Appendix 11 – Public Participation Appendix A – Newspaper Advert NOTICE OF A WATER USE LICENSE APPLICATION FOR THE PROPOSED MAROTOLA PRIMARY SCHOOL BOREHOLE UPGRADE AND INTERNAL INFRASTRUCTURE IN HAMMANSKRAAL, PROVINCE

Nemai Consulting has been appointed by Malani Padayachee and Associates, on behalf of the Gauteng Department of Infrastructure Development as the independent Environmental Assessment Practitioner (EAP) to undertake the Water Use License Application (WULA) Process for the proposed borehole upgrade and construction of internal infrastructure within the Marotola Primary School in Hammanskraal in terms of the National Water Act, 1998 (Act No. 36 of 1998) (NWA).

In addition, this notice serves to notify all Interested and Affected Parties (IAPs) of the 60-Day Review Period of the Draft WULA Technical Report from 25 September 2019 to 25 November 2019. The Draft WULA Technical Report is available for review at the Temba Library (Stand 4424/2, Zone 02, Municipal Offices, Temba; 25°23'11.8"S 28°15'20.7"E; 012 358 3179) and will be available on Nemai Consulting’s website for download. Any comments or concerns must be submitted to Jacqui Davis by 25 November 2019 via telephone (0117811730), fax (0117811731), email ([email protected]) or post (PO Box 1673 Sunninghill, 2157). Appendix B – Site Notice

NOTICE OF A WATER USE LICENSE APPLICATION FOR THE PROPOSED MAROTOLA PRIMARY SCHOOL BOREHOLE UPGRADE AND INTERNAL INFRASTRUCTURE IN HAMMANSKRAAL, GAUTENG PROVINCE

Notice is hereby given, in terms of the National Water Act, 1998 (Act No. 36 of 1998) (NWA), of the Water Use License Application (WULA) Process for the proposed Marotola Primary School Borehole Upgrade and Internal Infrastructure in Hammanskraal, Gauteng Province.

BACKGROUND

A Water Use License (WUL) was granted by DWS on 23 May 2014 for the Proposed Renovation/Upgrade of Marotola Primary School at Ga-Mokone in Hammanskraal, North of in accordance with NWA, which was subsequently amended on 19 January 2018.

Gauteng Department of Infrastructure Development (GDID) proposes to upgrade the borehole which is required to abstract water to provide potable water to the school, as well as construct/install additional infrastructure that is required to ensure that the school is functional. The borehole and additional infrastructure do not fall within the ambit of the existing WUL and thus require a new WUL as the borehole is located within a delineated wetland, while the proposed additional infrastructure fall within 500m of the wetland.

A new WUL is required for the borehole upgrade and for the following infrastructure: grey water tank; water pipeline; water purification plant; storage tanks; generator; and access road.

WATER USE LICENSE APPLICATION

The WULA Process requires authorisation from the Department of Human Settlements, Water and Sanitation (DHSWS) (formally DWS) as the borehole is located within a delineated wetland, while the proposed additional infrastructure fall within 500m of the wetland (Figure 1). The following water uses are triggered in terms of the NWA:

Section 21 Description of Water Use Relevance to Project (NWA) Taking water from a water Water will be abstracted from an existing borehole, 21 (a) resource which needs to be upgraded Construction of internal infrastructure within 500m Impeding or diverting the flow of 21 (c) of a wetland. The upgrade of the borehole is within water in a watercourse a delineated wetland. The school plans to irrigate the school grounds with 21 (e) Engaging in a controlled activity grey water. Altering the bed, banks, course Construction of internal infrastructure within 500m 21 (i) or characteristics of a of a wetland. The upgrade of the borehole is within watercourse a delineated wetland.

REVIEW OF WULA TECHNICAL REPORT

In addition, this notice serves to notify all IAPs of the 60-Day Review Period of the Draft WULA Technical Report from 25 September 2019 to 25 November 2019. The draft report is available for review at the Temba Library (Stand 4424/2, Zone 02, Municipal Offices, Temba (25°23'11.8"S; 28°15'20.7"E); 012 358 3179) and will be made available on Nemai Consulting’s website for download.

Please submit your name, contact information and comments by means of telephone, e- mail, fax or post to the consultant below at Nemai Consulting by 25 November 2019:

Contact Person: Jacqui Davis Tel: (011) 781 1730 Fax: (011) 781 1731 Email: [email protected] Postal Address: PO Box 1673, Sunninghill, 2157

Figure 1: Locality Map for the Borehole Upgrade and Internal Infrastructure for the Marotola Primary School

Samantha Gerber Proof of Notification Queries:  011 781 1730  [email protected]

Project Name: Marotola Primary School Type of Notification: Site Notifications

Site Notification

No. Coordinates Description Photo

25°24'30.48"S 1 Lucas Mangope Drive and unnamed road 28°08'47.00"E

25°24'31.08"S 2 Unnamed road 28°09'13.10"E

25°24'30.73"S 3 Unnamed road 28°09'21.20"E

25°24'39.87"S 4 Marotola Primary School Entrance 28°09'22.48"E

Samantha Gerber Proof of Notification Queries:  011 781 1730  [email protected]

Project Name: Marotola Primary School Type of Notification: Site Notifications

Site Notification

No. Coordinates Description Photo

25°24'42.45"S 5 Unnamed road 28°09'23.09"E

25°23'11.8"S 6 Temba Library 28°15'20.7"E

Appendix C – Background Information Document

100Ml Bronberg Reservoir Background Information Document

PROPOSED MAROTOLA PRIMARY

SCHOOL BOREHOLE UPGRADE AND INTERNAL INFRASTRUCTURE IN HAMMANSKRAAL, GAUTENG PROVINCE

BACKGROUND INFORMATION DOCUMENT

SEPTEMBER 2019

PREPARED FOR: MALANI PADAYACHEE AND ASSOCIATES

Marotola Primary School Internal Infrastructure Background Information Document

1 PURPOSE OF THE BACKGROUND INFORMATION DOCUMENT

The purpose of the Background Information Document (BID) is as follows:

1. It serves to provide an overview of the proposed borehole upgrade and construction of internal infrastructure within the Marotola Primary School in Hammanskraal; 2. It provides an outline of the Water Use License Application (WULA) Process that will be undertaken for the project; and 3. It grants the opportunity to be registered as an Interested and Affected Party (IAP) and allows for comments to be made on the Draft WULA Technical Report for the proposed project (refer to attached Reply Form (Annexure 1)).

The purpose of the WULA Process is to identify and evaluate potential impacts, to recommend measures to avoid or reduce negative impacts and to enhance positive impacts.

2 PROJECT OVERVIEW

2.1 Project Background

The Marotola Primary School needed to be upgraded/renovated in order to establish a number of structures and infrastructure. The school was in poor condition that were deemed unsafe for children and teachers.

The upgrade/renovation of the school required authorisation in terms of the National Water Act (Act 36 of 1998) (NWA). A WUL was granted by DWS on 23 May 2014 for the Proposed Renovation/Upgrade of Marotola Primary School at Ga-Mokone in Hammanskraal, North of Pretoria in accordance with NWA.

An amendment to the WUL to amend the scope of work from the installation of a septic tank to the installation of a Sewer Package Plant (SPP) was submitted to DHSWS (then the Department of Water and Sanitation (DWS)) on 19 January 2018. The amended WUL was granted on 18 September 2018.

GDID proposes to upgrade the borehole which is required to abstract water to provide potable water to the school, as well as construct/install additional infrastructure that is required to ensure that the school is functional. The borehole and additional infrastructure do not fall within the ambit of the existing WUL and thus require a new WUL as the borehole is located within a delineated wetland, while the proposed additional infrastructure fall within 500m of the wetland.

Page 1

September 2019

Marotola Primary School Internal Infrastructure Background Information Document

2.2 Project Description

A new WUL is required for the borehole upgrade and for the following infrastructure:

• Grey water tank; • Water pipeline; • Water purification plant; • Storage tanks; • Generator; and • Access road.

Condition 4.1 of Appendix ΙΙ of the amended WUL states the following:

The package plant must have a power backup system (e.g. generator) to ensure its functionality in the event of a power failure.

Despite the condition above, the generator falls within 500m of the delineated wetland and thus will be included in this application.

Figure 2 provides a locality map of the proposed borehole upgrade and internal infrastructure for the Marotola Primary School.

2.3 Project Location

The Marotola Primary School is situated in Ga-Mokone, Hammanskraal in the City of Tshwane Metropolitan Municipality, Gauteng Province (Figure 1). The school property is approximately 2.3 hectares. The main land use in the area is residential while the proposed development is an educational facility.

The school currently falls on two properties: Portion 1 of Erf 8224 Stinkwater Extension 7 Township JR; and Erf 7862 Stinkwater Extension 7 Township JR. Currently, GDID are undertaking a consolidation process to combine the two properties into Erf 8769 Stinkwater Extension 7 Township.

Page 2

September 2019

Marotola Primary School Internal Infrastructure Background Information Document

Figure 1: Topographical Map

Figure 2: Locality Map

Page 3

September 2019

Marotola Primary School Internal Infrastructure Background Information Document

3 ENVIRONMENTAL LEGAL FRAMEWORK

3.1 Water Use License Application (WULA)

NWA aims to manage national water resources in order to achieve sustainable use of water for the benefit of all water users. This requires that the qualities of water resources are protected, and that integrated management of water resources takes place.

In terms of Section 21 (c) and (i) of the NWA, any development within 500m of a wetland or within the 1:100 year floodline / “Riparian Zone” (whichever is greatest) of a watercourse requires a WULA.

A WULA Process is required as the proposed developments trigger the water uses described in Table 1.

Section 21 Description of Water Use Relevance to Project (NWA) Taking water from a water Water will be abstracted from an existing 21 (a) resource borehole, which needs to be upgraded Construction of internal infrastructure within Impeding or diverting the flow 21 (c) 500m of a wetland. The upgrade of the borehole of water in a watercourse is within a delineated wetland. Engaging in a controlled The school plans to irrigate the school grounds 21 (e) activity with grey water. Altering the bed, banks, course Construction of internal infrastructure within 21 (i) or characteristics of a 500m of a wetland. The upgrade of the borehole watercourse is within a delineated wetland. A draft copy of the WULA Technical Report will be made available for a 60-Day Review Period, prior to finalisation and submission to the Department of Human Settlements, Water and Sanitation (DHSWS) (previously the Department of Water and Sanitation (DWS)).

Refer to Figure 3 for an outline of the WULA Process.

Page 4

September 2019

Marotola Primary School Internal Infrastructure Background Information Document

Figure 3: Overview of WULA Process

Page 5

September 2019

Marotola Primary School Internal Infrastructure Background Information Document

4 PUBLIC PARTICIPATION

A Public Participation Process will be conducted in terms of Section 41(4) of NWA and in line with Regulation 17 of GN R. 267 of NWA.

The Public Participation Process will involve the following:

• Site notices will be placed at prominent points in and around the project area to inform IAPs; • BIDs will be distributed via email to the identified authorities and stakeholders in the area for the project; • Notices regarding the project will be e-mailed or faxed to the councillor in the area and stakeholders (including authorities and state departments); and • A notice will be placed in one local newspaper.

IAPs are encouraged to participate in the process in order for concerns to be addressed and included in the WULA Technical Report. IAPs are invited and encouraged to review and comment on the draft documents which will be lodged at the following place for review from 25 September 2019 to 25 November 2019:

No. Location Address Telephone No.

Stand 4424/2, Zone 02, Municipal Offices, Temba 1. Temba Library 012 358 3179 (25°23'11.8"S; 28°15'20.7"E)

In addition, an electronic copy of the report will be made available on Nemai Consulting’s website for download.

Please fill in the attached Reply Form (Annexure 1) and return by means of e-mail, fax or post to the Consultant below at Nemai Consulting:

Contact Person: Jacqui Davis Tel: (011) 781 1730 Fax: (011) 781 1731 Email: [email protected] Postal Address: PO Box 1673, Sunninghill, 2157

Page 6

September 2019

Marotola Primary School Internal Infrastructure Background Information Document

ANNEXURE 1 - REPLY FORM:

PROPOSED MAROTOLA PRIMARY SCHOOL BOREHOLE UPGRADE AND INTERNAL INFRASTRUCTURE IN HAMMANSKRAAL, GAUTENG PROVINCE

(Complete and return to: Jacqui Davis by no later than the 25 November 2019)

Date:

Name of Organisation:

Name of Interested and Affected Party (IAP):

Address: Postal: Physical:

Tel No:

Fax No:

E-mail:

Registration as an IAP: YES NO

Comments:

Page 7

September 2019

Appendix D – IAP Database Commenting Authority Contact Person Telephone Number Email Address Address

Boniswa Belot 011 240 3377 [email protected] 56 Eloff Street, Corner Main Street, Umknoto House, 28th Floor Boardroom, Johannesburg

Erik Moletsane 011 240 3397 [email protected]

Lillian Siwelane [email protected] 285 Francis Baard Street, Bothongo Plaza East, PRETORIA, 0001

Tshwane House, Room CP 118, Ground floor, Block A , 320

Rudzani Mukheli 012 358 8731/079 958 0360 [email protected] Madiba street, Pretoria

John Mhlanga 082 203 7056 [email protected] Capital Towers North, Room C620, 6th Floor, 225 Madiba Street, Pretoria Nkosinathi Ntombela [email protected]

012 358 6245/ 083 665 6855/ 083

Aaron Mokgale Maluleka 946 3721 [email protected]

Stakeholders Organisation Name Physical Address Telephone Number Email Address

Eskom M.P Maluleke 204 Smit Street, Cnr Harrison, Braamfontein, 2017 117112496 [email protected] 61 Oak Avenue, Highveld, Techno Park, Centurion

Openserve Linda Meyfarth 0157 123118650 [email protected] CoT Water and Room A704, 7th floor, Capital Towers North, 225

Sanitation Planning Cleopas Kgobe Madiba Street, Pretoria, 0002 123581527 [email protected] CoT Environment and Room CP 83, Tshwane House, Ground floor, Block

Agriculture Management C. Saunders/ek A, 320 Madiba Street, Pretoria, 0002 123588750 [email protected] CoT Energy and Nndwamato T. Room 608, 6th floor, Bothongo Plaza East, 285

Electicity Mutshidza Francis Baard Street, Pretoria 0002 123589999 [email protected] DFA Open Access

Network Vivian Mokoala 96 Koranna Avenue, , Centurion ,0157 124431000 [email protected] 0739093818/ 012 358

CoT: City Sustainibilty Lourens P. Swanepoel 7755 [email protected] Provincial Heritage Tebogo Molokomme 38 Rissik Street, NBS Building, Johannesburg, 011 355 2545 [email protected] Resources Authority 2000 072 932 0866 v.za Gauteng (PHRAG) Stakeholders Organisation Name Physical Address Telephone Number Email Address Department of Themba Dlamini Room 618, Hamilton Building, 110 Hamilton Street, 012 309 5733 [email protected] Agriculture, Forestry and Arcadia, Pretoria. Fisheries (DAFF) - Gauteng Regional Office

Tshepiso Solly Isivuno Building, cnr Lilian Ngoyi and Madiba [email protected] CoT: Executive Mayor Msimanga Street, PRETORIA 012 358 9999

CoT: City Manager Dr Moeketsi Mosola [email protected],

320 Madiba Str, Tshwane House. 123 584 901 [email protected]

CoT: City Sustainability Lourens P. Swanepoel 073 909 2818/012 358 [email protected]

General Organisation Contact Person Contact Number Email Address Address Divine cornerstone worship centre 079 485 1583 816 Block Mokone, Stinkwater, Hammanskraal, Pretoria Loratong Primary School 3520 Block Nokeri, Hammanskraal Avenue, Stinkwater, Shalom Media Group 076 570 6997 Hammanskraal, 0426 Despot Media Group(Pty)Ltd 071 311 7447 3777 Stinkwater, Hammanskraal, Pretoria The Light Has Come Ministries 082 623 5712 DMM Steel N Pipe 062 184 6948 B, 4219 Molefe Makinta, Stinkwater, 0400 New & Used Motor Spares 071 624 8317 3751 Molefe Makinta Road, Stinkwater, 0400 Dire's Printers 079 951 0453 2971 Molefe Makinta Road, Stinkwater, 0400 Guerilla Supermarket 081 412 7526 2986/7 Molefe Makinta, Stinkwater, 0400 Total IM Filling Station 012 715 5097 Lucas Mangope Rd, Stinkwater, 0407 Gigis General Dealer 073 240 9895 ERF 2912 Molefe Makinta, Stinkwater, 0400 [email protected] Modilati Secondary School 012 715 5111 5509 Refentse, Stinkwater, Hammanskraal, 0407

Bokamoso High School 0822515995 [email protected] 5506 Newstand, Stinkwater, Hammanskraal, 0407