GOVERNMENT OF PUNJAB DEPARTMENT OF PLANNING (BADP DIVISION)

MEETING OF STATE LEVEL SCREENING COMMITTEE OF BADP – 2019-20 Agenda

Agenda for the Meeting of SLSC for BADP for the Year 2019-20

Item No. Item Page No. Agenda Item No.1 Approval of Annual Action Plan for the year 2019-20 1-4 Agenda Item No.2 Review of Submission of UCs of previous years 5-6 Agenda Item No.3 Change of works out of the funds released from year 2016-17 to 2018-19 7-10 Agenda Item No.4 1) Special project for Raising of Flood Protection Embankment from RD 80000-141290 ft above 11-12 on L/S of River Ravi in Dera Baba Nanak Sector in (Punjab)-13.48 Crore 2) Special projects to be submitted to MHA, GoI during 2019-20. Agenda Item No.5 Any other item with the permission of Chairman of SLSC 13 Annexure-I BADP – Modified Guidelines (June,2015) 14-44 Annexure-II Letter of Ministry of Home Affairs, Government of regarding allocation of 2019-20 45-46 Annexure-III Summary 47-48 District-wise proposals Amritsar 49-61 Ferozepur 62-74 Fazilka 75-95 Gurdaspur 96-109 Pathankot 110-120 Tarn Taran 121-135 Agenda Item 1

Approval of Annual Action Plan for the year 2019-20.

The main objective of Border Area Development Programme (BADP) is to meet the special developmental needs and well being of the people living in remote and inaccessible areas situated near the international border and to saturate the border areas with the entire essential infrastructure through convergence of Central/State/BADP/Local schemes and participatory approach. With effect from 2016-17, this programme has been converted into 60:40 (GoI:State).The programme will cover all the villages which are located within the 0-10 Km of International Border and then 0-20 Km, 0-30 Km, 0-40 Km and then 0-50 Km of International Border, irrespective of border block abutting on the International Border or not (Detailed guidelines at Annexure-I).

Allocation 2019-20:

Ministry of Home Affairs, Government of India vide its letter dated 30th May, 2019 (Annexure II) has allocated an amount of Rs 42.95 Cr (CS: 25.77 Cr + SS: Rs 17.18 Cr.) for the year 2019-20 for the State of Punjab under the programme.

Criteria for District wise Allocation of Funds The funds allocated by Government of India are distributed among the border districts on the basis of: (i) Length of the International Border; (ii) Population of the Border Blocks; (iii) Areas of the Border Block (All the three criteria shall equal weightage).

On the basis of above criteria the district wise allocation was worked and conveyed to districts as under :-

(Rs in Lakhs) Name of the District Allocation Central Share State Share Total Amritsar 512.40 341.61 854.01 Ferozepur 504.08 335.99 840.07 Fazilka 560.52 373.71 934.23 Gurdaspur 405.33 270.24 675.57 Pathankot 111.61 74.38 185.99 Tarn Taran 483.06 322.07 805.13 Total 2577.00 1718.00 4295.00

Selection of Schemes: As per the guidelines, district level committee shall ensure that no schemes below the estimated cost of Rs 10 lakh are included. Besides, to facilitate the sector-wise allocation the guidelines also suggest the maximum/minimum limit. This suggested limit is for guidance only and not mandatory for the State Governments.

District-wise proposals for approval On the basis of the above allocation the summary of the proposals received from the Six Border Districts is as under:- Central Share- Rs 2577.00 lakhs (Rs in Lakhs)

SN Name of the Total Infrastructure Health Agriculture Social Sector Educatio Sports Special/ Schemes Adm District Allocation n Activities Specific by BGFs Exp. area Category Category Comm Capacity -I -II unity building 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Amritsar 512.40 402.26 0.00 0.00 0.00 0.00 51.23 0.00 0.00 0.00 51.23 7.68 %age 78.51 10.00 10.00 1.50 2 Ferozepur 504.08 289.60 0.00 0.00 0.00 0.00 50.40 0.00 113.74 0.00 42.78 7.56 %age 57.45 10.00 22.56 8.49 1.50 3 Fazilka 560.52 227.78 30.00 0.00 27.00 71.00 56.04 60.00 14.00 10.25 56.04 8.41 %age 40.64 5.35 4.82 12.67 10.00 10.70 2.50 1.83 10.00 1.50 4 Gurdaspur 405.33 250.98 0.00 0.00 0.00 45.66 40.51 21.60 0.00 0.00 40.50 6.08 %age 61.92 11.26 9.99 5.33 9.99 1.50 5 Pathankot 111.61 30.03 0.00 15.00 0.00 10.00 11.16 22.39 10.20 0.00 11.16 1.67 %age 26.91 13.44 8.96 10.00 20.06 9.14 10.00 1.50 Tarn 483.06 379.33 0.00 0.00 0.00 0.00 48.24 0.00 0.00 0.00 48.24 7.25 6 Taran %age 78.53 9.99 9.99 1.50 Total 2577.00 1579.98 30.00 15.00 27.00 126.66 257.58 103.99 150.49 10.25 237.40 38.65 %age 61.31 1.16 0.58 1.05 4.92 10.00 4.04 5.84 0.40 9.21 1.50

Work-wise allocation (Annexure-III) is placed before the Committee for approval. State Share: Rs 1718.00 lakhs (Rs in Lakhs)

SN Name of the Total Infrastructure Health Agriculture Social Sector Education Sports Special/ Schemes by District Allocation Activities Specific BGFs Category-I Category Comm Capacity area -II unity building schemes 1 2 3 4 5 6 7 8 9 10 11 12 13 1 Amritsar 341.61 237.51 0.00 0.00 0.00 0.00 34.16 20.00 0.00 15.77 34.17 %age 69.53 10 5.85 4.62 10 2 Ferozepur 335.99 170.55 0.00 0.00 0.00 42.00 33.66 0.00 56.64 0.00 33.14 %age 50.76 12.50 10.02 16.86 9.86 3 Fazilka 373.71 116.12 72.17 0.00 42.70 51.00 37.36 10.00 7.00 0.00 37.36 %age 31.07 19.31 11.43 13.65 10 2.68 1.87 10 4 Gurdaspur 270.24 130.66 0.00 12.50 0.00 29.30 27.02 36.24 7.50 0.00 27.02 %age 48.35 4.63 10.84 10 13.41 2.78 10 5 Pathankot 74.38 40.00 0.00 0.00 0.00 0.00 7.43 15.65 3.86 0.00 7.44 %age 53.78 9.99 21.04 5.19 10 6 Tarn Taran 322.07 248.99 0.00 0.00 0.00 0.00 32.20 0.00 8.68 0.00 32.20 %age 77.31 10 2.70 10 Total 1718.00 943.83 72.17 12.50 42.70 122.30 171.83 81.89 83.68 15.77 171.33 %age 54.94 4.20 0.73 2.49 7.12 10.00 4.77 4.87 0.92 9.97

Work-wise allocation (Annexure-III) is placed before the Committee for approval.

Agenda Item 2

Review of Submission of UCs of previous years

A. Financial Year 2011-12 to 2015-16

Utilisation Certificates to the extent of 100% released amount has been sent to Government of India upto 2011-12. UCs of meagre amount of Rs 1.75 lakh of District Pathankot is pending for 2012-13 on account of misappropriation for which FIR has been registered. UCs to the extent of 100% amount has also been submitted for 2013-14 to 2015-16.

B. Financial Year 2016-17 and 2017-18 Centre Share

The detail of UCs submitted by districts and further submitted to GoI is as under:- (Rs in Lakhs) District 2016-17(Central Share) 2017-18(Central Share) Allocation UC submitted UC pending Allocation UC submitted UC pending Amritsar 534.30 486.21 48.09 585.56 251.69 333.87 Ferozepur 576.67 530.62 46.05 565.51 434.17 131.34 Fazilka 658.44 611.94 46.50 468.10 468.10 174.20 Gurdaspur 478.81 477.10 1.21 466.11 466.11 0.00 Pathankot 127.25 127.25 0.00 126.46 95.77 30.69 Tarn Taran 422.78 422.78 0.00 414.06 382.98 31.08 Total 2798.25 2556.40 141.85 2800.00 2098.82 701.18

The DCs of the concerned border districts are requested to expedite the UCs of 2016-17 & 2017-18, so that these may be sent to MHA, GoI.

State Share State matching share for the year 2016-17 was released to the concerned border districts in the month of July 2018. For the release of State Matching Share i.e Rs. 1867.00 lakh of the year 2017-18, the file is pending with F.D.

C. Financial Year 2018-19

During 2018-19, an amount of Rs 19.60 Cr was released by GOI out of which Rs 17.81 Cr was released by the State in March, 2019. For the release of balance amount of Rs.1.79 Cr, the case is pending with FD. In addition online file for the release of Matching State Share of Rs 13.07 Cr for the year 2018-19 has also been sent to Finance Department, Punjab in the month of July, 2019. It is placed before the Committee for information and consideration please.

Agenda Item 3

Change of works out of the funds released during the year 2016-17 to 2018-19

District-wise Change of works out of the funds released from year 2016-17 to 2018-19 is as under :- (Rs in Lakhs)

SN Works already approved by SLSC Amount Works now to be approved by SLSC Amount 1 2 3 4 5 A District Ferozepur 2016-17 (Centre Share)

1 R.O System 7.00 R.O System 5.00 2 R.O System 7.00 C.C Flooring Jaimal Singh House to Ban 5.00 3 R.O System 7.00 Construction of Interlocking Tiles 1) Shingar Singh house to Gurubakhs Singh house 2) Lal 6.00 Singh House to Main Road

C.C. Flooring Darshan Singh house to Ajit Singh Chaki 5.00

2016-17 (State Share) 1 R.O System in Block Guru Harsahai Village Tillu Arian 5.00 C.C Flooring in Block Guru Harsahai Village 5.00 Tillu Arian

Total:- 26.00 26.00

SN Works already approved by SLSC Amount Works now to be approved by SLSC Amount 1 2 3 4 5 B District Fazilka 2016-17 and 2017-18(Centre Share) 1 Construction of Common Approach Road From Charan Construction of Bricks road from T-junction 5.13 6.93 Singh house to Nashatar Singh house to BOP-sher 2 Wrestling Indor Ground along with Mats in Construction of Bricks road ( width 12.25 Foot) between 5.79 Multipurpose Stadium, Jalalabad 13.75 village Pacca chisti to BOP Sowarwali appox. 2 km

3 150 mm Water works pipe line 8.00 4 200 mm Water works pipe line Sports Kit(Village Pacca Chisti,Mohammad Pira,Mumbake,Kabul Shah Hithar,Visakhe 3.78 Wala Khu, New Mumbake, Bakhu Shah, 3.60 SureshWala,Jattian Mohalla,Khattika Mohalla and Dhanka Mohalla. 5 C.R System Construction of Boundary wall and Toilet 11.00 6.00 Block in Sec. school 6 Construction of common interlock Road from main road 5.00 Construction of Gym Room 7.70 Jammu Ram House to dara patwari house 7 Water supply Pipe Line & boor Construction of Common approach road from Sukhder Singh s/o Prem Singh House to 5.00 Gurudwara Sahib and Lakha s/o Gurdeep 11.77 Singh House to Bair Seth s/o Milakh Raj House 8 Mobile dispensary Construction of Mini Open Stadium (Smart 2.50 5.24 School Chanan wala)GPS 9 Dialysis Unit for C.H 14.75 SN Works already approved by SLSC Amount Works now to be approved by SLSC Amount 1 2 3 4 5 10 Laproscope Complete Set For Galblader Surgery for civil 0.00 Construction of Smart Class Room and 24.00 Hospital Jalalabad Varanda In GMS 11 Construction of Bridge On Laxman Minor Canal Construction of Smart Class Room and 2.34 11.00 Varanda In GPS 12 Construction of Kissan Shed with toilet for Provision of 150 Ltrs Capacity RO System in BOP ladies Near Gate No.244/1,245/M,246/M, Maharsona,Mauzam village Mouzam Near Gate No, 254/M, Base,Khokhar,Nirmal,Jhanger,Asafwala,Nejeke,Satirwala 26.41 village Mahur Khewa Near Gate No 248/5, 16.00 and sadiqi, Jodhawal,New Gazniwala,DRD vallage Mahar Sona Near gate 251/3, Gate Nath,Joginder,JR Hittar,Rajamotham and No 251/2 and Chakmira Near Gate Sowarwali,Sher,Khanpur,Sowana, Roopnager and Murad No.255/M 13 Interest accrued out of the funds available 43.66 Facilities of Drinking Water and Toilet for Boys and Girls(Smart School Chanan 7.20 wala)GPS Construction of Pakka khal Mogha no 37137 10.06 L Branch Sarbjeet Singh Construction of Common Brick Road From 10.11 Gurudwara Sahib to Khuikhere Wale House. Total: 133.36 133.36 C District Pathankot 2018-19(Centre Share) Construction of Tarnah Bridge. 20.10 Construction of Street and Drain 10.10 Construction of Street and Drain 10.00 Total: 20.10 Total: 20.10 District Gurdaspur

District Gurdaspur has sent a proposal for Rs 69.49 lakhs(Centre Share) out of the savings/interest accrued on funds released under BADP during 2016-17. The detail of works is as under:-

SN Name of the Works Amount (in lakhs)

1 Construction of 2 class Rooms with Verandah in Saheed Lachhman Singh S.S. Smart 17.75 School Dharowali Block Dera Baba Nanak

2 Construction of Middle School Building at Village Pahra Block Gurdaspur(Ground 32.00 Floor)

3 Construction of Link Road (With Interlock Tiles) at Vill. Arlibhan Via Jaspreet Singh, 10.03 Mangal Sinhg and Sucha Singh Home, Block Dera Baba Nanak(0.41 km)

4 Construction of Link Road at Village Nikko Sarai Block Dera Baba Nanak(0.47km) 9.71

Total 69.49

The above changes of works are placed for the approval of SLSC.

District Gurdaspur (Rs. in lakhs)

SN Works already approved by SLSC Amount Works now to be approved by SLSC Amount 1 2 3 4 5 1 Construction of Toilet Block Near BOP Kamalpur Jattan, 9.48 Construction of Civil Health Dispensary 9.48 Block Kalanaur, Boharwadala, Chanduwadala, Dostpur Ghani-ke-Bet near BOP Basantar, Block Dera and in Government Primary School Boharwadala Baba Nanak

The above change of work is also placed for the approval of SLSC.

Agenda Item 4

(1) Special project for Raising of Flood Protection Embankment from RD 80000-141290 ft above Dera Baba Nanak on L/S of River Ravi in Dera Baba Nanak Sector in Gurdaspur(Punjab)-13.48 Crore.

Funds to the sum of Rs. 13.48 Crore (CS) has already been sanctioned by MHA, GoI vide letter No.12/31/2018-BADP, Dated 8.3.2019 during 2018- 19. These funds are being released to the District Gurdaspur for execution of works-submitted for the Ex-post facto approval of SLSC.

(2) Special projects to be submitted to MHA, GoI during 2019-20.

Deputy Commissioner Tarn Taran has proposed the following two project proposals as a special case under BADP.

Block Valtoha: Sr No Name of the work No of Gram No of works Amount (Rs in Cr) Panchayats 1 School Works 8 8 0.48 2 Streets etc. 30 37 21.70 3 Swatch Bharat Abhiyan, Sewerage Infrastructure and Disposal 8 8 1.29 Drains 4 Construction of Community Centre 1 1 0.10 Total: 54 23.57

Block Bhikhiwind:

SN Name of work No of Gram No of works Amount (Rs in Cr) Panchayats 1 Link Road 31 63 20.02 2 Streets etc. 42 321 9.06 3 Stadium 12 12 4.55 4 School Works 13 15 1.42 5 Disposal Drains 5 7 0.50 6 Bridges 2 2 0.59 7 Dispensary 1 1 0.08 8 Interlock 1 1 0.14 Total 422 36.36 Grand Total (Valtoha & Bhikhiwind) 476 59.93

The above said two projects are placed for the approval of SLSC. After approval these project will be sent to MHA, GoI for release of funds as a Special Case during 2019-20. Agenda Item 5

Any other item with the permission of the Chairman, SLSC.

Annexure I

Annexure II

Scanned by CamScanner Scanned by CamScanner

Annexure III

SUMMARY

STATE: PUNJAB SUMMARY ANNUAL ACTION PLAN 2019-20 BORDER AREA DEVELOPMENT PROGRAMME 2019-20(Central Share) (Rs. in lac)

Infrastructure Social Sector To be kept reserved for Special/ Schemes to be Total Allocation various services SN Name of the District/ Block Health Agriculture Capacity Education Sports Activities Specific area suggested by Category-I Category-II Community schemes BGFs Building 1.5 % with maximum of Rs. 50 lac 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Amritsar 1 Ajnala 165.56 129.98 0.00 0.00 0.00 0.00 16.55 0.00 0.00 0.00 16.55 2.48 2 Chogawan 153.30 120.34 0.00 0.00 0.00 0.00 15.33 0.00 0.00 0.00 15.33 2.30 3 Attari 125.54 98.56 0.00 0.00 0.00 0.00 12.55 0.00 0.00 0.00 12.55 1.88 4 Harsha Chhina 68.00 53.38 0.00 0.00 0.00 0.00 6.80 0.00 0.00 0.00 6.80 1.02 Total 512.40 402.26 0.00 0.00 0.00 0.00 51.23 0.00 0.00 0.00 51.23 7.68 Ferozepur 1 Ferozepur 196.62 50.00 0.00 0.00 0.00 0.00 19.66 0.00 108.74 0.00 15.27 2.95 2 Guru Harsahai 134.63 106.60 0.00 0.00 0.00 0.00 13.46 0.00 0.00 0.00 12.55 2.02 3 Mamdot 172.83 133.00 0.00 0.00 0.00 0.00 17.28 0.00 5.00 0.00 14.96 2.59 Total 504.08 289.60 0.00 0.00 0.00 0.00 50.40 0.00 113.74 0.00 42.78 7.56 Fazilka 1 Fazilka 240.45 68.76 20.00 0.00 27.00 29.00 24.04 30.00 14.00 0.00 24.04 3.61 2 Jalalabad 153.61 70.59 0.00 0.00 0.00 20.00 15.36 30.00 0.00 0.00 15.36 2.30 3 Khuian Sarvar 166.46 88.43 10.00 0.00 0.00 22.00 16.64 0.00 0.00 10.25 16.64 2.50 Total 560.52 227.78 30.00 0.00 27.00 71.00 56.04 60.00 14.00 10.25 56.04 8.41 Gurdaspur 1 Dera Baba Nanak 98.59 60.99 0.00 0.00 0.00 25.00 10.96 0.00 0.00 0.00 0.00 1.64 2 73.70 37.52 0.00 0.00 0.00 20.66 7.41 0.00 0.00 0.00 7.00 1.11 3 Dorangla 49.89 24.78 0.00 0.00 0.00 0.00 4.10 7.39 0.00 0.00 13.00 0.62 4 Gurdaspur 94.86 82.74 0.00 0.00 0.00 0.00 10.54 0.00 0.00 0.00 0.00 1.58 5 Kalanaur 88.29 44.95 0.00 0.00 0.00 0.00 7.50 14.21 0.00 0.00 20.50 1.13 Total 405.33 250.98 0.00 0.00 0.00 45.66 40.51 21.60 0.00 0.00 40.50 6.08 Pathankot 1 Bamial 20.81 10.03 0.00 0.00 0.00 0.00 0.00 10.39 0.00 0.00 0.00 0.39 2 Narot Jaimal Singh 90.80 20.00 0.00 15.00 0.00 10.00 11.16 12.00 10.20 0.00 11.16 1.28 Total 111.61 30.03 0.00 15.00 0.00 10.00 11.16 22.39 10.20 0.00 11.16 1.67 Tarn Taran 1 Bhikhiwind 126.30 99.14 0.00 0.00 0.00 0.00 12.63 0.00 0.00 0.00 12.63 1.90 2 Gandiwind 72.50 56.91 0.00 0.00 0.00 0.00 7.25 0.00 0.00 0.00 7.25 1.09 3 Valtoha 190.65 149.79 0.00 0.00 0.00 0.00 19.00 0.00 0.00 0.00 19.00 2.86 4 Patti 93.61 73.49 0.00 0.00 0.00 0.00 9.36 0.00 0.00 0.00 9.36 1.40 Total 483.06 379.33 0.00 0.00 0.00 0.00 48.24 0.00 0.00 0.00 48.24 7.25 G Total 2577.00 1579.98 30.00 15.00 27.00 126.66 257.58 103.99 137.94 10.25 249.95 38.65 STATE: PUNJAB SUMMARY ANNUAL ACTION PLAN 2019-20 BORDER AREA DEVELOPMENT PROGRAMME 2019-20(State Share) (Rs. in lac) Infrastructure Social Sector Special/ Total Allocation Schemes to be SN Name of the District/ Block Health Agriculture Education Sports Activities Specific area suggested by BGFs Category-I Category-II Community Capacity Building schemes 1 2 3 4 5 6 7 8 9 10 11 12 13 Amritsar 1 Ajnala 110.38 52.53 0.00 0.00 0.00 0.00 11.04 20.00 0.00 15.77 11.04 2 Chogawan 102.20 81.76 0.00 0.00 0.00 0.00 10.22 0.00 0.00 0.00 10.22 3 Attari 83.69 66.95 0.00 0.00 0.00 0.00 8.37 0.00 0.00 0.00 8.37 4 Harsha Chhina 45.34 36.27 0.00 0.00 0.00 0.00 4.53 0.00 0.00 0.00 4.54 Total 341.61 237.51 0.00 0.00 0.00 0.00 34.16 20.00 0.00 15.77 34.17 Ferozepur 1 Ferozepur 131.04 50.00 0.00 0.00 0.00 42.00 13.10 0.00 13.16 0.00 12.78 2 Guru Harsahai 89.76 50.00 0.00 0.00 0.00 0.00 8.98 0.00 22.00 0.00 8.78 3 Mamdot 115.19 70.55 0.00 0.00 0.00 0.00 11.58 0.00 21.48 0.00 11.58 Total 335.99 170.55 0.00 0.00 0.00 42.00 33.66 0.00 56.64 0.00 33.14 Fazilka 1 Fazilka 160.28 30.00 40.24 0.00 10.00 31.00 16.02 10.00 7.00 0.00 16.02 2 Jalalabad 102.41 30.00 31.93 0.00 10.00 10.00 10.24 0.00 0.00 0.00 10.24 3 Khuian Sarvar 111.02 56.12 0.00 0.00 22.70 10.00 11.10 0.00 0.00 0.00 11.10 Total 373.71 116.12 72.17 0.00 42.70 51.00 37.36 10.00 7.00 0.00 37.36 Gurdaspur 1 Dera Baba Nanak 78.74 29.12 0.00 0.00 0.00 29.30 7.30 0.00 0.00 0.00 13.02 2 Dina Nagar 44.48 39.54 0.00 0.00 0.00 0.00 4.94 0.00 0.00 0.00 0.00 3 Dorangla 31.58 21.85 0.00 0.00 0.00 0.00 2.73 0.00 0.00 0.00 7.00 4 Gurdaspur 63.27 0.00 0.00 12.50 0.00 0.00 7.03 36.24 7.50 0.00 0.00 5 Kalanaur 52.17 40.15 0.00 0.00 0.00 0.00 5.02 0.00 0.00 0.00 7.00 Total 270.24 130.66 0.00 12.50 0.00 29.30 27.02 36.24 7.50 0.00 27.02 Pathankot 1 Bamial 13.86 10.00 0.00 0.00 0.00 0.00 0.00 0.00 3.86 0.00 0.00 2 Narot Jaimal Singh 60.52 30.00 0.00 0.00 0.00 0.00 7.43 15.65 0.00 0.00 7.44 Total 74.38 40.00 0.00 0.00 0.00 0.00 7.43 15.65 3.86 0.00 7.44 Tarn Taran 1 Bhikhiwind 84.22 67.38 0.00 0.00 0.00 0.00 8.42 0.00 0.00 0.00 8.42 2 Gandiwind 48.34 30.00 0.00 0.00 0.00 0.00 4.83 0.00 8.68 0.00 4.83 3 Valtoha 127.06 101.66 0.00 0.00 0.00 0.00 12.70 0.00 0.00 0.00 12.70 4 Patti 62.45 49.95 0.00 0.00 0.00 0.00 6.25 0.00 0.00 0.00 6.25 Total 322.07 248.99 0.00 0.00 0.00 0.00 32.20 0.00 8.68 0.00 32.20 G.Total 1718.00 943.83 72.17 12.50 42.70 122.30 171.83 81.89 83.68 15.77 171.33

Annual Action Plan for the year 2019-20

District AMRITSAR

BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Approved outlay Whether Scheme is on-going Location SCSP Women Distance for of the Scheme Target for from the previous year. Funds Name of the Name of the Sector, Old / New Component component Sr. No. International for the current completion of Funds required in Remarks Scheme/Project Scheme Year (out of (out of Constituency District Block Village Border year. Scheme already currernt year commencement column 13) column 13) (in Lacs) utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 BLOCK: AJNALA A. Infrastructure 1 Construction of Link Way to village Abadi Ajnala Amritsar Ajnala Dial Bharang 10 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 Baldev Singh & Approach road in village inside from main road to Gurudwara Sahib, Captain Singh,Sarabjit Singh, Manjit Singh, Kulwant Singh etc = 0.50 Km

2 Construction of approach road in village inside Ajnala Amritsar Ajnala Anaitpura 6 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 with interlocking paver from Paramjit Singh to Kabal Singh, Jasbir Singh to Sucha Singh & Phirni etc =0.50 Km

3 Construction of approach road in village inside Ajnala Amritsar Ajnala Raipur Kalan 5 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 with interlocking paver on Phirni from Joginder Singh to Girjaghar, Ajaib Singh to Ranjit Kumar etc=0.50 Km 4 Construction of approach Road in village inside Ajnala Amritsar Ajnala Jassar 10 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 with concrete from Main road to Mahinder Singh, Gurudwara Sahib, Santokh Singh to Jaswant Singh, Kala to Satpal etc =0.50Km

5 Construction of Disposal Drain from village Ajnala Amritsar Ajnala Panj Grai 5 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 Pond to Drain & Approach Road in village Wahla inside with concrete from Dilbag Singh to Girjaghar Phirni, Gurudwara to Bhagwant Singh, Harjinder Singh to Harwant Singh etc = 0.20 Km BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Approved outlay Whether Scheme is on-going Location SCSP Women Distance for of the Scheme Target for from the previous year. Funds Name of the Name of the Sector, Old / New Component component Sr. No. International for the current completion of Funds required in Remarks Scheme/Project Scheme Year (out of (out of Constituency District Block Village Border year. Scheme already currernt year commencement column 13) column 13) (in Lacs) utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 6 Construction of approach Road in village inside Ajnala Amritsar Ajnala Gujjarpura 6 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 with concrete from Gurdev Singh to Parduman Singh, Avtar Singh to Parduman Singh, Harbhajan Singh to Karnail Singh Sarpanch, Charanjit Singh to Main road, Namberdar Pritam Singh to Main road, Pavitter Singh to Manjit Singh, Chanan Singh Chowkidar to David Masih, Sham Lal to Mahida Masih, Makbool Masih to Hira Masih, Surti Masih to Sada Masih, Avtar Singh Pandori to Gurudwara Chowk, Gurudwara Chowk to Ajit Singh, Phirni to Gurudwara Lahoriya, Girja Ghar to Kaka Masih, Kairo Masih to Manga Masih, Puran Masih to Sarabjit Singh, Santokh Singh Bal to Phirni, Jaswinder Singh to main road, Paramdeep SIngh to Jagdev Khurd Road=0.50 Km

7 Construction of approach Road in village inside Ajnala Amritsar Ajnala Bedi Channa 5 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 with concrete from Nirmal Singh to Rattan (Kot Razada) Singh, Jagir Singh to Sher Singh, Sahib Singh to Sadha Singh, Amar Singh to Bira Singh,Mahinder Singh to Kashmir Singh, Kashmir Singh to Balwinder Singh =0.50 Km

8 Construction of approach Road in village inside Ajnala Amritsar Ajnala Wadda Chak 5 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 with concrete from Shinda Singh to Harbans Dogran (Chak Singh, Hari Singh, to road, Phirni, Rattan Singh Dogran) to road, Sawinder Singh to road, Kashmir Singh to road, Bishan Singh to road, Karnail Singh to road, Virsa Singh to Gurudwara Sahib, Sohan Singh to Road, Visakha Singh to road =0.50 Km

9 Construction of approach Road in village inside Ajnala Amritsar Ajnala Nawan Dalla 5 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 with concrete from Main road to SC Abadi =0.50 Rajputan Km (Dalla Rajputan) BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Approved outlay Whether Scheme is on-going Location SCSP Women Distance for of the Scheme Target for from the previous year. Funds Name of the Name of the Sector, Old / New Component component Sr. No. International for the current completion of Funds required in Remarks Scheme/Project Scheme Year (out of (out of Constituency District Block Village Border year. Scheme already currernt year commencement column 13) column 13) (in Lacs) utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 10 Construction of Sewer Pipe Line from village to Ajnala Amritsar Ajnala Pashia 6 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 Pond = 1500 RFT & Concrete streets & Drains from Main road to Girjaghar & Mahinder Masih, Robert Masih to Gurudwara sahib Main road=0.20 Km 11 Construction of Approach Road in village inside Ajnala Amritsar Ajnala Madhushanga 10 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 with concrete from Maana Singh to Sawinder Singh, Sheela Singh to Tilak Raj, Main road to Amarjit Singh, Virsa Singh, Kulwinder Singh, Shubeg Singh to Shinda Singh, Gurudwara Sahib to Kashmir Singh=0.50 Km

12 Construction of Link ways Brick Paving from Ajnala Amritsar Ajnala Bhoyewali 10 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 from road to Narinder Singh, Kunan Singh, Iqbal Singh, Harpal Singh & Balraj Singh & Sukhdev Singh, Lakhwinder Singh, Charan Singh & Bhupinder Singh, Sukhdev Singh & Ranjit Singh & Balwinder Singh, Harjit Singh = 1 Km

13 Construction of Link ways Brick Paving from Ajnala Amritsar Ajnala Dhariwal 10 Km 9.98 31.3.20 New -- -- 9.98 3.19 4.59 Master Baldev Singh to Amrik Singh, Way of Kaler Joginder Singh, Pyara Singh, Harpal Singh, Gurmej Singh, Hira Singh, Jaspal Singh, Mata Rani, Jagga Singh = 1 Km Total 129.98 129.98 41.59 59.79 B. Capacity Building 16.55 16.55 5.30 7.61 C. Administrative Expenses 2.48 2.48 0.79 1.14 D. Border Security Force 0.00 1 Construction of Kissan shed in size 14'x12' and 4.00 4.00 1.28 1.84 01 seated toilet block with one Urinal point and wash basin near gate no. 67 in the AOR BOP D S Pura , 32 BN BSF

2 Construction of Kissan shed in size 14'x12' and 4.00 4.00 1.28 1.84 01 seated toilet block with one Urinal point and wash basin near gate No. 69 in the AOR BOP Kalamdogar, 32 BN BSF. BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Approved outlay Whether Scheme is on-going Location SCSP Women Distance for of the Scheme Target for from the previous year. Funds Name of the Name of the Sector, Old / New Component component Sr. No. International for the current completion of Funds required in Remarks Scheme/Project Scheme Year (out of (out of Constituency District Block Village Border year. Scheme already currernt year commencement column 13) column 13) (in Lacs) utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 3 Construction of Kissan shed in size 14'x12' and 4.00 4.00 1.28 1.84 01 seated toilet block with one Urinal point and wash basin near gate No. 72 in the AOR BOP Bhanian, 32 BN BSF.

4 Construction of Kissan shed in size 14'x12' and 4.55 4.55 1.46 2.09 01 seated toilet block with one Urinal point and wash basin near gate no. 73 in the AOR BOP Majhmian.

Total 16.55 16.55 5.30 7.61 Grand Total (A+B+C+D) 165.56 165.56 52.98 76.16 2 BLOCK: CHOGAWAN A. Infrastructure 1 Shifting of Lines and Installation of Raja Sansi Amritsar Chogawan Bhindi saidan 3 Km 17.35 2019-20 New -- -- 17.35 5.55 7.98 Transformers to provide 24 hour supply to the villagers

2 Construction of link Road from Jasraur to path Raja Sansi Amritsar Chogawan Jasraur 8 Km 11.00 2019-20 New 11.00 3.52 5.06 Mohan singh

3 Construction of link road from Ajnala Road to Raja Sansi Amritsar Chogawan Jasraur 5Km 17.19 2019-20 New 17.19 5.50 7.91 Dera Shingara Singh

4 Construction of link road from Jasraur Harpreet Raja Sansi Amritsar Chogawan Jasraur 1 Km 39.60 2019-20 New 39.60 12.67 18.22 Son of Mohan to dera pritam singh

5 Construction of link road from Ghoga Jaranil Raja Sansi Amritsar Chogawan Jasraur 1 Km 35.20 2019-20 New 35.20 11.26 16.19 mal to harpreet singh de road tak TOTAL 120.34 120.34 38.51 34.41 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Approved outlay Whether Scheme is on-going Location SCSP Women Distance for of the Scheme Target for from the previous year. Funds Name of the Name of the Sector, Old / New Component component Sr. No. International for the current completion of Funds required in Remarks Scheme/Project Scheme Year (out of (out of Constituency District Block Village Border year. Scheme already currernt year commencement column 13) column 13) (in Lacs) utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 B. Capacity Building 15.33 15.33 4.91 7.05 C. Administrative Expenses 2.30 2.30 0.74 1.06 D. Border Security Force 0.00 1 Construction of kissan shed in size 14'x12' and 4.00 4.00 1.28 1.84 01 seated toilet block with one Urinal point and wash basin BOP Rear Kakkar-Gate No 91

2 Construction of kissan shed in size 14'x12' and 4.00 4.00 1.28 1.84 01 seated toilet block with one Urinal point and wash basin BOP Fatehpur - Gate No 85

3 Construction of kissan shed in size 14'x12' and 4.00 4.00 1.28 1.84 01 seated toilet block with one Urinal point and wash basin BOP Burj - Gate No 84

4 Construction of Embankment of Pond at village 3.33 3.33 1.07 1.53 Mullakot near BS Force

TOTAL 15.33 15.33 4.91 7.05 Grand Total (A+B+C+D) 153.30 153.30 49.06 49.57 3 BLOCK: ATTARI A Infrasturcture 1 Construstion of approach road from Gurudwara Attari Amritsar Attari Dhanoe 2 km 10.00 2019-20 New 10.00 3.20 4.60 sahib to Sukhdev singh chakki wala(450 x 7), Kallan Sukhchain Singh to Jagtar singh & firni ( 600 x 7), Raman kumar to narinder kumar (200x 6) - -

2 Construstion of approach road from karaj singh Attari Amritsar Attari Dhanoe Khurd 1 Km 10.56 2019-20 New 10.56 3.38 4.86 to balkar singh ( 700 x 18) - -

3 Construction of rooms in Primary School. Attari Amritsar Attari Rangarh 1 KM 10.00 2019-20 New 10.00 3.20 4.60 - - 4 Construstion of approach road from Charan Attari Amritsar Attari Mulla Behram 1 KM 11.00 2019-20 New 11.00 3.52 5.06 singh to Sukhdev singh ( 500 x 17) - - BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Approved outlay Whether Scheme is on-going Location SCSP Women Distance for of the Scheme Target for from the previous year. Funds Name of the Name of the Sector, Old / New Component component Sr. No. International for the current completion of Funds required in Remarks Scheme/Project Scheme Year (out of (out of Constituency District Block Village Border year. Scheme already currernt year commencement column 13) column 13) (in Lacs) utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 5 Construction of approach road of vir singh and Attari Amritsar Attari Tajechak 8KM 12.00 2019-20 New 12.00 3.84 5.52 other , approach road from gurwel singh, Construstion of approach road of sewa singh - - street.

6 Construction of Sewerage in Bhinder Colony Attari Amritsar Attari Guruwali 1 KM 11.00 2019-20 New 11.00 3.52 5.06 - - 7 Construstion of approach road from SC Attari Amritsar Attari Chabba 5KM 12.00 2019-20 New 12.00 3.84 5.52 Gurudwara sahib to maan singh & main bazaar(500 x 25), approach road from main road to anoop singh haweli(500x25), Nawa bazar to kashmir singh jodhpuria rasta (900x9), - - Construstion of approach road from dalip singh street(100x9), main road to kuldip singh(300x11), main road to pargat singh(250x11).

8 Construstion of approach road from Avtar singh Attari Amritsar Attari Bhakna Kallan 3KM 10.00 2019-20 New 10.00 3.20 4.60 house to Mukhtar singh(Prauhne) 100x10, Kalar road to Harpal singh house 125x10, Dr. Simranjit singh to Bhagwant singh 150x11, - - Bikramjit singh to harbhajan singh 300x10, hardev singh driver gurdip singh 200x9 etc.

9 Construstion of appraoch road from bypass to Attari Amritsar Attari Dhatal 3KM 12.00 2019-20 New 12.00 3.84 5.52 Samma Singh (1200 x 10), approach road from bypass to Dara Singh(400 x10), Sewarage Pipeline from Gurdeep singh to drain, - - Construction of Street & Drain from Gurudwara sahib (250x8).

Total 98.56 98.56 31.54 39.82 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Approved outlay Whether Scheme is on-going Location SCSP Women Distance for of the Scheme Target for from the previous year. Funds Name of the Name of the Sector, Old / New Component component Sr. No. International for the current completion of Funds required in Remarks Scheme/Project Scheme Year (out of (out of Constituency District Block Village Border year. Scheme already currernt year commencement column 13) column 13) (in Lacs) utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 B. Capacity Building 12.55 12.55 4.02 5.77 C. Administrative Expenses 1.88 1.88 0.60 0.86 D. Border Security Force 0.00 1 Construction of kissan shed in size 14'x12' and 4.00 4.00 1.28 1.84 01 seated toilet block with one Urinal point ansd wash basin near gate No. 109 in the AOR BOP Mahwa 88 BN BSF.

2 Construction of kissan shed in size 14'x12' and 4.00 4.00 1.28 1.84 01 seated toilet block with one Urinal point and wash basin near gate No. 105 in the AOR BOP Roranwala 88 BN BSF. 3 Construction of kissan shed in size 14'x12' and 4.55 4.55 1.46 2.09 01 seated toilet block with one Urinal point and wash basin near gate no. 101 in the AOR BOP Rattan Khurd, 88 BN BSF.

Total 12.55 12.55 4.02 5.77 Grand Total (A+B+C+D) 125.54 125.54 40.17 52.23

4 BLOCK: HARSHA CHINNA A. Infrastructure 1 Construction of Link Road from Awan Vassu to Raja Sansi Amritsar Harsha Awan Vassu 3 Km 10.10 2019-20 New -- -- 10.10 3.23 4.65 Nizamabad Ajit Singh to Dera Bant Singh Chhina

2 Construction of link road from Awan Bassu Raja Sansi Amritsar Harsha Awan Vassu 3 Km 18.28 2019-20 New -- -- 18.28 5.85 8.41 Niamatabad road to Gulgarh Chhina

3 Construction of link road from Mallunangal to Raja Sansi Amritsar Harsha Mallunangal 10 Km 15.00 2019-20 New -- -- 15.00 4.80 6.90 Gurudwara Arjan Dev ji. Chhina

4 Construction of Approach road from the house Ajnala Amritsar Harsha Majjupura 10 Km 10.00 2019-20 New -- -- 10.00 3.20 4.60 of Balwinder Singh to the house of Ajaib Singh Chhina etc. TOTAL 53.38 53.38 17.08 24.55 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Approved outlay Whether Scheme is on-going Location SCSP Women Distance for of the Scheme Target for from the previous year. Funds Name of the Name of the Sector, Old / New Component component Sr. No. International for the current completion of Funds required in Remarks Scheme/Project Scheme Year (out of (out of Constituency District Block Village Border year. Scheme already currernt year commencement column 13) column 13) (in Lacs) utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 B. Capacity Building 6.80 6.80 2.18 3.13 C. Administrative Expenses 1.02 1.02 0.33 0.47 D. Border Security Force 0.00 1 Community Hall in proximity of BOP Sherpur 6.80 6.80 2.18 3.13 32 BN BSF

Grand Total (A+B+C+D) 68.00 68.00 21.76 31.28 Grand Total (All Blocks) 512.40 512.40 163.97 209.24 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Whether Scheme is Approved Location on-going from the Funds outlay of the SCSP Women Distance for Target for previous year. required Scheme for Old / New Component component Sr. No. Name of the Name of the Sector, Scheme/Project International completion in Remarks the current Scheme Year Funds (out of (out of Constitu Border of Scheme currernt District Block Village year. commenc already column 13) column 13) ency year (in Lakhs) ement utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 BLOCK: AJNALA A. Infrastructure 1 Construction of approach Road in village inside Ajnala Amritsar Ajnala Granthgarh 5Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 with concrete from Balwinder Singh to Rattan Singh & Approach road inside Christian Abadi =0.50 Km 2 Construction of Sewer Pipe Line from Village to Ajnala Amritsar Ajnala Kiampura 10 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 New Pond =3200 RFT 3 Construction of approach road in village inside with Ajnala Amritsar Ajnala Chaharpur 5 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 interlocking paver from Main road to Santokh Singh, Kuldeep Kaur, Amarjit Singh, Didar Singh, Pal Masih, Mukhtar Singh Fauji, Hardev Singh, Nishan Singh, Main Phirni to Baba Bhola Abadi Daddian, Gali of Girjaghar =0.50 Km

4 Construction of approach Road in village inside Ajnala Amritsar Ajnala Gaggomahal 6 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 paving with bricks from Main road to SC Abadi & Phirni to village inside =1 Km & Disposal Drain from village to main bazar 5 Construction of approach Road in village inside Ajnala Amritsar Ajnala Dalla 5 Km 12.53 31.3.20 New -- -- 12.47 4.01 5.76 with concrete from Main road to SC Abadi, Phirni Rajputan Mhanta Singh wali, Bamma to school, Pond to Mahinder Singh, Bau to Prabh Singh, Prabh Singh to Inder Singh =0.50 Km Total 52.53 52.47 16.81 24.16 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Whether Scheme is Approved Location on-going from the Funds outlay of the SCSP Women Distance for Target for previous year. required Scheme for Old / New Component component Sr. No. Name of the Name of the Sector, Scheme/Project International completion in Remarks the current Scheme Year Funds (out of (out of Constitu Border of Scheme currernt District Block Village year. commenc already column 13) column 13) ency year (in Lakhs) ement utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 B. Power Sector 1 Shifting 11 KV lines in village Gujjarpura, Dial Ajnala Amritsar Ajnala Gujjarpura, 10 Km 15.77 31.3.20 New -- -- 15.77 5.05 7.25 bharang, Wanjhawala, Mohalla Gopal Nagar , Dial bharang, Sarangdev, Urdhan, Sarai, Nangal Wanjhawala & Wanjhawala, Burrewali Mohalla Gopal Nagar , Sarangdev, Urdhan, Sarai, Nangal Wanjhawala & Burrewali C. Education Sector 1 Construction of Primary School two rooms+ Ajnala Amritsar Ajnala Darya Musa 4 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 Varadah 2 Construction of Primary School two rooms+ Ajnala Amritsar Ajnala Lakhuwal 6 Km 10.00 31.3.20 New -- -- 10.00 3.20 4.60 Varadah Ramdass Total 20.00 20.00 6.40 9.20 Grand Total 88.30 88.24 28.26 40.62 D. Capacity Building 11.04 11.04 3.53 5.08 E Border Security Force 0.00 1 Community Hall in proximity of BOP Shahpur, 32 6.00 6.00 1.92 2.76 BN BSF 2 Community Hall in proximity of BOP NSG, 32 BN 5.04 5.04 1.61 2.32 BSF Total 11.04 11.04 3.53 5.08 Grand Total (A+B+C+D+E) 110.38 110.32 35.32 50.77 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Whether Scheme is Approved Location on-going from the Funds outlay of the SCSP Women Distance for Target for previous year. required Scheme for Old / New Component component Sr. No. Name of the Name of the Sector, Scheme/Project International completion in Remarks the current Scheme Year Funds (out of (out of Constitu Border of Scheme currernt District Block Village year. commenc already column 13) column 13) ency year (in Lakhs) ement utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 2 BLOCK: CHOGAWAN A. Infrastructure 1 Construction of link road from Bhindi Aulakh road Raja Amritsar Chogawa Bhindi Aulakh 3 Km 66.00 2019-20 New -- -- 66.00 21.78 30.36 to kutiwal road Sansi n Kalan 2 Construction of link road from Bhindi Saida Road Raja Amritsar Chogawa Miadi Kalan 1 Km 15.76 2019-20 New -- -- 15.76 5.20 7.25 to Dera Bohlian wale Sansi n TOTAL 81.76 81.76 26.98 37.61 B. Capacity Building 10.22 10.22 3.27 4.70 C. Border Security Force 1 Construction of Kissan shed in size 14'x12' and 01 3.42 3.42 1.09 1.57 seated toilet block with one Urinal point and wash basin BOP Ghoga - Gate No 82 2 Construction of Kissan shed in size 14'x12' and 01 3.40 3.40 1.09 1.56 seated toilet block with one Urinal point and wash basin BOP Fatehpur - Gate No 87 3 Construction of Kissan shed in size 14'x12' and 01 3.40 3.40 1.09 1.56 seated toilet block with one Urinal point and wash basin BOP Fwd Kakkar - Gate No 90 TOTAL 10.22 10.22 3.27 4.70 Grand Total (A+B+C) 102.20 102.20 32.70 47.01 3 BLOCK: ATTARI A Infrasturcture 1 Construstion of approach road from nirmal singh to Attari Amritsar Attari Bhadiar 2 km 11.95 2019-20 New 11.95 3.82 5.50 sulkhan singh (300 x 8), Gurudwara sahib to mukhtar singh ( 200x 10), sarpanch to prem singh (200 x 20), Balkar singh to sawinder (150 x 10), - - Link road to firni & cremation ground ( 600 x10) BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Whether Scheme is Approved Location on-going from the Funds outlay of the SCSP Women Distance for Target for previous year. required Scheme for Old / New Component component Sr. No. Name of the Name of the Sector, Scheme/Project International completion in Remarks the current Scheme Year Funds (out of (out of Constitu Border of Scheme currernt District Block Village year. commenc already column 13) column 13) ency year (in Lakhs) ement utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 2 Construstion of approach road from kulwant singh Attari Amritsar Attari Rajataal 2KM 10.00 2019-20 New 10.00 3.20 4.60 to hira singh (350x16), main road to suba singh (250x18), Manjit singh to sajan singh (300x11) & Approach road from main road pal singh, santokh - - singh, amreek singh, tarsem singh (1200x10).

3 Construction of boundary wall in primary school Attari Amritsar Attari Gharinda 0.5 KM 11.00 2019-20 New - - 11.00 3.52 5.06 4 Construction of approach Road from bricks factory Attari Amritsar Attari Basarke gillan 4KM 11.00 2019-20 New 11.00 3.52 5.06 to sahib singh (600x8), approach road from mahilia to drain (1000x8), Construstion of approach road - - from main road to kabala singh numberdar( bibi amro wala bazaar ) (500x10). 5 Construstion of approach road from gurudwara Attari Amritsar Attari Ramuwal 5KM 12.00 2019-20 New 12.00 3.84 5.52 sahib wali road (300x25), Bakshish singh road (100 x 36), Construction of Sewarage in Baba Pritam - - Singh & Balwant Singh (950)

6 Construction of approach Road from main road to Attari Amritsar Attari Malluwal 3KM 11.00 2019-20 New 11.00 3.52 5.06 gurwinder singh (1000x8), kalar road to gajjan singh (400x8), main road to kabal singh (800x8), - - Hira singh to gurrdware (350x16), Balwinder Singh to Satnam Singh (400x8) Total 66.95 66.95 21.42 25.74 B Capacity Building 8.37 8.37 2.68 3.85 C Border Security Force 1 Construction of kissan shed in size 14'x12' and 01 4.00 4.00 1.28 1.84 seated toilet block with one Urinal point and wash basin near gate No. 99 in the AOR BOP Pulmoran, 88 BN BSF BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: AMRITSAR (Rs. in Lakh) Whether Scheme is Approved Location on-going from the Funds outlay of the SCSP Women Distance for Target for previous year. required Scheme for Old / New Component component Sr. No. Name of the Name of the Sector, Scheme/Project International completion in Remarks the current Scheme Year Funds (out of (out of Constitu Border of Scheme currernt District Block Village year. commenc already column 13) column 13) ency year (in Lakhs) ement utilized 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 2 Construction of kissan shed in size 14'x12' and 01 4.37 4.37 1.40 2.01 seated toilet block with one Urinal point and wash basin near gate No. 111/1 in the AOR BOP Rajatal, 138 BN BSF. Total 8.37 8.37 2.68 3.85 Grand Total (A+B+C) 83.69 83.69 26.78 33.44 4 BLOCK: HARSHA CHINNA A. Infrastructure 1 Shifting of lines and installation of transformers to Raja Amritsar Harsha Awan Vassu 3 Km 16.27 2019-20 New -- -- 16.27 5.21 7.48 provide 24 hour supply to the villagers Sansi Chhina 2 Construction of approach road from the house of Ajnala Amritsar Harsha Sangatpura 10 Km 10.00 2019-20 New -- -- 10.00 3.20 4.60 Mahinder singh to the house of Rashpal Singh etc. Chhina

3 Construction of approach road from the house of Ajnala Amritsar Harsha Talwandi 9 Km 10.00 2019-20 New -- -- 10.00 3.20 4.60 Anup Singh to the house of Ram Singh etc. Chhina sipahi mal TOTAL 36.27 36.27 11.61 16.68 B. Capacity Building 4.53 4.53 1.45 2.08 C. Border Security Force 1 Community Hall in proximity of BOP Gulgarh 32 4.54 4.54 1.45 2.09 BN BSF Grand Total (A+B+C) 45.34 45.34 14.51 20.86 Grand Total All Blocks 341.61 341.55 109.30 152.08

Annual Action Plan for the year 2019-20 District FEROZEPUR

BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur (Rs. In Lakh)

Whether scheme is on- Location going from the previous Distance Approved Target for Funds SCSP Women Whether year Implementing Name of the Sector from Inter- outlay of the completion of required Compone Compone S.No scheme Agency/Rema and Schemes/Project national scheme for the scheme Funds in the current nt (Out of nt (Out of is new Year of rks Constitue Border current Year (Months) already year 2019-20 Col.13) Col.13) District Block Village Commence- ncy utilized ment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

BLOCK: FEROZEPUR

Infrastructure-1 Sector Basti Construction of Street (Interlok Habib wali Ferozepur 1 Ferozepur Ferozepur 4 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Tiles) ( Khu Burj Urban Wala) 1) Construction of C.C. Flooring Lahor Singh House to Resham singh & Jagtar Singh House to Wariam Ferozepur 2 Ferozepur Ferozepur 3 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Mahinder Singh House (2) Const. Wala Rural of C.C. Flooring Road of Shamshanghat Ferozepur 3 Construction of Phirni Ferozepur Ferozepur Dhira Patra 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Rural Construction. of C.C Flooring Dulla Ferozepur 4 Community Center to Roop Singh Ferozepur Ferozepur Singh 2 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Rural Plot Wala Jhok Hari Har (Basti Ferozepur 5 Construction of Phirni Ferozepur Ferozepur 6 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Kande Rural Wali) BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur (Rs. In Lakh)

Whether scheme is on- Location going from the previous Distance Approved Target for Funds SCSP Women Whether year Implementing Name of the Sector from Inter- outlay of the completion of required Compone Compone S.No scheme Agency/Rema and Schemes/Project national scheme for the scheme Funds in the current nt (Out of nt (Out of is new Year of rks Constitue Border current Year (Months) already year 2019-20 Col.13) Col.13) District Block Village Commence- ncy utilized ment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Total 50.00 50.00 16.00 7.50 Sports Sector Installation og Garden Gym at Ferozepur 1 Ferozepur Ferozepur Ferozepur 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Gandi garden Ferozepur Urban Installation og Garden Gym at Ferozepur 2 Govt. Sen. Sec. School (Girl) Ferozepur Ferozepur Ferozepur 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Urban Ferozepur Installation og Garden Gym at Ferozepur 3 Gandhi Garden at Preet Nagar Ferozepur Ferozepur Ferozepur 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Urban Ferozepur City Installation of Garden Gym at Ferozepur 4 Ferozepur Ferozepur Ferozepur 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Railway Ground Ferozepur Urban Installation of Garden Gym at Ferozepur 5 Ferozepur Ferozepur Ferozepur 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Saragarhi Park Ferozepur Urban Khai Ferozepur 6 Installation of Garden Gym Ferozepur Ferozepur 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Pheme Ki Urban Installation of Garden Gym at Bedi Ferozepur 7 Ferozepur Ferozepur Ferozepur 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Coliny Phase-3, Ferozepur City Urban Ferozepur 8 Installation of Garden Gym Ferozepur Ferozepur Hasti Wala 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Urban BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur (Rs. In Lakh)

Whether scheme is on- Location going from the previous Distance Approved Target for Funds SCSP Women Whether year Implementing Name of the Sector from Inter- outlay of the completion of required Compone Compone S.No scheme Agency/Rema and Schemes/Project national scheme for the scheme Funds in the current nt (Out of nt (Out of is new Year of rks Constitue Border current Year (Months) already year 2019-20 Col.13) Col.13) District Block Village Commence- ncy utilized ment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Installation of Garden Gym at Ferozepur 9 Shaheed Bhagat Singh Stadium Ferozepur Ferozepur Ferozepur 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Urban Ferozepur Ferozepur 10 Developmet of Park Ferozepur Ferozepur Hake Wala 6 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Urban Wariam Ferozepur 11 Installation of Garden Gym Ferozepur Ferozepur 3 3.74 6 Month New 2019-20 - 3.74 1.20 0.56 -- Wala Rural Habib Ferozepur 12 Installation of Garden Gym Ferozepur Ferozepur 4 5.00 6 Month New 2019-20 - 5.00 1.60 0.75 -- Wala Rural Total 108.74 108.74 34.80 16.31 BSF (1) ECG Machines, equipment for dental clinic, pathological labs etc. At BOP barrier (2) Skill Development training to the farmers BOP of border villages for the use of Ferozepur 1 Ferozepur Ferozepur Barrier & 1 10.00 6 month new 2019-20 - 10.00 3.20 1.50 -- modern/ scientific technique in Rural KMS wala farming. (3)Swach Bharat Abhiyan Construction of toilet blocks in schools, public places particularly for women BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur (Rs. In Lakh)

Whether scheme is on- Location going from the previous Distance Approved Target for Funds SCSP Women Whether year Implementing Name of the Sector from Inter- outlay of the completion of required Compone Compone S.No scheme Agency/Rema and Schemes/Project national scheme for the scheme Funds in the current nt (Out of nt (Out of is new Year of rks Constitue Border current Year (Months) already year 2019-20 Col.13) Col.13) District Block Village Commence- ncy utilized ment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BOP New Installation of Solar plant in AOR MD wala Ferozepur 2 of BOP new MD wala 02 Nos and Ferozepur Ferozepur 1 5.27 6 month new 2019-20 - 5.27 1.69 0.79 -- and BOP Rural Firing Range of BOP Barre ke Bare ke Total 15.27 15.27 4.89 2.29 Skill Development & Capacity 19.66 19.66 6.29 0.00 Building Administative Expenses 2.95 2.95 0.94 0.00 Total Block Ferozepur 196.62 196.62 62.92 26.10 BLOCK GURU HAR SAHAI Infrastructure-1 Sector Construction of Road Guruharsahai- Guru Har Guru Har Guru Har 1 Goluka Road to Little Flower Ferozepur 6 20.00 6 Month New 2019-20 - 20.00 6.40 3.00 -- Sahai Sahai sahai School & Godown (1.00 Km)

Construction of Road Bulla Rai Guru Har Bulla Rai Guru Har 2 Hithar to Chhanga Rai (Santa Ferozepur 4 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Sahai Hithar sahai Singh) (0.50km) Construction of Road Wallu Singh Wallu Guru Har Guru Har 3 wala School to Munsha Singh (0.70 Ferozepur Singh 5 14.00 6 Month New 2019-20 - 14.00 4.48 2.10 -- Sahai sahai km) Wala BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur (Rs. In Lakh)

Whether scheme is on- Location going from the previous Distance Approved Target for Funds SCSP Women Whether year Implementing Name of the Sector from Inter- outlay of the completion of required Compone Compone S.No scheme Agency/Rema and Schemes/Project national scheme for the scheme Funds in the current nt (Out of nt (Out of is new Year of rks Constitue Border current Year (Months) already year 2019-20 Col.13) Col.13) District Block Village Commence- ncy utilized ment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Construction fo Road Grain Market Guru Har Guru Har 4 Sohangarh to Mahinder Singh (0.80 Ferozepur Sohangarh 4 16.00 6 Month New 2019-20 - 16.00 5.12 2.40 -- Sahai sahai km)

Construction of Road Chak saido ke Guru Har Chak Guru Har 5 Ferozepur 7 13.00 6 Month New 2019-20 - 13.00 4.16 1.95 -- to Ghanga Khurd (0.65 km) Sahai Saido Ke sahai Construction of Road Sohangarh to Guru Har Guru Har 6 Ferozepur Sohangarh 4 16.00 6 Month New 2019-20 - 16.00 5.12 2.40 -- Shamshanghat SC (0.80 km) Sahai sahai Construction of Road Rahime Shah Guru Har Chak Panje Guru Har 7 Bodla to Swai ke Road to Jhugge Ferozepur 7 17.60 6 Month New 2019-20 - 17.60 5.63 2.64 -- Sahai Ke sahai Tellian Wala Total 106.60 106.60 34.11 15.99 BSF BOP Samaske, J Installtion of 5 No. Ro Plants at F Singh, Guru Har Guru Har 1 BOP Samaske, J F Singh, Rana, Ferozepur Rana, 1 12.55 6 Month New 2019-20 - 12.55 4.02 1.88 -- Sahai Sahai Noubehram and K B K Noubehra m and K B K Total 12.55 12.55 4.02 1.88 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur (Rs. In Lakh)

Whether scheme is on- Location going from the previous Distance Approved Target for Funds SCSP Women Whether year Implementing Name of the Sector from Inter- outlay of the completion of required Compone Compone S.No scheme Agency/Rema and Schemes/Project national scheme for the scheme Funds in the current nt (Out of nt (Out of is new Year of rks Constitue Border current Year (Months) already year 2019-20 Col.13) Col.13) District Block Village Commence- ncy utilized ment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Skill Development & Capacity 13.46 13.46 4.31 0.00 Building Administrative Expenses 2.02 2.02 0.65 0.00 Total Block Guru har Sahai 134.63 134.63 43.08 17.87 BLOCK: MAMDOT Infrastructure-1 Sector Ferozepur 1 Construction of Phirni Ferozepur Mamdot Bodal 4 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Rural Pojo ke Ferozepur 2 Construction of Phirni / Streets Ferozepur Mamdot 2 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Uttar Rural Betu Ferozepur 3 Construction of Phirni Ferozepur Mamdot 4 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Qudim Rural Ferozepur 4 Construction of Phirni Ferozepur Mamdot Kala Tibba 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Rural Construction of Road main Road to Kamaldeen Ferozepur 5 Ferozepur Mamdot 3 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Baba Arjan Singh House Niyaji Rural Hazara Ferozepur 6 Construction of Phirni Ferozepur Mamdot Singh 4 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Rural Wala Ferozepur 7 Construction of Phirni Ferozepur Mamdot Fular Wan 5 10.00 6 Month New 2019-20 - 10.00 3.20 1.50 -- Rural BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur (Rs. In Lakh)

Whether scheme is on- Location going from the previous Distance Approved Target for Funds SCSP Women Whether year Implementing Name of the Sector from Inter- outlay of the completion of required Compone Compone S.No scheme Agency/Rema and Schemes/Project national scheme for the scheme Funds in the current nt (Out of nt (Out of is new Year of rks Constitue Border current Year (Months) already year 2019-20 Col.13) Col.13) District Block Village Commence- ncy utilized ment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Construction of Road Jhoke Mohre Jhoke Guru Har 8 to railway Station Jhoke tehal singh Ferozepur Mamdot 7 18.00 6 Month New 2019-20 - 18.00 5.76 2.70 -- Mohre Sahai Wala ( 1.00 km) Molvi Wala Construction of Road Molvi wala to Guru Har 9 Ferozepur Mamdot (Chak 3 27.00 6 Month New 2019-20 - 27.00 8.64 4.05 -- Surjan Singh House (1.50 Km0 Sahai Haraj Baraka)

Construction of Road Gulam patra Gulam Guru Har 10 Ferozepur Mamdot 3 18.00 6 Month New 2019-20 - 18.00 5.76 2.70 -- to Mann Singh House (1.00 Km) Patra Sahai Total 133.00 133.00 42.56 19.95 Sports Sector Guru Har 1 Installation of Open Gym Ferozepur Mamdot Dila Ram 6 5.00 6 Month New 2019-20 - 5.00 1.60 0.75 -- Sahai Total 5.00 5.00 1.60 0.75 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur (Rs. In Lakh)

Whether scheme is on- Location going from the previous Distance Approved Target for Funds SCSP Women Whether year Implementing Name of the Sector from Inter- outlay of the completion of required Compone Compone S.No scheme Agency/Rema and Schemes/Project national scheme for the scheme Funds in the current nt (Out of nt (Out of is new Year of rks Constitue Border current Year (Months) already year 2019-20 Col.13) Col.13) District Block Village Commence- ncy utilized ment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BSF

Construction Of 11 Nos. Toilet block 02 seated with running water facilities near BS Fence for use of Kissans Gate no. 192/1 & 193/M of BOP Jagdish, 195/1 of BOP DT BOP LS Ferozepur 1 Ferozepur Mamdot 1 14.96 6 month new 2019-20 - 14.96 4.79 2.24 -- Mall, 197/M & 198/1 of BOP wala Rural Maboke, 199/M & 199/1 of BOP Gattihayat, 203/1 & 204/M of BOP Mastagatti, 205/M of BOp LS wala, 206/M of BOP LS wala

Total 14.96 14.96 4.79 2.24 Skill Development & Capacity 17.28 17.28 5.53 0.00 Building Administrative Expenses 2.59 2.59 0.83 0.00 Total Block Mamdot 172.83 172.83 55.31 22.94 Grand Total(All Blocks) 504.08 504.08 161.31 66.91 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur

(Rs. In Lakh)

Whether scheme is on- Funds Approved Target for Location Distance going from the previous required SCSP Women outlay of completion Whether Implementing Name of the Sector from Inter- year in the Componen Componen S.No the scheme of the scheme is Agency/Rema and Schemes/Project national Funds current t (Out of t (Out of for current scheme new Year of rks Border already year 2019- Col.13) Col.13) District Block Village Constituency Year (Months) Commence- ment utilized 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: FEROZEPUR Infrastructure-1 Sector Constuction of Road Canal to Ferozepur 1 Ferozepur Ferozepur Wahka Mour 5 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Gagubua (Interlok Tiles) Urban Constuction of Street Single Road Ferozepur 2 to Mehnga Singh House (Interlok Ferozepur Ferozepur Talli Gulam 2 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Urban Tiles) Ferozepur 3 Constuction of Phirni Ferozepur Ferozepur Nanakpura 5 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Rural Basti Mohmad Ferozepur 4 Constuction of Phirni Ferozepur Ferozepur 6 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Ali Shah Rural Constuction of C.C. Flooring (1) Main Road to Colony Raod Kuldeep Singh House to Sukhbir Ferozepur 5 Singh House (2) Const. of C.C. Ferozepur Ferozepur Nurang ke Syal 8 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Rural Flooring Jathdar Tara Singh House to Manjeet Sing Ex. Sarepanch & Village Phirni Total 50.00 50.00 16.00 7.50 Social Sector Ferozepur 1 Constuction of Community Hall Ferozepur Ferozepur Usman Wala 6 12.00 6 Month New 2019-20 _ 12.00 3.84 1.80 -- Urban Katora (Wahka Ferozepur 2 Constuction of Community Hall Ferozepur Ferozepur 5 30.00 6 Month New 2019-20 _ 30.00 9.60 4.50 -- Mour) Urban Total 42.00 42.00 13.44 6.30 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur

(Rs. In Lakh)

Whether scheme is on- Funds Approved Target for Location Distance going from the previous required SCSP Women outlay of completion Whether Implementing Name of the Sector from Inter- year in the Componen Componen S.No the scheme of the scheme is Agency/Rema and Schemes/Project national Funds current t (Out of t (Out of for current scheme new Year of rks Border already year 2019- Col.13) Col.13) District Block Village Constituency Year (Months) Commence- ment utilized 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Sports Sector Ferozepur 1 Development of park/ Interlok Tiles Ferozepur Ferozepur Suba Qudim 4 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Urban Bhawra Azam Ferozepur 2 Installtion of Gym Ferozepur Ferozepur 3 3.16 6 Month New 2019-20 _ 3.16 1.01 0.47 -- Shah Rural Total 13.16 13.16 4.21 1.97 BSF (1) Constuction Of Permanent dustbin & Distribution of dustbin under Swachh Bharat Abhiyan in KMS wala ,BOP Border villages (2) Installation of Shameke, BOP Ferozepur 1 Solar plant in the AOR of BOP Ferozepur Ferozepur 1 12.78 6 month new 2019-20 - 12.78 4.09 1.92 -- Pachharian, BOP Rural Shameke 02 Nos ,AOR of BOP Ulloke Pachharian & Old MD wala 02 Nos , AOR of BOP Ulloke & H K Tower 02 Nos Total 12.78 12.78 4.09 1.92 Skill Development & Capacity 13.10 13.10 4.19 0.00 Building Total Block Ferozepur 131.04 131.04 41.93 17.69 BLOCK: GURU HAR SAHAI Infrastructure-1 Sector Constuction of Road Guruharsahai- Guru Har 1 kanniaya Wali Road to Baghu Wala Ferozepur Kanniya Wala Guru Har Sahai 4 20.00 6 Month New 2019-20 _ 20.00 6.40 3.00 -- Sahai (1.00 Km) Constuction of Road Backside Guru Har 2 Govt. Ghanga Kalan to Sharma Ferozepur Ghanga kalan Guru Har Sahai 5 20.00 6 Month New 2019-20 _ 20.00 6.40 3.00 -- Sahai House (1.00 Km) BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur

(Rs. In Lakh)

Whether scheme is on- Funds Approved Target for Location Distance going from the previous required SCSP Women outlay of completion Whether Implementing Name of the Sector from Inter- year in the Componen Componen S.No the scheme of the scheme is Agency/Rema and Schemes/Project national Funds current t (Out of t (Out of for current scheme new Year of rks Border already year 2019- Col.13) Col.13) District Block Village Constituency Year (Months) Commence- ment utilized 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Constuction fo Road Gammu Wala- Guru Har 3 Nou Behram Sher Singh wala Road Ferozepur Gammu Wala Guru Har sahai 7 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Sahai to jhugge Wallu Singh Total 50.00 50.00 16.00 7.50 Sports Sector Guru Har Chhanga Rai 1 Installation of Indoor Gym Ferozepur Guru Har sahai 4 2.00 6 Month New 2019-20 - 2.00 0.64 0.30 -- Sahai Uttar Guru Har 2 Installation of Open gym Ferozepur Panje Ke Uttar Guru Har Sahai 6 5.00 6 Month New 2019-20 _ 5.00 1.60 0.75 -- Sahai Guru Har 3 Installation of Open gym Ferozepur Amir Khas Guru Har Sahai 4 5.00 6 Month New 2019-20 _ 5.00 1.60 0.75 -- Sahai Installation of Open gym at Guru Har 4 Ferozepur Mohan ke Hithar Guru Har Sahai 5 5.00 6 Month New 2019-20 _ 5.00 1.60 0.75 -- Shaheed Udham Singh Collage Sahai Guru Har Guru Har sahai 5 Installation of Open gym Ferozepur Guru Har Sahai 5 5.00 6 Month New 2019-20 _ 5.00 1.60 0.75 -- Sahai (Adarsh park) Total 22.00 22.00 7.04 3.30 BSF Constuction of 2 No. Kisaan Shed Guru Har BOP Samaske 1 with Toilets Block at BOP Ferozepur Guru Har Sahai 1 8.78 6 Month New 2019-20 _ 8.78 2.81 1.32 -- Sahai and KBK Samaske and KBK Total 8.78 8.78 2.81 1.32 Skill Development & Capacity 8.98 8.98 2.87 0.00 Building Total Block Guru har Sahai 89.76 89.76 28.72 12.12 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur

(Rs. In Lakh)

Whether scheme is on- Funds Approved Target for Location Distance going from the previous required SCSP Women outlay of completion Whether Implementing Name of the Sector from Inter- year in the Componen Componen S.No the scheme of the scheme is Agency/Rema and Schemes/Project national Funds current t (Out of t (Out of for current scheme new Year of rks Border already year 2019- Col.13) Col.13) District Block Village Constituency Year (Months) Commence- ment utilized 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: MAMDOT Infrastructure-1 Sector Ferozepur 1 Constuction of Phirni Ferozepur Mamdot Tibbi Kalan 5 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Rural Sunder Singh Ferozepur 2 Constuction of Phirni Ferozepur Mamdot 3 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Wale jhugge Rural Ferozepur 3 Constuction of Phirni Ferozepur Mamdot Bharoli Bhan 4 10.00 6 Month New 2019-20 _ 10.00 3.20 1.50 -- Rural Constuction of Road Baba Kirpal 4 Ferozepur Mamdot Mehma Guru Har Sahai 5 20.55 6 Month New 2019-20 _ 20.55 6.58 3.08 -- Singh House Constuction of Road Guddar Dhani 5 Ferozepur Mamdot Guddar Dhandi Guru Har Sahai 5 20.00 6 Month New 2019-20 _ 20.00 6.40 3.00 -- Raod to Chak Bhude Shah Total 70.55 70.55 22.58 10.58 Sports Sector 1 Installation of Open Gym Ferozepur Mamdot Karma Guru Har Sahai 5 4.00 6 Month New 2019-20 _ 4.00 1.28 0.60 -- Chak Amrik Ferozepur 2 Installation of Garden Gym Ferozepur Mamdot 4 5.00 6 Month New 2019-20 _ 5.00 1.60 0.75 -- Singh Wala Rural Lakhmir Ke Ferozepur 3 Installation of Garden Gym Ferozepur Mamdot 3 5.00 6 Month New 2019-20 _ 5.00 1.60 0.75 Uttar Rural Sawan Wale Ferozepur 4 Development of Park & Gym Ferozepur Mamdot 2 7.48 6 Month New 2019-20 _ 7.48 2.39 1.12 Jhugge Rural Total 21.48 21.48 6.87 3.22 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Ferozepur

(Rs. In Lakh)

Whether scheme is on- Funds Approved Target for Location Distance going from the previous required SCSP Women outlay of completion Whether Implementing Name of the Sector from Inter- year in the Componen Componen S.No the scheme of the scheme is Agency/Rema and Schemes/Project national Funds current t (Out of t (Out of for current scheme new Year of rks Border already year 2019- Col.13) Col.13) District Block Village Constituency Year (Months) Commence- ment utilized 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BSF

(1) Installation Of 10 Nos. of Hand Pump Near Fence at various gates in AOR of 29 Bn BSF for Use of Kissans Toilet block 02 seated with BOP Jagdish, running water facilities near BS Ferozepur 1 Ferozepur Maboke, gatti 1 11.58 6 month new 2019-20 - 11.58 3.71 1.74 -- Fence for use of Kissans (2) Const. Rural hayat, masta gatti Of 05 Nos. of Kissan shed (8'x8' with 10' height) Gate no. 193/M of BOP Jagdish, 198/M, 198/1 of BOP Maboke, 199/1

Total 11.58 11.58 3.71 1.74 Skill Development & Capacity 11.58 11.58 3.71 0.00 Building Total Block Mamdot 115.19 115.19 36.86 15.54 Grand Total(ALL BLOCKS) 335.99 335.99 107.52 45.35

Annual Action Plan for the year 2019-20

District FAZILKA

BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: FAZILKA A Infrastructure (i) Infrastructure (I) Construction of Link Road Behak Khas Xen Panchayti Behak 1 Shamshanghat to Vill Chandmari and Fazilka Fazilka Fazilka 8 48.61 6 months new 2019-20 0 48.61 15.56 7.29 Raj Bridge on Mauzam minor Khas

Construction of road from Surinder Gram kumar house to Muk ram and Sushil panchyat 2 kumar to Bhumia Chownk Main chownk Fazilka Fazilka Khan wala Fazilka 2 10.00 6 months new 2019-20 0 10.00 3.20 1.50 to village Sath Construction of interlock road from Hans XEN 3 Raj Agro mills to Bhura Ram House Fazilka Fazilka Fazilka Fazilka 10 10.15 6 months new 2019-20 0 10.15 3.25 1.77 Panchyati Raj

Sub Total (A i):- 68.76 68.76 22.00 10.56 (ii) Infrastructure (II) 1 Construction of outfall drain Visakhew Gram Fazilka Fazilka Fazilka 4 10.00 6 months new 2019-20 0 10.00 3.20 2.00 ala Khu panchyat 2 Construction of Outfall Drain Gram Fazilka Fazilka Badha Fazilka 8 10.00 6 months new 2019-20 0 10.00 3.20 1.50 panchyat

Sub Total (A ii):- 20.00 20.00 6.40 3.50 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (iii) Other Infrastructure B Health Sector C Agriculture & Allied Sector 1 Minor Irrigation Works Construction of Gram Khal Mogha No 76370 and School to Fazilka Fazilka Kotha Fazilka 4 17.00 6 months new 2019-20 0 17.00 5.44 2.69 panchyat Shamshanghat (Pipe Line) 2 Minor Irrigation works Construction of Fazilka Fazilka Pacca Fazilka 1 10.00 6 months new 2019-20 0 10.00 3.20 2.00 XEN Pacca Khal Mogha No. 91080 Branch Chisti Panchayati Sandeep Kumar Raj

Sub Total (C):- 27.00 27.00 8.64 4.69 D Social Sector (i) Community Center,Common shelters for old and handicapped etc. 1 Construction of Community Centre XEN Mahatam Fazilka Fazilka Fazilka 3 19.00 6 months new 2019-20 0 19.00 6.08 2.85 Panchayati Nagar Raj 2 Construction of Smart anganwadi Centre Mohamma Gram Fazilka Fazilka Fazilka 3 10.00 6 months new 2019-20 0 10.00 3.20 1.80 d Pira panchyat Sub Total (D i):- 29.00 29.00 9.28 4.65 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (ii) Capacity Building & Skill Dev. Including Tourism & Hospitality etc. 1 Capacity building programme by way of vocational studies & training for youth for self employment and skill up Fazilka Fazilka Fazilka Fazilka 10 24.04 6 months new 2019-20 0 24.04 7.69 gradation of artisans and weavers

Sub Total (D ii):- 24.04 24.04 7.69 (iii) Sanitation. Swatch Bharat Abhiyan, Const. of Toilets particularly for ladies, rural sanitation etc. E Education Sector Construction of Smart classroom of Fazilka Fazilka Mohar Fazilka 1 6 months new 2019-20 0 10.00 3.20 2.00 Gram 1 10.00 Govt.Primary School Jamsher panchyat Construction of Smart classroom in GPS Fazilka Fazilka Mumbeki Fazilka 2 7 months new 2019-21 0 10.00 3.20 1.50 Gram 2 10.00 panchyat Construction of Boundary Wall and Fazilka Fazilka Bakhu Fazilka 3 6 months new 2019-20 0 10.00 3.20 1.80 Gram 3 Smart classroom of Govt.Primary School Shah 10.00 panchyat

Sub Total (E):- 30.00 30.00 9.60 5.30 F Sports Activities Construction of Complete Gym with XEN 1 Room Fazilka Fazilka Mauzam Fazilka 3 14.00 6 months new 2019-20 0 14.00 4.48 2.50 Panchayati Raj Sub Total (F):- 14.00 14.00 4.48 2.50 G Special/Specific Area Schemes Sub Total (G):- BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 H Maintenance Sub Total (H):- 0.00 0.00 0.00 0.00 I Schemes to be suggested by BGFs Construction of common interlocking Fazilka Fazilka Sadqi Fazilka 0 24.04 6 months new 2019-20 0 24.04 7.69 XEN road BOP Sadqi entrance gate to IB Panchayati fence, and Construction of Bus Stand Raj, Fazilka 1 Near BSF gate Rampura and Provision of 150 Ltrs Capacity RO

Sub Total (I):- 24.04 24.04 7.69 J Administrative Expenses Including Monitoring. Trg. Etc. 1 Monitoring & Administartive Expenses Fazilka Fazilka Fazilka Fazilka 10 3.61 3.61 1.16 DyESA, Fazilka Sub Total (J):- 3.61 3.61 1.16 Total (A to J) 240.45 240.45 76.94 31.20 BLOCK: JALALABAAD (Fazilka):- A Infrastructure (i) Infrastructure (I) Construction of common interlock Road Fazilka Jalalabad Jhuge lal Fazilka 10 14.59 6 months new 2019-20 0 14.59 4.67 1.80 Gram 1 from Bhane Lal to Des Raj Singh panchyat

Dhani 3.20 Xen Construction of C.C. Flooring Chhanga Chowdhri 2 Fazilka Jalalabad Jalalabad 10 10.00 6 Month New No No 10.00 1.50 Panchayati Ram Street Chhanga Raj, Fazilka Ram BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 3.20 Xen Construction of C.C. Flooring Street Chak 3 Fazilka Jalalabad Jalalabad 7 10.00 6 Month New No No 10.00 1.50 Panchayati From main road to Shamshanghat Sukkar Raj, Fazilka Construction of common interlock Phirni 5.12 Gram 4 Fazilka Jalalabad Ghubaya Jalalabad 6 16.00 6 Month New No No 16.00 3.00 Road Panchayt 3.20 Xen Construction of C.C. Flooring road From Baghe Ke 5 Fazilka Jalalabad Jalalabad 6 10.00 6 Month New No No 10.00 3.00 Panchayati Sarvan Singh House Uttar Raj, Fazilka 3.20 Xen Construction of C.C. Flooring road From Dhani Juj 6 Fazilka Jalalabad Jalalabad 6 10.00 6 Month New No No 10.00 1.50 Panchayati Gurbaksh Singh House Singh Raj, Fazilka Sub Total (A i):- 70.59 70.59 22.59 12.30 (ii) Infrastructure (I) Sub Total (A ii):- 0.00 0.00 0.00 0.00 (iii) Other Infrastructure Sub Total (A iii):- 0.00 0.00 0.00 0.00 B Health Sector Sub Total (B):- 0.00 0.00 0.00 0.00 C Agriculture & Allied Sector Sub Total (C):- 0.00 0.00 0.00 0.00 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 D Social Sector (i) Community Centers, Kissan Sheds with Toilet Facility etc. 1 Xen Jodha Construction of Community Center Fazilka Jalalabad Jalalabad 5 10.00 6 Month New No No 10.00 3.20 2.00 Panchayati Bhaini Raj, Fazilka 2 Pharbat Xen Construction of Community Center Fazilka Jalalabad Singh Jalalabad 5 10.00 6 Month New No No 10.00 3.20 2.00 Panchayati wala Raj, Fazilka Hithar Sub Total (D i):- 20.00 20.00 6.40 4.00

(ii) Capacity Building & Skill Dev. Including Tourism & Hospitality etc.

Capacity building programme by way of vocational studies & training for youth 1 Fazilka Jalalabad Fazilka Fazilka 10 15.36 6 months new 2019-20 0 15.36 4.92 for self employment and skill up gradation of artisans and weavers

Sub Total (D -ii):- 15.36 15.36 4.92 (iii) Sanitation. Swatch Bharat Abhiyan, Const. of Toilets particularly for ladies, rural sanitation etc. Sub Total (D -iii):- 0.00 0.00 0.00 0.00 E Education Sector Xen Construction of 2 Room & Verandah in Chak 1 Fazilka Jalalabad Jalalabad 8 10.00 6 Month New No No 10.00 3.20 1.50 Panchayati Govt. Primary School Sotrian Raj, Fazilka BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Chak Xen Construction of 2 Room & Verandah in 2 Fazilka Jalalabad Moujdeen Jalalabad 10 10.00 6 Month New No No 10.00 3.20 1.75 Panchayati Govt. High School wala Raj, Fazilka Chak Xen Construction of Common Shed in 3 Fazilka Jalalabad Mochan Jalalabad 8 10.00 6 Month New No No 10.00 3.20 1.70 Panchayati Adarsh Model School Wala Raj, Fazilka Sub Total (E):- 30.00 30.00 4.95 9.60 F Sports Activities

Sub Total (F):- 0.00 0.00 0.00 0.00 G Special/Specific Area Schemes

Sub Total (G):- 0.00 0.00 0.00 0.00

H Maintenance Sub Total (H):- 0.00 0.00 0.00 0.00 I Schemes to be suggested by BGFs Construction of RCC road from BOP Fazilka Jalalabad Chak Jalalabad 2 15.36 15.36 4.92 Xen Panchati 1 6 months new 2019-20 0 Chakkhewa to fencing in AOR Khewa Raj Sub Total (I):- 15.36 15.36 4.92 J Administrative Expenses Including Monitoring. Trg. Etc. 1 Monitoring & Administartive Fazilka Jalalabad Jalalabad 2.30 2.30 0.74 Dy ESA, 10 Expenses Fazilka Sub Total (J):- 2.30 2.30 0.74 Total (A to J) 153.61 153.61 49.16 21.25 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: KHUIAN SARVAR A Infrastructure (i) Infrastructure (I) 1 Construction of interlock road from Roop Gram Ram house to Ram Kishan house and Khuian Panchyat Fazilka Ghallu Balluana 12 10.00 6 momth new 2019-20 0 10.00 3.20 2.00 Dharampal house to Ginder bazigar sarvar house 2 Construction of interlock road from Fazilka Khuian Bareka Fazilka 2 14.52 6 months new 2019-20 0 14.52 1.50 Gram Rakesh huse to Sadhuram house Bhajan sarvar Panchyat 4.65 lal to Davinder House and main road to Gyan kumar house 3 Construction of road and outfall drain Gram from Jora Singh house to Manoj kumar Panchyat house and Pooran ram to Gyani ram Khuian Usman Nathu singh to Banta Singh Sharma to Fazilka Abohar 10 20.82 6 months new 2019-20 0 20.82 6.66 3.10 Shera Ram Mohan lal to Des Raj sarvar Khrera lakhwinder Singh to gurudwara to Pola Ram House 4 Construction of road and outfall drain Gram from Bhoop Ram to Duli Chand Raku Panchyat Khuian Meghwal to Gugamadi Phirni To Chiman Fazilka Gumjal Abohar 6 15.21 7 months new 2019-20 0 15.21 4.87 1.88 Lal Vijay Singh to Het Ram Ram Partap sarvar to Somkar BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 5 Construction of road and outfall drain Gram from Hanuman to Soma Singh Inder Panchyat Khuian Panniwala Singh to Harnek Singh Bhaju to Baba Fazilka Abohar 13 14.92 8 months new 2019-20 0 14.92 4.77 2.98 Atma Ganga Ram to Water Works sarvar Mohalla Harkamaljeet to Link Road 6 Construction of Interlock road from Prem Gram Kumar to Bhim Sen House Atta Chaki to Khuian Panchyat Fazilka Panjkosi Abohar 10 12.96 9 months new 2019-20 0 12.96 4.15 1.94 Rade Ram house Canal to Mohan lal sarver Chimpa Sub Total (A i):- 88.43 88.43 28.30 13.40 (ii) Infrastructure (II) 1 Construction of Outfall Drain Fazilka Khuian Bodhi Wla Fazilka 14 6 months new 2019-20 0 10.00 1.50 Gram 10.00 3.20 sarver Pitha panchyat Sub Total (A ii):- 10.00 10.00 3.20 1.50 (iii) Other Infrastructure Sub Total (A iii):- 0.00 0.00 0.00 0.00 B Health Sector Sub Total (B):- 0.00 0.00 0.00 0.00 C Agriculture & Allied Sector Sub Total (C):- 0.00 0.00 0.00 0.00 D Social Sector (i) Community Centers, Kissan Sheds with Toilet Facility etc. 1 Construction of Community Hall Fazilka Khuian Churiwala Balluana 12 12.00 6 momth new 2019-20 0 12.00 3.84 2.40 Gram sarvar Dhanna Panchyat BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 2 Construction of Smart Anganwadi Canter 10.00 10.00 3.20 1.50 XEN Khui Fazilka Fazilka 12 6 months new 2019-20 0 Panchayati Khera Raj Sub Total (D i):- 22.00 22.00 7.04 3.90 (ii) Capacity Building & Skill Dev. Including Tourism & Hospitality etc. 1 Fazilka Khuian Fazilka 10 16.64 6 months new 2019-20 0 16.64 5.32 Capacity building programe by way of sarvar vocational studies & training for youth for self employment and skill up gradation of artisans and weavers

Sub Total (D ii):- 16.64 16.64 5.32 (iii) Sanitation. Swatch Bharat Abhiyan, Const. of Toilets particularly for ladies, rural sanitation etc. Sub Total (D iii):- 0.00 0.00 0.00 0.00 E Education Sector Sub Total (E):- 0.00 0.00 0.00 0.00 F Sports Activities Sub Total (F):- 0.00 0.00 0.00 0.00 G Special/Specific Area Schemes

Construction of Street Solar light in New 1.53 Khuian Gram 1 village new mahinder nagar,Azam Wala Fazilka mahinder Balluana 10 10.25 6 momth new 2019-20 0 10.25 3.28 sarvar Panchyat and Patrewala Nangar Sub Total (G):- 10.25 10.25 3.28 1.53 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Centre Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka

(Rs. In Lakh) Whether Scheme is on Location Distance going from the Approved Target for from Previous Year Funds SCSP Women Outlay of the Completio Whether Internat- Required Component Component Sr. No. Name of the Sector / Scheme / Project Scheme for n of the Scheme is Remarks ional Year of Funds in Current (Out of (Out of Constitue the Current scheme New District Block Village Border Commenc Already Year Colom. 13) Colom. 13) ncy Year (Months) (in km) ement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 H Maintenance

Sub Total (H):- 0.00 0.00 0.00 0.00

I Schemes to be suggested by BGFs

Costruction of Toilet block Costruction XEN of Kissan Shed with toilet Nera BOP Khuian 1 Fazilka Roopnager Fazilka 1 16.64 6 months new 2019-20 0 16.64 5.32 Panchayati Nirmal,Sher,Khanpur,Sowana,Bishamber Sarvar Raj Fazilka and Roopnager.

Sub Total (I):- 16.64 16.64 5.32 J Administrative Expenses Including Monitoring. Trg. Etc.

1 Monitoring & Administartive Expenses Khuian Fazilka 10 2.50 2.50 0.8 DyESA, Khuian Fazilka Saravr Fazilka Sarvar Sub Total (J):- 2.50 2.50 0.8 Total (A to J) 166.46 166.46 53.27 20.33 (Khuian Sarvar):- Total All Block 560.52 560.52 179.37 72.78 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK : FAZILKA A Infrastructure (i) Infrastructure (I) Construction of Common Mandi Gram 1 interlock road of Phirni Fazilka Fazilka Hazur Fazilka 5 10.00 6 months new 2019-20 0 10.00 3.20 1.50 panchyat Singh Construction of Common road Alam Gram 2 from Pooran Chand house to Fazilka Fazilka Fazilka 4 10.00 6 months new 2019-20 0 10.00 3.20 1.50 Ashok Singh House Shah panchyat Construction of road from Rukmal Ram house to Des Raj Koriyan Gram 3 Chanan Ram to Nand Ram Sona Fazilka Fazilka Fazilka 10 10.00 6 months new 2019-20 0 10.00 3.20 1.50 Singh to Dharampal Sohan wali panchyat Singh to Ram partap

Sub Total (A i):- 30.00 30.00 9.60 4.50 (ii) Infrastructure (II) 1 Construction of outfall Drain Fazilka Fazilka Amarpura Fazilka 6 6 months new 2019-20 0 10.00 3.20 1.50 Gram 10.00 panchyat 2 Construction of outfall Drain Fazilka Fazilka Abuhan Fazilka 11 6 months new 2019-20 0 10.24 3.28 1.50 Gram 10.24 panchyat 3 Construction of outfall Drain Fazilka Fazilka Jhuge Fazilka 9 6 months new 2019-20 0 10.00 3.20 1.50 Gram Gulab panchyat 10.00 (Behak Khas) BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Construction of outfall Drain Gudar 3.20 Gram 4 Fazilka Fazilka Fazilka 2 10.00 6 months new 2019-20 0 10.00 1.50 Bhaini panchyat Sub Total (A ii):- 40.24 40.24 12.88 6.00 (iii) Other Infrastructure

Sub Total (A iii):- 0.00 0.00 0.00 0.00 B Health Sector . Sub Total (B):-

C Agriculture & Allied Sector 1 Minor Irrigation Works Construction of Pakka Khal Karni Gram Fazilka Fazilka Fazilka 5 10.00 6 months new 2019-20 0 10.00 3.20 1.50 Mogha No 24120-L Balvinder khera panchyat Singh to Gulzar Singh Sub Total (C):- 10.00 10.00 3.20 1.50 D Social Sector (i) Community Center,Common shelters for old and handicapped etc. 1 Construction of Community 10.00 10.00 3.20 2.10 Gram Fazilka Fazilka Gagan Ke Fazilka 6 6 months new 2019-20 0 Center panchyat 2 Construction of Smart 10.00 10.00 3.20 1.50 Gram Fazilka Fazilka New Rana Fazilka 5 6 months new 2019-20 0 Anganwadi Center panchyat 3 Construction of Smart Nawi 11.00 11.00 3.52 1.50 Gram Fazilka Fazilka Fazilka 5 6 months new 2019-20 0 Anganwadi Center Basti panchyat Sub Total (D i):- 31.00 31.00 9.92 5.10 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (ii) Capacity Building & Skill Dev. Including Tourism & Hospitality etc. 1 Capacity building programe by Fazilka Fazilka Fazilka Fazilka 10 16.02 6 months new 2019-20 0 16.02 5.13 way of vocational studies & training for youth for self employment and skill up gradation of artisans weavers Sub Total (D ii):- 16.02 16.02 5.13 (iii) Sanitation. Swatch Bharat Abhiyan, Const. of Toilets Sub Total (D- iii):- 0.00 0.00 0.00 0.00 particularly for ladies, rural sanitation etc. E Education Sector Construction of Boundary Wall Jhanger Gram 1 and Smart classroom of Fazilka Fazilka Fazilka 2 10.00 6 months new 2019-20 0 10.00 3.20 2.00 Bhaini panchyat Govt.Primary School Sub Total (E):- 10.00 10.00 3.20 2.00 F Sports Activities Construction of Mini Open Zim Newi 7.00 7.00 2.24 1.00 Gram 1 Fazilka Fazilka Basti Fazilka 5 6 months new 2019-20 0 panchyat Slamshah Sub Total (F):- 7.00 7.00 2.24 1.00 G Special/Specific Area Schemes

Sub Total (G):- 0.00 0.00 0.00 0.00 H Maintenance Sub Total (H):- 0.00 0.00 0.00 0.00 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 I Schemes to be suggested by BGFs Provision of public toilets block XEN near BOP Maharsona, Panchayati Mouzambase,Chakmira,Khokhar Mohar Raj, Fazilka 1 Fazilka Fazilka Fazilka 1 16.02 7 months new 2019-20 0 16.02 5.13 2.88 ,Nirmal,Jhanger,Sadqi,Sowarwal Khiva i,Sher,Khanpur,Sowana,Murad, Bishamber,Roopnager and Nejeke Sub Total (I):- 16.02 16.02 5.13 Sub Total (J):- Total (A to J) (Fazilka):- 160.28 160.28 51.29 20.10 BLOCK: JALALABAAD A Infrastructure (i) Infrastructure (I) Basti Baba Xen Construction of Interlocking 1 Fazilka Jalalabad Bhuman Jalalabad 8 10.00 6 Month New No No 10.00 3.20 1.70 Panchayati Tiles along the road shah Raj, Fazilka Construction of common Fazilka Jhuge lal 10 10.00 6 months new 2019-20 0 10.15 1.80 Gram 2 interlock Road from Bhane Lal Jalalabad Singh Jalalabad 3.25 panchyat to Des Raj Mohar Xen C.C. Flooring road from link 3 Fazilka Jalalabad Singh Jalalabad 6 10.00 6 Month New No No 10.00 3.20 1.90 Panchayati road to playground Wala Raj, Fazilka Sub Total (A i):- 30.00 30.15 9.65 5.40 Sub Total (A ii):- 0.00 0.00 0.00 0.00 (ii) Infrastructure (I) BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Xen Pacca 1 Out Fall Drain Fazilka Jalalabad Jalalabad 14 10.00 6 Month New No No 10.00 3.20 2.00 Panchayati Kale Wala Raj, Fazilka Construction of Water supply Fazilka Ladhuka 8 11.93 6 months new 2019-20 0 11.93 2.28 Gram 2 pipe line Jalalabad Pind Jalalabad 3.82 panchyat Chak Xen 3 Out Fall Drain Fazilka Jalalabad Tahli Jalalabad 3 10.00 6 Month New No No 10.00 3.20 1.50 Panchayati Wala Raj, Fazilka Sub Total (A iii):- 31.93 31.93 10.22 5.78 (iii) Other Infrastructure B Health Sector Sub Total (B):- 0.00 0.00 0.00 0.00 C Agriculture & Allied Sector Irrigation pacca Khal Moga no. Xen Bahmni 1 33700 L from Smt. Krishna Devi Fazilka Jalalabad Jalalabad 10 10.00 6 Month New No No 10.00 3.20 1.50 Panchayati Wala field to Jarnail Singh Field Raj, Fazilka Sub Total (C):- 10.00 10.00 3.20 1.50 D Social Sector (i) Community Centers, Kissan Sheds with Toilet Facility etc. 1 Dhani Xen Construction of Public Common Chowdhri Fazilka Jalalabad Jalalabad 10 10.00 6 Month New No No 10.00 3.20 2.00 Panchayati Shed Chhanga Raj, Fazilka Ram Sub Total (D i):- 10.00 10.00 3.20 2.00 (ii) Capicity Building & Skill Dev. Including Tourism & Hospitality etc. BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 Capacity building programe by way of vocational studies & training for youth for self Fazilka Jalalabad Fazilka Fazilka 10 10.24 6 months new 2019-20 0 10.24 3.28 employment and skill up gradation of artisans and weavers Sub Total (D -ii):- 10.24 10.24 3.28 (iii) Sanitation. Swatch Bharat Abhiyan, Const. of Toilets particularly for ladies, rural sanitation etc. E Education Sector

F Sports Activities Sub Total 0.00 0.00 0.00 0.00

G Special/Specific Area Schemes Sub Total (G):- 0.00 0.00 0.00 0.00 H Maintenance Sub Total (H):- 0.00 0.00 0.00 0.00 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 I Schemes to be suggested by BGFs Construction of Road from Fazilka Jalalabad Jodha Jalalabad 2 Shamshan Ghat (Jodha Bhaini) Bhaini Xen Panchati 1 10.24 6 months new 2019-20 0 10.24 3.28 to fencing in AOR of BOP Raj Jodhawala Sub Total (I):- 10.24 10.24 3.28

Total (A to J) 102.41 102.56 32.82 14.68 BLOCK: KHUIAN SARVAR A Infrastructure (i) Infrastructure (I) 1 Construction of road and outfall Fazilka Khuian Nihal Balluana 12 10.00 6 momth new 2019-20 0 10.00 3.20 1.88 Gram drain from Tansukh ram to sarvar Khera Panchyat Bhajan lal House

2 Construction of interlock road Fazilka Khuian new Balluana 11 10.00 6 momth new 2019-20 0 10.00 3.20 1.50 Gram from main road to Suba Singh sarvar mahinder Panchyat house nagar 3 Construction of Disposable Fazilka Khuian Kheowali Fazilka 3 10.00 6 months new 2019-20 0 10.00 3.20 1.75 Gram Drain from Phirni to Pond sarvar Dhab Panchyat

4 Construction of Interlock road Fazilka Khuian Khuian Abohar 10 10.01 9 months new 2019-20 0 10.01 3.20 1.50 Gram from Raju House to Ramesh Lal sarvar Sarver Panchyat house Farsha Ram to Sajjan Kuamr house BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 5 Construction of Interlock road Fazilka Khuian Mandi Abohar 10 16.11 9 months new 2019-20 0 16.11 5.16 2.11 Gram from Joginder Snadhu to sarvar Kaller Panchyat Raghubir house Ganga nagar Khera road to Pala Singh house Paniwala link road to Iqbal Singh house Sub Total (A i):- 56.12 56.12 17.96 8.74 (ii) Infrastructure (II) Sub Total (A ii):- 0.00 0.00 0.00 0.00 (iii) Other Infrastructure Sub Total (A iii):- 0.00 0.00 0.00 0.00 B Health Sector Sub Total (B):- 0.00 0.00 0.00 0.00 C Agriculture & Allied Sector

1 Minor Irrigation works Fazilka Khuian Khui Fazilka 12 11.21 6 months new 2019-20 0 11.21 3.59 1.89 XEN construction of pacca Khal sarvar Khera Panchayati mogha no 17835 right Manohan Raj Devi farm to Bhagwan Singh fozi

2 Construction of Pacca Khal Fazilka Khuian Ghallu Balluana 12 11.49 6 months new 2019-20 0 11.49 3.68 2.12 Gram mogha no 16942 from Raman sarvar Panchyat Khet to Baldev Bhatiwal Khet Sub Total (C):- 22.70 22.70 7.26 4.01 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 D Social Sector (i) Community Centers, Kissan Sheds with Toilet Facility etc. 1 Construction of Community Hall Fazilka Khuian Ram Balluana 10 10.00 6 momth new 2019-20 0 10.00 3.20 2.02 Gram sarver Nagar Panchyat Sub Total (D i):- 10.00 10.00 3.20 2.02 (ii) Capacity Building & Skill Dev. Including Tourism & Hospitality etc. 1 Capacity building programme by Fazilka Khuian Fazilka Fazilka 10 11.10 6 months new 2019-20 0 11.10 3.55 way of vocational studies & sarvar training for youth for self employment and skill up gradation of artisans and weavers Sub Total (D ii):- 11.10 11.10 3.55 (iii) Sanitation. Swatch Bharat Abhiyan, Const. of Toilets particularly for ladies, rural sanitation etc. Sub Total (D- iii):- 0.00 0.00 0.00 0.00 E Education Sector Sub Total (E):- 0.00 0.00 0.00 0.00 F Sports Activities Sub Total (F):- 0.00 0.00 0.00 0.00 G Special/Specific Area Schemes Sub Total (G):- 0.00 0.00 0.00 0.00 H Maintenance Sub Total (H):- 0.00 0.00 0.00 0.00 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Fazilka (Rs. In Lakh) Whether Scheme is on Distance Approved Target for Location going from the Previous Funds SCSP Women from Outlay of the Completion Whether Sr. Name of the Sector / Scheme / Year Required in Component Component Internationa Scheme for of the Scheme is Remarks No. Project Year of Funds Current (Out of (Out of Constitu l Border (in the Current scheme New District Block Village Commenceme Already Year Colom. 13) Colom. 13) ency km) Year (Months) nt Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 I Schemes to be suggested by BGFs Construction of Boundary Wall XEN and Smart classroom of Khuian Muradwal 1 Fazilka Fazilka 1 11.10 6 months new 2019-20 0 11.10 3.55 0.80 Panchayati Govt.Primary School Sarvar a Raj Fazilka Sub Total (I):- 11.10 11.10 3.55 0.80 Total (A to J) (Khuian 111.02 111.02 15.57 Sarvar):- 35.53 Total All Block 373.71 373.86 119.64 50.35

Annual Action Plan for the year 2019-20

District GURDASPUR

BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur

(Rs. In Lakh) Name of the Sector / Location Distance Approved Target for whether the Whether Scheme is on Funds SCSP Funds Women Implementing Scheme / Project from Outlay of completion scheme is going from the Previou required for Component Component agency/ Internation the Scheme of scheme new Year current year as Central as State Remarks Sr. al Border for current (in months) 2017-18 Share (Out Share (Out No. District Block Village Constituen Year of Funds (in Km) year of Col. 15) of Col. 15) cy Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: DERA BABA NANAK A Infrastructure (I) Construction of New Link Gurdaspur Dera Baba Dharamkot Dera Baba 3 24.77 12 Months 24.77 7.93 12.22 XEN.Punjab Road Dharamkot Randhawa Nanak Randhawa Nanak Mandi Board Road to vill.Dharamkot Gurdaspur 1 Pattan Upto Dhussi Band Yes Ghonewal (1.05 km)

Construction of Circular Gurdaspur Dera Baba Nabinagar Dera Baba 8 14.10 12 Months 14.10 4.51 6.27 XEN.Punjab 2 Road vill.Nabinagar (0.60 Nanak Nanak Yes Mandi Board km) Gurdaspur Construction of New Link Gurdaspur Dera Baba Udhowali Dera Baba 10 22.12 12 Months 22.12 7.08 10.34 XEN.Punjab Road Udhowali Khurd to Nanak Khurd Nanak Mandi Board Yes 3 Raimal-Udhowali Gurdaspur Road.(1.00 km) Sub Total Infrastructure 60.99 60.99 19.52 28.83 (A) - (Dera Baba Nanak):-

C Capacity Building To Provide Trainings for Gurdaspur Dera Baba Dera Baba Dera Baba 1 10.96 12 Months 10.96 3.51 5.00 Training Partner 4 capacity Building at block Nanak Nanak Nanak Yes to be decided level Sub Total Capacity 10.96 10.96 3.51 5.00 Building - (Dera Baba Nanak):- BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur

(Rs. In Lakh) Name of the Sector / Location Distance Approved Target for whether the Whether Scheme is on Funds SCSP Funds Women Implementing Scheme / Project from Outlay of completion scheme is going from the Previou required for Component Component agency/ Internation the Scheme of scheme new Year current year as Central as State Remarks Sr. al Border for current (in months) 2017-18 Share (Out Share (Out No. District Block Village Constituen Year of Funds (in Km) year of Col. 15) of Col. 15) cy Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 D Social Sector Community (i) Centers,Kissan Sheds with Toilet Facility etc. Construction of Community Gurdaspur Dera Baba Talwandi Dera Baba 10 25.00 12 Months 25.00 8.00 11.76 XEN.Punjab 5 Centre at vill.Talwandi Nanak Rama Nanak Yes Mandi Board Rama Gurdaspur Sub Total Social Sector 25.00 25.00 8.00 11.76 (D) - (Dera Baba Nanak):-

Administrative M Expenditure,Monitoring Expenditure,Monitoring Gurdaspur Dera Baba Dera Baba Dera Baba 1 1.64 12 Months 1.64 0.52 0.00 6 Yes Dy.E.S.A.Gsp. Nanak Nanak Nanak Sub Total Adminisrative 1.64 1.64 0.52 0.00 Expenditure, Monitoring (M) - (Dera Baba Nanak):-

Total (Dera Baba Nanak):- 98.59 98.59 31.55 45.59 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur

(Rs. In Lakh) Name of the Sector / Location Distance Approved Target for whether the Whether Scheme is on Funds SCSP Funds Women Implementing Scheme / Project from Outlay of completion scheme is going from the Previou required for Component Component agency/ Internation the Scheme of scheme new Year current year as Central as State Remarks Sr. al Border for current (in months) 2017-18 Share (Out Share (Out No. District Block Village Constituen Year of Funds (in Km) year of Col. 15) of Col. 15) cy Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: DINANAGAR A Infrastructure (I) Construction of new link Gurdaspur Dinanagar Daburji Dinanagar 2 24.00 12 Months 24.00 7.68 11.82 XEN.Punjab 7 road from vill.Daburji to Yes Mandi Board Bharth-Balour road Gurdaspur Construction of new link Gurdaspur Dinanagar Jagochak Dinanagar 2 13.52 12 Months 13.52 4.33 6.50 XEN.Punjab 8 road vill.Jagochak Tanda Tanda Yes Mandi Board (Jhabkra) (Jhabkra) Gurdaspur Sub Total Infrastructure 37.52 37.52 12.01 18.32 (A) - (Dinanagar):- C Capacity Building To Provide Trainings for Gurdaspur Dorangla Dinanagar Dinanagar 7.41 7.41 2.37 3.00 Training Partner 9 capacity Building at block to be decided level Sub Total Capacity 7.41 7.41 2.37 3.00 Building (C) - (Dinanagar):- D Social Sector Community (i) Centers,Kissan Sheds with Toilet Facility etc. Construction of Community Gurdaspur Dinanagar Awankha Dinanagar 10 20.66 12 Months 20.66 6.61 9.73 XEN, PWD Hall and Toilet Block near (B&R) Const, 10 Aanganwari Center Yes Divn, Pathankot vill.Awankha

Sub Total Infrastructure 20.66 20.66 6.61 9.73 (A) - (Dinanagar):- BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur

(Rs. In Lakh) Name of the Sector / Location Distance Approved Target for whether the Whether Scheme is on Funds SCSP Funds Women Implementing Scheme / Project from Outlay of completion scheme is going from the Previou required for Component Component agency/ Internation the Scheme of scheme new Year current year as Central as State Remarks Sr. al Border for current (in months) 2017-18 Share (Out Share (Out No. District Block Village Constituen Year of Funds (in Km) year of Col. 15) of Col. 15) cy Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 L Schemes suggested by BGF Construction of Toilet block Gurdaspur Dinanagar Toor Dinanagar 0.4 7.00 12 Months 7.00 2.24 3.36 XEN, PWD with sewage tank at Primary (B&R) Const, Yes 11 School vill. Toor Divn, Pathankot

Sub Total BGF (L) - 7.00 7.00 2.24 3.36 (Dinanagar):- Administrative 0.00 M Expenditure,Monitoring Administrative Expenditure, Gurdaspur Dinanagar Dinanagar Dinanagar 1.11 12 Months 1.11 0.36 0.00 12 Monitoring etc. Yes Dy.E.S.A.Gsp.

Sub Total Administrative 1.11 1.11 0.36 0.00 Expenditure, Monitoring (M) - (Dinanagar):-

Total (Dinanagar):- 73.70 73.70 23.58 34.41 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur

(Rs. In Lakh) Name of the Sector / Location Distance Approved Target for whether the Whether Scheme is on Funds SCSP Funds Women Implementing Scheme / Project from Outlay of completion scheme is going from the Previou required for Component Component agency/ Internation the Scheme of scheme new Year current year as Central as State Remarks Sr. al Border for current (in months) 2017-18 Share (Out Share (Out No. District Block Village Constituen Year of Funds (in Km) year of Col. 15) of Col. 15) cy Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: DORANGLA #NAME? A Infrastructure (I) Construction of new link Gurdaspur Dorangla Sanghor Dinanagar 1 24.78 12 Months 24.78 7.93 11.68 XEN.Punjab 13 road vill. Sanghor to Yes Mandi Board Malook Chack (1.00 km) Gurdaspur Sub Total Infrastructure 24.78 24.78 7.93 11.68 (A) - (Dorangla):-

C Capacity Building 4.10 To Provide Trainings for Gurdaspur Dorangla Dorangla Dinanagar 4.10 12 Months 4.10 1.31 2.00 Training Partner 14 Yes capacity Building at block to be decided Sub Total Capacity 4.10 4.10 1.31 2.00 Building (F) - (Dorangla):-

E Education Construction of Gurdaspur Dorangla Magar Dinanagar 8 7.39 12 Months 7.39 2.36 3.62 XEN, PWD Govt.Primary School Mudian (B&R) Const, Yes 15 Building Magar Mudian Divn, Pathankot

Education Total 7.39 7.39 2.36 3.62 L Schemes suggested by BGF 0.00 Concrete/Bricks culvert Gurdaspur Dorangla Addi Dinanagar 0.5 13.00 12 Months 13.00 4.16 6.42 XEN, PWD with Hume pipe approx.150 (B&R) Const, Yes 16 Divn, Pathankot

BGF Total 13.00 13.00 4.16 6.42 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur

(Rs. In Lakh) Name of the Sector / Location Distance Approved Target for whether the Whether Scheme is on Funds SCSP Funds Women Implementing Scheme / Project from Outlay of completion scheme is going from the Previou required for Component Component agency/ Internation the Scheme of scheme new Year current year as Central as State Remarks Sr. al Border for current (in months) 2017-18 Share (Out Share (Out No. District Block Village Constituen Year of Funds (in Km) year of Col. 15) of Col. 15) cy Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Administrative M Expenditure,Monitoring Administrative Expenditure, Gurdaspur Dorangla Dorangla Dinanagar 0.62 12 Months 0.62 0.20 0.00 17 Monitoring etc. Yes Dy.E.S.A.Gsp.

Sub Total Administrative 0.62 0.62 0.20 0 Expenditure, Monitoring (M) - (Dorangla):-

Total (Dorangla):- 49.89 49.89 15.96 23.72 BLOCK: GURDASPUR A Infrastructure (I) Construction of New Link Gurdaspur Gurdaspur Chore Gurdaspur 15.74 12 Months 15.74 5.04 7.55 Xen.Provincial Road in vill.Chore (1.00 Division PWD Yes 18 km) B&R Gurdaspur

Construction of New Link Gurdaspur Gurdaspur Lole Gurdaspur 23.52 12 Months 23.52 7.53 11.54 Xen.Provincial Road Lole Nanagal to Nanagal Division PWD Yes 19 Dorangla Road (1.50 km) B&R Gurdaspur

Construction of New Link Gurdaspur Gurdaspur Chaguwala Gurdaspur 12.00 12 Months 12.00 3.84 5.85 Xen.Provincial Road Pharni of Division PWD Yes 20 vill.Chguwala(0.80 km) B&R Gurdaspur

Construction of New Gurdaspur Gurdaspur Barnala Gurdaspur 15.74 12 Months 15.74 5.04 7.35 Xen.Provincial Circular Road in Division PWD Yes 21 vill.Barnala (1.00 km) B&R Gurdaspur BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur

(Rs. In Lakh) Name of the Sector / Location Distance Approved Target for whether the Whether Scheme is on Funds SCSP Funds Women Implementing Scheme / Project from Outlay of completion scheme is going from the Previou required for Component Component agency/ Internation the Scheme of scheme new Year current year as Central as State Remarks Sr. al Border for current (in months) 2017-18 Share (Out Share (Out No. District Block Village Constituen Year of Funds (in Km) year of Col. 15) of Col. 15) cy Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Construction of New Link Gurdaspur Gurdaspur Nurpur Gurdaspur 15.74 12 Months 15.74 5.04 7.18 Xen.Provincial Road Pharni of vill.Nurpur Division PWD Yes 22 (1.00 km) B&R Gurdaspur

Sub Total Infrastructure 82.74 82.74 26.48 39.47 (A) - (Gurdaspur):-

C Capacity Building To Provide Trainings for Gurdaspur Gurdaspur Gurdaspur Gurdaspur 10.54 10.54 3.37 4.00 Training Partner 23 capacity Building at block to be decided level Sub Total Capacity 10.54 10.54 3.37 4.00 Building Administrative 0.00 M Expenditure,Monitoring Administrative Gurdaspur Gurdaspur Gurdaspur Gurdaspur 1.58 12 Months 1.58 0.51 0.00 24 Expenditure,Monitoring etc. Yes Dy.E.S.A.Gsp.

Sub Total Administrative 1.58 1.58 0.51 0.00 Expenditure, Monitoring (M) - (Gurdaspur):- Total (Gurdaspur):- 94.86 94.86 30.36 43.47 BLOCK : KALANAUR A Infrastructure (I) Construction of new link Gurdaspur Kalanaur Naranwali Gurdaspur 34.95 12 Months 34.95 11.18 17.13 Xen.Provincial road. from Gurdaspur Division PWD 25 Hardochanni road.to Yes B&R Gurdaspur Naranwali via Dera Dostpur BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur

(Rs. In Lakh) Name of the Sector / Location Distance Approved Target for whether the Whether Scheme is on Funds SCSP Funds Women Implementing Scheme / Project from Outlay of completion scheme is going from the Previou required for Component Component agency/ Internation the Scheme of scheme new Year current year as Central as State Remarks Sr. al Border for current (in months) 2017-18 Share (Out Share (Out No. District Block Village Constituen Year of Funds (in Km) year of Col. 15) of Col. 15) cy Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Construction of new link Gurdaspur Kalanaur Loppe Gurdaspur 10.00 12 Months 10.00 3.20 4.60 Xen.Provincial 26 road. from village Loppe to Yes Division PWD Govt. School Rosse via B&R Gurdaspur Subcanal Total Passage Infrastructure 44.95 44.95 14.38 21.73 (A) - (Kalanaur):-

C Capacity Building To Provide Trainings for Gurdaspur Kalanaur Kalanaur Gurdaspur 7.50 12 Months 7.50 2.40 3.00 Training Partner 27 capacity Building at block Yes to be decided level Sub Total Capacity 7.50 7.50 2.40 3.00 Building (F) - (Kalanaur):-

E Education 0.00 Construction of 2 class Gurdaspur Kalanaur Kalanaur Gurdaspur 6 14.21 12 Months 14.21 4.55 9.03 Xen.Provincial rooms and supply of Division PWD Yes 28 furniture in Govt. Primary B&R Gurdaspur School Kalanaur Sub Total Education (H) - 14.21 14.21 4.55 9.03 (Kalanaur):- BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur

(Rs. In Lakh) Name of the Sector / Location Distance Approved Target for whether the Whether Scheme is on Funds SCSP Funds Women Implementing Scheme / Project from Outlay of completion scheme is going from the Previou required for Component Component agency/ Internation the Scheme of scheme new Year current year as Central as State Remarks Sr. al Border for current (in months) 2017-18 Share (Out Share (Out No. District Block Village Constituen Year of Funds (in Km) year of Col. 15) of Col. 15) cy Commence Already ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 L Schemes suggested by BGF Construction of Kissan Shed Gurdaspur Kalanaur Rosse Dera Baba 1 7.00 12 Months 7.00 2.24 3.33 Xen.Provincial vill.Rosse Nanak Division PWD Yes 29 B&R Gurdaspur

Construction of hall for Gurdaspur Kalanaur Shahoor Dera Baba 1 13.50 12 Months 13.50 4.32 6.44 Xen.Provincial Vocational Training Center Kalan Nanak Division PWD Yes 30 of Border youths B&R Gurdaspur

Sub Total BGF (L) - 20.50 20.50 6.56 9.77 (Kalanaur):- Administrative M Expenditure,Monitoring Administrative Gurdaspur Kalanaur Kalanaur Dera Baba 6 1.13 12 Months 1.13 0.36 0.00 31 Expenditure, Monitoring Nanak Yes Dy.E.S.A.Gsp. etc. Sub Total Administrative 1.13 1.13 0.36 0.00 Expenditure, Monitoring (M) - (Kalanaur):-

Total (Kalanaur):- 88.29 88.29 28.25 43.53 Grand Total District 405.33 405.33 129.71 190.72 Gurdaspur:- BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur (Rs. In Lakh)

Whether Scheme is Location on going from the Distance from Approved Target for SCSP Funds Women Previou Year Funds required Implementing Name of the Sector / Scheme International Outlay of the completion of whether the Component as Component as Sr. No. for current agency/ / Project Border Scheme for scheme scheme is new State Share State Share Year of Funds year 2019-20 Remarks District Block Village Constituency (in Km) current year (in months) Commen Already (Out of Col. 15) (Out of Col. 15) cement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: DERA BABA NANAK A Infrastructure (I) Construction of New Link XEN.Punjab Road Dhianpur Maman Road Dera Baba Dera Baba 1 Gurdaspur Maman 10 22.72 12 months Yes 22.72 7.27 10.73 Mandi Board Via Dera Sadha Singh Nanak Nanak Gurdaspur (Balance Length) (1.05 Km) Construction of New Link XEN.Punjab Dera Baba Dera Baba 2 Road Mallewal (Balane Gurdaspur Mallewal 8 6.40 12 months Yes 6.40 2.05 3.05 Mandi Board Nanak Nanak Length)(0.28 km) Gurdaspur Sub Total Infrastructure (A) - 29.12 29.12 9.32 13.78 (Dera Baba Nanak):- D Social Sector Community Centers,Kissan (i) Sheds with Toilet Facility etc. Construction of Community XEN.Punjab Dera Baba Dharmkot Dera Baba 3 Hall at vill.Dharmkot Gurdaspur 3 29.30 12 months Yes 29.30 9.38 4.78 Mandi Board Nanak Randhawa Nanak Randhawa Gurdaspur Sub Total Social Sector (E) - 29.30 29.30 9.38 4.78 (Dera Baba Nanak):- BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur (Rs. In Lakh)

Whether Scheme is Location on going from the Distance from Approved Target for SCSP Funds Women Previou Year Funds required Implementing Name of the Sector / Scheme International Outlay of the completion of whether the Component as Component as Sr. No. for current agency/ / Project Border Scheme for scheme scheme is new State Share State Share Year of Funds year 2019-20 Remarks District Block Village Constituency (in Km) current year (in months) Commen Already (Out of Col. 15) (Out of Col. 15) cement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 C Capacity Building To Provide Trainings for Training Dera Baba Dera Baba Dera Baba 4 capacity Building at block Gurdaspur 7.30 12 months Yes 7.30 2.34 3.00 Partner yet to be Nanak Nanak Nanak level decided

Sub Total Capacity Building - 7.30 7.30 2.34 3.00 (Dera Baba Nanak):- L Schemes suggested by BGF Construction of Kisan Shed Xen.Provincial near BOP Basantar & Ghania- Dera Baba Dera Baba 5 Gurdaspur Ghania-Ke 1 13.02 12 months Yes 13.02 4.17 0.00 Division PWD Ke alongwith Toilet Block & Nanak Nanak B&R Gurdaspur Hand Pump. Sub Total BGF (L) - (Dera 13.02 13.02 4.17 0.00 Baba Nanak):- Total (Dera Baba Nanak):- 78.74 78.74 25.20 21.56 BLOCK : DINANAGAR A Infrastructure (I) XEN.Punjab Construction of new link road 6 Gurdaspur Dinanagar Manjh Dinanagar 6 11.60 12 months Yes 11.60 3.71 5.20 Mandi Board from vill.Manjh to Kaire(0.50) Gurdaspur XEN.Punjab Construction of Circular road 7 Gurdaspur Dinanagar Bala Pindi Dinanagar 5 7.08 12 months Yes 7.08 2.27 3.38 Mandi Board vill. Bala Pindi (0.30km) Gurdaspur Construction of Circular road XEN.Punjab 8 vill.Nawa Tanda SC Basti(0.90 Gurdaspur Dinanagar Jhabkra Dinanagar 2 20.86 12 months Yes 20.86 6.68 10.04 Mandi Board km) Gurdaspur Sub Total Infrastructure (A) - 39.54 39.54 12.65 18.62 (Dinanagar) BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur (Rs. In Lakh)

Whether Scheme is Location on going from the Distance from Approved Target for SCSP Funds Women Previou Year Funds required Implementing Name of the Sector / Scheme International Outlay of the completion of whether the Component as Component as Sr. No. for current agency/ / Project Border Scheme for scheme scheme is new State Share State Share Year of Funds year 2019-20 Remarks District Block Village Constituency (in Km) current year (in months) Commen Already (Out of Col. 15) (Out of Col. 15) cement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 C Capacity Building To Provide Trainings for Training 9 capacity Building at block Gurdaspur Dinanagar Dinanagar Dinanagar 8 4.94 12 months Yes 4.94 1.58 2.50 Partner yet to be level decided

Sub Total Capacity Building 4.94 4.94 1.58 2.50 (F) - (Dinanagar):- Total (Dinanagar):- 44.48 44.48 14.23 21.12 BLOCK: DORANGLA A Infrastructure (I) Construction of new link road XEN.Punjab Beharmpur Gahlri Road to 10 Gurdaspur Beharmpur Dinanagar 4 21.85 12 months Yes 21.85 6.99 10.70 Mandi Board Beharmpur Ucha Dhakla Gurdaspur (balance poration 0.80)

Sub Total Infrastructure (A) - 21.85 21.85 6.99 10.70 (Dorangla):- C Capacity Building To Provide Trainings for Training 11 capacity Building at block Gurdaspur Dinanagar Dinanagar 2.73 12 months Yes 2.73 0.87 0.00 Partner yet to be level decided Sub Total Capacity Building 2.73 2.73 0.87 0.00 (F) - (Dorangla):- L Schemes suggested by BGF 0.00 XEN, PWD Construction of Kisan Shed at 12 Gurdaspur Dorangla Chakri Dinanagar 0.6 7.00 12 months Yes 7.00 2.24 0.00 (B&R) Const, BOP Chakri near Gate No.19/1 Divn, Pathankot

Total Schemes suggested by BGF 7.00 7.00 2.24 Total (Dorangla):- 31.58 31.58 10.11 10.70 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur (Rs. In Lakh)

Whether Scheme is Location on going from the Distance from Approved Target for SCSP Funds Women Previou Year Funds required Implementing Name of the Sector / Scheme International Outlay of the completion of whether the Component as Component as Sr. No. for current agency/ / Project Border Scheme for scheme scheme is new State Share State Share Year of Funds year 2019-20 Remarks District Block Village Constituency (in Km) current year (in months) Commen Already (Out of Col. 15) (Out of Col. 15) cement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: GURDASPUR B Health Construction of room and Xen.Provincial Hardochha 13 B/Wall of Civil Health Gurdaspur Gurdaspur Gurdaspur 4 12.50 12 months Yes 12.50 4.00 6.12 Division PWD ni Dispensari of vill.Hardochhani B&R Gurdaspur

Total Health 12.50 12.50 4.00 6.12 C Capacity Building To Provide Trainings for Training 14 capacity Building at block Gurdaspur Gurdaspur Gurdaspur Gurdaspur 7.03 12 months Yes 7.03 2.25 2.50 Partner yet to be level decided

Sub Total Capacity Building 7.03 7.03 2.25 E Education Construction of 2 No.Class Xen.Provincial Bhopar 15 Rooms & B/Wall in Govt.High Gurdaspur Gurdaspur Gurdaspur 6 26.24 12 months Yes 26.24 8.40 12.68 Division PWD Saida School Bhopar Saida B&R Gurdaspur

Construction of 1 No.Class Xen.Provincial Room & other works in 16 Gurdaspur Gurdaspur Qadianwali Gurdaspur 8 10.00 12 months Yes 10.00 3.20 4.86 Division PWD Govt.Primary School B&R Gurdaspur Qadianwali Total Education 36.24 36.24 11.60 Activities in the field of Sports

Xen.Provincial Construction of Gym room in 17 Gurdaspur Gurdaspur Qadianwali Gurdaspur 8 7.50 12 months Yes 7.50 2.40 3.64 Division PWD vill.Qadianwali B&R Gurdaspur

Total Sports 7.50 7.50 2.40 Total (Gurdaspur):- 63.27 63.27 20.25 6.12 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Gurdaspur (Rs. In Lakh)

Whether Scheme is Location on going from the Distance from Approved Target for SCSP Funds Women Previou Year Funds required Implementing Name of the Sector / Scheme International Outlay of the completion of whether the Component as Component as Sr. No. for current agency/ / Project Border Scheme for scheme scheme is new State Share State Share Year of Funds year 2019-20 Remarks District Block Village Constituency (in Km) current year (in months) Commen Already (Out of Col. 15) (Out of Col. 15) cement Utilised

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK : KALANAUR A Infrastructure (I) Construction of new link road. Xen.Provincial Dera Baba 18 from village Pakeewan to Gurdaspur Kalanaur Pakeewan 1 15.93 15.93 5.10 7.98 Division PWD Nanak Dhusi Bundh B&R Gurdaspur

Construction of new link road Xen.Provincial Lakhan Dera Baba 19 from village Lakhan Kalan to Gurdaspur Kalanaur 1 24.22 12 Months Yes 24.22 7.75 11.56 Division PWD Kalan Nanak Sekh Kabir B&R Gurdaspur

Sub Total Infrastructure (A) - 40.15 40.15 12.85 19.54 (Kalanaur):- C Capacity Building To Provide Trainings for Training Dera Baba 20 capacity Building at block Gurdaspur Kalanaur Kalanaur 5.02 12 Months Yes 5.02 1.61 2.00 Partner to be Nanak level decided Sub Total Capacity Building 5.02 5.02 1.61 2.00 (F) - (Kalanaur):- L Schemes suggested by BGF Xen.Provincial Chanduwad Dera Baba 21 Const.of Kissan Shed Gurdaspur Kalanaur 0.5 7.00 12 Months Yes 7.00 2.24 3.22 Division PWD ala Nanak B&R Gurdaspur

Sub Total BGF (L) - 7.00 7.00 2.24 3.22 (Kalanaur):- Total (Kalanaur):- 52.17 52.17 16.69 24.76 Grand Total District 270.24 270.24 86.48 84.26 Gurdaspur:-

Annual Action Plan for the year 2019-20

District PATHANKOT

BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot (Rs in Lakh)

Approved Whether Scheme is on going Location Distance from Target for Funds SCSP Women Outlay of the Whether from the Previous Year Sr. Name of the Sector / International Completion Required in Component Component Scheme for Scheme is Remarks No. Scheme / Project Border of the scheme Current Year (Out of (Out of the Current New Year of Funds Constit (in km) (Months) 2019-20 Colom. 13) Colom. 13) District Block Village Year Commencem Already uency ent Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: BAMIAL A Infrastructure (i) Infrastructure (i) 1 Construction of Street Pathankot Bamial Manwal Bhoa 3 10.03 New 10.03 3.21 5.01 and Drain. Mangwal Sub Total 10.03 10.03 3.21 5.01 (A i):- (ii) Infrastructure (ii) Sub Total 0.00 0.00 0.00 0.00 (A ii):- (iii) Other Sub Total 0.00 0.00 0.00 0.00 Infrastructure (A iii):- B Health Sector Sub Total (B):- 0.00 0.00 0.00 0.00 C Agriculture & Allied Sub Total (C):- 0.00 0.00 0.00 0.00 Sector D Social Sector (i) Community Centers, Sub Total (D i):- 0.00 0.00 0.00 0.00 Kissan Sheds with Toilet Facility etc.

(ii) Capacity Building & Sub Total (D- ii):- 0.00 0.00 0.00 0.00 Block BML Skill Development Amount (2.60 Including Tourism & Lac) included in Hospitality etc. NJS Block. BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot (Rs in Lakh)

Approved Whether Scheme is on going Location Distance from Target for Funds SCSP Women Outlay of the Whether from the Previous Year Sr. Name of the Sector / International Completion Required in Component Component Scheme for Scheme is Remarks No. Scheme / Project Border of the scheme Current Year (Out of (Out of the Current New Year of Funds Constit (in km) (Months) 2019-20 Colom. 13) Colom. 13) District Block Village Year Commencem Already uency ent Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (iii) Sanitation. Swatch Sub Total (D- 0.00 0.00 0.00 0.00 Bharat Abhiyan, iii):- Const. of Toilets particularly for ladies, rural sanitation etc.

E Education Sector 1 Construction of Pathankot Bamial Danwal Bhoa 1 10.39 New 10.39 3.32 5.19 Room in Govt. Primary School. Sub Total (E):- 10.39 10.39 3.32 5.19 F Sports Activities Sub Total (F):- 0.00 0.00 0.00 0.00 G Special/Specific Sub Total (G):- 0.00 0.00 0.00 0.00 Area Schemes H Maintenance Sub Total (H):- 0.00 0.00 0.00 0.00 I Schemes to be Sub Total (I):- 0.00 0.00 0.00 0.00 Block BML suggested by BGFs Amount (2.60 Lac) included in NJS Block. BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot (Rs in Lakh)

Approved Whether Scheme is on going Location Distance from Target for Funds SCSP Women Outlay of the Whether from the Previous Year Sr. Name of the Sector / International Completion Required in Component Component Scheme for Scheme is Remarks No. Scheme / Project Border of the scheme Current Year (Out of (Out of the Current New Year of Funds Constit (in km) (Months) 2019-20 Colom. 13) Colom. 13) District Block Village Year Commencem Already uency ent Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 J Monitoring & Administartive Expenses 1 Monitoring Pathankot Bamial Bamial Bhoa 0 0.39 0.39 0.12 0.19 &Administartive Expenses Sub Total (J):- 0.39 0.39 0.12 0.19 Total Block 20.81 20.81 6.66 10.39 Bamial (A to J) :- BLOCK: NAROT JAIMAL SINGH A Infrastructure (ii) Infrastructure (i) 1 Construction of Street Pathankot Narot Nabha Bhoa 9 10.00 6 Month New 10.00 3.20 5.00 and Drain. Jaimal Dass Singh Abadie (Village Kiri Khurd) 2 Construction of Street Pathankot Narot Balawar Bhoa 5 10.00 6 Month New 10.00 3.20 5.00 and Drain. Jaimal Singh Sub Total 20.00 20.00 6.40 10.00 (A i):- BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot (Rs in Lakh)

Approved Whether Scheme is on going Location Distance from Target for Funds SCSP Women Outlay of the Whether from the Previous Year Sr. Name of the Sector / International Completion Required in Component Component Scheme for Scheme is Remarks No. Scheme / Project Border of the scheme Current Year (Out of (Out of the Current New Year of Funds Constit (in km) (Months) 2019-20 Colom. 13) Colom. 13) District Block Village Year Commencem Already uency ent Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Infrastructure (II) Sub Total 0.00 0.00 0.00 0.00 (A ii):- (iii) Other Sub Total 0.00 0.00 0.00 0.00 Infrastructure (A iii):- B Health Sector 1 Construction of Pathankot Narot Sehora Bhoa 15.00 6 Month New 15.00 4.80 7.50 Dispensary. Jaimal Khurd Singh Sub Total (B):- 15.00 15.00 4.80 7.50 C Agriculture & Allied Sub Total (C ):- 0.00 0.00 0.00 0.00 Sector D Social Sector 1 Installation of CCTV Pathankot Narot Narot Bhoa 5 10.00 New 10.00 3.20 5.00 Cameras and Solar Jaimal Jaimal Lights in Border Singh Singh Village Area.

Sub Total 10.00 10.00 3.20 5.00 (D- i):- BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot (Rs in Lakh)

Approved Whether Scheme is on going Location Distance from Target for Funds SCSP Women Outlay of the Whether from the Previous Year Sr. Name of the Sector / International Completion Required in Component Component Scheme for Scheme is Remarks No. Scheme / Project Border of the scheme Current Year (Out of (Out of the Current New Year of Funds Constit (in km) (Months) 2019-20 Colom. 13) Colom. 13) District Block Village Year Commencem Already uency ent Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (ii) Capacity Building & Skill Dev. Including Tourism & Hospitality etc. 1 Skill Development Pathankot Narot Narot Bhoa 5 11.16 6 Month New 11.16 3.57 5.58 Block BML Courses. Jaimal Jaimal Amt (2.60 Lac) Singh Singh included Sub Total 11.16 11.16 3.57 5.58 (D -ii):- (iii) Sanitation. Swatch Pathankot Narot Bhoa Sub Total 0.00 0.00 0.00 0.00 Bharat Abhiyan, Jaimal (D -iii):- Const. of Toilets Singh particularly for ladies, rural sanitation etc.

E Education Sector 1 Construction of room Pathankot Narot Begowal Bhoa 8 12.00 6 Month New 12.00 3.84 6.00 in Govt. Primary Jaimal School. Singh Sub Total (E):- 12.00 12.00 3.84 6.00 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot (Rs in Lakh)

Approved Whether Scheme is on going Location Distance from Target for Funds SCSP Women Outlay of the Whether from the Previous Year Sr. Name of the Sector / International Completion Required in Component Component Scheme for Scheme is Remarks No. Scheme / Project Border of the scheme Current Year (Out of (Out of the Current New Year of Funds Constit (in km) (Months) 2019-20 Colom. 13) Colom. 13) District Block Village Year Commencem Already uency ent Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 F Sports Activities 1 Construction of Open Pathankot Narot Kharkhra Bhoa 6 10.20 6 Month New 10.20 3.26 5.10 Gym with Fixed Jaimal thutowal/ Equipments/Sports. Singh Jaini Chack/K hojkiCha ck Sub Total (F):- 10.20 10.20 3.26 5.10 G Special/Specific Sub Total (G):- 0.00 0.00 0.00 0.00 Area Schemes H Maintenance Sub Total (H):- 0.00 0.00 0.00 0.00 I Schemes to be suggested by BGFs

1 Installation of Solar Pathankot Narot Paharipur Bhoa 0 11.16 6 Month New 11.16 3.57 5.58 Block BML Lights on the road of Jaimal & Kanshi Amt (2.60 Lac) Village Paharipur & Singh Barwan included Kanshi Barwan to ferry Point. Sub Total (I):- 11.16 11.16 3.57 5.58 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot (Rs in Lakh)

Approved Whether Scheme is on going Location Distance from Target for Funds SCSP Women Outlay of the Whether from the Previous Year Sr. Name of the Sector / International Completion Required in Component Component Scheme for Scheme is Remarks No. Scheme / Project Border of the scheme Current Year (Out of (Out of the Current New Year of Funds Constit (in km) (Months) 2019-20 Colom. 13) Colom. 13) District Block Village Year Commencem Already uency ent Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 J Administrative Expenses Including Monitoring. Trg. Etc.

1 Administrative Pathankot Narot Narot Bhoa 5 1.28 New 1.28 0.41 0.64 Expenses Including Jaimal Jaimal Monitoring. Singh Singh Sub Total (j):- 1.28 1.28 0.41 0.64 Total (A to J) :- 90.80 90.80 29.06 45.40

Grand Total 111.61 111.61 35.72 55.79 (BML +NJS) :- BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot

(Rs in Lakh) Sr. Name of the Sector / Location Distance from Approved Target for Whether Whether Scheme is on Funds SCSP Women Remarks No. Scheme / Project International Outlay of Completion Scheme going from the Previous Required in Component Component Border the Scheme of the is New Year Current (Out of Col. (Out of (in km) for the scheme Year of Funds Year 13) Col. 13) Constit District Block Village Current (Months) Commence Already 2019-20 uency Year ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: BAMIAL A Infrastructure (i) Infrastructure (i) 1 Construction of Street and Pathankot Bamial Janial Bhoa 5 10.00 6 Month New 10.00 3.20 5.00 Drain Sub Total (A i):- 10.00 10.00 3.20 5.00 (ii) Infrastructure (ii) Sub Total (A ii):- 0.00 0.00 0.00 0.00

(iii) Other Infrastructure Sub Total (A iii):- 0.00 0.00 0.00 0.00

B Health Sector Sub Total (B):- 0.00 0.00 0.00 0.00 C Agriculture & Allied Sector Sub Total (C):- 0.00 0.00 0.00 0.00

D Social Sector (i) Community Centers, Kissan Sub Total (D i):- 0.00 0.00 0.00 0.00 Sheds with Toilet Facility etc.

(ii) Capacity Building & Skill Sub Total (D- ii):- 0.00 0.00 0.00 0.00 Block BML Dev. Including Tourism & Amt (1.73 Lac) Hospitality etc. included in NJS Block. (iii) Sanitation. Swatch Bharat Sub Total (D- iii):- 0.00 0.00 0.00 0.00 Abhiyan, Const. of Toilets particularly for ladies, rural sanitation etc. BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot

(Rs in Lakh) Sr. Name of the Sector / Location Distance from Approved Target for Whether Whether Scheme is on Funds SCSP Women Remarks No. Scheme / Project International Outlay of Completion Scheme going from the Previous Required in Component Component Border the Scheme of the is New Year Current (Out of Col. (Out of (in km) for the scheme Year of Funds Year 13) Col. 13) Constit District Block Village Current (Months) Commence Already 2019-20 uency Year ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 E Education Sector Sub Total (E):- 0.00 0.00 0.00 0.00 F Sports Activities 1 Construction of open Gym Pathankot Bamial Muthi Bhoa 2 3.86 New 3.86 1.24 1.93 with Fixed Equipment/ Sports . Sub Total (F):- 3.86 3.86 1.24 1.93 G Special/Specific Area Sub Total (G):- 0.00 0.00 0.00 0.00 Schemes H Maintenance Sub Total (H):- 0.00 0.00 0.00 0.00 I Schemes to be suggested by Sub Total (I):- 0.00 0.00 0.00 0.00 Block BML BGFs Amt (1.74 Lac) included in NJS Block. J Monitoring & Administartive Sub Total (J):- 0.00 0.00 0.00 0.00 Expenses Total Block 13.86 13.86 4.44 6.93 Bamial (A to J) :- BLOCK:NAROT JAIMAL SINGH A Infrastructure (ii) Infrastructure (i) 1 Construction of Street and Pathankot Narot Bhagwan Bhoa 6 10.00 6 Month New 10.00 3.20 5.00 Drain Jaimal pur Singh 2 Construction of Street and Pathankot Narot Kothe Bhoa 7 10.00 6 Month New 10.00 3.20 5.00 Drain Jaimal Khiala Singh BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot

(Rs in Lakh) Sr. Name of the Sector / Location Distance from Approved Target for Whether Whether Scheme is on Funds SCSP Women Remarks No. Scheme / Project International Outlay of Completion Scheme going from the Previous Required in Component Component Border the Scheme of the is New Year Current (Out of Col. (Out of (in km) for the scheme Year of Funds Year 13) Col. 13) Constit District Block Village Current (Months) Commence Already 2019-20 uency Year ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 3 Construction of Street and Pathankot Narot Jaswan Bhoa 7 10.00 6 Month New 10.00 3.20 5.00 Drain Jaimal Singh Sub Total (A i):- 30.00 30.00 9.60 15.00 Infrastructure (II) Sub Total (A ii):- 0.00 0.00 0.00 0.00 (iii) Other Infrastructure Sub Total (A iii):- 0.00 0.00 0.00 0.00 B Health Sector Sub Total (B):- 0.00 0.00 0.00 0.00 C Agriculture & Allied Sector Sub Total (C ):- 0.00 0.00 0.00 0.00 D Social Sector (i) Community Centers, Kissan Sub Total (D- i):- 0.00 0.00 0.00 0.00 Sheds with Toilet Facility etc. (ii) Capacity Building & Skill Dev. Including Tourism & Hospitality etc. 1 Skill Development Courses Pathankot Narot Narot Bhoa 5 7.43 6 Month New 7.43 2.38 3.71 Block BML Jaimal Jaimal Amount (1.73 Singh Singh Lac) included Sub Total (D -ii):- 7.43 7.43 2.38 3.71 (iii) Sanitation. Swatch Bharat Sub Total 0.00 0.00 0.00 0.00 Abhiyan, Const. of Toilets (D -iii):- particularly for ladies, rural sanitation etc. BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Pathankot

(Rs in Lakh) Sr. Name of the Sector / Location Distance from Approved Target for Whether Whether Scheme is on Funds SCSP Women Remarks No. Scheme / Project International Outlay of Completion Scheme going from the Previous Required in Component Component Border the Scheme of the is New Year Current (Out of Col. (Out of (in km) for the scheme Year of Funds Year 13) Col. 13) Constit District Block Village Current (Months) Commence Already 2019-20 uency Year ment Utilised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 E Education Sector 1 Construction of room in Pathankot Narot Mallarwa Bhoa 7 15.65 6 Month New 15.65 5.01 7.82 Govt. Primary School and Jaimal n Disposal of Sullage Water. Singh Sub Total (E):- 15.65 15.65 5.01 7.82 F Sports Activities Sub Total (F):- 0.00 0.00 0.00 0.00 G Special/Specific Area Sub Total (G):- 0.00 0.00 0.00 0.00 Schemes H Maintenance Sub Total (H):- 0.00 0.00 0.00 0.00 I Schemes to be suggested by BGFs 1 Construction of Metaled Pathankot Narot Paharipur Bhoa 0 7.44 6 Month New 7.44 2.38 3.72 Block BML road from Village Paharipur Jaimal Amount (1.74 to Ferry Point. Singh Lac) included Sub Total (I):- 7.44 7.44 2.38 3.72 J Administrative Expenses Sub Total (j):- 0.00 0.00 0.00 0.00 Including Monitoring. Training etc. Total (A to J) :- 60.52 60.52 19.37 30.25

Grand Total 74.38 74.38 23.80 37.18 (BML +NJS) :-

Annual Action Plan for the year 2019-20

District TARN TARAN

BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh) Approved Whether Scheme Distance Funds Location outlay of the is on-going from for Target for Old / required SC Sr. Scheme for the previous Women Name of the Sector, Scheme/Project Internati completion New in Component Remarks No. the current Yearyear. Component onal of Scheme Scheme Funds currernt (in Lacs) year comme Constituncy District Block Village Border already year (in Lacs) ncemen utilized t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: BHIKHIWIND A Education ------B Health Sector ------C Agriculture and Allied Sectors ------D Infrastructure 1 Construction of Pc Road Salwana wala 22 Khem Tarn Bhikhiwind Baler 3 20.50 31.03.2020 New - - 20.50 6.56 9.63 Khu to Main Raod (3850 rft) Karan Taran 2 Construction of Pc Road Link Road to 22 Khem Tarn Algon Bhikhiwind 7 10.00 31.03.2020 New - - 10.00 3.20 4.70 Milkha singh House (1750rft) Karan Taran Kalan 3 of Pc Road Link Road to sukhchain singh Algon 22 Khem Tarn House (1750rft) Bhikhiwind Kalan 5 10.00 31.03.2020 New - - 10.00 3.20 4.70 Karan Taran Boparai 4 Construction of Pc Road Link Road to 22 Khem Tarn Wara Bhikhiwind 6 13.00 31.03.2020 New - - 13.00 4.16 6.00 sukhchain singh House (2420rft) Karan Taran Thelian 5 Construction of Pc Road Link Road toMain 22 Khem Tarn Street Chanan singh House to Gurudwara Bhikhiwind Bhi Ladhu 5 10.00 31.03.2020 New - - 10.00 3.20 4.60 Karan Taran Sahib (1750rft) 6 Construction of Rasta Phirni to Gurudwara 22 Khem Tarn Bhi Ladhu Sahib with interloc tile (12*880 feet)) Bhikhiwind 5 10.50 31.03.2020 New - - 10.50 3.36 4.65 Karan Taran Kurd 7 Construction of Pc Road Link Road to 22 Khem Tarn Sahib singh sarpanch wala Rasta (1750rft) Bhikhiwind Sidhwa 7 10.00 31.03.2020 New - - 10.00 3.20 4.60 Karan Taran 8 Construction of Pc Road Link Road to 22 Khem Tarn Bhikhiwind Sugga 1 15.14 31.03.2020 New - - 15.14 4.84 7.00 sukhwant singh (2550rft) Karan Taran BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh) Approved Whether Scheme Distance Funds Location outlay of the is on-going from for Target for Old / required SC Sr. Scheme for the previous Women Name of the Sector, Scheme/Project Internati completion New in Component Remarks No. the current Yearyear. Component onal of Scheme Scheme Funds currernt (in Lacs) year comme Constituncy District Block Village Border already year (in Lacs) ncemen utilized t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Total Infrastructure 99.14 - - 99.14 31.72 45.88 Social Sector ------Security Related ------1 C/O 05 Nos Toielt block (with 05 Nos Urinal point) at Bop Narlie with tiles & sanitary fitting . Water storage tank capacity 1000 Ltr and 01 HP Submersible 22 Khem Tarn 138 BN motor pumpset with water storage tank Bhikhiwind 1 7.50 31.3.2020 New - - 7.50 2.40 3.25 capacity 500 ltr and 01 Nos RO capacity Karan Taran BSF 100 Ltr/per hrs potable use near fencing Gate No 128/1.

C/O 02 Nos Toielt block (with 02 Nos Urinal point) at Bop Narlie with tiles & sanitary fitting . Water storage tank capacity 500 Ltr and 01 HP Submersible 22 Khem Tarn 138 BN 2 Bhikhiwind 1 3.00 31.3.2020 New - - 3.00 0.96 1.41 motor pumpset with water storage tank Karan Taran BSF capacity 250 Ltr and 01 Nos RO capacity 50Ltr/per hrs potable use near fencing Gate No 127/1. 3 Installation of Hand Pump at BOP Narlie 22 Khem Tarn 138 BN Bhikhiwind 1 2.13 31.3.2020 New - - 2.13 0.68 1.06 Near OP No 1,2,3,4,&5 Karan Taran BSF Total Security Related 12.63 - - 12.63 4.04 5.72 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh) Approved Whether Scheme Distance Funds Location outlay of the is on-going from for Target for Old / required SC Sr. Scheme for the previous Women Name of the Sector, Scheme/Project Internati completion New in Component Remarks No. the current Yearyear. Component onal of Scheme Scheme Funds currernt (in Lacs) year comme Constituncy District Block Village Border already year (in Lacs) ncemen utilized t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 22 Khem Tarn Capacity Building Bhikhiwind 12.63 31.3.20 new - - 12.63 4.04 5.90 Karan Taran 22 Khem Tarn Adm. Expenses Bhikhiwind 1.90 31.3.20 New - - 1.90 0.61 Karan Taran Total Block Bhikhiwind 126.30 - - 126.30 40.42 57.50 BLOCK:GANDIWIND A Education ------B Health Sector ------C Agriculture and allied Sectore ------D Infrastructure ------1 Construction of approach road from Sur singh road to Gurdeep singh s/o Darshan singh house, Nikke bhuchar to balkar singh Tarn Bhuchar Tarn Taran Gandiwind 5 11.00 31-03-2020 New - - 11.00 3.52 5.06 s/o fouja singh house, Gaggobua road to Taran kalan Mangal singh Pardhan kishan sagarsh commette 2 Construction of stadium Tarn Cheema Tarn Taran Gandiwind 4 12.93 31-03-2020 New - - 12.93 4.14 5.947 Taran kalan BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh) Approved Whether Scheme Distance Funds Location outlay of the is on-going from for Target for Old / required SC Sr. Scheme for the previous Women Name of the Sector, Scheme/Project Internati completion New in Component Remarks No. the current Yearyear. Component onal of Scheme Scheme Funds currernt (in Lacs) year comme Constituncy District Block Village Border already year (in Lacs) ncemen utilized t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 3 Construction of approach road from Pargat singh s/o Gurdev singh to Hardial singh s/o Swaran singh house. Drain to Harbhajan singh s/o sohan singh house. Drain to Darshan singh s/o lakha singh house, Tarn Tarn Taran Gandiwind Chhirewal 6 12.98 31-03-2020 New - - 12.98 4.15 5.97 Darshan singh s/o jagjit singh ti Iqbal singh Taran s/o didar singh house and approach road froom gaggo bua road to house of bakhsish singh

4 Construction of approach road fromTejpal singh house to Gurjinder singh s/o mukhtar singh house, Gurmit singh house to sukhjit Tarn singh house, Manakpura road to Tarn Taran Gandiwind Gandiwind 7 10.00 31-03-2020 New - - 10.00 3.20 4.60 sukhwinder singh s/o raghbir singh house, Taran cheema kalan road to gurbaksh singh house

5 Construction of approach road from main Chhina Tarn road to abadi Chhina bidhichand Tarn Taran Gandiwind Bidhi 1 10.00 31-03-2020 New - - 10 3.20 4.60 Taran chand Total Infrastructure 56.91 - - 56.91 18.21 26.18 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh) Approved Whether Scheme Distance Funds Location outlay of the is on-going from for Target for Old / required SC Sr. Scheme for the previous Women Name of the Sector, Scheme/Project Internati completion New in Component Remarks No. the current Yearyear. Component onal of Scheme Scheme Funds currernt (in Lacs) year comme Constituncy District Block Village Border already year (in Lacs) ncemen utilized t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 E Social Sector ------F Security Related 1 C/o kissan waiting hall at BOP CB chind with electrical fitting and 02 nos celling fan attached tpiolet block and kota stone tiles Tarn 138 Bn all sanitary with water storage tank Tarn Taran Gandiwind 1 7.25 31-03-2020 New - - 7.25 2.32 3.33 capacity 1000 ltr and 01 HP submersible Taran BSF motor, chair and table near fencing Gate No. 126/1 G Capacity building Tarn Tarn Taran Gandiwind 7.25 31-03-2020 New - - 7.25 2.32 3.33 Taran H Administrative Exp. Tarn Tarn Taran Gandiwind 1.09 31-03-2020 New - - 1.09 0.35 - Taran Total block Gandiwind 72.50 - - 72.50 23.20 32.84 BLOCK: PATTI A Education ------B Health Sector ------C Agriculture and allied Sectore ------D Infrastructure ------Construction of TUT Ram singh and Tarn 1 Rasukpur Road (2040mt) and Bhangala 023 Patti Patti Tut 1 73.49 31.3.2020 New - - 73.49 23.52 33.80 Taran road ( briz) to River Bund (3000mt) E Social Sector ------BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh) Approved Whether Scheme Distance Funds Location outlay of the is on-going from for Target for Old / required SC Sr. Scheme for the previous Women Name of the Sector, Scheme/Project Internati completion New in Component Remarks No. the current Yearyear. Component onal of Scheme Scheme Funds currernt (in Lacs) year comme Constituncy District Block Village Border already year (in Lacs) ncemen utilized t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 F Security Related Jhugian Construction of approach road to BSF Post Tarn 1 023 Patti Patti Nur 1 9.36 31.3.2020 New - - 9.36 2.9952 4.30 JNM to up to Fencing (613 mt) Taran Momand Tarn G Capacity building 023 Patti Patti valtoha 9.36 31.3.2021 New - - 9.36 2.9952 4.30 Taran Tarn H Administrative Exp. 023 Patti Patti valtoha 1.40 31.3.2022 New - - 1.40 0.448 Taran Total block Patti 93.61 93.61 29.96 42.40 BLOCK VALTOHA A Education ------B Health Sector ------C Agriculture and Allied Sectors ------D Infrastructure 0 1 Construction of PC Road Budha singh 22 Khem Tarn Valtoha Manwan 3 18.00 31.03.2020 New - - 18.00 5.76 8.28 House (Lenth 3300 ft and w=10 ft) Karan Taran 2 Construction of PC Road Kale ke road to Joginder singh,Karaj singh Buggaian wala 22 Khem Tarn Valtoha Gharyala 7 23.20 31.03.2020 New - - 23.20 7.424 10.70 House (Lenth 3300 ft and w=10 ft) Karan Taran

3 Construction of PC Road Partap singh Madar 22 Khem Tarn Sarpanch House (Lenth 2500 ft and w=10 Valtoha Mathra 5 13.75 31.03.2020 New - - 13.75 4.4 6.35 Karan Taran ft) Baghi 4 Swatchh Bharat Abhyan Sewage 22 Khem Tarn Valtoha Fathepur 6 10.00 31.03.2020 New - - 10.00 3.2 4.70 infrastructure (lenth.3000 ft)(w=2.5 ft) Karan Taran BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh) Approved Whether Scheme Distance Funds Location outlay of the is on-going from for Target for Old / required SC Sr. Scheme for the previous Women Name of the Sector, Scheme/Project Internati completion New in Component Remarks No. the current Yearyear. Component onal of Scheme Scheme Funds currernt (in Lacs) year comme Constituncy District Block Village Border already year (in Lacs) ncemen utilized t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 5 Construction of PC Road Main Road to Kulwant Singh,manjit singh s/o Gurbaksh 22 Khem Tarn Memoodpu singh House and Main Road to Sukha Valtoha 5 25.00 31.03.2020 New - - 25.00 8 11.50 Singh House,S.Bikram Singh House (Lenth Karan Taran ra 3650 ft and w=10 ft) 6 Construction of approach Road Mahil singh wala Rasta to Daler Singh House 22 Khem Tarn Valtoha Beharwal 5 10.84 31.03.2020 New - - 10.84 3.47 4.75 with interloc paver (Lenth 1750 ft and Karan Taran w=10 ft) 7 Construction of PC Road Harjit Singh and 22 Khem Tarn Harpal Singh House (Lenth 3080 ft and Valtoha Mandi 7 17.00 31.03.2020 New - - 17.00 5.44 7.85 Karan Taran w=10 ft) 8 Construction of Approach Road Talu 22 Khem Tarn Mian Wala Valtoha 1 10.00 31.03.2020 New - - 10.00 3.2 4.70 walian (Lenth 2000 ft and w=8 ft) Karan Taran Hathar 9 Construction of Approach Road Adda 22 Khem Tarn Adda Valtoha wala (Lenth 2000 ft and w=8 ft) Valtoha 7 10.00 31.03.2020 New - - 10.00 3.2 4.70 Karan Taran Valtoha 10 Construction of approach Road Valtoha 22 Khem Tarn Valtoha Kurd wala(Lenth 2300 ft and w=8 ft) Valtoha 7 12.00 31.03.2020 New - - 12.00 3.84 5.50 Karan Taran Kurd Total Infrastructure 149.79 - - 149.79 47.93 69.03 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (Central Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh) Approved Whether Scheme Distance Funds Location outlay of the is on-going from for Target for Old / required SC Sr. Scheme for the previous Women Name of the Sector, Scheme/Project Internati completion New in Component Remarks No. the current Yearyear. Component onal of Scheme Scheme Funds currernt (in Lacs) year comme Constituncy District Block Village Border already year (in Lacs) ncemen utilized t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Social Sector Security Related ------1 Installation of RO Plant 500 Ltr and 300 Ltr capacity with water coolers and 22 Khem Tarn BSF Khem Valtoha 1 9.00 31.3.2020 New - - 9.00 2.88 4.00 shelters,TJ Singh,Noor wala (BSF Khem Karan Taran Karan Karan) 2 Installation of RO Plant Two 500 Ltr 22 Khem Tarn BSF capacity with water coolers and shelters, Valtoha 1 10.00 31.3.2020 New - - 10.00 3.2 4.70 Karan Taran Amarkot BOP Rajoke and Palopati Total Security Related 19.00 19.00 6.08 8.70 22 Khem Tarn Valtoha 19.00 31.3.20 New 19.00 6.08 Capacity Building Karan Taran 8.70 22 Khem Tarn Valtoha 2.86 31.3.20 New 2.86 0.92 Adm. Expenses Karan Taran Total Block Valtoha 190.65 190.65 61.01 86.43 Grand Total District Tarn Taran 483.06 483.06 154.58 219.17 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh)

Whether Scheme is on- Location Approved going from the Funds Distance for outlay of the Target for previous year. SC Sr. Name of the Sector, Old / New required in Women Internationa Scheme for the completion Component Remarks No. Scheme/Project Scheme currernt Component l Border current of Scheme Year Funds (in Lacs) year Constituncy District Block Village year.(in Lacs) commence already ment utilized

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BLOCK: BHIKHIWIND A Education ------B Health Sector ------C Agriculture and Allied Sectors ------D Infrastructure ------Bhani - - Construction of Pc Road Link Road 22 Khem Tarn 1 Bhikhiwind Massa 3 15.25 31.03.2020 New 15.25 4.88 7.00 to Timme wala Rasta (2850rft) Karan Taran singh Construction of Pc Road Link Road to - - 22 Khem Tarn Kalsian 2 Bakhshish singh wala Rasta Bhikhiwind 7 12.13 31.03.2020 New 12.13 3.88 5.50 Karan Taran Kalan (2300rft) Construction of approach Road with interloc tile ,mangat singh wali gali(w=8')Prem singh wali Gali (w=8')Walmik wali gali 22 Khem Tarn 3 Bhikhiwind Baserke 5 10.00 31.03.2020 New - - 10.00 3.20 4.60 (w=6')Gurvailsingh to sahib singh Karan Taran House (w=18')Sahib singh house to virsa singh House (w=6')Shinder singh House(w=8') Construction of approach road with 22 Khem Tarn Baserke 4 interloc tile Baba shital Singh house Bhikhiwind 6 10.00 31.03.2020 New - - 10.00 3.20 4.60 Karan Taran Kurd to pandit house (900rft) BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh)

Whether Scheme is on- Location Approved going from the Funds Distance for outlay of the Target for previous year. SC Sr. Name of the Sector, Old / New required in Women Internationa Scheme for the completion Component Remarks No. Scheme/Project Scheme currernt Component l Border current of Scheme Year Funds (in Lacs) year Constituncy District Block Village year.(in Lacs) commence already ment utilized

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Construction of Approach road with 22 Khem Tarn 5 Bhikhiwind Kazi Chak 5 10.00 31.03.2020 New - - 10.00 3.20 4.60 dry brick ajab singh wala (1750 rft) Karan Taran

Main Road to Const.of PC Road 22 Khem Tarn 6 Sarpanch Mandeep Singh House Bhikhiwind Sandhra 5 10.00 31.03.2020 New - - 10.00 3.20 4.60 Karan Taran (1750 rft) Total Infrastructure 67.38 - - 67.38 21.56 30.90 Security Related ------Construction of Brick approach road 22 Khem Tarn 1 from Khalra Road to BOP Karma (8 Bhikhiwind Khalra 0 8.42 31.3.2020 New - - 8.42 2.69 3.90 Karan Taran feet * 1.10 KMs) 22 Khem Tarn Capacity Building Bhikhiwind 8.42 8.42 2.69 3.90 Karan Taran Total Block Bhikhiwind 84.22 84.22 26.95 38.70 BLOCK: GANDIWIND A Education ------B Health Sector ------C Agriculture and allied Sectore ------BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh)

Whether Scheme is on- Location Approved going from the Funds Distance for outlay of the Target for previous year. SC Sr. Name of the Sector, Old / New required in Women Internationa Scheme for the completion Component Remarks No. Scheme/Project Scheme currernt Component l Border current of Scheme Year Funds (in Lacs) year Constituncy District Block Village year.(in Lacs) commence already ment utilized

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 D Infrastructure ------

Construction of approach road Baba budha singh sahib road to ravail singh Tarn 1 Tarn Taran Gandiwind Thatha 10 10.00 31-03-2020 New - - 10.00 3.20 4.6 s/o iqbal singh house Drain to harbans Taran singh, sucha singh, gura singh house

Construction of approach road Kuldeep Singh s/o Anokh Singh chowk to Gurjit Singh s/o Baldev Tarn Bir Raja 2 Tarn Taran Gandiwind 2 10.00 31-03-2020 New - - 10.00 3.20 4.6 Singh house, Drain to Ranjit Singh Taran Teja singh Yadwinder Singh Sukhchain Singh house Drain to Piara Singh s/o Tara Singh house, main road to Sukhjinder Tarn 3 Singh,Shamshan shat (gen) , Tarn Taran Gandiwind LAHIAN 4 10.00 31-03-2020 New - - 10.00 3.20 4.6 Taran Gurdwara bidhi chand road to Kashmir Singh house Total Infrastructure 30.00 30.00 9.60 13.8 Sports Installation of Multi GYM FIX Tarn 1 Tarn Taran Gandiwind chahal 2 4.34 31-03-2020 New - - 4.34 1.39 1.99 Machines Taran BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh)

Whether Scheme is on- Location Approved going from the Funds Distance for outlay of the Target for previous year. SC Sr. Name of the Sector, Old / New required in Women Internationa Scheme for the completion Component Remarks No. Scheme/Project Scheme currernt Component l Border current of Scheme Year Funds (in Lacs) year Constituncy District Block Village year.(in Lacs) commence already ment utilized

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Sarai Installation of Multi GYM FIX Tarn 2 Tarn Taran Gandiwind amanat 5 4.34 31-03-2020 New - - 4.34 1.39 1.99 Machines Taran khan Total Sports 8.68 8.68 2.78 3.98 E Social Sector ------F Security Related

Brick road from BOP CB Chand to Tarn 138 Bn 1 Tarn Taran Gandiwind 1 4.83 31-03-2020 New - - 4.83 1.55 2.22 Gate no. 126/1 (approx 400 mtr) Taran BSF Tarn G Capacity building Tarn Taran Gandiwind 4.83 31-03-2020 New 4.83 1.55 2.22 Taran Total block Gandiwind 48.34 48.34 15.47 22.22 BLOCK: PATTI 0.00 A Education ------B Health Sector ------C Agriculture and allied Sectore ------D Infrastructure ------Construction of K.K Road to Lallan Tarn 1 023 Patti Patti Bhangala 2 49.95 31.3.2020 New - - 49.95 15.98 22.97 Gurudwara sahib ( 1300 mt ) Taran BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh)

Whether Scheme is on- Location Approved going from the Funds Distance for outlay of the Target for previous year. SC Sr. Name of the Sector, Old / New required in Women Internationa Scheme for the completion Component Remarks No. Scheme/Project Scheme currernt Component l Border current of Scheme Year Funds (in Lacs) year Constituncy District Block Village year.(in Lacs) commence already ment utilized

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 E Social Sector ------F Security Related 0.00 Jhugian Construction of approach road to BSF Tarn 1 023 Patti Patti Nur 1 6.25 31.3.2020 New - - 6.25 2.00 2.88 Post JNM to up to Fencing (B7 mt) Taran Momand Tarn G Capacity building 023 Patti Patti Tarn Taran 6.25 6.25 2.00 2.88 Taran Total block Patti 62.45 62.45 19.98 28.73 BLOCK: VALTOHA 0.00 A Education ------B Health Sector ------C Agriculture and Allied Sectors ------D Infrastructure - - 0.00 - Construction of approach Road Baghwan Singh s/o Dal Singh House and Achar Singh s/o Narian Singh to 22 Khem Tarn Ratoke 1 Valtoha 1 10.50 31.03.2020 New - - 10.50 3.36 4.70 Baba Sukha Singh,Virsa Singh s/o Karan Taran Gurdwara Gujjar Singh House (Lenth 1500 ft and w=10 ft) Construction of approach Road Charn Singh House to Satbir Singh Lakhbir 22 Khem Tarn 2 Valtoha Ratoke 1 10.06 31.03.2020 New - - 10.06 3.22 4.70 Singh House (Lenth 700 ft and w=22 Karan Taran ft) BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh)

Whether Scheme is on- Location Approved going from the Funds Distance for outlay of the Target for previous year. SC Sr. Name of the Sector, Old / New required in Women Internationa Scheme for the completion Component Remarks No. Scheme/Project Scheme currernt Component l Border current of Scheme Year Funds (in Lacs) year Constituncy District Block Village year.(in Lacs) commence already ment utilized

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Construction of PC Road Baba wala 22 Khem Tarn 3 Rasta up to bahadar nagar valtoha Valtoha Maneke 6 16.10 31.03.2020 New - - 16.10 5.15 7.40 Karan Taran road (Lenth 3000 ft and w=10 ft)

Construction of approach Road Main 22 Khem Tarn Chak 4 road to Karaj Singh (Lenth 1200 ft Valtoha 5 16.00 31.03.2020 New - - 16.00 5.12 7.40 Karan Taran Bamba and w=10 ft) (width=14')

Construction of PC Road Bhura 22 Khem Tarn Bhura 5 Manwa Road to Master Balbir Singh Valtoha 5 10.50 31.03.2020 New - - 10.50 3.36 4.70 Karan Taran Kohna House (Lenth 1900 ft and w=10 ft)

Construction of PC Road Nirvail 22 Khem Tarn 6 Singh House (Lenth 2300 ft and Valtoha Bhandal 5 12.50 31.03.2020 New - - 12.50 4.00 5.70 Karan Taran w=10 ft) Swatchh Bharat Abhyan Sewage 22 Khem Tarn Gharyali 7 infrastructure (lenth.3200 ft)(w=2.5 Valtoha 8 12.00 31.03.2021 New - - 12.00 3.84 5.65 Karan Taran Dasuwal ft) Construction of PC Road Khazan 22 Khem Tarn Havilan 8 Singh House jhar Sahib (1700 ft and Valtoha 2 14.00 31.03.2022 New - - 14.00 4.48 6.45 Karan Taran Jhar sahib w=10 ft ) Total Infrastructure 101.66 - - 101.66 32.53 46.70 BORDER AREA DEVELOPMENT PROGRAMME Annual Action Plan of BADP for the year 2019-20 (State Share) Name of the State: Punjab Meeting of the SLSC held on: 12/09/2019 Name of the District: Tarn Taran (Rs in Lakh)

Whether Scheme is on- Location Approved going from the Funds Distance for outlay of the Target for previous year. SC Sr. Name of the Sector, Old / New required in Women Internationa Scheme for the completion Component Remarks No. Scheme/Project Scheme currernt Component l Border current of Scheme Year Funds (in Lacs) year Constituncy District Block Village year.(in Lacs) commence already ment utilized

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Social Sector Security Related Construction of Kissan Shed at BOP 22 Khem Tarn BSF Khem 1 Valtoha 1 6.00 31.3.2020 New - - 6.00 1.92 2.76 of KK Barrier Karan Taran Karan

Installation of RO Plant 500 and 200 22 Khem Tarn BSF 2 Ltr capacity with water coolers and Valtoha 1 6.70 31.3.2020 New - - 6.70 2.14 3.00 Karan Taran Amarkot shelters,(BSF Amarkot

Total Security Related 12.70 12.70 4.06 5.76 22 Khem Tarn Capacity Building Valtoha 12.70 12.70 4.06 5.80 Karan Taran 22 Khem Tarn Total Block Valtoha Valtoha 127.06 127.06 40.66 58.26 Karan Taran Grand Total (All Blocks) 322.07 322.07 103.06 147.91