Fixing NSW: a Long-Term Vision for Better Infrastructure

Total Page:16

File Type:pdf, Size:1020Kb

Fixing NSW: a Long-Term Vision for Better Infrastructure Fixing NSW: A LONG-TERM VISION FOR BETTER INFRasTRUCTURE A submission to Infrastructure NSW Infrastructure Partnerships Australia is a national forum, comprising public and private sector CEO Members, advocating the public policy interests of Australia’s infrastructure industry. Infrastructure Partnerships Australia 8th Floor 8-10 Loftus Street Sydney NSW 2000 T +61 2 9240 2050 F +61 2 9240 2055 www.infrastructure.org.au For more information please contact: Brendan Lyon Chief Executive Officer Infrastructure Partnerships Australia Level 8, 8-10 Loftus Street, Sydney NSW 2000 PO Box R 1804, Royal Exchange, Sydney NSW 1225 T +61 2 9240 2051 E [email protected] Adrian Dwyer Director, Policy Infrastructure Partnerships Australia Level 8, 8-10 Loftus Street, Sydney NSW 2000 PO Box R 1804, Royal Exchange, Sydney NSW 1225 T +61 2 9240 2056 E [email protected] I II I II Contents Executive Summary V Recommendations VII 2 Principles 1 2.1 The Long-Term Infrastructure Plan Must be the Principal Focus for Infrastructure NSW 1 2.2 Strategic Corridor and Land Preservation 4 2.3 Infrastructure NSW as a Strategic Partner Across Government 5 2.4 Project Conception and Prioritisation 5 2.5 Procurement Agnosticism 6 2.6 Contestability in Public Services 6 2.7 Oversight and ‘Step-In’ Powers 7 2.8 Ex Post Review and Project Monitoring 8 2.9 Commonwealth Government Submissions 8 3 Background to the Infrastructure Challenge 9 3.1 A Burgeoning Population 9 3.2 The Challenge of a Constrained Balance Sheet 11 3.3 Economic Growth 12 3.4 Productivity Growth 14 4 Transport 16 4.1 Integrated Land-use and Transport Planning 17 4.2 Network Tolling 17 4.3 Tripling of the Freight Task 18 III IV 4.4 Building for Future Capacity 21 4.5 Preserving Corridors for Future Transport Infrastructure 21 4.6 Resolving the Role of Rapid Transit 22 4.7 Regional NSW Transport 23 5 Energy 24 6 Water 27 6.1 Metropolitan Water 27 7 Social Infrastructure 29 7.1 Health 29 7.2 Corrective Services 31 7.3 Public Housing in New South Wales 33 8 Critical Projects 35 8.1 M5 East Duplication 35 8.2 Northern Beaches Health Services 35 8.3 M4 East 36 8.4 F3 – Sydney Orbital Links 36 8.5 Passenger Rail Upgrades 37 8.6 Freight Rail Upgrades 37 8.7 Moorebank Intermodal 38 8.8 Pacific Highway Upgrades 38 9 New South Wales Infrastructure Maps & Pipeline 39 9.1 Infrastructure Prioritisation List 42 10 Annexures 48 III IV Executive Summary New South Wales needs to substantially increase the quality, capacity and efficiency of its transport, utilities, social and community infrastructure. This will require the State to increase both the quantum of money it invests, and ensure that it invests in the best infrastructure projects to meet social and economic outcomes. Achieving a permanent increase in infrastructure investment will require substantial reform to the State’s budget; while increasing the quality and value for money achieved from these investments will require a fundamental overhaul of the way projects are conceived, funded, delivered and operated. This new approach will require substantial changes to the established roles of government and the private sector. Shortfalls across transport, utility and social infrastructure are constraining the State’s productivity and imposing significant pressures on taxpayers, households and businesses through higher costs of infrastructure services. Efficient infrastructure is the lifeblood of any economy; it underpins: • the productivity of the economy; • the ability of businesses to compete in a national and global market; and • the quality of life and prosperity of the community. At its core, infrastructure underpins the delivery of efficient services to drive forward economic growth and social development. However, solving the infrastructure challenge in New South Wales is not as simple as issuing contracts for new projects. It will first require a fundamental shift in the way that infrastructure is conceived and planned – and a substantial period of budget reform to allow projects to advance from concept to completion. Currently the New South Wales budget does not have the capacity to fund new projects without endangering the State’s AAA credit rating. Analysis by Infrastructure Partnerships Australia estimates that New South Wales can borrow only an additional few billion dollars before it reaches its AAA downgrade trigger point. The NSW Government estimates that a drop to a AA+ rating would result in additional debt servicing costs of $3.75 billion over 10 years.1 In the past decade, New South Wales has suffered from the lack of a well-considered, well- founded and suitably long-term plan for the infrastructure needed to support economic and social outcomes. But this lack of a long-term vision for infrastructure is a relatively recent phenomenon. Indeed, the State has historically benefited from ambitious and very long- term approaches to infrastructure. Examples include: • Governor Macquarie’s reorganisation of the Sydney road network in the very early years of colonial Sydney; • John Bradfield’s 1923 Master Plan for Sydney; and • The 1951 County of Cumberland Planning Scheme. 1 NSW Budget Speech, 2012-13 NSW Budget. V VI Each of these plans contained substantial foresight and ambition and acted to fundamentally change the shape, operation and development of the State. In the past decade, that level of long-term strategic planning and sustained project delivery has been replaced by a series of rapidly changing planning and project priorities. The result has been a regrettable lack of integration and cohesion across government; and an equally regrettable lack of progress on the delivery of critical projects. Done well, the creation of Infrastructure NSW, with its mandate to develop a long-term strategy for the State’s infrastructure networks, offers a generational opportunity for the State to recapture the vision and ambition contained in the Macquarie, Bradfield and Cumberland plans. A strong and evidence based strategic infrastructure plan spanning the State offers the opportunity to shape the development of New South Wales across the coming half century. Infrastructure NSW was formed after significant consultation across government and industry to perform two key functions: • The delivery of an integrated long-term state infrastructure strategy and prioritised project pipeline; and • The identification and adoption of major policy and market reforms, ensuring that New South Wales has the financial capacity to fund the massive infrastructure programme that is required. Expectations are high among business and the broader community that Infrastructure NSW will be able to make immediate impacts on the State’s infrastructure backlog. However, the pursuit of immediate-term goals must be considered in the context of longer-term requirements for the State’s growth infrastructure. Developing a whole of government infrastructure strategy will be a complex task. Prioritising the delivery of health projects against transport, community, justice, social housing and utility projects presents a significant challenge in its own right. The development of a robust project prioritisation methodology, which accurately identifies requirements and costs – whilst allowing for the flexibility to innovate in the provision of infrastructure and services – will be a crucial part of ensuring the right projects are prioritised and advanced. Of course, a robust long-term strategy alone will not solve the State’s infrastructure shortfall. The strategy will likely identify hundreds of billions of dollars of project investments that will need to be funded over the coming decades. That will mean that the Infrastructure NSW strategy will need to be backed by sustained fiscal reforms across the State’s public sector. Creating sustainable capacity for increased taxpayer investment in infrastructure will require complex reforms to the cost and quality of public services; as well as an ongoing process of privatisation of public assets and the consideration and adoption of targeted taxation and user pays measures to increase the availability of funding. For example, research undertaken by Infrastructure Partnerships Australia found a full privatisation of the State’s remaining electricity assets would liberate between $32.5 billion and $41 billion that could be invested in new projects. Full privatisation would also transfer future energy infrastructure investments away from taxpayers and on to the private sector. Reforming electricity alone would therefore strengthen the State’s capacity to invest by more than $50 billion. The NSW Government’s privatisation of the Sydney Desalination Plant, and planned divestment of Port Botany, Port Kembla and the State-owned electricity generators must form the start of an ambitious and sustained programme to recycle taxpayer dollars from existing assets, for investment in new projects. This submission makes a range of suggestions about fiscal, governance and project priorities that should be considered by Infrastructure NSW and the NSW Government in approaching this task. V VI Recommendations 1 The long-term infrastructure strategy must be the principal focus of Infrastructure NSW and must look at requirements beyond the 20 year planning horizon to deliver a robust and stable infrastructure programme. • To be effective, the long-term strategy produced by Infrastructure NSW should integrate with the individual strategies and project plans of the State’s central and line agencies, in particular the Long
Recommended publications
  • New Nsw Rail Timetables Rail and Tram News
    AUSTRALASIAN TIMETABLE NEWS No. 268, December 2014 ISSN 1038-3697 RRP $4.95 Published by the Australian Timetable Association www.austta.org.au NEW NSW RAIL TIMETABLES designated as Hamilton Yard (Hamilton Station end) and Sydney area Passenger WTT 15 Nov 2014 Hamilton Sidings (Buffer Stop end). Transport for NSW has published a new Passenger Working Timetable for the Sydney area, version 3.70. Book 2 The following sections of the Working Timetable will be re- Weekends is valid from 15 November, and Book 1 issued with effect from Saturday 3 January 2015: • Weekdays valid from 17 November. There appear to be no Section 7- Central to Hornsby-Berowra (All Routes) significant alterations other than the opening of Shellharbour • Section 8- City to Gosford-Wyong-Morisset- Junction station closing of Dunmore station. A PDF of the Broadmeadow-Hamilton new South Coast line Public timetable can be accessed from • Section 9- Hamilton to Maitland-Dungog/Scone. the Sydney trains website. Cover pages, Explanatory Notes and Section Maps will also be issued. Additionally, amendments to Section 6 will need Sydney area Freight WTT 15 Nov 2014 to be made manually to include updated run numbers and Transport for NSW has published a new Freight Working changes to Sydney Yard working as per Special Train Notice Timetable for the Sydney area, version 3.50. Book 5 0034-2015. The re-issued sections of Books 1 & 2 will be Weekends is valid from 15 November, and Book 4 designated as Version 3.92, and replace the corresponding Weekdays valid from 17 November. There appear to be no sections of Working Timetable 2013, Version 3.31, reprint significant alterations.
    [Show full text]
  • New South Wales Class 1 Load Carrying Vehicle Operator’S Guide
    New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Important: This Operator’s Guide is for three Notices separated by Part A, Part B and Part C. Please read sections carefully as separate conditions may apply. For enquiries about roads and restrictions listed in this document please contact Transport for NSW Road Access unit: [email protected] 27 October 2020 New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Contents Purpose ................................................................................................................................................................... 4 Definitions ............................................................................................................................................................... 4 NSW Travel Zones .................................................................................................................................................... 5 Part A – NSW Class 1 Load Carrying Vehicles Notice ................................................................................................ 9 About the Notice ..................................................................................................................................................... 9 1: Travel Conditions ................................................................................................................................................. 9 1.1 Pilot and Escort Requirements ..........................................................................................................................
    [Show full text]
  • Re Particularly Interested in the Live PROGRAM 01· Exhibits)
    AUSTRALIAN MUSEUM A n n u a f ''Re p a r t A M eAnnua{ Report o{ the AUSTRALIAN MUSEUM ISSN 1039 • ·1141 To the Hon Bob Carr MP fre111i£'r a/1(/ t(illister /('1 rite · lrts Sir. In accordance with the provisions of the Annual Reports (Statutory Bodies) Act 1984. and the Public Finance and Audit Act 1983. we have pleasure in submitting this report of the activities of the Australian Museum Trust for the financial year ended 30 June 1996 for presentation to Parliament. On behalf of the Australian Museum Trust. Dr Des Griffin AM Mr Malcolm Long Secrrfm·lf fi/ tfu, .Jmsl fresic/elll oj tlte Jmsl AUS IR AL I AN MUSE UM 6 College Street Sydney 2000 Phone: (02) 9320 6000 Internet: i1ifol @amsg .Austmus.gov.au Open 7 days (except Chnstmas Day) 9.30am to 5pm Admission Charges: Family $12, Child $2, Adults $5, Concession $3, Seniors and TAMS Members Free . contents Statement of Ph1losophy 4 Introduction 6 Highlights 7 Premier's Message 8 President's Message 10 Director's Message 12 PubliC Programs and Marketing 16 Sc1ence m the Museum 22 Commerc1al Act1V1t1es 36 Corporate Serv1ces 40 Fmanc1al Statements 46 Appendices Trust 62 Management Structure 64 Staff 66 Publ1cat1ons 70 Sponsors 83 Index 84 statement of philosophy The future of our natural environment and cultural heritage IS of central concern: we intend to join in public debate and g1ve adv1ce to government, the community and business. where we have special knowledge The Australian Museum is comm1tted to: • Excellence in research and scholarship 1n natural science and human studies for the benefit of current and future generations.
    [Show full text]
  • Guide to Using Northconnex for Trucks and Buses December 2020
    Guide to using NorthConnex for trucks and buses December 2020 Pennant Hills Road, Pennant Hills NorthConnex is a nine kilometre twin tunnel motorway, NorthConnex delivers faster, safer, more reliable and providing a seamless connection between the M1 more efcient journeys for road users. It also returns Pacifc Motorway at Wahroonga and the M2 Hills local roads to local communities, improves air quality Motorway at West Pennant Hills. The $3 billion project along Pennant Hills Road and reduces congestion has been delivered by Transurban in partnership with and noise. We are able to deliver the benefts of the Australian and NSW Governments. NorthConnex NorthConnex by removing some of the truck and bus opened to trafc on 31 October 2020. trafc from Pennant Hills Road. Benefts of NorthConnex for you and your business Changes to using Pennant Hills Road Trucks and buses (over 12.5 metres long or over 2.8 Cameras in the gantries record the height and length of metres clearance height) travelling between the M1 and trucks and buses. M2 must use the tunnels unless they have a genuine delivery or pick up destination only accessible via Trucks and buses (over 12.5 metres long or over 2.8 Pennant Hills Road. metres clearance height) which pass both gantries with the fow of trafc will receive a fne of $194 with no loss Two gantries monitor trucks and buses on Pennant Hills of demerit points. Road – in the north at Normanhurst and in the south at Beecroft / West Pennant Hills. Drivers will pass Only trucks and buses a warning sign on that pass under both routes approaching gantries with the fow of the Pennant Hills trafc will be checked Road gantries.
    [Show full text]
  • GETTING Homesafely Anewapproach.Com.Au
    GETTING Home SAFELY Labor’s pLAN TO MAKE TRAIN TRAVEL SAFER ON FRIDAY AND SATURDAY NIGHTS Labor understands that the people of NSW deserve safe, reliable and comfortable public transport. As part of providing a public transport service that meets community needs a Foley Government will do all it can to make travelling on public transport safer. That’s why Labor will: • Re-introduce Guardian train services on Friday and Saturday nights; and • Run all-night train services from Kings Cross to Town Hall and Central Stations. Feeling safe and having confidence in the security on our trains is a major factor for people choosing whether or not to use the rail network, especially for women, parents with children, and older and other vulnerable people. The NRMA’s Seeing Red on Rail reported personal security as the second most pressing issue for over 11,000 thousand commuters. 38% of commuters in this survey said that they do not feel safe at certain times of the day. The Sydney Trains network includes 12 lines, 176 stations and many interchanges. NSW TrainLink network includes 5 intercity lines and over 130 stations. It is a large area to cover. Knowing that there is assistance if other passengers are being anti-social, violent or abusive – especially at night, can increase the numbers of people using public transport as well as improve security. Under the Baird Liberal Government, security on the rail network has been cut. When the Liberals and Nationals came to government in 2011 there were 600 dedicated transit officers for trains and 300 commuter police attached to local area commands.
    [Show full text]
  • NSW Government Action Plan: a Ten Point Commitment
    NSW Government Action Plan A ten point commitment to the construction sector June 2018 A TEN POINT COMMITMENT TO THE CONSTRUCTION SECTOR 1 PURPOSE This statement has been developed by the NSW Government’s Construction Leadership Group (CLG) and is endorsed by its member agencies1, all of whom are engaged in the delivery of a large long term pipeline of infrastructure investment on behalf of the NSW Government. The CLG member agencies recognise that This Action Plan covers all Government-procured the NSW Government can only achieve its construction and is designed to: infrastructure objectives in partnership with the » Encourage an increase in the “supply side” private sector, and that this depends on healthy capacity of the sector to meet future demand. ongoing competition between a capable field » Reduce industry’s costs and “down-time” by of construction firms, sub-contractors and the making Government procurement processes industry supply chain – not just now, but for more efficient. years to come. » Develop the skills, capability and capacity of They have therefore jointly committed to a range the construction industry’s workforce. of steps to help improve the capability and » Encourage culture change and greater capacity of the construction sector. diversity in the construction sector and its suppliers. The NSW Government is committed to achieving value for money in construction procurement. » Foster partnership and collaboration between But value for money does not mean obtaining the public and private sectors to drive the lowest price for every project. Rather, it is innovation in the NSW construction sector. about adopting a broader, longer term view about the need to drive quality, innovation and cost effectiveness by fostering a thriving and sustainable construction sector in NSW.
    [Show full text]
  • Stage 6 (Years 11 And
    Stage 6 Preliminary Course – Year 11, 2020 HSC Course – Year 12, 2021 COURSE INFORMATION BOOKLET Index Introduction .......................................................................................................................... 1 Senior Studies ..................................................................................................................... 2 All My Own Work ................................................................................................................. 2 What types of Courses form the HSC curriculum? .............................................................. 3 What are Units? ................................................................................................................... 4 Determined and administered by NESA .............................................................................. 5 The Higher School Certificate .............................................................................................. 5 Post-Secondary Studies ...................................................................................................... 6 The Australian Tertiary Admission Rank (ATAR) ................................................................. 7 Language Courses .............................................................................................................. 8 Courses Offered at Killara High School ............................................................................... 9 Pathways to the HSC ........................................................................................................
    [Show full text]
  • Lower Northern Beaches
    BUS ROUTE FIVE Lower Northern Beaches Avalon Berowra Ku-ring-gai 4 Chase Mount Ku-ring-gai Newport Dural Mount Colah MONA VALE RD Mona Vale 3 Duffys Forest Asquith Terrey Hills Warriewood Hornsby North Turramurra Waitara ROAD Belrose Wahroonga Warrawee St Ives Turramurra Collaroy Pymble Davidson Frenchs Forest South Turramurra Gordon Gordon East Killara Killara 5 North Curl Curl West Pymble Killarney Heights East Lindfield M2 MWY Lindfield Macquarie Park Seaforth Roseville Castle Cove Willoughby SYDNEY RD North Ryde Chatswood West Ryde Manly Artarmon Northbridge East Ryde St Leonards Gladesville Cammeray Lane1 Cove Northwood Neutral Bay Wollstonecraft Hunters Hill Mosman St Waverton 2 Milsons Point Pymble Ladies’ College is located on 20 hectares of park-like grounds on Sydney’s Upper North Shore 1 Pymble Bus Route One: This College Bus services Lane Cove, Hunters Hill, Boronia Park, East Ryde, Ryde, Macquarie Park and students board and alight within the College grounds. 2 Pymble Bus Route Two: This College Bus services Neutral Bay, Cammeray, Northbridge, Willoughby, Castlecrag, Middle Cove, Castle Cove, East Roseville, right into Eastern Arterial Rd and on through East Lindfield, East Killara and students board and alight within the College grounds. 3 Pymble Bus Route Three: This College Bus services Dural, Glenhaven, Castle Hill (at Oakhill College), West Pennant Hills, Beecroft, Cheltenham (at Cheltenham Girls’ High School), Epping, Marsfield and Macquarie Park (at Macquarie Centre) and students board and alight within the College grounds. 4 Pymble Bus Route Four: This College Bus services Avalon, Newport, Mona Vale, Ingleside, Terrey Hills, Hassall Park and St Ives and students board and alight within the College grounds.
    [Show full text]
  • South West Rail Link Concept Plan and Environmental Assessment
    South West Rail Link Concept Plan and Environmental Assessment EcoTransit Sydney Submission PO Box 630 Milsons Point NSW 1565 0438 253 022 [email protected] Introduction 1. EcoTransit Sydney is a community-based organisation that is dedicated to promoting ecologically sustainable modes of transport for Sydney. 2. EcoTransit is broadly in agreement with many of the stated objectives of the South West Rail Link (hereinafter ‘SWRL’) and of the Metropolitan Rail Expansion Programme (hereinafter ‘MREP’). In particular the intention to improve the public transport system across metropolitan Sydney is welcomed. 3. A desired outcome of the SWRL project is stated as the facilitation of Transit- Oriented Development (‘TOD’) in the South West Growth Centre (‘SWGC’). Whereas EcoTransit also welcomes this approach, TOD is something that must be extended city-wide across the transport network. 4. EcoTransit would like to highlight the dangers in allowing private vehicle usage to become dominant in the SWGC, and such dominance entrenched, in the event that the SWRL is in any way delayed. This has been the case for the majority of new housing estates in the south-west over the last two decades. Existing Context 5. In terms of the Transport Context for this project, it is noted that the existing rail network to this area has frequencies described as ‘relatively convenient.’ [2.3.1] This is patently wrong for users of the network outside peak hours and is not borne out by experience. It is important for planners to realize that Macarthur services to/from the City are practicable for the great majority of train travellers only by the East Hills line.
    [Show full text]
  • Adding to the Dividend, Ending the Divide #3
    ADDING TO THE DIVIDEND, ENDING THE DIVIDE #3 ISSUES PAPER 14 | JANUARY 2017 CONTENTS OVERVIEW 4 A CITY OF 8M IN 2056: BUSINESS AS USUAL WON’T DO 4 ADDING TO THE SYDNEY DIVIDEND 5 ENDING THE DIVIDE IN A REBALANCED SYDNEY 6 SYDNEY AND THE NEW NATIONAL NARRATIVE ON CITIES 7 PART 1: ADDING TO THE DIVIDEND 8 THE NATIONAL ECONOMIC IMPORTANCE OF SYDNEY 8 SYDNEY’S MOMENTUM CONTINUES 11 SYDNEY STANDS OUT – AND HAS COME A LONG WAY SINCE 2012/13 11 PART 2: ENDING THE DIVIDE 12 WESTERN SYDNEY ON THE MOVE…. 12 BUT THE JOBS GAP REMAINS 12 MEASURING SYDNEY’S DIVIDE WITH EFFECTIVE JOB DENSITY 14 GROSS VALUE ADDED 15 LABOUR PRODUCTIVITY 16 INCOME DIVIDE 17 EDUCATION DIVIDE 17 HEALTH DIVIDE 18 KEEP ON KEEPING ON … 19 PART 3: KEY CITY TRENDS 20 COMPACT SYDNEY AND SPRAWLED SYDNEY 20 THE RE-URBANISATION OF THE ECONOMY AND THE RISE OF INNOVATION DISTRICTS 21 PART 4: A DUAL DEVELOPMENT STRATEGY FOR THE TWO SYDNEYS 22 OUTCOMES TO ADDRESS THE DIVIDE 23 INNOVATION DISTRICTS 23 A MORE WALKABLE SYDNEY IS AN ECONOMIC STRATEGY 23 A MORE WALKABLE SYDNEY IS A HEALTH STRATEGY 24 MODAL SHIFT TO COUNTERACT SPRAWL AND SPATIAL INEQUITY 26 POOR MOBILITY MEANS POOR SOCIAL MOBILITY 27 EXPAND THE RAIL NETWORK 28 INCREASING EFFECTIVE JOB DENSITY 30 THE ‘30-MINUTE SYDNEY’: FROM MOBILITY TO ACCESSIBILITY 30 TOWN-CENTRE RENEWAL AND THE BENEFITS OF ‘DENSITY DONE WELL’ 32 POLICY INITATIVES TO REDUCE THE DIVIDE 33 THE VERTICAL FISCAL IMBALANCE 33 LEARNING FROM THE US? 33 ENTER THE CITY DEAL 33 CITY DEALS AND CITY SHAPING INFRASTRUCTURE 34 VALUE CAPTURE, USER CHARGES AND FUNDING ‘CITY FOLLOWING’ INFRASTRUCTURE 35 CITY GOVERNANCE 36 CONCLUSION 37 2 COMMITTEE FOR SYDNEY TABLE OF FIGURES FIGURE 1.
    [Show full text]
  • APPENDIX Q STAKEHOLDER CONSULTATION REPORT Aurecon
    POWERHOUSE PARRAMATTA ENVIRONMENTAL IMPACT STATEMENT APPENDIX Q STAKEHOLDER CONSULTATION REPORT Aurecon Powerhouse Parramatta Consultation Summary Report Infrastructure NSW May 2020 Contents Executive summary .......................................................................................................................................... 2 Introduction ....................................................................................................................................................... 4 Project status ......................................................................................................................................... 4 Project overview .................................................................................................................................... 4 Project benefits ...................................................................................................................................... 4 Consultation ........................................................................................................................................... 5 Pre-EIS Consultation approach ...................................................................................................................... 6 Communication and engagement objectives ........................................................................................ 6 Engagement framework ........................................................................................................................ 6 Stakeholders
    [Show full text]
  • Northconnex: Subsurface Stratum Acquisition
    Proceedings of the 21st Association of Public Authority Surveyors Conference (APAS2016) Leura, New South Wales, Australia, 4-6 April 2016 NorthConnex: Subsurface Stratum Acquisition Kit Panya Roads and Maritime Services [email protected] ABSTRACT NorthConnex is a proposed 9 km tunnel motorway designed to link the M1 Pacific Motorway in Wahroonga to the Hills M2 Motorway in Pennant Hills. The tunnel is part of the NSW Government’s State Infrastructure Strategy forming an essential link in the Sydney Orbital Network and expected to cost $3 billion. In January 2015, NorthConnex received official project approval by the NSW Government. The earliest access date required for tunnel construction was July 2015. The NorthConnex project team engaged the Roads and Maritime Services (RMS) Cadastral Survey Unit for the stratum acquisition of approximately 900 lots. The acquisition was predominantly subsurface, but also included surface land, strata title, and community title acquisition. Between the project approval date and the tunnel access requirements, we had a timeframe of two months to acquire the first 80 lots in the initial stage. This paper outlines how the RMS Cadastral Survey Unit was able to respond, using a plan production and lodgement strategy unique to previous motorways. With Land and Property Information (LPI), we developed the Subsurface Stratum Definition Strategy to allow for the compilation of boundaries for subsurface acquisition plans. Once the strategy was in place, the extent of acquisition was determined from analysis of spatial data and the tunnel model. Compiled plan production, and occasionally field surveys, could then take place to complete the acquisition process.
    [Show full text]