2009/00500/OUT Received on 12 May 2009 Entec UK Ltd, Pacific House
Total Page:16
File Type:pdf, Size:1020Kb
2009/00500/OUT Received on 12 May 2009 Entec UK Ltd, Pacific House, Imperial Way, Reading, Berkshire RG2 0TD, The Secretary of State for Defence, Metrix UK Limited and Sodexo Limited, 10, Great George Street, 2nd Floor, London., W1P 3AE Land at and adjoining MoD St. Athan in the Vale of Glamorgan, extending from the B4265 at Boverton in the west to Castleton Farm, St Athan, in the east, and from north of the runway and north of Castleton Road at St Athan in the south to land at the northern end of the MoD St Athan site at Picketston and up to Flemingston Road, St Athan, in the north; together with land adjoining the B4265 near Gileston and land at Waycock Cross, Barry. Development of a Defence Technical College and associated facilities and works, including 483 Service Families' Accommodation dwellings, military external and field training areas, the alteration and reconfiguration of St Athan golf course, a hotel, an energy centre, improved parking and servicing facilities for the existing spar shop on Eglwys Brewis Road, the provision of a new access road and other associated highway works and improvements, including a garage for Rose Cottage, and all associated ancillary building, sports, community, ecological mitigation and enhancement, engineering, landscaping, means of enclosure and other works. TABLE OF CONTENTS PAGE 1. INTRODUCTION & CONTEXT 13 2. SITE DESCRIPTION 14 3. DEVELOPMENT DESCRIPTION 16 3.1 The Proposals 16 3.2 Supporting Documentation 18 4. RELEVANT PLANNING HISTORY 19 5. PRE-APPLICATION 20 6. COMMUNITY ENGAGEMENT 20 7. CONSULTATION RESPONSES 22 8. REPRESENTATIONS 39 8.1 Extent of Publicity / Notifications Undertaken 39 8.2 Analysis of Responses Received 39 8.2.1 Petitions 39 Pg 1 8.2.2 Letters of Representation 40 8.2.3 Summary of Representations 41 8.2.4 Representations received from Member of Parliament and Assembly Members 43 9. ANALYSIS OF LAND OWNERSHIP / NOTIFICATION RESPONSES (including responses to notice under Article 6) 45 10. NATIONAL, REGIONAL AND LOCAL STRATEGIC POLICY 48 10.1 National Policy 48 10.2 Emerging Local Development Plan 49 10.3 Unitary Development Plan 50 10.4 Supplementary Planning Guidance 52 10.5 St. Athan Development Brief 52 11. ISSUES 53 12. THE PRINCIPLE OF DEVELOPING A DEFENCE TECHNICAL COLLEGE 54 12.1 Analysis of the proposals against existing and emerging national and local policy 54 12.2 Rationale behind location of Service Families Accommodation (SFA) 56 12.2.1 Numbers and Type of Accommodation Required 56 12.2.2 Analysis 58 12.2.3 Conclusions 60 12.3 The consideration of the Highway Access Options 61 12.4 The Economic Case for the Development 65 12.5 Summary 67 13. SITE-SPECIFIC DEVELOPMENT: “INSIDE THE WIRE” 68 13.1 Main Gate 70 13.2 The Mall & Parade Ground 71 13.3 The College 72 13.4 The Hub 72 13.5 Heritage Park 72 13.6 Single Living Accommodation (SLA) 73 13.7 Messes and Officer Accommodation 73 13.8 Second Gate (and environs) 73 13.9 RID (Received Incoming Delivery (RiD) facilities) 74 13.10 Energy Centre 74 13.11 Other Matters – Car Parking Strategy 75 13.12 Other Matters – Lighting 76 13.13 Other Matters – Security 76 Pg 2 14. SITE-SPECIFIC DEVELOPMENT: “OUTSIDE THE WIRE” 76 14.1 Northern Access Road 76 14.1.1 NAR Description 78 14.1.2 Landscape and Visual Impacts from surrounding views 79 14.1.3 Analysis of landscape impacts from surrounding viewpoints 80 14.1.4 Impact on existing residential properties 82 14.2 Other Highway Schemes 84 14.2.1 Off-site Highway Works 85 14.3 Service Families Accommodation (SFA) 88 14.3.1 Introduction and Background 88 14.3.2 Tremains Farm 97 14.3.3 North of West Camp 107 14.3.4 Picketston South West 115 14.3.5 Stadium / Golf Course 122 14.4 Picketston Area 131 14.4.1 Sports & Recreation Facilities 131 14.4.2 Community Facilities 132 14.4.3 Hotel 132 14.4.4 Picketston Field Training Area (FTA) 134 14.4.5 Other Development / Uses 135 14.4.6 Picketston General Conclusions 135 14.5 Castleton Area 135 14.5.1 Field Training Area 135 14.5.2 St Athan Golf Course 137 14.6 Other Matters – Infrastructure 137 14.6.1 Foul Drainage and Wastewater Treatment 138 14.6.2 Water Supply and Re-Use 139 15. TRAFFIC & TRANSPORT IMPLICATIONS 139 15.1 Northern Access Road (NAR) and Off Site Highway Works 140 15.2 Sustainable Transport Provisions 140 15.3 DTC Travel Plan 142 15.4 Construction Travel Plan 142 15.5 Transport Assessment 143 15.6 Impact on the Highway Network 144 15.6.1 Impact on A473/ Waterton Cross Roundabout 144 15.6.2 Requirement for the Airport Access Road 144 15.6.3 Impact on Llysworney 145 Pg 3 15.6.4 Impact on Minor Roads in the Vicinity 145 15.6.5 Requirement for a roundabout rather than traffic signals at B4265 Gileston / St Athan junction 146 15.7 Impact on Rail Services 146 15.8 Impact on Bus Services 147 15.9 Impact on cycle and pedestrian routes 148 15.10 Public Rights of Way 148 15.11 Construction Traffic Impact 149 16. GENERAL SUSTAINABILITY 150 16.1 Policy Background 150 16.2 The Proposals 151 16.3 Analysis 152 16.4 Transport 152 16.5 Travel Plans 153 16.6 Design, Orientation etc. 153 16.7 Low and Zero Carbon choices including Energy Centre 154 16.8 Other Low and Zero Carbon Energy Choices 155 16.9 Sustainable Buildings 156 16.10 Waste Management 156 17. ENVIRONMENTAL IMPACTS 157 17.1 Air Quality 158 17.2 Odour 163 17.3 Noise and Vibration 164 17.4 Conclusion and Summary 184 18. HYDROLOGY, GEOLOGY & HYDROGEOLOGY 185 18.1 Flood Risk Management 185 18.2 Surface Water Drainage and Attenuation 186 18.3 Foul Drainage and Wastewater Treatment 187 18.4 Surface water drainage and pollution prevention measures 188 18.5 Silt, Oil and other Possible Pollutants 189 18.6 Highway Drainage 189 18.7 Land Contamination 189 18.8 Water Supply 190 19. HISTORIC ENVIRONMENT 190 19.1 Impact on Listed Buildings 190 19.1.1 Church of Saint Brise 191 19.1.2 Other Listed Buildings 192 19.2 Impact on Conservation Areas 192 19.3 Impact on Archaeological Resource 193 19.4 Impact on Scheduled Ancient Monuments 195 19.5 Other Historic Environment effects 196 Pg 4 19.6 Other Matters 195 20. ECOLOGICAL ISSUES 196 20.1 The proposals 197 20.2 Analysis 198 20.2.1 Great Crested Newts 199 20.2.2 Bats 200 20.2.3 Dormice 201 20.2.4 Other Species (including Otters, Reptiles and Badger) 201 20.2.5 Hedgerows 201 20.3 Conclusions 202 21. HEALTH IMPACT 203 21.1 Impacts on Health 203 21.2 Sport and Recreation Facilities 204 21.3 Potential Effect on Local Health Services Arising During Construction Period 204 22. LANDSCAPE & VISUAL ASSESSMENT 205 23. AGRICULTURAL IMPACT 207 23.1 Land Quality 206 23.2 Impact on Agricultural Holdings 209 24. SECTION 106 ISSUES 209 24.1 Section 106 Issues (General) 209 24.1.1 Transport 210 24.1.2 Highway Matters 210 24.1.3 Construction Traffic Impact 210 24.1.4 Sustainable Transport 211 24.1.5 Recreational Routes (PRoW) 212 24.1.6 Public Art 212 24.1.7 Waste 213 24.1.8 Leisure and Recreational Facilities 213 24.1.9 Town / Village Centre Enhancement 213 24.2 Section 106 Issues (Service Family Accommodation) 214 24.2.1 Occupancy Restrictions 214 24.2.2 Affordable Housing 214 24.2.3 Education 216 24.2.4 School Transport 217 24.2.5 Public Open Space 218 24.2.4 Community Facilities 218 Pg 5 24.3 Conclusion on Section 106 Planning Obligation Matters 219 25. PHASING ISSUES 219 26. CONCLUSION 220 27. RECOMMENDATION 221 LIST OF FIGURES: Figure 1. Application Site Boundary Figure 2. Potential Economic Flows associated with the proposal Figure 3. DTC Masterplan Figure 4. East Camp Masterplan (extract) Figure 5. Second Gate (extract) Figure 6. Northern Access Road (extract) Figure 7. NAR: Bridge over Llanmaes Brook (extract 003622/B1/01) Figure 8. Site Location Plan: Tremains Farm Figure 9. Illustrative layout Plan: Tremains Farm Figure 10. Site Location Plan: North West camp Figure 11. Illustrative layout Plan: North West camp Figure 12. Site Location Plan: Picketston South West Figure 13. Illustrative layout Plan: Picketston South West Figure 14. Site Location Plan: Stadium / Golf Course Figure 15. Illustrative layout Plan: Stadium / Golf Course Figure 16. Picketston Masterplan (extract) Figure 17. Castleton Masterplan (extract) Figure 18. Air Quality Receptor Locations Pg 6 LIST OF APPENDICES Appendix 1. Llanfair Community Council response Appendix 2. St Athan Community Council response Appendix 3. Llanmaes Community Council response Appendix 4. Environment Agency Wales response Appendix 5. Countryside Council for Wales response Appendix 6. Glamorgan Gwent Archaeological Trust response Appendix 7. Dwr Cymru Welsh Water response Appendix 8. Vale of Glamorgan Head of Visible Services (Highway development) response Appendix 9. Vale of Glamorgan Head of Visible Services (Drainage) response Appendix 10a. Petition (front page/ letter) from Llanmaes residents Appendix 10b. Petition (front page/ letter) from St Athan residents Appendix 10c. Petition (front page/ letter) from Gileston/ St Athan residents Appendix 10d. Petition (front page/ letter) from Millands Park residents Appendix 10e. Petition (front page/ letter) from Boverton residents Appendix 10f. Petition (letter and petition) from residents of St Athan Appendix 11. Examples of Letters of Representation Appendix 12. Letter of representation from Cynefin y Werin Appendix 13.