MELTON HIGHWAY, SYDENHAM LEVEL CROSSING REMOVAL UPDATE DECEMBER 2015 What’s happening? Removing 50 dangerous Construction has already begun at Melton Highway level crossing in and congested level several sites, including Main Road Sydenham has been fast tracked for and Furlong Road in St Albans, removal by the Victorian Government. crossings will transform and planning and consultation is Removing this level crossing will the way people live, underway for the removal of the improve travel to and from this major work and travel across remaining level crossings. transport hub and support local development in one of the fastest metropolitan Melbourne growing areas of Australia. and improve safety for drivers and pedestrians. Why remove the boom gates? The Melton Highway boom gates • improved safety – crossing the are down for around 24 minutes railway tracks will be much safer during the two-hour morning peak, for pedestrians, cyclists and drivers causing congestion and frustration • more reliable roads and rail CONTACT US in Melbourne’s west. No more – traffic congestion will be boom gates will mean no more levelcrossings.vic.gov.au reduced and more trains will be waiting for the 30,000 vehicles,
[email protected] able to run more often including 200 buses, that use this 1800 762 667 level crossing each weekday! • better connected communities Level Crossing Removal Authority – opportunities to create new GPO Box 4509 The Level Crossing Removal public spaces, and establish Melbourne VIC 3001 Project will remove dangerous and new connections congested level crossings that divide • enhancing and creating vibrant Follow us on social media communities.