Search Results Recreational Trails Program Project Database
Your search for projects in State: FL, Total Results : 260
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 1993 Milton Trails ADA Trail Build ADA Boardwalk 1 Santa Rosa $26,304 $25,000 $51,304
FL 1997 Sweetwater Creek Sweetwater Creek Construction of ADA boardwalk. 1 Santa Rosa $14,000 $14,000 $28,000
Boardwalk Boardwalk Phase 2
FL 2007 Bone Creek Loop Trail Bone Creek Loop Trail Renovation of boardwalk and related support 1 Okaloosa $24,000 $16,000 $40,000
Boardwalk facilities
FL 2010 Whiting Field OHV Trails Whiting Field OHV Trail Construct two trailheads, with kiosks, parking 1 Santa Rosa $307,199 $76,780 $383,979
System areas, signs safety/control fencing; one
trailhead to include restroom; construct thirty
(30) miles OHV trail; and related support
facilities.
FL 2011 Southwest Greenway, Jones Southwest Greenway, Jones Construct 0.5 miles, 10 foot wide, natural 1 Escambia $200,000 $200,000 $400,000
Swamp Trail Swamp Trail Ext 3 surface hiking trail, 0.5 miles boardwalk, one
trailhead with parking, educational signs;
renovate - 1 mile, 12 foot wide natural
surface hiking trail; related support facilities.
FL 2012 Bagdad Mill Trail Bagdad Mill Trail Construct 2,239 linear feet asphalt loop trail; 1 Santa Rosa $33,460 $33,460 $66,920
931 linear feet, 12 foot wide asphalt trail
connectors, 12 ft. wide asphalt trail, benches,
water fountain, trash receptacles, bike racks,
and related support facilities
FL 2012 Bear Lake Loop Trail Bear Lake Loop Trail Removing 19 existing planks (footwalks) and 1 Santa Rosa $30,000 $20,000 $50,000
replacing with fixed piling boardwalks and
rocked crossings over wetland areas.
FL 2014 Bud and Dorie Day Patriot's Bud and Dorie Day Patriot's Bud and Dorie Day Patriot's Trail 1 Okaloosa $88,000 $22,000 $110,000
Trail Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2017 Freeport Walk Bike Trail Freeport Walk Bike Trail Construction of 6' x 200 LF (+/- 10%) 1 Walton $157,350 $39,530 $196,880
boardwalk; Purchase and installation of
outdoors U.A. workout equip.; Construction of
1/4 mile (+/- 10%) loop wheelchair trail,
pavilion, sidewalk, sensory stations.
FL 2018 Southwest Greenway Trail Southwest Greenway Trail Trailhead parking and signage; benches, bike 1 Escambia $175,000 $175,000 $350,000
5th Extension rack, bridge; natural surface trail with stream
crossings; access trail; 2 warm up stations;
trail signs; information kiosk.
FL 2018 Choctawhatchee Paddle Choctawhatchee Paddle Kayak launch, screened in shelters, canoe 1 Walton $116,610 $23,322 $139,932
Trail- River Road Trail- River Road racks, restrooms, pavilion, boat ramp,
Commanders Landing Commanders Landing educational kiosk
FL 2010 Lake Chautauqua Trails Lake Chautauqua Trails Construct 2.3 mile, 8 foot wide, pulverized 10 Pinellas $200,000 $200,000 $400,000
shell trail, a parking facility, signage, and
other amenities - design, permitting, clearing,
grubbing, installation.
FL 2017 West Lake Wetlands West Lake Wetlands Construction of 8' x 1800 LF (+/- 10%) 10 Lake $200,000 $200,000 $400,000
multi-surface trail to include boardwalks over
wetland areas; purchase and installation of
interpretive signage.
FL 2017 Kit Land Nelson Park Kit Land Nelson Park Construction 10' X 2,900 LF (+/- 10%) 10 Orange $120,000 $80,000 $200,000
concrete fitness trail; Purchase and
installation of landscaping and additional
lighting.
FL 1993 Marshall Swamp Trailhead Marshall Swamp Trailhead Construct Parking Lot, Signs, Restrooms 11 Marion $25,000 $25,000 $50,000
Construction
FL 1993 Withlacoochee State Forest Public Information Facilities, Install Signage, Brochures 11 Citrus, Hernando, $7,524 $10,000 $17,524
Trails Sign Program Sumter
FL 1997 McKay Bay Trail McKay Bay Trail - Bike Construction of hard surface trail. 11 Hillsborough $50,000 $50,000 $100,000
Connector
FL 1997 Trout Creek Trout Creek Bridge Construction of bridge. 11 Hillsborough $12,000 $12,000 $24,000
FL 2001 Gadsden Park Trail Gadsen Park Trail Construction asphalt trail & support facilities 11 HillsBorough $80,000 $80,000 $160,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2002 Blake Trail Blake Trail Southern Hard surface multi-use trail and related 11 Hillsborough $100,000 $100,000 $200,000
Extension support facilities
FL 2004 Riviera Dunes Trail Riviera Dunes Trail Hard surface trail and related support 11 Manatee $114,296 $100,000 $214,296
facilities
FL 2009 Norma Lloyd Multi-Use Trail Norma Lloyd Multi-Use Trail Construct hard surface multi-use trail with 11 Manatee $127,124 $250,000 $377,124
bridge and related support facilities
FL 2012 Floral City Withlacoochee Floral City Trailside Facilities Construct restroom facility, drinking fountains 11 Citrus $79,120 $19,780 $98,900
State Trail and sign
FL 2012 Mill Creek Crossing Mill Creek Crossing Construct 435 linear feet, 8 foot wide 11 Sumter $200,000 $50,000 $250,000
boardwalk, 4 interpretive signs; renovate 4
wayfinding signs and related support facilities
FL 2016 Ocala National Forest OHV Ocala NF OHV Trail Trail trimming- tread and height; Purchase of 11 Marion $255,000 $51,000 $306,000
Trails Maintenance PPE, signs, stickers, and trail maintenance
equipment. Trail maintenance; 2 years of
intern salaries.
FL 2017 Pineridge-Meadowcrest Trail Pineridge-Meadowcrest Trail Design, permitting and construction of 11 Citrus $150,000 $150,000 $300,000
Trailhead facilities to include, restrooms, bike
rack, signage, landscaping, and parking lot
FL 2018 Wetland Groundwater Wetland Groundwater 2.5 mile asphalt trail, trail signs and maps, 11 Marion $200,000 $50,000 $250,000
Recharge Park Recharge Park accessible picnic table, trash receptacles
FL 2002 Lake Myrtle Trail Lake Myrtle Trailhead Trailhead and related support facilities 12 Polk $75,000 $50,000 $125,000
FL 2004 Fort Fraser Trail Fort Fraser Trail Hard surface trail and related support 12 Polk $114,296 $100,000 $214,296
facilities
FL 2006 Chain of Lakes Trail Chain of Lakes Trail Paved multi-use trail, trailhead, and related 12 Polk $200,000 $200,000 $400,000
support facilities
FL 2007 Lake Wales Rails-to-Trails Lake Wales Rails-to-Trails Multi-Use hard surface trail and related 12 Polk $153,691 $133,000 $286,691
support facilities
FL 2010 Snowden Park Recreational Snowden Park Recreational Construct 3,000 linear feet, 12 foot wide 12 Hillsborough $125,000 $125,000 $250,000
Trail Trail concrete trail; and related support facilities.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2011 Mobbly Bayou Wilderness Mobbly Bayou Wilderness Construct 5,000 linear feet, 12 foot wide 12 Pinellas $100,000 $100,000 $200,000
Preserve Preserve Phase 2 crushed shell multi-use trail; 160 linear feet
composite decking, 20 linear feet, 10 foot
wide boardwalks; fitness equipment; related
support facilities.
FL 2016 James E. Grey Preserve James E. Grey Preserve Construction of parking lot, hard surface 12 Pasco $200,000 $285,000 $485,000
Urban Trail Connector Urban Trail Connector bicycle trail, walking trails, walking bridge,
signage, trail connections, and improvements
for bicycles to Phase III upper trail
FL 2017 James E. Grey Preserve James E. Grey Preserve Construction of 8' x 898 LF (+/- 10%) 12 Pasco $200,000 $200,000 $400,000
boardwalk
FL 2018 Shingle Creek Shingle Creek Trailside facilities 12 Osceola $200,000 $50,000 $250,000
FL 2014 Osgood Point Trail Osgood Point Trail Osgood Point Trail Connector 12, 13 Pinellas $200,000 $399,390 $599,390
Connector
FL 1997 Emerson Point Conservation Emerson Point Conservation Construction of hard surface trail. 13 Manatee $32,269 $50,000 $82,269
Trail Trail
FL 1997 Cedar Creek Trail Cedar Creek Trail Construction of soft surface trail and bridge. 13 Pinellas $20,100 $20,100 $40,200
Improvements
FL 1998 Terra Ceia Bay Trail Terra Ceia Bay Trail Construction of firm surface trail and 13 Manatee $49,000 $49,000 $98,000
boardwalk.
FL 2001 Venetian Waterway Park Venetian Waterway Park Construction hard surface & facilities 13 Sarasota $12,872 $18,380 $31,252
FL 2001 Venetian Waterway Park Segment 2c, Venetian Construction hard surface & facilities 13 Sarasota $11,936 $18,360 $30,296
Waterway Park
FL 2001 Palmetto Recreational Trail Recreational Trail, Hydrant Construction hard surface trail & facilities 13 Manatee $37,750 $9,500 $47,250
to Hidden Lake Park
FL 2001 Eighth Street Linear Park Eighth Street Linear Park Construction hard surface trail & facilities 13 Sarasota $45,236 $80,000 $125,236
and Recreational Trail and Recreational Trail
FL 2002 North Metro Multi-Use Trail North Metro Multi-Use Trail Hard surface multi-use trail and related 13 Sarasota $60,000 $40,000 $100,000
support facilities
FL 2004 Hardee Lakes Parks and Hardee Lakes Parks and Soft surface trails and related support 13 Hardee $80,000 $20,000 $100,000
Trails Trails facilities
FL 2006 Palmetto Recreational Trail Recreational Trail Extension Paved multi-use trail and related support 13 Manatee $200,000 $200,000 $400,000
facilities
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2008 Hydrant Trailhead Hydrant Trailhead Renovate trailhead, construct trail linkage, 13 Manatee $10,119 $15,000 $25,119
Enhancement install fitness stations along multi-use trail,
and related support facilities
FL 2009 Oyster Creek Waterfront Oyster Creek Waterfront Construct natural surface trail and boardwalk 13 Charlotte $68,495 $100,000 $168,495
Trail Trail and related support facilities
FL 2011 Lake Belleview Trail Lake Belleview Trail Construct 5,262 linear feet, 12 foot wide 13 Pinellas $200,000 $200,000 $400,000
paved multi-use trail; related support
facilities.
FL 2013 Fred Marquis Pinellas Trail Fred Marquis Pinellas Trail 0.5 mile trail renovation 13 Pinellas $75,000 $355,000 $430,000
FL 2015 Ream Wilson Trail Ream Wilson Trail Bridge Maintenance and restoration of existing trail 13 Pinellas $104,637 $104,638 $209,275
by replacing the existing six-foot wide bridge
with a twelve-foot wide bridge.
FL 2018 Crews Park, Parks at Peace Crews Park, Parks at Peace Drainage, kayak rack & pad, asphalt and 13 Hardee $143,247 $28,649 $171,896
River River Phase I pavers, signage, fishing dock, lighting,
irrigation, bridge
FL 1998 Hickey Creek Interpretative Hickey Creek Interpretative Construction of soft surface trail. 14 Lee $50,000 $50,000 $100,000
Trail Trail
FL 2001 Glover's Blight Trail Glover Bight Trail (Phase I) Construction hard surface trail & facilities 14 Lee $80,000 $20,000 $100,000
FL 2004 Caloosahatchee Creeks Caloosahatchee Creeks Paddling trail, trailhead, and related support 14 Lee $114,296 $100,000 $214,296
Trails Trails facilities
FL 2013 Orange River Trail Orange River Trailhead Loop w/paddling launch and amenities 14 Lee $49,630 $12,407 $62,037
FL 1998 Turkey Creek Boardwalk Turkey Creek Boardwalk Construction of Boardwalk Trail 15 Brevard $10,000 $10,000 $20,000
FL 2001 Sports Park Multi-Use Sports Park Multi-Use Construction hard surface trail & facilities 15 Brevard $65,194 $53,334 $118,528
Recreational Trail Recreational Trail
FL 2002 Boundary Canal Trail Boundary Canal Trail Hard surface multi-use trail and related 15 Brevard $100,000 $50,000 $150,000
support facilities
FL 2004 Boundary Canal Trail Boundary Canal Trail - Multi-Use trails and related support facilities 15 Brevard $72,812 $67,000 $139,812
Phase II
FL 2009 Trans-Florida Railroad Trail Trans-Florida Railroad Trail Construct hard surface multi-use trail and 15 Indian River $207,157 $49,700 $256,857
related support facilities
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2011 Polk County OHV Trails Polk County Off-Highway Construct OHV system for ATVs and Dirt 15 Polk $1,351,372 $337,843 $1,689,215
Bikes to include trailhead with restrooms,
access trails, collector trails, riding trails
appropriate to terrain.
FL 2013 Fellsmere Preserve Rail-Trail Fellsmere Preserve Rail-Trail 12' wide ADA compliant trail 15 Indian River $74,960 $18,700 $93,660
Improvements
FL 2013 Shingle Creek Regional Trail Shingle Creek Regional Trail 18 signage locations 15 Osceola $66,654 $16,664 $83,318
FL 2001 Apoxee Wilderness Preserve Apoxee Wilderness Preserve Construction soft surface & facilities 16 Palm Beach $80,000 $80,000 $160,000
Recreational Trail Recreational Trail
FL 2002 Fairlane Farms Trail Fairlane Farms Trail Hard surface multi-use trail and related 16 Palm Beach $85,000 $85,000 $170,000
support facilities
FL 2002 Apoxee Wilderness Trails Apoxee Wilderness - Phase Natural surface trail and related support 16 Palm Beach $100,000 $100,000 $200,000
II facilities
FL 2004 Wildcat Cove Trail Wildcat Cove Trail Boardwalk, overlooks, paddling trailhead, and 16 St. Lucie $22,500 $22,500 $45,000
related support facilities
FL 2004 Fort Center Trail Fort Center Trail Firm surface trail and related support facilities 16 Glades $80,000 $20,000 $100,000
FL 2007 Apoxee Preserve Bike/Hike Apoxee Preserve Bike/Hike Natural surface trail, renovation of firm 16 Palm Beach $200,000 $50,000 $250,000
Trail Trail, Phase 3 surface trail, signage and related support
facilities
FL 2011 Neal Preserve Trail Neal Preserve Trail Construct 735 linear feet, 10 feet wide 16 Manatee $200,000 $200,000 $400,000
boardwalk, 350 linear feet, 8 feet wide
boardwalk, benches and related support
facilities.
FL 2012 Legacy Park Legacy Park Construct one-half mile, 12 ft. wide concrete 16 Sarasota $200,000 $200,000 $400,000
trail and restroom
FL 2012 Dundee Parks Connector Dundee Parks Connector Construct 1 mile, 10 foot wide asphalt trail, 17 Polk $153,400 $153,400 $306,800
Trail Trail lighting, landscaping, irrigation, drinking
fountain, benches, garbage cans, puppy
stations, etc.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2012 Lake Wales Trail Lake Wales Trail Construct trail entrance, 5 exercise stations; 17 Polk $160,000 $40,000 $200,000
renovate 2.5 miles asphalt trail, expand
trailhead parking lot to include additional
accessible parking, and related support
facilities
FL 2014 Okee-Tantie Park Okee-Tantie Park Okee-Tantie Park 17 Okeechobee $200,000 $200,000 $400,000
FL 2015 Bone Valley ATV Trail Bone Valley ATV Trail Construction of OHV facilities including 11 17 Polk $300,000 $75,000 $375,000
Crossing eight-foot wide connector trails, a riding area
with challenges, a timed trials course, a
scramble area and a parking area.
FL 2016 Harbor Walk Harbor Walk Phase 1B Construction of 9,321 square feet of 17 Charlotte $200,000 $2,783,855 $2,983,855
boardwalk and 3,970 linear feet of concrete
pilings; (2) U-bridges and safety lighting
FL 2017 West Terry Street Path West Terry Street Path Design, permitting and construction of 12' 17 Lee $200,000 $780,650 $980,650
X1.25 mile (+/- 10%) asphalt multi-use path
FL 2017 Panther Point Trail Panther Point Trail Construction of 12' x 3.5 miles (+/- 10%) 17 Polk $200,000 $330,000 $530,000
Development Development crushed rock trail; Purchase and installation
of 4' grass on each side of trail.
FL 2017 Ortona Indian Mound Trail Ortona Indian Mound Trail Purchase and installation of 10 interpretive 17 Glades $50,000 $40,600 $90,600
Rehabilitation and kiosks; Renovation/replacement of (2) 360
Enhancement sq. ft. bridges; Replace 6' x 270 LF (+/- 10%)
boardwalk with 2,340 sq. ft. (+/- 10%)
lumberock.
FL 2018 Downtown Lake Wales Trail Downtown Lake Wales Trail 3,410 ft concrete trail 17 Polk $200,000 $200,000 $400,000
FL 2014 Bowman's Beach Trail Bowman's Beach Trail Bowman's Beach Trail 17, 19 Lee $200,000 $200,000 $400,000
FL 1997 Mangrove Boardwalk Trail Mangrove Boardwalk Trail Construction of boardwalk 18 Dade $50,000 $50,000 $100,000
FL 2008 Coco Plumn Recreational Coco Plum Trail Upgrade Construct new and renovate multi-use trails, 18 Monroe $203,115 $207,500 $410,615
Trail and related support facilities
FL 2011 Queens Island Preserve Queens Island Preserve Trail Construct 2,600 linear feet, 8 foot wide 18 St. Lucie $28,000 $7,000 $35,000
Trails System natural surface trail with 4 wood boardwalk
crossings and 2 trail benches; related support
facilities.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2013 Coco Plum Recreational Coco Plum Rec Trail - Phase 8' paved trail w/crosswalks, safety signs, 2 18 Monroe $64,000 $16,000 $80,000
Trail 3 rest areas
FL 2017 Jones Creek Preserve Open Space at Jones Creek Purchase and installation of new kayak 18 Palm Beach $101,700 $101,700 $203,400
Preserve launch and kayak rack, 10 benches, covered
picnic area with picnic table, bike rack, water
fountain, trash cans, path to launch.
Construction of pervious access drive,
parking area with 7 spaces, 5 standard, 1...
FL 2018 Marine Stadium Basin Trail Marine Stadium Basin Trail 770'paved extension, renovate existing trail 18 Dade, Miami $200,000 $200,000 $400,000
At Virginia Key At Virginia Key asphalt
FL 2014 DuPuis Trail DuPuis Trailhead DuPuis Trailhead Improvement 18, 20, 21, 22 Palm Beach, Martin $44,000 $11,118 $55,118
Improvement
FL 2014 Community Park Trail Community Park Trail Community Park Trail 18, 20, 21, 22 Palm Beach $200,000 $200,000 $400,000
FL 2014 Commons Park Trail Commons Park Trail Commons Park Trail 18, 20, 21, 22 Palm Beach $200,000 $200,000 $400,000
FL 2001 Parkland Trails Connecting and Enhancing Construction hard surface trail & facilities 19 Broward $63,300 $53,340 $116,640
Trail Ways
FL 2006 Long Pine Greenway Long Pine Greenway Concrete trail and related support facilities 19 Broward $42,090 $79,386 $121,476
FL 2008 Equestrian Estates Trails Equestrian Estates Trails Construct hiking trails and related support 19 Broward $95,145 $250,000 $345,145
facilities
FL 2009 Hilton Road Greenway Hilton Road Greenway Construct hard surface multi-use trail and 19 Broward $25,593 $79,350 $104,943
related support facilities
FL 2010 Saw Palmetto Trail Saw Palmetto Trail Construct 9,800 sf - 5' wide concrete path, 19 Broward $92,250 $92,250 $184,500
130 lf 5' aluminum path, 3 interpretive signs,
3 benches, 2 bike racks, 1 trash receptacle, 1
trailhead informational kiosk, 1,500 sy asphalt
trailhead entrance, 5,000 sf bahia sod (2' on
either side of...
FL 2011 Bonita Trail Bonita Trail Phase I Construct 1,700 linear feet, multi-use natural 19 Lee $160,000 $40,000 $200,000
surface trail and boardwalks; related support
facilities.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2011 Admiral Lehigh Trailhead Admiral Lehigh Trailhead Construct 0.5 miles, 12 foot wide, paved 19 Lee $14,212 $126,324 $140,536
multi-use trail with boardwalk and bridge,
trailhead and trailside amenities to include
parking and restrooms; related support
facilities.
FL 2012 Pond Apple-Shipley Park Pond Apple / Shipley Park Construct 420 linear feet, 8 foot wide, 19 Lee $74,000 $74,000 $148,000
connector boardwalk, and related support
facilities
FL 2017 Gordon River Greenway Gordon River Greenway Design, permitting and construction of 12' X 19 Collier $200,000 $235,000 $435,000
Recreational Bridge And Recreational Bridge And 1,947 LF (+/- 10%) asphalt trail
Boardwalk Boardwalk
FL 1993 Munson Hills Trailside Facilities Trailside facilities with potable water supply 2 Leon $12,881 $20,144 $33,025
FL 1993 Saint Marks Trail Toilet Installation and Trail Install restroom and trail spur 2 Leon $25,000 $25,000 $50,000
Construction
FL 1997 Bear Creek Trails Bear Creek Environmental Construction of hard and soft surface trail. 2 Gadsden $14,320 $14,375 $28,695
Education Trails
FL 1997 Eastern Lake Trail Eastern Lake Trail Construction of soft surface trail. 2 Bay $25,056 $21,909 $46,965
Improvement
FL 2001 Apalachicola National Forest Apalachicola National Forest Purchase Sweco & trail maintenance 2 Leon, Wakulla $100,000 $30,000 $130,000
Motorized Trail Motorized Trail Maint.
FL 2001 Madison County Rail-Trail Madison County Rails to Construction asphalt trail & support facilities 2 Madison $76,873 $20,000 $96,873
Park Trails Park Phase II
FL 2002 Paved Trail Four Freedoms - Phase III Hard surface multi-use trail and related 2 Madison $39,167 $10,890 $50,057
support facilities
FL 2004 East Slough Overlook Trail East Slough Overlook Trail Nature trail, boardwalk and related support 2 Franklin $83,424 $25,000 $108,424
facilities
FL 2004 Sally Ward Bridge Phase Sally Ward Bridge Phase Boardwalk, foot bridge and related support 2 Wakulla $62,296 $12,000 $74,296
One One facilities
FL 2004 Harders Park Walking Trail Harders Park Walking Trail Paved Trail 2 Bay $29,983 $80,000 $109,983
FL 2007 Florida National Scenic Trail Florida Trail Bridge Project Two bridges on the FNST, trail maintenance 2 Bay $76,969 $53,000 $129,969
and related support facilities
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2008 Chattahoochee Nature Trails Chattahoochee Nature Trails Construct hard surface multi-use trail, natural 2 Gadsden $250,000 $63,430 $313,430
surface equestrian trail and related support
facilities
FL 2009 Apalachicola National Forest OHV Projects Construct and improve OHV trailheads, 2 Leon, Wakulla $933,900 $222,780 $1,156,680
Motorized Trail bridge, and related support facilities
FL 2009 Miccosukee Greenway Trail Miccosukee Greenway Trail Construct hardened surface multi-use trail 2 Leon $54,255 $75,000 $129,255
and related support facilities
FL 2010 Miccosukee Greenway Miccosukee Greenway - Renovate 3.75-4.0 miles, 12 foot wide 2 Leon $17,465 $250,000 $267,465
Phase 2 multi-use trail, trailhead and related support
facilities.
FL 2010 Chipola Greenway Trails Chipola Greenway Trails Construct two trailheads, with parking; 12,300 2 Jackson $146,208 $36,552 $182,760
linear foot, 10 foot wide multi-use bicycle and
hiking trail; 4,900 linear foot, 6 foot wide
hiking and mountain biking trail; 2,700 linear
foot, 6 foot wide hiking trail; 600 linear foot, 8
foot wide...
FL 2012 Water Street Park Water Street Park Construct Blue Stream Wood Boardwalk 653 2 Jefferson $200,000 $50,000 $250,000
Recreational Trails Recreational Trails LF, 6 ft. wide wood boardwalk, 3 ft. off grade;
410 LF, 6ft wide, wood boardwalk, 12 ft. off
grade; Green Treetop Wood Boardwalk;
1,380 LF, 6 ft. wide natural surface trail; 28
Interpretive Signs; 8...
FL 2013 Lake Talquin Connector Trail Lake Talquin Connector Trail Trail work, water crossing, parking, restrooms 2 Leon $35,032 $10,800 $45,832
w/electric, mounting blocks
FL 2014 Butler National Recreation Butler Trail Extension Butler Trail Extension 2 Jackson $37,750 $37,750 $75,500
Trail
FL 2014 Miccosukee Greenway Miccosukee Greenway, Miccosukee Greenway, Phase 3 2 Leon $200,000 $200,000 $400,000
Phase 3
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2017 Port City Trail Port City Trail Renovation of 1,700 LF (+/- 10%) and 2 Gulf $160,000 $40,000 $200,000
construction of additional 600 LF (+/-10%) of
crushed shell trail; Construction of 600 (+/-
10%) brick paver trail; Construction of 160 LF
(+/- 10%) boardwalk; Renovation of existing
lighting; Purchase and...
FL 2018 Wakulla County Wooly Park Wakulla County Wooly Park Parking area, info kiosk, water fountain, 2 Wakulla $75,000 $75,000 $150,000
and Big Bend Maritime and Big Bend Maritime kayak launch, bicycle rack
Museum Museum
FL 1997 Flamingo Road Trail Flamingo Road Trail Construction of hard and soft surface trail. 20 Broward $50,000 $50,000 $100,000
FL 1998 Hominy Branch Trail Hominy Branch Trail Construction soft surface trail. 20 Flagler $30,127 $39,375 $69,502
FL 2002 Central City Linear Trail Central City Linear Trail Hard surface multi-use trail and related 20 Broward $100,000 $100,000 $200,000
support facilities
FL 2004 C-11 Canal Recreational C-11 Canal Recreational Trail renovation and related support facilities 20 Broward $83,104 $20,000 $103,104
Trail Trail
FL 2007 MURT System Trailhead MURT System Trailhead Trailhead and related support facilities 20 Broward $131,224 $32,910 $164,134
FL 2007 C-11 Canal Recreational C-11 Recreational Trail Construction and renovation of firm surface 20 Broward $45,710 $14,174 $59,884
Trail Phase 2 trail and related support facilities
FL 2009 Plantation Cultural Trail Plantation Cultural Trail Construct hard surface multi-use trail and 20 Broward $40,487 $12,656 $53,143
related support facilities
FL 2010 Mainlands Recreational Trail Mainlands Recreational Trail Construct 7,000 linear feet, 12 foot wide, hard 20 Broward $248,998 $248,998 $497,996
surface walking trail with fitness equipment,
related support facilities.
FL 2012 Welleby Park Trail Welleby Park Trail Renovate 1.2 miles of trail 20 Broward $200,000 $200,000 $400,000
Renovation
FL 2013 Fishing Hole Trail Fishing Hole Trailhead 1 trailhead facility with restrooms and 1 20 Broward $34,027 $34,027 $68,054
multi-purpose trail
FL 2017 Community Center Fitness Community Center Fitness Construction of 10' x 2500 LF (+/- 10%) multi 20 Palm Beach $200,000 $50,000 $250,000
Trail Trail use paved fitness trail; purchase and
installation of 4 fitness stations; Construction
of accessible parking lot; Construction of trail
connector to adjacent Delacort Park
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2018 Lakeside Park Trail Lakeside Park Trail 8 Benches, 8 trash cans, signage, and 2,000 20 Palm Beach $200,000 $50,000 $250,000
lf. asphalt trail
FL 2018 Hypoluxo Scrub Trailhead Hypoluxo Scrub Trailhead Resurface parking and access drives with 20 Palm Beach $200,000 $50,000 $250,000
concrete
FL 1997 Wellington Urban Trail Wellington Urban Trail Construction of hard surface bicycle trail. 21 Palm Beach $35,500 $35,500 $71,000
Linkage
FL 1997 Westland Park Trail Westland Park Trail Construction of firm surface trail. 21 Dade $50,000 $50,000 $100,000
FL 2011 Sabal Pines Greenway Sabal Pines Greenway Construct 1,800 linear feet, 12 foot wide, 21 Broward $113,325 $113,325 $226,650
concrete trail; one trailhead feature; related
support facilities.
FL 2015 Community Park Trail Community Park Trail Construction of 2,500 Linear Feet (LF) of 21 Palm Beach $200,000 $50,000 $250,000
eight-foot wide concrete trail, four fitness
stations, and two shade structures.
FL 2015 Brown Trail Brown Trail Connector Construction of 1,000 Linear Feet (LF) of 21 Palm Beach $200,000 $200,000 $400,000
eight-foot wide natural surface equestrian trail
and concrete bridge over a canal.
FL 2017 Dog Park Trail Dog Park Trail Construction of 2,000 LF (+/-10%) paved 21 Palm Beach $200,000 $140,000 $340,000
accessible fitness trail and 4 fitness stations;
Construction of soft surface trail connection
to adjacent bridle trails; Construction of new 8
acre equestrian riding and staging area.
FL 2017 Winston Park Nature Center Winston Park Nature Center Construction of 1,650 LF (+/- 10%), 21 Broward $100,000 $100,000 $200,000
Greenway Trail Greenway Trail multi-surface path and accessible ramp
connecting to existing elevated boardwalk.;
purchase and installation of 2 benches,
pergola, informational signage.
FL 2017 Terramar Park Trails Terramar Park Trails Construction of 6-8' x 1,500 LF (+/- 10%) 21 Broward $200,000 $50,000 $250,000
paved multi-use trail; Renovation of 6-8' x
3000 LF (+/- 10%) paved multi-use trail.
FL 2018 Peacefull Waters Boardwalk Peacefull Waters Boardwalk 1,200 LF x 8' wide wooden boardwalk 21 Palm Beach $200,000 $200,000 $400,000
FL 1997 Constitution Park Arboretum Constitution Park Arboretum Construction of hard surface trail. 22 Broward $25,000 $25,000 $50,000
Trail Trail
FL 1998 Spacer Walk of Fame Space Walk of Fame - IV Construction of hard surface trail. 22 Broward $50,000 $50,000 $100,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 1998 Radice Park Jogging Trail Radice Park Jogging Trail Construction of hard surface trail. 22 Broward $25,000 $25,000 $50,000
FL 2007 Anchorage Park Trails Anchorage Park Multi-use hard surface trail, renovation of 22 Palm Beach $199,944 $200,000 $399,944
multi-use hard surface trail and related
support facilities
FL 2009 Riverbend Park Trails Riverbend Park Construct natural surface trails, with archery 22 Palm Beach $240,000 $60,000 $300,000
obstacles, trailhead and related support
facilities
FL 2011 Okeeheelee Park South Okeeheelee Park South Construct 70 linear feet, 12 foot wide 22 Palm Beach $199,500 $50,000 $249,500
Greenway Greenway multi-use paved trail; 7,200 linear feet, 12
foot wide shell rock multi-use trail; 7,200
linear feet, 10 foot wide equestrian trail;
trailhead; paddle launch; renovate - widen
4,560 linear feet paved multi-use...
FL 2015 Royal Palm Natural Area Royal Palm Natural Area Construction of 1,800 Linear Feet of 22 Broward $200,000 $50,000 $250,000
eight-foot wide natural surface trail with
wooden boardwalk, installation of six signs.
FL 2015 Intracoastal Park Trail Intracoastal Park Trailhead Construction of a paddling trail facilities 22 Palm Beach $28,500 $28,500 $57,000
including: a floating dock, a gangway, a
launch, transfer bench, signage, native
vegetative buffer, and related support
facilities.
FL 2018 Margate Blueway Margate Blueway Install 2 ADA kayak launch facilities, info 22 Broward $200,000 $50,000 $250,000
signs
FL 2018 Royal Palm Beach Pines Royal Palm Beach Pines 545' trail connector, shelter w/bench, gate, 22 Palm Beach $168,875 $162,875 $331,750
Trail Trail kiosk, renovate trail, boardwalk, parking lots,
shelter and accessibility signage and swing
bench
FL 2001 Tivoli Sand Pine Preserve Tivoli Sand Pine Preserve Construction hard surface & facilities 23 Broward $8,000 $80,000 $88,000
Trail Trail
FL 2008 Grassy Waters Trails Grassy Waters Trails - Construct multi-use trails and related support 23 Palm Beach $250,000 $62,500 $312,500
Phase 1 facilities
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2017 Long Key South Trail Long Key South Trail Design, permitting and construction of 6' X 23 Broward $122,790 $81,860 $204,650
1,830 LF (+/-10%) concrete path; 6' X 1,110
LF (+/-10%) mulch trail; purchase and
installation of 24' hexagonal shelter with slab;
renovation of concrete train platform;
purchase and installation of 3...
FL 2014 West Sports Complex West Sports Complex West Sports Complex Development 23, 24, 25 Broward $200,000 $200,000 $400,000
FL 2014 Johnnie McKeithen Trail Johnnie McKeithen Trail Johnnie McKeithen Trail 23, 24, 25 Broward $50,000 $100,000 $150,000
FL 2014 Snyder Park Bike Trail Snyder Park Bike Trail Snyder Park Bike Trail 23, 24, 25 Broward $200,000 $40,000 $240,000
FL 2014 Pine Trail Park Trail Pine Trail Park Trail Pine Trail Park Trail 23, 24, 25 Broward $200,000 $200,000 $400,000
FL 2014 Shotgun Road Trail Shotgun Road Trail Shotgun Road Trail 23, 24, 25 Broward $200,000 $846,073 $1,046,073
FL 2015 Hugh Taylor Birch State Park Hugh Taylor Birch State Park Construction of 8' wide multi-use trail 23, 24, 25 Broward $192,600 $192,600 $385,200
Recreational Trail Recreational Trail including 1,920 Linear Feet (LF) asphalt and
1,800 LF concrete, a bridge, benches,
educational kiosks, safety fencing and related
support facilities.
FL 1997 Spacer Walk of Fame Space Walk of Fame Construction of hard surface trail. 24 Brevard $50,000 $50,000 $100,000
FL 2010 ECR Rail-Trail ECR Rail-Trail - Segment 3 Construct 2.7 miles, 12 foot wide, paved 24 Volusia $250,000 $250,000 $500,000
multi-use trail; trailhead with parking; and
related support facilities.
FL 2011 NW 170th Street Greenway NW 170th Street Greenway Construct 2,500 linear feet, 12 foot wide 25 Miami-Dade $77,500 $77,500 $155,000
Phase II paved multi-use trail with benches; related
support facilities.
FL 2014 Middle Beach Corridor Middle Beach Corridor Middle Beach Corridor 25, 26, 27 Miami-Dade $200,000 $200,000 $400,000
FL 2017 Key Tree Cactus Preserve Key Tree Cactus Preserve Design, permitting and construction of 9' x 26 Monroe $200,000 $200,000 $400,000
Boardwalk Boardwalk 576 LF (+/- 10%) boardwalk
FL 2011 Amelia Earhart Park Amelia Earhart Park Construct 3,100 linear feet, 12 foot wide, 27 Miami-Dade $200,000 $200,000 $400,000
Mountain Bike Trail Mountain Bike Trail paved multi-use trail, 1.5 miles natural
surface bike trail, bike wash station; related
support facilities.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2015 Coral Reef Park Trail Coral Reef Park Trail Construction of two pedestrian bridges and 27 Miami-Dade $200,000 $200,000 $400,000
Extension 2,000 Linear Feet (LF) of ten-foot wide hard
surface trail (including asphalt and concrete),
installation of trail signage, installation of sod
adjacent to the trail for stabilization.
FL 1997 Welaka State Forest Environmental Education Construction of hard and soft surface trail. 3 Putnam $12,433 $12,433 $24,866
Trails
FL 1998 Van Zant Park Trails Van Zant Park Trails Construction of equestrian trails. 3 Clay $38,750 $38,750 $77,500
FL 2001 Clear Lake Park Trail Clear Lake Parks Trail Construction hard & soft surface trail & facility 3 Orange $80,000 $80,000 $160,000
FL 2002 Equestrian Trail Equestrian Trail Natural surface trail and related support 3 Duval $100,000 $100,000 $200,000
facilities
FL 2002 Lake Monroe Trail Lake Monroe Trailhead Trailhead and related support facilities 3 Volusia $94,460 $100,000 $194,460
FL 2007 Goldsboro Trail Goldsboro Trail Hard surface trail 3 Seminole $120,766 $200,000 $320,766
FL 2010 S Line Rail-Trail S Line Rail-Trail Phase II Construct 4,300 linear feet, 12 foot wide 3 Duval $182,750 $182,750 $365,500
asphalt paved multi-use trail
FL 2013 Coastline Park Trail Coastline Park Trailhead 1,500 linear feet of 10 foot wide asphalt 3 Seminole $75,000 $75,000 $150,000
FL 2013 Ocala National Forest OHV Ocala National Forest OHV Corral, signage, fencing, kiosks, maintenance 3 Marion $471,300 $241,427 $712,727
Trail Trail Maintenance interns, spec replacement
FL 2014 Buie Park Trail Buie Park Trail Buie Park Trail 3 Levy $160,000 $32,000 $192,000
FL 2015 Tanglewylde Nature Park Tanglewylde Nature Park PH Construction of 1,320 Linear Feet (LF) of 3 Putnam $200,000 $48,000 $248,000
2 eight-foot wide crushed stone trail and
installation of signage.
FL 2009 Ocala National Forest OHV Phase 2 Construct and improve OHV trailheads, 3, 11 Marion, Lake, $933,900 $222,780 $1,156,680
Motorized Trails corrals, and related support facilities Putnam
FL 2014 St. Johns River Trail St. Johns River Trail St. Johns River Trail 2 3, 4, 5 Clay $98,500 $98,500 $197,000
FL 2018 COKH Rails-to-Trails COKH Rails-to-Trails Concrete trail connecting to parking lot, bike 3, 4, 5 Clay $108,500 $186,500 $295,000
Trailhead Trailhead racks and repair station, air pump, signage,
picnic tables, restrooms, and playground
FL 2013 Ed Gustafson Park Trails Ed Gustafson Park Trails Trail stabilization w /4 exercise stations, 6 36 Clay $45,000 $30,000 $75,000
interpretive signs
FL 2002 Matanzas Waterway Park Matanzas Waterway Park Natural surface trail, trailhead and related 4 St. Johns $100,000 $100,000 $200,000
support facilities
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2007 St. Mary's Shoals Park St. Mary's Shoals Park ATV recreational trail system, trail head and 4 Baker $518,421 $130,511 $648,932
related support facilities
FL 2008 St. Mary's Shoals Park St. Mary's Shoals - Phase 2 Construct ATV trail system, trailhead, and 4 Baker $500,000 $125,000 $625,000
related support facilities
FL 2009 LHTP Canopy Walkway Trail LHTP Canopy Walkway Trail Construct and renovate natural surface and 4 Leon $250,000 $250,000 $500,000
boardwalk trails and related support facilities
FL 2013 St. Mary's Shoals Park St. Mary's Shoals Park - 15 miles maintenance, 40 hrs./month 2 years, 4 Baker $173,280 $43,320 $216,600
Phase 3 mowing, small dozer, 20 hrs./month motor
grader, large dozer
FL 2013 Four Freedoms Trailhead Four Freedoms Trailhead Handicap accessible restroom 4 Madison $11,959 $11,959 $23,918
FL 2014 St. Mary's Shoals Park Trails St. Mary's Shoals Park St. Mary's Shoals Park 4 Baker $49,165 $12,900 $62,065
FL 2016 Wiggins Campground OHV Wiggins Campground OHV Campground improvements at existing OHV 4 Columbia $308,287 $77,072 $385,359
Upgrade Upgrade facility to include eight campsites, two parking
areas, corral system leading to the trail, one
double vault toilet. Upgrades to existing trail.
FL 2017 Jarboe Park Trail Jarboe Park Trail Construction of 10' x 1050 LF (+/- 10%) 4 Duval $160,000 $40,000 $200,000
asphalt trail; Purchase and installation of
bridge; Construction of new kiosk and
restroom facilities.
FL 2018 Jarboe Park Trail Jarboe Park Trail Phase II 1,000 ft trail,2 bridges, 2 fitness stations 4 Duval $200,000 $50,000 $250,000
FL 2018 Westside Regional Park Trail Westside Regional Park Trail Blazing trail, driveway, restroom, well, access 4 Naussau $153,990 $30,798 $184,788
System System road, ADA parking
FL 2014 Lonnie Miller Park Trail Lonnie Miller Park Trail Lonnie Miller Park Trail 4, 5 Duval $200,000 $200,000 $400,000
FL 1993 Croom Trailhead Croom Trailhead Parking, Trailhead Improvement 5 Hernando $21,677 $27,608 $49,285
Improvements
FL 1993 Croom Trailhead Croom Trailhead Signage, Entrance 5 Hernando $4,185 $5,000 $9,185
Improvements
FL 1993 Croom Trailhead Croom Install Fencing Install Fence 5 Hernando $15,654 $20,000 $35,654
FL 1997 Croom Trailhead Croom Area #2 Trailhead improvements. 5 Hernando $22,000 $22,000 $44,000
FL 1997 Croom Trailhead Croom Area #1 Trailhead improvements. 5 Hernando $25,000 $25,000 $50,000
FL 2001 Crystal River Crosstown Trail Crystal River Cross-Town Construction asphalt trail & support facilities 5 Citrus $63,035 $63,035 $126,070
and Bicycle Path Trail & Bicycle Path
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2011 Florahome Trailhead Florahome Trailhead Construct trailhead to include restroom, 5 Putnam $65,600 $16,400 $82,000
parking, trail access spur, benches, kiosk,
bike rack; related support facilities.
FL 2012 Paynes Prairie Park Trails Paynes Prairie Park Trails Construct 3.1 miles, 12 foot wide hard 5 Alachua $200,000 $200,000 $400,000
surface trail, two rest area, 338 linear feet, 5
to 6 foot wide entry trail, 1,928 linear feet, 6
foot wide entry boardwalk, and related
support facilities
FL 2017 Silver Lake OHV Trailhead Silver Lake OHV Trailhead Renovation of OHV trailhead & parking; 5 Leon $427,500 $103,700 $531,200
Reconstruction Reconstruction renovation of overflow lot and entrance road;
construct restroom and exterior shower;
enclose existing maintenance equipment
storage shed; purchase and install
informational signage and garbage cans.
FL 2017 Monticello Ecological Park Monticello Ecological Park Construction of 1,200 Sq.Ft. (+/- 10%) 5 Jefferson $180,000 $45,000 $225,000
covered pavilion with tables and grills;
Purchase and installation of prefabricated
comfort station with a men's and women's
restroom.
FL 2017 St. Hebron Park Walk and St. Hebron Park Walk and Construction of 10' X 1 mile (+/- 10%) paved 5 Gadsden $200,000 $200,000 $400,000
Bike Trail Bike Trail multi use trail to include wooden boardwalk
and footbridge over wetland areas; Trailhead
kiosk with informational signage, parking,
composting restroom facilities, solar powered
security lighting.
FL 2017 Jax Baldwin Trail Jax Baldwin Trail Construction of 10-12' x 6,400 LF (+/- 10%) 5 Duval $200,000 $200,000 $400,000
Development-Sal Taylor asphalt trail.
Creek Preserve
FL 2014 Crooked River Trail Crooked River Trailhead Crooked River Trailhead 5, 10, 11 Lake $39,190 $39,190 $78,380
FL 2014 Zoo River Walk Zoo River Walk Connector Zoo River Walk Connector 5, 7 Seminole $200,000 $200,000 $400,000
FL 2014 Terwilliger Trail Terwilliger Trail Terwilliger Trail 5, 7 Seminole $200,000 $200,000 $400,000
FL 1993 Holly Hill Bike Trail Bicycle Trail Construction Construct trail with amenities 6 Volusia $26,304 $25,000 $51,304
FL 1998 Trenton Trail Trenton Trailhead Construction of trailhead. 6 Gilchrist $40,000 $40,000 $80,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2001 Camp Milton Historic Camp Milton Historic Construction of Trailhead & support facilities 6 Duval $80,000 $80,000 $160,000
Preserve Preserve
FL 2002 Florida National Scenic Trail Florida National Scenic Trail Hiking trail, trailhead, related support 6 Marion $33,834 $10,000 $43,834
Construction - Ocala facilities, and trail maintenance
FL 2002 Montverde Greenway Trail Montverde Greenway Trail Hard surface multi-use trail and related 6 Lake $68,249 $18,958 $87,207
support facilities
FL 2009 Newberry Archery Trail Newberry Archery Trail Construct natural surface trail, trail head and 6 Alachua $102,180 $240,000 $342,180
related support facilities
FL 2015 Graham Swamp Graham Swamp Construction of a bicycle pump track, a 6 Flagler $64,665 $64,665 $129,330
Improvements restroom, expansion of the parking area,
safety fencing, and paving of the entrance
road.
FL 2018 Clermont Legacy Loop Clermont Legacy Loop 1,500' x 12 ' wide asphalt trail 6, 11, 15 Lake $200,000 $200,000 $400,000
FL 2018 Minneola Trail Renovation Minneola Trail Renovation Bollard lighting, benches, trash cans, 6, 11, 15 Lake $214,800 $143,200 $358,000
signage, pet stations, electric and wi-fi, trail
repaving and landscaping
FL 2001 East Coast Greenway East Coast Greenway Construction hard surface & facilities 7 Volusia $26,801 $100,000 $126,801
Recreational Trail Recreational Trail (Phase III)
FL 2001 Florida National Scenic Trail Florida National Scenic Trail Construction trail bridge & support facilities 7 Seminole $80,000 $80,000 $160,000
Bridge
FL 2002 Oviedo Trail Oviedo Trailhead Trail construction, signage, trailhead, and 7 Seminole $80,000 $20,000 $100,000
related support facilities
FL 2006 Spring to Spring Trail Spring to Spring Trail-Phase Paved multi-use trail and related support 7 Volusia $148,330 $200,000 $348,330
7A facilities
FL 2007 Big Tree Park Trail Big Tree Park Trailhead & Spur trail, boardwalk renovations, trail head 7 Seminole $63,607 $148,500 $212,107
Trail and related support facilities
FL 2011 Beck Ranch Trailhead Beck Ranch Trailhead Construct trailhead to include parking and 7 Volusia $70,932 $70,932 $141,864
4,375 linear foot, 12 foot wide trail; related
support facilities.
FL 2012 Seminole Wekiva Trail Seminole Wekiva Trail Renovate 3.6 miles trail to include 7 Seminole $110,648 $110,648 $221,296
resurfacing, sod, striping, tree trimming,
installation of water fountain and three pieces
of exercise equipment
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2013 Reinhart/Cross Seminole Reinhart/Cross Seminole Signage and resurfacing 7 Seminole $75,000 $75,000 $150,000
Trail Trail
FL 2015 Reiter Park Reiter Park Construction of 1,200 Linear Feet (LF) of 7 Seminole $100,000 $50,000 $150,000
eight-foot wide trail, up to two feet of sod
adjacent to the trail surface as needed for
stabilization, eight benches, two small shade
shelters and two signs.
FL 2017 Ward Park Perth/Loch Ward Park Perth/Loch Demolition of existing trail; design and 7 Orange $125,000 $125,000 $250,000
Lomand Nonmotorized Lomand Nonmotorized construction of 10'-12' x 4,907 LF (+/-10%)
Recreational Trail Recreational Trail concrete trail
FL 2017 Historic Downtown Historic Downtown Construction of 8' x 2000 LF (+/- 10%) paved 7 Seminole $200,000 $150,000 $350,000
Stormwater Trailhead Stormwater Trailhead trail; Construction of 750-1,000 sq. ft. (+/-
10%) trailhead structure with maps. Purchase
and installation of interpretive signage,
drinking fountain, sitting areas, and garbage
cans.
FL 2008 Cross Seminole Trail Cross Seminole Trail Phase I Renovate paved multi-use trails and related 7, 24 Seminole $149,796 $175,000 $324,796
support facilities
FL 2018 Central Winds Trailhead Central Winds Trailhead Restrooms, concrete pathway, info sign, 7, 24 Seminole $200,000 $50,000 $250,000
trash cans, bench, bike rack
FL 2002 Lake Lizzie Nature Preserve Lake Lizzie Nature Preserve Natural surface trail restoration, trailhead and 8 Osceola $100,000 $75,000 $175,000
related support facilities
FL 2003 Ocala National Forest Trails Ocala National Forest, 59 miles motorized recreational trail, 7 8 Marion $477,601 $125,000 $602,601
Phase 1 trailheads, signs/kiosks, SWECO
FL 2004 Shingle Creek Recreation Shingle Creek Recreation Trailhead and related support facilities 8 Osceola $114,296 $100,000 $214,296
Preserve Preserve
FL 2010 Proposed Trailway Proposed Trailway Extension Construct 2,800 linear feet, 12 foot wide hard 8 Lake $148,000 $37,000 $185,000
surface trail, related support facilities.
FL 2011 Lagoon Greenway Lagoon Greenway Phase B of project (Phase A is currently 8 Indian River $109,000 $109,000 $218,000
under construction) - please see exhibit 'E' for
information regarding phases A and B. See
Exhibit (W) for Phase B breakdown.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2012 Palm Bay Cross City Trail Cross City Trail - Phase 1 Construct 6,850 LF of trail - 2,930 LF 8 Brevard $198,363 $49,591 $247,954
sidewalk, 3,920 LF asphalt for new trail.
FL 2013 Park of the Americas Park of the Americas 4,350 linear feet of 6' wide multi-use trail 8 Orange $75,000 $75,000 $150,000
Recreational Trail Recreational Trail w/fitness stations
FL 2013 West Orange Trail West Orange Trail 6 inch ribbon 1.15 miles, asphalt resurfacing 8 Orange $75,000 $75,000 $150,000
Resurfacing - Phase 1
FL 2014 Barton Lake Trail Barton Lake Trail Barton Lake Trail 8 Brevard $180,000 $189,013 $369,013
FL 2014 Sand Hill Trailhead Sand Hill Trailhead Sand Hill Trailhead 8 Brevard $90,480 $22,620 $113,100
FL 2014 Martin Luther King Trail Martin Luther King Trail Martin Luther King Trail 8 Indian River $59,000 $209,000 $268,000
FL 2015 Town Connector Trail Town Connector Trail Construction of 3,150 Linear Feet (LF) of 8 Brevard $53,600 $13,400 $67,000
six-foot wide natural surface trail.
FL 2017 Rail-Trail Greenway Rail-Trail Greenway Construction of 2,200 LF (+/- 10%) multi-use 8 Indian River $200,000 $200,000 $400,000
trail to include 12' wide hardened surface
accessible pedestrian trail and 12' wide
natural surface equestrian trail; Purchase and
installation of signage & crossing markers
and 1 bridge over a canal;...
FL 2018 Sandspur Road Trail Sandspur Road Trail 10' wide concrete shared use path 8 Orange $200,000 $200,000 $400,000
FL 2018 DeSoto Park Multi-Use DeSoto Park Multi-Use Concrete trail, exercise equipment, info kiosk, 8 Brevard $120,000 $80,000 $200,000
Recreational Trail Recreational Trail trash cans and benches, dirt replacement,
additional ADA park spaces
FL 2018 West Orange Trail West Orange Trail Plant Bridge demolition, fill and paving 8 Orange $92,059 $92,059 $184,118
Street Bridge
FL 1997 Peg Horn Slough Peg Horn Slough Construction of soft surface trail. 9 Osceola $50,000 $50,000 $100,000
FL 1998 Lake Chautauqua Trail Lake Chautauqua Trail Construction of multi-use hard surface trail. 9 Pinellas $50,000 $50,000 $100,000
FL 2004 Oldsmar Park Connection Oldsmar Park Connection Hard surface trail, boardwalk and related 9 Pinellas $64,296 $50,000 $114,296
Trail Trail support facilities
FL 2004 James Grey Preserve James Grey Preserve Firm surface hiking and bicycling trail and 9 Pasco $114,000 $100,000 $214,000
related support facilities
FL 2006 East West Trail East West Trail Renovation Renovation of Multiple use trail, restrooms 9 Pinellas $199,869 $200,000 $399,869
and related support facilities
FL 2007 Oldsmar Park Connection Oldsmar Park Connection Construction of hard surface trail, boardwalk 9 Pinellas $100,000 $100,000 $200,000
Trail Trail and related support facilities
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
FL 2007 Kapok Spur Trail Kapok Spur Trail Hard surface trail and related support 9 Pinellas $40,000 $40,000 $80,000
facilities
FL 2008 Cypress Forest Park Trail Cypress Forest Park Trail I Construct multi-use trails and related support 9 Pinellas $195,401 $250,000 $445,401
facilities
FL 2015 Shingle Creek Regional Trail Shingle Creek Trail Construction of 2,100 Linear Feet (LF) of 9 Osceola $200,000 $100,000 $300,000
10-foot wide asphalt trail.
Grand $34,973,218 $29,145,232 $64,118,450
Totals
(all results)