools capable of heat water and vastly reduces CO2 ●Services offered by Kenes ers’ trusted partner in energy and living, HIKARI brand, as well as eo-Mobile, a measuring a wide variety of data simul- emissions and heating costs. We are also for tomorrow’s low-carbon society. mobile broadband service, by utilizing a taneously. Sale working to promote the widespread s o e and f G fiber optic network that covers the ic F a rv ue s ●Providing total solutions by combining excellent adoption of IH cooktops, which can be e l S O entire Kansai region. The eo-HIKARI O il Group services, with a focus on electricity used safely and easily by the entire C S service has been rated number one in E family. multiple customer satisfaction surveys. Comfort and Safety Other Group company Kanden Security services in daily life ●Solar panels installed on the roof Utility e of Society (Kanden SOS) offers home c i Service v r M e Electricity operations security services that keep its customers a S Information and Integrated n E y a n it telecommunications (core business) g er il energy supply safe and secure 24 hours a day, 365 em gy ac (IT) e F nt Se days a year. rvice Group support ●Kansai Electric Power’s energy-equipment business diagnostic services

●EcoCute ●Electric vehicle adopted by Kansai Electric Power

25 ■A totally electric kitchen, including an IH cooktop, offers security and comfort. 26 Low-carbon society / Research and development / Overseas operations The path ahead has yet to be opened,

We are promoting forward-looking businesses to build a better society. but a path will be created by the company bold enough to bravely forge ahead.

We are that company.

27 ■We are engaged in biotechnological R&D to achieve a low-carbon society. 28 Low-carbon society Tackling various challenges as we strive to achieve a low-carbon society.

Adopting a long-term perspective, ing to achieve a low-carbon society We are working hard on a Achieving next-generation The Kanden Smart Grid offers The Kanden Smart Grid offers Kansai Electric Power is continuing through both supply-side and demand- variety of efforts to achieve the high-quality electric power a stable supply of lower-carbon services better tailored to to promote low-carbon efforts in side initiatives and are aiming to delivery of low-carbon electric —the Kanden Smart Grid. electric power. customer needs. the electric power industry. construct the Kanden Smart Grid. power to our customers. Beyond this, we are promoting activi- “Smart grids” are the next-generation Should renewable energy sources with One of the high-quality services Kansai Electric Power is developing ties abroad and the development of Kansai Electric Power is promoting network of energy transmission systems highly variant output, such as solar power, achieved by the Kanden Smart Grid is initiatives aimed at achieving a sustain- advanced technologies that will efforts to reduce the carbon emissions of that will be essential to the achieve- be used to supply power on a large-scale support for our customers’ need to able low-carbon society. Based on our contribute to the fight against global the electric power we deliver to custom- ment of a low-carbon society and or intensive basis, they could potentially conserve energy. We are promoting the medium- to long-term Kansai e-Eco warming, and are actively striving to be ers through a variety of initiatives. The further service improvements. The have an adverse effect on electric power introduction of a New Metering System Strategy for promoting the creation of a main player in the low-carbon era. CO2 emissions factor in FY 2010 was Kansai Electric Power Group has quality (in terms of such factors as voltage and the “visualization of energy low-carbon communities, we are striv- 0.281 kg-CO2/kWh.* defined “smart grids” as systems that and frequency). To ensure that such effects consumption patterns” to enable our *This is a provisional value. The government will use new technologies, such as IT and do not impact its customers, Kansai Electric customers to use energy with a real officially announce actual values, based on the Law Concerning the Promotion of the Measures to Cope storage battery technologies, to achieve Power is promoting the concept of the awareness of their need to conserve with Global Warming, etc. a low-carbon society and improve Kanden Smart Grid for supplying lower-car- energy, reduce costs, and reduce CO2. ■Change in CO2 emissions factor, etc. bon electric power. This concept includes This allows us to carefully measure our ContributeContCConConttrriribiibbbuuteteet t too convenience for customers without eneenerenenergynenerrgyyyc c conservation,oonnsenservarvatvattion,ionion,iioon,on,n (100 GWh) compromising the stability of the under- plans for maintaining and upgrading electric customers’ energy use and to be more costcoscooostt reductionsredrreedduucctictctit onsonn aanandndd (10,000 t-CO2) Amount of power consumed (sold) COCO2 redreductionseduucctictctiionsons byb Amount of CO2 power equipment and electricity distribu- precise in conducting energy consulta- cuscustccucustocustomersuststomeromeoomersmemerm rs andanandsodds societysosoocietccietcieitiete y lying electric power system, in an effort Accelerateate (kg-CO2/kWh) emissions conversionn to ConstructCoonnsn truct End-use CO2 emissions factor 1,511 to achieve a high-efficiency, high-quality, tion facilities that play a role in coordinating tions. low-carbonbon theheh KandenKandK denen 1,416 electricityity SmartSSmararttGr GridGridd and highly reliable electricity distribution demand and supply from sources like 1,206 Kansai Electric Power 1,459 system. This is what we call the Kanden thermal power and hydropower plants. To reduction target: KansaiKaKansaansaaii e-Ecoee--EEcccoo 0.353 0.355 Approx. 0.282kg-CO2/kWh Smart Grid. do this, we are promoting the development StraSStrategytratatteeggyy 5-year average for of system operation and control technolo- 0.311 FY 2008–FY 2012 0.294 gies, and research on power demand and 0.299 supply control systems. DevelopmentDeveelopmloppmentmente t of ActivitiesActctivitititivi es aadvanceddvanceddvanced abroadab 0.281 ttechnologiesh l i 5,173 0.265 + 4,703 4,161 Amount deducted through CO2 4,261 4,360 3,757 4,250 credits (Note)

1990 2008 2009 2010 2011 2012 (FY) First commitment period of the Kyoto Protocol (2008–2012)

Note: The values for FY 2005 onward are calculated based on the calculation, reporting and publication system for greenhouse-gas emission volumes, as mandated in the Law Concerning the Promotion of the Measures to Cope with Global Warming. Note that under this system, CO2 reduction values such as green power certifications are not taken into consideration.

29 ■We are promoting a biotope initiative to create an environment at our power plants where wildlife like frogs and dragonflies can thrive. 30 (Asago Eco Park at Okutataragi Power Station) Research and Overseas development For a sustainable society and lifestyle, we are Spread Kansai’s power to the world, operations putting our sophisticated technology and wealth bring the world’s dynamism to Kansai. of experience to work in building a bright future.

Our R&D themes: a stable To introduce large-scale photovoltaic We are developing We are actively pursuing Kansai Electric Power’s Our technology transfer and supply of electricity and the overseas operations based overseas businesses contribute personnel training help mitigate power generation, we have begun proprietary technology achievement of a low-carbon on our experience to the stable supply of electric environmental burdens in research on electricity supply and demand to capture and recover CO2 society. accumulated in Japan. power overseas. developing countries. control systems using batteries. during power generation. As global environmental issues become Based on the technological capabilities As part of our activities under the Photovoltaic power generation presents In 1990, anticipating the coming demands ever more pressing, a new feed-in tariff and expertise that we have gained as a Global Sustainable Electricity Partner- a model of power generation that does for CO2 emissions reduction, Kansai Electric (fixed price purchasing system) for not produce CO2 during the generation Power launched a project to develop Japanese electric power company, ship (formerly the e8), Kansai Electric renewable energies is expected to be process and that uses a natural energy technologies for capturing and recovering Kansai Electric Power is undertaking Power is participating in many projects launched in July 2012, and the adoption that is not in danger of depletion. Howev- CO2 from the exhaust gas discharged by activities to contribute to a stable supply involving support for developing nations of renewable energies, such as photovol- er, power output can vary significantly thermal power plants. We teamed up with of electricity overseas. We view the and the promotion of environmental taic power and wind power, is expected and suddenly depending on solar radia- Mitsubishi Heavy Industries, Ltd. on a joint world as a new field for our activities, initiatives, including projects to provide to accelerate. However, the large-scale tion and other natural conditions, posing project to build an experimental plant at which include contributing to energy guidance to a micro-hydro project in issues for its viability as a stable energy our Nanko Power Station, and developed introduction of renewable energies conservation and CO2 emissions reduc- Bhutan and a solar power project in source. Therefore, we are participating in KS-1®*, a CO2-absorbing solution capable whose output is weather dependent will tion on a global scale through transfer of ●Repowering work at the Senoko Power Station Tuvalu. From March 2005 to November an effort by all electric power companies of recovering more than 90% of the CO2 make it more difficult to maintain technology and cultivation of human Senoko Energy is the largest producer of 2010, we held eight workshops for in Japan to install solar radiation meters from exhaust gas. The superior perfor- electricity quality as defined by such resources in developing countries. The thermal power in Singapore. We began electric power company engineers from and thermometers nationwide. These mance of KS-1® has earned it acclaim as the factors as voltage and frequency. To knowledge gained through these activi- investing in the company in September the Pacific Island nations, training devices will collect data at one-second world’s best CO2-absorbing solution, and address this issue, we are developing a intervals, allowing us to collect detailed the product is in use at chemical plants ties can then be put to use in our domes- 2008 and have provided various types personnel in renewable energies and wide range of technologies aimed at information about photovoltaic power throughout the world. We are currently tic electricity business. of technological support. Today, we are energy conservation. reducing CO2 emissions and introducing generation output variances. As part of working to promote its eventual adoption working on a repowering project to renewable energies while never sacrific- an independent project, we have at thermal power plants, where direct convert the existing power generation ing the stable supply of electricity. installed a supply and demand control recovery of CO2 from exhaust gas will play equipment at the Senoko Power Station system that uses nickel metal hydride a part in preventing global warming. to a high-efficiency natural gas-fired batteries at the Ishizugawa Substation to *KS-1 is a registered trademark in Japan. combined-cycle system. We have sent which the Sakai Solar Power Station is engineers to the plant and are striving to connected, to manage output fluctua- improve the plant’s process manage- tions in photovoltaic power generation, ment and quality. We are also promot- and we are conducting research on ●Technology transfer workshops supply and demand control systems for ing efforts to transfer technologies to ●Senoko Power Station in Singapore ensuring the stability of the electric the plant to prevent the degradation of power grid. We intend to publicize the its piping. In addition, we also conduct results of this research and contribute to an annual educational program to the wider adoption of renewable energy provide technical training in Japan to in Japan. operators and maintenance personnel ●CO2 recovery pilot plant at Nanko Power Station at the San Roque Hydropower Station in the Philippines.

31 ■Solar power generation facilities installed in Tuvalu. 32 Hand-in-hand with the community

We support community development by working closely with local residents.

We work with local communities in thinking

about energy and the environment,

and work with them to help

educate the next generation.

33 ■We organize “mobile classrooms” where we discuss energy and environmental issues with children. 34 Activities as a member of Kansai Electric Power is doing its best to help, the local community for the future of local communities.

Hosting classical music concerts Holding a Kansai-wide We actively participate in We think about energy and Our PR facilities help people Electric Power Company Pavilion around Kansai is one of the exhibition of works by community development environment with children find out more about at KidZania Koshien enables ways we support the cultural artists with disabilities. activities, contributing to in our mobile classrooms. electricity and energy. children to experience simulated life of the region. urban revitalization. power maintenance work.

It is very important for children to think At KidZania Koshien, a theme park that about energy and the environment opened in March 2009 in Nishinomiya surrounding us since they will become (Hyogo Prefecture), children can experi- the leaders of the future. Thus, Kansai ence various jobs and learn more about Electric Power offers what are called how society works. Kansai Electric “mobile classrooms” at elementary and Power sponsors one of the pavilions, junior high schools. Mobile classrooms where children can participate in an are classes arranged and conducted by ●The PR facility “El Cool Sakaiko” activity that simulates restoring power employees of Kansai Electric Power Kansai Electric Power has established to a community after a blackout. ●FY 2010 Invitation to the Opera, ●Kanden Collabo Art 21 ●The Nakanoshima neighborhood in Osaka The Barber of Seville where children can enjoy learning about public facilities for PR activities at our Through this experience, they can learn Since 1988, Kansai Electric Power has Since 2001, Kansai Electric Power has Kansai Electric Power has been making both energy and the environment through power plants and other locations so how important electric power is and held classical music concerts, sponsored held exhibitions of work by artists with infrastructural (hard) and organizational experiments and hands-on activities. In that people can learn more about how rewarding it feels to know that we by either our head office or branch offic- disabilities in support of their activities. (soft) contributions to community develop- FY 2010, the approximately 1,200 electricity, energy, and the environment, are fulfilling such an important responsi- es. Events such as our Kanden Classical Out of nearly 1,000 submissions, 30 are ment activities especially in central Osaka. mobile classrooms that were organized and so that we can enhance communi- bility as we carry out this work. Special “Invitation to the Opera” carefully selected and exhibited at ten These include our activities on Nakanoshima were attended by about 53,000 cations with local residents. In October program give people an opportunity to venues. Many venues to the exhibitions Island, where our head office is located. children. 2010, we renovated our PR facility at the enjoy classical music in their own have said they came away deeply Kansai Electric Power serves as the secretar- Sakaiko Power Station (Nishi-ku, Sakai communities. inspired by the fascinating artwork. iat of the Round Table on the Future of City), “El Cool Sakaiko.” This facility uses Nakanoshima, whose members are mainly models and videos to explain the landowner companies in the Nakanoshima combined-cycle power generation Playing a committed role in area. The association promotes community model, which offers greatly improved cleanup activities in cooperation development through activities that include thermal efficiency, outlining our efforts with the community. distributing information on its website, to achieve a low-carbon society. ●Inside the Electric Power Company Pavilion joining area clean-up campaigns, and sympo- Kansai Electric Power works hand-in-hand sia. Kansai Electric Power will continue ●Over 1,000 mobile classrooms a year are with neighborhood associations on clean- held as part of our popular program. making active contributions to community up activities covering a wide area, includ- development efforts in the Kansai region. ing the vicinity of our business locations, shorelines and riverbanks, tourist destina- tions, and social welfare facilities.

●Using an aerial work truck to clean streetlights (Nara)

35 ■Children have fun while learning about the importance of electricity at the KidZania Koshien Theme Park. 36 data 38 TEL: 073-422-8111 TEL: 0736-32-1245 TEL: 079-421-3201 TEL: 0796-22-3131 TEL: 0795-42-0260 TEL: 0739-22-1212 TEL: 0735-22-5211 Corporate TEL: 079-292-3131 TEL: 0739-22-1212 TEL: 0791-22-0730 Wakayama Sales Office Hashimoto Sales Office Tanabe Sales Office Office Sales Shingu Office Sales Gobo Office Sales Himeji Kakogawa Sales Office Aioi Sales Office Yashiro Sales Office Toyooka Sales Office (as of June 30, 2011) LNG Ebisu Shipping Corporation Osaka School Amenity Service Co., Inc. Co. OG-Kanden Planning Joint Co. Investing Sojitz Enrichment Kansai Kansai Electron Beam Co., Ltd. Kanden Inc. L-Heart Co., Kanden-el-farm, Inc. Kansai Electric Power Australia Pty. Ltd. Inc. GEO-RE KANDEN Management Corp Kanden Venture Other business areas METEOROLOGICAL ENGINEERING CENTER INC. CENTER ENGINEERING METEOROLOGICAL CCL Co., Ltd. Japan Australia Uranium Resources Development Co., Ltd. Ltd. Co., LNG Indonesia Japan Inc. Service, Irradiation Beam Electron Japan B.V. Netherlands, KPIC International Nuclear Energy Development of Japan Co., Ltd. Ltd. NuclearJapan Fuel TEL: 0748-22-2111 TEL: 0770-32-0025 TEL: 06-6481-3961 TEL: 0745-53-1131 TEL: 0749-22-0080 TEL: 078-912-2651 TEL: 079-563-2484 TEL: 0799-22-0605 TEL: 077-522-2611 TEL: 078-392-6200 TEL: 0742-36-1201 6-2-1 Kano-cho,6-2-1 Chuo-ku, Kobe, Hyogo 650-0001, Japan 48 Omori-cho, Nara 630-8548, Japan Nionohama,4-1-51 Otsu, Shiga 520-8570, Japan 40 Okayama-cho, Wakayama 640-8145, Japan Junishomae-cho,117 Himeji, Hyogo 670-8577, Japan Fukokuseimei Building, Uchisaiwai-cho, 2-2-2, Chiyoda-ku, Tokyo 100-0011, Japan TEL: 03-3591-9261 Takaoka Park Bldg., Higashi-sakura, 2-2-1 Higashi-ku, Nagoya, Aichi 461-8540, Japan TEL: 052-931-1521 Higashi-denjigatamachi,1-2-13 930-8513, Toyama Japan Sumitomo Nakanoshima Nakanoshima, 3-2-18 Bldg. 12F, Kita-ku, Osaka 530-0005, Japan TEL: 06-6459-0433 Chikko1-2 Shinmachi, Nishi-ku, Sakai, Osaka 592-8331,Japan TEL: 072-241-9781 Tanagawa1905-12 Tanigawa, Misaki-cho, Sennan-gun, Osaka 599-0311, Japan TEL: 0724-95-0661 7-3-8 Nanko Minami, Suminoe-ku, Osaka 559-0032, Japan 260-96 Funao-Aza Nakahama, Kainan, Wakayama 642-0001, Japan TEL: 073-482-6153 Aza1-3 Tomishima, Minami Shioya, Shioya-cho, Gobo, Wakayama 644-0024, Japan TEL: 0738-23-2811 3058-1 Nakashima, Shikama-ku, Himeji, Hyogo 672-8530, Japan 079-235-0551 TEL: Megatokiwa-cho, Shikama-ku, Himeji, Hyogo 672-8034, Japan 079-245-1651 TEL: Japan 678-0041, Hyogo Aioi, Aioi, Aza Yanagiyama, 5315-46 0791-23-5063 TEL: 1062 Kariya Aza Higashi Okite, Ako, Hyogo 678-0239, Japan TEL: 0791-42-4111 Japan TEL: 072-456-6140 560-5 Aza Chitose, Maizuru, Kyoto 625-0135, Japan Senshu Kuko Naka Tajiri-cho, 1, Sennan-gun, Osaka 549-0011, Note: When calling any of the locations in Japan listed above, of the locations Note: When calling any code with the country code 81. the 0 of the area replace Mihama Sales Office Kobe Sales Office Office Sales Awaji Akashi Sales Office Office Sales Hanshin Sanda Sales Office Nara Sales Office Takada Sales Office Shiga Sales Office Hikone Sales Office Office Sales Yokaichi Enegate Co., Ltd. Group business support THE GENERAL ENVIRONMENTAL TECHNOS CO., LTD. CO., TECHNOS ENVIRONMENTAL GENERAL THE The Kanden L&A Company, Ltd. Kanden EL Auto System Co., Ltd. Kanden Engineering Corp. Kanden Inc. Office Co., Work The Kanden Services Co., Inc. Kanden CS Forum Inc. Ltd. Co., Joinus Kanden Kanden Corp. Power-Tech Kanden Business Support Corporation Kanden Plant Corp. CORPORATION KINDEN The Kurobe Gorge Railway Co., Ltd. Inc. System, Safety Nuclear of Institute Nuclear Engineering, Ltd. NIHON NETWORK SUPPORT CO., LTD. INC. NEWJEC TEL: 078-391-7211 0742-27-1237 077-522-2626 073-422-4150 079-225-3221 Branch Kobe TEL: Branch Nara TEL: 076-432-6111 Shiga Branch TEL: BranchWakayama TEL: Branch Himeji TEL: Tokyo Branch 06-6613-0101 Tokai Branch Hokuriku Branch TEL: Fossil Power Center Administration Sakaiko Power Station Tanagawa No. 2 Power Station Nanko Power Station TEL: Kainan Power Station 0773-68-2004 Gobo Power Station Himeji No. 1 Power Station Himeji No. 2 Power Station Aioi Power Station Ako Power Station Maizuru Power Station TEL: International Kansai Airport Energy Center TEL: 072-238-8681 TEL: TEL: 0773-22-3101 TEL: 0772-62-0051 TEL: 0770-72-1212 TEL: 072-422-4701 TEL: 072-956-3381 TEL: 0773-62-2540 TEL: 075-611-2131 TEL: 0770-52-0890 TEL: 0772-22-2112 TEL: 075-491-1141 Main sales offices Main business locations Main business Main affiliated companies Main affiliated Habikino Sales Office Sales Habikino Office Sales Osaka Minami Office Sales Kishiwada Kyoto Sales Office Fushimi Sales Office Fukuchiyama Sales Office Maizuru Sales Office Miyazu Sales Office Obama Sales Office Mineyama Sales Office Takahama Sales Office Comfort and Safety services in daily life Information and telecommunications and Information URBAN SERVICE CO., LTD. EL Suehiro Food Service Co., Ltd. Kansai Jyutaku Hinshitsu Hosho Management Co., Ltd. Kansai Medical Net Co., Inc. Corp. AMENIX KANDEN Kanden E House Corporation Ltd. Co., Kanden Life Joy Kanden Security of Society, Inc. Kanden Building Management Ltd. Co., LTD. CO., FUDOSAN KANDEN Clearpass Co., Ltd. MID Urban Development Co., Ltd. Kanden System Solutions Co., Inc. K-Opticom Corp. Corporation Television Cable K Teruya Corporation Fukushima-ku, Osaka 553-0003, Japan TEL: 06-4796-8853 2-5-5 Shimizu, Ibaraki, Osaka 567-0059, Japan Osaka 530-0005, Japan TEL: 06-6441-8831 Taira, Omachi,2010-17 Nagano 398-0001, Japan 3-9-3 Honjohigashi, Kita-ku, Osaka 531-8588, Japan 579 Higashi-shiokojicho, Karasuma Nishi-iru, Shiokoji-dori, Shimogyo-ku, Kyoto 600-8216, Japan TEL: 075-361-7171 TEL: 072-641-1691 TEL: Megatokiwa-cho, Shikama-ku, Himeji, Hyogo 672-8034, Japan 3-6-16 Nakanoshima, Kita-ku, Osaka 530-8270, Japan TEL: 06-6384-1131 Fukushima, 2-1-7 Fukushima-ku, Osaka 553-0003, Japan TEL: 06-6908-4731 TEL: 072-676-3131 TEL: 06-6373-3131 TEL: 06-6441-8821 TEL: Japan TEL: 0770-32-3500 919 -1201, Japan TEL: Japan 919-2392, Ohi-gun, Fukui Takahama-cho, 07 Tanoura, 1 70 -39 -1111 0770-76-1221 TEL: Aza1-1 Yoshimi, 1 Oshima, Ohi-cho, Ohi-gun, Fukui 919-2101, Japan TEL: 0770-77-1131 Sumitomo Nakanoshima Nakanoshima, 3-2-18 Bldg. 12F, Kita-ku, Osaka 530-0005, Japan TEL: 06-6441-8821 3-6-16 Nakanoshima, Kita-ku, Osaka 530-8270, Japan 3, rue Scribe, Paris 75009, France TEL: 40 81 +33-(0)1 43 12 Sumitomo Fudosan Nishi-Umeda Building Fukushima, 5-1-7 5F, Fukushima-ku, Osaka 553-0003, Japan TEL: 06-4796-8860 Nakoji, Amagasaki,3-11-20 Hyogo 661-0974, Japan TEL: 06-6700-3131 TEL: 072-841-1131 TEL:06-6787-5011 TEL: 06-6631-4101 TEL: 06-6391-1061 3-9-5 Hamaguchinishi, Suminoe-ku, Osaka 559-0006, Japan TEL: 06-6441-8821 TEL: TEL: 072-752-5070 Sumitomo Fudosan Nishi-Umeda Building Fukushima, 5-1-7 4F, TEL: 06-6582-2881 TEL: 06-6441-8821 079-245-1659 TEL: TEL: 8 Yokota, Goichi Mihama-cho, 13, Mikata-gun, Fukui 919-1141, 5-3Kawasakayama, Nyu 66, Mihama-cho, Mikata-gun, Fukui Nakanoshima Center Building, 6-2-27 Nakanoshima, Kita-ku, Nakoji, Amagasaki, 3-11-20 Hyogo 661-0974, Japan

3-6-16 Nakanoshima, Kita-ku, Osaka 530-8270, Japan Integrated energy supply energy Integrated TEL: 06-6491-0221 TEL: Higashi Sumiyoshi Sales Office and Architecture Architecture and Human Power Electric Kansai Resources Development Center Kujo Sales Office Ogimachi Sales Office Hokusetsu Sales Office Mikuni Sales Office Takatsuki Sales Office Office Sales Ikeda Moriguchi Sales Office Hirakata Sales Office Namba Sales Office ECHIZEN ENELINEECHIZEN INC. CO., eL ENERGY Company Incorporated Osaka Bioenergy Co., Ltd. Corporation Service Energy Rinkai Osaka KIA Heating & Cooling Supply Co., Ltd. Kanden Energy Development Co., Inc. Kanden Energy Solution Co., Inc. Incorporated Company ENERGY KOUKA KOBE HEATING AND COOLING Co., SUPPLY Ltd. SAKAI LNG Corp The Japan Atomic Power Company HYDRO EDGE Co., Ltd. Inc. Company, Power Kyodo Wakayama TEL: 06-6458-5821 0261-22-0800 06-6373-1541Power Systems Center Engineering 06-6672-1301 Hospital Denryoku Kansai TEL: Kuroyon Administrative Office TEL: Wakayama Power Station Office Construction Himeji No. 2 Power Station Office Construction Branch Osaka-Kita TEL: Osaka-Minami Branch TEL: Kyoto Branch Higashiosaka Sales Office Head Office Head Nuclear Power Division Mihama Power Station Takahama Power Station Ohi Power Station 06-6491-0222 Fossil Power Center Engineering Information Technology and Center Telecommunications Paris Office Center Purchasing Power Engineering R&D Center Energy Use R&D Center TEL: Center for Civil Engineering Shin-Kurobegawa No. 3 Kurobegawa No. 4 Otozawa Kiso Yomikaki Maruyama Shimokotori Hydropower plant Thermal power plant Nuclear power plant Substation Switching station Converter station 500 kV transmission line Tie point with other power companies Kansai Electric Power’s supply area Legends: (as of March 2011) 31, (as of March 2011) 31, Higashiomi Okuyoshino Higashi Yamato Reinan Kisenyama Minami Kyoto Keihoku Shigi Shin-Ikoma Nishi Kyoto Ohi

Mihama

Kihoku

Kinokawa Takahama Nose Shin-Ayabe Inagawa Gobo Nanko System map Maizuru Sakaiko Kainan Hydropower plants locations 149 1,579 locations thousand 152,510 kVA Hokusetsu Miyazu Okutataragi

Kansai International Himeji No. 2 Note: Figures are rounded, so the sum of individual figures may differ slightly from the indicated total. indicated the from slightly differ may figures individual of sum the so rounded, are Figures Note: direct kV ±250 Airport Energy Center Yamazaki Seiban

Tanagawa No. 2 Aioi line transmission current Himeji No. 1 Okawachi Renewable energy plants 1 location 1 kW kW plants thousand thousand locations energy kW* plants Power km 8,200 km km km 9,770 165 Renewable 10,000 14,085 4,384 Total Thermal power plants Transmission locations 12 lines 123,445 (length) 6,196 Overhead Nuclear power plants Underground 3 locations (length) lines Distribution Overhead Underground Substations kW thousand 16,910 kW thousand 34,880 Ako Power Station when it was only partially operational was 6,300 kW (as of March 2011). 31, *Expressed in units of 10,000 kW due to rounding. The output of the Sakai Solar Solar Sakai the of output The rounding. to due kW 10,000 of units in *Expressed Supply area: part), (greater Hyogo Osaka, Kyoto, prefectures; and Wakayama Shiga, Nara, portions of Mie, Gifu, and Fukui prefectures 0 1,000 1,500 4,000 3,500 3,000 2,500 2,000 (10,000 kWh) (FY) 1 1 5 3,009 , System peak demand peak System 11,511 2,723 6 1 4 , 11,416 9 5 2 4 9 , 11,459 9 (as of March 2011) 31, 2,2,992 2,963 1,504 3 7 2,953 4 , 11,473 Note: Figures are rounded, so the sum of individual figures may differ slightly from the indicated total. 71 2,960 4 , 11,471 9 4 4 2,955 , 11,449 1,402 Overview supply facilities power Electric 2,969 Residential: Residential: kWh million 52,316 Wakayama prefectures, greater part of Hyogo Hyogo part of greater prefectures, Wakayama prefecture, and portions of Mie, Gifu and Fukui prefectures Residential: 12,390 thousand 12,390 Residential: 1951 1, May registry) employee on 22,207 (based 164,600 million kWh million 164,600 938,730,000

1,418 1,418 33,060 MW (August 2, 2001) ¥2,475,900 million ¥2,475,900 3,068 1,398 ¥202,400 million million ¥202,400 ¥489,300 million ¥489,300 9 ¥6,457,500 million million ¥6,457,500 2 *Maximum 3-day average peak demand (transmission end) 3,185 4 Entirety of Osaka, Kyoto, Nara, Shiga and System Peak Demand* Electricity Sales Volume ¥103,300 million ¥103,300 1,1,429 ‘90 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ‘08 ‘09 ‘10 1,206 3,015 0 Electricity sales volume and system peak demand Electricity sales volume Note: Figures are rounded, so the sum of individual figures may differ slightly from the indicated total. total. indicated the from slightly differ may figures individual of sum the so rounded, are Figures Note: Monetary amounts are rounded down to the nearest 1 million yen. Paid-in capital Paid-in common of Number issued shares Total assets employees of Number Electricity volume sales million) ¥7,310,100 (consolidated: Date of establishment of Date 500 Total: 13,480 thousand 13,480 Total: electricity system Gross amount demand peak System Commercial and industrial: 1,090 thousand area Supply end) generating at value daily (Highest customers of Number industrial: and Commercial kWh million 98,762 Total: kWh million 151,078 Operating revenues Operating income Ordinary income Net million) ¥2,769,700 (consolidated: million) ¥237,900 (consolidated: million) ¥123,100 (consolidated: 1,000 1,500 volume 2,682 (100 GWh) Electricity sales

37

data Corporate Cover: Sakai Solar Power Station

Jan. 2012