M/S. Srinivas M/S. Srinivasa Infra
Total Page:16
File Type:pdf, Size:1020Kb
CONCEPTUAL PLAN (CONSTRUCTION OF HIGH-RISE RESIDENTIAL APARTMENTS) M/S. SRINIVASA INFRA Site Address: D.No: 5-3-50, T.S No: 80/1,80/2,80/7,80/8,80/9 , 81/4,81/5,81/6,81/7, 81/3B,81/8B,81/9B, 81/10, 81/11B, Tungalam Village, Gajuwaka, Div. no: 59, Zone –V, G.V.M.C Limits, Visakhapatnam Andhra Pradesh Office Address: D. No: 5-19-25/40/1, Thunglam Visakhapatnam - 530012 PREPARED &SUBMITTED BY SV ENVIRO LABS & CONSULTANTS ENVIRO HOUSE, B-1, BLOCK-B, IDA, AUTONAGAR, VISAKHAPATNAM Phone: 0891-2755528 Email: [email protected] Recognized by MoEF&CC, QCI Accredited CONCEPTUAL PLAN | 1 Oct’ 2019 1.0 INTRODUCTION M/s. Srinivasa Infra, construction of high rise residential building is located at D.No: 5-3-50, T.S.No: 80/1, 80/2, 80/7, 80/8, 80/9, 81/4, 81/5, 81/6, 81/7, 81/3B, 81/8B, 81/9B, 81/10, 81/11B, Tungalam Village, Gajuwaka, Div. No: 59, Zone –V, G.V.M.C Limits, Visakhapatnam District, Andhra Pradesh. M/s. Srinivasa Infra enjoys good brand equity in the society for its housing projects at reasonable and affordable costs with optimum customer satisfaction. The main objective of the company is to provide housing in a clean environment of beautiful living. The mission is to anticipate and exceed the customer’s aspirations with quality construction. In this direction, the company had approached for approvals and clearances from local authorities for construction of High-rise Apartment buildings to meet the needs of the society. The total units under the proposed housing project would be 369 no. flats which comprise of Residential Apartments with Cellar + G + Upper 9 floors in Block – A and amenity block will be in the ground floor area in an total site area of 7930.84 Sq.mts or 1.95 Acres. 1.1 ABOUT THE PROJECT: M/s. Srinivasa Infra proposes for construction of residential high rise building at D.No: 5-3-50, T.S No: 80/1, 80/2, 80/7, 80/8, 80/9, 81/4, 81/5, 81/6, 81/7, 81/3B, 81/8B, 81/9B, 81/10, 81/11B, Tungalam Village, Gajuwaka, Div. No: 59, Zone –V, G.V.M.C Limits, Visakhapatnam District, Andhra Pradesh. The project total built up area is 48101.41Sq.mts. The surroundings of the proposed area has educational institutions, hospitals, private business centers and number of residential apartments. CONCEPTUAL PLAN | 2 The project of this magnitude would have various positive and negative impacts and the same are to be addressed during design stage of the project to arrive at mitigation/ management measures. The water requirement of the project during operation will be met through Municipal supply. Sewage treatment plant will be provided to treat the waste water. Water conservation measures will be incorporated in the plumbing designs. Water recycle / reuse will be adopted by way of using treated water for toilet flush systems, and green belt development. The balance treated water and storm water will be let-out into the municipal drain. The required power will be drawn from the APEPDCL and the energy requirement will be optimized by adopting energy efficient design for lighting; by providing open space between each flat to allow sunlight. Solar energy will be used for common street lighting, and other areas wherever feasible economically. Construction material will be drawn from local sources which include fly ash based construction materials. The parking provision follows the guidelines prescribed by GO MS 119and building policy of State of Andhra Pradesh. 1.1.1 Government of India – Legislation – Construction Projects Government of India, Ministry of Environment, Forest and Climate Change, New Delhi has issued a notification with regard to the development of infrastructure / construction projects, which is known as EIA Notification-2006, issued on 14.09.2006. As per this notification all the building /construction projects / Area Development projects and Townships projects are exempted from scoping, EIA and public hearing as it comes under 8 (a) category. CONCEPTUAL PLAN | 3 1.1.2 Clearance requirements for this project The project would need the following clearances: 1. Layout clearance from Municipal authorities 2. Environmental Clearance from the AP SEIAA under EIA Notification, 2006. 3. Consent for Establishment from State Pollution Control Board. 4. NOC from Fire Department. 5. Consent for Operation from State Pollution Control Board 1.1.3 Site selection criteria Site selection criteria play an important role in the initiation of any developmental activity such as Residential developmental project. Availability of basic infrastructure necessary for the construction project & demand for housing purposed as it is facilitated for general requirements like educational institutes, transportation, etc., no alternate site is examined. Table -1: Details about Project Site Site Location D.No: 5-3-50, T.S No: 80/1,80/2,80/7,80/8,80/9, 81/4,81/5,81/6,81/7,81/3B,81/8B,81/9B, 81/10, 81/11B, Tungalam Village, Gajuwaka, Div. no: 59, Zone –V, G.V.M.C Limits, Visakhapatnam District, Andhra Pradesh Latitude 17°42'25.18"N Longitude 83°11'23.35"E Nearest Highway NH-5 at 1.88 Kms Nearest Habitation Within Tungalam Nearest Airport Visakhapatnam Airport at 4.24 kms Nearest Railway station Duvvada Railway Station at 4.07 kms Nearest Water Bodies Gollapallu Cheruvu at 0.43 kms Tungalam pond 0.50 kms CONCEPTUAL PLAN | 4 Narava Gedda at 2.46 kms Meghadri Gedda Reservoir at 5.75 kms Bay of Bengal at 9.84Kms Nearest Reserve Forests Narava RF at 3.18 kms Nadupuru RF at 7.90 kms Nearest National Park/Wild life There are no national parks/wild life sanctuaries within 10 sanctuary km radius from the project site Nearest APSRTC Bus Stop Tungalam Bus Stop at 0.48 kms Details including buildings within 1Km radius Gollapallu Cheruvu - 465.86m Tungalam Pond - 507.89m Railway line to vizag steel from Duvvada – 259.83m Line to vizag steel from Simhachalam and vizag port – 218.00m NTPC coal line from Simhachalam and port -855.11m Narayana Jr. collge -971.48m United Luthern church -475.65m SRK Industries – 660.48m Marco Power Solutions Pvt ltd – 596.54m Maandeo Motors (India) pvt ltd – 496.98m Aaemvee Granites Pvt Ltd -443.24m PS enterprises – 504.67m Dozco (India) Pvt Ltd -654.19m Ecom express -849.86m Genius filters & systems pvt ltd -780.51m MVV Builders -65.73mts CONCEPTUAL PLAN | 5 Fig 1: Google Image of 10km Radius CONCEPTUAL PLAN | 6 Fig 2: Topomap of 10 km Radius CONCEPTUAL PLAN | 7 Fig 3 : Location plan CONCEPTUAL PLAN | 8 Fig4: Site Layout Amenities in ground floor Green Belt RWH Block-A STP in cellar Tot-Lot Transformer Garbage chute yard Entry Gate Exit Gate CONCEPTUAL PLAN | 9 Area in Sq.mts Floors Residential Amenity Total built up area BLOCK - A Cellar floor 6586.86 -- 6586.86 Stilt floor 4288.00 -- 4288.00 Ground floor 2580.2 1119.57 3699.77 First floor 3697.50 -- 3697.50 Second floor 3697.50 -- 3697.50 Third floor 3697.50 -- 3697.50 Fourth Floor 3697.50 -- 3697.50 Fifth Floor 3697.50 -- 3697.50 Sixth Floor 3697.50 -- 3697.50 Seventh Floor 3697.50 -- 3697.50 Eight Floor 3697.50 -- 3697.50 Ninth Floor 3697.50 -- 3697.50 Terrace floor 249.28 -- 249.28 TOTAL 46981.84 1119.57 48101.41 No. of flats 369 Floor wise Built up Area 36106.98 Cellar &stilt floor built up 10874.86 area Amenities area 1119.57 Total Built up area 48101.41 Tot Lot Area 414.13 Green belt area (2m 916.12 wide). Proposed Building Height 29.95 Total Site area 7930.84 CONCEPTUAL PLAN | 10 1.2 PARKING PROVISION It is proposed to provide cellar and stilt for parking. The parking provision follows the guidelines prescribed by Building policy of Andhra Pradesh. The parking provision follows the guidelines prescribed by Building policy of Andhra Pradesh GO 119, GoAP i.e., 20% of total built up area to be provided. Parking Provisions details: Total Number of Units: 369no’s The proposed construction project is of 369two bed room flats. Parking space provision of the Project: Floor Required Parking area (sq.mts) Required parking as per GO 119 Total Parking Area provided in Cellar & stilt area 10874.86 Sq.m Parking for residential area (@20% of total built up area 7221.39 i.e., 36106.98Sq.mts) Parking for commercial area (@30% of total built up 335.87 area i.e., 1119.57Sq.mts) Total parking area required (A) 7557.26 Visitors parking @10% for residential 722.13 Visitors parking @10% for commercial 33.58 Total parking area required (B) 755.71 Total Parking area required as per GO MS 119 8312.97 (A+B) Parking area provided 10874.86 Required parking as per MoEF & NBC Parking area (sq. m) 4 Wheelers 8487.00 (@23Sq.m per ECS) – 369nos 2 Wheelers 461.25 (@1.25Sq.m per vehicle) -369nos Parking area required (A) 8948.25 Visitors parking @10% (B) 894.82 Required as per NBC (A+B) 9843.07 Parking area provided 10874.86 Hence, the parking area provided is more than the GO MS 119, NBC and MoEF & CC guidelines. CONCEPTUAL PLAN | 11 1.2.1 Residents Parking: The entire cellar and stilt floor has been allocated exclusively for residents parking. These parking areas are both for four wheelers and two wheelers. 1.2.2 Visitors Parking: Separate Car and 2 wheeler parking places have been provided around the proposed project for the visitors to park their vehicles.