HUDSONREBUILD BY DESIGNRIVER | JERSEY CITY HOBOKEN WEEHAWKEN

PUBLIC MEETING MAY 9, 2018 MEETING AGENDA

1. Overview and Accomplishments

2. Design Team Introduction

3. Reviewing Purpose and Need

4. Field Investigations

5. Design Principles

6. Engagement Schedule and Strategies

7. Breakout Activity

2 PUBLIC MEETING 01 REBUILD BY DESIGN - New Jersey Department of Environmental Protection Engineering and Construction REBUILD BY DESIGN HUDSON RIVER Assistant Commissioner Dave Rosenblatt Bureau of Flood Resilience New Jersey Department of Environmental Protection Engineering and Construction Assistant Commissioner Dave Rosenblatt Bureau of Flood Resilience

3 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER HOW REBUILDDo We get BY there?DESIGN VISION(THE Process)

BULKHEAD LEVEES BERM LANDSCAPE BULKHEAD WITH FLOOD WALL BULKHEAD LEVEES BERM LANDSCAPE BULKHEAD WITH FLOOD WALL PROGRAMMED DECK PROGRAMMED DECK

GATE IN-WATER BARRIER DEPLOYABLE GATE LEVEE (LAND ON STILTS TEMPORARY WALL GATE IN-WATER BARRIER DEPLOYABLE GATE LEVEE (LAND ON STILTS TEMPORARY WALL BOTH SIDES) BOTH SIDES)

Weehawken Weehawken Cove Cove

LANDSCAPE REVETMENT BULKHEAD BERM BERM LANDSCAPE LEVEES REVETMENT BULKHEAD BERM BERM BULKHEADLEVEESBULKHEAD LEVEESLEVEES BERM BERM LANDSCAPELANDSCAPE BULKHEADBULKHEAD WITH WITH FLOOD FLOODWALL WALL PROGRAMMEDPROGRAMMED DECK DECK

BULKHEAD LEVEES BERM LANDSCAPE BULKHEAD WITH FLOOD WALL BULKHEAD LEVEES BERM LANDSCAPE BULKHEAD WITH FLOOD WALL PROGRAMMED DECK PROGRAMMED DECK

RESIST14th Street BULKHEAD LEVEES BERM LANDSCAPE BULKHEAD WITH FLOOD WALL PROGRAMMED DECK delay

GATE GATE IN-WATERIN-WATER BARRIER BARRIER DEPLOYABLEDEPLOYABLE GATE GATE LEVEE (LANDLEVEE ON (LAND ON STILTS STILTS TEMPORARYTEMPORARY WALL WALL BOTH SIDES)BOTH SIDES)

GATE IN-WATER BARRIER DEPLOYABLE GATE LEVEE (LAND ON STILTS TEMPORARY WALL GATE IN-WATER BARRIER DEPLOYABLE GATE LEVEE (LAND ON STILTS TEMPORARY WALL BOTH SIDES) Stevens InstituteBOTH SIDES)of Stevens Institute of BULKHEAD LEVEES TechnologyBERM LANDSCAPE BULKHEAD WITH FLOOD WALL Technology PROGRAMMED DECK Washington Street Washington Street

GATE IN-WATER BARRIER DEPLOYABLE GATE LEVEE (LAND ON STILTS TEMPORARY WALL BOTH SIDES) LANDSCAPE REVETMENT BULKHEAD BERM BERM LANDSCAPE BERM REVETMENT BULKHEAD LEVEESLEVEES BERM

LANDSCAPE BERM LANDSCAPE JFK Stadium REVETMENT BERM BERM JFK Stadium REVETMENT BULKHEAD LEVEES BERM BULKHEAD LEVEES

GATE IN-WATER BARRIER BULKHEADDEPLOYABLE GATE LEVEESLEVEE (LAND ON BERM STILTS LANDSCAPE TEMPORARY WALL BULKHEAD WITH FLOOD WALL BOTH SIDES) PROGRAMMED DECK BERM LANDSCAPE REVETMENT BULKHEAD LEVEES BERM

BERM LANDSCAPE REVETMENT BULKHEAD LEVEES BERM GATE IN-WATER BARRIER DEPLOYABLE GATE LEVEE (LAND ON STILTS TEMPORARY WALL BOTH SIDES) Hoboken Hoboken BULKHEAD LEVEES BERM Terminal LANDSCAPE BULKHEAD WITH FLOOD WALL Terminal City Hall PROGRAMMED DECK City Hall

BULKHEAD LEVEES BERM LANDSCAPE BULKHEAD WITH FLOOD WALL PROGRAMMED DECK BERM LANDSCAPE REVETMENT BULKHEAD LEVEES BERM

GATE Observer Highway IN-WATER BARRIER DEPLOYABLE GATE LEVEE (LAND ON STILTS TEMPORARY WALL Observer Highway BULKHEAD LEVEES BERM LANDSCAPE BULKHEAD WITH FLOOD WALL BOTH SIDES) PROGRAMMED DECK

GATE IN-WATER BARRIER DEPLOYABLE GATE LEVEE (LAND ON STILTS TEMPORARY WALL BOTH SIDES)

BERM LANDSCAPE REVETMENT BULKHEAD LEVEES BERM

GATE IN-WATER BARRIER DEPLOYABLE GATE LEVEE (LAND ON STILTS TEMPORARY WALL BOTH SIDES)

BERM LANDSCAPE Potential Sites for Water REVETMENT BULKHEAD PotentialLEVEES SitesBERM for Water Resisting Features in Hoboken Delaying Features in Hoboken

BERM LANDSCAPE REVETMENT BULKHEAD LEVEES BERM

Resist Feature References Delay Feature References

Green Roof Permeable Pavers Terraced Edge Terraced Landscape Milstein Hall Glen Oaks Branch Library Sea Organ Jack Evans Boat Harbor Ithaca, New York Queens, New Yorkv Zadar, Croatia Deployable Flood Barriers Gold Coast, Australia OMA / SCAPE Parkland, Gabion, and Boardwalk SCAPE Nikola Bašić Shropshire, UK Aspect Studios

Weehawken Weehawken Cove Cove

STORE14th Street DISCHARGE14th Street

Stevens Institute of Stevens Institute of Technology Technology

Washington Street Washington Street

JFK Stadium JFK Stadium

Hoboken Hoboken City Hall Terminal City Hall Terminal

Observer Highway Observer Highway

Potential Sites for Water Potential Sites for Water Storage Features in Hoboken Discharge Features in Hoboken

Storage Feature References

Constructed Wetlands Renaissance Park Chattanooga, Tennessee Screening and Wet Weather Pumping Station Stormwater Management Pipes Hargreaves Associates Bioretention Basin Hoboken, New Jersey John Nastasi Hoboken Storm Drain

4 PUBLIC MEETING 01 Rebuild by Design Hudson River: ▪ Resist ▪ Delay ▪ Store ▪ Discharge ▪ REBUILD BY DESIGN - HUDSON RIVER A LOOK BACK 2015 - 2017

PURPOSE SCREENING UTHORITION ND CRITERI CONCEPT LTERNTIVE DRT INL O GRNT NOI NEED SCOPING METRICS SCREENING NLYSIS EIS EIS ROD UNDS UN 01 UG 01 SEP 01 OCT 01 EB 01 UL 01 EBPR 01 UL 01 SEP 01 OCT 01

NEP PROCESS

ESIBILITY SSESSMENT

PUBLIC INVOLVEMENT

5 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER A LOOK FORWARD

RBD D C NEP P P P C 1 YER YERS YERS YERS

UN 01 UN 01 SEP 01 SEP 01 SEP 0 R D

6 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER AREAS OF ONGOING COORDINATION

• Executive Steering Committee

• Citizen Advisory Group

• Operations and Maintenance

• FEMA Accreditation

• Urban Design and Amenities

• Section 106 Programmatic Agreement

7 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER ISSUES OF KNOWN CONCERN SUMMARY

CHALLENGES STATUS

• Schedule Design Phase - Complete 2019 Construction - Complete Sept. 2022

• Budget Under review during design phase Value Engineering will be required

• FEMA Accreditation Large number of gates Subsurface conditions under investigation

• Southern Resist Alignment A final decision has not yet been made (Option 1 vs. Option 2)

• Operations & Maintenance Developing options, entity and long term financing (O&M)

8 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER THE TEAM SPECIALTY SUB CONSULTANTS

REMORA CONSULTING, LLC.

9 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER Organization Chart: Our Team

Built to deliver responsive design solutions: AECOM has the depth of resources and State of New Jersey Organization Chart: Our Team expertise required to manage the entire range of possible work orders that may be issued Department of Treasury under this contract. We have enlisted the services of a few specialty subconsultants Division of Property Management & Construction Built to deliver responsive design solutions: AECOM has the depth of resources and who bringState special of New insights Jersey valuable to our team. We believe you’ll find our team provides + expertise required to manage the entire range of possible work orders that may be issued outstandingDepartment experience of Treasury and an exceptionalTHE level TEAM of capability in professional consulting Department of Environmental Protection under this contract. We have enlisted the services of a few specialty subconsultants Divisionservices of Property to support Management this contract. & ConstructionWHO YOU WILL SEE TONIGHT FROM THE AECOM PROJECTBureau TEAM of Flood Resilience who bring special insights valuable to our team. We believe you’ll find our team provides + outstanding experience and an exceptional level of capability in professional consulting Department of Environmental Protection Bureau of Flood Resilience All personnel listed are AECOM employees unless services to support this contract. Presenter Presenter Presenter Presenter otherwise indicated: PROJECT PROJECT EXECUTIVE OMA OMA Christopher Benosky, PE, CFM MANAGEMENT All personnel listed are AECOM employees unless MKA Magnusson Klemencic Associates otherwise indicated: PROJECT MANAGER PROJECT PROJECT EXECUTIVE CHRISTOPHER BENOSKY, KAREN APPELL PE, CPESC ERIC OLSEN ADEL EBEID MATRIX Matrix New World Engineering, Inc. ● OMA OMA Karen Appell, PE, CPESC MANAGEMENT Christopher Benosky, PE, CFM PE, CFM Project Manager Landscape Architecture/ Community Engagement REMORA Remora Consultants, LLC Project Executive MKA Magnusson KlemencicUrban Associates Design and Community Facilitator RHDHV Royal HaskoningDHV PROJECT MANAGER Engagement MATRIX Matrix New World Engineering, Inc. ● STEVENS Stevens Institute of Technology Karen Appell, PE, CPESC REMORA Remora Consultants, LLC DEPUTY PROJECT MANAGER Collaborative Efficient Flexible ● Certified SBE firm RHDHV Royal HaskoningDHV Heather Morgan, RLA STEVENS Stevens Institute of Technology DEPUTY PROJECT MANAGER Collaborative Efficient Flexible ● Certified SBE firm ENGAGEMENT/Heather Morgan, RLA COMMUNITY RELATIONS FEMA ACCREDITATION HUD COMPLIANCE HEALTH & SAFETY QUALITY ASSURANCE COMPLIANCE HEATHER MORGAN, RLA CHRISTY CHENG DANIEL SGRIZZI MARC TUOZZOLO Deputy Project Manager CommunityJeff Brizendine, Engagement PE, CFM, Landscape Architecture/ Project Specialist ENGAGEMENT/ Laura Baird (OMA) Urban Design Kevin Hamby (REMORA) Richard Renzi, CIH Dean Challes, CCM COMMUNITY RELATIONS FEMA ACCREDITATION HUD COMPLIANCE HEALTH & SAFETY PMPQUALITY ASSURANCE COMPLIANCE Jeff Brizendine, PE, CFM, Laura Baird (OMA) Kevin Hamby (REMORA) Richard Renzi, CIH Dean Challes, CCM PMP TECHNICAL TECHNICAL DISCIPLINE LEADS TECHNICAL ADVISORS COASTAL FLOOD RISK LANDSCAPE ARCHITECTURE/ MARINE/COASTAL ENGINEERING LANDSCAPE ARCHITECTURE/ LEADERSHIP MODELING MANAGEMENT URBAN DESIGN TECHNICAL DISCIPLINE LEADS TECHNICAL ADVISORS Edward Schmeltz, PE URBAN DESIGN Steven Li, PhD, D.CE, PE Mark Gonski, PE Brandon Cappellari, RLA, ASLA, TECHNICAL COASTAL MODELING Shohei Shigematsu (OMA) COASTAL FLOOD RISK LANDSCAPE ARCHITECTURE/ 10 MARINE/COASTALPUBLIC MEETING 01 ENGINEERING LANDSCAPE ARCHITECTURE/ LEED AP REBUILD BY DESIGN - HUDSON RIVER LEADERSHIP Alan Blumberg, PhD (STEVENS) FLOOD RISK MANAGEMENT MODELING MANAGEMENT URBAN DESIGN Edward Schmeltz, PE URBAN DESIGN STORMWATER MANAGEMENT/ Joseph Chapman, PE Steven Li, PhD, D.CE, PE Mark Gonski, PE Brandon Cappellari, RLA, ASLA, SITE/CIVILShohei ENGINEERINGShigematsu (OMA) BIDDING/CONSTRUCTION COASTAL & RIVERINE MGMT. INTERIORCOASTAL DRAINAGE MODELING LEED AP Douglas Kubovic, PE ADMINISTRATION George Peters (RHDHV) STRUCTURAL DESIGN JohnAlan Dromsky-Reed, Blumberg, PhD PE (STEVENS) FLOOD RISK MANAGEMENT Drew Gangnes, PE, SE (MKA) Phillip Sieber, PE COMPLIANCE Bruce Lelong, PE STORMWATER MANAGEMENT/ Matthew Jones, PE (MKA) Joseph Chapman, PE SITE/CIVIL ENGINEERING BIDDING/CONSTRUCTION COASTAL & RIVERINE MGMT. Josh Sawislak, AICP INTERIOR DRAINAGE Douglas Kubovic, PE ADMINISTRATION George Peters (RHDHV) STRUCTURAL DESIGN John Dromsky-Reed, PE Drew Gangnes, PE, SE (MKA) Phillip Sieber, PE COMPLIANCE Bruce Lelong, PE Matthew Jones, PE (MKA) SUPPORT LEADS TECHNICAL Josh Sawislak, AICP

SUPPORT MECHANICAL/ELECTRICAL GEOTECHNICAL ENVIRONMENTAL ENGINEERING PERMITTING ARCHITECTURE SUPPORT LEADS ENGINEERING ENGINEERING Christopher Venezia, LSRP Sherri Albrecht, PWS Niels Benavides, RA TECHNICAL Paul Moulton, PE John Volk, PE SUPPORT MECHANICAL/ELECTRICAL GEOTECHNICAL ENVIRONMENTAL ENGINEERING PERMITTING ARCHITECTURE ENGINEERING ENGINEERING Christopher Venezia, LSRP Sherri Albrecht, PWS Niels Benavides, RA Paul Moulton, PE John Volk, PE ACCESS/EASEMENTS/ NEPA COMPLIANCE SCHEDULING COST ESTIMATING TRANSPORTATION ENGINEERING LAND SURVEYING Donald Ehrenbeck, PP, AICP Shruthi Ashokan Jay Bayersdorfer, PE Tom Elsroth, PE Andrew Raichle, PE (MATRIX) ACCESS/EASEMENTS/ NEPA COMPLIANCE SCHEDULING COST ESTIMATING TRANSPORTATION ENGINEERING LAND SURVEYING Donald Ehrenbeck, PP, AICP Shruthi Ashokan Jay Bayersdorfer, PE Tom Elsroth, PE Andrew Raichle, PE (MATRIX) REBUILD BY DESIGN – HUDSON RIVER TC-003 DPMC PROJECT P1155-00 Organization Chart/Staffing Plan 1-3

REBUILD BY DESIGN – HUDSON RIVER TC-003 DPMC PROJECT P1155-00 Organization Chart/Staffing Plan 1-3 PROJECT AREA

UNION CITY WEEHAWKEN PROJECT AREA BOUNDARY

WEEHAWKEN HOBOKEN COVE

JERSEY CITY HUDSON HOBOKEN RIVER TERMINAL

LONG SLIP CANAL

MANHATTAN N

11 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER TOPOGRAPHY

PROJECT AREA BOUNDARY

WEEHAWKEN COVE

LEGEND PROJECT AREA HUDSON BOUNDARY RIVER 15+ FT LONG SLIP CANAL 10 - 15 FT

5 - 10 FT N 0 - 5 FT

12 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER HISTORICAL CONTEXT 1844

PROJECT AREA BOUNDARY

HISTORIC COASTLINE

N PRESENT DAY COASTLINE

13 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER HISTORICAL FLOODING 1844 FLOODPLAIN

PROJECT AREA BOUNDARY HISTORIC FLOODPLAIN

HISTORIC COASTLINE

N PRESENT DAY COASTLINE

14 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER 100-YEAR FLOODPLAIN

WEEHAWKEN PROJECT AREA BOUNDARY

WEEHAWKEN HOBOKEN COVE

JERSEY CITY HUDSON RIVER

LONG SLIP CANAL

N

15 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER HURRICANE SANDY BREACH POINTS

WEEHAWKEN PROJECT AREA BOUNDARY

WEEHAWKEN HOBOKEN COVE

JERSEY CITY HUDSON RIVER

LONG SLIP CANAL

N

16 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER PURPOSE AND NEED

COASTAL STORM SURGE

SYSTEMIC INTERIOR FLOODING

17 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER COMPREHENSIVE WATER MANAGEMENT STRATEGY RESIST, DELAY, STORE, DISCHARGE

RESIST - NORTH

NORTHWEST RESILIENCY PARK DSD TANKS

SOUTHWEST PARK EXPANSION

LEGEND RESIST HIGH LEVEL STORM ALIGNMENT SEWER SYSTEM PROJECT AREA BOUNDARY H5 PUMP STATION MUNICIPALITY BOUNDARY

HIGH LEVEL STORM SEWER SYSTEM RESIST - SOUTH H1 PUMP STATION N DSD PROJECTS

18 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER RESIST COMPONENTS

RESIST - NORTH WEEHAWKEN PROJECT AREA BOUNDARY

RESIST - SOUTH

WEEHAWKEN HOBOKEN COVE

OPTION 1

OPTION 2

LEGEND HIGH LEVEL STORM SEWER SYSTEM RESIST JERSEY ALIGNMENT CITY HUDSON PROJECT AREA RIVER BOUNDARY

LONG SLIP MUNICIPALITY CANAL BOUNDARY

HIGH LEVEL N STORM SEWER SYSTEM

19 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER Plotted: 2/20/2018 6:30 PM, By: Jason Smith © MATRIXNEWORLD\F:\2017\17-414 Rebuild by Design - Hudson River DPMC P1155-00\Technical\Dwg\17-414_Basemap (2018-02-07).dwg\Sht-12 (N)

MATCH LINE - SHEET 11 20 FIELD INVESTIGATIONS Subsurface Investigations -Geotechnical andEnvironmental Contour Mapping Survey -Topographic Land Dry PUBLIC MEETING 01 PUBLIC MEETING MATCH LINE-SHEET11(LEFT) Contour Mapping -Underwater Bathymetry MATCH LINE-SHEET13(TOP)

PROJECT NUMBER: TOPOGRAPHIC SURVEY - NORTH . BARLOWSKI, P.L.S. DESIGNED BY: SHEET OF SCALE: BLK 245, LotS 1-10; BLK 248, LotS 5-10; 262.02, Lot 1; BLK 262.03, DATE: Lot 1; BLK 262.03, Lot 1; BLK 262.06, Lot 1; BLK 263.02, Lot 1; BLK NEW JERSEY PROFESSIONAL LAND SURVEYOR 269.02, LotS 1, 4 & 5; BLK 269.03 LICENSE NO. 24GS03973500 REVIEWED BY: 12 REBUILD BY DESIGN - HUDSON RIVER Matrix New World Engineering, Land Surveying AS NOTED 02/07/2018 DESIGN & CONSTRUCTION ADMINISTRATION SERVICES and Landscape Architecture, P.C. 442 State Route 35, Second Floor Tel: 732-588-2999 TERM CONTRACT TC-003 17-414 17 Eatontown, New Jersey 07724 Fax: 973-240-1818 RELEASED BY: DPMC CONTRACT P1155-00 WBE / DBE / SBE www.matrixneworld.com 02/07/2018 NO. DESCRIPTION DATE: BY: APR: NEW JERSEY CERTIFICATE OF AUTHORIZATION No. 24GA27962300 DATE CITY OF HOBOKEN, HUDSON COUNTY, NEW JERSEY REVISIONS Pile Load Testing soon - starting Survey LIDAR +Bathymetry: REBUILD BYREBUILD -HUDSON DESIGN RIVER FIELD INVESTIGATIONS SUBSURFACE INVESTIGATION WORK - BORINGS AND TESTS

• 54 Geotechnical / Environmental borings to be competed (20 of 54 complete as of 4/30/18) • 10 Permeability Tests to be completed (1 of 10 complete as of 4/30/18) • 11 Cone Penetrometer Tests to be completed (0 of 11 complete as of 4/30/18) • 2 Pump Tests to be completed (0 of 2 complete as of 4/30/18) WEEHAWKEN PROJECT AREA BOUNDARY

WEEHAWKEN HOBOKEN COVE

JERSEY CITY HUDSON LEGEND RIVER BORINGS

LONG SLIP ‘CPT’ CANAL ‘PT’

N PUMP TEST

21 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER FIELD INVESTIGATIONS FEEDBACK TO DESIGN

• Survey + Bathymetry work: December 2017 - November 2018 • Geotechnical + Environmental work: April 2018 - July 2018 • Pile Load Testing work: May 2018 - July 2018 RESIST - NORTH WEEHAWKEN PROJECT AREA BOUNDARY

RESIST - SOUTH

WEEHAWKEN HOBOKEN COVE

OPTION 1

OPTION 2

HIGH LEVEL STORM SEWER SYSTEM JERSEY CITY HUDSON RIVER

LONG SLIP CANAL

22 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER DEVELOPMENT OF DESIGN

DESIGN DEVELOPMENT

23 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER DEVELOPMENT OF DESIGN FIELD INVESTIGATIONS INFORMING DESIGN DEVELOPMENT

FIELD INVESTIGATIONS

DESIGN DEVELOPMENT

24 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER DEVELOPMENT OF DESIGN 3 DESIGN PRINCIPLES INFORMING DESIGN DEVELOPMENT

FINAL EIS

PRIOR COMMUNITY INPUT FIELD FEASIBILITY STUDY INVESTIGATIONS

DESIGN DEVELOPMENT 3 DESIGN PRINCIPLES

25 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER DESIGN PRINCIPLES

Engineering Design FLOOD RISK REDUCTION Principles

Urban Design & WOVEN INTO INTEGRATED Landscape Architecture MULTI-PURPOSE EXISTING URBAN INTO OPEN SPACE Design Principles FABRIC IMPROVEMENTS

26 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER DESIGN PRINCIPLES MULTI-PURPOSE

FLOOD RISK REDUCTION + PUBLIC BENEFIT = MULTI-PURPOSE FLOOD RISK REDUCTION ALIGNMENT

(6/16/16) DRAFT FOR DISCUSSION PURPOSES ONLY

Wayfinding Extending from Surface Wifi Hotspot Lighting - every 25’ Activation

Wayfinding Imposed on Surface

to Harborside Park to Weehawken Cove Tiered Precast Planters Trash Receptacle - every 200’

Inset Bicycle Parking

Seating - every 50’

Active Passive

68 69 MULTI-PURPOSE ALIGNMENT MULTI-PURPOSE ALIGNMENT

27 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER DESIGN PRINCIPLES WOVEN INTO EXISTING URBAN FABRIC

IMPLEMENTATIONZONE OF

28 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER DESIGN PRINCIPLES INTEGRATED INTO OPEN SPACE IMPROVEMENTS

29 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER DEVELOPMENT OF DESIGN COMMUNITY ENGAGEMENT INFORMING DESIGN DEVELOPMENT

FINAL EIS

PRIOR COMMUNITY INPUT FIELD FEASIBILITY STUDY INVESTIGATIONS

DESIGN DEVELOPMENT 3 DESIGN PRINCIPLES

COMMUNITY INPUT DURING DESIGN PHASE

30 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER DEVELOPMENT OF DESIGN COMMUNITY ENGAGEMENT INFORMING DESIGN DEVELOPMENT

FINAL EIS FINAL PRIOR COMMUNITY DESIGN COMPLETION INPUT DELIVERED FIELD FEASIBILITY STUDY INVESTIGATIONS

DESIGN CONSTRUCTION DEVELOPMENT 3 DESIGN PRINCIPLES

COMMUNITY INPUT COMMUNITY OUTREACH DURING DURING DESIGN PHASE CONSTRUCTION PHASE

31 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER 32 • • • CADENCE +ORGANIZATION ENGAGEMENT SCHEDULE+STRATEGIES RBD HUDSON COMMUNITY ENGAGEMENT SCHEDULE RBD HUDSON COMMUNITY engagement process. engage withthe public andspecific identified special interest groups onanasneedbasis throughout the overall Working focus group meetingperiods willcompliment thecadence ofmeetingsabove, andwillserve asaway to Video recordings ofpublicmeetingswillbe posted to theweb for those whocan’t attend. Public meetingmaterials willbe posted to theweb, aswell asproject updates.

PUBLIC MEETING 01 PUBLIC MEETING DESIGN ONE CAG PUBLIC WORKSHOPS MEETINGS MEETINGS APR

CAG MEETING MAY

INTRODUCTORY PUBLIC MEETING UN

DESIGN ONE WORKSHOP ONES 1-

CAG MEETING UL AUG

CAG MEETING SEP

DESIGN ONE WORKSHOP ONES 1- OCT

PUBLIC MEETING NOV

CAG MEETING DEC

DESIGN ONE WORKSHOP AN AS NEEDED CAG MEETING FEB

PUBLIC MEETING MAR APR announcements. formal meetingdate confirmations and project needs.See NJDEPwebsite for to changeto best reflect andmeet schedules are approximate andsubject ** Meetingdates shown ongraphic

REBUILD BYREBUILD -HUDSON DESIGN RIVER CAG MEETING MAY UN

CAG MEETING UL FINAL PUBLIC MEETING 33 PUBLIC MEETINGS ENGAGEMENT SCHEDULE+STRATEGIES RBD HUDSON COMMUNITY ENGAGEMENT SCHEDULE RBD HUDSON COMMUNITY

PUBLIC MEETING 01 PUBLIC MEETING DESIGN ONE CAG PUBLIC WORKSHOPS MEETINGS MEETINGS APR

CAG MEETING MAY TODAY

INTRODUCTORY PUBLIC MEETING UN

DESIGN ONE WORKSHOP ONES 1-

CAG MEETING UL AUG

CAG MEETING SEP

DESIGN ONE WORKSHOP ONES 1- OCT

PUBLIC MEETING NOV

CAG MEETING DEC

DESIGN ONE WORKSHOP AN AS NEEDED CAG MEETING FEB

PUBLIC MEETING MAR APR announcements. formal meetingdate confirmations and project needs.See NJDEPwebsite for to changeto best reflect andmeet schedules are approximate andsubject ** Meetingdates shown ongraphic

REBUILD BYREBUILD -HUDSON DESIGN RIVER CAG MEETING MAY UN

CAG MEETING UL FINAL PUBLIC MEETING 34 CITIZEN ADVISORY GROUP (CAG) MEETINGS ENGAGEMENT SCHEDULE+STRATEGIES RBD HUDSON COMMUNITY ENGAGEMENT SCHEDULE RBD HUDSON COMMUNITY

PUBLIC MEETING 01 PUBLIC MEETING DESIGN ONE CAG PUBLIC WORKSHOPS MEETINGS MEETINGS APR

CAG MEETING MAY TODAY

INTRODUCTORY PUBLIC MEETING UN

DESIGN ONE WORKSHOP ONES 1-

CAG MEETING UL AUG

CAG MEETING SEP

DESIGN ONE WORKSHOP ONES 1- OCT

PUBLIC MEETING NOV

CAG MEETING DEC

DESIGN ONE WORKSHOP AN AS NEEDED CAG MEETING FEB

PUBLIC MEETING MAR APR announcements. formal meetingdate confirmations and project needs.See NJDEPwebsite for to changeto best reflect andmeet schedules are approximate andsubject ** Meetingdates shown ongraphic

REBUILD BYREBUILD -HUDSON DESIGN RIVER CAG MEETING MAY UN

CAG MEETING UL FINAL PUBLIC MEETING 35 DESIGN ZONE WORKSHOPS ENGAGEMENT SCHEDULE+STRATEGIES RBD HUDSON COMMUNITY ENGAGEMENT SCHEDULE RBD HUDSON COMMUNITY

PUBLIC MEETING 01 PUBLIC MEETING DESIGN ONE CAG PUBLIC WORKSHOPS MEETINGS MEETINGS APR

CAG MEETING MAY TODAY

INTRODUCTORY PUBLIC MEETING UN

DESIGN ONE WORKSHOP ONES 1-

CAG MEETING UL AUG

CAG MEETING SEP

DESIGN ONE WORKSHOP ONES 1- OCT

PUBLIC MEETING NOV

CAG MEETING DEC

DESIGN ONE WORKSHOP AN AS NEEDED CAG MEETING FEB

PUBLIC MEETING MAR APR announcements. formal meetingdate confirmations and project needs.See NJDEPwebsite for to changeto best reflect andmeet schedules are approximate andsubject ** Meetingdates shown ongraphic

REBUILD BYREBUILD -HUDSON DESIGN RIVER CAG MEETING MAY UN

CAG MEETING UL FINAL PUBLIC MEETING ENGAGEMENT SCHEDULE + STRATEGIES DESIGN ZONE WORKSHOPS

RESIST - NORTH WEEHAWKEN PROJECT AREA BOUNDARY

RESIST - SOUTH

WEEHAWKEN HOBOKEN COVE

OPTION 1

OPTION 2

HIGH LEVEL STORM SEWER SYSTEM JERSEY CITY HUDSON RIVER

LONG SLIP CANAL

36 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER ENGAGEMENT SCHEDULE + STRATEGIES DESIGN ZONES

DESIGN ZONE 5: DESIGN ZONE 4: JERSEY CITY TIE-IN OBSERVER HIGHWAY

DESIGN ZONE 1: WEEHAWKEN TIE IN

DESIGN ZONE 2: COVE PARK

DESIGN ZONE 3: WASHINGTON STREET ALLEYWAY

37 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER 38 UPCOMING MEETINGS ENGAGEMENT SCHEDULE+STRATEGIES RBD HUDSON COMMUNITY ENGAGEMENT SCHEDULE RBD HUDSON COMMUNITY

PUBLIC MEETING 01 PUBLIC MEETING DESIGN ONE CAG PUBLIC WORKSHOPS MEETINGS MEETINGS APR

CAG MEETING MAY TODAY

INTRODUCTORY PUBLIC MEETING UN

DESIGN ONE WORKSHOP ONES 1-

CAG MEETING UL AUG

CAG MEETING SEP

DESIGN ONE WORKSHOP ONES 1- OCT

PUBLIC MEETING NOV

CAG MEETING DEC

DESIGN ONE WORKSHOP AN AS NEEDED CAG MEETING FEB

PUBLIC MEETING MAR APR announcements. formal meetingdate confirmations and project needs.See NJDEPwebsite for to changeto best reflect andmeet schedules are approximate andsubject ** Meetingdates shown ongraphic

REBUILD BYREBUILD -HUDSON DESIGN RIVER CAG MEETING MAY UN

CAG MEETING UL FINAL PUBLIC MEETING INFORMING FUTURE ENGAGEMENT LOOKING TOWARDS DESIGN ZONE WORKSHOPS

Input from today’s activity will guide discussions in the upcoming Design Zone Workshops (6/16/16) DRAFT FOR DISCUSSION PURPOSES ONLY (6/16/16) DRAFT FOR DISCUSSION PURPOSES ONLY on how to best utilize the previously defined(6/16/16) DRAFT tools/toolkit, FOR DISCUSSION along PURPOSES with ONLYadditional strategies identified as appropriate, to design the urban spaces and amenities along the alignment based Canopy (6/16/16) DRAFT FOR DISCUSSION PURPOSESGarbage ONLY on the qualities identified inAn overheadthe activity canopy can shelteras desirable gathering spaces for (such your as community. BikeGarbage Storage containers can be built into the side of the barrier with bus stops) along the barrier and is colored for highlight. Bike storage can be inset intoa colored the side top of surface the barrier to highlight, and can be employed as and highlighted with colored interiorstandalone surfaces. units or combined with other furniture. Wayfinding Location wayfinding extends off of the barrier, while directional wayfinding is located at eye level. Colored for highlight. Can be combined with 5’ MAX other functions along barrier 18”-24” Located @ top edge Garbage @ every 150’ of barrier above 7’ or at road intersection Option to integrate with other functions Located @ 4’-6’ on barrier 18”-24”

18” 24”-30”

12”-20” 42”-48” DIM. SIM. DIM. SIM. 18” 24”-30” Gloria Furniture Fence, Soren Korsgaard, Denmark DIM. SIM. DIM. SIM. 94 Store Muu, PIT IN desk 95 88 4” 89 74 90 PIT IN desk, STORE MUU The Goods Line, ASPECT Studios, Sydney 75 91

(6/16/16) DRAFT FOR DISCUSSION PURPOSES ONLY

Wayfinding Extending from Surface Wifi Hotspot Lighting - every 25’ Activation

Wayfinding Imposed on Surface

to Harborside Park to Weehawken Cove Tiered Precast Planters Trash Receptacle - every 200’

Inset Bicycle Parking

Seating - every 50’

Active Passive

68 69

39 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER STICKERSENGAGEMENT TODAY STICKERS - RECEIVED AT CHECK IN

LIVE WORK VISIT

LIVE WORK VISIT

LIVE WORK VISIT

They receive a total of (15) stickers to be used wisely across the (5) boards.

40 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER 5 TYPOLOGIESENGAGEMENT5 TYPOLOGIES TODAY 5 TYPES OF URBAN SPACES FOR INPUT ALLEYWAY ALLEYWAY SIDEWALK SIDEWALK COVE PARKCOVE PARK

DESIGN ZONE 3 DESIGN ZONE 3 DESIGN ZONES 3 & 4 DESIGN ZONES 3 & 4 DESIGN ZONE 2 DESIGN ZONE 2

URBAN STREETURBAN STREETGREEN CORRIDORGREEN CORRIDOR

5 types of urban spaces identify the nature of existing spaces along the Resist alignment system.

DESIGN ZONE 4 DESIGN ZONE 4 DESIGN ZONE 1 & 5 DESIGN ZONE 1 & 5

41 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER ALLEYWAY

ENGAGEMENT TODAY ALLEYWAY COMPARISONS - WHAT DOALLEYWAY YOU LIKE? ALLEYWAY

HOW SHOULD IT LOOK? VIBRANT ALLEYWAY SUBDUED ALLEYWAY ALLEYWAY SIDEWALK WHAT SHOULD IT BE? DESTINATION PASS-THROUGH HOW SHOULD IT LOOK? HOW SHOULD IT LOOK? VIBRANT ALLEYWAY VIBRANTSUBDUED SUBDUED

HOW SHOULD IT FEEL? SOCIAL PERSONAL WHAT SHOULD IT BE? WHAT SHOULD IT BE? DESTINATION PASS-THROUGHDESTINATIONHOW SHOULD IT FEEL? PASS-THROUGH 3 questionsSOCIAL ask for your preferences on the PERSONAL quality of design interventions within each HOW SHOULDtype IT FEEL? of urban space. 42 PUBLICSOCIAL MEETING 01 PERSONAL REBUILD BY DESIGN - HUDSON RIVER ENGAGEMENT ACTIVITY SETUP ACTIVITY

S

SIDEWALK DESIGN ZONE / URBAN SPACES PHOTOS & DIAGRAMS

N

8

16

FEEDBACK OPPORTUNITIES: USE YOUR DOTS ON THE TABLE!

43 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER ACTIVITY TIME!

44 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER NEXT STEPS + KEY DATES

• Design Zone Workshops Round 1 • Questions & Comments:

May 29 - June 6th [email protected]

• Communications • Mail

Field work updates will be posted to the website. Dennis Reinknecht, Chief Bureau of Flood Resilience Survey + Bathymetry: December 2017 to November 2018 501 East State Street, Geotechnical + Environmental: March 2018 to May 2018 Mail Code 501-01A, PO Box 420 Trenton, NJ 08625-0420 Pile Load Testing: May 2018 to July 2018 • Website: Public meeting materials will all be posted to the web. www.rbd-hudsonriver.nj.gov Public meetings will be video recorded for those who cannot attend.

45 PUBLIC MEETING 01 REBUILD BY DESIGN - HUDSON RIVER HUDSONREBUILD BY DESIGNRIVER | JERSEY CITY HOBOKEN WEEHAWKEN NEW JERSEY

GOOD NIGHT! MAY 9, 2018