Search Results Recreational Trails Program Project Database

Your search for projects in State: FL, Total Results : 260

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 1993 Milton Trails ADA Trail Build ADA Boardwalk 1 Santa Rosa $26,304 $25,000 $51,304

FL 1997 Sweetwater Creek Sweetwater Creek Construction of ADA boardwalk. 1 Santa Rosa $14,000 $14,000 $28,000

Boardwalk Boardwalk Phase 2

FL 2007 Bone Creek Loop Trail Bone Creek Loop Trail Renovation of boardwalk and related support 1 Okaloosa $24,000 $16,000 $40,000

Boardwalk facilities

FL 2010 Whiting Field OHV Trails Whiting Field OHV Trail Construct two trailheads, with kiosks, parking 1 Santa Rosa $307,199 $76,780 $383,979

System areas, signs safety/control fencing; one

trailhead to include restroom; construct thirty

(30) miles OHV trail; and related support

facilities.

FL 2011 Southwest Greenway, Jones Southwest Greenway, Jones Construct 0.5 miles, 10 foot wide, natural 1 Escambia $200,000 $200,000 $400,000

Swamp Trail Swamp Trail Ext 3 surface hiking trail, 0.5 miles boardwalk, one

trailhead with parking, educational signs;

renovate - 1 mile, 12 foot wide natural

surface hiking trail; related support facilities.

FL 2012 Bagdad Mill Trail Bagdad Mill Trail Construct 2,239 linear feet asphalt loop trail; 1 Santa Rosa $33,460 $33,460 $66,920

931 linear feet, 12 foot wide asphalt trail

connectors, 12 ft. wide asphalt trail, benches,

water fountain, trash receptacles, bike racks,

and related support facilities

FL 2012 Bear Lake Loop Trail Bear Lake Loop Trail Removing 19 existing planks (footwalks) and 1 Santa Rosa $30,000 $20,000 $50,000

replacing with fixed piling boardwalks and

rocked crossings over wetland areas.

FL 2014 Bud and Dorie Day Patriot's Bud and Dorie Day Patriot's Bud and Dorie Day Patriot's Trail 1 Okaloosa $88,000 $22,000 $110,000

Trail Trail

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2017 Freeport Walk Bike Trail Freeport Walk Bike Trail Construction of 6' x 200 LF (+/- 10%) 1 Walton $157,350 $39,530 $196,880

boardwalk; Purchase and installation of

outdoors U.A. workout equip.; Construction of

1/4 mile (+/- 10%) loop wheelchair trail,

pavilion, sidewalk, sensory stations.

FL 2018 Southwest Greenway Trail Southwest Greenway Trail Trailhead parking and signage; benches, bike 1 Escambia $175,000 $175,000 $350,000

5th Extension rack, bridge; natural surface trail with stream

crossings; access trail; 2 warm up stations;

trail signs; information kiosk.

FL 2018 Choctawhatchee Paddle Choctawhatchee Paddle Kayak launch, screened in shelters, canoe 1 Walton $116,610 $23,322 $139,932

Trail- River Road Trail- River Road racks, restrooms, pavilion, boat ramp,

Commanders Landing Commanders Landing educational kiosk

FL 2010 Lake Chautauqua Trails Lake Chautauqua Trails Construct 2.3 mile, 8 foot wide, pulverized 10 Pinellas $200,000 $200,000 $400,000

shell trail, a parking facility, signage, and

other amenities - design, permitting, clearing,

grubbing, installation.

FL 2017 West Lake Wetlands West Lake Wetlands Construction of 8' x 1800 LF (+/- 10%) 10 Lake $200,000 $200,000 $400,000

multi-surface trail to include boardwalks over

wetland areas; purchase and installation of

interpretive signage.

FL 2017 Kit Land Nelson Park Kit Land Nelson Park Construction 10' X 2,900 LF (+/- 10%) 10 Orange $120,000 $80,000 $200,000

concrete fitness trail; Purchase and

installation of landscaping and additional

lighting.

FL 1993 Marshall Swamp Trailhead Marshall Swamp Trailhead Construct Parking Lot, Signs, Restrooms 11 Marion $25,000 $25,000 $50,000

Construction

FL 1993 Withlacoochee State Forest Public Information Facilities, Install Signage, Brochures 11 Citrus, Hernando, $7,524 $10,000 $17,524

Trails Sign Program Sumter

FL 1997 McKay Bay Trail McKay Bay Trail - Bike Construction of hard surface trail. 11 Hillsborough $50,000 $50,000 $100,000

Connector

FL 1997 Trout Creek Trout Creek Bridge Construction of bridge. 11 Hillsborough $12,000 $12,000 $24,000

FL 2001 Gadsden Park Trail Gadsen Park Trail Construction asphalt trail & support facilities 11 HillsBorough $80,000 $80,000 $160,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2002 Blake Trail Blake Trail Southern Hard surface multi-use trail and related 11 Hillsborough $100,000 $100,000 $200,000

Extension support facilities

FL 2004 Riviera Dunes Trail Riviera Dunes Trail Hard surface trail and related support 11 Manatee $114,296 $100,000 $214,296

facilities

FL 2009 Norma Lloyd Multi-Use Trail Norma Lloyd Multi-Use Trail Construct hard surface multi-use trail with 11 Manatee $127,124 $250,000 $377,124

bridge and related support facilities

FL 2012 Floral City Withlacoochee Floral City Trailside Facilities Construct restroom facility, drinking fountains 11 Citrus $79,120 $19,780 $98,900

State Trail and sign

FL 2012 Mill Creek Crossing Mill Creek Crossing Construct 435 linear feet, 8 foot wide 11 Sumter $200,000 $50,000 $250,000

boardwalk, 4 interpretive signs; renovate 4

wayfinding signs and related support facilities

FL 2016 OHV Ocala NF OHV Trail Trail trimming- tread and height; Purchase of 11 Marion $255,000 $51,000 $306,000

Trails Maintenance PPE, signs, stickers, and trail maintenance

equipment. Trail maintenance; 2 years of

intern salaries.

FL 2017 Pineridge-Meadowcrest Trail Pineridge-Meadowcrest Trail Design, permitting and construction of 11 Citrus $150,000 $150,000 $300,000

Trailhead facilities to include, restrooms, bike

rack, signage, landscaping, and parking lot

FL 2018 Wetland Groundwater Wetland Groundwater 2.5 mile asphalt trail, trail signs and maps, 11 Marion $200,000 $50,000 $250,000

Recharge Park Recharge Park accessible picnic table, trash receptacles

FL 2002 Lake Myrtle Trail Lake Myrtle Trailhead Trailhead and related support facilities 12 Polk $75,000 $50,000 $125,000

FL 2004 Fort Fraser Trail Fort Fraser Trail Hard surface trail and related support 12 Polk $114,296 $100,000 $214,296

facilities

FL 2006 Chain of Lakes Trail Chain of Lakes Trail Paved multi-use trail, trailhead, and related 12 Polk $200,000 $200,000 $400,000

support facilities

FL 2007 Lake Wales Rails-to-Trails Lake Wales Rails-to-Trails Multi-Use hard surface trail and related 12 Polk $153,691 $133,000 $286,691

support facilities

FL 2010 Snowden Park Recreational Snowden Park Recreational Construct 3,000 linear feet, 12 foot wide 12 Hillsborough $125,000 $125,000 $250,000

Trail Trail concrete trail; and related support facilities.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2011 Mobbly Bayou Wilderness Mobbly Bayou Wilderness Construct 5,000 linear feet, 12 foot wide 12 Pinellas $100,000 $100,000 $200,000

Preserve Preserve Phase 2 crushed shell multi-use trail; 160 linear feet

composite decking, 20 linear feet, 10 foot

wide boardwalks; fitness equipment; related

support facilities.

FL 2016 James E. Grey Preserve James E. Grey Preserve Construction of parking lot, hard surface 12 Pasco $200,000 $285,000 $485,000

Urban Trail Connector Urban Trail Connector bicycle trail, walking trails, walking bridge,

signage, trail connections, and improvements

for bicycles to Phase III upper trail

FL 2017 James E. Grey Preserve James E. Grey Preserve Construction of 8' x 898 LF (+/- 10%) 12 Pasco $200,000 $200,000 $400,000

boardwalk

FL 2018 Shingle Creek Shingle Creek Trailside facilities 12 Osceola $200,000 $50,000 $250,000

FL 2014 Osgood Point Trail Osgood Point Trail Osgood Point Trail Connector 12, 13 Pinellas $200,000 $399,390 $599,390

Connector

FL 1997 Emerson Point Conservation Emerson Point Conservation Construction of hard surface trail. 13 Manatee $32,269 $50,000 $82,269

Trail Trail

FL 1997 Cedar Creek Trail Cedar Creek Trail Construction of soft surface trail and bridge. 13 Pinellas $20,100 $20,100 $40,200

Improvements

FL 1998 Terra Ceia Bay Trail Terra Ceia Bay Trail Construction of firm surface trail and 13 Manatee $49,000 $49,000 $98,000

boardwalk.

FL 2001 Venetian Waterway Park Venetian Waterway Park Construction hard surface & facilities 13 Sarasota $12,872 $18,380 $31,252

FL 2001 Venetian Waterway Park Segment 2c, Venetian Construction hard surface & facilities 13 Sarasota $11,936 $18,360 $30,296

Waterway Park

FL 2001 Palmetto Recreational Trail Recreational Trail, Hydrant Construction hard surface trail & facilities 13 Manatee $37,750 $9,500 $47,250

to Hidden Lake Park

FL 2001 Eighth Street Linear Park Eighth Street Linear Park Construction hard surface trail & facilities 13 Sarasota $45,236 $80,000 $125,236

and Recreational Trail and Recreational Trail

FL 2002 North Metro Multi-Use Trail North Metro Multi-Use Trail Hard surface multi-use trail and related 13 Sarasota $60,000 $40,000 $100,000

support facilities

FL 2004 Hardee Lakes Parks and Hardee Lakes Parks and Soft surface trails and related support 13 Hardee $80,000 $20,000 $100,000

Trails Trails facilities

FL 2006 Palmetto Recreational Trail Recreational Trail Extension Paved multi-use trail and related support 13 Manatee $200,000 $200,000 $400,000

facilities

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2008 Hydrant Trailhead Hydrant Trailhead Renovate trailhead, construct trail linkage, 13 Manatee $10,119 $15,000 $25,119

Enhancement install fitness stations along multi-use trail,

and related support facilities

FL 2009 Oyster Creek Waterfront Oyster Creek Waterfront Construct natural surface trail and boardwalk 13 Charlotte $68,495 $100,000 $168,495

Trail Trail and related support facilities

FL 2011 Lake Belleview Trail Lake Belleview Trail Construct 5,262 linear feet, 12 foot wide 13 Pinellas $200,000 $200,000 $400,000

paved multi-use trail; related support

facilities.

FL 2013 Fred Marquis Pinellas Trail Fred Marquis Pinellas Trail 0.5 mile trail renovation 13 Pinellas $75,000 $355,000 $430,000

FL 2015 Ream Wilson Trail Ream Wilson Trail Bridge Maintenance and restoration of existing trail 13 Pinellas $104,637 $104,638 $209,275

by replacing the existing six-foot wide bridge

with a twelve-foot wide bridge.

FL 2018 Crews Park, Parks at Peace Crews Park, Parks at Peace Drainage, kayak rack & pad, asphalt and 13 Hardee $143,247 $28,649 $171,896

River River Phase I pavers, signage, fishing dock, lighting,

irrigation, bridge

FL 1998 Hickey Creek Interpretative Hickey Creek Interpretative Construction of soft surface trail. 14 Lee $50,000 $50,000 $100,000

Trail Trail

FL 2001 Glover's Blight Trail Glover Bight Trail (Phase I) Construction hard surface trail & facilities 14 Lee $80,000 $20,000 $100,000

FL 2004 Caloosahatchee Creeks Caloosahatchee Creeks Paddling trail, trailhead, and related support 14 Lee $114,296 $100,000 $214,296

Trails Trails facilities

FL 2013 Orange River Trail Orange River Trailhead Loop w/paddling launch and amenities 14 Lee $49,630 $12,407 $62,037

FL 1998 Turkey Creek Boardwalk Turkey Creek Boardwalk Construction of Boardwalk Trail 15 Brevard $10,000 $10,000 $20,000

FL 2001 Sports Park Multi-Use Sports Park Multi-Use Construction hard surface trail & facilities 15 Brevard $65,194 $53,334 $118,528

Recreational Trail Recreational Trail

FL 2002 Boundary Canal Trail Boundary Canal Trail Hard surface multi-use trail and related 15 Brevard $100,000 $50,000 $150,000

support facilities

FL 2004 Boundary Canal Trail Boundary Canal Trail - Multi-Use trails and related support facilities 15 Brevard $72,812 $67,000 $139,812

Phase II

FL 2009 Trans- Railroad Trail Trans-Florida Railroad Trail Construct hard surface multi-use trail and 15 Indian River $207,157 $49,700 $256,857

related support facilities

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2011 Polk County OHV Trails Polk County Off-Highway Construct OHV system for ATVs and Dirt 15 Polk $1,351,372 $337,843 $1,689,215

Bikes to include trailhead with restrooms,

access trails, collector trails, riding trails

appropriate to terrain.

FL 2013 Fellsmere Preserve Rail-Trail Fellsmere Preserve Rail-Trail 12' wide ADA compliant trail 15 Indian River $74,960 $18,700 $93,660

Improvements

FL 2013 Shingle Creek Regional Trail Shingle Creek Regional Trail 18 signage locations 15 Osceola $66,654 $16,664 $83,318

FL 2001 Apoxee Wilderness Preserve Apoxee Wilderness Preserve Construction soft surface & facilities 16 Palm Beach $80,000 $80,000 $160,000

Recreational Trail Recreational Trail

FL 2002 Fairlane Farms Trail Fairlane Farms Trail Hard surface multi-use trail and related 16 Palm Beach $85,000 $85,000 $170,000

support facilities

FL 2002 Apoxee Wilderness Trails Apoxee Wilderness - Phase Natural surface trail and related support 16 Palm Beach $100,000 $100,000 $200,000

II facilities

FL 2004 Wildcat Cove Trail Wildcat Cove Trail Boardwalk, overlooks, paddling trailhead, and 16 St. Lucie $22,500 $22,500 $45,000

related support facilities

FL 2004 Fort Center Trail Fort Center Trail Firm surface trail and related support facilities 16 Glades $80,000 $20,000 $100,000

FL 2007 Apoxee Preserve Bike/Hike Apoxee Preserve Bike/Hike Natural surface trail, renovation of firm 16 Palm Beach $200,000 $50,000 $250,000

Trail Trail, Phase 3 surface trail, signage and related support

facilities

FL 2011 Neal Preserve Trail Neal Preserve Trail Construct 735 linear feet, 10 feet wide 16 Manatee $200,000 $200,000 $400,000

boardwalk, 350 linear feet, 8 feet wide

boardwalk, benches and related support

facilities.

FL 2012 Legacy Park Legacy Park Construct one-half mile, 12 ft. wide concrete 16 Sarasota $200,000 $200,000 $400,000

trail and restroom

FL 2012 Dundee Parks Connector Dundee Parks Connector Construct 1 mile, 10 foot wide asphalt trail, 17 Polk $153,400 $153,400 $306,800

Trail Trail lighting, landscaping, irrigation, drinking

fountain, benches, garbage cans, puppy

stations, etc.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2012 Lake Wales Trail Lake Wales Trail Construct trail entrance, 5 exercise stations; 17 Polk $160,000 $40,000 $200,000

renovate 2.5 miles asphalt trail, expand

trailhead parking lot to include additional

accessible parking, and related support

facilities

FL 2014 Okee-Tantie Park Okee-Tantie Park Okee-Tantie Park 17 Okeechobee $200,000 $200,000 $400,000

FL 2015 Bone Valley ATV Trail Bone Valley ATV Trail Construction of OHV facilities including 11 17 Polk $300,000 $75,000 $375,000

Crossing eight-foot wide connector trails, a riding area

with challenges, a timed trials course, a

scramble area and a parking area.

FL 2016 Harbor Walk Harbor Walk Phase 1B Construction of 9,321 square feet of 17 Charlotte $200,000 $2,783,855 $2,983,855

boardwalk and 3,970 linear feet of concrete

pilings; (2) U-bridges and safety lighting

FL 2017 West Terry Street Path West Terry Street Path Design, permitting and construction of 12' 17 Lee $200,000 $780,650 $980,650

X1.25 mile (+/- 10%) asphalt multi-use path

FL 2017 Panther Point Trail Panther Point Trail Construction of 12' x 3.5 miles (+/- 10%) 17 Polk $200,000 $330,000 $530,000

Development Development crushed rock trail; Purchase and installation

of 4' grass on each side of trail.

FL 2017 Ortona Indian Mound Trail Ortona Indian Mound Trail Purchase and installation of 10 interpretive 17 Glades $50,000 $40,600 $90,600

Rehabilitation and kiosks; Renovation/replacement of (2) 360

Enhancement sq. ft. bridges; Replace 6' x 270 LF (+/- 10%)

boardwalk with 2,340 sq. ft. (+/- 10%)

lumberock.

FL 2018 Downtown Lake Wales Trail Downtown Lake Wales Trail 3,410 ft concrete trail 17 Polk $200,000 $200,000 $400,000

FL 2014 Bowman's Beach Trail Bowman's Beach Trail Bowman's Beach Trail 17, 19 Lee $200,000 $200,000 $400,000

FL 1997 Mangrove Boardwalk Trail Mangrove Boardwalk Trail Construction of boardwalk 18 Dade $50,000 $50,000 $100,000

FL 2008 Coco Plumn Recreational Coco Plum Trail Upgrade Construct new and renovate multi-use trails, 18 Monroe $203,115 $207,500 $410,615

Trail and related support facilities

FL 2011 Queens Island Preserve Queens Island Preserve Trail Construct 2,600 linear feet, 8 foot wide 18 St. Lucie $28,000 $7,000 $35,000

Trails System natural surface trail with 4 wood boardwalk

crossings and 2 trail benches; related support

facilities.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2013 Coco Plum Recreational Coco Plum Rec Trail - Phase 8' paved trail w/crosswalks, safety signs, 2 18 Monroe $64,000 $16,000 $80,000

Trail 3 rest areas

FL 2017 Jones Creek Preserve Open Space at Jones Creek Purchase and installation of new kayak 18 Palm Beach $101,700 $101,700 $203,400

Preserve launch and kayak rack, 10 benches, covered

picnic area with picnic table, bike rack, water

fountain, trash cans, path to launch.

Construction of pervious access drive,

parking area with 7 spaces, 5 standard, 1...

FL 2018 Marine Stadium Basin Trail Marine Stadium Basin Trail 770'paved extension, renovate existing trail 18 Dade, Miami $200,000 $200,000 $400,000

At Virginia Key At Virginia Key asphalt

FL 2014 DuPuis Trail DuPuis Trailhead DuPuis Trailhead Improvement 18, 20, 21, 22 Palm Beach, Martin $44,000 $11,118 $55,118

Improvement

FL 2014 Community Park Trail Community Park Trail Community Park Trail 18, 20, 21, 22 Palm Beach $200,000 $200,000 $400,000

FL 2014 Commons Park Trail Commons Park Trail Commons Park Trail 18, 20, 21, 22 Palm Beach $200,000 $200,000 $400,000

FL 2001 Parkland Trails Connecting and Enhancing Construction hard surface trail & facilities 19 Broward $63,300 $53,340 $116,640

Trail Ways

FL 2006 Long Pine Greenway Long Pine Greenway Concrete trail and related support facilities 19 Broward $42,090 $79,386 $121,476

FL 2008 Equestrian Estates Trails Equestrian Estates Trails Construct hiking trails and related support 19 Broward $95,145 $250,000 $345,145

facilities

FL 2009 Hilton Road Greenway Hilton Road Greenway Construct hard surface multi-use trail and 19 Broward $25,593 $79,350 $104,943

related support facilities

FL 2010 Saw Palmetto Trail Saw Palmetto Trail Construct 9,800 sf - 5' wide concrete path, 19 Broward $92,250 $92,250 $184,500

130 lf 5' aluminum path, 3 interpretive signs,

3 benches, 2 bike racks, 1 trash receptacle, 1

trailhead informational kiosk, 1,500 sy asphalt

trailhead entrance, 5,000 sf bahia sod (2' on

either side of...

FL 2011 Bonita Trail Bonita Trail Phase I Construct 1,700 linear feet, multi-use natural 19 Lee $160,000 $40,000 $200,000

surface trail and boardwalks; related support

facilities.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2011 Admiral Lehigh Trailhead Admiral Lehigh Trailhead Construct 0.5 miles, 12 foot wide, paved 19 Lee $14,212 $126,324 $140,536

multi-use trail with boardwalk and bridge,

trailhead and trailside amenities to include

parking and restrooms; related support

facilities.

FL 2012 Pond Apple-Shipley Park Pond Apple / Shipley Park Construct 420 linear feet, 8 foot wide, 19 Lee $74,000 $74,000 $148,000

connector boardwalk, and related support

facilities

FL 2017 Gordon River Greenway Gordon River Greenway Design, permitting and construction of 12' X 19 Collier $200,000 $235,000 $435,000

Recreational Bridge And Recreational Bridge And 1,947 LF (+/- 10%) asphalt trail

Boardwalk Boardwalk

FL 1993 Munson Hills Trailside Facilities Trailside facilities with potable water supply 2 Leon $12,881 $20,144 $33,025

FL 1993 Saint Marks Trail Toilet Installation and Trail Install restroom and trail spur 2 Leon $25,000 $25,000 $50,000

Construction

FL 1997 Bear Creek Trails Bear Creek Environmental Construction of hard and soft surface trail. 2 Gadsden $14,320 $14,375 $28,695

Education Trails

FL 1997 Eastern Lake Trail Eastern Lake Trail Construction of soft surface trail. 2 Bay $25,056 $21,909 $46,965

Improvement

FL 2001 Apalachicola National Forest Apalachicola National Forest Purchase Sweco & trail maintenance 2 Leon, Wakulla $100,000 $30,000 $130,000

Motorized Trail Motorized Trail Maint.

FL 2001 Madison County Rail-Trail Madison County Rails to Construction asphalt trail & support facilities 2 Madison $76,873 $20,000 $96,873

Park Trails Park Phase II

FL 2002 Paved Trail Four Freedoms - Phase III Hard surface multi-use trail and related 2 Madison $39,167 $10,890 $50,057

support facilities

FL 2004 East Slough Overlook Trail East Slough Overlook Trail Nature trail, boardwalk and related support 2 Franklin $83,424 $25,000 $108,424

facilities

FL 2004 Sally Ward Bridge Phase Sally Ward Bridge Phase Boardwalk, foot bridge and related support 2 Wakulla $62,296 $12,000 $74,296

One One facilities

FL 2004 Harders Park Walking Trail Harders Park Walking Trail Paved Trail 2 Bay $29,983 $80,000 $109,983

FL 2007 Florida National Scenic Trail Bridge Project Two bridges on the FNST, trail maintenance 2 Bay $76,969 $53,000 $129,969

and related support facilities

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2008 Chattahoochee Nature Trails Chattahoochee Nature Trails Construct hard surface multi-use trail, natural 2 Gadsden $250,000 $63,430 $313,430

surface equestrian trail and related support

facilities

FL 2009 Apalachicola National Forest OHV Projects Construct and improve OHV trailheads, 2 Leon, Wakulla $933,900 $222,780 $1,156,680

Motorized Trail bridge, and related support facilities

FL 2009 Miccosukee Greenway Trail Miccosukee Greenway Trail Construct hardened surface multi-use trail 2 Leon $54,255 $75,000 $129,255

and related support facilities

FL 2010 Miccosukee Greenway Miccosukee Greenway - Renovate 3.75-4.0 miles, 12 foot wide 2 Leon $17,465 $250,000 $267,465

Phase 2 multi-use trail, trailhead and related support

facilities.

FL 2010 Chipola Greenway Trails Chipola Greenway Trails Construct two trailheads, with parking; 12,300 2 Jackson $146,208 $36,552 $182,760

linear foot, 10 foot wide multi-use bicycle and

hiking trail; 4,900 linear foot, 6 foot wide

hiking and mountain biking trail; 2,700 linear

foot, 6 foot wide hiking trail; 600 linear foot, 8

foot wide...

FL 2012 Water Street Park Water Street Park Construct Blue Stream Wood Boardwalk 653 2 Jefferson $200,000 $50,000 $250,000

Recreational Trails Recreational Trails LF, 6 ft. wide wood boardwalk, 3 ft. off grade;

410 LF, 6ft wide, wood boardwalk, 12 ft. off

grade; Green Treetop Wood Boardwalk;

1,380 LF, 6 ft. wide natural surface trail; 28

Interpretive Signs; 8...

FL 2013 Connector Trail Lake Talquin Connector Trail Trail work, water crossing, parking, restrooms 2 Leon $35,032 $10,800 $45,832

w/electric, mounting blocks

FL 2014 Butler National Recreation Butler Trail Extension Butler Trail Extension 2 Jackson $37,750 $37,750 $75,500

Trail

FL 2014 Miccosukee Greenway Miccosukee Greenway, Miccosukee Greenway, Phase 3 2 Leon $200,000 $200,000 $400,000

Phase 3

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2017 Port City Trail Port City Trail Renovation of 1,700 LF (+/- 10%) and 2 Gulf $160,000 $40,000 $200,000

construction of additional 600 LF (+/-10%) of

crushed shell trail; Construction of 600 (+/-

10%) brick paver trail; Construction of 160 LF

(+/- 10%) boardwalk; Renovation of existing

lighting; Purchase and...

FL 2018 Wakulla County Wooly Park Wakulla County Wooly Park Parking area, info kiosk, water fountain, 2 Wakulla $75,000 $75,000 $150,000

and Big Bend Maritime and Big Bend Maritime kayak launch, bicycle rack

Museum Museum

FL 1997 Flamingo Road Trail Flamingo Road Trail Construction of hard and soft surface trail. 20 Broward $50,000 $50,000 $100,000

FL 1998 Hominy Branch Trail Hominy Branch Trail Construction soft surface trail. 20 Flagler $30,127 $39,375 $69,502

FL 2002 Central City Linear Trail Central City Linear Trail Hard surface multi-use trail and related 20 Broward $100,000 $100,000 $200,000

support facilities

FL 2004 C-11 Canal Recreational C-11 Canal Recreational Trail renovation and related support facilities 20 Broward $83,104 $20,000 $103,104

Trail Trail

FL 2007 MURT System Trailhead MURT System Trailhead Trailhead and related support facilities 20 Broward $131,224 $32,910 $164,134

FL 2007 C-11 Canal Recreational C-11 Recreational Trail Construction and renovation of firm surface 20 Broward $45,710 $14,174 $59,884

Trail Phase 2 trail and related support facilities

FL 2009 Plantation Cultural Trail Plantation Cultural Trail Construct hard surface multi-use trail and 20 Broward $40,487 $12,656 $53,143

related support facilities

FL 2010 Mainlands Recreational Trail Mainlands Recreational Trail Construct 7,000 linear feet, 12 foot wide, hard 20 Broward $248,998 $248,998 $497,996

surface walking trail with fitness equipment,

related support facilities.

FL 2012 Welleby Park Trail Welleby Park Trail Renovate 1.2 miles of trail 20 Broward $200,000 $200,000 $400,000

Renovation

FL 2013 Fishing Hole Trail Fishing Hole Trailhead 1 trailhead facility with restrooms and 1 20 Broward $34,027 $34,027 $68,054

multi-purpose trail

FL 2017 Community Center Fitness Community Center Fitness Construction of 10' x 2500 LF (+/- 10%) multi 20 Palm Beach $200,000 $50,000 $250,000

Trail Trail use paved fitness trail; purchase and

installation of 4 fitness stations; Construction

of accessible parking lot; Construction of trail

connector to adjacent Delacort Park

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2018 Lakeside Park Trail Lakeside Park Trail 8 Benches, 8 trash cans, signage, and 2,000 20 Palm Beach $200,000 $50,000 $250,000

lf. asphalt trail

FL 2018 Hypoluxo Scrub Trailhead Hypoluxo Scrub Trailhead Resurface parking and access drives with 20 Palm Beach $200,000 $50,000 $250,000

concrete

FL 1997 Wellington Urban Trail Wellington Urban Trail Construction of hard surface bicycle trail. 21 Palm Beach $35,500 $35,500 $71,000

Linkage

FL 1997 Westland Park Trail Westland Park Trail Construction of firm surface trail. 21 Dade $50,000 $50,000 $100,000

FL 2011 Sabal Pines Greenway Sabal Pines Greenway Construct 1,800 linear feet, 12 foot wide, 21 Broward $113,325 $113,325 $226,650

concrete trail; one trailhead feature; related

support facilities.

FL 2015 Community Park Trail Community Park Trail Construction of 2,500 Linear Feet (LF) of 21 Palm Beach $200,000 $50,000 $250,000

eight-foot wide concrete trail, four fitness

stations, and two shade structures.

FL 2015 Brown Trail Brown Trail Connector Construction of 1,000 Linear Feet (LF) of 21 Palm Beach $200,000 $200,000 $400,000

eight-foot wide natural surface equestrian trail

and concrete bridge over a canal.

FL 2017 Dog Park Trail Dog Park Trail Construction of 2,000 LF (+/-10%) paved 21 Palm Beach $200,000 $140,000 $340,000

accessible fitness trail and 4 fitness stations;

Construction of soft surface trail connection

to adjacent bridle trails; Construction of new 8

acre equestrian riding and staging area.

FL 2017 Winston Park Nature Center Winston Park Nature Center Construction of 1,650 LF (+/- 10%), 21 Broward $100,000 $100,000 $200,000

Greenway Trail Greenway Trail multi-surface path and accessible ramp

connecting to existing elevated boardwalk.;

purchase and installation of 2 benches,

pergola, informational signage.

FL 2017 Terramar Park Trails Terramar Park Trails Construction of 6-8' x 1,500 LF (+/- 10%) 21 Broward $200,000 $50,000 $250,000

paved multi-use trail; Renovation of 6-8' x

3000 LF (+/- 10%) paved multi-use trail.

FL 2018 Peacefull Waters Boardwalk Peacefull Waters Boardwalk 1,200 LF x 8' wide wooden boardwalk 21 Palm Beach $200,000 $200,000 $400,000

FL 1997 Constitution Park Arboretum Constitution Park Arboretum Construction of hard surface trail. 22 Broward $25,000 $25,000 $50,000

Trail Trail

FL 1998 Spacer Walk of Fame Space Walk of Fame - IV Construction of hard surface trail. 22 Broward $50,000 $50,000 $100,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 1998 Radice Park Jogging Trail Radice Park Jogging Trail Construction of hard surface trail. 22 Broward $25,000 $25,000 $50,000

FL 2007 Anchorage Park Trails Anchorage Park Multi-use hard surface trail, renovation of 22 Palm Beach $199,944 $200,000 $399,944

multi-use hard surface trail and related

support facilities

FL 2009 Riverbend Park Trails Riverbend Park Construct natural surface trails, with archery 22 Palm Beach $240,000 $60,000 $300,000

obstacles, trailhead and related support

facilities

FL 2011 Okeeheelee Park South Okeeheelee Park South Construct 70 linear feet, 12 foot wide 22 Palm Beach $199,500 $50,000 $249,500

Greenway Greenway multi-use paved trail; 7,200 linear feet, 12

foot wide shell rock multi-use trail; 7,200

linear feet, 10 foot wide equestrian trail;

trailhead; paddle launch; renovate - widen

4,560 linear feet paved multi-use...

FL 2015 Royal Palm Natural Area Royal Palm Natural Area Construction of 1,800 Linear Feet of 22 Broward $200,000 $50,000 $250,000

eight-foot wide natural surface trail with

wooden boardwalk, installation of six signs.

FL 2015 Intracoastal Park Trail Intracoastal Park Trailhead Construction of a paddling trail facilities 22 Palm Beach $28,500 $28,500 $57,000

including: a floating dock, a gangway, a

launch, transfer bench, signage, native

vegetative buffer, and related support

facilities.

FL 2018 Margate Blueway Margate Blueway Install 2 ADA kayak launch facilities, info 22 Broward $200,000 $50,000 $250,000

signs

FL 2018 Royal Palm Beach Pines Royal Palm Beach Pines 545' trail connector, shelter w/bench, gate, 22 Palm Beach $168,875 $162,875 $331,750

Trail Trail kiosk, renovate trail, boardwalk, parking lots,

shelter and accessibility signage and swing

bench

FL 2001 Tivoli Sand Pine Preserve Tivoli Sand Pine Preserve Construction hard surface & facilities 23 Broward $8,000 $80,000 $88,000

Trail Trail

FL 2008 Grassy Waters Trails Grassy Waters Trails - Construct multi-use trails and related support 23 Palm Beach $250,000 $62,500 $312,500

Phase 1 facilities

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2017 Long Key South Trail Long Key South Trail Design, permitting and construction of 6' X 23 Broward $122,790 $81,860 $204,650

1,830 LF (+/-10%) concrete path; 6' X 1,110

LF (+/-10%) mulch trail; purchase and

installation of 24' hexagonal shelter with slab;

renovation of concrete train platform;

purchase and installation of 3...

FL 2014 West Sports Complex West Sports Complex West Sports Complex Development 23, 24, 25 Broward $200,000 $200,000 $400,000

FL 2014 Johnnie McKeithen Trail Johnnie McKeithen Trail Johnnie McKeithen Trail 23, 24, 25 Broward $50,000 $100,000 $150,000

FL 2014 Snyder Park Bike Trail Snyder Park Bike Trail Snyder Park Bike Trail 23, 24, 25 Broward $200,000 $40,000 $240,000

FL 2014 Pine Trail Park Trail Pine Trail Park Trail Pine Trail Park Trail 23, 24, 25 Broward $200,000 $200,000 $400,000

FL 2014 Shotgun Road Trail Shotgun Road Trail Shotgun Road Trail 23, 24, 25 Broward $200,000 $846,073 $1,046,073

FL 2015 Hugh Taylor Birch State Park Hugh Taylor Birch State Park Construction of 8' wide multi-use trail 23, 24, 25 Broward $192,600 $192,600 $385,200

Recreational Trail Recreational Trail including 1,920 Linear Feet (LF) asphalt and

1,800 LF concrete, a bridge, benches,

educational kiosks, safety fencing and related

support facilities.

FL 1997 Spacer Walk of Fame Space Walk of Fame Construction of hard surface trail. 24 Brevard $50,000 $50,000 $100,000

FL 2010 ECR Rail-Trail ECR Rail-Trail - Segment 3 Construct 2.7 miles, 12 foot wide, paved 24 Volusia $250,000 $250,000 $500,000

multi-use trail; trailhead with parking; and

related support facilities.

FL 2011 NW 170th Street Greenway NW 170th Street Greenway Construct 2,500 linear feet, 12 foot wide 25 Miami-Dade $77,500 $77,500 $155,000

Phase II paved multi-use trail with benches; related

support facilities.

FL 2014 Middle Beach Corridor Middle Beach Corridor Middle Beach Corridor 25, 26, 27 Miami-Dade $200,000 $200,000 $400,000

FL 2017 Key Tree Cactus Preserve Key Tree Cactus Preserve Design, permitting and construction of 9' x 26 Monroe $200,000 $200,000 $400,000

Boardwalk Boardwalk 576 LF (+/- 10%) boardwalk

FL 2011 Amelia Earhart Park Amelia Earhart Park Construct 3,100 linear feet, 12 foot wide, 27 Miami-Dade $200,000 $200,000 $400,000

Mountain Bike Trail Mountain Bike Trail paved multi-use trail, 1.5 miles natural

surface bike trail, bike wash station; related

support facilities.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2015 Coral Reef Park Trail Coral Reef Park Trail Construction of two pedestrian bridges and 27 Miami-Dade $200,000 $200,000 $400,000

Extension 2,000 Linear Feet (LF) of ten-foot wide hard

surface trail (including asphalt and concrete),

installation of trail signage, installation of sod

adjacent to the trail for stabilization.

FL 1997 Welaka State Forest Environmental Education Construction of hard and soft surface trail. 3 Putnam $12,433 $12,433 $24,866

Trails

FL 1998 Van Zant Park Trails Van Zant Park Trails Construction of equestrian trails. 3 Clay $38,750 $38,750 $77,500

FL 2001 Clear Lake Park Trail Clear Lake Parks Trail Construction hard & soft surface trail & facility 3 Orange $80,000 $80,000 $160,000

FL 2002 Equestrian Trail Equestrian Trail Natural surface trail and related support 3 Duval $100,000 $100,000 $200,000

facilities

FL 2002 Lake Monroe Trail Lake Monroe Trailhead Trailhead and related support facilities 3 Volusia $94,460 $100,000 $194,460

FL 2007 Goldsboro Trail Goldsboro Trail Hard surface trail 3 Seminole $120,766 $200,000 $320,766

FL 2010 S Line Rail-Trail S Line Rail-Trail Phase II Construct 4,300 linear feet, 12 foot wide 3 Duval $182,750 $182,750 $365,500

asphalt paved multi-use trail

FL 2013 Coastline Park Trail Coastline Park Trailhead 1,500 linear feet of 10 foot wide asphalt 3 Seminole $75,000 $75,000 $150,000

FL 2013 Ocala National Forest OHV Ocala National Forest OHV Corral, signage, fencing, kiosks, maintenance 3 Marion $471,300 $241,427 $712,727

Trail Trail Maintenance interns, spec replacement

FL 2014 Buie Park Trail Buie Park Trail Buie Park Trail 3 Levy $160,000 $32,000 $192,000

FL 2015 Tanglewylde Nature Park Tanglewylde Nature Park PH Construction of 1,320 Linear Feet (LF) of 3 Putnam $200,000 $48,000 $248,000

2 eight-foot wide crushed stone trail and

installation of signage.

FL 2009 Ocala National Forest OHV Phase 2 Construct and improve OHV trailheads, 3, 11 Marion, Lake, $933,900 $222,780 $1,156,680

Motorized Trails corrals, and related support facilities Putnam

FL 2014 St. Johns River Trail St. Johns River Trail St. Johns River Trail 2 3, 4, 5 Clay $98,500 $98,500 $197,000

FL 2018 COKH Rails-to-Trails COKH Rails-to-Trails Concrete trail connecting to parking lot, bike 3, 4, 5 Clay $108,500 $186,500 $295,000

Trailhead Trailhead racks and repair station, air pump, signage,

picnic tables, restrooms, and playground

FL 2013 Ed Gustafson Park Trails Ed Gustafson Park Trails Trail stabilization w /4 exercise stations, 6 36 Clay $45,000 $30,000 $75,000

interpretive signs

FL 2002 Matanzas Waterway Park Matanzas Waterway Park Natural surface trail, trailhead and related 4 St. Johns $100,000 $100,000 $200,000

support facilities

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2007 St. Mary's Shoals Park St. Mary's Shoals Park ATV recreational trail system, trail head and 4 Baker $518,421 $130,511 $648,932

related support facilities

FL 2008 St. Mary's Shoals Park St. Mary's Shoals - Phase 2 Construct ATV trail system, trailhead, and 4 Baker $500,000 $125,000 $625,000

related support facilities

FL 2009 LHTP Canopy Walkway Trail LHTP Canopy Walkway Trail Construct and renovate natural surface and 4 Leon $250,000 $250,000 $500,000

boardwalk trails and related support facilities

FL 2013 St. Mary's Shoals Park St. Mary's Shoals Park - 15 miles maintenance, 40 hrs./month 2 years, 4 Baker $173,280 $43,320 $216,600

Phase 3 mowing, small dozer, 20 hrs./month motor

grader, large dozer

FL 2013 Four Freedoms Trailhead Four Freedoms Trailhead Handicap accessible restroom 4 Madison $11,959 $11,959 $23,918

FL 2014 St. Mary's Shoals Park Trails St. Mary's Shoals Park St. Mary's Shoals Park 4 Baker $49,165 $12,900 $62,065

FL 2016 Wiggins Campground OHV Wiggins Campground OHV Campground improvements at existing OHV 4 Columbia $308,287 $77,072 $385,359

Upgrade Upgrade facility to include eight campsites, two parking

areas, corral system leading to the trail, one

double vault toilet. Upgrades to existing trail.

FL 2017 Jarboe Park Trail Jarboe Park Trail Construction of 10' x 1050 LF (+/- 10%) 4 Duval $160,000 $40,000 $200,000

asphalt trail; Purchase and installation of

bridge; Construction of new kiosk and

restroom facilities.

FL 2018 Jarboe Park Trail Jarboe Park Trail Phase II 1,000 ft trail,2 bridges, 2 fitness stations 4 Duval $200,000 $50,000 $250,000

FL 2018 Westside Regional Park Trail Westside Regional Park Trail Blazing trail, driveway, restroom, well, access 4 Naussau $153,990 $30,798 $184,788

System System road, ADA parking

FL 2014 Lonnie Miller Park Trail Lonnie Miller Park Trail Lonnie Miller Park Trail 4, 5 Duval $200,000 $200,000 $400,000

FL 1993 Croom Trailhead Croom Trailhead Parking, Trailhead Improvement 5 Hernando $21,677 $27,608 $49,285

Improvements

FL 1993 Croom Trailhead Croom Trailhead Signage, Entrance 5 Hernando $4,185 $5,000 $9,185

Improvements

FL 1993 Croom Trailhead Croom Install Fencing Install Fence 5 Hernando $15,654 $20,000 $35,654

FL 1997 Croom Trailhead Croom Area #2 Trailhead improvements. 5 Hernando $22,000 $22,000 $44,000

FL 1997 Croom Trailhead Croom Area #1 Trailhead improvements. 5 Hernando $25,000 $25,000 $50,000

FL 2001 Crystal River Crosstown Trail Crystal River Cross-Town Construction asphalt trail & support facilities 5 Citrus $63,035 $63,035 $126,070

and Bicycle Path Trail & Bicycle Path

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2011 Florahome Trailhead Florahome Trailhead Construct trailhead to include restroom, 5 Putnam $65,600 $16,400 $82,000

parking, trail access spur, benches, kiosk,

bike rack; related support facilities.

FL 2012 Paynes Prairie Park Trails Paynes Prairie Park Trails Construct 3.1 miles, 12 foot wide hard 5 Alachua $200,000 $200,000 $400,000

surface trail, two rest area, 338 linear feet, 5

to 6 foot wide entry trail, 1,928 linear feet, 6

foot wide entry boardwalk, and related

support facilities

FL 2017 Silver Lake OHV Trailhead Silver Lake OHV Trailhead Renovation of OHV trailhead & parking; 5 Leon $427,500 $103,700 $531,200

Reconstruction Reconstruction renovation of overflow lot and entrance road;

construct restroom and exterior shower;

enclose existing maintenance equipment

storage shed; purchase and install

informational signage and garbage cans.

FL 2017 Monticello Ecological Park Monticello Ecological Park Construction of 1,200 Sq.Ft. (+/- 10%) 5 Jefferson $180,000 $45,000 $225,000

covered pavilion with tables and grills;

Purchase and installation of prefabricated

comfort station with a men's and women's

restroom.

FL 2017 St. Hebron Park Walk and St. Hebron Park Walk and Construction of 10' X 1 mile (+/- 10%) paved 5 Gadsden $200,000 $200,000 $400,000

Bike Trail Bike Trail multi use trail to include wooden boardwalk

and footbridge over wetland areas; Trailhead

kiosk with informational signage, parking,

composting restroom facilities, solar powered

security lighting.

FL 2017 Jax Baldwin Trail Jax Baldwin Trail Construction of 10-12' x 6,400 LF (+/- 10%) 5 Duval $200,000 $200,000 $400,000

Development-Sal Taylor asphalt trail.

Creek Preserve

FL 2014 Crooked River Trail Crooked River Trailhead Crooked River Trailhead 5, 10, 11 Lake $39,190 $39,190 $78,380

FL 2014 Zoo River Walk Zoo River Walk Connector Zoo River Walk Connector 5, 7 Seminole $200,000 $200,000 $400,000

FL 2014 Terwilliger Trail Terwilliger Trail Terwilliger Trail 5, 7 Seminole $200,000 $200,000 $400,000

FL 1993 Holly Hill Bike Trail Bicycle Trail Construction Construct trail with amenities 6 Volusia $26,304 $25,000 $51,304

FL 1998 Trenton Trail Trenton Trailhead Construction of trailhead. 6 Gilchrist $40,000 $40,000 $80,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2001 Camp Milton Historic Camp Milton Historic Construction of Trailhead & support facilities 6 Duval $80,000 $80,000 $160,000

Preserve Preserve

FL 2002 Florida National Scenic Trail Florida National Scenic Trail Hiking trail, trailhead, related support 6 Marion $33,834 $10,000 $43,834

Construction - Ocala facilities, and trail maintenance

FL 2002 Montverde Greenway Trail Montverde Greenway Trail Hard surface multi-use trail and related 6 Lake $68,249 $18,958 $87,207

support facilities

FL 2009 Newberry Archery Trail Newberry Archery Trail Construct natural surface trail, trail head and 6 Alachua $102,180 $240,000 $342,180

related support facilities

FL 2015 Graham Swamp Graham Swamp Construction of a bicycle pump track, a 6 Flagler $64,665 $64,665 $129,330

Improvements restroom, expansion of the parking area,

safety fencing, and paving of the entrance

road.

FL 2018 Clermont Legacy Loop Clermont Legacy Loop 1,500' x 12 ' wide asphalt trail 6, 11, 15 Lake $200,000 $200,000 $400,000

FL 2018 Minneola Trail Renovation Minneola Trail Renovation Bollard lighting, benches, trash cans, 6, 11, 15 Lake $214,800 $143,200 $358,000

signage, pet stations, electric and wi-fi, trail

repaving and landscaping

FL 2001 East Coast Greenway East Coast Greenway Construction hard surface & facilities 7 Volusia $26,801 $100,000 $126,801

Recreational Trail Recreational Trail (Phase III)

FL 2001 Florida National Scenic Trail Florida National Scenic Trail Construction trail bridge & support facilities 7 Seminole $80,000 $80,000 $160,000

Bridge

FL 2002 Oviedo Trail Oviedo Trailhead Trail construction, signage, trailhead, and 7 Seminole $80,000 $20,000 $100,000

related support facilities

FL 2006 Spring to Spring Trail Spring to Spring Trail-Phase Paved multi-use trail and related support 7 Volusia $148,330 $200,000 $348,330

7A facilities

FL 2007 Big Tree Park Trail Big Tree Park Trailhead & Spur trail, boardwalk renovations, trail head 7 Seminole $63,607 $148,500 $212,107

Trail and related support facilities

FL 2011 Beck Ranch Trailhead Beck Ranch Trailhead Construct trailhead to include parking and 7 Volusia $70,932 $70,932 $141,864

4,375 linear foot, 12 foot wide trail; related

support facilities.

FL 2012 Seminole Wekiva Trail Seminole Wekiva Trail Renovate 3.6 miles trail to include 7 Seminole $110,648 $110,648 $221,296

resurfacing, sod, striping, tree trimming,

installation of water fountain and three pieces

of exercise equipment

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2013 Reinhart/Cross Seminole Reinhart/Cross Seminole Signage and resurfacing 7 Seminole $75,000 $75,000 $150,000

Trail Trail

FL 2015 Reiter Park Reiter Park Construction of 1,200 Linear Feet (LF) of 7 Seminole $100,000 $50,000 $150,000

eight-foot wide trail, up to two feet of sod

adjacent to the trail surface as needed for

stabilization, eight benches, two small shade

shelters and two signs.

FL 2017 Ward Park Perth/Loch Ward Park Perth/Loch Demolition of existing trail; design and 7 Orange $125,000 $125,000 $250,000

Lomand Nonmotorized Lomand Nonmotorized construction of 10'-12' x 4,907 LF (+/-10%)

Recreational Trail Recreational Trail concrete trail

FL 2017 Historic Downtown Historic Downtown Construction of 8' x 2000 LF (+/- 10%) paved 7 Seminole $200,000 $150,000 $350,000

Stormwater Trailhead Stormwater Trailhead trail; Construction of 750-1,000 sq. ft. (+/-

10%) trailhead structure with maps. Purchase

and installation of interpretive signage,

drinking fountain, sitting areas, and garbage

cans.

FL 2008 Cross Seminole Trail Cross Seminole Trail Phase I Renovate paved multi-use trails and related 7, 24 Seminole $149,796 $175,000 $324,796

support facilities

FL 2018 Central Winds Trailhead Central Winds Trailhead Restrooms, concrete pathway, info sign, 7, 24 Seminole $200,000 $50,000 $250,000

trash cans, bench, bike rack

FL 2002 Lake Lizzie Nature Preserve Lake Lizzie Nature Preserve Natural surface trail restoration, trailhead and 8 Osceola $100,000 $75,000 $175,000

related support facilities

FL 2003 Ocala National Forest Trails Ocala National Forest, 59 miles motorized recreational trail, 7 8 Marion $477,601 $125,000 $602,601

Phase 1 trailheads, signs/kiosks, SWECO

FL 2004 Shingle Creek Recreation Shingle Creek Recreation Trailhead and related support facilities 8 Osceola $114,296 $100,000 $214,296

Preserve Preserve

FL 2010 Proposed Trailway Proposed Trailway Extension Construct 2,800 linear feet, 12 foot wide hard 8 Lake $148,000 $37,000 $185,000

surface trail, related support facilities.

FL 2011 Lagoon Greenway Lagoon Greenway Phase B of project (Phase A is currently 8 Indian River $109,000 $109,000 $218,000

under construction) - please see exhibit 'E' for

information regarding phases A and B. See

Exhibit (W) for Phase B breakdown.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2012 Palm Bay Cross City Trail Cross City Trail - Phase 1 Construct 6,850 LF of trail - 2,930 LF 8 Brevard $198,363 $49,591 $247,954

sidewalk, 3,920 LF asphalt for new trail.

FL 2013 Park of the Americas Park of the Americas 4,350 linear feet of 6' wide multi-use trail 8 Orange $75,000 $75,000 $150,000

Recreational Trail Recreational Trail w/fitness stations

FL 2013 West Orange Trail West Orange Trail 6 inch ribbon 1.15 miles, asphalt resurfacing 8 Orange $75,000 $75,000 $150,000

Resurfacing - Phase 1

FL 2014 Barton Lake Trail Barton Lake Trail Barton Lake Trail 8 Brevard $180,000 $189,013 $369,013

FL 2014 Sand Hill Trailhead Sand Hill Trailhead Sand Hill Trailhead 8 Brevard $90,480 $22,620 $113,100

FL 2014 Martin Luther King Trail Martin Luther King Trail Martin Luther King Trail 8 Indian River $59,000 $209,000 $268,000

FL 2015 Town Connector Trail Town Connector Trail Construction of 3,150 Linear Feet (LF) of 8 Brevard $53,600 $13,400 $67,000

six-foot wide natural surface trail.

FL 2017 Rail-Trail Greenway Rail-Trail Greenway Construction of 2,200 LF (+/- 10%) multi-use 8 Indian River $200,000 $200,000 $400,000

trail to include 12' wide hardened surface

accessible pedestrian trail and 12' wide

natural surface equestrian trail; Purchase and

installation of signage & crossing markers

and 1 bridge over a canal;...

FL 2018 Sandspur Road Trail Sandspur Road Trail 10' wide concrete shared use path 8 Orange $200,000 $200,000 $400,000

FL 2018 DeSoto Park Multi-Use DeSoto Park Multi-Use Concrete trail, exercise equipment, info kiosk, 8 Brevard $120,000 $80,000 $200,000

Recreational Trail Recreational Trail trash cans and benches, dirt replacement,

additional ADA park spaces

FL 2018 West Orange Trail West Orange Trail Plant Bridge demolition, fill and paving 8 Orange $92,059 $92,059 $184,118

Street Bridge

FL 1997 Peg Horn Slough Peg Horn Slough Construction of soft surface trail. 9 Osceola $50,000 $50,000 $100,000

FL 1998 Lake Chautauqua Trail Lake Chautauqua Trail Construction of multi-use hard surface trail. 9 Pinellas $50,000 $50,000 $100,000

FL 2004 Oldsmar Park Connection Oldsmar Park Connection Hard surface trail, boardwalk and related 9 Pinellas $64,296 $50,000 $114,296

Trail Trail support facilities

FL 2004 James Grey Preserve James Grey Preserve Firm surface hiking and bicycling trail and 9 Pasco $114,000 $100,000 $214,000

related support facilities

FL 2006 East West Trail East West Trail Renovation Renovation of Multiple use trail, restrooms 9 Pinellas $199,869 $200,000 $399,869

and related support facilities

FL 2007 Oldsmar Park Connection Oldsmar Park Connection Construction of hard surface trail, boardwalk 9 Pinellas $100,000 $100,000 $200,000

Trail Trail and related support facilities

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

FL 2007 Kapok Spur Trail Kapok Spur Trail Hard surface trail and related support 9 Pinellas $40,000 $40,000 $80,000

facilities

FL 2008 Cypress Forest Park Trail Cypress Forest Park Trail I Construct multi-use trails and related support 9 Pinellas $195,401 $250,000 $445,401

facilities

FL 2015 Shingle Creek Regional Trail Shingle Creek Trail Construction of 2,100 Linear Feet (LF) of 9 Osceola $200,000 $100,000 $300,000

10-foot wide asphalt trail.

Grand $34,973,218 $29,145,232 $64,118,450

Totals

(all results)