FSA Status of Consumers - Existing Or Through LOA As on 31.03.2016

Total Page:16

File Type:pdf, Size:1020Kb

FSA Status of Consumers - Existing Or Through LOA As on 31.03.2016 Northern Coalfields Ltd. FSA Status of consumers - existing or through LOA as on 31.03.2016 Priority Sector Run Sl Name of the Factory Address Office / Registered State Approved No of Units Capacity Entitled Qty/ Qty to be ACQ Date of Execution FSA valid Source/ Grade(s) Size Mode Rake Fit Remarks consumer Address where Capacity (TPS/CPP- covered under upto Field Station plant (in unit) MW) (other FSA located sectors- ltpa)* NTPC Bhawan, Core 7, Shaktinagar/ Singrauli Super Shaktinagar, Scope Complex, 7 Uttar Power 1 2000 MW 7 2000 MW 11000000 11000000 11000000 24.07.09 20 Years NCL C-E (-) 250 mm Rail/MGR Krishnashila/ Themal Power Station Sonbhadra (UP) Institutional Area, Lodhi Pradesh Singrauli Road, New Delhi Samruddhi Venture Vindhyachal Super Vindhyanagar, Park, 2nd Floor, MIDC, Madhya 2 3260 MW 10 3260 MW 17200000 17200000 17200000 11.08.09 20 Years NCL C-E (-) 250 mm Rail/MGR Shaktinagar Thermal Power Project Singrauli (MP) Marol, Andheri(E), Pradesh Mumbai NTPC Bhawan, Core 7, Shaktinagar/ Rihand Super Thermal Rihandnagar, Scope Complex, 7 Uttar 3 2000 MW 4 2000 MW 10500000 10500000 10500000 24.07.09 20 Years NCL C-E (-) 250 mm Rail/MGR Krishnashila/ Power Project Sonbhadra (UP) Institutional Area, Lodhi Pradesh Singrauli Road, New Delhi 3979749 ( modified Obra Thermal Power Shakti Bhawan, Uttar from earlier Obra Dam, 4 Obra, Sobhadra (UP) 1362 MW 13 1362 MW 5000000 5000000 25.07.09 15 Years NCL C-E (-) 250 mm Rail Station Lucknow(UP) Pradesh 5000000 EC rly w.e.f.01.04.2014) Krishnasila/ Anpara Thermal Power Anpara, Sonbahdra Shakti Bhawan, Uttar 5 1630 MW 5 1630 MW 8500000 8500000 8500000 25.07.09 15 Years NCL C-E (-) 250 mm Rail/MGR Shaktinagar/ Station (UP) Lucknow(UP) Pradesh Singrauli Paricha Thermal Shakti Bhawan, Uttar 6 Paricha, Jhansi (UP) 640 MW 4 640 MW 1141000 1141000 1141000 25.07.09 20 Years NCL C-E (-) 250 mm Rail Parichha Power Station Lucknow(UP) Pradesh Krishnasila/ Rajghat Thermal Himadri, Rajghat Office 7 Rajghat, New Delhi New Delhi 135 MW 2 135 MW 800000 800000 800000 17.07.09 10 Years NCL Deshaled / G7-G10 (-) 250 mm Rail Shaktinagar/ Power Station Complex, New Delhi Singrauli 3650000 ( modified Shaktinagar/ Kota Thermal Power Vidyut Bhawan, from earlier 8 Shakatpur, Kota Rajasthan 1045 MW 6 1045 MW 3650000 3650000 18.07.09 20 Years NCL G7 to G10 (-) 250 mm Rail Krishnashila/ Station Janpath, Jaipur 1650000 w.e.f. Singrauli 31.03.2015) 500000 ( modified Shaktinagar/ Suratgarh Thermal Vidyut Bhawan, from earlier 9 Suratgarh, Rajasthan 1250 MW 5 1250 MW 500000 500000 18.07.09 20 Years NCL G7 to G10 (-) 250 mm Rail Krishnashila/ Power Station Janpath, Jaipur 2000000 w.e.f. Singrauli 31.03.2015) 11 through LOA Lanco Anpara Power Pvt.Ltd.,411/9,Riverside Lanco Lanco Anpara Power Anpara, Sonbhadra , Uttar 24.04.12 resigned on 1 Appartments,New 1200MW 2 1200MW 4182000 4182000 4182000 20 YEARS NCL G7 to G10 (-)250mm RAIL/MGR/ROAD Anpara Limited UP Pradesh 21.09.2013 Hyderabad,Lucknow(U. (LAKS) P.)-226007 Anpara 'D'- Unit- I Anpara, Sonbahdra Shakti Bhawan, Uttar 02.02.13 & re-signed 2 500 MW 2 500 MW 1770000 1770000 1770000 20 Years NCL G7 to G10 (-) 250 mm Rail/ MGR/Road Anapara Thermal Power Station (UP) Lucknow(UP) Pradesh on 14.03.14 NTPC Bhawan, Core 7, Rihand Super Thermal Rihand Nagar, Scope Complex, 7 Uttar 3 Power Project, stage - 1000.0 2 1000.0 3365000 3365000 3365000 02.09.2013 20 Years NCL C-E (G7-G10) (-) 250 mm Rail/ MGR Shaktinagar Sonebhadra, UP. Institutional Area, Lodhi Pradesh III, Unit-V & VI, NTPC Road, New Delhi NTPC Bhawan, Core 7, Vindhyachal Super Vindhyanagar, Scope Complex, 7 Madhya 4 Thermal Power Project 1000.0 2 1000.0 3189200 3189200 3189200 02.09.2013 20 Years NCL C-E (G7-G10) (-) 250 mm Rail/ MGR Shaktinagar Singrauli, MP Institutional Area, Lodhi Pradesh (VSTPP) Stage IV Road, New Delhi Shankargarh Stn., Alpha Prayagraj Power Bara Thermal Power Sector128, Noida- Uttar Code-SRJ, 5 Generation Company Project, Bara, 1980.0 3 1980.0 7020000 7020000 7020000 29.08.2013 20 Years NCL C-E (G7-G10) (-) 250 mm Rail/ Raod 201304, UP Pradesh Numerical Ltd Allahabad, UP Code- 16209710 Indira Gandhi Super NTPC Bhawan, Core 7, 1500000 ( mofified Aravali Power Thermal Power Scope Complex, 7 from earlier MIGK, Kosli, 6 Company Private Ltd Haryana 1500.0 3 1500.0 1500000 1500000 05.09.2013 20 Years NCL C-E (G7-G10) (-) 250 mm Rail Station, Jharli, Distt- Institutional Area, Lodhi 1000000 w.e.f. Haryana (for IGSTPS) Jhajjar, Haryana Road, New Delhi 12.03.2015) Mahatma Gandhi Village Khanpur, Tahsil TPP, Village Khanpur, 7 Jhajjhar Power Ltd. Matenhail, Distt- Jhajjar, Haryana 1320.0 2 1320.0 500000 500000 500000 18.10.2013 20 Years NCL G7 to G10 (-) 250 mm Rail MJPJ Jharli Tahsil Matenhail, Distt- Haryana-124142 Jhajjar, Haryana Earlier Coal Supply has been done to Rajiv Gandhi Thermal Urja Bhawan, Plot No- RGTPP against FSA Rajiv Gandhi Thermal 8 Power Plant, Khedar, C7, Sector-6, Haryana 1200 MW 2 1200 MW 1500000 1500000 1500000 04.01.2014 20 Years NCL Deshaled / G7-G10 (-) 250 mm Rail PMRG signed b/w NCL & Power Plant Hirsar, Haryana Panchkula Panipat TPP till FSA signed b/w NCL & RGTPP on 04.01.2014 Anpara 'D'- Unit- II Anpara, Sonbahdra 14th Floor,Shakti Uttar Anapara D 9 500 MW 1 500 MW 1594000 1594000 1594000 14.03.14 20 Years NCL G7 to G10 (-) 250 mm Rail/ MGR/Road Thermal Power Station (UP) Bhawan, Lucknow(UP) Pradesh TPS Railway CEMENT 1 Uttar 1 NCL Salaibanwa/ Dalla Cement Factory Jaiprakash Associate Renewed on till 08.12.19 Dalla, Sonebhadra, Pradesh 2500000 2500000 PDLF- (A Unit of Jaiprakash Ltd.Sector-128, Noida, 319000 319000 319000 22.12.14 earlier on from G7 to G10 U.P TPA TPA 10109117 Associates) UP 31/01/2012 8/12/2014 (-) 250 mm Rail/Road CEMENT CPP 1 JAIPRAKASH Jaiprakash Associate Uttar 1 NCL Salaibanwa Dalla, Sonebhadra, renewed on 11.03.15 till ASSOCIATES Ltd.Sector-128, Noida, Pradesh 27 MW 27 MW 121209 121209 121209 G7 to G10 Rail/Road (SLBN) U.P earlier on 8/2/2010 07.02.2020 LIMITED(DALLA) UP (-)250mm 2 JAIPRAKASH Jaiprakash Associate Uttar 1 NCL Chunar renewed on 05.03.15 till ASSOCIATES Chunar, Mirzapur, U.P Ltd.Sector-128, Noida, Pradesh 38 MW 38 MW 163600 163600 163600 G7 to G10 Rail/Road earlier on 8/2/2010 07.02.2020 LIMITED(CHUNAR) UP (-)250mm 3 JAIPRAKASH Jaiprakash Associate Uttar 1 NCL Beohari Majhgawan, renewed on 05.03.15 till ASSOCIATES Ltd.Sector-128, Noida, Pradesh 35 MW 35 MW 150683 150683 150683 G7 to G10 Rail/Road Sdg., / JRCS Bharatpur, Sidhi, M.P earlier on 8/2/2010 07.02.2020 LIMITED(SIDHI) UP (-)250mm Sdg. Other CPP 1 Uttar 8 NCL Hindalco Industries Ltd Century Bhawan, Dr Renewed on Renusagar, Pradesh ( Renusagar Power Annie Beasant Road, 574.8 MW 574.8 MW 2396916 2546651 2546651 11.07.13 earlier on 30.06.2018 Sonbhadra (UP) Divn ( I to VIII units)) Mumbai 02.06.2008 G8-G10 Grade (-)250mm RAIL/Rope/Road 2 Century Bhawan, Dr Uttar 1 Renewed on NCL Renukoot Hindalco Industries Ltd Renukoot, Sonbhadra Annie Beasant Road, Pradesh 30.6 MW 30.6 MW 236043 236043 236043 10.08.2013 earlier 30.04.2018 ( Co generation Plant) (UP) Mumbai on 30.04.2008 G10 Grade Sized ROM Rail/Road 3 Hindalco Industries Century Bhawan, Dr Uttar 1 Renewed on NCL HACG Pvt Renukoot, Sonbhadra Ltd(40MW Captive Co- Annie Beasant Road, Pradesh 40 MW 40 MW 181880 181880 181880 10.08.2013 earlier 30.04.2018 Sdg. (UP) gen Plant) Mumbai on 17.11.2011 G8/G10 Grade (-)250mm Rail/Road 4 Century Bhawan, Dr Uttar 2 Renewed on NCL Hindalco Industries Ltd Renusagar, Annie Beasant Road, Pradesh 160 MW 160 MW 667200 667200 667200 02.08.2013 earlier 29.04.2018 (RPD) ( IX & X units)* Sonbhadra (UP) Road/ Belt Pipe Mumbai on 25.02.2012 G8 Grade (-)250mm Conveyor 5 Grasim Industries Ghanashyam Kunj, Uttar 1 NCL Renukoot Limited (Renukoot Renukoot, Sonbhadra Garhwa Road, Pradesh 25 MW 25 MW 125496 125496 125496 18.03.2016 30.04.2018 Chemical Division) (UP) Rehla,Distt- Palamu, Unit-I Jharkhand G 10 Grade Sized ROM Road 6 Grasim Industries Ghanashyam Kunj, Uttar 1 NCL Renukoot Limited (Renukoot Renukoot, Sonbhadra Garhwa Road, Pradesh 25 MW 25 MW 125496 125496 125496 18.03.2016 30.04.2018 Chemical Division) (UP) Rehla,Distt- Palamu, Unit-II Jharkhand G10 Grade Sized ROM Road Sponge Iron 1 Madhya 1 renewed on NCL Singrauli Godwali, Deosar, C 27/95-E Jagatganj, 105000 Trimula Industries Ltd Pradesh 105000 TPA 126000 126000 126000 27.02.2014 earler on 31.01.2019 Sidhi (MP) Varanasi TPA 20.01.2009 G5-G10 (-)250mm Rail/Road 2 680 Kailashprui, Uttar 2 renewed on NCL Chunar Shanti Gopal Concast Dhaunhan, Chunar, Mughalsarai, Chandauli Pradesh 60000 TPA 60000 TPA 72000 72000 72000 27.02.2014 earler on 31.01.2019 Pvt Ltd Mirzapur (UP) (UP) 20.01.2009 G5-G10 STEAM/ROM Rail/Road Aluminium 1 Century Bhawan, Dr Uttar renewd on NCL Renukoot Hindalco Industries Ltd Renukoot, Sonbhadra Annie Beasant Road, Pradesh 252000 252000 252000 10.08.2013 earlier 5 Years (alu) (UP) Mumbai on 30.04.2008 G10 Grade Sized ROM Rail/Road.
Recommended publications
  • 1 | Page District Skill Development Plan:Sonbhadra
    1 | P a g e District skill Development Plan:Sonbhadra “District Skill Development Plan” District- Sonbhadra Year-2020-21 District Project Management Team, Skill Development Mission, Sonbhadra, Uttar Pradesh Website: www.upsdm.gov.in, email: [email protected]/ [email protected] 2 | P a g e District skill Development Plan:Sonbhadra Contents As Is Scenario ......................................................................................................................................................................... 5 Executive Summary........................................................................................................................................................ 5 Overview ............................................................................................................................................................................. 6 District Composition ...................................................................................................................................................... 7 Target population: As per 2011 census ................................................................................................................ 7 Blockwise-Population ................................................................................................................................................... 7 District’s economic structure ........................................................................................................................................
    [Show full text]
  • Sociedade E Natureza V.23
    Geografi a, pobreza e desenvolvimento: um debate interdisciplinar Anand Prasad Mishra GEOGRAPHY, POVERTY AND DEVELOPMENT: AN INTERDISCIPLINARY DEBATE Geografi a, pobreza e desenvolvimento: um debate interdisciplinar Anand Prasad Mishra Associate professor, department of geography, Faculty of science Banaras Hindu University. Varanasi 221005 – Uttar Pradesh – India [email protected] [email protected] Artigo recebido para publicação em 20/02/2011e aceito para publicação em 20/06/2011 ABSTRACT: An emerging feature of contemporary development studies in India is the deployment of an interdisci- plinary approach involving geographical location, level of poverty, nature of development and planning etc. The prevalence of poverty in a specifi c geographical location represents the evolving pattern of deprivation under a particular mode of production. The historicity of poverty in a geographical space needs an independent enquiry and identifi cation of different production systems which are responsible for the problem of deprivation through multiple routes. The present paper is an attempt to initiate a debate on the issue of poverty, especially in a tribal region, through a multi-dimensional perspective, i.e. interrelation between geography, poverty, development and planning. The paper identifi es one of the most poverty-stricken regions of India for a detailed discussion of the various casual factors which are apparently responsible for the poverty of that region. The paper also tries to explore the historical background of poverty in the study area (Babhani Block of Sonbhadra U. P.). Keywords: Poverty. Deprivation. Geography of poverty. Historical routes of poverty. RESUMO: Uma característica emergente dos estudos de desenvolvimento na Índia contemporânea é a implantação de uma abordagem interdisciplinar envolvendo localização geográfi ca, nível de pobreza, a natureza do desenvolvimento e planejamento, entre outros.
    [Show full text]
  • Mercury Pollution in Sonbhadra District of Uttar Pradesh and Its Health Impacts
    CSE Study: Mercury Pollution in Sonbhadra District of Uttar Pradesh and its Health Impacts Mercury Pollution in Sonbhadra District of Uttar Pradesh and its Health Impacts INVESTIGATORS Mr. Ramakant Sahu Ms. Poornima Saxena Dr. Sapna Johnson Ms. Soundaram Ramanathan Ms. Sugandh Juneja ADVISORS Prof. (Dr.) H. B. Mathur Prof. (Dr.) H. C. Agarwal October 2012 CENTRE FOR SCIENCE AND ENVIRONMENT 41, TUGHLAKABAD INSTITUTIONAL AREA, NEW DELHI –110062 TEL: 91-11-2995 6110/5124/6394/6399 FAX: 91-11-2995 5879 EMAIL: [email protected] WEBSITE: www.cseindia.org POLLUTION MONITORING LABORATORY CORE-6A, FOURTH FLOOR, INDIA HABITAT CENTRE LODHI ROAD, NEW DELHI – 110003 1 CSE Study: Mercury Pollution in Sonbhadra District of Uttar Pradesh and its Health Impacts CONTENTS 1. Pollution Monitoring Laboratory of CSE 3 2. The Study 3 3. Introduction 4 4. Review of Literature 10 5. Health Effects 16 6. Objectives of the Study 19 7. Materials and Methods 19 8. Results and Discussion 26 9. Conclusions 36 10. Recommendations 38 11. Annexures 46-47 Annexure 1: Village Wise Distribution of Mercury in Human Blood, Hair and Nail in Singrauli Annexure 2: Concentration of Mercury in Human Blood, Hair and Nail in Singrauli on Gender basis 2 CSE Study: Mercury Pollution in Sonbhadra District of Uttar Pradesh and its Health Impacts 1. POLLUTION MONITORING LABORATORY OF CSE The Centre for Science and Environment (CSE), a non-governmental organization based in New Delhi, has set up the Pollution Monitoring Laboratory (PML) to monitor environmental pollution. PML is an ISO 9001:2008 certified laboratory accredited by SWISO, CH-5610, Wohlen, Switzerland, conducting Pollution Monitoring and Scientific Studies on Environmental Samples.
    [Show full text]
  • Unpaid Dividend-15-16-I4 (PDF)
    Note: This sheet is applicable for uploading the particulars related to the unclaimed and unpaid amount pending with company. Make sure that the details are in accordance with the information already provided in e-form IEPF-2 CIN/BCIN L72200KA1999PLC025564 Prefill Company/Bank Name MINDTREE LIMITED Date Of AGM(DD-MON-YYYY) 17-JUL-2018 Sum of unpaid and unclaimed dividend 759188.00 Sum of interest on matured debentures 0.00 Sum of matured deposit 0.00 Sum of interest on matured deposit 0.00 Sum of matured debentures 0.00 Sum of interest on application money due for refund 0.00 Sum of application money due for refund 0.00 Redemption amount of preference shares 0.00 Sales proceed for fractional shares 0.00 Validate Clear Proposed Date of Investor First Investor Middle Investor Last Father/Husband Father/Husband Father/Husband Last DP Id-Client Id- Amount Address Country State District Pin Code Folio Number Investment Type transfer to IEPF Name Name Name First Name Middle Name Name Account Number transferred (DD-MON-YYYY) 49/2 4TH CROSS 5TH BLOCK KORAMANGALA BANGALORE MIND00000000AZ00 Amount for unclaimed and A ANAND NA KARNATAKA INDIA Karnataka 560095 2539 unpaid dividend 72.00 28-Apr-2023 69 I FLOOR SANJEEVAPPA LAYOUT MEG COLONY JAIBHARATH NAGAR MIND00000000AZ00 Amount for unclaimed and A ANTONY FELIX NA BANGALORE INDIA Karnataka 560033 2646 unpaid dividend 72.00 28-Apr-2023 NO 198 ANUGRAHA II FLOOR OLD POLICE STATION ROAD MIND00000000AZ00 Amount for unclaimed and A G SUDHINDRA NA THYAGARAJANAGAR BANGALORE INDIA Karnataka 560028 2723 unpaid
    [Show full text]
  • Stone Crushers Sonebhadra District NGT Order.Pdf
    BEFORE THE NATIONAL GREEN TRIBUNAL PRINCIPAL BENCH NEW DELHI ********** ORIGINAL APPLICATION NO. 482 OF 2015 (M.A. NO. 574/2016) IN THE MATTER OF: Chaudhary Yashwant Singh Son of Late Sri Ratiram Singh Aged about 54 years R/o. Vikas Nagar, Ward No. 11 Robertsganj, Sonebhadra …..Applicant Versus 1. State of Uttar Pradesh Through the Chief Secretary Government of U.P. at Lucknow U.P. 2. Member Secretary U.P. Pollution Control Board TC-12, Vibhuti Khand, Gomti Nagar Lucknow, U.P. 3. Managing Director U.P. Rajkiya Nirman Nigam Ltd. Vibhuti Khand, Gomti Nagar, Lucknow 4. District Magistrate Sonebhadra U.P. 5. Member Secretary, Ministry of Environment Forest and Climate Change, Govt. of India New Delhi 6. State of Uttar Pradesh Through its Chief Forest Conservator Uttar Pradesh, Lucknow, U.P. Pin Code No. 226001 7. State of U.P. Through its Principal Secretary, Forest Uttar Pradesh, Lucknow, U.P. Pin Code No. 226001 1 8. Principal Secretary Mines and Mineral Uttar Pradesh, Lucknow, U.P. Pin Code No. 226001 9. District Mining Officer District Sonebhadra, U.P. Pin Code No. 231216 10. JAY PEE Industries Ltd. (J.P. Cements, Dala/Churk) Dala District Sonebhadra, U.P. Pin Code No. 231207 11. HINDALCO Industries Ltd. (Renusagar Power Division Renusagar) District Sonebhadra, U.P. Pin Code No. 231218 12. LANCO Anpara Power Ltd. Gate No. 3 Anpara, Post Anpara District Sonebhadra, U.P. Pin Code No. 231225 13. CEO UPSHA (Uttar Pradesh State Highway Authority) Pin Code No. 226001 14. Project Manager Chetak Construction Co./A.C.P. Tollyways Pvt.
    [Show full text]
  • ANNEXURE 5.8 (CHAPTER V, PARA 25) FORM 9 List of Applications For
    Print ANNEXURE 5.8 (CHAPTER V, PARA 25) FORM 9 List of Applications for inclusion received in Form 6 Designated location identity (where Constituency (Assembly/£Parliamentary): Duddhi Revision identity applications have been received) From date To date @ 2. Period of applications (covered in this list) 1. List number 01/10/2018 01/10/2018 3. Place of hearing* Serial Name of Father / $ Date of Name of Date of Time of number Mother / Husband and Place of residence of receipt claimant hearing* hearing* (Relationship)# application LALJI 213/215, VIDYUT VIHAR COLONY 1 01/10/2018 PRASAD HOOB LAL LAL (F) NTPC, SHAKTINAGAR, , Sonbhadra PRASAD LAL DAI LALJI 213/215, VIDYUT VIHAR COLONY 2 01/10/2018 DEVI DEVI PRASAD PRASAD (H) NTPC, SHAKTINAGAR, , Sonbhadra Vishal 3 01/10/2018 Lal Bahadur (F) 302 k, Naktu Adhaura, Sirsoti, , Sonbhadra Kumar 4 01/10/2018 Rajita Devi Chhotelal (H) 312kh, Naktu Adhaura, Sirsoti, , Sonbhadra Pratibha 5 01/10/2018 Ram Darshan (F) 305k, Naktu Adhaura, Sirsoti, , Sonbhadra Kumari Sonu Kumar 6 01/10/2018 Sita Ram Pal (F) 300k, Naktu Adhaura , Sirsoti, , Sonbhadra Pal Chandan 7 01/10/2018 Jitu Sonkar (F) 159, Bijpur, Bijpur, , Sonbhadra Sonkar 8 01/10/2018 Sushrita Girdhari (F) 123, Bijpur, Bijpur, , Sonbhadra prawindara 9 01/10/2018 rajesh sharma (F) 56, shanti nagar, Bijpur, , Sonbhadra kumar krishna kumar 10 01/10/2018 puja kumari 585, santi nagar, Bijpur, , Sonbhadra panday (H) 11 01/10/2018 Neha yadav mahesh chnd yadav (H) 123, shanti nagar , Bijpur, , Sonbhadra komal arvind kumar 12 01/10/2018 200, Bijpur, Bijpur,
    [Show full text]
  • Quarterly Progre Non – Terly Progress Repor
    QUARTERLY PROGRESS REPORT OF NON – ATTAINMENT CITY ANPARA Submitted on behalf of State of Uttar Pradesh JANUARY - MARCH 21 UTTAR PRADESH POLLUTION CONTROL BOARD Building No. TC-12V, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh 226010 CONTENTS Sl.No. Anpara City Page No. I Basic Information 04-04 II Capacity Building, Monitoring Network and Source 05-06 Apportionment III Public Outreach 07-08 IV Road Dust and Construction & Demolition 09-11 V Vehicles 12-13 VI Industries 14-16 VII Waste and Biomass- Dumping and Burning 17-18 VIII Air Quality Data 19-19 IX Annexures 20-72 1. Annex -CB 1 20-21 2. Annex -CB 2 22-24 3. Annex -CB 3 25-32 4. Annex -CB 4 33-33 5. Annex -CB 5 34-35 6. Annex -PO 1 36-38 7. Annex -RD 1 39-39 2 8. Annex -RD 2 40-40 9. Annex -RD 3 41-41 10. Annex -RD 4 42-50 11. Annex -CD 1 51-51 12. Annex -VE 1 52-52 13. Annex -VE 2 53-54 14. Annex -VE 3 55-56 15. Annex -IP 1 57-57 16. Annex -IP 2 58-58 17. Annex -IP 3 59-61 18. Annex -IP 4 62-62 19. Annex -IP 5 63-63 20. Annex -IP 6 64-64 21. Annex -IP 7 65-65 22. Annex -IP 8 66-67 23. Annex -IP 9 68-68 24. Annex -WB 1 69-69 25. Annex -WB 2 70-72 3 Basic Information Name of Non Attainment City ANPARA Sate/ Union Territory UTTAR PRADESH Name of Nodal Officer at PCB/ PCC Chief Environmental Officer (Laboratory) Email Id [email protected] Contact Number 0522-2720832 Date till which progress is submitted 31.03.2021 Action Point Code Sector Total Number of Actions Number of Number of Actions Actions Under Completed Progress CB CAPACITY BUILDING, MONITORING 8 4 4 NETWORK AND SOURCE
    [Show full text]
  • India-NCAP-Plans-UP
    AACCTTIIOONN PPLLAANN FFOORR TTHHEE CCOONNTTRROOLL OOFF AAIIRR PPOOLLLLUUTTIIOONN IINN AANNPPAARRAA RREEGGIIOONNAALL OOFFFFIICCEE UU...PP... PPOOLLLLUUTTIIOONN CCOONNTTRROOLL BBOOAARRDD HHOOUUSSEE NNoo...116622,,, UUTTTTAARR MMOOHHAALL,,, RROOBBEERRTTSSGGAANNJJ SSOONNBBHHAADDRRAA -- 223311221166 1.INTRODUCTION Anpara is a city in Myorpur Block in Sonbhadra District of Uttar Pradesh State, India. It belongs to Mirzapur Division. It is located 71 Km towards South from District head quarters Robertsganj. 33 KM from Myorpur. 403 Km. from State capital Lucknow. Parasi (3 Km) , Kakari (4 Km) , Kuldomari (4 Km) , Garabandha (5 Km) , Basi (6 Km) are the nearby Villages to Anpara. Anpara is surrounded by Myorpur Block towards East , Waidhan Block towards west , Obra Block towards North , Chitrangi Block towards North . Coordinates: 24.206°N 82.765°E Singrauli , Renukoot , Obra , Kota are the nearby cities to Anpara. 2. ACTION TAKEN BY THE BOARD Board has issued directions to Principal Secretary Urban Development, Principal Secretary Forests, Principal Secretary Transport, Principal Secretary Agriculture, Managing Director Central U.P. Gas Ltd., Managing Director Indraprastha Gas Ltd, and Managing Director Green Gas Ltd. under section 31 (A) of the Air (Prevention and Control of Pollution) Act, 1981 regarding prevention and control of air pollution in Anpara city on dated 05.09.2016 in compliance of directions issued by Central Pollution Control Board, Delhi under section 18(1) (b) of the Air (Prevention and Control of Pollution) Act, 1981. Board has also issued directions under section31(A) of the Air (Prevention and Control of Pollution) Act, 1981 as amended regarding prevention and control of air pollution in Anpara city on dated 14.11.2017. Ambient Air is being monitored regularly by the Board.
    [Show full text]
  • Sonbhadra Page:- 1 Cent-Code & Name Exam Sch-Status School Code & Name #School-Allot Sex Part Group 1001 Govt Inter College Ghorawal Sonebhadra Arm
    DATE:27-02-2021 BHS&IE, UP EXAM YEAR-2021 **** FINAL CENTRE ALLOTMENT REPORT **** DIST-CD & NAME :- 90 SONBHADRA PAGE:- 1 CENT-CODE & NAME EXAM SCH-STATUS SCHOOL CODE & NAME #SCHOOL-ALLOT SEX PART GROUP 1001 GOVT INTER COLLEGE GHORAWAL SONEBHADRA ARM HIGH ARM 1001 GOVT INTER COLLEGE GHORAWAL SONEBHADRA 127 F HIGH CRM 1132 G P D I C GAUNKUNDA SHIVDWAR SONEBHADRA 66 M HIGH ARM 5001 GOVT INTER COLLEGE GHORAWAL SONEBHADRA 6 F 199 INTER ARM 1001 GOVT INTER COLLEGE GHORAWAL SONEBHADRA 110 F ALL GROUP INTER CRM 1132 G P D I C GAUNKUNDA SHIVDWAR SONEBHADRA 14 M OTHER THAN SCICNCE INTER ARM 5001 GOVT INTER COLLEGE GHORAWAL SONEBHADRA 1 F SCIENCE 125 CENTRE TOTAL >>>>>> 324 1003 G I C SIRSIYA THAKURAI KPUR SONEBHADRA ARM HIGH ARM 1003 G I C SIRSIYA THAKURAI KPUR SONEBHADRA 39 F HIGH CRM 1069 B S H S S KAMHARIYA MADHUPUR SONEBHADRA 73 M HIGH CRM 1085 RANA PRATAP HSS LOHARA SUKRIT SONEBHADRA 42 M HIGH CRM 1153 KALAWATI DEVI S PAGIYA KHAIRAHI SONEBHADRA 91 M HIGH CRM 1159 M M R D HSS SIRSIYA KEKRAHI SONEBHADRA 5 M HIGH CRM 1161 OM SHIV SHIVA IC MADHUPUR SONEBHADRA 20 M HIGH CRM 1172 B NARAYAN CHAUHAN IC GAURAHI SONBHADRA 42 M HIGH ARM 5003 G I C SIRSIYA THAKURAI KPUR SONEBHADRA 2 F 314 INTER ARM 1003 G I C SIRSIYA THAKURAI KPUR SONEBHADRA 20 F OTHER THAN SCICNCE INTER CRM 1058 MAA VINDHYAVASINI I C PAANPI SONEBHADRA 32 M OTHER THAN SCICNCE INTER CRM 1058 MAA VINDHYAVASINI I C PAANPI SONEBHADRA 153 M SCIENCE INTER CRM 1153 KALAWATI DEVI S PAGIYA KHAIRAHI SONEBHADRA 89 M ALL GROUP INTER CRM 1161 OM SHIV SHIVA IC MADHUPUR SONEBHADRA 5 M OTHER THAN SCICNCE
    [Show full text]
  • Sonebhadra Dealers Of
    Dealers of Sonebhadra Sl.No TIN NO. UPTTNO FIRM - NAME FIRM-ADDRESS 1 09115100007 RG0020946 SHARAD TRADERS ANPARA BAZAR SONEBHADRA 2 09115100012 RG0026506 PRABHAGIY LONGING MAN.U.P.VAN OBRA SONBHADRA NIGAM 3 09115100026 RG0025488 AJAY KUMAR S/O SANTOSH KUMAR DHARM SHALA ROAD ROBERS GANJ SONBHADRA 4 09115100031 RG0030555 AGRAWAL STONE WORKS BILLI SONBHADRA 5 09115100045 RG0039829 AGRWAL DAL MILL OBRA SONBHADRA 6 09115100050 RG0041607 K.N.CONTRUCTION & CO. ANAPARA SONEBHADRA 7 09115100059 RG0047106 NIKKU NEW K.FINE SIYAL SERVICE LTD MAIN ROAD SONBHADRA 8 09115100064 RG0044666 ANIL AUTO SPARES KHARIA SONEBHADRA 9 09115100078 RG0044213 SHANKAR MACHINERY STORE ROBERTS GANJ SONEBHADRA 10 09115100083 RG0043599 JAIN MACHINERY STORE ROBERTSGANJ SONEBHADRA 11 09115100097 RG0044504 KESHERVANI CYCLE STORE ROBERTS GANJ SONEBHADRA 12 09115100106 RG0045478 MAHAVEER PRASAD AGRWAL MAIN ROAD SONEBHADRA 13 09115100111 RG0043854 VAISHNV STORE MAIN ROAD RAVERTSGANJ SONEBHADRA 14 09115100125 RG0045959 DHARMENDRA GENERAL STORE ROBERTSGANJ SOBHADRA 15 09115100130 RG0043943 FRIENDS ENNG.WORKS MURDGVA SONEBHADRA 16 09115100139 RG0047786 FRIENDS ENTERPRISES DARRA SONBHADRA 17 09115100144 RG0044225 KUSHVAHA BROTHERS ANAPARA SONEBHADRA 18 09115100158 RG0046015 DEEP AUTO CENTRE CHOPAN SONBHADRA 19 09115100163 RG0045567 P.K.ARK USES ENTERPRISES RENUKUT SONEBHADRA 20 09115100177 RG0044375 MANYANK ENNG.ACIOCATES RENUKUT SONEBHADRA 21 09115100182 RG0046836 KHUSHBU SARI CENTRE ANPARA SOBHADRA 22 09115100196 RG0050594 S.P.SINGH OBERA SONBHADRA 23 09115100205 RG0047471 VINOD
    [Show full text]
  • Hindalco.Pdf
    1 Contents Introduction 3 I. Birlas in Renukoot 4 Box: Doomed Villages 5 Table: Invisible Subsidies 7 IT. Hindalco and Workers 9 Table: Grade and Wage Structure at Hindalco 11 Box: A Lonely Battle 13 III. Accidents: A Logical Outcome 16 Table: Fatal Accidents: 1994-96 17 Box: Renusagar Revisited 19 IV. Unorganised Workers in Organised Industry 20 Table: The Endless Wait 21 Table: Costs of Justice 23 Box: Life After Retirement 24 V. Conclusion 25 2 Introduction On 10 April 1996 a sizable portion of the wall Goswami. a permanent worker residing in the com- of a fly-ash disposal pond belonging TO Hindalco pany quarters, did not return home alter the Industries Ltd. collapsed at Renukoot town. Ap- shift duty. The wives of Kaushal Pradhan and Pujari. proximately 22,500 tonnes of the ash and water Goswsami filed complaints with police. Dwarika sludge swept the valley area upto the Rihand river Singh, leader of a trade union associated with the covering a distance of over a kilometre. Large AITUC, also filed a complaint providing some number of people are feared killed in the accident. names of people feared killed in the accident. The However, no reliable estimates exist regarding the police refused to lake cognizance of the reported loss to both life and property. deaths and only registered an FIR (No. 66/96) under Section 337, I PC (causing hurt by negligent act). Around a year ago water had started seeping at three places through the mud wall of the ash pond For two days no official either from Hindalco and flowing close to a Shri Sarweshwari Samooh or from the district administration visited the site of Ashram situated some 50 metres from the base of the accident.
    [Show full text]
  • Report on Environmental Impacts & Environment
    REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN FOR CHANGE IN FUEL SOURCE / FUEL MIX REQUEST FOR CONCURRENCE FOR CHANGE IN FUEL SOURCE / FUEL MIX at 999.7 MW CPP of Renusagar Power Division, P.O. Renusagar, Sonbhadra District, Uttar Pradesh Project Proponent: M/s Hindalco Industries Ltd PO Renusagar Power Plant, District Sonbhadra, Uttar Pradesh, India Environmental Consultants: Bhagavathi Ana Labs Pvt. Limited (A Bureau Veritas Group Company) 7-2-C14, Industrial Estate, Sanath Nagar, Hyderabad- 500018 NABET Certificate No NABET/EIA/1316/RA008 December, 2016 Report on Environmental Impacts & Environmental Management Plan for change in source of fuel / fuel mix at 999.7 MW CPP of Renusagar Power Division, P.O. Renusagar, Sonbhadra District, Uttar Pradesh M/s Hindalco Industries Ltd Document Reference: IND.BH.41.16.0108/HSR Revision: Draft, Rev01, dated 22/12/2016 Copyright Bureau Veritas India Pvt. Ltd. All rights reserved. Report on environmental impacts and Environmental Management Plan for change in fuel source / fuel mix at 999.7 MW CPP of Renusagar Power Division, Renusagar Village, Sonbhadra District, Uttar Pradesh of M/s Hindalco Industries Ltd. Report on Impacts & Environment Management Plan TABLE OF CONTENTS DISCLAIMER 3 REVIEW AND REVISION HISTORY 4 TABLE OF CONTENTS 5 ABBREVIATIONS 7 1.0 INTRODUCTION 7 1.1 PREAMBLE 7 1.2 ABOUT PROJECT PROPONENT 7 1.3 PROJECT BACKGROUND 7 1.3 PROJECT PROPOSAL – EC AMENDMENT 8 1.4 PROJECT LOCATION 9 1.5 REPORT STRUCTURE 9 2.0 PROJECT DETAILS 10 2.1 PREAMBLE 10 2.2 PROJECT PROPOSAL
    [Show full text]