HPT’sHPT’s Activity Activity forfor ThermalThermal PowerPower PlantsPlants
HitachiHitachi PlantPlant Technologies,Technologies, LtdLtd
July,July, 20062006 BusinessBusiness AreaArea
¾ Gas Turbine ¾ Steam Turbine ¾ Generator ¾ HRSG ¾ Conventional Boiler (Coal, Oil, Gas) ¾ Combined Cycle ¾ Co-generation Plant etc
Hitachi Plant Technologies 2 TypeType ofof ProjectProject
) Installation of New Equipment ) Refurbishment ) Overhaul ) Renovation ) Replacement ) Maintenance etc
Hitachi Plant Technologies 3 ScopeScope ofof Work:Work: OverviewOverview
Construction Materials Planning Fabrication Detail Design BOP Supply Design Engineering of BOP Spare Parts Project Management Civil & Field Maintenance Field Building Work & Repair Work Electrical Supply of Work Piping Mechanical Fabrication & Work Erection Materials
Hitachi Plant Technologies 4 DivisionDivision ofof Works:Works: Case-1Case-1
OWNER
Main Contractor
Supplier HPC • Main Equipment • M & E Field Wok • Basic Engineering • BOP Design & Supply • Detail Eng. / Material Supply • Civil & Building
Hitachi Plant Technologies 5 DivisionDivision ofof Works:Works: CaseCase 22
OWNER
Main Contractor
Supplier HPC
• Main Equipment • M & E Field Wok • Basic Engineering • Detail Engineering • BOP Design & Supply • Material Supply • Civil & Building
Hitachi Plant Technologies 6 MajorMajor MailMail stonestone
¾ JAPAN: - First power plant : year1957 - 250 units constructed in Japan ¾ OVERSEAS: - First power plant - in India: year 1963 - Erection Experience in over 20 counties
Hitachi Plant Technologies 7 ExecutionExecution RecordRecord inin Overseas:Overseas: OverviewOverview
PAKISTAN CANADA GTG 16unit &TG: TG 19 projects: 1,140MW 5,520MW
IRAN JAPAN GTG 23unit & TG: 83 projects: 41.815MW 600MW Br: 16 projects BTG: 25 projects TG:25 projects KUWAIT CC: 11 projects GTG 8 units: BAHAMA GTG: 6 projects 225 MW GTG 2unit: 50 MW EGYPT CHINA GTG 4units : 100MW BTG:250MW MEXICO GTG 7 units & TG: NIGERIA THAILAND 456 MW GTG 6 units & BTG: CC & BTG: 79MW 1,690 MW CUBA GTG 3unit & BTG: PHILIPIPINES 229MW TG & Br: 850MW INDIA SAUDIARAB IA GTG 2unit, BTG GTG 10 units: & TG: 200 MW SINGAPORE VENEZUELA 350 MW GTG 2units, CC, Br 3units: 1,200MW MALAYSIA TG: 2,650 MW GTG 7 units: 170MW TOTAL: 64,000 MW ARGENTINA AUSTRALIA TG 2units: 360MW GTG 5units, TG & Br: 3,856MW
Hitachi Plant Technologies 8 ExecutionExecution RecordsRecords :: OverseasOverseas
PERU THAILAND Ilo Thermal Power MAPUTAPHUT 125 MW Power Station 70MW x 2 GT-G (Marker: Hitachi, Ltd.) (Maker : GE) Completed in Year 2000 Completed in Year 1997
Hitachi Plant Technologies 9 ExecutionExecution RecordsRecords :: OverseasOverseas
NIGERIANIGERIA NIGERIANIGERIA Lagos Thermal Power Delta Power Station Boiler/Turbine H25 Gas Turbine 6Unit Rehabilitation Work (Maker: HITACHI) (Maker: HITACHI)
Hitachi Plant Technologies 10 ExecutionExecution RecordsRecords :: OverseasOverseas
BAHAMA Bahama Electricity Co. 25MW x 2 Gas Turbines (Marker: Hitachi, Ltd.) Completed in Year 2003
Hitachi Plant Technologies 11 ExecutionExecution RecordsRecords :: OverseasOverseas
BAHAMA 1. Contract Formation: HitachiHitachi Ltd. Ltd. Main Equipment Supply
BahamasBahamas Electricity Electricity Corp. Corp. SumitomoSumitomo Corp. Corp. Foundation work, HitachiHitachi Plant Plant Installation work & 2. Location: Material Supply
ReplacementReplacement ofof GTGGTG (F5(F5 class)class) toto H25H25 (25MW)(25MW)
Hitachi Plant Technologies 12 MajorMajor Projects:Projects: OverseasOverseas
EGYPT Cairo North 750MW Combined Cycle Power Station Erection Works 250MW x 2 Gas Turbines and Generators (Maker: Mitsubishi Heavy Industries) 250MW x 1 Steam Turbine (Maker: Hitachi,Ltd.)
Hitachi Plant Technologies 13 ExecutionExecution Records:Records: SingaporeSingapore -- Overview Overview
~ SenokoSenoko P.S.P.S. No.1 No.1~88 × 120MW120MW×33 × 250MW250MW×55
JurongJurong P.S.P.S. No.1No.1~~44 60MW60MW××44
TuasTuas stagestage 22 Phase2Phase2 720MW720MW C/CC/C
Tuas Stage1No.1,2 Sakura P.S. 800MW C/C Seraya P.S. No.4~6 Tuas Stage1No.1,2 Sakura P.S. 800MW C/C Seraya P.S. No.4~6 HPCHPC 600MW×2 250MW×3 600MW×2 250MW×3 SingaporeSingapore BranchBranch Hitachi Plant Technologies 14 ExecutionExecution Records:Records: SingaporeSingapore -- Tuas Tuas
SINGAPORE Tuas Stage I 600 MW x Tuas Stage II 360 MWx2 2ST-G (Maker:Hitachi,Ltd.) Combined Cycle Power Station Completed in Year 1999 (Maker: Mitsubishi Heavy Industries)
Hitachi Plant Technologies 15 ExecutionExecution RecordsRecords inin AustraliaAustralia STANWELL: 1,400MW(350MW×4) Maker: Hitachi,Ltd. Completed in year 1996 TARONG: 1400MW(350MW×4) MUNGARRA: Maker: Hitachi,Ltd. TARONG NORTH: 37MW (F6×1) Completed in year 1988 450MW(450MW×1) Maker: Hitachi,Ltd. Maker: Toshiba,Ltd. Completed in year Completed in year 2002 1989 BRISBANE
MELBOURNE PERTH SYDNEY LOY YANG B: PINJAR: KALGOORIE: 1,000MW(500MW×2) 37MW (F6×1) 37MW (F6×1) Maker :Hitachi,Ltd. Maker : Hitachi,Ltd. Maker: Hitachi,Ltd. Completed in year 1996 Completed in year 1990 Completed in year 1989
Hitachi Plant Technologies 16 ExecutionExecution Records:Records: Australia-Australia- Queensland Queensland
Tarong Power Station 350MW x 4 Steam Turbines (Maker: Hitachi, Ltd.) Completed in Year 1988
Hitachi Plant Technologies 17 ExecutionExecution Records:Records: Australia-Australia- Queensland Queensland
Tarong North Power Station 450MW x 1 Steam Turbines (Maker: Toshiba, Ltd.) Completed in Year 2002
Hitachi Plant Technologies 18 ExecutionExecution Records:Records: Australia-Australia- Queensland Queensland
Stanwell Power Station 350MW x 4 TG & Auxiliaries (Maker: Hitachi, Ltd.) Completed in Year 1996
Hitachi Plant Technologies 19 ExecutionExecution Records:Records: Australia-Australia- Victoria Victoria
Loy Yang ‘B’: 500MW x 2 TG & Auxiliaries (Maker: Hitachi, Ltd.) Completed in Year 1996
Hitachi Plant Technologies 20 ExecutionExecution Records:Records: Australia-Australia- Western Western AustraliaAustralia
- Mungarra : 37MW x 1 F6 Gas Turbine (Maker: Hitachi, Ltd.) Completed in year 1989 - Kalgoorlie: 37MW x 1 F6 Gas Turbine (Maker: Hitachi, Ltd.) Completed in year 1989 - Pinjar: 37MW x 1 F6 Gas Turbine (Maker: Hitachi, Ltd.) Completed in year 1990
Hitachi Plant Technologies 21 ExecutionExecution Records:Records: KoganKogan Creek Creek 750MW750MW ( ( underunder construction)construction)
) Project Name: Kogan Creek Power plant 750MW coal fired power station ) Location: Queensland, Australia ) Owner: CEPA(Kogan Creek)Holding Pty Ltd. ) Manufacture: SIEMENS Ltd. Australia ) Scope of our work: Installation work ) Date of Contract: Aug 2005 ) Date of Completion: Aug, 2007
Hitachi Plant Technologies 22 ExecutionExecution Records:Records: AustraliaAustralia
) Waste Water Treatment Plant for Sydney Metropolitan Waste Disposal Authority ) Major overhaul of Tarong U1 Turbine ) Refurbishment and re-commissioning of Swankbank ‘A’ Sootblowers ) Electrical & instrumentation for retrofit of precipitators fabric filter plant Swankbank ‘B’. ) Cabling, light & power services for Callide ‘A’ re- powering
Hitachi Plant Technologies 23 ExecutionExecution RecordsRecords :: VenezuelaVenezuela -- CADAFE CADAFE
) 1978– 1984
) PLANTA CENTRO THERMAL POWER STATION UNITS 3 & 4, and Unit 5
) Owner: COMPAÑÍA ANONIMA DE ADMINISTRACION Y FOMENTO (CADAFE)
) Unit:3 & 4: Installation of Two 1400 Ton/Hour Boilers and Associated equipment for 400 MW generating Units No 3 & 4, AFE including erection of Steel Structures of the Boilers.
) Unit 5: Installation of 1,400 Ton/Hour boiler for 400 MW generation unit.
Hitachi Plant Technologies 24 ExecutionExecution RecordsRecords :: VenezuelaVenezuela -- Tacoa Tacoa DCS DCS
) Construction period: 2004-2005
) Project Name: Tacoa Power plant unit 7, 8 & 9 - DCS (Distributed digital controls) project
) Owner: La Electricidad de Caracas (EDC)
) Purchaser: Toshiba Corporation (Mitsui & Co., ltd)
) Site: Caracas
) HPC & VHPC’s scope
- Installation and electrical works
- Supply of cables & materials
Hitachi Plant Technologies 25 ExecutionExecution RecordsRecords :: VenezuelaVenezuela -- Tacoa Tacoa DCS DCS
Hitachi Plant Technologies 26 ExecutionExecution RecordsRecords :: VenezuelaVenezuela -- ELEVAL ELEVAL H25H25
) Construction period: 2005-2006
) Project name: ELEVAL H25 GTG x 1 units
) Owner : ELEVAL
) Purchaser: Hitachi Ltd (Mitsui & Co., ltd)
) Site: VALENCIA
) HPC & VHPC’s scope
- Installation and electrical works
- Foundation work
- Inland transportation and material supply
Hitachi Plant Technologies 27 ExecutionExecution RecordsRecords :: VenezuelaVenezuela -- ELEVAL ELEVAL H25H25
Hitachi Plant Technologies 28 ExecutionExecution RecordsRecords :: JapanJapan
ISOGO FUTTSU 600 MW Coal Fired Futtsu Power Station Turbine Generator 1520MW Combined Cycle System Installation (Maker: Hitachi, Ltd.) (Maker: Fuji – Siemens) Completed in Year 2003 Completed in Year 2002
Hitachi Plant Technologies 29 ExecutionExecution RecordsRecords::CombinedCombined CycleCycle PlantPlant inin JapanJapan::OverviewOverview
Kanden/Himeji 6 (670MW C/C)1996
Chugokuden/Yanai 1 (700MW C/C)1992 2 (700MW C/C)1996 Toden/Chiba 2 (720MW C/C)2000
Toden/Futtsu 2(1000MW C/C)1988 Futtsu 3(1520MW C/C) 2005
Toden/Yokohama 8 (1400MW C/C)1998
Chubuden/Kawagoe 3 (1650MW C/C)1996 Kyusyuden/Shinoita 1 (690MW C/C)1991 3 (700MW C/C) 1998
Hitachi Plant Technologies 30 ExecutionExecution RecordsRecords::Shin-OitaShin-Oita CCCC PlantPlant
ChippingChipping WorkWork forfor SoleSole PlatesPlates
Hitachi Plant Technologies 31 ExecutionExecution RecordsRecords::Shin-OitaShin-Oita CCCC PlantPlant
ContactContact CheckCheck forfor SoleSole PlatePlate PadsPads
Hitachi Plant Technologies 32 ExecutionExecution RecordsRecords::Shin-OitaShin-Oita CCCC PlantPlant
HandlingHandling ofof CondenserCondenser LowerLower ShellShell
Hitachi Plant Technologies 33 ExecutionExecution RecordsRecords::Shin-OitaShin-Oita CCCC PlantPlant
GasGas TurbineTurbine LiftLift--upup withwith LiftingLifting JackJack
Hitachi Plant Technologies 34 ExecutionExecution RecordsRecords::Shin-OitaShin-Oita CCCC PlantPlant
InstallationInstallation donedone byby LiftingLifting JackJack
Hitachi Plant Technologies 35 ExecutionExecution RecordsRecords::Shin-OitaShin-Oita CCCC PlantPlant
Gas Turbine Setting Completed
Hitachi Plant Technologies 36 BOP:BOP: AirAir PollutionPollution ControlControl SystemSystem
) Dry and Wet Type Electrostatic Precipitators ) Moving-Electrode Type Electrostatic ) Harmful Gas Removal Units (Including Hydrogen Chloride Gas) ) Fuel Gas Temperature Regulators ) Ash & Dust Conveying Systems ) Precipitators ) Bag Filters Senoko Power Station Singapore (Electrostatic Precipitator)
Hitachi Plant Technologies 37 ISOISO certificatecertificate && QCQC
Hitachi Plant Technologies 38 OurOur Advantages:Advantages: BenefitsBenefits toto CustomerCustomer
Our Advantages Cost Benefits to Customer Wide Range of Work Scope Accumulated Project Knowledge & Experience Advanced Construction Technology MinimumMinimum Global Networks CostCost Skillful Human Recourses Pre-engineering Service
Schedule Advanced Project Management Systematic Schedule Management OnOn Time Time Interface management with Other Parties
Reliability Long-term Experience Sound financial background TotalTotal Satisfaction Satisfaction QA/QC, Safety Policy
Hitachi Plant Technologies 39 Pre-EngineeringPre-Engineering :: BenefitsBenefits toto CustomersCustomers
EngineeringEngineering ProcurementProcurement ConstructionConstruction
Pre-Engineering Feed-BackFeed-Back Service ¾Suggestion of Design for Benefits optimizing Erection Work & Construction Schedule ¾Realization of Effective ¾Introduction of Advanced Construction Schedule Erection Technology ¾Reduction of Total Project Cost ¾Assistance of making by minimizing Erection Cost Documentation for ¾Reduction of Documentation construction planning Cost ¾Advice of site work ¾Smoothing Site work conditions
Hitachi Plant Technologies 40