6.0 Area Freight Rail Activities 6.0 AREA FREIGHT RAIL ACTIVITIES The major freight rail providers operating throughout the greater region are currently involved in a range of activities. The following summaries, covering a range of subject matter, are meant to provide a “snapshot” of some current events. These summary materials are regularly distributed to interested parties as part of ongoing educational efforts. Area Freight Rail Activity materials include: • New England Rail Forum & Expo, Providence, RI, March 2008 • New England Rail Forum & Expo, Worcester, March 24, 2009 • CSX Transportation, Agreement with Massachusetts • Grafton & Upton Railroad, Revitalization & Expansion • Mass Central Railroad Corporation, Track Improvements • Pan Am Southern, Patriot Corridor with Norfolk Southern • Providence & Worcester Railroad Company, Locomotive Retrofits 190 2008 New England Rail Forum & Expo Providence, Rhode Island Join together with industry professionals as we explore the current and future state of freight, inter-city passenger,and transit operations in New England and beyond. March 25, 2008 Rhode Island Convention Center A COMPLETE GUIDE TO THE EXPO FOR BOTH ATTENDEES AND EXHIBITORS INCLUDING ALL RESERVATION FORMS Information: 617.437.7810 www.nerailroadclub.com 191 Floorplan Head Table Prefunction Area • Escalators/elevators to first floor Prefunction entrance to dinner Registration 1 2 3 4 5 6 7 8 Bar main entrance Cookies Coffee to show 15 14 13 12 11 10 9 Soda & chips 16 17 18 19 20 21 22 Bar 23 Reception food 31 30 29 28 27 26 25 24 39 32 33 34 35 36 37 38 entrance/exit to 40 seminar room Reception food Bar 47 46 45 44 43 42 41 seminar room 192 193 194 DEVAL L. PATRICK GOVERNOR TIMOTHY P. MURRAY LIEUTENANT GOVERNOR September 23, 2009 - For immediate release: PATRICK-MURRAY ADMINISTRATION FINALIZES AGREEMENT WITH CSX TRANSPORTATION Historic agreement re-defines passenger and freight rail system in the Commonwealth BOSTON – Wednesday, September 23, 2009 – Lieutenant Governor Timothy P. Murray today announced that the Commonwealth’s comprehensive multi-year rail transportation agreement with CSX Transportation (CSXT), the national freight carrier serving Massachusetts, has been finalized. The announcement was made during Lieutenant Governor Murray’s keynote address before a crowd of approximately 300 business leaders at the Greater Boston Chamber of Commerce Government Affairs breakfast. Lieutenant Governor Murray, who has been working on this agreement since he was Mayor of Worcester, led the negotiations for this agreement on behalf of the administration with critical support from the Governor, Senator John Kerry and Congressman Jim McGovern. Many of the agreement’s major elements were resolved last year; however, the long standing debate concerning liability remained unresolved. Today, Lieutenant Governor Murray proudly announced all parties reached an agreement under which CSXT will help defray the MBTA’s liability insurance cost and pay the deductible on the liability insurance policy if an accident occurs involving a freight train and CSXT is clearly at fault because of willful misconduct. “Consistent with our commitment to improve transportation service throughout the Commonwealth, we have done more to deliver on the South Coast rail project than any other administration," said Governor Deval Patrick. “This is a critical milestone, and I thank Lieutenant Governor Murray for his leadership, and Senator Kerry, Congressman McGovern, and CSXT leaders for all coming to the table and staying there until we could get a deal that works.” 195 “The Governor and I have been dedicated to improving our freight and passenger rail system for the long-term health of our economy and our environment,” said Lieutenant Governor Murray. “We are thankful for the continued support of Senator Kerry and Congressman McGovern, who have both been by our side, helping us achieve the best interest for the Commonwealth. I also commend CSXT for its commitment to seeing this agreement to fruition. A vibrant rail network that serves both passengers and freight needs is an important part of our transportation system.” “This deal is a tremendous victory with countless benefits for Massachusetts – it’s a boost to our economy, it’ll help reduce pollution, and it will relieve congestion on the roads. It’s been a long slog, but anyone who has ever been stuck in traffic on the Mass Pike or taken the commuter rail from Worcester to Boston will agree that it was worth every last minute on the phone, every hour in the conference room, and every heated discussion at the negotiating table. After clearing the liability hurdle, we were able to finish the important work of linking the economies, businesses and homes of Worcester, New Bedford and Fall River with Boston," said Senator John Kerry. "I want to thank CSX for their effort and I’m proud to be part of a group - including Lieutenant Governor Tim Murray and Congressman Jim McGovern – that refused to go away until this was done." “This announcement is terrific news for commuters in Massachusetts,” Representative Jim McGovern said. “Increasing commuter rail service to Worcester and Fall River has long been a priority of mine. It will ease congestion on our roads, increase economic development and benefit our environment. This agreement is the product of a lot of hard work and some difficult negotiations, and I want to thank Senator Kerry, Governor Patrick and Lieutenant Governor Murray for all of their efforts.” “This final agreement results from a lot of hard work on the part of many, many people over a long period of time,” said Transportation Secretary James Aloisi. “But our work is not done. We look forward to a new partnership with CSXT on these and other issues and are happy to further advance the prospects for increased MBTA service that this agreement provides.” “This is a great development for the Commonwealth, its residents, its environment and its economy,” said Michael J. Ward, CSX Chairman, President and Chief Executive Officer. “CSXT, Lieutenant Governor Tim Murray and the entire Patrick-Murray Administration have worked closely to create solutions that work for the Commonwealth, CSXT and its customers. In addition to commuter service, the plan will give the Commonwealth a double-stack freight rail route that will help alleviate congestion on Massachusetts highways.” The main elements of the agreement include: 196 • The Commonwealth will purchase the property rights of the Boston to Worcester rail line from CSXT, increasing the potential for additional commuter service while also taking control of dispatching and maintenance on the line. Through the development of this agreement, the MBTA has already been able to add five Framingham-Boston commuter trains to Worcester on CSX Transportation’s Boston line. • The Commonwealth and CSXT will increase the vertical clearances of bridges along the railroad main line between I-495 and the New York State line to accommodate double-stack freight trains. The Commonwealth will assume responsibility for raising highway bridges, while CSXT will be responsible for lowering tracks. • In conjunction with the Patrick-Murray Administration’s South Coast Rail Corridor Plan, the Commonwealth will purchase the New Bedford-Fall River Line from CSXT. The Commonwealth will also purchase the Boston Terminal Running Track and West First Street Yard in South Boston and CSXT’s ownership of the Grand Junction secondary line that extends from Beacon Park Yard through Cambridge to East Boston from CSXT. • In an effort to create capacity for additional commuter rail service over time, the Commonwealth will help CSXT relocate the company’s operations out of Beacon Park Yard in Boston. This relocation will facilitate the redevelopment and reuse of this strategic parcel of land. • Federal law requires that a new, state-of-the-art technology known as a “positive train control” system will be installed to provide improved rail safety. The new system will monitor rail traffic, and can automatically stop train movements in an area if it detects a potential conflict. • Passenger and freight trains will operate, as much as possible, in exclusive “windows” of time, thereby reducing the chance for conflict and assisting with the efficiency of both freight and passenger service. • Allocates liability amongst the parties in a way that provides incentives for both parties to operate safely, ensures that payments are made quickly to anyone injured in an accident, and encourages joint problem solving to correct safety concerns. 197 • CSXT will contribute $500,000 to help defray the cost of the liability insurance policy the MBTA carries for the entire commuter system. Additionally, in the event an accident occurs involving a freight train and CSXT is clearly at fault because of willful misconduct, the rail road will be responsible to pay the deductible on that policy, up to a maximum of $7.5 million per accident. In July, the Patrick-Murray Administration joined the New England Governors in announcing a coordinated regional vision for high speed rail that will connect major cities and airports, and support economic growth throughout the region. The Vision for the New England High Speed and Intercity Rail Network lays out key projects to strengthen passenger and freight rail service along new and existing rail corridors. To learn more about New England's rail vision visit: http://www.eot.state.ma.us/recovery/HSR.htm. 198 199 200 201 202 203 From: Gene Phillips [mailto:[email protected]] Sent: Thursday, August 21, 2008 3:58 PM To: Richard T Moore; Phil Shwachman; Rep John Fernandes (Rep); Barry Fiengold; Lawrence Adams; Jon Delli Priscole; Ted Carman; Michael Ruane; Alan & Theresa Ryan; Bob Burns; Eugene Phillips (H); Mike Collins Cc: 'Eugene Phillips (H)' Subject: Everyone: The Selectman at their meeting on August 1 asked me to look into the feasibility and practicality of getting a Commuter Rail Station in Hopedale. Such a station would be on an upgraded section of the Grafton and Upton Railroad (“GURR”) connecting to the existing MBTA Station at Forge Park.
Recommended publications
  • CHAPTER 2 Progress Since the Last PMT
    CHAPTER 2 Progress Since the Last PMT The 2003 PMT outlined the actions needed to bring the MBTA transit system into a state of good repair (SGR). It evaluated and prioritized a number of specific enhancement and expansion projects proposed to improve the system and better serve the regional mobility needs of Commonwealth residents. In the inter- vening years, the MBTA has funded and implemented many of the 2003 PMT priorities. The transit improvements highlighted in this chapter have been accomplished in spite of the unsus- tainable condition of the Authority’s present financial structure. A 2009 report issued by the MBTA Advisory Board1 effectively summarized the Authority’s financial dilemma: For the past several years the MBTA has only balanced its budgets by restructuring debt liquidat- ing cash reserves, selling land, and other one-time actions. Today, with credit markets frozen, cash reserves depleted and the real estate market at a stand still, the MBTA has used up these options. This recession has laid bare the fact that the MBTA is mired in a structural, on-going deficit that threatens its viability. In 2000 the MBTA was re-born with the passage of the Forward Funding legislation.This legislation dedicated 20% of all sales taxes collected state-wide to the MBTA. It also transferred over $3.3 billion in Commonwealth debt from the State’s books to the T’s books. In essence, the MBTA was born broke. Throughout the 1990’s the Massachusetts sales tax grew at an average of 6.5% per year. This decade the sales tax has barely averaged 1% annual growth.
    [Show full text]
  • 2020 FMCB Annual Report
    2020 FMCB Annual Report This report fulfills the requirements of Section 207 of Chapter 46 of the Acts of 2015 specifying that the MBTA Fiscal and Management Control Board (FMCB) report annually on, among other things, the Massachusetts Bay Transportation Authority’s “own-source revenue, operating budget, capital plan and progress toward meeting performance metrics and targets.” This final report is presented to the Legislature after five and a half years of governance by the FMCB, with just under six months left in our extended term. 2020 was an extraordinary year, marked by an unprecedented global pandemic, nationwide protests, political and racial tensions, and substantial changes in the ways we live and work. Due to the widespread adoption of teleworking and the closure of hotels, restaurants, and other sectors to slow the spread of COVID-19, MBTA ridership fell sharply. By the end of October, Commuter Rail ridership was down 87% compared to 2019, with the system carrying only 8.5% of its pre- COVID morning peak ridership. Ferry ridership stood at 12% of pre-COVID ridership, with the MBTA paying to operate 112 trips daily with an average of seven riders per trip. Ridership at gated rapid transit (subway) stations was still roughly one-quarter of pre-COVID levels. Even bus ridership, which serves our most durable, transit-dependent customers, had fallen to about 45% of the baseline by October. This decline in ridership, of course, had significant implications for own source revenue. In November 2020, fare revenues were down 78% compared to November 2019. Parking and advertising revenues dropped in line with fares, while real estate revenues remained more stable.
    [Show full text]
  • South County
    Fairmount Line Corridor Improvements Project MBTA Contract No.G74PS01 Amendment 8 Service Enhancement Study Final Report April 2008 Prepared for: Prepared by: Fairmount Line Service Enhancement Study Introduction and Executive Summary...........................................................................................................2 Methodology.................................................................................................................................................8 1. Kick Off Meeting......................................................................................................................................9 2. Validate and Update Tools: Key Findings.............................................................................................10 2.1. South Station Capacity................................................................................................................10 2.2. Station Dwell Times with High Peak Period Travel Volumes....................................................15 2.3. Equipment Maintenance and Storage Capacity...........................................................................17 3. Develop and Screen Preliminary Options: Key Findings .......................................................................21 3.1. Baseline.......................................................................................................................................21 3.2. Peak Alternatives.........................................................................................................................22
    [Show full text]
  • Phased Corridor Map
    Home Benefits Programs Environmental Construction Documents Community Engagement Home > Route and Service > Phased Corridor Map Phased Corridor Map Download PDF of the Phased Corridor Map [240 KB] Corridor map for the South Coast Rail project showing the project's phasing plan. Phase 1 will extend the existing Middleborough/Lakeville Commuter Rail Line to provide service to Taunton, New Bedford and Fall River. The Phase 1 route begins at South Station in Boston and continues on the existing Middleborough Main Line to Pilgrim Junction, then follows the Middleborough Secondary to Cotley Junction. The route then continues south and splits into two legs: one leg bound for Fall River following the Fall River Secondary and one leg bound for New Bedford following the New Bedford Main Line. Existing stations and layovers for Phase 1 include South Station, Holbrook/Randolph, Montello, Brockton, Campello, Bridgewater, Middleborough/Lakeville, and Middleborough Layover. Phase 1 includes four new stations: East Taunton, Fall River Depot, King's Highway, and Whale's Tooth; a potential new Middleborough station; and two new layover facilities (Weaver's Cove and Wamsutta). Phase 2 follows the Northeast Corridor from Boston to Canton Junction, then follows the Stoughton Line to Cotley Junction. Existing stations include South Station, Back Bay, Ruggles, Forest Hills, Readville, Route 128, and Canton Junction. Reconstructed stations include Canton Center and Stoughton stations. New stations for phase 2 include: North Easton, Easton Village, Raynham Place, Taunton, Freetown, and Battleship Cove. Powered by Translator | Translation Support MassDOT Home | About Us | Employment | Contact Us | Site Policies Copyright © 2017 Commonwealth of Massachusetts.
    [Show full text]
  • Final Amendment
    AMENDMENT TO PATHS TO A SUSTAINABLE REGION, THE BOSTON REGION METROPOLITAN PLANNING ORGANIZATION’S LONG-RANGE TRANSPORTATION PLAN ADOPTED BY THE BOSTON REGION MPO ON JUNE 28, 2012 OVERVIEW The Boston Region Metropolitan Planning Organization (MPO) adopted an amendment to its current Long-Range Transportation Plan (LRTP), Paths to a Sustainable Region, on June 28, 2012. Paths to a Sustainable Region had been endorsed by the MPO in September 2011. The adopted amendment is explained in this document. The primary reason for this amendment is to provide for consistency between the LRTP and the Federal Fiscal Years (FFYs) 2013–16 Transportation Improvement Program (TIP), which was also endorsed by the MPO on June 28, 2012. Primarily, the information on one of the projects in the LRTP required updating for consistency with the information on it in the endorsed TIP. In the TIP, the Route 53 widening project in Hanover is programmed in FFY 2014. This project had been programmed in the LRTP in the FFYs 2016–20 funding time band. The LRTP amendment moves it to FFY 2014 to be consistent with information presented in the TIP. The Hanover project is regionally significant and therefore must be included in the region’s air quality conformity determination in the correct time band. The MPO performed a full conformity determination on the TIP because of this change. A new conformity determination was also performed on the LRTP, as amended. This amendment, in addition to changing the time band for the Hanover project, updates the LRTP with the latest planning assumptions and information, and changes the funding time bands for two projects that are outside of the TIP’s time frame but must be considered in the air quality conformity determination.
    [Show full text]
  • Shadow Transit Agency: When These by MICHAEL JONAS Three Transportation Policy Wonks Speak, the MBTA Listens
    DEMOCRACY ISN’T WORKING IN MASSACHUSETTS GANGS/ELECTIONS/UTILITIES/NURSES/TRANSITMATTERS POLITICS, IDEAS & CIVIC LIFE IN MASSACHUSETTS Shadow transit agency commonwealthmagazine.org FALLSUMMER 2017 2017 $5.00$5.00 When these three wonks speak, FALL 2017 FALL the MBTA listens Leaders in both the public and private sectors rely on The MassINC Polling Group for accurate, unbiased results. You can too. Opinion Polling Market Research Strategic Consulting Communications Strategies DATA-DRIVEN INSIGHT MassINCPolling.com @MassINCPolling (617) 224-1628 [email protected] T:7.5” Our people have always been the ones behind the HERE’S TO continued success of Partners HealthCare. And for the past 24 years, it’s been the people—68,000 strong—who have helped our hospitals rank on the prestigious U.S. News & THE PEOPLE World Report “Best Hospitals Honor Roll.” WHO POWER This year, in addition to our nationally ranked founding hospitals, Massachusetts General Hospital and Brigham and Women’s Hospital, we congratulate McLean T:10.5” PARTNERS Hospital and the Spaulding Rehabilitation Hospital, which were recognized nationally for their specialties. We HEALTHCARE also extend our congratulations to our neighbors at Beth Israel Deaconess, Tufts Medical Center, and Children’s Hospital for their national recognition. And as we do every year, we wish to thank our employees for helping lead the way with their achievements. For us, this recognition is always about more than a ranking. It’s about providing the highest quality care, innovating for the future, and ensuring our community continues to thrive. This is Partners HealthCare. A legacy of knowing what counts in high quality health care.
    [Show full text]
  • EXECUTIVE SUMMARY Acknowledgements
    EXECUTIVE SUMMARY Acknowledgements COMMONWEALTH OF MASSACHUSETTS STATE INTERAGENCY CORRIDOR PLAN TEAM Deval Patrick, Governor • Kristina Egan, co-chair Timothy Murray, Lieutenant Governor • Robert Mitchell, co-chair • Administration and Finance Jay Gonzalez, Karol Ostberg, Thomas Dugan Executive Office of Transportation • Department of Housing and Community Development • James Aloisi, Secretary Alana Murphy, Patrick Hart, Carol Wolfe, William Reyelt • Kristina Egan, South Coast Rail Manager • Housing and Economic Development Eric Nakajima Executive Office of Housing and Economic Development • Energy and Environmental Affairs EOHED David Cash, Maeve Vallely Bartlett, Robert O’Connor • Greg Bialecki, Secretary • Robert Mitchell, Special Assistant for Planning Initiatives • MEPA (Energy and Environmental Affairs) Aisling Eglington • MassGIS (Energy and Environmental Affairs) THANKS TO THE FOLLOWING FOR LEADERSHIP Christian Jacqz AND SUPPORT: • Labor and Workforce Development • Leslie Kirwan, Secretary, Executive Office for Administration R.J. McGrail, Robb Smith and Finance • Massachusetts Bay Transportation Authority • Ian Bowles, Secretary, Executive Office of Energy and Joe Cosgrove, Mark Boyle, Ron Morgan Environmental Affairs • Suzanne Bump, Secretary, Executive Office of Labor and • Transportation and Public Works Workforce Development Peter O’Connor, Tim Doherty, Katherine Fichter • Tina Brooks, Undersecretary, Department of Housing and • MassHighway (Transportation and Public Works) Community Development Diane Madden • David Perini,
    [Show full text]
  • KEEPING on TRACK Our Second Progress Report on Reforming and Funding Transportation Since Passage of the Massachusetts Transportation Finance Act of 2013
    KEEPING ON TRACK Our Second Progress Report on Reforming and Funding Transportation Since Passage of the Massachusetts Transportation Finance Act of 2013 Written by Produced by Rafael Mares Kirstie Pecci FEBRUARY 2015 KEEPING ON TRACK Our Second Progress Report on Reforming and Funding Transportation Since Passage of the Massachusetts Transportation Finance Act of 2013 Rafael Mares, Conservation Law Foundation Kirstie Pecci, MASSPIRG Education Fund February 2015 ACKNOWLEDGMentS The authors thank the following MassDOT; Rani Murali, former Intern, individuals for contributing information Transportation for Massachusetts; or perspectives for this report: Jeannette Orsino, Executive Director, Andrew Bagley, Director of Research Massachusetts Association of Regional and Public Affairs, Massachusetts Transit Authorities; Martin Polera, Office Taxpayers Foundation; Paula of Real Estate and Asset Development, Beatty, Deputy Director of Budget, MBTA; Richard Power, Legislative MBTA; Taryn Beverly, Legal Intern, Director, MassDOT; Janice E. Ramsay, Conservation Law Foundation; Matthew Director of Finance Policy and Analysis, Ciborowski, Project Manager, Office MBTA; and Mary E. Runkel, Director of of Transportation Planning, MassDOT; Budget, MBTA. Jonathan Davis, Chief Financial Officer, MBTA; Thom Dugan, former Deputy This report was made possible thanks Chief Financial Officer & Director, to generous support from the Barr Office of Management and Budget, Foundation. MassDOT; Kristina Egan, Director, Transportation for Massachusetts; Adriel © 2015 Transportation for Massachusetts Galvin, Supervisor of Asset Systems Development, MassDOT; Scott Hamwey, The authors bear responsibility for any Manager of Long-Range Planning, factual errors. The views expressed in Office of Transportation Planning, this report are those of the authors and MassDOT; Dana Levenson, Assistant do not reflect the views of our funders Secretary and Chief Financial Officer, or those who provided review.
    [Show full text]
  • Keeping on Track-Transportation Progress Report
    KEEPING ON TRACK Our Progress in Reforming and Funding Transportation since Passage of the Massachusetts Transportation Finance Act of 2013 Written by Produced by Rafael Mares Kirstie Pecci With assistance from MARCH 2014 KEEPING ON TRACK Our Progress in Reforming and Funding Transportation since Passage of the Massachusetts Transportation Finance Act of 2013 Rafael Mares, Conservation Law Foundation Kirstie Pecci, MASSPIRG Education Fund March 2014 ACKNOWLEDGMENTS The authors thank the following for Urban and Regional Policy, Paul individuals for contributing Regan, Executive Director of the MBTA information or perspectives for this Advisory Board, and Elizabeth Weyant, report: Andrew C. Bagley, Director Advocacy Director of Transportation for of Research and Public Affairs of the Massachusetts. Massachusetts Taxpayers Foundation, Justin Backal-Balik, Manager of Public This report was made possible thanks Policy and Government Affairs of A to generous support from the Barr Better City, Thom Dugan, Deputy Chief Foundation. Financial Officer of the Massachusetts Department of Transportation, Kristina The authors bear responsibility for any Egan, Director of Transportation factual errors. The views expressed in for Massachusetts, Doug Howgate, this report are those of the authors Budget Director of the Senate and do not necessarily reflect the Ways and Means Committee of the views of our funders or those who Commonwealth of Massachusetts, provided review. Emily Long, Program Assistant at the Conservation Law Foundation, © 2014 Transportation for Massachusetts Melanie Medalle, legal intern at the Conservation Law Foundation, Cover photos (clockwise from top): David Mohler, Deputy Secretary for Patrick D. Rosso, pdrosso @ flickr; Policy and Executive Director of the Worcester Regional Transit Authority; Office of Transportation Planning Richard Masoner/Cyclelicious; MassDOT.
    [Show full text]
  • Spring 2020 Fact Sheet
    www.mass.gov/southcoastrail South Coast Rail Enters a Landmark Year The year 2020 will begin the four-year process Davol Street, not far from the original station that of making South Coast Rail (SCR) a reality. The closed in 1958. A rendering of the station appears MBTA will advertise for construction bids to build on page 3. The Freetown station will be at 161 South Phase 1 of the SCR Program over the next few Main Street. Previously, stations were located in months. The process began in February with the Assonet at Elm Street and Crystal Spring (Thwaites) first advertisement for the Fall River Secondary at Copicut Road. Service also ended in 1958. contract package (see the map on page 2). The second package, for the New Bedford Main Line, the The second construction package is for the New Middleborough Secondary and the signal system for Bedford Main Line, Middleborough Secondary and the entire Phase 1 corridor, will be advertised in the Signal and Communication Systems. New stations spring. Both elements of Phase 1 construction will be include Middleborough, East Taunton, North New underway by the end of 2020. The MBTA is targeting Bedford, and New Bedford. The New Bedford Main the end of 2023 for the start of regular service. Line layover facility will be located at Wamsutta, adjacent to an existing layover site. The contract The SCR Program will restore passenger rail service will also include six bridges, 18 grade crossings, to the South Coast region for the first time since 14 interlockings and 35 track miles.
    [Show full text]
  • South Coast Rail Faqs
    Introduction The Massachusetts Department of Transportation (MassDOT) and the Massachusetts Bay Transportation Authority (MBTA) held a series of public meetings in southeastern Massachusetts in September 2016 to update the cities and towns in the region on two topics: (1) progress in designing the South Coast Rail project, and (2) a new proposal to advance service to the South Coast using the Middleborough line, a route that was previously considered and rejected. MassDOT and the MBTA estimate that service to the South Coast is not likely to begin until 2030 on the Stoughton Electric route (see map on page 2), which is the preferred route. The agencies began to look at other potential routes that could possibly be put into service more quickly and brought this information to the September public meetings for review. This document includes questions that were posed at the six meetings. It’s not possible to answer all of the questions at this time, since the design engineers have just started to look at the Middleborough route in detail. MassDOT and the MBTA are collecting the information needed to evaluate the new Middleborough Option cost and construction duration, required permits, operational plans, travel time and ridership. The project team will present its findings to MassDOT and MBTA leadership in the next several months. Frequently Asked Questions What is the status of the South Coast Rail project? In 2013, the Stoughton Electric route was selected by the state and the U.S. Army Corps of Engineers from among 64 possible alternatives as the preferred route for a new MBTA rail service between the South Coast and Boston.
    [Show full text]
  • Invests$'Jlom Into Restoring Railroadservice
    Paga46 • August2015 26, • www.oonotructlonoquipmenlgUlcle.com • CONSTRUCTION EQUIPMEriTGUIIE � Invests$'JlOM Into Restoring Railroad Service ByJay Adams problems. While the Commonwealth of CEO CORRESPONDENT Cardi Corp. crews work 011 rat/over Massachusetts provided an emergency sub­ PresidentAve1n1e tn FaU Rive,: sidy to continue service to tl1e Soud1 Coast in A long-dead mode of transportation is 1958, it was not enough. Passenger service coming back to life in several cities in on the Old Colony line was abandooed in Massachusetts.. 1959, with the exception of the main line Months of summer work have begun to between Boston and Providence,R.l. repair vital rail bridgesin the FallRiver area, The currentone-year phase of lhe project partof the 120-month South Coast Rail proj­ is seeingrailways shoredup forthe firsttime ect d1at is restoring52 mi. (83.6 km)of com­ in 56 years. muter rail service between Boston and lhe With the first year design phase complete. Massachusetts South Coast. The entirecost involving state discussions with communi­ of die decade-long plan is estimated to be tiesfrom Stoughton to FallRiver. tons of soil $2l0million. samples are being taken over many months "We are thrilled about the three Fall River to discerntoxic conte111 and other vital infor­ bridges and the Warnsutta Bridge in New mation. When the design phase is complete Bedford. These are solid investments that and the samples in hand, MassDOT will will provide immediate benefit to the begin replacing four bridges - New expanding freightrail sector. along the same Bedford's Wan�utta Bridge. Fall River's route as lhe future South Coast Rail com­ Golf Club Road.
    [Show full text]