Catchment Matters

Total Page:16

File Type:pdf, Size:1020Kb

Catchment Matters Issue 5 October 2004 Catchment Matters The newsletter from the Parrett Catchment Project Inside this issue: Communication matters Lobby group consultations - 2 Welcome to Issue 5 of Catchment Matters from the Parrett Catchment Project (PCP), the quar- where does PCP stand? terly bulletin for members, supporters and everyone who wants to hear about the work under- Parrett sluice news 2 way in the Parrett catchment to reduce flood risk and bring water levels under control. Also, out now is Issue 2 of Catchment Matters: Farming Edition, available from the PCP office or website. 2 PCP welcomes a new partner Flood retention 3 Sharing information between members is a key benefit of partnership working, but it’s something demonstrations update that in practice is not so easily achieved. To assist we are developing the PCP website: www. parrettcatchment.info as an information source, where members can submit and access useful 4 Modelling the catchment information, progress updates, PCP policy responses and technical information. A Presentation Are we communicating ? 4 CD is also available from the PCP office. Updated quarterly this assists partners in explaining the whys and wherefores of the Parrett Catchment Project within your organisations and/or to Flood facts 4 external groups. Rising to our next challenge With the JAF ‘Farming Water’ projects well socio-economic change from the Agri- underway the PCP partnership's attention is environment reforms, it has become clear that now turning towards strategy component no. 4: the restoration of natural wetland ecosystems Creation and enhancement of wetland habitats, is vital for the protection of our environment and with very good reason. and also for the benefit of local livelihoods. Although listed in PCP’s action strategy as a PCP believes the wetland ecosystem must play mid to long-term action, pressures from UK a central role in the social and economic devel- government and Europe, together with global opment of the Parrett catchment. The EU 45% of our SSSI’s on the Somerset climate uncertainty, are requiring an urgent fo- Directives and subsequent UK policy will drive Levels are in ‘favourable condition’. cussing of minds and effort towards the Somer- forward the restoration of wetland ecosystems set Levels and Moors. In short these are: on the Levels and Moors, and integrate the way in which our rivers, wetlands and coastal 1. The socio-economic changes that will ecosystems are managed. inevitably result from the reform of the Agri-environment scheme and other PCP will assess what is required to ensure support mechanisms; thriving ‘wider wetlands’ for the long term. Partners will help to achieve favourable condi- 2. The government target to achieve 95% of tions through the delivery of the PCP action Special Sites of Scientific Interest (SSSI’s) in strategy and the EA’s Parrett Catchment ‘favourable condition’ by 2010 under the Water Management Strategy Action Plan The demographics of agriculture on the Habitats Directive. At present approxi- (PCWMSAP). Levels has changed dramatically over the mately 45% of the SSSI’s in the Parrett last 13 years. As the number of farms catchment are in ‘favourable condition’. On some moors, the lowering of penning levels have decreased the size of those English Nature and the Environment Agency in watercourses during the winter can result in remaining have increased. © FWAG will receive full support from the PCP in low winter levels detrimental to life in those their work to achieve this standard; wetlands. Such areas have been identified, prioritised and solutions agreed, ready for 3. The need for inland and coastal waters to implementation. be managed on a river basin scale and to reach ‘good status’ by 2015 under the EU Through the PCWMSAP, partners have com- Water Framework Directive. A number of mitted themselves to meet the requirements of sub-catchments in the Parrett catchment the national, regional and local Biodiversity are ‘at risk’ of failing WFD objectives. Action Plan through the development of a wise use concept in the wider wetland landscape of As we face the pressures of global climate the catchment, and the instigation of specific change with the increased risk of flooding, and management actions. Page 2 Catchment Matters Lobby group consultations Many of the PCP’s ideas The PCP Lobby Group's mission is to achieve ment-Sensitive Farming Programme: taking for- national and regional policies that will further ward the Strategic review of diffuse water pollu- can be carried out on the delivery of PCP's components by respond- tion from agriculture.) DEFRA invited views on the ground using ing to formal consultations as well as taking the approach and possible measures to improve existing policies and every opportunity to raise the issues in national water quality through catchment-sensitive farm- resources, but there are and regional fora. ing. policies that need to be On the lobby group's agenda at the moment Formal Consultation on the draft new EU Rural improved or modified to are three key consultation documents: Development Regulation (deadline Nov 12th). help us deliver our The draft new EU Rural Development Regula- objectives. "Making Space for Water" is the consultation tion was published by the European Commis- on a new Government strategy for flood and sion on 15 July 2004. The Regulation forms the coastal erosion risk management in England for second pillar of the Common Agricultural Pol- the next twenty years (deadline November). icy. PCP needs to ensure that measures to en- The last national Strategy for Flood and Coastal courage farmers to retain water on their land Defence was published in 1993 and now needs are included in the final version of the Environ- revising. The full consultation document is avail- mental Stewardship scheme. able from www.defra.gov.uk/corporate/consult/ waterspace. For a copy of PCP's responses visit the PCP website. If you would like to join the group Developing measures to promote catchment- please contact Humphrey Temperley at: sensitive farming in England (within the Catch- [email protected] Parrett sluice news A tidal sluice at Bridgwater has been an aspira- So far the Environment Agency has committed tion for over a century. Many believe it is now £300,000 to completing the feasibility studies the most sustainable option for the future man- by April 2005 and Somerset County Council, agement of the Parrett, by increasing flood dis- Sedgemoor District Council and Taunton charges, maximising flood storage and reducing Deane Borough Council are committed to rais- the need to pump. It would be a more eco- ing £100,000 to look at the wider economic nomical option than raising 30 km of tidal banks benefits of the sluice. These will provide Wes- as sea levels rise. By reducing the flood risk and sex Regional Flood Defence Committee with Stakeholders visiting Dunball to discuss potential issues of a sluice improving the visual appearance of the town, it the information to decide whether to go ahead could transform the economy of Bridgwater. with the project, and apply for national funding. But, there are a number of serious environ- Meanwhile a local group, the Tidal Sluice Part- mental concerns, and any sluice would have to nership, has been set up to inform the commu- be designed and managed to enhance the nature nity and seek local partnership funding for the conservation interests of the affected moors. scheme. This group brings together the key partners under the chair of Francis Cornish. PCP welcomes new partner The South Somerset Hydropower Group was This is a pilot project for the rest of the coun- formed in 2001 as a group of 10 mill owners try, and already other groups are forming in interested in using historic water mill sites for different areas. When all 10 mill sites are generating electricity. With the aid of grants generating it is hoped to produce over 600,000 from the Energy Saving Trust and South West- kWh per year, enough to power 150 average ern Electricity Board feasibility studies have sized houses. been completed, and the first mill is now gener- ating electricity. The remaining mills are ex- The South Somerset Hydropower Group Gants Mill, Bruton - producing their own electricity. pected to start generating in 2005. supports the Parrett Catchment Project in mak- ing best use of all the water resources within Visit their website Within the PCP area the mills involved are the Parrett catchment area. www.gantsmill.co.uk Court and Nimmer mills on the Isle, Carey’s and Thorney mills on the Parrett, and Hinton For more info. about the South Somerset and Hainbury mills on the Yeo. Hydropower Group contact Stephen Bartlett at [email protected] Issue 5 Page 3 Update on PCP’s flood retention demonstrations With the lengthy and almost imperceptible If you would like to find out more about these phase of negotiations, licences, agreements, demonstration projects e.g. what PCP hopes to tendering and contracts completed on three of achieve through them or the project manage- the ‘Farming Water’ demonstrations we are ment or engineering aspects do contact us. pleased to be able to report that the exciting phase of ground works has now commenced. Dan Alsop the project engineer is also happy to lead site visits and conduct presentations for In this article we are reporting on two of the groups. All the parish councils affected by these schemes that are now underway. schemes have been offered this service. Bower Hinton Scheme The c. £37,000 scheme at Bower Hinton outlet pipe embankment construction Farm, Martock, commenced on 7th Septem- ber 2004. The following 7 days (including 3 days of torrential downpours) saw the contractor (JTT of Exeter), complete scrub clearance and topsoil stripping, dig 60% of the pond, lay the outlet pipe and begin “Farming at Bower Hinton construction of the embankments (see all my life I have often photos 1 & 2).
Recommended publications
  • Pitcombe WARD: TOWER DESCRIPTION: Use of Land for Siting of a Marquee from 15Th April to 15Th October Annually
    OFFICER: Andrew Collins 01935 462276 APPL.NO: 07/05484/COU APPLICATION TYPE: Change of Use PARISH: Pitcombe WARD: TOWER DESCRIPTION: Use of land for siting of a marquee from 15th April to 15th October annually. GR (367484/134256) LOCATION: Gants Mill Gants Mill Lane Bruton Somerset BA10 0DB APPLICANT: Mr And Mrs Shingler AGENT: Mr D Carpendale Brimble Lea & Partners Wessex House High Street Gillingham Dorset SP8 4AG DATE ACCEPTED: 30 November 2007 Reason for Referral to Committee The proposal is brought to committee at the request of the Chairman due to amount of public interest and as he feels there is a case both for and against the application. Site Description and Proposal The site is located outside of the development area. The mill is Grade II* listed and the dwelling and other buildings on the site are Grade II listed. A Certificate of Lawfulness for a Proposed Use or Development was granted which considered that the use of wedding ceremonies and receptions for 28 days in any year was lawful. However, a informative was attached to the decision that said that any marquee could only be left on the site for 28 days in any year and would need to be taken down between events. Meeting: AE10A 07:08 20 Date: 13.02.08 It is now proposed to retain the marquee on site between 15th April and 15th October. No elevation details have been submitted but the block plan shows a red line measuring 24 metres by 12 metres. History 03/00047/LBC - The installation of additional turbine and generator within mill building - Application permitted with conditions - 10/11/04 07/04428/COL - Application for a Certificate of Lawfulness for the proposed use of land for not more than 28 days in total in any calendar year for wedding ceremonies and receptions - Application Permitted - 19/11/07.
    [Show full text]
  • Micro Hydro Power
    Water power in the South Pennines How to develop a micro hydro scheme Contents 1. OUR HERITAGE 2. INTRODUCTION TO MODERN HYDRO 3. FEASIBILITY STUDIES 4. CAPACITY 5. EQUIPMENT 6. PERMISSIONS 7. THE FINANCIAL BIT 8. LEGAL STRUCTURES 9. OTHER DEVELOPMENT OPTIONS 10. CASE STUDIES © Power from the landscape 2009 1 1. OUR HERITAGE From the earliest times, water power has provided a pivotal role in the development of the South Pennines; from the early corn and fulling mills to the growth of the early Industrial Revolution of the late 18th and early 19th centuries. In the early 1800s water was powering upwards of 100 mills in the upper Calder Valley alone. From the 1840s onwards, it was used to complement steam power and was still being used in some mills well into the 20th century. The evidence is permanently disappearing as the mills shut down, the mill ponds and goits dry up and the landscape changes back to its natural state. At present there are still small fragmented, tantalising clues to this not so distant past in the landscape itself. Our energy needs now are far greater than in the past and water levels have dropped significantly, but new technology can be used to harness the power that once turned the waterwheels. Power from the Landscape aims to make water power a common feature of the landscape once again It has the potential to provide a useful contribution to the power mix of the area, and it is a clean, readily available, environmentally friendly resource, with great heritage and community value.
    [Show full text]
  • Bruton Circular (Via Hauser & Wirth Somerset) Or from Castle Cary
    Bruton Circular Castle Cary to Bruton 1st walk check 2nd walk check 3rd walk check 1st walk check 2nd walk check 3rd walk check 17th June 2017 17th June 2017 Current status Document last updated Saturday, 11th September 2021 This document and information herein are copyrighted to Saturday Walkers’ Club. If you are interested in printing or displaying any of this material, Saturday Walkers’ Club grants permission to use, copy, and distribute this document delivered from this World Wide Web server with the following conditions: • The document will not be edited or abridged, and the material will be produced exactly as it appears. Modification of the material or use of it for any other purpose is a violation of our copyright and other proprietary rights. • Reproduction of this document is for free distribution and will not be sold. • This permission is granted for a one-time distribution. • All copies, links, or pages of the documents must carry the following copyright notice and this permission notice: Saturday Walkers’ Club, Copyright © 2017-2021, used with permission. All rights reserved. www.walkingclub.org.uk This walk has been checked as noted above, however the publisher cannot accept responsibility for any problems encountered by readers. Bruton Circular (via Hauser & Wirth Somerset) or from Castle Cary Start: Bruton Station Finish: Bruton station Bruton Station, map reference ST 687 347, is 45 km west of Salisbury, 31 km south of Bath and 168 km south west of Charing Cross. It lies 72m above sea level. Castle Cary Station, map reference ST 635 335, is 5 km south west of Bruton and 43m above sea level.
    [Show full text]
  • Sprainting Site Preference of European Otter, 2011
    2011 Research Project Word Count 5000 excluding tables Jo Pearse INVESTIGATION INTO SPRAINTING SITE PREFERENCE OF EUROPEAN OTTER LUTRA LUTRA [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] Contents Page Chapter 1 Introduction 1.1 Aim 1.2 Study site 1.3 Hypothesis Chapter 2 Literary Review Chapter 3 Method 3.1 Landscapes 3.2 Otter signs 3.3 Table of methodology Chapter 4 Results 4.1 Habitat 4.1.1 Standard symbols for use in River Corridor Surveys 4.1.2 7km stretch of the Brue centred on Bruton 4.1.3 4.1.3 River Corridor Map 1 and Notes 4.1.4 River Corridor Map 2 and Notes 4.1.5 River Corridor Map 3 and Notes 4.1.6 River Corridor Map 4 and Notes 4.1.7 4km stretch of the Alham at Alhampton 4.1.8 River Corridor Map 5 and Notes 4.1.9 River Corridor Map 6 and Notes 4.1.10 River Corridor Map 7 and Notes 4.1.11 River Corridor Map 8 and Notes 4.2 Otter surveys 4.2.1 Background 4.2.2 Main site surveys 4.3 Water testing 4.4 Environment Agency data 4.5 Biological monitoring 4.6 Otter prey – fish data Chapter 5 Discussion 5.1 Habitat 5.2 Otter surveying Jo Pearse 2 5.3 Water analysis 5.4 Biological monitoring 5.5 Pollution events 5.6 Fish availability Chapter 6 Conclusion 6.1 Hypothesis 6.2 Recommendations for further study Chapter 7 References Chapter 8 Appendix 8.1 Oxygen and temperature data 8.2 Nutrient and chemical analysis 8.3 pH levels data 8.4 Otter spraint surveys 8.5 Macroinvertebrate surveys 8.6 Environment Agency fish data 8.7 Environment Agency chemical and nutrient data 8.8 Environment Agency – various 8.9 DNA study 8.10 Total Brue catchment 8.11 Map from 2 day Somerset Otter Group Survey 8.12 Letter from Agency Agency 8.13Risk Assessment Jo Pearse 3 1.Introduction 1.1 Aim To analyse patterns of otter (lutra lutra) sprainting in relationship to the ecology of the environment by investigating and comparing two sites, one known to be used by otters, the other absent of otter signs.
    [Show full text]
  • Peripheral Landscape Study Bruton
    Peripheral landscape study – Bruton Conservation and Design Unit South Somerset District Council March 2008 Peripheral landscape study - Bruton Page No: Contents – 1. Background to study 3 2. The settlement 4 3. Landscape character 5 4. Landscape sensitivity 8 5. Visual sensitivity 10 6. Values and Constraints 13 7. Landscape capacity 14 8. Proposals 15 9. Appendices 17 (1) - capacity matrix (2) - historic landscape character (3) - photos (1-10) 10. Plans - 1) site context and study area - 2) landscape character sensitivity - 3) visual sensitivity - 4) values and constraints - 5) landscape capacity Page 2 of 18 Peripheral landscape study - Bruton 1) Background to the study: 1.1. The forthcoming South Somerset Local Development Framework (LDF) will be required to allocate new development sites for both housing and employment for the period 2006-2026, with the focus of major growth placed upon Yeovil, thereafter the district’s major towns and rural centres. As part of the process of finding suitable sites for development, a landscape study to assess the capacity of the settlement fringe to accommodate new development in a landscape-sympathetic manner, is commissioned. This will complement other evidence-based work that will contribute to the LDF process. 1.2 PPS 7 commends the approach to the identification of countryside character developed by the Countryside Agency (now Natural England) and suggests that it can assist in accommodating necessary change due to development without sacrifice of local character and distinctiveness. National
    [Show full text]
  • Pitcombe Parish Plan 2015
    Pitcombe Parish Plan 2015 19th March 2015 FOREWORD The IP summarised the mainly relevant points of the SSDC Local Plan, which at that time was in the process of re-drafting to take on board latest Government legislation as referred to above. Much of what was stated in the Local Plan then, at least as it applies at our level, has broadly survived into the final SSDC Local Plan THE STATUS OF CURRENT PARISH PLANNING (Feb 2015). However, for completeness, and as a ready reference important to the understanding of implications at our level, relevant aspects of the SSDC Local Plan Where are we? 2015 have been extracted into Annex A. This is a draft of a new Pitcombe Parish Plan 2015, the aim of which is to provide The intention is that Parish Plan 2015 is to take account of, and analyse, the new an opportunity for residents to study and have input before it is finalised. information and its impact and provide more robust conclusions for determining how Pitcombe parish sees its future, and how it intends to influence decisions. The Initial Plan (IP), launched in 2014, was based on analysis of responses by residents to a Questionnaire covering specific issues. This provided a platform for Why create a new parish plan? the development of wider ranging and longer-term policy, which is the intended focus for Pitcombe Plan 2015. Some of the content of the IP is repeated in The Localism Act offers communities more control in the future over their areas, appropriate sections of this plan to preserve extant analysis and provide linkage.
    [Show full text]
  • Local Environment Agency Plan
    local environment agency plan BRUE AND AXE CONSULTATION REPORT JULY 1997 E n v ir o n m e n t Ag e n c y Ninonil Information Centre The Environment Agency Rio House Waterside Drive Aztec West BRISTOL BS1 2 +UD Due for return FOREWORD this Local Environment Agency Plan represents a significant step forward in environmental thinking. It has been clear for many years that the problems of land, air and water, particularly in the realm of pollution control, cannot be adequately addressed individually. They are interdependent, each affecting the others. The Government's answer was to create the Environment Agency with the umbrella responsibility for all three. The role and duties of the Agency are set out in this Consultation Report. This holistic approach is now reflected in this Plan. It is a logical development of the Catchment Management Plans prepared by the former National Rivers Authority, now subsumed into the new Agency. It sets out the environmental problems of the area in a way which has not been done before, and suggests the most important issues which should now be addressed. It is, I believe, vital reading for everyone concerned with the future of North Wessex. The catchment of the Rivers Brue and Axe encompasses a varied and complex environment, which includes a major part of the important Somerset Levels and Moors. The Plan covers all the work of the Environment Agency - water management, waste regulation and the control of heavy industrial processes. We look forward to hearing your views on the many environmental issues discussed here and I hope that with the help of our partners we can work towards a better environment in this area.
    [Show full text]
  • SHTAV NEWS HISTORIC TOWNS and VILLAGES 2005 Issue Number 3 of the UK
    JOURNAL <ii the ASSOCIATION OF SMALL SHTAV NEWS HISTORIC TOWNS AND VILLAGES 2005 Issue Number 3 of the UK SUMMER PARTY IN BRUTON On other pages Chipping Campden Landmark Trust Tribute to Dr H.Lane ASHTAV Local miscellany The Inspector Says.. Protect your ATM Summer Party Hydrology Revisited eritage Link thinks Monkey Bikes Anne's Solar Dream Visit to a Brickworks Can't compute ... ASHTAV Where have All .... Fordingbridge AGM 23 Lanes, Boutique Park 24 ASHTAV AGM SATURDAY 22nd OCTOBER I-OR ") NGBR L)GE DO PLEASE TRY TO ATTEND ORE DETAILS ON TH BACK COVER PARTY PROGRAMME NETWORK LUNCHEON THE BULL BRUTON: THE INSIDE STOIO JOHN BISHTON CANTS MILL HYDROLOGY MILLING GARDEN PARTY TEA ustus more coverage on the centre page merchant in Chaucer's 'Canterbury CHIPPING Talcs': CAMPDEN i OVlt/rc/ii/tit n-a.it/ior m't/i fcrfiut! fjortf, Herbert Lane's ,'jn rnotiU'fcyv /tJtrf/tyi} cji fyeTSB Itv ■Mil-, resting place Coijcji itU iwL'ifa FfauiiiCru.i&li Eovvr {tut, 7Jis£oota cftiApoiTjidre luufjl'tris/y; "1 thank God and ever shall *Jji.i rociis fia sjiufijai<scfomj3tiefy, It is the sheepe hath payed wcuiiujiqe a/way t/uyjicrco c(~/ih uy for all." What were Chipping Campden's qualities that enticed Herbert Lane to live there? His library and his meticulous notes reveal just how much he knew about small towns across Europe and bow passionately he cared for them. He had read G.M.Trevelyn's description of Campden : "the most beautiful village street now left in the island". An inveterate traveller by public transport, he possessed first-hand knowledge of so many places, so what extra dowry did Chipping Campden bring to their marriage? Chipping Campden is remarkable for it has remained the same size tor seven hundred years.
    [Show full text]
  • 5 Understanding Flood Risk In
    5 Understanding flood risk in MDC One of the key purposes of this SFRA is to identify the influential local flood risk issues and to summarise recorded local flood incidents and predicted flood risk to the area. Flood risk can arise from a variety of different sources, as described within this section. Often however, flooding originates from a combination of courses as flood mechanisms are integrated. 5.1 How flood risk is assessed A flood is now formally defined in the Flood and Water Management Act (2010) as “any case where land not normally covered by water becomes covered by water”. The Act also states that a flood, as defined above, can be caused by: • Heavy rainfall • A river overflowing, or its banks being breached • A dam overflowing or being breaches • Tidal waters • Groundwater • Anything else (including a combination of factors) In the context of the FWMA (2010) a flood does not include: • A flood from any part of a sewerage system, unless wholly or partly caused by an increase in the volume of rainwater (including snow and other precipitation) entering or otherwise affecting the system • A flood caused by a burst water main (within the meaning given by section 219 of the Water Industry Act 1991) The FWMA (2010) states that flood risk “means a risk in respect of flood”, where risk is “assessed and expressed (as for insurance and scientific purposes) as combination of the probability of the occurrence with its potential consequences”. Thus, it is possible to define and express flood risk as: Consequences Flood Flood Receptor Receptor = Probability X Hazard X presence X Vulnerability Risk Magnitude 5.2 Historical flooding Mendip District has a history of documented flood events with the main sources being from fluvial flooding, with surface water flooding also significant.
    [Show full text]