Con Edison – 11th Street Conduit Draft Upland Site Summary

CON EDISON – 11TH STREET CONDUIT (DAR SITE ID #110) Address: Ash Street and McGuinness Boulevard, , Kings, New York 11222 Tax Lot Parcel(s): Brooklyn Block 2491, Lot 136 Latitude: 40.738481 Longitude: -73.952379 Regulatory Programs/ Numbers/Codes: RCRA Handler ID NYR000078469, SPDES No. NY0201138; NYSDEC Spill No. 9910098, 0111517, 0202606, 0606690, 0606729, 0609866, and 0609822 Analytical Data Status: Electronic Data Available Hardcopies only No Data Available

1 SUMMARY OF CONSTITUENTS OF POTENTIAL CONCERN (COPCs) TRANSPORT PATHWAYS TO THE CREEK The current understanding of the transport mechanisms of COPCs from the upland portions of the Consolidated Edison, Inc. (Con Edison) – 11th Street Conduit site (site) to is summarized in this section and in Table 1 and supported in the following sections.

Overland Transport The site is adjacent to Newtown Creek. Stormwater at the site is expected to infiltrate into the ground, flow overland towards Newtown Creek, or discharge to the creek via a local stormdrain system. There is insufficient evidence to make a current or historical pathway determination.

Bank Erosion No specific evidence of bank erosion was identified in the available site records. A wooden bulkhead extends across the shoreline at the site. There is insufficient evidence to make a current or historical pathway determination.

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 1 120782-01.01

Con Edison – 11th Street Conduit

Groundwater Information regarding on-site groundwater investigations was not identified in documents available for review. There is insufficient evidence to make a current or historical pathway determination.

Overwater Activities The site is adjacent to Newtown Creek. Information regarding overwater activities was not identified in documents available for review. There is insufficient evidence to make a current or historical pathway determination.

Stormwater/Wastewater Systems Operations at the site are covered under New York State Pollutant Discharge Elimination System (SPDES) Permit No. NY0201138 for discharge to one outfall to Newtown Creek (believed to be Outfall NCB-006131-002) located at the northwest corner of the property in Brooklyn (Ash Street and McGuinness Boulevard). The outfall is connected to a sump pump that discharges up to 85,000 gallons per day (gpd) of groundwater and stormwater that infiltrates into and collects in the Con Edison utility conduit beneath Newtown Creek. Direct discharge of stormwater and wastewater is a potentially complete historic pathway and a complete current pathway. There is insufficient evidence to make a current or historical pathway determination for discharge to sewer/combined sewer overflows.

Air Releases Information regarding air emissions from the site was not identified in documents available for review. There is insufficient evidence to make a current or historical pathway determination.

2 PROJECT STATUS The site is currently listed as a Conditionally Exempt Small Quantity Generator (CESQG; FOIA Report 2009; EDR 2010). The Resource Conservation and Recovery Act (RCRA) ID is NYR000078469 and the NYSDEC Site Manager is Bob Wither.

No available documents containing environmental investigations were identified for this site.

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 2 120782-01.01

Con Edison – 11th Street Conduit

3 SITE OWNERSHIP HISTORY Respondent Member: Yes No

Owner Years Occupant Types of Operations A J McCollums circa 1920s A J McCollums Coal yards Consolidated Edison 1964 – present Consolidated Edison Conduit outfall

4 PROPERTY DESCRIPTION This upland parcel occupies approximately 0.67 acres1 adjacent to Newtown Creek (see Figure 1). The property is located at the intersection of Ash Street and McGuinness Boulevard in Brooklyn, in the county of Kings, New York. The 11th Street Conduit provides an artificial closed conduit under Newtown Creek, which houses the Con Edison electrical distribution cable between Brooklyn and . The tunnel extends from the site at Ash Street and McGuinness Boulevard to 11th Street and 47th Road in Queens (see Attachment 1). The property is generally flat with steep slopes at the bulkhead adjacent to Newtown Creek. The majority of the site appears to be unpaved with areas of vegetation above the creek. Structures include a single, one-story building, approximately 850 square feet, located on the western portion of the property. The building contains the primary “headhouse” that controls tunnel operations at the property. A wooden bulkhead extends across the 150-foot shoreline at the north side of the property.

The site is bordered by Newtown Creek to the north, an industrial properties to the east and south, and by the to the west. The property lies within a manufacturing district, zoned as M1-2 (NYCDCP 2011). M1 districts typically include light industrial uses, such as woodworking shops, repair shops, and wholesale service and storage facilities..

A 2010 aerial photograph of the site is presented as Figure 1.

5 CURRENT SITE USE The site is currently owned by Con Edison and is used for electric power distribution.

1 Acreage is an approximation of the site tax parcel using geographic information system data.

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 3 120782-01.01

Con Edison – 11th Street Conduit

6 SITE USE HISTORY The lot was formerly used as a coal yard (E. Belcher Hyde Map Co. Inc. 1929). Consolidated Edison, Inc. purchased the lot in 1964 (Con Edison 1994).

7 CURRENT AND HISTORICAL AREAS OF CONCERN AND COPCS The current understanding of the historical and current potential upland and overwater areas of concern at the site is summarized in Table 1. The following sections provide brief discussion of the potential sources and COPCs at the site requiring additional discussion.

7.1 Uplands Reviewed records did not indicate upland areas of concern. This could be due to missing information or a lack of environmental issues at the site. COPCs at the site include polychlorinated biphenyls (PCBs), petroleum hydrocarbons, creosote, and volatile organic compounds (VOCs) based on general knowledge of constituents associated with electrical distribution equipment, spill reports, and site SPDES permit requirements (Con Edison 1994).

7.2 Overwater Activities Overwater activities are not a current transport pathway.

7.3 Spills Documented spills at the site are summarized as follows:

NYSDEC Spill No. Spill Date Close Date Material Spilled Remarks Black oily substance in trough of the 03/06/02 09/05/06 Unknown Petroleum 0111517 conduit Reported approximately 2 pints of unknown oil in 500 gallons of water in 06/11/02 08/26/02 Unknown Material 0202606 sump pump structure. Liquid appeared to be contained.

09/11/06 12/21/06 Creosote 300 gallons spilled, mixed with water 0606690

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 4 120782-01.01

Con Edison – 11th Street Conduit

NYSDEC Spill No. Spill Date Close Date Material Spilled Remarks Spilled from Consolidated Edison vehicle 09/12/06 12/21/06 Antifreeze (0.5 gallon) 0606729 to soil Light sheen on Newtown Creek in vicinity

11/29/06 01/25/07 Unknown Petroleum of the Consolidated Edison tunnel (area of 0609866 roughly 40 feet by 15 feet) Unknown Material Equipment failure (sump pimp cables 11/28/06 02/20/07 (mixture of oil and 0609822 snapped) caused spill to surface water grease) 9908111 10/04/99 01/10/08 Unknown Petroleum Equipment failure spill to soil 9910098 11/19/99 11/19/99 Lube oil 1 gallon spill to soil due to human error

Notes: Information gathered from the Environmental Data Resources DataMap Environmental Atlas (EDR 2010). NYSDEC – New York State Department of Environmental Conservation

8 PHYSICAL SITE SETTING Site-specific hydrogeologic information was not identified in documents available for review. The geologic setting for Newtown Creek consists of impermeable Precambrian and Paleozoic crystalline bedrock, overlain by the Upper Cretaceous Raritan formation, Magothy formation and Matawan Group (undifferentiated), unconsolidated Pleistocene deposits and upper Pleistocene glacial deposits and Holocene shore, beach salt-marsh deposits, and alluvium, along with local occurrences of artificial fill (Buxton et al. 1981; Soren and Simmons 1987). The primary areas of groundwater discharge are Newtown Creek and its tributaries and the East River (Misut and Monti 1999). In the vicinity of Newtown Creek, groundwater flow in the Upper Glacial aquifer is generally north and south towards the creek. With increased distance from the creek, groundwater will flow towards the nearest surface water body to discharge (Misut and Monti 1999). Incidences of perched groundwater may occur above the Upper Glacial Aquifer in some areas, particularly in formerly low-lying areas that have been filled. Groundwater flow at a specific property may differ from the regional pattern due to pumping for groundwater treatment or dewatering activities (Misut and Monti 1999), the presence of buried utilities, or other preferential pathways.

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 5 120782-01.01

Con Edison – 11th Street Conduit

9 NATURE AND EXTENT (CURRENT UNDERSTANDING OF ENVIRONMENTAL CONDITIONS) 9.1 Soil Soil Investigations Yes No Bank Samples Yes No Not Applicable Soil-Vapor Investigations Yes No

Information regarding on-site soil investigations was not identified in documents available for review.

9.2 Groundwater Groundwater Investigations Yes No NAPL Presence (Historical and Current) Yes No Dissolved COPC Plumes Yes No Visual Seep Sample Data Yes No Not Applicable

Information regarding on-site groundwater investigations was not identified in documents available for review.

9.3 Surface Water Surface Water Investigation Yes No SPDES Permit (Current or Past) Yes No Industrial Wastewater Discharge Permit (Current or Past) Yes No Stormwater Data Yes No Catch Basin Solids Data Yes No Wastewater Data Yes No

9.3.1 Stormwater and Wastewater Systems This site is within the Newtown Creek Water Pollution Control Plant (WPCP) sewershed. Stormwater at the site is expected to infiltrate into the ground, flow overland towards Newtown Creek, or discharge to the creek via a local stormdrain system (potentially at

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 6 120782-01.01

Con Edison – 11th Street Conduit

Outfalls NCB-246 and NCB-248). Seepage of groundwater through the conduit walls and infiltration of rainwater through the riser shafts located at Ash Street and McGuinnes Boulevard and at 11th Street and 47th Road is discharged to Newtown Creek at Outfall NCB­006131-002 (Con Edision 1994). Sanitary wastewater is conveyed to the Newtown Creek WPCP (NYCDEP 2007).

9.3.2 SPDES Permit The SPDES permit application was submitted on March 20, 1994. The operation contributing to the discharge flow is described as a groundwater infiltration and stormwater pump/recovery system from the tunnel. Because the electrical distribution cables within the conduit are oil-filled, an oil-water separator was installed to separate any oil from collected waters prior to discharge, as depicted in Attachment 2 (Con Edison 1994; USEPA 1994b). The oil-water separator was installed in 1995. Sometime prior to the 2006 permit renewal, a coalesce filter was also installed in front of the oil-water separator to increase filtration capabilities of the outfall prior to discharge to Newtown Creek (NYSDEC 2006). Prior to 1995, collected water was discharged to Newtown Creek via sump pump discharge piping without treatment (Con Edison 1994).

The discharge flow is given as 85,000 gpd. The permit and additional modifications were issued on January 9, 1997, and it was subsequently renewed on a 5-year cycle. The most recent renewal was August 3, 2006 (expiring February 29, 2012). Permit parameters and limitations are summarized as follows (NYSDEC 1997, 2001, and 2006; NYSDEC 2011):

Permit Permit Type Number Start Date Outfalls Volume Frequency-Parameters (Limit) SPDES SPDES No. 01/09/97 001 85,000 Monthly instantaneous – Flow NY0201138 (Renewed gallons Monthly grab – Total Suspended 09/06/01 per day Solids and (50 mg/L Daily Maximum) 08/03/06; Monthly grab – Oil & Grease expired (15 mg/L Daily Maximum) 02/29/12) Annual grab – Benzene (0.10 mg/L Daily Maximum) Annual grab – Toluene (0.10 mg/L Daily Maximum)

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 7 120782-01.01

Con Edison – 11th Street Conduit

Permit Permit Type Number Start Date Outfalls Volume Frequency-Parameters (Limit) Annual grab – Xylene (0.10 mg/L Daily Maximum) Annual grab – Ethylbenzene (0.10 mg/L Daily Maximum) There shall be no discharge of polychlorinated biphenyl compounds (additional requirement)

Note: mg/L – milligram per liter

9.3.3 Wastewater Data The SPDES permit application for the site includes analytical results for an unknown number of samples of conduit seepage water collected between December 1993 and February 1994. According to SPDES discharge monitoring data from between April 30, 2006, and March 31, 2011, the site was in compliance for all dates monitored, except for one exceedance for oil and grease levels on November 30, 2006 (documented discharge: 21 mg/L; NYSDEC 2011). No PCB monitoring results were present in the 2006 to 2011 SPDES monitoring data. Discharge monitoring data for the period from issuance of the permit in 1997 to April 2006 was not available.

A summary of the available wastewater sampling results is provided in the following table:

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 8 120782-01.01

Con Edison – 11th Street Conduit

2 Report Date Constituent Result Unit Limit Source PCBs (All No discharge of <0.3 ppb Aroclors) PCBs Oil and Grease 8.4 ppm 15 ppm Consolidated March 19941 Benzene <1.0 ppb 100 ppb Edison 1994 Toluene <1.0 ppb 100 ppb Ethylbenzene <1.1 ppb 100 ppb Xylenes <1.3 ppb 100 ppb PCBs (All Not No discharge of -- Aroclors) reported PCBs Oil and Grease <5 – 21 ppm 15 ppm April 2006 – Benzene 3 – 5 ppb 100 ppb NYSDEC 2011 March 2011 Toluene 3 – 18 ppb 100 ppb Ethylbenzene <5 – 42 ppb 100 ppb Xylenes <3 – 32 ppb 100 ppb

Notes: 1 – Prior to permit issuance 2 – 1997 permit limits mg/L – milligram per liter NYSDEC – New York State Department of Environmental Conservation PCB – polychlorinated biphenyl ppb – parts per billion ppm – parts per million

9.3.4 Surface Water Summary The site discharges to Newtown Creek groundwater and stormwater that infiltrates into and collects in the tunnel. An SPDES permit was issued to the site in 1997 and has been renewed on a 5-year cycle. The current permit will expire in 2012 (NYSDEC 2006, 2011). One effluent violation is documented in December 2006 for oil and grease discharge of 40 percent above the specified permit limit (USEPA 2010). However, no other permit violations or compliance issues are documented at the site (USEPA 2010 and 2011).

9.4 Sediment Creek Sediment Data Yes No Not Applicable

Information regarding sediment investigations was not identified in documents available for review.

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 9 120782-01.01

Con Edison – 11th Street Conduit

9.5 Air Air Permit Yes No Air Data Yes No

Information regarding air emissions from the site was not identified in documents available for review.

10 REMEDIATION HISTORY (INTERIM REMEDIAL MEASURES AND OTHER CLEANUPS) Information regarding on-site remedial activities was not identified in documents available for review.

11 BIBLIOGRAPHY/INFORMATION SOURCES Buxton et al. (Buxton, H.T., Soren, J.,Shernoff, P.K.), 1981. Reconnaissance of the Groundwater Resources of Kings and Queens Counties, New York. U.S. Department of the Interior, U.S. Geological Survey. Open-File Report 81-1186. 1981.

Con Edison (Consolidated Edison, Inc.), 1966. Supplemental Indenture. January 1, 1966.

Con Edison, 1994. New SPDES Permit Application 11th Street Conduit. Prepared for New York State Department of Environmental Conservation. March 28, 1994.

E. Belcher Hyde Map Co. Inc., 1929. Desk Atlas of the Borough of Brooklyn, City of New York. Volume 2: Sheet 3. 1929.

EDR (Environmental Data Resources, Inc.), 2010. EDR DataMapTM Environmental AtlasTM. Prepared for Newtown Creek, Queens, New York. November 4, 2010.

FOIA Report (Freedom of Information Act Report), 2009. FOIA Report of Non-Sensitive Compliance Monitoring and Enforcement Data. November 24, 2009.

Misut and Monti (Misut, P.E. and Monti, J. Jr.), 1999. Simulation of Ground-Water Flow and Pumpage in Kings and Queens Counties, Long Island, New York. U.S. Geological Survey. Water-Resources Investigations Report 98-4071. 1999.

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 10 120782-01.01

Con Edison – 11th Street Conduit

NYCDCP (New York Department of City Planning), 2011. Zoning and Land Use Mapping Tool. Updated: December 20, 2011. Accessed December 20, 2011. Available from: http://www.nyc.gov/html/dcp/

NYCDEP (New York City Department of Environmental Protection), 2007. Landside Modeling Report, Sewershed Characteristics and Model Calibration. City-Wide Long Term CSO Control Planning Project. Newtown Creek WPCP Service Area. Draft. Department of Environmental Protection, Bureau of Engineering Design and Construction. July 2007.

NYSDEC (New York State Department of Environmental Conservation), 1997. NYSDEC State Pollutant Discharge Elimination System (SPDES) Discharge Permit. SPDES Permit No. NY0201138. March 1, 1997

NYSDEC, 2001. NYSDEC SPDES Notice/Renewal Application/Permit. March 1, 2002.

NYSDEC, 2006. NYSDEC SPDES Notice/Renewal Application/Permit. March 1, 2007.

NYSDEC, 2011. Discharge Monitoring Report Data: Dischargers to Newtown Creek. NYSDEC Spreadsheet. April 30, 2006, through March 31, 2011.

Sanborn (Sanborn Map Company), 1887. Insurance Maps of the Borough of Brooklyn, City of New York. Volume 4: Sheet 91. 1887

Sanborn, 1916. Insurance Maps of the Borough of Brooklyn, City of New York. Volume 4: Sheet 10. Original 1916, revised 1942.

Soren and Simmons (Soren, J. and Simmons, D.L.), 1987. Thickness and Hydrogeology of Aquifers and Confining Units Below the Upper Glacial Aquifer on Long Island, New York. U.S. Geological Survey. Water-Resources Investigations Report 86-4175. Scale 1:125,000. 1987.

USEPA (U.S. Environmental Protection Agency), 2010. Enforcement and Compliance History Online (ECHO) Database. Con Edison – 11th Street Conduit. Accessed February 12, 2010. Available from: http://www.epa-echo.gov/ Queried: February 12, 2010.

USEPA, 2011. Enforcement and Compliance History Online (ECHO) Database. Con Edison – 11th Street Conduit. Accessed December 20, 2010. Available from: http://www.epa-echo.gov/ Queried: December 20, 2010.

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 11 120782-01.01

Con Edison – 11th Street Conduit

12 ATTACHMENTS Figures Figure 1 Site Vicinity Map: Con Edison – 11th Street Conduit

Tables Table 1 Potential Areas of Concern and Transport Pathways Assessment

Supplemental Attachments Attachment 1 Figure 2: Site Plot Plan (Con Edison 1994) Attachment 2 Figure 3: Con Edison 11th Street Conduit Flow Diagram (NYSDEC 2006)

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 12 120782-01.01

Con Edison – 11th Street Conduit

Table 1 Potential Areas of Concern and Transport Pathways Assessment – Con Edison – 11th Street Conduit

Potential Areas of Media Impacted COPCs Potential Complete Pathway Concern TPH VOCs

– –

Range

Range - Range –

– Discharge

Sediment

Description of Areas of ank Erosion

Concern Surface Soil Subsurface Soil Groundwater Solids Basin Catch Creek Gasoline Diesel Heavier Related Petroleum (e.g., BTEX) VOCs Chlorinated VOCs SVOCs PAHs Phthalates Phenolics Metals PCBs Herbicides and Pesticides Dioxins/Furans Overland Transport Groundwater Direct Discharge Overwater Direct Storm/Wastewater Discharge to Sewer/CSO B Air Releases Spills √ ? ? ? ? √ ? √ √ ? ? ? √ ? ? ? ? ? ? ? ? ? ? ? ? ? Leaks from electrical ? ? ? ? ? ? ? √ √ √ ? ? √ ? ? ? √ ? ? ? ? ? √ ? ? ? equipment in Conduit

Notes: √ – COPCs are/were present in areas of concern having a current or historical pathway that is determined to be complete or potentially complete. ? – There is not enough information to determine if COPC is/was present in area of concern or if pathway is complete. -- – Current or historical pathway has been investigated and shown to be not present or incomplete.

BTEX - benzene, toluene, ethylbenzene, and xylene COPC – constituent of potential concern CSO – combined sewer overflowPAH – polycyclic aromatic hydrocarbon PCB – polychlorinated biphenyl SVOC – semi-volatile organic compound TPH – total petroleum hydrocarbon VOC – volatile organic compound

Draft Upland Site Summary Report May 2012 Newtown Creek RI/FS 13 120782-01.01 (! !. !.

TBTA Queens BB-135 BB-582 Midtown Tunnel (! A V BB-134 (! 5 1 (! BB-136 BB-132 (! (! A V BB-137 BB-138 NC-SD22B !. N (! NC-SD22B D E (! (! O R (! NC-SD18A B NC-SD18A !. !. !. NC-SD20BNC-SD20B BB-133!. BB-581 NC-SD20A/SD92ANC-SD20A/SD92A A V 5 3 BB-130 BB-131 BB-129 (! (! 1 (! BB-049 1 (! S BB-580 NC-SD18BNC-SD18B NC-SD19BNC-SD19B !. T !. BB-127 !. !. U N NC-SD19ANC-SD19A T (!(! NC-SD15A W N NC-SD15A T O (! !. I D !. !. NC-SD16ANC-SD16A EK M BB-128!. CRE N S BB-126 N C E E BB-043 NC-SD16BNC-SD16B W NC-SD17BNC-SD17B Q U TO NCB-257 EW !.NC-SD17ANC-SD17A NCB-506 NCB-259 BB-013! (! N (! ( !NCB-253. (! NCB-250 (! NCB-409(! Newtown Creek 10 (! (! NCB-258 BB-901 (! NCB-254 Wastewater NC-SD15BNC-SD15B (! (! NCB-251 NCB-256 Treatment Plant BB-900 (! !. !. NC-SD75ANC-SD75A 5 BB-899

V (! !. E (! NC-SD75B R NC-SD14BNC-SD14B NCB-821 NC-SD75B N O NC-SD14ANC-SD14A!. NCB-248 N (! !. B (! L NCB-0201138 V D (!(! NCB-245(!(! NCB-244 BB-579 NC-SD13ANC-SD13A ! BB-014 NCB-006131-002( (! !. NC-SD13BNC-SD13B ! (! NC-SD12ANC-SD12A ( Con Edison - BB-123 (! NC-SD12BNC-SD12B NCB-021 Con Edison - !. Motiva BB-124 NCB-022 P 11th Street (! U Brooklyn BB-122 NCB-242 AL Conduit Terminal NC-SD11ANC-SD11A S (! K NC-SD76B/SD92BNC-SD76B/SD92B (! I !. NC-SD11BNC-SD11B !. B !. BB-898 R NCB-408 (! (! NC-SD76ANC-SD76A !. A V NCB-407 5 4 (! M C (! G (! (! U A V I G E N 5 A I D N P E NCB-240 S S ! B ( (! L V (! NC-SD10A D (! NC-SD10A Newtown Creek !. NC-SD10BNC-SD10B NCB-550 Newtown Creek NC-SD09A(! Wastewater ! NC-SD09A NCB-239 T Wastewater ( NC-SD09BNC-SD09B(! P NCB-405!. Y S R Treatment Plant T O ST-24 S V NCB-406 NCB-238 H CLA O (! S S (! A T 10 S BB-015 T T (! 10 S NCB-237 T 5 (! N (! O T S NCB-820 P S T U D N NCB-549 A T M (! S E T E M X S R O F A B E N L G H A A E T T A N A V Q:\Jobs\110782-01_NewTownCreek\Maps\RI_RemedialInvestigation\Historic_Data_Research\Site Features Mapbook.mxd ckiblinger 5/23/2012 5:37:02 PM Q:\Jobs\110782-01_NewTownCreek\Maps\RI_RemedialInvestigation\Historic_Data_Research\Site

! NOTES: . USEPANC-SD08ANC-SD08BNC-SD08ANC-SD08B Sample Locations (Surface and Subsurface) Outfall Class 1. Outfall Labeling: BB: Bowery Bay; NC(B/Q): Newtown Creek, Brooklyn/Queens; ST: Stormwater. !. (! 2. Outfall locations are preliminary, compiled, estimated data based on New York City Department of Shoreline (NYC Dept. of Information Technology, 2006) Direct Discharge Environmental Protection (NYCDEP) maps and tabulated data and other resources. Many outfall locations (! were taken from the New York City Shoreline Survey Program: Newtown Creek Water Pollution Control Plant USGS Nat'l Elev. Dataset 5-foot Contours General Drainage Area, NYCDEP, March 31, 2003. Other locations were taken from an excerpt from a similar report (! NEWTOWN (! from 2008 (the complete report was not included in files available for review). Finally, some outfall locations CREEK Selected Site Property Boundary Highway Drain were inherited from previous Anchor QEA and Newtown Creek Project work. Latitudinal and longitudinal data provided in the 2003 and 2008 NYCDEP reports were rounded to the nearest second. This resulted in (! EAST Neighboring Site Property Boundary Major Stormwater Outfall [ RIVER (! potential outfall location discrepancies of up to approximately 200 feet. All outfall locations are currently ! under field verification. Feet !. ( SPDES 3. Aerial Photos: New York State Division of Homeland Security and Emergency Services, 2010. NC-SD07ANC-SD07BNC-SD07ANC-SD07B (! 4. Site Boundaries are based on New York City parcels data. 0 100 200 300 400 (! Storm Drain 5. Coarse topographic contours are derived from U.S. Geological Survey 10-meter data. HUDSON RIVER

(! !. Figure 1 Site Vicinty Map Draft Upland Site Summary: Con Edison - 11th Street Conduit DRAFT Newtown Creek RI/FS

SUPPLEMENTAL ATTACHMENTS

Attachment 1

NEWT-0119123 Attachment 2

NEWT-0088882